| | issue date = 03/29/2012 | | | issue date = 03/29/2012 |
| | title = Mtg Ann -Surry Regulatory Conference - 2012 | | | title = Mtg Ann -Surry Regulatory Conference - 2012 |
| | author name = McCoy G J | | | author name = Mccoy G |
| | author affiliation = NRC/RGN-II/DRP/RPB5 | | | author affiliation = NRC/RGN-II/DRP/RPB5 |
| | addressee name = Heacock D A | | | addressee name = Heacock D |
| | addressee affiliation = Virginia Electric & Power Co (VEPCO) | | | addressee affiliation = Virginia Electric & Power Co (VEPCO) |
| | docket = 05000280, 05000281 | | | docket = 05000280, 05000281 |
Line 14: |
Line 14: |
| | page count = 6 | | | page count = 6 |
| }} | | }} |
| | |
| | =Text= |
| | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 29, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060 |
| | |
| | ==SUBJECT:== |
| | MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY CONFERENCE MEETING - SURRY POWER STATION, DOCKET NOS. 50-280 AND 281 |
| | |
| | ==Dear Mr. Heacock:== |
| | |
| | This letter confirms the email correspondence between Mr. Barry Garber of your staff and Mr. |
| | Gerald McCoy of the NRC, on March 21, 2012, concerning a Regulatory Conference being conducted at your request, which has been scheduled for April 19, 2012, from 1:30 p.m. to 3:30 p.m. Eastern Daylight Time (EDT). The enclosed meeting notice provides additional details. |
| | The purpose of this Regulatory Conference is to discuss one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS) standpipe level erratic indications. The results of the NRCs inspection of this issue are available in NRC Inspection Report No. 05000280, 281/2012007, available at the Agencywide Document Access and Management System (ADAMS) (ML120730510). |
| | In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs ADAMS. |
| | ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room). |
| | Should you have any questions concerning this meeting, please contact me at (404) 997-4551. |
| | Sincerely, |
| | /RA/ |
| | Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280 & 50-281 License Nos.: DPR-32 & DPR-37 |
| | |
| | ==Enclosure:== |
| | As stated |
| | |
| | _ ML12089A274 ________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE Rii:DRP RII:DRP SIGNATURE SON by email GJM1 NAME SNinh GMcCoy DATE 03/27/2012 03/29/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO VEPCO 2 cc w/encl: Michael M. Cline Larry Lane Director Site Vice President Virginia Department of Emergency Services Surry Power Station Management Virginia Electric and Power Company Electronic Mail Distribution Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Kenny B. Sloane Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq. |
| | Senior Counsel Dominion Resources Services, Inc. |
| | Electronic Mail Distribution Tom Huber Director, Nuclear Licensing & Operations Support Innsbrook Technical Center Electronic Mail Distribution Ginger L. Rutherford Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883 |
| | |
| | VEPCO 3 Letter to David A. Heacock from Gerald J. McCoy dated March 29, 2012 |
| | |
| | ==SUBJECT:== |
| | MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY CONFERENCE MEETING - SURRY POWER STATION, DOCKET NOS. 50-280 AND 281 Distribution w/encl: |
| | C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS |
| | |
| | ==SUBJECT:== |
| | REGULATORY CONFERENCE MEETING WITH VIRGINIA ELECTRIC POWER COMPANY FACILITY: SURRY POWER STATION DOCKETS: 50-280 AND 50-281 DATE & TIME: Thursday, April 19, 2012 from 1:30 p.m. to 3:30 p.m. EDT LOCATION: US Nuclear Regulatory Commission Region II 245 Peachtree Center Ave. NE Suite 1200 Atlanta, GA 30303 PURPOSE: The purpose of this Regulatory Conference is to discuss one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS) standpipe level erratic indications. The results of the NRCs inspection of this issue are available in NRC Inspection Report No. 05000280, 281/2012007, available at Agencywide Document Access and Management System (ADAMS) (ML120730510). The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov, and contains information regarding conduct of NRC meetings. |
