Attachment A 6
Attachment A 6
i 9                The safety organizations (Nuclear Safety 'Consnittee, IRAG, ' NSPED) will all be staffed and functioning as shown on the chart four months prior to fuel loading.      It' should be noted that ORSO has- been functioning as an organizational unit since 1977 and will continue to function through fuel loading and beyond. :IRAG will be organized -and functioning six -
i 9                The safety organizations (Nuclear Safety 'Consnittee, IRAG, ' NSPED) will all be staffed and functioning as shown on the chart four months prior to fuel loading.      It' should be noted that ORSO has- been functioning as an organizational unit since 1977 and will continue to function through fuel loading and beyond. :IRAG will be organized -and functioning six -
Line 109: Line 108:
a 4,      - Rehabshty Data 3        - Audit Leaders j        - NRC Reports & Letters                                                                                                                              .
a 4,      - Rehabshty Data 3        - Audit Leaders j        - NRC Reports & Letters                                                                                                                              .
           - Problem Solving Leaders i
           - Problem Solving Leaders i
    ;                  ..


;
i                                                                                                                                                                                                                                                  .
i                                                                                                                                                                                                                                                  .
Matrixed from General                                                                                                                                      ~
Matrixed from General                                                                                                                                      ~
Line 136: Line 133:
                                                                                                                                                                                                                 - ARMS i'
                                                                                                                                                                                                                 - ARMS i'
i 4
i 4
l
l t
;
t


d
d
Line 144: Line 139:
4                                                                                                                                                          #
4                                                                                                                                                          #
4 1
4 1
4
4 Chart 4 i
;
Chart 4 i
i Director Outage Management
i Director Outage Management
;                                                                                                  2                  5 4
;                                                                                                  2                  5 4
Line 155: Line 148:
i
i
                   ~                                                      -Maintenance Contractor
                   ~                                                      -Maintenance Contractor
                                                                           -Specialbes Contractors
                                                                           -Specialbes Contractors 1
;
4 l
1 4
4 4
l 4
i e
4 i
S i.
e S
i.
4 1
4 1
i 4
i 4
Line 222: Line 213:
                                                                                                 - Procedures i                                                                                              -Schedule
                                                                                                 - Procedures i                                                                                              -Schedule
                                                                                                 - Budget I                                                                    .I
                                                                                                 - Budget I                                                                    .I
)      [3 General Supennsor
)      [3 General Supennsor General Supervisor            General Supervisor 1          Nuclear Safety &                  Nuclear Technology                    Nuclear Fuel Plant Engmeering 4                  28                                    19                                    18 l
;
i                Ch 6A                                Ch CB                            Ch 6C i
General Supervisor            General Supervisor 1          Nuclear Safety &                  Nuclear Technology                    Nuclear Fuel Plant Engmeering 4                  28                                    19                                    18 l
J n
i                Ch 6A                                Ch CB                            Ch 6C
4 1
;
4 4
i J
l
n 4
1 4
4 l


i Chart 6A Matrixed frorn                                              2 Nuclear Quality Assurance                                          General Superwsor i                                                            Nuclear Safety &
i Chart 6A Matrixed frorn                                              2 Nuclear Quality Assurance                                          General Superwsor i                                                            Nuclear Safety &
I                                                            Plant Engwieering I
I                                                            Plant Engwieering I
Y 4                          m I
Y 4                          m I
;
I 1
I 1
I                              'I                                                I Superwsor Supenrism Engineenng Asswance Supenrism New issues Safety &
I                              'I                                                I Superwsor Supenrism Engineenng Asswance Supenrism New issues Safety &
Line 247: Line 234:
j                                                                                                                                                                                                                                                                                                                  .-
j                                                                                                                                                                                                                                                                                                                  .-
I i
I i
i
i 1
;
1
;


i
i r
;                                                                                                                                                                                          -
1 1
r 1
j Chart 6B 1
1 j
Chart 6B 1
i Nuclear Technology 2                              19 d
i Nuclear Technology 2                              19 d
i i                                                                                                        Group Leader                                        Group Let%r
i i                                                                                                        Group Leader                                        Group Let%r
Line 270: Line 252:
!                                                                                                                                                              -Meteorlogical i
!                                                                                                                                                              -Meteorlogical i
e 1
e 1
;
1 I                                                                                                  e4 t
1 I                                                                                                  e4 t


