ML20023E170: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(StriderTol Bot change)
 
Line 153: Line 153:
: b.                    1    enario file                      Q
: b.                    1    enario file                      Q
: c.                      ite Emergency 0 g iz ion Duty Roster
: c.                      ite Emergency 0 g iz ion Duty Roster
;
                               .        Emergency Plan
                               .        Emergency Plan
: e.          Emergency Pr                              ss repetitive t $ s records
: e.          Emergency Pr                              ss repetitive t $ s records
Line 228: Line 227:
{
{
3.6.3                        Off-site Emergency Organization Du                                                        shall be th maintai                    current and availabl                                      mergency Prepa                                      nager.
3.6.3                        Off-site Emergency Organization Du                                                        shall be th maintai                    current and availabl                                      mergency Prepa                                      nager.
D i                                                3.6.4                      T                            y Plan will be c                              led and revised in
D i                                                3.6.4                      T                            y Plan will be c                              led and revised in e with regul to                                    quirements and GPUNC olicies.
;
e with regul to                                    quirements and GPUNC olicies.
3.6.5                      Emergency Plan                                                ting Procedure          IP's) will be contro11e                                          vi ed to reflect            e late t version of the E                                          an. Revisions                  h.      impact upon the                        gical Controls D a                                t will have the v                    the Radiologic                            Co    ois Department. All ts will be made to re olve the comments and unresolved coments will be escalated to upper manage-
3.6.5                      Emergency Plan                                                ting Procedure          IP's) will be contro11e                                          vi ed to reflect            e late t version of the E                                          an. Revisions                  h.      impact upon the                        gical Controls D a                                t will have the v                    the Radiologic                            Co    ois Department. All ts will be made to re olve the comments and unresolved coments will be escalated to upper manage-
   '                                                                            ment as appropriate.                                                                                    t I
   '                                                                            ment as appropriate.                                                                                    t I
Line 346: Line 343:
Emergency log book                                                                                                                              i
Emergency log book                                                                                                                              i
!                      b.
!                      b.
: c. Phone listing
: c. Phone listing f                                                                                17.0 4
;
f                                                                                17.0 4
v -,  --- -,        .      ,  - . , - , , ,,,,,-o,-r,      --,--r-,~.-w      e,e-,e-,  ,--w - --, , - - - -ver-  -,,-w,- - - - , - - - -,wmemw-,-~~~-~c        wwy . - - , ~ ~ - ~
v -,  --- -,        .      ,  - . , - , , ,,,,,-o,-r,      --,--r-,~.-w      e,e-,e-,  ,--w - --, , - - - -ver-  -,,-w,- - - - , - - - -,wmemw-,-~~~-~c        wwy . - - , ~ ~ - ~


Line 441: Line 436:
: c.      Phone cabinet
: c.      Phone cabinet
: d.      Log book
: d.      Log book
                                                                                                                                ;
: e.      INPO Manual                  nt Handbook                    Q
: e.      INPO Manual                  nt Handbook                    Q
: f.      Activation
: f.      Activation
Line 491: Line 485:
                             \,
                             \,
                         ~ .. -
                         ~ .. -
            ;,
             ,' k        l' i      ,
             ,' k        l' i      ,
i          - %
i          - %
Line 528: Line 521:
(List below) 1
(List below) 1
                                         @                        v                                                          .
                                         @                        v                                                          .
l
l l                                        Signed Dept. Head or designee Send to:                                                                                                            l l
!                                                                                                                              ;
l                                        Signed Dept. Head or designee Send to:                                                                                                            l l
i Emergency Preparedness Dept.
i Emergency Preparedness Dept.
l          Trailer 67 TMI-1 l
l          Trailer 67 TMI-1 l
Line 551: Line 542:
Specifically, these req        n s include:
Specifically, these req        n s include:
: 1. Boron analys        leted within 3    rs    less from the time a decisio      ma    o obtain a sa
: 1. Boron analys        leted within 3    rs    less from the time a decisio      ma    o obtain a sa
;                                                                  .
: 2. Gamma is      c analysis for            n of degree o core damage completed within 3 hours o          from the time          ion is made to obtain a sample.
: 2. Gamma is      c analysis for            n of degree o core damage completed within 3 hours o          from the time          ion is made to obtain a sample.
: 3. Chloride analysi              within 1 shi        .u  8 hours), if done in-house.          nt off-site, a      i    11 be completed within 4 da    )
: 3. Chloride analysi              within 1 shi        .u  8 hours), if done in-house.          nt off-site, a      i    11 be completed within 4 da    )
Line 644: Line 634:
(E ) in back left hand corne 2
(E ) in back left hand corne 2
4.8.13      P1 I
4.8.13      P1 I
s (G ) and (G )          t      dividual poly
s (G ) and (G )          t      dividual poly l
;
tape bags shut.              y (GI ) and (G2 )
l tape bags shut.              y (GI ) and (G2 )
                                                                   \
                                                                   \
wi    a dose rate in t me        .
wi    a dose rate in t me        .
Line 677: Line 666:
:                volume is 1 x 10-7 ml.                                                      :
:                volume is 1 x 10-7 ml.                                                      :
l          4.8.14      Transport appropriate sample (s) (those                            1 mr/hr) to count room and count on Geli dete t                        system per SCP 1958.3.
l          4.8.14      Transport appropriate sample (s) (those                            1 mr/hr) to count room and count on Geli dete t                        system per SCP 1958.3.
4.8.15      P            ron analysis on the              tents of the beaker Chemistry Proce              N 1904 observing the
4.8.15      P            ron analysis on the              tents of the beaker Chemistry Proce              N 1904 observing the l
;
l
                           @p        owing cautions              ceptions:
                           @p        owing cautions              ceptions:
: a.      In the ca cu            s given in section 6.0 of l
: a.      In the ca cu            s given in section 6.0 of l