| | CATEGORY: This is a Category 1 meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned. |
| | The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. |
| | NRC OFFICE PARTICIPATING: Region II Enclosure |
| | |
| | 2 OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS: NRC (partial list) |
| | V. McCree, Regional Administrator, Region II (RII) |
| | L. Wert, Deputy Regional Administrator, RII R. Croteau, Division Director, Division of Reactor Projects J. Munday, Director, Division of Reactor Safety H. Christensen, Deputy Director, Division of Reactor Safety C. Evans, Regional Council, Office of Enforcement and Investigation Coordination G. MacDonald, Senior Reactor Analyst, Division of Reactor Safety G. McCoy, Chief, Reactor Projects Branch 5 J. Nadel, Resident Inspector, Surry R. Clagg, Resident Inspector, North Anna LICENSEE (partial list) |
| | L. Lane, Site Vice President, Surry K. Sloane, Plant Manager B. Stanley, Director, Station Safety and Licensing MEETING CONTACT: Gerald J. McCoy 404-997-4551 Gerald.McCoy@nrc.gov AUDIO TELE-CONFERENCING: Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please contact the NRC meeting contact in advance of the meeting to obtain teleconferencing information. |
| | VIDEO TELE-CONFERENCING: Not Available Enclosure}} |
Similar Documents at Surry |
---|
Category:Letter
MONTHYEARML24283A0702024-10-0707 October 2024 Annual Submittal of Technical Specifications Bases Changes Pursuant to Technical Specification 6.4.J IR 05000280/20244032024-10-0303 October 2024 Cyber Security Inspection Report 05000280-2024403 and 05000281-2024403 Cover Letter (Public) IR 05000280/20240102024-10-0202 October 2024 Biennial Problem Identification and Resolution Inspection Report 05000280/2024010 and 05000281/2024010 ML24270A0022024-09-25025 September 2024 Inservice Inspection Owners Activity Report (OAR) ML24248A1712024-09-0303 September 2024 Proposed License Amendment Request - Temporary Service Water Supply to the Component Cooling Heat Exchangers IR 05000280/20240052024-08-26026 August 2024 Updated Inspection Plan for Surry Power Station, Units 1 and 2 (Report 05000280/2024005 and 05000281-2024005), Rev 1 ML24219A2372024-08-23023 August 2024 Issuance of Amendment Nos. 319 and 319, Adoption of TSTF-577, Rev. 1, Revised Frequencies for Steam Generator Tube Inspection, ML24207A0402024-08-21021 August 2024 Summary of July 17, 2024, Public Meeting - TS 3.7/3.14 AOT for SW Piping Maintenance IR 05000280/20240112024-08-13013 August 2024 Comprehensive Engineering Team Inspection Report 05000280/2024011 and 05000281/2024011 ML24164A0012024-08-12012 August 2024 Proposed Alternative Relief Request V-1 Inservice Testing of Pressure Isolation Valves (EPID l-2023-LLR-0060) IR 05000280/20240022024-08-0101 August 2024 Integrated Inspection Report 05000280/2024002 and 05000281/2024002 05000280/LER-2024-001, Troubleshooting Initiated Unknown Turbine Trip Feature in Control System2024-07-30030 July 2024 Troubleshooting Initiated Unknown Turbine Trip Feature in Control System ML24165A2782024-07-17017 July 2024 Issuance of Amendment Nos. 318 and 318, Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection ML24165A1232024-07-17017 July 2024 Proposed Alternative Relief Request P-1, P-2 Inservice Testing of Residual Heat and Containment Spray Pumps (EPID l-2023-LLR-0058) ML24190A4192024-07-0808 July 2024 Inservice Testing (IST) Program for Pumps and Valves Revised Sixth IST Interval Start Date and Updated Technical Specifications References for Alternative Request V-1 ML24179A2932024-07-0101 July 2024 Notification of Inspection and Request for Information for NRC Problem Identification and Resolution Inspection ML24178A2422024-06-25025 June 2024 2023 Annual Report of Emergency Core Cooling System (ECCS) Model, Changes Pursuant to the Requirements of 10 CFR 50.46 ML24177A2792024-06-20020 