;
Chart 6C                                          -
Chart 6C                                          -
32 j
32 j
Line 333: Line 313:
                                                                                                                                                                     * "P I
                                                                                                                                                                     * "P I
I Manager Nuclear                            n Operations I
I Manager Nuclear                            n Operations I
I                              I                      I                            I                        I              I Director                                          Director                            Director                      Director                                  Drector Nuclear Quality                          w          Outage                              Nuclear                                                         *
I                              I                      I                            I                        I              I Director                                          Director                            Director                      Director                                  Drector Nuclear Quality                          w          Outage                              Nuclear
;
* D@trat                                                                                Nuclear                              Nuclear Plant Assurance nis                                                                                                                a l Management                              Training        j Engineenng                  p            Modfications 1
D@trat                                                                                Nuclear                              Nuclear Plant Assurance nis                                                                                                                a l Management                              Training        j Engineenng                  p            Modfications 1
I                  I                I echn.                uel Satyk +              OSRO  Onsite Review Organization l [I^"I, wo L
I                  I                I echn.                uel Satyk +              OSRO  Onsite Review Organization l [I^"I, wo L


Line 422: Line 401:
9 DATE: June 1, 1981 NAME OF GROUP: LICENSED OPERATORS MINIMUM                      TOIAL #            %
9 DATE: June 1, 1981 NAME OF GROUP: LICENSED OPERATORS MINIMUM                      TOIAL #            %
EXPECTED              INDIVIDUAIS            TRAINING
EXPECTED              INDIVIDUAIS            TRAINING
;
                                                               # DAYS / PERSON        TO BE 'IRAINED          COMPIETED IMPLDENIED PROGRAMS                ,
                                                               # DAYS / PERSON        TO BE 'IRAINED          COMPIETED IMPLDENIED PROGRAMS                ,
ACADEMIC REFRESHER                              20                          18              100 BASIC NUCLEAR                                  60                          18              100 GENERIC SYSTENS AND PRCCEDURE3                  10                          20              100 SAFE 1Y TAGGING                                  1                          20              100 FIRST AID /CPR                                  2                          -20              100 RESEARCH REACICR                                8                          20              100 BWR TECHNOIOGY                                  20                          20              100 BWR SIMUIATOR                                  40                          20              100
ACADEMIC REFRESHER                              20                          18              100 BASIC NUCLEAR                                  60                          18              100 GENERIC SYSTENS AND PRCCEDURE3                  10                          20              100 SAFE 1Y TAGGING                                  1                          20              100 FIRST AID /CPR                                  2                          -20              100 RESEARCH REACICR                                8                          20              100 BWR TECHNOIOGY                                  20                          20              100 BWR SIMUIATOR                                  40                          20              100
Line 511: Line 489:
Since then, approximately 24 prospective employes have ~ caen interviewed.
Since then, approximately 24 prospective employes have ~ caen interviewed.
Offers of employment have been made to about 17 of these people and about eight of these individuals will be starting work within the next.two months. These eight individuals include one Water Plant Technician, one-
Offers of employment have been made to about 17 of these people and about eight of these individuals will be starting work within the next.two months. These eight individuals include one Water Plant Technician, one-
;            Chemistry Technician, one Ph.D. Haalth Physicist, one Environmental
;            Chemistry Technician, one Ph.D. Haalth Physicist, one Environmental Engineer, three Health Physics Technicians and one degreed Chemistry / Health Physics training specialist.
;
Engineer, three Health Physics Technicians and one degreed Chemistry / Health Physics training specialist.
The recruiting effort has included contact 1with numerous nationwide
The recruiting effort has included contact 1with numerous nationwide
!            employment agencies, direct contact with associates in the nuclear industry, recruiting trips to various conferences, San. Francisco and Seattle.
!            employment agencies, direct contact with associates in the nuclear industry, recruiting trips to various conferences, San. Francisco and Seattle.
Line 520: Line 496:
g      --my, e    wy--.ev'-,p.-      y    p w t+Ny-,+g-v--, - -e - y-g ,---,m yey ,--,- yg g.e c y
g      --my, e    wy--.ev'-,p.-      y    p w t+Ny-,+g-v--, - -e - y-g ,---,m yey ,--,- yg g.e c y