Latest revision as of 02:33, 16 February 2020

Public Version of Revised Administrative Procedures 1053 Re Emergency Equipment Readiness & 1055 Re Maintaining Emergency Preparedness & Revised Emergency Plan Implementing Procedure 1004.33 Re Reactor Coolant
ML20023E170
Person / Time
Site: Three Mile Island Constellation icon.png
Issue date: 05/02/1983
From: Nelson M, Toole R
GENERAL PUBLIC UTILITIES CORP.
To:
Shared Package
ML20023E169 List:
References
PROC-830502-01, NUDOCS 8306150030
Download: ML20023E170 (43)


Text

, . ,

1053 Revision 7 05/02/83 IWORTANT TO SAFETY NON-ENVIRONMENTAL IWACT RELATED bO-THREE MILE ISLAND NUCLEAR STATION UNIT NO.1 ADMINISTRATIVE PROCEDURE 1053 EMERGENCY EQUIPMENT READINESS Table of Effective Pages Page Revision Page Revision Page Revision Page Revision 1.0 4 26.0 3 2.0 5 27.0 5 3.0 3 28.0 4 4.0 5 29.0 5 5.0 5 30.0 5 6.0 4 31.0 4 7.0 4 32.0 8.0 5 33.0 9.0 4 34.0 10.0 4 35.0 9 11.0 5 36.

12.0 3 37. 5 13.0 4 5 14.0 3 5 15.0 5 5 16.0 3 17.0 3 18.0 5 22.0 5 23.0 3 24.0 3 25.0 5 A

v v i A 0 8 83 Signature Date l .

t 4. -g -g3 3'9"**" )***

U

(Dof hp8t
  • Signature sa-o Date O[t/

Document ID: 0031B l8MB88R4888lle;

1053 R::visien 6 ,

ENCLOSURE VI INVENTORY CHECKLIST - EMERGENCY EQUIPMENT ,

PERSONNEL MONITORING Kit Location: U-1 Warehouse Type: Emerg. Inst. Emerg. Inventory Date:

Kit Kit Locker i

Inventory Perfomed By: Reviewed: Date:

^

: NUMBER  : NUMBER -
CAL DATE/  : OPERATIONAL  :
ITEM /) REQUIRED  : PRES X S/N  : REY. NO.  : CHECK  :
Protective Clothing - full set fits *  :~  : M: N/A  : N/A  :

V  :  :

1004.5 Att II.
\) A  :
1004.20 Att II and III :I A  :  : ff(N  : N/A  :
Tablets, Pens, Pencils,  : (/N) .  : yN) j r'  :  :
Wax Pencils  : 4 ea  : N/A N/A  : N/A  :
.  : )  : 4  :  :

-l

Polyethylene Sheeting (4' x 8' min): 2 f /).  : N/A  : N/A  : N/A  :
hasking Tape  :. 5 Rolls  : i A N/A  : N/A  : N/A  :
: G f:f  :  :  :
Dose Rate Meter (E520 or equiv) -

n 1  : /A:M  :  :  :

Beta-Gamma contamination Meter  :

i  : RM-14 or equiv 1  :  : A  :  :

hegaphones  : /) :  :  : h N/A  :  :
1004.36 Attactment I  : 1 x  : N/A . /)  : N/A  :

10b4.36 Attachment III  : 500  :  : N/A  : b: N/A  :

Substation Key  : 1  :  : N/A  : ?N A N/A  :

Inventory Checklists (Blank)  : as ~ required :  : N/A  : </(f:"f
/ N/A

i REMARKS:

  • Stored in Locker Emergency Kit Locked or Sealed:

signature 21.0

1055 Revision 1 04/27/83 IW ORTANT TO SAFETY NON-ENVIRONENTAL IWACT RELATED THREE MILE ISLAND NUCLEAR STATION UNIT NO.1 ADMINISTRATIVE PROCEDURE 1055 MAINTAINING EERGENCY PREPAREDNESS Table of Effective Pages Page Revision Page Revision Page Revision Page Revision 1.0 1 2.0 1 3.0 1 4.0 1 5.0 1 6.0 1 7.0 1 8.0 1 9.0 1 10.0 1 11.0 1 12.0 1 13.0 1 i-14.0 1 15.0 1 '

16.0 1 17.0 1 18.0 1 19.0 1 i

id 22.0 1

b l

l 23.0 15:

1

! g V 6U

$ / A&M_) 4 $

Signature Date y f -ZDate7 93 signature q 27 - 13 Signature Date Document ID: 0027B

l 1055 Revision 1 THREE MILE ISLAND NUCLEAR STATION UNIT NO.1 ADMINISTRATIVE PROCEDURE 1055 MAINTAINING EERGENCY PREPAREDNESS Table of Contents Section Page 1.0 GENERAL 3.0 1.1 Purpose 1.2 Scope .D 1.3 References 3.0 2.0 RESPONSIBILITIES 3.0 2.1 Manager, Plant T TMI-1 3.0 2.2 Fire Brigade Coordinator 9 4.0 2.3 Manager, En tal Controls TM 4.0 2.4 Manager ustrial Safety and a 4.0 2.5 Manager,Q thods Progr s 5.0 2.6 Plant Engineering Dir TMP 1 5.0 2.7 Director, Systems E e g 5.0 2.8 Operations and ance Director, TM 5.0 2.9 Manager, Ra Controls, TMI 6.0 2.10 Manager, ntenance, TMI 1 6.0 2.11 Manager, Pla dainistration TMI-1 6.0 2.12 Emergency Preparedness Manager 7.0 2.13 Manager, Plant Operations, TMI-1 7.0 2.14 Manager, TMI Information Management 8.0 1.0

?

,,-,--m-- -

1055

- Revision 1 Table of Contents (cont'd)

Section ,Pg 3.0 REQUIREENTS 8.0 3.1 Emergency Preparedness Drills 8.0 3.2 Emergency Preparedness Training 8.0 3.3 . Emergency Preparedness Equipment 3.4 Emergency Preparedness Facilities .0 3.5 Scheduling and Tracking Emergency Preparednes 10.0 Requirements .

3.6 Emergency Prepar @ uments Contr 1 12.0 4

Mit of Enclosures D

1. Emergency Cont 1 (ECC) 13.0

)

2. Technical Su Center (TSC) 15.0
3. Operations Support Center (OSC) 17.0
4. Near-site Emergency Operati cit 1ty (NEOF) 19.0
5. Annex Near-site Emergene ons Facility ( 21.0
6. Environmental Assess ommand Center (EACC 23.0
7. Parsippany Technt u tions Center (P ) 24.0
8. Emergency Facil ntory Sheet 25.0 i

2.0 l

1055 Revision 1 1.0 GENERAL 1.1 Purpose This procedure delineates the requirements for maintaining amergency preparedness in TMI Unit 1.

1.2 Scope t This procedure applies to all phases of maintaining e y preparedness in TMI Unit 1.

1.3 References 1.3.1 Emerge an, TMI Unit i V 1.3.2 Emerg hImplementing umen for TMI Unit 1 1.3.3 AP inistration of t n-site and Off-site l y Duty Roster 1.3.4 P 1051, Emerge a Drills 1.3.5 AP 1052, Emerge ing Training 1.3.6 AP 1053, E uipment Readi ss Ch List 1.3.7 AP 1038 , tection Progr a 2.0 RESPONSIBILITIES 2.1 The Manager t Training, TMI-1 onsible for the follow-ing- ,

2.1.1 Schedule training for all emergency response personnel on the Emergency Plan and Implementing Document.

2.1.2 Schedule all site personnel to receive basic familiari-zation with the TMI Emergency Plan.

2.1.3 Coordinate emergency training for all Off-site support agencies in accordance with reference 1.3.5 and 1.3.7.

3.0

1055 Revision 1 2.1.4 Ensure that all formal Emergency Plan Training is properly documented.

2.1.5 Forward results of training and documentation to i

EmergencyP. reparedness Manager as requested.

2.1.6 Assistance to the Emergency Preparedness Department by providing drill observers.

l 2.2 The Fire Brigade Training Coordinator is responsi he planning, scheduling and conduct of Fire Eme is 'in accordance with reference 1.3.7. [

2.3 The Manager, Env 1 Controls TMI_ is re nsible to:

2.3.1 Pr stance to the E Preparedness ln conducting Ra on Emergency Exercises in l cordance with re .3.4.

l 2.3.2 Ensure that the ntal Assessmen omand Center is maintain i le and in rea ness per section 3.4.6.

2.4 The Manager, Irtd al Safety and Healt sponsible to:

M 2.4.1 P e sistance to th ncy Preparedness in conducting the al Emergency Drill in accordance with reference 1.3.4.

2.4.2 Ensure that first aid and medical equipment required for use in emergencies are available and in readiness.

l 2.4.3 The Site Supervisor-Safety and Health is designated the ,

responsibility to carry out these duties in the absence of the Manager, Industrial Safety and Health.

4.0

1055 Revision 1 2 5- The Manager, QA Methods Program, Audits is responsible for auditing, at least on an annual basis, the TMI Emergency Plan and Implementing Document to verify compliance with the Operational Quality Assurance Plan, the Fire Protection Plan, internal rules and procedures, federal regulations, and operating-license provisions.

