| title = Grand Gulf, Unit 1 - Redacted, Request for Additional Information, Nrr/De/Emcb Review of Steam Dryer, Round 4, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt (TAC
| title = Redacted, Request for Additional Information, Nrr/De/Emcb Review of Steam Dryer, Round 4, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt
| author name = Wang A B
| author name = Wang A
| author affiliation = NRC/NRR/DORL/LPLIV
| author affiliation = NRC/NRR/DORL/LPLIV
| addressee name =  
| addressee name =  
Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:OFFICIAL USE ONLY PROPRIETI\RY UNITED NUCLEAR REGULATORY WASHINGTON, D.C. 20555.0001 Apr i1 18. 2012 Vice President, Operations Entergy Operations, Inc. Grand Gulf Nuclear Station P.O. Box Port Gibson, MS GRAND GULF NUCLEAR STATION, UNIT 1 -REQUEST FOR ADDITIONAL INFORMATION REGARDING EXTENDED POWER UPRATE APPLICATION LICENSE AMENDMENT REQUEST (TAC NO. ME4679)  
{{#Wiki_filter:OFFICIAL USE ONLY         PROPRIETI\RY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555.0001 Apr i1 18. 2012 Vice President, Operations Entergy Operations, Inc.
Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 SUB~IECT:      GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING EXTENDED POWER UPRATE APPLICATION LICENSE AMENDMENT REQUEST (TAC NO. ME4679)


==Dear Sir or Madam:==
==Dear Sir or Madam:==
By application dated September 8,2010 (Reference 1), as supplemented by letters dated November 18, 2010 (Reference 2), November 23,2010 (Reference 3), February 23,2011 (four letters, References 4, 5, 6, and 7), March 9, 2011 (two letters, References 8) and 9, March 22, 2011 (Reference 10), March 30, 2011 (Reference 11), March 31,2011 (Reference 12),ApriI14, 2011 (Reference 13), April 21, 2011 (Reference 14), May 3,2011 (Reference 15), May 5, 2011 (Reference 16), May 11,2011 (Reference 17), June 8,2011 (Reference 18), June 15, 2011 (Reference 19), June 21,2011 (Reference 20) June 23,2011 (Reference 21), July 6,2011 (Reference 22), July 28, 2011 (Reference 23), August 25, 2011 (Reference 24), August 29, 2011 (Reference 25), August 30,2011 (Reference 26), September 2,2011 (Reference 27), September 9, 2011 (Reference 28), September 12, 2011 (Reference 29), September 15, 2011 (Reference 30), September 26,2011 (Reference 31), October 10, 2011 (two letters, References 32 and 33), October 24,2011 (Reference 34), November 14, 2011 (Reference 35), November 25,2011 (Reference 36), November 28, 2011 (Reference 37), December 19, 2011 (Reference 38), February 6,2012 (Reference 39), February 15,2012 (Reference 40), February 20,2012 (Reference 41), March 13,2012 (Reference 42), March 21, 2012 (Reference 43), and April 5, 2012 (Reference 44), Entergy Operations, Inc. (Entergy, the licensee), submitted a license amendment request for Grand Gulf Nuclear Station, Unit 1 (GGNS). Portions of the letters dated September 8 and November 23, 2010, and February 23, April 21, May 11, July 6, July 28, September 2, October 10, November 14, November 25, and November 28,2011, and February 6, February 15, February 20, March 13, March 21, and April 5, 2012, contain sensitive unclassified non-safeguards information (proprietary) and, accordingly, have been withheld from public disclosure. The proposed amendment requests an increase in the maximum steady-state power level at GGNS from 3898 megawatts thermal (MWt) to 4408 MWt. This represents an approximate 13 percent increase above the current licensed thermal power or an approximate 15 percent increase above the original licensed thermal power. On September 19-20, 2011, the U.S. Nuclear Regulatory Commission (NRC) conducted an audit (Reference 45), to review the General Electric Hitachi (GEH) documents pertaining to the NOTICE: Enclosure 1 to this letter contains Proprietary Information. Upon separation from Enclosure 1, this letter is DECONTROLLED. OFFIGIAL 10/8& ONLY PROPRIETARY INFORMATION Lf.
 
OFFICIAL USE ONL'l-PROPRIETARY INFORMATION GGNS steam dryer evaluations. By two letters dated October 10,2011 (References 32 and 33), Entergy submitted responses to the request for additional information (RAI) for GGNS. Based on a review of the licensee's responses, the NRC staff has identified areas for which additional information is required. This RAI was discussed with Mr. Jerry Burford of your staff it was agreed that a response would be provided within 30 days of receipt of this letter. The NRC staffs proprietary version of the RAI is provided in Enclosure 1 and a nonproprietary version is provided in Enclosure 2. A list of references is provided in Enclosure 3. The proprietary information in Enclosure 1 is identified by text enclosed within double brackets. If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan.Wang@nrc.gov. Sincerely, Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416  
By application dated September 8,2010 (Reference 1), as supplemented by letters dated November 18, 2010 (Reference 2), November 23,2010 (Reference 3), February 23,2011 (four letters, References 4, 5, 6, and 7), March 9, 2011 (two letters, References 8) and 9, March 22, 2011 (Reference 10), March 30, 2011 (Reference 11), March 31,2011 (Reference 12),ApriI14, 2011 (Reference 13), April 21, 2011 (Reference 14), May 3,2011 (Reference 15), May 5, 2011 (Reference 16), May 11,2011 (Reference 17), June 8,2011 (Reference 18), June 15, 2011 (Reference 19), June 21,2011 (Reference 20) June 23,2011 (Reference 21), July 6,2011 (Reference 22), July 28, 2011 (Reference 23), August 25, 2011 (Reference 24), August 29, 2011 (Reference 25), August 30,2011 (Reference 26), September 2,2011 (Reference 27),
September 9, 2011 (Reference 28), September 12, 2011 (Reference 29), September 15, 2011 (Reference 30), September 26,2011 (Reference 31), October 10, 2011 (two letters, References 32 and 33), October 24,2011 (Reference 34), November 14, 2011 (Reference 35),
November 25,2011 (Reference 36), November 28, 2011 (Reference 37), December 19, 2011 (Reference 38), February 6,2012 (Reference 39), February 15,2012 (Reference 40),
February 20,2012 (Reference 41), March 13,2012 (Reference 42), March 21, 2012 (Reference 43), and April 5, 2012 (Reference 44), Entergy Operations, Inc. (Entergy, the licensee), submitted a license amendment request for Grand Gulf Nuclear Station, Unit 1 (GGNS). Portions of the letters dated September 8 and November 23, 2010, and February 23, April 21, May 11, July 6, July 28, September 2, October 10, November 14, November 25, and November 28,2011, and February 6, February 15, February 20, March 13, March 21, and April 5, 2012, contain sensitive unclassified non-safeguards information (proprietary) and, accordingly, have been withheld from public disclosure. The proposed amendment requests an increase in the maximum steady-state power level at GGNS from 3898 megawatts thermal (MWt) to 4408 MWt. This represents an approximate 13 percent increase above the current licensed thermal power or an approximate 15 percent increase above the original licensed thermal power.
On September 19-20, 2011, the U.S. Nuclear Regulatory Commission (NRC) conducted an audit (Reference 45), to review the General Electric Hitachi (GEH) documents pertaining to the NOTICE: Enclosure 1 to this letter contains Proprietary Information. Upon separation from Enclosure 1, this letter is DECONTROLLED.
OFFIGIAL 10/8& ONLY       PROPRIETARY INFORMATION           Lf.
 