_;.
Attachment D 4.
Attachment D 4.
                     ~
                     ~
Line 531: Line 506:
Internal to Radchem, we will soon have two individual who will; dedicate the majority of their time to developing Radchem training in cooperation with our Nuclear Training Department. One individual has a B.S. Degree (Chemistry) with two years of experf ince in developing and conducting Health Physics and Chemistry training for the General Electric Company.
Internal to Radchem, we will soon have two individual who will; dedicate the majority of their time to developing Radchem training in cooperation with our Nuclear Training Department. One individual has a B.S. Degree (Chemistry) with two years of experf ince in developing and conducting Health Physics and Chemistry training for the General Electric Company.
The other individual is a Ph.D. Health Physicist and will dedicate much of his time to providing subject. matter for the Health Physics theory and analysis.
The other individual is a Ph.D. Health Physicist and will dedicate much of his time to providing subject. matter for the Health Physics theory and analysis.
BACKUP RPM It is Detroit Edison policy that there will be backup for all important company positions. A long term r.atomated personnel management program is in operation to meet this policy. The Radiation Protection Manager is considered a very important company position. Two indivir als presently in the Radchem section l    can quality as the backup RPM in the absence of the General Supervisor-Health Physics. These individuals are the Radchem Engineer and one technician who will l    soon be promoted to Health Physics Supervisor-Operations (this individual should
BACKUP RPM It is Detroit Edison policy that there will be backup for all important company positions. A long term r.atomated personnel management program is in operation to meet this policy. The Radiation Protection Manager is considered a very important company position. Two indivir als presently in the Radchem section l    can quality as the backup RPM in the absence of the General Supervisor-Health Physics. These individuals are the Radchem Engineer and one technician who will l    soon be promoted to Health Physics Supervisor-Operations (this individual should be qualified in six to nine months).
;
be qualified in six to nine months).
We are presently attempting to recruit two people with at least a B.S. Degree in Health Physics and/or as much practical and professional operating experience as possible. These individuals would, in time, meet the requirements of the RPM.
We are presently attempting to recruit two people with at least a B.S. Degree in Health Physics and/or as much practical and professional operating experience as possible. These individuals would, in time, meet the requirements of the RPM.
In addition, we have already hired a Ph.D. in Health Physics whose educational                .
In addition, we have already hired a Ph.D. in Health Physics whose educational                .
Line 592: Line 565:
l                H.I.A.1.1.2          NRC Position Each licensee shall provide an onshift technical advisor to the
l                H.I.A.1.1.2          NRC Position Each licensee shall provide an onshift technical advisor to the
* l                  shift supervisor. The shift technical advisor may serve more i
* l                  shift supervisor. The shift technical advisor may serve more i
;
than one unit at a multiunit site, if c,ualified to perfocm the advisor function for the various units.
than one unit at a multiunit site, if c,ualified to perfocm the advisor function for the various units.
(  )        The shift technical advisor shall have a bachelor's degree or
(  )        The shift technical advisor shall have a bachelor's degree or
Line 637: Line 609:
   ]
   ]
'l 4 N
'l 4 N
;<
'i                                                                                                                                    .
'i                                                                                                                                    .
'i
'i
Line 674: Line 645:
                       -w,                      w                o    y    -es--- g ,  w v  ,  m
                       -w,                      w                o    y    -es--- g ,  w v  ,  m


;
f        .-
f        .-
4 l
4 l

Revision as of 19:16, 17 February 2020

Forwards Response to 810521 Licensee Qualifcation Audit. Encl marked-up FSAR Pages Will Figure in Forthcoming Amend
ML20004C843
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 06/03/1981
From: Heidel C
DETROIT EDISON CO.
To: Kintner L
Office of Nuclear Reactor Regulation
References
EF2-53-432, NUDOCS 8106050487
Download: ML20004C843 (40)


Text

{{#Wiki_filter:; .