2.6 The Plant Engineering Director, TMI-1 is responsib1 t e that the Technical Support Center is maintained e and in readiness as per section 3.4.2.

, 2.6.1 Provide ce to the Emerg eparedness Depar supplying drill og ers and scenario as i tan as requested.

2.7 The Dire 6 Sy tems Engineeri ponsible to ensure that the Parsi Technical F nter is maint ned available and in readiness as per .4.7.

2.8 The Operations and Ma e e Director - TI(I sponsible to maintain the On-s ncy Organizat u Roster current in accordance r rence 1.3.3.

2.8.1 P ov assistance to the cy Preparedness Dep nt by supplying drill observers and scenario l

l assistance as requested.

l 2.9 The Manager, Radiological Controls, TMI-1 is responsible to:

2.9.1 Provide assistarce to the Emergency Preparedness Manager in conducting the following as per refer-ence 1.3.4.

a. Radiation Emergency Exercise l

l l 5.0

l 1055 Revision 1

b. Radiological Controls Drill
c. Radiological Monitoring Drill 2.9.2 Ensure that radiological controls emergency equipment is maintained in accordance with reference 1.3.6.

2.9.3 Ensure that the Operations Support Center and the Radiological Assessment Coordinators area CC l

are maintained available and in readine sections 3.4.3 and 3.4.1 respectivel .

2.9.4 Provide assistance to the Emerge P redness Depar upplying drill o se s and scenario as c s requested. D 2.10 The ManagAr, Maintenance is e on ible to: l l

v 2.10.1 ovide assistance to rgency Preparedness l

! anager in cond pair and Damage ntr31 Drills in accordan h ference 1.3.4 2.10.2 Ensure t e control equi ired for use l in em ies is available a adiness.

2.11 The Manager dministration TMS s responsible to:

2.11.1 hat the Annex Nea e Emergency Operations Fac lity is maintained available and in readiness as per section 3.4.5.

l 2.12 The Emergency Preparedness Manager is responsible to:

2.12.1 Plan, schedule and coordinate all Emergency Plan l related drills and exercises.

2.12.2 Maintain the near-site Emergency Operations Facility in l l readiness as per section 3.4.4.

l l

6.0 I

l i

1055 Revision 1 2.12.3 Review the Emergency Plan training lesson plans and examinations for technical accuracy, and provide technical support of applicable training activities.

2.12.4 Audit Emergency Preparedness records and documents at l 1 east annually and submit results to the following:

a. Manager, Emergency Preparedness
b. Operations and Maintenance Director
c. Vice President, TMI Unit 1 ,

2.12.5 Maintain current the following:

l a. Act Tracking system

b. 1 enario file Q
c. ite Emergency 0 g iz ion Duty Roster

. Emergency Plan

e. Emergency Pr ss repetitive t $ s records
f. Emergenc an lementing Documen

! 2.13 The Manager, Plant Op ti_ , TMI 1 is res 0:

Provide

/ Vtance to the Emer n paredness 2.13.1

Man nducting all a exercises in l 0 hewithreference ..

2.13.2 Ensihed that the Emergency Control Center is maintained available and in readiness as per section 3.4.1.

2.13.3 Provide assistance to the Emergency Preparedness Manager in the performance of emergency communications tests as required by OPS-S223 Communications Surveil-

! lance Procedure.

7.0

1055 Revision 1 2.14 The Manager, TMI Information Management is responsible to:

2.14.1 Provide controlled copies of procedures and the Emer- l gency Plan to facility coordinators as required in sub section 3.4.

2.14.2 Maintain current, up-to-day drawir.gs and technical manuals at emergency facilities as require s -

section 3.4.

3.0 REQUIREENTS ,

3.1 Emergency Preparedness Drills 3.1.1 Drill s E cises will be conduc following the gui e f reference 1.3. D 3.1.2 r' narios will be red for each drill and proved in accordance reference 1.3.4. A file of -

ese scen&rios aintained by t Emergency Preparedness e.

3.1.3 Drill Pa e il be retained a ast ona year with t rgency Preparednes . then forwarded to d t ontrols for pe ne storage.

3.2 Emergency a ness Training 3.2.1 Training on the Emergency Plan and its implementation shall be scheduled for all personnel at TMI Unit 1 as per reference 1.3.5.

3.2.2 Documentation of formal training provided shall be l

maintained by the training department.

l 8.0

1055 Revision 1 3.3 Emergency Equipment Preparedness 3.3.1 Inventories, inspections and operability checks shall be performed on Emergency Preparedness Equipment in accordance with reference 1.3.6.

3.3.2 Emergency kit / locker key control shall be maintained by the Radiological Controls Department with d ' c es maintained in the Emergency Control Cen .

3.4 Emergency Response Facilities

NOTE: The in uals identified be their designec  :
shal the facilitie st the  :
appr nclosure(s) a t quarterly and  : ,
a drill or emerge ecting those  :
ies. These inv ori shall be documented  :
osure 8 and sen t t Emergency Prepared _  :
n epartment.  :

3.4.1 T e Emergency Co ( ter (ECC) sha e maintained by the Manager, t rations TMI.1 to he require.

ments of n s iti 1, Part A. T ogical Assess.

ment C ator (RAC) area s 11 intained by the Ma iological Con M .1 to meet the re_

r ts of Enclosure 1 B.