OFFICIAL USE ONL'l- PROPRIETARY INFORMATION
                                                -2 GGNS steam dryer evaluations. By two letters dated October 10,2011 (References 32 and 33),
Entergy submitted responses to the request for additional information (RAI) for GGNS. Based on a review of the licensee's responses, the NRC staff has identified areas for which additional information is required. This RAI was discussed with Mr. Jerry Burford of your staff it was agreed that a response would be provided within 30 days of receipt of this letter.
The NRC staffs proprietary version of the RAI is provided in Enclosure 1 and a nonproprietary version is provided in Enclosure 2. A list of references is provided in Enclosure 3. The proprietary information in Enclosure 1 is identified by text enclosed within double brackets.
If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan.Wang@nrc.gov.
Sincerely, Ala~n~:r.ger Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416


==Enclosures:==
==Enclosures:==
1. Proprietary RAls 2. Non-proprietary RAls 3. References cc w/non-proprietary encl: Distribution via Listserv OFFICIAL USE ONLY PROPRIETARY INFORMATION V OFFIGIAL Y&E ONLY PROPRIETARY INFORMATION ENCLOSURE 2 REQUEST FOR ADDITIONAL STEAM DRYER GRAND GULF NUCLEAR STATION. UNIT EXTENDED POWER UPRATE LICENSE AMENDMENT ENTERGY OPERATIONS. DOCKET NO. OffiCIAL USi ONLY PROPRIETARY INFORMATION OFFICIAL liSE ONloY PROPRIETAR¥ INFORMATION REQUEST FOR ADDITIONAL INFORMATION GRAND GULF NUCLEAR STATION, UNIT NO.1 EXTENDED POWER UPRA TE LICENSE AMENDMENT REQUEST ENTERGY OPERATIONS. INC. DOCKET NO. 50-416 By letter dated September 8,2010, as supplemented (see Enclosure 3), Entergy Operations, Inc. (Entergy), submitted an extended power uprate (EPU) license amendment request for Grand Gulf Nuclear Station, Unit 1 (GGNS). The proposed amendment requests an increase in the maximum steady-state power level at GGNS from 3898 megawatts thermal (MWt) to 4408 MWt. This represents an approximate 13 percent increase above the current licensed thermal power (CLTP) or an approximate 15 percent increase above the original1icensed thermal power. On September 19-20, 2011, the U.S. Nuclear Regulatory CommiSSion (NRC) conducted an audit (Reference 45), to review the General Electric Hitachi (GEH) documents pertaining to the GGNS steam dryer evaluations. By two letters dated October 10, 2011 (References 32 and 33), Entergy submitted responses to the request for additional information (RAI) for GGNS. Based on a review of the licensee's responses, the NRC staff has identified the following areas for which additional information is required. GGNS-SD-AA1-RAI-01 The response to the audit action item 1 did not provide updated data for frequency dependent Bias and Uncertainties (B&U) and GGNS dryer loads. The licensee is requested to provide this information. GGNS-SD-AA3-RAI2 In response to the audit action item 3, the licensee has assessed the potential errors and uncertainties aSSOCiated with its load mapping algorithm, which projects pressures from its acoustic models to loads applied to its structural models. GEH subdivided its GGNS dryer model into GEH computed However, it is unclear whether the analyses include model regions where the load mapping procedure fails. The NRC staff notes that may not capture the impacts of load mapping errors on the high-stress regions. The licensee has also not supplied some of the tables and figures discussed in its response. In addition, the licensee has not provided an assessment of load mapping errors on Further, the NRC Enclosure OFFICIAL UBI! ONLY PROPRII!TARY INFORMATION 9FnO....L Il6E 9NL¥ PR9PR1ETAR¥ INF9RMATION k( -staff is concerned that if load mapping errors are endemic to the current load mapping code, their effects may not be fully captured by The licensee is requested to provide:
: 1. Proprietary RAls
* Table 1 (cited on page 12 of 46, but not provided) Figures 5 and 6 (cited on page 13 of 46, but not provided) Contours of local load mapping errors (worst-case at peak loading frequencies) over the and corresponding discussions of the potential impacts of the errors on high stress locations (from Table 2 on page 36 or 46). An assessment of load mapping errors on the This should be based on projected effects on A quantitative deSCription of the load mapping errors -their root cause(s) and potential impacts on dryer components, and proof that the assessments made on the GGNS dryer capture the worst-case potential impacts. The NRC staff notes that the corrective action report (CAR) seen by the staff during the audit specifically pointed out errors near the Therefore, the licensee is further requested to demonstrate that the that were described in the internal CAR which seem to lead to the worst load mapping errors. The licensee is requested to provide GEH's plans on how it will resolve the load mapping error issue for GGNS and/or future plants. GGNS-50-AA5*RAI3 In response to the audit action item 5. the licensee provided a plot (Figure 2) which gives appropriate However, the explanation is not clear about how the appropriateness of the is determined. Since the greater than that given by Figure 2 would also provide analytically acceptable results for the a criterion needs to be specified for determining the appropriateness of the The licensee is requested to clarify if (for Figure 1), The licensee is also requested to confirm if this criterion is utillzed in preparing Figure 2. OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY PROPRIETARY INFORMATION GGNS-SD-AA7-RAI4 In response to audit action item 7 pertaining to incorporating the into the GGNS dryer analysis, the licensee did not provide the Figures 1 through 6 and Tables 1 and 2 referenced in its response. The