    /                                            .-a Harry Tauber                         iN Ng $ h no consnucson          \,           N Detroit
 ,Cdi    n $ No$.*if $ o^a U s*228
                                           & G[           'Q[2.

wu 1 i taia) 237-e000 g3.g0,.7g g r-

                                           )h        '

6 June 3, 1981

                                           \%'f                  EF2 - 53,432 Mr. L. L. Kintner Division of Project Management Office of Nuclear Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Kintner:

Reference:

Enrico Fermi Atomic Power Plant, Unit 2 NRC Docket No. 50-341

Subject:

Detroit Edison Response to the Licensee Qualification Audit During the exit critique of the Licensee Qualification Audit on May-21, 1981, the audit team identified five areas of concern. In addition, the team had several questions concerning a draft revision of Chapter 13 of the FSAR. The attachments document the NRC concern or request and Detroit Edison's response to each. Where appropriate, marked up pages of the FSAR have been included and will be formally amended in a forthcoming FSAR amendment. It is our understanding that the sub-mission of the attached responses satisfies the concerns and will be sufficient to allow preparation of the appropriate Safety Evaluation Report sections. Sincerely, ( ^\ " u Attachments 0 0' bi cc: B. Little t I 810605 0 A .

+ 9 Attachment A. 4 NRC CONCERN

1. Plant ana Corporate Staffing NRC is concerned about the lack of proper staffing. At present-there are 160 people-in Nuclear Operations, and the planned staff should include 490 people. There are many key positions still open. The Plant' staff shculd be functional not later than six months before fuel load in order to have a smooth operating organization.

DETROIT EDISON RESPONSE In order to provide sufficient experience as an operating organization, The Detroit Edison Company will have the essential elements of its Nuclear 4 Operations Organization in place from four to six months prior to fuel loading. The specific plan to meet this commitment is as follows-(see attached organization charts): Chart No. Commitment 1 All positions except the Director-Quality Assurance, The Director-Outage Management and the Director-Nuclear Plant Modifications are in place as of the present time. The Director-Quality Assurance will be in place and functioning within the next several months, but the Director will ' report to the Manager-Quality Assurance until four months prior to fuel loading, at which time the Director will report to the Vice President-Nuclear Operations. 2 These functions are presently being performed by the Project Quality Assurance Organization and Fermi PMO. The functionally comparable supervisory positions will' be filled and reporting to the Director-I Quality Assurance by December 1981. The organization will;be functioning and reporting to the Vice President-Nuclear Operations four months prior to fuel loading. 3 All supervisory positions will be filled six months prior to fuel loading and the organization - functioning according to the . plan four months prior to fuel loading. 4 This organizational unit will be in place at fuel loading and is not needed until that' time because the Fermi 2 PMO is performing this i function for the project as well as for Nuclear Operations. 1 GED/15/6. m.

                   +
                     +-e-- ---g e - - - - - e=r.w e       ,   ,.y- e      e y-  ,-w,   ,m., +,,y--, +v - m- % A   y y--.-   .-

Attachment A , 5 The couplete organizational unit covering the simulator does not have to be in place until the simulator is delivered to the site (scheduled for 1983). The other supervisory positions 'will be in place by December

                  - 1981 in order to meet .the training requirements prior to fuel loading.

6 All supervisory positions are filled -now, and will be functioning' four months prior to fuel loading. 6A The supervisory positions in Nuclear Safety and Plant Engineering will . be filled and functioning at least four months prior to fuel loading. 6B These positions will be , filled to about 50 percent of the specific complement six months prior to-fuel loading, and the remaining needs will be filled as they arise. A large number of - these needs are beiag covered in the interim by the Generation Engineering Department and the Engineering Research Department of Detroit Edison as well as by outside - consultants. 6C Those supervisory positions will be in place and functioning at fuel loading. Most of the functions shown on this chart are presently being performed in the Nuclear Engineering Division of the Generation Engineering Department, and many of them will be transferred to Nuclear Operations before December 1981. All comparable supervisory positions have been filled and functioning since 1978. Significant programs now moving under the responsibility of the Vice President-Nuclear Operations as described in the accompanlying charts have been under development during the past four years including the anticipated required procedures. 7 All key positions will be filled as indicated on the attached pages 13.1-29,30 (Part of Attachment F) of the FSAR. Basically all key positions will be filled six months prior to fuel loading except for personnel performing compatible startup activities which will continue until commercial operation. Ninety percent of the complement of Nuclear Production will be filled four months prior to fuel loading. 8 This function is now being performed by the Fermi 2 PMO. It will continue to be performed by the PMO, but organized along the lines on Chart 8, and report to the Manager-Nuclear Operations at fuel loading. GED/15/6.1 gi,- w-. p .y v - e m , _-<a, my,- _ g--. gyyg-4__-. --- - . - -m9 .-,r4- m e