3.4.2 The echnical Support Center (TSC) shall be maintained by the Plant Engineering Director, TMI-1 to meet the re.

quirements of Enclosure 2.

3.4.3 The Operations Support Center (OSC) shall be maintained by the Manager, Radiological Controls to meet the re_

quirements of Enclosure 3.

9.0 l

l

1055 Revision 1 3.4.4 The Near-site Emergency Operations Facility (NEOF) shall be maintained by the Emergency Preparedness Manager, to meet the requirements of Enclosure 4.

3.4.5 The Annex Near-site Emergency Operations Facility (AEOF) shall be maintained by the Emergency Preparedness Mana-ger, to meet the requirements of Enclosur 3.4.6 The Environmental Assessment Command CC) shall be maintained by the Manager, Envi Controls TMI to meet the requirements of Enc ur 3.4.7 The P Technical Functions nter (PTFC) shall be ma n by the Director, Y s Engineering to meet frements of Enc o e 7.

Sched and Tracking Eme ene-

\eparedness Requirements 3.,5 3.5.1 epetitive tas heduled and tra d on master check list t assignment eets p. vided to the Emerge dness Manager id ate on at least a mon asi s.

. a assignment sh distributed to the ssigned supervisors accomplishment.

b. Upon accomplishment of a task, the assignment sheet is completed and signed with problems or other appropriate coments recorded in the remarks section; and returned to the Emergency Prepared-ness Manager.
c. The Emergency Preparedness Manager will track all t

problems or discrepancies utilizing the Action Item Tracking System described in step 3.5.2.

l 10.0

1055

- Revision 1 3.5.2 The Action Item Tracking System is designed to list Emergency Preparedness discrepancies and comments from .

whatever source, to assign responsibility for their resolution and to follow them through to completion.

a. The Action Item Tracking System shall be main-tained by the Emergency Preparedness .
b. Action items are detennined from igues, audits or inventories, are ass king numbers, persons responsib1 or ir resolution, j on a schedule. Th atus of these re maintained in t3 ergency Preparedness ice.

j

. Schedules, with se forms, will be forwarded l

! weekly to ns assigned res nsibility '

until s repcrted c lete a resolu-ti . The Action will then be u ed.

1 responses are t umented by persons l l sponsible for thei. letion. These responses are filed in the Emergency Preparedness office and a copy forwarded to training to file with the Drill packet (if applicable).

e. Resolution of action items shall be reflected on the Action Item Schedule.

11.0

1055

- Revision 1 1

3.6 Emergency Preparedness Document Control 3.6.1 A file of drill scenarios shall be maintained by the Emergency Preparedness Manag'er The format for drill scenarios shall be that delineated in reference 1.3.4 i 3.6.2 Emergency Access Lists shall be maintained c rrent and available to security site access personn t Emergency Preparedness Manager or his .

{

3.6.3 Off-site Emergency Organization Du shall be th maintai current and availabl mergency Prepa nager.

D i 3.6.4 T y Plan will be c led and revised in e with regul to quirements and GPUNC olicies.

3.6.5 Emergency Plan ting Procedure IP's) will be contro11e vi ed to reflect e late t version of the E an. Revisions h. impact upon the gical Controls D a t will have the v the Radiologic Co ois Department. All ts will be made to re olve the comments and unresolved coments will be escalated to upper manage-

' ment as appropriate. t I

i i l

12.0 4

h r- -, -,- n.. --,,, . . . . - . - - . . . - - , - ~ ..--.- ,. - -,

n ,,-.,_,-. - , ,,,. .,._ _ ,,-,------.. - - - . . - . -

l 1055

- Revision 1 ENCLOSURE ONE (Page 1 of 2)

A. Emergency Control Center (ECC)

1. Located in the Unit 1 Control Room and adjacent Shift Super-visor's Office.
2. In addition to norinal comunications, the following lines of emergency comunications shall be provided:
a. Operational Line in Shift Supervisor's Offic
b. Radiological Lines in Control Room and C
c. NRC Emergency Notification System (EN in trol Room and I Shift Supe ffice.
d. Health twork (HPN) in S opervisor's Office.
e. Envi Assessment Line i area.

l

f. N 1 Warning System (. "k ine in Control Room.

visor's

g. Emerge y Director's -

1er in Shift Su Office.

h. Emergency Dir %t-Line in Con
1. Radio C ions .
3. Shall provi f c ent work area o t following personnel:
a. Eme rector
b. Emergene Comunicator
c. Operations Coordinator
d. Radiological Assessment Coordinator
e. Radiological Assessment Engineers 13.0

,,-w. y-em-+w ,..--.-.-gww----w-- y y y g-,w-g,v,,g-- p .g v wwmeyw----twve3-n-----,w w--w- r w w r-'iu-v--r-w--e---+-&-- - - - - - - - - - - - - --

1055 Revision 1 ENCLOSURE ONE (Page 2 of 2)

4. Equipment will be maintained in the Emergency Locker in accor-dance with reference 1.3.6.
5. In addition to documents nomally in the Control Room. controlled .

l copies of the Emergency Plan and Implementing Document shall be provided.