licensee is requested to provide the accompanying figures and tables. GGNS-SD-AAii-RAI 5 In response to audit action item 11, the licensee provided a summary of all adjustments made to its GGNS replacement dryer stress calculations, and a table updating the maximum stresses and stress ratios. The licensee also stated that based on the reanalysis. from the original submission. The licensee is requested to revise this table based on its responses to the follow-up questions for audit action items 1, 3, 5, and 7 noted above. GGNSi-SD-New-RAIS In Section 3.3.2.4 ofthe GEH report NEDC-33601P, "Engineering Report -Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using PBLE Methodology,* the applicant discusses (Section 3.3.2.4.5, see in Table 3-22 ). (a) The licensee is requested to explain whether and also explain how does one determine whether to perform sub-modeling at a given high stress location. (b) The licensee is requested to explain why the (c) It appears that the strength of materials approach determines the The licensee is requested to explain whether this stress is compared with the GGNSi-SD-New-RAI 7 In Appendix F (Section F.2) of the GEH report NEDC-33601 P, Revision 0, it is stated that during power ascension from CLTP to EPU. OFFlelAL I;ISE ONLY
: 2. Non-proprietary RAls
* PROPRIETARY INFORMMlON OFFICIAL liSE ONIoV PROPRIETAR¥ INFORMATION However, this comparison does not confirm whether the projected loads are less than or equal to the design loads expected at that specific power level; these design loads may be determined by properly interpolating the EPU acceptance limits for the steam dryer pressures. The licensee is requested to revise or clarify the monitoring plan used during power ascension to confirm that the loads acting on the steam dryer at any given power level do not exceed the corresponding deSign loads. GGNS1-SD-New-RAI8 In the background section of topical report, BWRVIP-139, "Steam Dryer Inspection and Flaw Evaluation Guidelines," it is stated that fOI The licensee is requested to explain what the frequency of the frequency loading was and how long it might have taken to cause the failure. Since the high-cycle fatigue cracking due to low frequency loading can potentially manifest after a longer period of operation (longer than few operating cycles) at EPU loading, the licensee is requested to describe the long-term inspection requirements for the GGNS replacement steam dryer. In the "Results &Findings" section of topical report BWRVIP-139. it is stated that, for the dryer because the high-cycle fatigue cracking caused by the low-frequency pressure loading is not likely to be present in the baseline inspection results. The licensee is therefore requested to explain how the baseline inspection results would help in determining the re-inspection requirements for the GGNS replacement dryer operating at EPU. GGNS1-SD-New-RAI9 The licensee is requested to identify the American Society of Mechanical Engineers (ASME) Code requirements that are followed for the deSign and fabrication of the partial penetration welds in the GGNS replacement steam dryer. The licensee is requested to describe how the fatigue assessment of the partial penetration weld is performed. If the size of the partial penetration weld is smaller than that required by the ASME Code, the licensee is requested to describe how the undersize effect of OFFICIAL liSE ONLY PROPRIETARY INFORMATlON OFIP'ICIAL. USE ONLY PROPRIETARY Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 8, 2010 (GNRO-2010/00056) (ADAMS Accession No. ML102660409). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 18,2010 (GNRO-2010/00071) (ADAMS Accession No. ML103260003). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommisSion, "Supplemental License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,' dated November 23, 2010 (GNRO-2010/00073) (ADAMS Accession No. ML103330146). Krupa, M. A" Entergy Operations, Inc .. letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23,2011 (GNRO-2011/00007) (ADAMS Accession No. ML110540534). Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23, 2011 (GNRO-2011/00012) (ADAMS Accession No. ML110540540). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23, 2011 (GNRQ-2011/00011) (ADAMS Accession No. ML110540545). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23, 2011 (GNRO-2011/00013) (ADAMS Accession No. ML110550318). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate. Grand Gulf Nuclear Station, Unit 1," dated March 9,2011 (GNRO-2011/00017) (ADAMS Accession No. ML110680507). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommiSSion, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 9,2011 (GNRO-2011/00016) (ADAMS Accession No. ML110730025). 1 of 5 OFFICIAL USE ONLY* PROPRIETARY INFORMATION OFFIO....L USE ONLY* PROPRIE_INFORMA1l0N Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1." dated March 22,2011 (GNRO-2011/00019) (ADAMS Accession No. ML110820262). Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 30,2011 (GNRO-2011/00018) (ADAMS Accession No. ML110900275). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommisSion, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1 I" dated March 31,2011 (GNRO-2011/00021) (ADAMS Accession No. ML110900586). Krupa, M. A.. Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,n dated April 14, 2011 (GNRO*2011/00024) (ADAMS Accession No. ML111050134). Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated April 21, 2011 (GNRO-2011100025) (ADAMS Accession No. ML111120329). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 3,2011 (GNRO-2011/00034) (ADAMS Accession No. ML111240288). Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 5,2011 (GNRO*2011100035) (ADAMS Accession No. ML111250552). Krupa, M. A" Entergy Operations. Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 11, 2011 (GNRO-2011/00037) (ADAMS Accession No. ML111320263). Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 8, 2011 (GNRO-2011/00043) (ADAMS Accession No. ML111590836). Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 15, 2011 (GNRO-2011/00046) (ADAMS Accession No. ML111670059). 20f5 OFFICIAL USE ONLY* PROPRIETARY INFORMATION OFFIGIAL liSE ONL¥ PROPRIETARY INFORMATION Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 21,2011 (GNRO-2011/00050) (ADAMS AcceSSion No. ML111730235). Krupa, M. A, Entergy Operations, Inc.. letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 23, 2011 (GNRO-2011/00052) (ADAMS Accession No. ML111750244). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated July 6,2011 (GNRO-2011/00053) (ADAMS Accession No. ML111880138). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate. Grand Gulf Nuclear Station, Unit 1,n dated July 28, 2011 (GNRO-2011/00055) (ADAMS Accession No. ML112101485). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated August 25, 2011 (GNRO-2011/00070) (ADAMS Accession No. ML112370770). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated August 29, 2011 (GNRO-2011/00073) (ADAMS Accession No. ML112410566). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated August 30,2011 (GNRO-2011/00074) (ADAMS Accession No. ML112420169). Krupa. M. A. Entergy Operations. Inc.. letter to U.S. Nuclear Regulatory Commission. "Supplemental Information Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 2, 2011 (GNRO-2011/00075) (ADAMS Accession No. ML112490050). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 9, 2011 (GNRO-2011/00033) (ADAMS Accession No. ML112521284). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 12, 2011 (GNR0-2011/00079) (ADAMS Accession No. ML112550495). 30f5 OFFICIAL USE ONLY PROPRIETARY liSE ONLY. PROPRIETARY INFORMATION Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 15, 2011 (GNRO-2011/00080) (ADAMS Accession No. ML 112580223). Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 26,2011 (GNRO-2011/00082) (ADAMS Accession No. ML 112690143). Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power U prate , Grand Gulf Nuclear Station, Unit 1,w dated October 10, 2011 (GNRO-2011/00087) (ADAMS Accession No. ML 112840155). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nu!=lear Station, Unit 1,* dated October 10, 2011 (GNRO-2011/00088) (ADAMS Accession No. ML 112840171). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Pertaining to Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated October 24,2011 (GNRO-2011/00092) (ADAMS Accession No. ML 112980113). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 14, 2011 (GNRO-2011/00101) (ADAMS Accession No. ML 113190403). Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommiSSion, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 25, 2011 (GNRO-2011/00105) (ADAMS Accession No. ML 113290137). Krupa. M. A. Entergy Operations. Inc .. letter to U.S. Nuclear Regulatory Commission. "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 28, 2011 (GNRO-2011/001 07) (ADAMS Accession No. ML 113320403). Krupa, M. A. Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate. Grand Gulf Nuclear Station, Unit 1," dated December 19, 2011 (GNRO-2011/00111) (ADAMS Accession No. ML 113530656). Krupa, M. A., Entergy Operations. Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 6, 2012 (GNRO-2012/00006) (ADAMS Accession No. ML 12039A071). 4 of 5 OFFICIAL USE ONLY PROPRIETARY INFORMATION OFFICIAL USE ONLY* PROPRIETARY Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,n dated February 1S, 2012 (GNRO-2012100009) (ADAMS Accession No. ML120470138). Krupa, M. A.. Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,-dated February 20,2012 (GNRO-2012100011) (ADAMS Accession No. ML120540043). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, KResponse to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 13, 2012 (GNRO-2012100016) (ADAMS Accession No. ML120740083). Krupa, M. A. Entergy Operations, Inc.. letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station. Unit 1,n dated March 21, 2012 (GNRO-2012100018) (ADAMS Accession No. ML12082002S). Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate. Grand Gulf Nuclear Station, Unit 1," dated AprilS, 2012 (GNRO-2012100023) (ADAMS Accession No. ML12097AOSS). Wang, A. B., U.S. Nuclear Regulatory Commission, letter to Entergy Operations, Inc., "Grand Gulf Nuclear Station, Unit 1 -Audit of Calculations Related to Extended Power Uprate (TAe No. ME4679).II dated October 19. 2011 (ADAMS Accession No. ML112790370). S ofS OFFI61...L USE ONLY
: 3. References cc w/non-proprietary encl: Distribution via Listserv OFFICIAL USE ONLY         PROPRIETARY INFORMATION             V
* PROPRIETARY INFORMlf<'fION OFFIC:1Al U8E ONLY PROPRIETARY INFORMATION Lf -GGNS steam dryer evaluations. By two letters dated October 10, 2011 (References 32 and 33), Entergy submitted responses to the request for additional information (RAI) for GGNS. Based on a review of the licensee's responses, the NRC staff has identified areas for which additional information is required. This RAI was discussed with Mr. Jerry Burford of your staff it was agreed that a response would be provided within 30 days of receipt of this letter. The NRC staffs proprietary version of the RAI is provided in Enclosure 1 and a version is provided in Enclosure 2. A list of references is provided in Enclosure 3. proprietary information in Enclosure 1 is identified by text enclosed within double If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan,Wang@nrc.gov. Sincerely, IRAJ Alan B. Wang. Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416  
 