Attachment A 6 i 9 The safety organizations (Nuclear Safety 'Consnittee, IRAG, ' NSPED) will all be staffed and functioning as shown on the chart four months prior to fuel loading. It' should be noted that ORSO has- been functioning as an organizational unit since 1977 and will continue to function through fuel loading and beyond. :IRAG will be organized -and functioning six - months prior. to fuel loading. The presently scheduled fuel load date is November 1982. : Most of the conunitments made are based on that schedule date; however, if for any reason that date is delayed, such as prolonged hearings, the commitments will be tied to the new fuel load date. i l I i f l GED/15/6.2 i

           ~ . - . - - -   ,    ---,$.< -,e9 ,             -,-m, g,e e - . - - - - r,, - , -- . . - ye- c. .,    + - - , --- ,   --v-- v . e y-

l Nuclear Operations Organization Chart 1 Level-e- " spea -

;                                                                                                                                                                                                      o 7

Ce Vice President , Nuclear Operations 2 W.H. Jens 4g0 6 Ma @ Nuclear i Operations a W.R. Holland 4.3 l I i l l l l 1 2 Director a 2 d 5 Direct ~ Director 3 Director Director Plant 5 Director Quality Adtrunestration Outage Nuclear Nuclear Superintendent Nuclear Plant Assurance Management Training Engineering Nuclear Modifications 4 26 5 Produchon 117 2 5 4 26 4 65 4 233 2 8 l

Ch 2 Ch 3 Ch4 Ch 5 Ch 8 Ch 7 Ch 8 i
                                                                                                                                                                *Not inch _=*ng 74 security and medcalpe sonnel 4

4 4

                                                                                       .4 1

l I l . l l l CMd2 - ( . 2 l Director Quality Assurance ! 4 26 i Matrixed to Nuclear Production i i Matrixed to Matrixed to Maintenance Matrixed to I Nuclear Engineenng

                               & Piar,t Modifications                 Material Controls i

I and Gen. Engr.

 ,                                        JL                                 {                    A t
                                                                                                                                              ;i I                    I e                                 i                    a                                            a
'                                          i                                 l                    i                                            i I                                 I                    i                                            l 1                                 1                    e                                            i i        Sa'pervuior                 Supervisor                 Supervisor                  Supervisor                   Supervuior i           O/A Staff              Construction and       Vendor and Receiving          Operational Assurance Engineenng Assurance Maintenance            Inspection and Quality Assurance         Quality Assurance 3              inwth         ,                           ,                        ,                                                                    ,

a 4, - Rehabshty Data 3 - Audit Leaders j - NRC Reports & Letters .

          - Problem Solving Leaders i

i . Matrixed from General ~ Purchasirg and Stores ' and Transportation 3 Mainxed kom Director Controller l Administration j l 5 117 l l l 4 I i i l g I I f Ii General Superwor CuWisor Superwsor Material Control g Supervisor Personnel Plantnag . S@ Budgetog 20 29 21 35 4 I I I 1 Matrixed from Supervisor- Superwsor - Clerical - Cost Estunating ! Nuclear - Ubrary - Capdal Budget Purchasing Warehouse i Quality Assurance s is g

- Convenhonal - Schedunng - Word Processing - O&M Budget 3 Tranng ,

h - PIMS

                                                                                                                                                                - Prof. & Mgmt.            - Action item Lists - Doc. Control Vendor O!A -                                                                                                                                     - Complement

{ Development

                                                                                                 - Expeditin9                                                                                                                     4 i                                                                                                                                                                - Admn.trators             - Cc;Tputer         - Procedures       t- COOP Contract I