Operating Materials shall be provided to include, b' imited 6.

to, the following:

a. Status Boards
1. Emerge irector/ operations nator
b. Emergenc d. tors log book
c. Phone st
d. O s plies l
e. Log et holders,1 et B. Radiological Assessment Coor ina (RAC) area
1. Located in the Unit Co ol Room Operating Mater s be provided c , but not limited 2.

to, the foll .

1 i a. St s i l

b. REMP l c. Appropriate logs and procedures I
d. Calculation system (i.e., TRS-80) j
e. Office supplies 14.0 l

y , , - , s--r--

1055 Revision 1 4

ENCLOSURE TWO (Page 1 of 2)

Technical Support Center (TSC)

1. Located in the Control Tower Building, 322' elevation, beneath the Control Room.
2. In addition to nonnal communications, the following lines of emergency communications shall be provided:
a. Operational Line
b. NRC Emergency' Notification System
c. Parsippany/TMI Line
d. B and W Extensio e
3. In addition to the equipment requi et) AP 1053, the follow-

< ing operating sat 1 hall be provide :

a. 4 desk ables,10 chairs
b. Continuous ir Monitor i c. Area Radiation Monitor
d. Whiteboard with mark a erasers
e. Emergency Plan IPs
f. Unit i FSAR
g. Unit 1 T ic Specifications
h. Select Vendor nuals Diesel Generator, Reload Report, Physics Test Manual, CRDM Manual, Bailey ICS/NNI, RPS, and ESAS Manuals, Reactor Coolant Pump Manual
1. Engineering Handbooks (Electrical, Mechanical. Industrial Power)
j. Procedure Index
k. Operating Procedures (1100 Series)  !

I i

15.0

1055 Revision 1 ENCLOSURE TWO (Page 2 of 2)

Technical Support Center (TSC)

1. Select Surveilance Procedures (ESAS, RPS, ICS, and NNI) i
m. Emergency Procedures (1202 Series)
n. Abnomal Operating Procedures (1203 Series)
  • o . Select Plant or System Drawings Series 001, 002, 012, 014, 015, 206, 208, 2 , 03, 304, and 660
  • p. Instrument List (SS 3081 thru SS 308 249
q. Telecopter
r. CRT Temina nter l s. Phone Li i
t. Genera ice Supplies
  • NOTE: Drawings ar co 11ed in accordt AP 1001C.  :

Audits o ng will be condu ed an documented  :

in accor e th AP 1001C.  :

-e 0 .

4 4

16.0

( . .

1055 Revision 1 ENCLOSURE THREE (Page 1 of 2)

~

- Operations Support Center (OSC)

! 1. Located in the area of the Radiological Access Control Point on the 306' elevation of the Auxiliary Building.

2. In addition to nomal communications, the following lines of emergency g communications shall be provided:
a. Operational Line.
b. Radiological Line.
c. NRC Emergency Notification System.

l d. Radiological Con o-Di aler.

3.. Shall provide suffi k areas or stand ereas as required for the following perso n .

a. Operat upport Center Coord .

! b. Emergency aintenance Coo

c. Radiological Controls i or.
d. Chemistry Coordina
e. Industrial Safet Health Representa v

! 4. Emergency equipme 1 e maintained i ergency Locker in accor-dance with refe .3.6.

5. Operating materials shall be provided to include, but not limited to, the following:
a. Status board I

Emergency log book i

! b.

c. Phone listing f 17.0 4

v -, --- -, . , - . , - , , ,,,,,-o,-r, --,--r-,~.-w e,e-,e-, ,--w - --, , - - - -ver- -,,-w,- - - - , - - - -,wmemw-,-~~~-~c wwy . - - , ~ ~ - ~

1055 Revision 1 l ENCLOSURE THREE (Page 2 of 2)

Operations Support Center (OSC) l d. Office Supplies

e. Log sheet holders, log sheets
f. Emergency Plan and Emerger.cy Plan Implementing Documen f g. Radio base station o+ #,

O v 4

% O 1

18.0

, - , - - , . , - , ,---,.,c w, ,g.,- - - , ,-,, -

1055 Rev1sion 1 ENCLOSURE FOUR (Page 1 of 2)

Near-Site Emergency Operations Facility (NEOF)

1. Located in the Training Center.
2. In addition to normal comunications, the following fines of emergency comunications shall be provided:
a. Operational Line l
b. Radiological Line
c. NRC Emergency Notification System Line
d. NRC Health Physics Network Line v
e. Environmental A Line ev D  %
f. Parsippany/T
g. Emergenc D 's Hot-Line
h. Radio nication with env o Ya1andradiologicalfield essessment teams.
1. Conventional telepho
3. In addition to emergene t required pe erepte 1.3.6, operat-1 ing materials shall e vided to include, bu limited to the following
a. One exten c rd
b. One set of Unit 1 FSARs
c. One set of Unit 2 FSARs
d. Three four-drawer file cabinets
e. Nine folding tables l f. Two 6'-two door lockers l
g. Fifty chairs l

l h. Two clocks.