OFFIGIAL Y&E ONLY PROPRIETARY INFORMATION ~
ENCLOSURE 2 (NON-PROPRIETARY)
REQUEST FOR ADDITIONAL INFORMATION STEAM DRYER EVALUATION GRAND GULF NUCLEAR STATION. UNIT NO.1 EXTENDED POWER UPRATE LICENSE AMENDMENT REQUEST ENTERGY OPERATIONS. INC.
DOCKET NO. 50-416 OffiCIAL USi ONLY PROPRIETARY INFORMATION
 
OFFICIAL liSE ONloY PROPRIETAR&#xa5; INFORMATION                 ~
REQUEST FOR ADDITIONAL INFORMATION GRAND GULF NUCLEAR STATION, UNIT NO.1 EXTENDED POWER UPRATE LICENSE AMENDMENT REQUEST ENTERGY OPERATIONS. INC.
DOCKET NO. 50-416 By letter dated September 8,2010, as supplemented (see Enclosure 3), Entergy Operations, Inc. (Entergy), submitted an extended power uprate (EPU) license amendment request for Grand Gulf Nuclear Station, Unit 1 (GGNS).
The proposed amendment requests an increase in the maximum steady-state power level at GGNS from 3898 megawatts thermal (MWt) to 4408 MWt. This represents an approximate 13 percent increase above the current licensed thermal power (CLTP) or an approximate 15 percent increase above the original1icensed thermal power.
On September 19-20, 2011, the U.S. Nuclear Regulatory CommiSSion (NRC) conducted an audit (Reference 45), to review the General Electric Hitachi (GEH) documents pertaining to the GGNS steam dryer evaluations. By two letters dated October 10, 2011 (References 32 and 33),
Entergy submitted responses to the request for additional information (RAI) for GGNS. Based on a review of the licensee's responses, the NRC staff has identified the following areas for which additional information is required.
GGNS-SD-AA1-RAI-01 The response to the audit action item 1 did not provide updated data for frequency dependent Bias and Uncertainties (B&U) and GGNS dryer loads. The licensee is requested to provide this information.
GGNS-SD-AA3-RAI2 In response to the audit action item 3, the licensee has assessed the potential errors and uncertainties aSSOCiated with its load mapping algorithm, which projects pressures from its acoustic models to loads applied to its structural models. GEH subdivided its GGNS dryer model into GEH computed However, it is unclear whether the analyses include model regions where the load mapping procedure fails. The NRC staff notes that                                               may not capture the impacts of load mapping errors on the high-stress regions. The licensee has also not supplied some of the tables and figures discussed in its response. In addition, the licensee has not provided an assessment of load mapping errors on Further, the NRC Enclosure OFFICIAL UBI! ONLY         PROPRII!TARY INFORMATION           t~
 
9FnO....L Il6E 9NL&#xa5; PR9PR1ETAR&#xa5; INF9RMATION                         k(
                                                    - 2 staff is concerned that if load mapping errors are endemic to the current load mapping code, their effects may not be fully captured by a                                              The licensee is requested to provide:
* Table 1 (cited on page 12 of 46, but not provided)
* Figures 5 and 6 (cited on page 13 of 46, but not provided)
* Contours of local load mapping errors (worst-case at peak loading frequencies) over the                       and corresponding discussions of the potential impacts of the errors on high stress locations (from Table 2 on page 36 or 46).
* An assessment of load mapping errors on the This should be based on projected effects on
* A quantitative deSCription of the load mapping errors - their root cause(s) and potential impacts on dryer components, and proof that the assessments made on the GGNS dryer                           capture the worst-case potential impacts.
The NRC staff notes that the corrective action report (CAR) seen by the staff during the audit specifically pointed out errors near the Therefore, the licensee is further requested to demonstrate that the that were described in the internal CAR which seem to lead to the worst load mapping errors.
* The licensee is requested to provide GEH's plans on how it will resolve the load mapping error issue for GGNS and/or future plants.
GGNS-50-AA5*RAI3 In response to the audit action item 5. the licensee provided a plot (Figure 2) which gives appropriate However, the explanation is not clear about how the appropriateness of the                                   is determined. Since the greater than that given by Figure 2 would also provide analytically acceptable results for the                                 a criterion needs to be specified for determining the appropriateness of the                                     The licensee is requested to clarify if (for Figure 1),
The licensee is also requested to confirm if this criterion is utillzed in preparing Figure 2.
OFFICIAL USE ONLY PROPRIETARY INFORMATION
 
OFFICIAL USE ONLY         PROPRIETARY INFORMATION
                                                  -3 GGNS-SD-AA7-RAI4 In response to audit action item 7 pertaining to incorporating the into the GGNS dryer analysis, the licensee did not provide the Figures 1 through 6 and Tables 1 and 2 referenced in its response. The licensee is requested to provide the accompanying figures and tables.
GGNS-SD-AAii-RAI 5 In response to audit action item 11, the licensee provided a summary of all adjustments made to its GGNS replacement dryer stress calculations, and a table updating the maximum stresses and stress ratios. The licensee also stated that based on the reanalysis.
from the original submission. The licensee is requested to revise this table based on its responses to the follow-up questions for audit action items 1, 3, 5, and 7 noted above.
GGNSi-SD-New-RAIS In Section 3.3.2.4 ofthe GEH report NEDC-33601P, "Engineering Report - Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using PBLE Methodology,* the applicant discusses (Section 3.3.2.4.5, see                       in Table 3-22 ).
(a)     The licensee is requested to explain whether and also explain how does one determine whether to perform sub-modeling at a given high stress location.
(b)     The licensee is requested to explain why the (c)     It appears that the strength of materials approach determines the The licensee is requested to explain whether this stress is compared with the GGNSi-SD-New-RAI 7 In Appendix F (Section F.2) of the GEH report NEDC-33601 P, Revision 0, it is stated that during power ascension from CLTP to EPU.
OFFlelAL I;ISE ONLY
* PROPRIETARY INFORMMlON                   ~
 