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24166A0622024-06-18018 June 2024 – Proposed Alternative Relief Request P-3, P-4 Inservice Testing of Boric Acid, Component Cooling Water Pumps ML24157A0542024-06-13013 June 2024 Audit Summary in Support of License Amendment Request for Proposed Reclassification of Low Head Safety Injection Flow Instrumentation Related to Regulatory Guide 1.97 ML24143A1622024-06-12012 June 2024 – Correction to Issuance of Amendment Nos. 297 and 280 and Surry Units 1 and 2, Correction to Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24170B0532024-06-10010 June 2024 DOM-NAF-2-P/NP-A, Revision 0.5, Reactor Core Thermal-Hydraulics Using the VIPRE-D Computer Code ML24141A2862024-05-22022 May 2024 Information Request for the Cyber Security Baseline Inspection, Notification to Perform Inspection 05000280/2024403 and 05000281- 2024403 ML24141A2512024-05-20020 May 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable - Supplemental Information ML24141A0482024-05-17017 May 2024 EN 56958_1 Ametek Solidstate Controls, Inc ML24136A2302024-05-13013 May 2024 Core 1 Cycle 33 Pattern Mdr Revision 0 ML24130A2492024-05-0909 May 2024 Submittal of Information in Support of Surry Power Station Unit 1 Thermal Shield Flexure Replacement Campaign ML24130A2032024-05-0909 May 2024 Proposed License Amendment Request Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections Supplemental Information ML24130A1192024-05-0707 May 2024 Inservice Test Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests - Response to Request for Additional Information Regarding Alternative Request V-1 ML24142A3852024-04-30030 April 2024 2023 Annual Radioactive Effluent Release Report IR 05000280/20240012024-04-30030 April 2024 Integrated Inspection Report 05000280-2024001 and 05000281-2024001 ML24122C6522024-04-30030 April 2024 Annual Radiological Environmental Operating Report ML24122B3032024-04-29029 April 2024 Associated Independent Spent Fuel Storage Installation, Revision to Emergency Plan Report of Change IR 05000280/20244022024-04-29029 April 2024 Security Baseline Inspection Report 05000280/2024402 and 05000281/2024402 ML24115A1952024-04-24024 April 2024 Notification of Surry Power Station Comprehensive Engineering Team Inspection - U.S. NRC Inspection Report 05000280/2024011 and 05000281/2024011 ML24054A0142024-04-22022 April 2024 Issuance of Amendment Nos. 297 and 280, and Surry Power Station Unit Nos. 1 and 2, Issuance of Amendment Nos. 317 and 317, to Change Emergency Plan Staff Augmentation Times ML24108A1812024-04-15015 April 2024 Proposed License Amendment Request - Reclassification of Low Head Safety Injection Flow Indication Regulatory Guide 1.97 Variable Supplemental Information ML24095A2172024-04-12012 April 2024 – Review of the Spring 2023 Steam Generator Tube Inspection Report ML24088A2482024-03-26026 March 2024 Inservice Testing Program for Pumps and Valves Sixth Interval Update and Associated Relief and Alternative Requests- Response to Request for Additional Information ML24087A2082024-03-22022 March 2024 Proposed License Amendment Request Addition of Containment Limiting Condition for Operation and Surveillance Requirements ML24078A2642024-03-21021 March 2024 – Regulatory Audit in Support of License Amendment Request to Proposed Reclassification of Regulatory Guide 1.97 Variable for Low Head Safety Injection Flow Instrumentation ML24087A1522024-03-18018 March 2024 Annual Changes, Tests, and Experiments Report Regulatory Commitment Evaluation Report ML24023A5762024-03-0808 March 2024 Correction to Issuance of Amendment Nos. 315 and 315, Regarding Revised Emergency Plan for Relocation of the Technical Support Center IR 05000280/20230062024-02-28028 February 2024 Annual Assessment Letter for Surry Power Station, Units 1 and 2 - NRC Inspection Reports 05000280/2023006 and 05000281/2023006 ML24032A4712024-02-20020 February 2024 Exemption from Select Requirements of 10 CFR Part 73 - Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting ML24051A1782024-02-19019 February 2024 Proposed License Amendment Request - Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections ML24057A0612024-02-19019 February 2024 and Virgil C. Summer Power Nuclear Stations - Nuclear Property Insurance Coverage IR 05000280/20230042024-02-0909 February 2024 Integrated Inspection Report 05000280/2023004 and 05000281/2023004 IR 05000280/20244012024-02-0606 February 2024 Security Baseline Inspection Report 05000280/2024401, 05000281/2024401 and 07200002/2024401 IR 05000280/20230102024-01-18018 January 2024 – Age Related Degradation Inspection Report 05000280-2023010 and 05000281-2023010 2024-09-03
[Table view] Category:Meeting Notice
MONTHYEARPMNS20241176, Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses2024-09-23023 September 2024 Pre-submittal Meeting with Dominion Energy Regarding a Planned License Amendment Request for North Anna Power Station and Surry Power Station to Revise Selected Alternate Source Term Dose Consequence Analyses PMNS20240863, Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 22024-06-27027 June 2024 Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 2 PMNS20240758, Notice of Meeting with Dominion Energy Inc. to Discuss Guidance in NUREG-0800 Standard Review Plan (SRP)2024-06-12012 June 2024 Notice of Meeting with Dominion Energy Inc. to Discuss Guidance in NUREG-0800 Standard Review Plan (SRP) PMNS20240556, Annual Assessment Meeting Surry Power Station Annual Assessment Meeting2024-04-18018 April 2024 Annual Assessment Meeting Surry Power Station Annual Assessment Meeting PMNS20231323, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-11-27027 November 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230615, Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 22023-05-11011 May 2023 Meeting with Virginia Electric and Power Company Regarding License Amendment Request to Revise Emergency Plan Staff Augmentation Times for North Anna Power Station Units 1 and 2 and Surry Power Station Units 1 and 2 PMNS20230430, Assessment Meetingsurry Power Station Annual Assessment Meeting2023-04-13013 April 2023 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220318, Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station2022-04-0707 April 2022 Public Meeting with the Dominion Energy to Discuss a Planned Emergency Preparedness Submittal for the North Anna Power Station and the Surry Power Station PMNS20220349, Assessment Meetingsurry Power Station Annual Assessment Meeting2022-04-0404 April 2022 Assessment Meetingsurry Power Station Annual Assessment Meeting PMNS20220301, Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 22022-03-29029 March 2022 Pre-submittal Meeting with Virginia Electric and Power Company (VEPCO) to Discuss Its Proposed License Amendment for Surry Power Station, Units 1 and 2 PMNS20220113, Pre-submittal Meeting with Virginia Electric Power Company (VEPCO) to Discuss Future License Amendment for Surry Power Station, Units 1 and 22022-02-11011 February 2022 Pre-submittal Meeting with Virginia Electric Power Company (VEPCO) to Discuss Future License Amendment for Surry Power Station, Units 1 and 2 PMNS20210540, Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Revise the New and Spent Fuel Pool Criticality Analyses for Surry Power Station, Units 1 and 22021-05-11011 May 2021 Pre-Submittal Meeting - Proposed License Amendment Request (LAR) to Revise the New and Spent Fuel Pool Criticality Analyses for Surry Power Station, Units 1 and 2 PMNS20210612, Pre-Submittal Meeting - Proposed License Amendment (LAR) Request to Revise the Licensing Basis for the Turbine Building and the Fuel Building Trolley Support Structures Relative to Tornado Effects for Surry Power Station, Units 1 and 22021-05-10010 May 2021 Pre-Submittal Meeting - Proposed License Amendment (LAR) Request to Revise the Licensing Basis for the Turbine Building and the Fuel Building Trolley Support Structures Relative to Tornado Effects for Surry Power Station, Units 1 and 2 