19.0

e O es 1055

- Revision 1 ENCLOSURE FOUR (Page 2 of 2)

Near-Site Emergency Operations Facility (NEOF)

1. Three space dividers J. Six lamps (battery powered)
k. Phone stands
1. Twenty-four clipboards  ?

i

! m. Seven comunications logs and writing materials

n. Twelve flashlights and batteries
o. Eleven plant and facility status boards
p. One set of Unit it 2 Operating Proce- s
q. Emergency P rgency Plan Imp 1 " ng Document
r. INPO Man 1 reement Handboo
s. TMI Ev ion Time Estimate ,

I

t. CRT with p inter and pla r tenninal
u. Radio i

l l

20.0

1055 Revision 1 ENCLOSURE FIVE (Page 1 of 2)

Annex Near-Site Emergency Operation Facility (AEOF) I

~

1. Located in,the office complex at Crawford Station.
2. In addition to nomal communications, the following lines of emergency communications shall be provided:
a. Operational Line
b. Radiological Line
c. Conventional Telephone
3. Shall provide sufficient work areas or standby equired for the l l

following personnel:

a. Group Leader bon Support 9
b. Rad Con rsonnel l

i

c. Group - Maintenance Su i
d. Maintenance Support Perso I e. Maintenance and Const nager
f. Group Leader - Sec ort
g. Security Support onnel
h. Personnel r g Coordinator
1. Radiologi - C rols Manpower Supe ndent
4. Shall provide areas for the following functions:
a. Badge issue
b. Training
c. TLD issue
d. Whole Body counting facility 21.0 l

l l . . - - . ,. - _ ._ _

l 1055

- Revision 1

~

ENCLOSURE FIVE (Page 2 of 2)

Annex Near-Site Emergency Operation Facility (AEOF)

5. Equipment shall be provided in an Emergency Locker in accordance with

! reference 1.3.6.

6. Operating materials shall be provided to include, but not ifmited to, the following:
a. Three tables
b. Eight chairs
c. Phone cabinet
d. Log book
e. INPO Manual nt Handbook Q
f. Activation
g. 2 log holders
h. Three stat s boards (Rad , rational, gene )
1. Blackboard, chalk and e Clock a

J.

k. Area map ~~ ~N

\

I

1. Tech. drawi i st ..['
m. Writing r (pens, markers, -f-
n. Radio \~- J , ,
o. Emergency Plan and Emergency Plan Implementing Documents  ;

1 r

6 eg, A

.' )

22.0 V

-e. w- p, ,w g 2 -, , - , - - - - - - - c -i - - ^._

1055 Revision 1 ENCLOSURE SIX (Page 1 of 1)

Environmental Assessment Comand Center (EACC)

1. Located in the Environmental Control Building at the Olmsted (Harrisburg International) Airport.
2. In addition to normal operation communications, the following lines of communication shall'be provided:
a. Environmental A,siessment Une 5

(1) dedicated line to RAC

~

(2) dedicated line to EOF

\  %

s.

5

\

b. Conventional Tel

( x c. Radio communi o field assessme s s

u 3. Shall provide suf work areas for h fo owing personnel:

a. Enviro 1 Assessment Coord a h ,
b. EnvironmenM1 Assessment
4. A status board, shall be prov .

he Environmenta nt Coordi-nator.

5. In addition to.. e, quip rmally utilized b th cility a Geli

's,s

- i detector 'shall be .' -

6. In addition to u s nonna11y in the onmental Control Building, N- s

' controlled copies o the Emergency Plan and Implementing Document shall i i -

, urther dilution  :

ontents of bot (E i Note  :
bsequent dilution 2)sso required.

that correct  :

une calculations can be performed.  :

1

NOTE 1: If background noble gas levels result in interference :
with Geli analysis (high deadtime on EA) insure  :

shield cover on Geli cave is closed and initiate  :

compressed air purge of cave.  :

6.0

1004.33 Revision 4

NOTE 2: If background levels do not allow the use of the  :
TMI-I Geli/MCA system, analysis may be performed by  :
transporting samples to TMI.2 or to the mobile lab  :
of the Environmental Assessment Group.  :
NOTE: If counting

__ __ _ _ _____ ____ ______vial___( _ __ _1) , vol ume fo r u se i n the C RAM  :

program is 1 x 10- ml . If counting vial (G2 ),  :
volume is 1 x 10-7 ml.  :

l 4.8.14 Transport appropriate sample (s) (those 1 mr/hr) to count room and count on Geli dete t system per SCP 1958.3.

4.8.15 P ron analysis on the tents of the beaker Chemistry Proce N 1904 observing the l

@p owing cautions ceptions:

a. In the ca cu s given in section 6.0 of l

I ,

Chemi dure CPN 1904, mple volume, 1 .

l

b. KAP standard standardization l

I i ay be used vice 3 a a fied in CP N1904.

. No spiked samp1 wi be run.