OFFICIAL liSE ONIoV       PROPRIETAR&#xa5; INFORMATION           ~
                                                  -4 However, this comparison does not confirm whether the projected loads are less than or equal to the design loads expected at that specific power level; these design loads may be determined by properly interpolating the EPU acceptance limits for the steam dryer pressures. The licensee is requested to revise or clarify the monitoring plan used during power ascension to confirm that the loads acting on the steam dryer at any given power level do not exceed the corresponding deSign loads.
GGNS1-SD-New-RAI8 (a)    In the background section of topical report, BWRVIP-139, "Steam Dryer Inspection and Flaw Evaluation Guidelines," it is stated that fOI (i)      The licensee is requested to explain what the frequency of the low frequency loading was and how long it might have taken to cause the failure.
(ii)    Since the high-cycle fatigue cracking due to low frequency loading can potentially manifest after a longer period of operation (longer than few operating cycles) at EPU loading, the licensee is requested to describe the long-term inspection requirements for the GGNS replacement steam dryer.
(b)    In the "Results & Findings" section of topical report BWRVIP-139. it is stated that, for the dryer because the high-cycle fatigue cracking caused by the low-frequency pressure loading is not likely to be present in the baseline inspection results. The licensee is therefore requested to explain how the baseline inspection results would help in determining the re-inspection requirements for the GGNS replacement dryer operating at EPU.
GGNS1-SD-New-RAI9 (a)    The licensee is requested to identify the American Society of Mechanical Engineers (ASME) Code requirements that are followed for the deSign and fabrication of the partial penetration welds in the GGNS replacement steam dryer.
(b)    The licensee is requested to describe how the fatigue assessment of the partial penetration weld is performed.
(c)    If the size of the partial penetration weld is smaller than that required by the ASME Code, the licensee is requested to describe how the undersize effect of OFFICIAL liSE ONLY PROPRIETARY INFORMATlON                   ~
 
OFIP'ICIAL. USE ONLY PROPRIETARY INFORMATION ENCLOSURE3-REFERENCES
: 1. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 8, 2010 (GNRO-2010/00056) (ADAMS Accession No. ML102660409).
: 2. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 18,2010 (GNRO-2010/00071) (ADAMS Accession No. ML103260003).
: 3. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommisSion, "Supplemental License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,' dated November 23, 2010 (GNRO-2010/00073) (ADAMS Accession No. ML103330146).
: 4. Krupa, M. A" Entergy Operations, Inc.. letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23,2011 (GNRO-2011/00007) (ADAMS Accession No. ML110540534).
: 5. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23, 2011 (GNRO-2011/00012) (ADAMS Accession No. ML110540540).
: 6. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23, 2011 (GNRQ-2011/00011) (ADAMS Accession No. ML110540545).
: 7. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23, 2011 (GNRO-2011/00013) (ADAMS Accession No. ML110550318).
: 8. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate. Grand Gulf Nuclear Station, Unit 1," dated March 9,2011 (GNRO-2011/00017) (ADAMS Accession No. ML110680507).
: 9. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommiSSion, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 9,2011 (GNRO-2011/00016) (ADAMS Accession No. ML110730025).
1 of 5 OFFICIAL USE ONLY* PROPRIETARY INFORMATION
 
OFFIO....L USE ONLY* PROPRIE_INFORMA1l0N                       ~
: 10. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1." dated March 22,2011 (GNRO-2011/00019) (ADAMS Accession No. ML110820262).
: 11. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 30,2011 (GNRO-2011/00018) (ADAMS Accession No. ML110900275).
: 12. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommisSion, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1 dated March 31,2011 (GNRO-2011/00021) (ADAMS Accession I"
No. ML110900586).
: 13. Krupa, M. A.. Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,n dated April 14, 2011 (GNRO*2011/00024) (ADAMS Accession No. ML111050134).
: 14. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated April 21, 2011 (GNRO-2011100025) (ADAMS Accession No. ML111120329).
: 15. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 3,2011 (GNRO-2011/00034) (ADAMS Accession No. ML111240288).
: 16. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 5,2011 (GNRO*2011100035) (ADAMS Accession No. ML111250552).
: 17. Krupa, M. A" Entergy Operations. Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 11, 2011 (GNRO-2011/00037) (ADAMS Accession No. ML111320263).
: 18. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 8, 2011 (GNRO-2011/00043) (ADAMS Accession No. ML111590836).
: 19. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 15, 2011 (GNRO-2011/00046) (ADAMS Accession No. ML111670059).
20f5 OFFICIAL USE ONLY* PROPRIETARY INFORMATION
 
OFFIGIAL liSE ONL&#xa5; PROPRIETARY INFORMATION                 ~
: 20. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 21,2011 (GNRO-2011/00050) (ADAMS AcceSSion No. ML111730235).
: 21. Krupa, M. A, Entergy Operations, Inc.. letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 23, 2011 (GNRO-2011/00052) (ADAMS Accession No. ML111750244).
: 22. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission,
    ~Request  for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated July 6,2011 (GNRO-2011/00053) (ADAMS Accession No. ML111880138).
: 23. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate. Grand Gulf Nuclear Station, Unit 1, n dated July 28, 2011 (GNRO-2011/00055) (ADAMS Accession No. ML112101485).
: 24. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated August 25, 2011 (GNRO-2011/00070) (ADAMS Accession No. ML112370770).
: 25. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated August 29, 2011 (GNRO-2011/00073) (ADAMS Accession No. ML112410566).
: 26. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated August 30,2011 (GNRO-2011/00074) (ADAMS Accession No. ML112420169).
: 27. Krupa. M. A. Entergy Operations. Inc.. letter to U.S. Nuclear Regulatory Commission.
    "Supplemental Information Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,"
dated September 2, 2011 (GNRO-2011/00075) (ADAMS Accession No. ML112490050).
: 28. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,"
dated September 9, 2011 (GNRO-2011/00033) (ADAMS Accession No. ML112521284).
: 29. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 12, 2011 (GNR0-2011/00079) (ADAMS Accession No. ML112550495).
30f5 OFFICIAL USE ONLY PROPRIETARY INFORMATION
 