PMNS20210382, the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 20202021-04-12012 April 2021 the U.S. Nuclear Regulatory Commission (NRC) Will Hold a Webinar to Discuss the Nrc'S Assessment of Safety Performance at the V. C. Summer, North Anna and Surry Power Stations for 2020 PMNS20201174, Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc)2020-10-0101 October 2020 Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc) PMNS20201170, Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc)2020-09-30030 September 2020 Notice of Pre-Submittal Meeting with Virginia Electric and Power Company (Vepc) ML14076A1112014-03-17017 March 2014 Notice of Public Meeting to Provide an Open Forum to Discuss the Annual Assessment of Surry Power, Units 1 and 2 ML14066A1252014-03-0707 March 2014 March 18, 2014, Notice of Category 3 Public Meeting/Open House Regarding Surry, Units 1 & 2, Annual Assessment ML14065A5302014-03-0606 March 2014 Notice of Category 3 Public Meeting/Open House with Virginia Electric and Power Company to Discuss Surry Power Station Units 1 and 2 Annual Assessment ML14065A4942014-03-0606 March 2014 Notice of Category 3 Public Meeting/Open House with Virginia Electric and Power Company to Discuss Surry Power Station Units 1 and 2 Annual Assessment ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13109A1642013-04-19019 April 2013 Notice of Public Meeting/Open House Regarding Surry Power Station, Units 1 and 2, Annual Assessment ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML12100A1952012-04-0909 April 2012 Notice of Meeting to Provide an Open Public Forum to Discuss the NRC Reactor Oversight Process and the Nrc'S Annual Assessment of the Surry Power Station During Calendar Year 2011 ML12089A2742012-03-29029 March 2012 Mtg Ann -Surry Regulatory Conference - 2012 ML1115403882011-06-0202 June 2011 08/02-03/2011 Meeting Announcement - 2011 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers Workshop ML1110304262011-04-13013 April 2011 Public Meeting/Open House Attendees ML1036200902010-12-28028 December 2010 Notice of Category 1 Public Meeting with Virginia Electric and Power Company to Discuss the Plant Status of the Surry Power Station ML1015501432010-06-0404 June 2010 08/17-18/2010 Meeting Announcement - 2010 NRC Initial Exam Writers Workshop ML1008803892010-03-29029 March 2010 Meeting Notice to Discuss the NRC Reactor Oversight Process and the Annual Assessment of the Surry Power Station ML0931002542009-11-0909 November 2009 Notice of Conference Call with Virginia Electric and Power Company to Discuss Issues Relating to Surry Power Station ML0918004532009-06-29029 June 2009 Meeting Announcement - Category 2 Public Meeting, 2009 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Development Workshop ML0908302052009-03-23023 March 2009 Notice of Category 3 Public/Open House Meeting with Surry Power Station to Discuss NRC Reactor Oversight Process and Annual Assessment ML0819600282008-07-11011 July 2008 08/05-06/2008-Notice of Meeting - 2008 Us Nuclear Regulatory Commission Initial Examination Development Workshop ML0807009262008-03-0707 March 2008 Notice of Meeting with Virginia Electric & Power Co to Discuss NRC Reactor Oversight Process Annual Assessment of Surry Power Station ML0726900152007-09-26026 September 2007 Notice of Forthcoming Meeting with Dominion Nuclear to Discuss Proposed Chemical Testing Methods Related to GSI-191, Assessment of Debris Accumulation on PWR Sump Performance, as Proposed by Its Vendor ML0713706072007-05-17017 May 2007 Notice of Meeting for NRC Training Managers' Conference Hosting by Rgn II ML0708701352007-03-27027 March 2007 Notice of Meeting with Surry to Discuss the NRC Reactor Oversight Process Annual Assessment ML0633102092006-11-27027 November 2006 Rescheduled Forthcoming Meeting with Virginia Electric and Power Company (VEPCO) Regarding Main Control Room and Emergency Switchgear Room Air-Conditioning System Application for Surry Nuclear Station, Units 1 and 2 ML0632605122006-11-22022 November 2006 