Operation Admnstrator l - Recemog inWinn l g - Manuals I i

                                                                                                 - Vendor inspecison 4

Mainxed to l Nuclear Produchon Edeng

& roduction Nuclear Engmeering +

Nuclear Tranng

                                                                                                                                                                                                               - ARMS i'

i 4 l t

d

 \

4 # 4 1 4 Chart 4 i i Director Outage Management

2 5 4

} i e

i
Contract Outage Coordmators l Admmistrator Outage Engmeets j 2 3 i

i

                 ~                                                       -Maintenance Contractor
                                                                         -Specialbes Contractors 1

4 l 4 4 i e S i. 4 1 i 4 w

f 9 3 s4 n sg s o rng rn it a ooni n oo si r i siir t n i v t ad p e vaiecae e c efinO I af phTi n g ir I ph a ua ua gn s 2 r od 7 1 Sudn Su m sng QanE Q n m ian v a o r te so n r esin i T r fD yit pna d& Sa u uor eP x 8 Yi gl i StialT iO r n a v l ca t a nE aim ri f elar 5 d 4 M a r n o s- sn T eQuF r n gl rnga G oona oonyy sii i sii c t ni i t nci t vain vainr I r efirh ca I r ef ca e cu ir pliTc pliTgen ua e ua

       .                                                                       SudT Qa  n              SudiS Qao nn t

e C g2 n I n i 5 t r t o ar ri 3 cT a ir e r a h De r _ C l c on sie u it N vc r 3 4 I e pt ur r o 7 u sn s Si i r xe n p% u t o i St I ai m l it a rS 3 mt os r r o e n r i f in ga t e rn dg n dm nt r is G oai ed1ii ni ies m iAx r inai r vr r am Tm I t e pwr a Mea ar d ud g A r o lc Sar u HP N s s m e r e deduI k ul c e no oh r c it c PS A 4 j ,',!  ;  ; ji ; i' ,,Iii, . 4 i4 -

I Chart 6 4 Matrixed from Dire Nuclear Administration l Nuclear Engineering l Y , 4 as  : I Engmeeting Administrator

2
                                                                                               - Procedures i                                                                                               -Schedule
                                                                                               - Budget I                                                                    .I

) [3 General Supennsor General Supervisor General Supervisor 1 Nuclear Safety & Nuclear Technology Nuclear Fuel Plant Engmeering 4 28 19 18 l i Ch 6A Ch CB Ch 6C i J n 4 1 4 4 l

i Chart 6A Matrixed frorn 2 Nuclear Quality Assurance General Superwsor i Nuclear Safety & I Plant Engwieering I Y 4 m I I 1 I 'I I Superwsor Supenrism Engineenng Asswance Supenrism New issues Safety & Perfornuance W h * '9 3 Engineering 12 to 3 l I l 4 1 .: Group Leader Group Leader i i Contract Plant Engmeetwig V Engineering and Design 5 6 ]' Shift Te'hriical Adnsors

is <ed to Nuck Produchon I

j .- I i i 1

i r 1 1 j Chart 6B 1 i Nuclear Technology 2 19 d i i Group Leader Group Let%r { Malerials & Methods Radiological , 9 9

                                                                                                          -Malenals                                            -Rado Chemmary
                                                                                                          -Weidng                                             -Health Physics
                                                                                                          - NDT                                               -Environmental Morutonn'g i

l - ASME Secton lli -Stwending ! -Codes & Standards Radah Nection Instrumentation j -Reg. Guides -AL ARA

-R&D Work -Decontamination 4

j -Computer Applications -Waste Disposal i ! -Meteorlogical i e 1 1 I e4 t

Chart 6C - 32 j General Supervisor Nuclear Fuel 3 to i I

  • I
!          Supervisor                                                                                                 Supervisor                      Supervisor j         Nuclear Fuel                                                                                             Fuel Engineering               Reactor Engineering 6                                                                                                           3                              8 i
         - FuelCycle Analysis                                                                                      - Fuel Design                    - Fuel Accountability l
         - Uranium & Enrichment                                                                                     - Fuel Fabrication              - Control Sod Analysis Programming                                                                                                                         f Contract Administratior   i
                                                                                                                                                    - Fuel Bumup Core Analysis                                                                                           - Fuel Assurance
        - Reactor Dynamics                                                                                         - Fuel Storage & Shipping   h j)       -
                                                                                                                   - Fuel Performance           l u                          Reactor Engineer matrixed to Nuclear Production i

i l l 'f f 5 l .9

Chart 7 . 5 Plant Security Medical Superintendas Depanment Depanment Nuclear Producton