OPPleIA~    liSE ONLY. PROPRIETARY INFORMATION                 ~
: 30. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 15, 2011 (GNRO-2011/00080)
(ADAMS Accession No. ML112580223).
: 31. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 26,2011 (GNRO-2011/00082)
(ADAMS Accession No. ML112690143).
: 32. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate , Grand Gulf Nuclear Station, Unit 1,w dated October 10, 2011 (GNRO-2011/00087) (ADAMS Accession No. ML112840155).
: 33. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nu!=lear Station, Unit 1,* dated October 10, 2011 (GNRO-2011/00088) (ADAMS Accession No. ML112840171).
: 34. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Pertaining to Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated October 24,2011 (GNRO-2011/00092) (ADAMS Accession No. ML112980113).
: 35. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 14, 2011 (GNRO-2011/00101) (ADAMS Accession No. ML113190403).
: 36. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommiSSion, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 25, 2011 (GNRO-2011/00105) (ADAMS Accession No. ML113290137).
: 37. Krupa. M. A. Entergy Operations. Inc .. letter to U.S. Nuclear Regulatory Commission.
    "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 28, 2011 (GNRO-2011/001 07) (ADAMS Accession No. ML113320403).
: 38. Krupa, M. A. Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate. Grand Gulf Nuclear Station, Unit 1," dated December 19, 2011 (GNRO-2011/00111) (ADAMS Accession No. ML113530656).
: 39. Krupa, M. A., Entergy Operations. Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 6, 2012 (GNRO-2012/00006) (ADAMS Accession No. ML12039A071).
4 of 5 OFFICIAL USE ONLY PROPRIETARY INFORMATION
 
OFFICIAL USE ONLY* PROPRIETARY INFORMATION                    ~
: 40. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,n dated February 1S, 2012 (GNRO-2012100009)
(ADAMS Accession No. ML120470138).
: 41. Krupa, M. A.. Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,- dated February 20,2012 (GNRO-2012100011)
(ADAMS Accession No. ML120540043).
: 42. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, KResponse to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 13, 2012 (GNRO-2012100016)
(ADAMS Accession No. ML120740083).
: 43. Krupa, M. A. Entergy Operations, Inc.. letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station. Unit 1,n dated March 21, 2012 (GNRO-2012100018)
(ADAMS Accession No. ML12082002S).
: 44. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate.
Grand Gulf Nuclear Station, Unit 1," dated AprilS, 2012 (GNRO-2012100023) (ADAMS Accession No. ML12097AOSS).
4S. Wang, A. B., U.S. Nuclear Regulatory Commission, letter to Entergy Operations, Inc.,
    "Grand Gulf Nuclear Station, Unit 1 - Audit of Calculations Related to Extended Power Uprate (TAe No. ME4679). dated October 19. 2011 (ADAMS Accession No.
II ML112790370).
S ofS OFFI61...L USE ONLY
* PROPRIETARY INFORMlf<'fION               ~
 
OFFIC:1Al U8E ONLY           PROPRIETARY INFORMATION               Lf
                                                    - 2 GGNS steam dryer evaluations. By two letters dated October 10, 2011 (References 32 and 33),
Entergy submitted responses to the request for additional information (RAI) for GGNS. Based on a review of the licensee's responses, the NRC staff has identified areas for which additional information is required. This RAI was discussed with Mr. Jerry Burford of your staff it was agreed that a response would be provided within 30 days of receipt of this letter.
The NRC staffs proprietary version of the RAI is provided in Enclosure 1 and a nonproprietary version is provided in Enclosure 2. A list of references is provided in Enclosure 3. The proprietary information in Enclosure 1 is identified by text enclosed within double brackets.
If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan,Wang@nrc.gov.
Sincerely, IRAJ Alan B. Wang. Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416


==Enclosures:==
==Enclosures:==
1. Proprietary RAls 2. Non-proprietary RAls 3. References cc w/non-proprietary encl: Distribution via Listserv DISTRIBUTION: NON*PUBLIC RidsNrrDeEmcb Resource RidsNrrPMGrandGulf Resource LPLlVrlf RldsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLAJBurkhardt Resource CBasavaraju. NRR/DElEMCB OFFICE NAME AWang DATE 4/16112 NRRlOEIEMCB NRRlOORUlPL4IBC NRRIDORUlPL4IPM MMurphy JBurkhardt MMarkley 4/13112 11/16111 4118/12 AWang (NKalyanam for) 4/16112 OFFICIAL AGENCY OFFI61AL USE 6NLV -PRel'ftlETAftV INFORMATION
: 1. Proprietary RAls
}}
: 2. Non-proprietary RAls
: 3. References cc w/non-proprietary encl: Distribution via Listserv DISTRIBUTION:
NON*PUBLIC                         RidsNrrDeEmcb Resource             RidsNrrPMGrandGulf Resource LPLlVrlf                           RldsNrrDorlLpl4 Resource           RidsRgn4MailCenter Resource RidsAcrsAcnw_MailCTR Resource       RidsNrrLAJBurkhardt Resource       CBasavaraju. NRR/DElEMCB OFFICE                                           NRRlOEIEMCB      NRRlOORUlPL4IBC    NRRIDORUlPL4IPM MMurphy                              AWang (NKalyanam NAME     AWang             JBurkhardt                            MMarkley            for)
DATE     4/16112           4/13112             11/16111         4118/12             4/16112 OFFICIAL AGENCY RECORD OFFI61AL USE 6NLV - PRel'ftlETAftV INFORMATION                       ~}}

Latest revision as of 17:18, 6 February 2020

Redacted, Request for Additional Information, Nrr/De/Emcb Review of Steam Dryer, Round 4, Amendment Request for Extended Power Uprate to Increase the Maximum Reactor Core Power Operating Limit from 3898 to 4408 Mwt
ML121030099
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 04/18/2012
From: Wang A
Plant Licensing Branch IV
To:
Entergy Operations
Wang, A B, NRR/DORL/LPLIV, 415-1445
Shared Package
ML121030094 List:
References
TAC ME4679
Download: ML121030099 (13)


Text

OFFICIAL USE ONLY PROPRIETI\RY INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555.0001 Apr i1 18. 2012 Vice President, Operations Entergy Operations, Inc.