4.8. lowing titration, the contents of beaker (I) down hood sink and flush sink for approximately 2 minutes with demin water.

4.8.17 If chloride analysis is to be done off-site, put flask (H) aside for preparation for shipment. If chloride analysis is to be done on-site, perform l

chloride analysis on the contents of the flask (H) per CP N1902 observing the following cautions and l exceptions:

7.0 l

l l

l

1004.33

  1. Revision 4 i a. Spectrophotometer cell and flask (H) containing sample must be handled with lead gloves on.
b. Results must be multiplied by 25 since only 2 mis of sample are used vice 50 as specified in CP N1902.
c. The dilute Hydrochloric acid used H adjustment in the boron analy oved from the sample hood prior ing the stoppers from flask (H n (S).

d ration of a spi d le is not required.

5.0 FINAL CONDITIONS Q cedure can be n at later time, to allow the {

The remainder of s I

radioactivit 1 to decay:

Lead pig (s containing s le (F) (and via M,if diluted 5.1 chloride sample is sen f- e for analysis) . placed in a locked High Radiatio e (for examp1 filter room) as directed by the logical Controls C r or. The exact location mu Mified in the 1 w.

l High Radi bicle location:

5.2 Poly bottles El and E2 must be emptied into the sink and the sink flushed for 5 minutes with demineralized water.

5.3 If off-site chloride analysis will be performed, prepare flask (H) for shipment.

8.0

1004.33

.- Revision 4 ATTACHMENT I t

b

' -
' 2%T: hi) z. ..-;:.? W @

5'$%?.'&-jkW)/e,4lI'7.'AW+-F*'45*:: " ' V  ;

t NE

. 4, . .=.,.p

'.3- s-o, t s i.t......!.=.'.. (a) .:. .:. .. , . . . .... ..

.. . . ?.s.:.. . . .... .. __,

.3:. u'n- w:

=^-

.= ....

L z

==- . '. . .

I'. df 1'kMdO

-6 i a.. ./*IM til;e11.-Sf :: r.1

.idf.-5.:Id:- '.'.;- .5a= dr.s )t - - 3. . 3

% .';5 k

$- . . d Ls.end 3 *.6.A..

(D') (s') (c')c,j

+- ( o) rd nele ,

_(t).--+ w; A pa. ,

,f

/ / *nuk '

AN) v' (

O ,

'n 'i e M(A V t t OO c c. <

s ,

'g '5 (G') (G'h b' / / / //p/Q9f'// eW b (P)-+! / / / / / / /

I

'*h,i$

b < 1 N

, s-

@ ' &> uv&

@ i!

Oe. .'"

f car + wNh hMNwykols, pigs $ + Ifs, .sfArt.

}lDdth.

I y _.

9.0 ,

, _ . , . . . . , . . . .,s _ . - - _ _ _ _ _ _ . - . . . - - _ . . _ . _ - - . . _ . . . , -

j 1004.33 Revision 4 ATTACHMENT I HOOD 1 (A) Lead glass shield 24" long,12" high and 1" thick (B) Spill catch pan 24" X 20" X 2" deep (C) Lead pig for sample bottle (1" lead shielding)

(D )

1 Magnetic stirrer bases 2 Magnetic stirrer base (D )

I 1 liter poly bottle containing 1000 ml demin d stir bar, (E )

lid off.

2 1 liter poly b ntaining 1000 ml ater and stir bar, (E )

lid off. 9 (F) 125 sampi containing sa (i lead transfer pig on port art) l I 10 ml co ting vial con mis demin wate lid off i

(G )

(G )

2 10 ml counting vial a 9 9 mis demin wa , d off (H) 125 Erlenmeyer fla n) containing 3 in water (I) 250 m1 beaker ining 99 mis demi wa e nd stir bar (J) 0.1 ml Ep pet with new , c rt

, (K) 1.0 m1 f pipet with new , n cart (L) Lead recep le with cover, for used pipet tips and syringe (M) 5.0 m1 vial for storage of undfluted liquid sample (required only if chloride analysis will be performed off-site)

(N) 1 mi syringe containing gas sample (in lead transfer pig on portable cart) l t

r

! 10.0

1004.33 Revision 4 ATTACHMENT I (Cont'd)

(S) 125 ml Erlenmeyer flask (clean) containing 25 mis demin water, on cart .

(T) and (U) Chloride reagents, on cart L required only if (V) Chloride reagent pipets, on cart sample is to be anal-(X) 10 cm DU cell for Cl , on cart J yzed fo lorides ons o v

% 0 i

'w 11.0

. 4 1004.33 Revision 4 ATTACHMENT I HOOD 2 3 Magnetic stirrer base (D )

(I) Beaker I from hood 1 after sample added (N) Ring stand for piston buret (0) Piston buret (P) Lead glass shield 12" x 12" x 4" thick (Q) Mannitol with scoop (R) Dilute HCL for pH adjustment

NOTE: Shor tongs shall be m um of 12" long  :
Long tongs shall inimum of 36" long.  :

_______________ _________________g ______________________

1 e

@ v 12.0 t

.- _