Forthcoming Meeting with Virginia Electric and Power Company. Regarding Main Control Room and Emergency Switchgear Room for Surry Nuclear Station Units 1 and 2 ML0626203902006-09-19019 September 2006 Notice of Meeting with Virginia Electric Power Company (VEPCO) to Discuss Organizational Changes at VEPCO, Etc ML0618700742006-07-0505 July 2006 and 07/20/2006 Meeting Announcement 2006 NRC Initial Exam Development Workshop to Clarify the Exam Development Process and Question Development for Both the Written and Operating Portion of the Initial Examination ML0609404382006-04-0404 April 2006 Notice of Annual Assessment Public Meeting with Virginia Electric and Power Company to Discuss NRC Reactor Oversight Process Annual Assessment of Surry Facility ML0602700902006-01-27027 January 2006 Forthcoming Meeting with Virginia Electric and Power Co. and Westinghouse to Discuss License Amendments to Increase the Lead Rod Average Burnup Limit to 62,000 Mwd/Mt at Surry Power Station, Unit 1 ML0525606282005-09-13013 September 2005 Notice of Category 1 Meeting W/ VEPCO Surry and ISFSI Related Criticality Analysis Between Part 50 and 72 ML0513100022005-05-10010 May 2005 Notice of Meeting Regarding the plant-specific Implementation of VIPRE-D Topical Report for Dominion, VEPCO, (Surry, North Anna & Millstone) ML0510200412005-04-12012 April 2005 Meeting Notice with Nrc/ Dominion to Discuss Status of Current Licensing Issues & Attributes of Good Licensing Submittals ML0506904622005-03-0909 March 2005 Public Meeting Notice - Category One Meeting - Regulatory Performance Meeting - Surry Power Station ML0506803262005-03-0808 March 2005 Meeting Announcement - Public Meeting - Annual Assessment of Surry Power Station ML0436303932004-12-28028 December 2004 2005 U. S. Nuclear Regulatory Commission (NRC) Training Managers' Conference 2024-09-23
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 March 29, 2012 Mr. David A. Heacock President and Chief Nuclear Officer Virginia Electric and Power Company Innsbrook Technical Center 5000 Dominion Boulevard Glen Allen, VA 23060
SUBJECT:
MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY CONFERENCE MEETING - SURRY POWER STATION, DOCKET NOS. 50-280 AND 281
Dear Mr. Heacock:
This letter confirms the email correspondence between Mr. Barry Garber of your staff and Mr.
Gerald McCoy of the NRC, on March 21, 2012, concerning a Regulatory Conference being conducted at your request, which has been scheduled for April 19, 2012, from 1:30 p.m. to 3:30 p.m. Eastern Daylight Time (EDT). The enclosed meeting notice provides additional details.
The purpose of this Regulatory Conference is to discuss one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS) standpipe level erratic indications. The results of the NRCs inspection of this issue are available in NRC Inspection Report No. 05000280, 281/2012007, available at the Agencywide Document Access and Management System (ADAMS) (ML120730510).
In accordance with 10 CFR 2.390 of the NRCs "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRCs ADAMS.
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 997-4551.
Sincerely,
/RA/
Gerald J. McCoy, Chief Reactor Projects Branch 5 Division of Reactor Projects Docket Nos.: 50-280 & 50-281 License Nos.: DPR-32 & DPR-37
Enclosure:
As stated
_ ML12089A274 ________ X SUNSI REVIEW COMPLETE X FORM 665 ATTACHED OFFICE Rii:DRP RII:DRP SIGNATURE SON by email GJM1 NAME SNinh GMcCoy DATE 03/27/2012 03/29/2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO VEPCO 2 cc w/encl: Michael M. Cline Larry Lane Director Site Vice President Virginia Department of Emergency Services Surry Power Station Management Virginia Electric and Power Company Electronic Mail Distribution Electronic Mail Distribution B. L. (Sonny) Stanley Director, Nuclear Safety and Licensing Virginia Electric and Power Company Electronic Mail Distribution Kenny B. Sloane Plant Manager Surry Power Station Virginia Electric & Power Company Electronic Mail Distribution Lillian M. Cuoco, Esq.