!                               Matrixed from       4                 233 Nuclear Quality                                     Matrixed from Assurance                                         Administration I                                                  il 7

. Y U Supervisor Adm#nistrator Operational Nuclear Assurance Production s. Supervisor  ; Coordination i R M at s i Protection 45 . Assistant Supemsor Supenmor Plant Security Medical Superintendent as e iss I _ l _ i I Operations Engineei' Maintenance Engineer Technical Engineer Reactor Engineer Shift Technical Advisors > 71 89 47 4 s l ' 4 4 u--- > T--- Matrixed from . Nuclear Engineenng i e

e i l 1 Chart 8 . Matrixed from Matrixed from

     .                                       Generation Engineenng                                             Constructon 8

I I I ________, i , j l Nuclear j l Director i Engineering i Nuclear Pfard i I l 1 Modifications I l 2 a L__ Director______J _____L__, l 1 I e l-- ' ' i

                               ' t Requirements      ,                           Matrixed from         4                         Matrixed from

! Nuclear Safety & Crit'oria Nuclear Quality Construction Nuclear Quality l Plant Engineenng , l Project Engineer Supenntendent Assurance L __y____ Assurance l t__________J Drawings

                                      & Specs l'                  4

[ 4 8 Y i Engineenng Constructon O/A & Assurance inspechon 1 I Assistant Assistant Asst. Const. Supt. Asst. Const. Supt. Project Engineer Project Engineer Edison Bechtel Contract Design Edison Design Construction Construction s l t

                          .o

Nuclear Safety Organizations Board of Directors Chart 9 - lN Nuclear Safety - Chairman of the Committee Board Chief Executive Officer i President Chief Operating Officer I Executive Vice Presdent Operations l N IRAG d Operations __

                                                                                                                                                                   * "P I

I Manager Nuclear n Operations I I I I I I I Director Director Director Director Drector Nuclear Quality w Outage Nuclear

  • D@trat Nuclear Nuclear Plant Assurance nis a l Management Training j Engineenng p Modfications 1

I I I echn. uel Satyk + OSRO Onsite Review Organization l [I^"I, wo L

m _ i

 ~ Attachment B NRC CONCERN'
2. Training Organization and Training.

Training organization seems weak and fragmented. The training for licensed and non-licensed personnel is behind schedule. . The NRC has asked for a training schedule and the status of training. - DETROIT EDISON RESPONSE Nuclear Operations Training Plan is attached.

         " Number of individuals to be trained" means " minimum nu-ber required at fuel -

loading". However, it is our intent to train more than the minimum numbers. l l - . I GED/15/6.3 I I ,

  ,.v         ,-y y9-,,   ,-

e,m- # y - - - - - + , . .-92,- 9 4 , , ,e,. ,- r - - - w --w y p--%g + , . , , -er ,

4 NUCLEAR OPERATIONS TRAINING PLAN DATE :. 6/1/81 MONTH PRIOR TO FUEL LOAD GROUP TO g o g g g g gg g g 7 e g , , , , , , BE TRAIMED CHEMISTRY "d 175.5 1217l HEALTH PHYSICS  ! L3.J l582l MAlhiTENANCE N _ 13 3 . 51 1694i LICENSED OPERATORS FJgt4% C ' -- ajes'h'SN m" a'" o* o 3695l l2485l J s NON-LICENSED [Li y 0PERATORS l185l l6751

  • QUALITY ASSURANCE / b CONTROL L69J l645i SECURITY E

[.6J l1659l SHIFT TECHNICAL B ADv1SOR 1461 16961

                                                 ~

IECHNICIANS 526 l l 409l LEGEND COMPLETED TRAINING T0-DATE TRAINING REMAINiliC {;Template:.f;5