Senior Counsel Dominion Resources Services, Inc.
Electronic Mail Distribution Tom Huber Director, Nuclear Licensing & Operations Support Innsbrook Technical Center Electronic Mail Distribution Ginger L. Rutherford Virginia Electric and Power Company Electronic Mail Distribution Virginia State Corporation Commission Division of Energy Regulation P.O. Box 1197 Richmond, VA 23209 Attorney General Supreme Court Building 900 East Main Street Richmond, VA 23219 Senior Resident Inspector Surry Power Station U.S. Nuclear Regulatory Commission 5850 Hog Island Rd Surry, VA 23883
VEPCO 3 Letter to David A. Heacock from Gerald J. McCoy dated March 29, 2012
SUBJECT:
MEETING ANNOUNCEMENT - CATEGORY ONE - REGULATORY CONFERENCE MEETING - SURRY POWER STATION, DOCKET NOS. 50-280 AND 281 Distribution w/encl:
C. Evans, RII EICS L. Douglas, RII EICS OE Mail RIDSNRRDIRS PUBLIC RidsNrrPMSurry Resource Region II Administrators Secretary Region II DRP Division Secretary Region II Division Directors and Deputies Region II Counsel Region II State Liaison Officer Region II Public Affairs Officer Region II Resource Management Branch Region II Receptionist Region II Regional Coordinator OEDO Headquarters Operation Officer PMNS
SUBJECT:
REGULATORY CONFERENCE MEETING WITH VIRGINIA ELECTRIC POWER COMPANY FACILITY: SURRY POWER STATION DOCKETS: 50-280 AND 50-281 DATE & TIME: Thursday, April 19, 2012 from 1:30 p.m. to 3:30 p.m. EDT LOCATION: US Nuclear Regulatory Commission Region II 245 Peachtree Center Ave. NE Suite 1200 Atlanta, GA 30303 PURPOSE: The purpose of this Regulatory Conference is to discuss one Apparent Violation (AV) of Technical Specification (TS) 6.4.A.7 associated with Surry Unit 2 reactor coolant system (RCS) standpipe level erratic indications. The results of the NRCs inspection of this issue are available in NRC Inspection Report No. 05000280, 281/2012007, available at Agencywide Document Access and Management System (ADAMS) (ML120730510). The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, http://www.nrc.gov, and contains information regarding conduct of NRC meetings.
CATEGORY: This is a Category 1 meeting: The public is invited to observe this meeting and will have one or more opportunities to communicate with the NRC after the business portion, but before the meeting is adjourned.
The NRC provides reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., Braille, large print), please notify the NRCs meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
NRC OFFICE PARTICIPATING: Region II Enclosure
2 OTHER ORGANIZATIONS PARTICIPATING: None PARTICIPANTS: NRC (partial list)
V. McCree, Regional Administrator, Region II (RII)
L. Wert, Deputy Regional Administrator, RII R. Croteau, Division Director, Division of Reactor Projects J. Munday, Director, Division of Reactor Safety H. Christensen, Deputy Director, Division of Reactor Safety C. Evans, Regional Council, Office of Enforcement and Investigation Coordination G. MacDonald, Senior Reactor Analyst, Division of Reactor Safety G. McCoy, Chief, Reactor Projects Branch 5 J. Nadel, Resident Inspector, Surry R. Clagg, Resident Inspector, North Anna LICENSEE (partial list)
L. Lane, Site Vice President, Surry K. Sloane, Plant Manager B. Stanley, Director, Station Safety and Licensing MEETING CONTACT: Gerald J. McCoy 404-997-4551 Gerald.McCoy@nrc.gov AUDIO TELE-CONFERENCING: Interested members of the public can participate in this meeting via a toll-free audio teleconference. Please contact the NRC meeting contact in advance of the meeting to obtain teleconferencing information.
VIDEO TELE-CONFERENCING: Not Available Enclosure