Grand Gulf Nuclear Station P.O. Box 756 Port Gibson, MS 39150 SUB~IECT: GRAND GULF NUCLEAR STATION, UNIT 1 - REQUEST FOR ADDITIONAL INFORMATION REGARDING EXTENDED POWER UPRATE APPLICATION LICENSE AMENDMENT REQUEST (TAC NO. ME4679)

Dear Sir or Madam:

By application dated September 8,2010 (Reference 1), as supplemented by letters dated November 18, 2010 (Reference 2), November 23,2010 (Reference 3), February 23,2011 (four letters, References 4, 5, 6, and 7), March 9, 2011 (two letters, References 8) and 9, March 22, 2011 (Reference 10), March 30, 2011 (Reference 11), March 31,2011 (Reference 12),ApriI14, 2011 (Reference 13), April 21, 2011 (Reference 14), May 3,2011 (Reference 15), May 5, 2011 (Reference 16), May 11,2011 (Reference 17), June 8,2011 (Reference 18), June 15, 2011 (Reference 19), June 21,2011 (Reference 20) June 23,2011 (Reference 21), July 6,2011 (Reference 22), July 28, 2011 (Reference 23), August 25, 2011 (Reference 24), August 29, 2011 (Reference 25), August 30,2011 (Reference 26), September 2,2011 (Reference 27),

September 9, 2011 (Reference 28), September 12, 2011 (Reference 29), September 15, 2011 (Reference 30), September 26,2011 (Reference 31), October 10, 2011 (two letters, References 32 and 33), October 24,2011 (Reference 34), November 14, 2011 (Reference 35),

November 25,2011 (Reference 36), November 28, 2011 (Reference 37), December 19, 2011 (Reference 38), February 6,2012 (Reference 39), February 15,2012 (Reference 40),

February 20,2012 (Reference 41), March 13,2012 (Reference 42), March 21, 2012 (Reference 43), and April 5, 2012 (Reference 44), Entergy Operations, Inc. (Entergy, the licensee), submitted a license amendment request for Grand Gulf Nuclear Station, Unit 1 (GGNS). Portions of the letters dated September 8 and November 23, 2010, and February 23, April 21, May 11, July 6, July 28, September 2, October 10, November 14, November 25, and November 28,2011, and February 6, February 15, February 20, March 13, March 21, and April 5, 2012, contain sensitive unclassified non-safeguards information (proprietary) and, accordingly, have been withheld from public disclosure. The proposed amendment requests an increase in the maximum steady-state power level at GGNS from 3898 megawatts thermal (MWt) to 4408 MWt. This represents an approximate 13 percent increase above the current licensed thermal power or an approximate 15 percent increase above the original licensed thermal power.

On September 19-20, 2011, the U.S. Nuclear Regulatory Commission (NRC) conducted an audit (Reference 45), to review the General Electric Hitachi (GEH) documents pertaining to the NOTICE: Enclosure 1 to this letter contains Proprietary Information. Upon separation from Enclosure 1, this letter is DECONTROLLED.

OFFIGIAL 10/8& ONLY PROPRIETARY INFORMATION Lf.

OFFICIAL USE ONL'l- PROPRIETARY INFORMATION

-2 GGNS steam dryer evaluations. By two letters dated October 10,2011 (References 32 and 33),

Entergy submitted responses to the request for additional information (RAI) for GGNS. Based on a review of the licensee's responses, the NRC staff has identified areas for which additional information is required. This RAI was discussed with Mr. Jerry Burford of your staff it was agreed that a response would be provided within 30 days of receipt of this letter.

The NRC staffs proprietary version of the RAI is provided in Enclosure 1 and a nonproprietary version is provided in Enclosure 2. A list of references is provided in Enclosure 3. The proprietary information in Enclosure 1 is identified by text enclosed within double brackets.

If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan.Wang@nrc.gov.

Sincerely, Ala~n~:r.ger Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416

Enclosures:

1. Proprietary RAls
2. Non-proprietary RAls
3. References cc w/non-proprietary encl: Distribution via Listserv OFFICIAL USE ONLY PROPRIETARY INFORMATION V

OFFIGIAL Y&E ONLY PROPRIETARY INFORMATION ~

ENCLOSURE 2 (NON-PROPRIETARY)

REQUEST FOR ADDITIONAL INFORMATION STEAM DRYER EVALUATION GRAND GULF NUCLEAR STATION. UNIT NO.1 EXTENDED POWER UPRATE LICENSE AMENDMENT REQUEST ENTERGY OPERATIONS. INC.

DOCKET NO. 50-416 OffiCIAL USi ONLY PROPRIETARY INFORMATION

OFFICIAL liSE ONloY PROPRIETAR¥ INFORMATION ~

REQUEST FOR ADDITIONAL INFORMATION GRAND GULF NUCLEAR STATION, UNIT NO.1 EXTENDED POWER UPRATE LICENSE AMENDMENT REQUEST ENTERGY OPERATIONS. INC.

DOCKET NO. 50-416 By letter dated September 8,2010, as supplemented (see Enclosure 3), Entergy Operations, Inc. (Entergy), submitted an extended power uprate (EPU) license amendment request for Grand Gulf Nuclear Station, Unit 1 (GGNS).

The proposed amendment requests an increase in the maximum steady-state power level at GGNS from 3898 megawatts thermal (MWt) to 4408 MWt. This represents an approximate 13 percent increase above the current licensed thermal power (CLTP) or an approximate 15 percent increase above the original1icensed thermal power.

On September 19-20, 2011, the U.S. Nuclear Regulatory CommiSSion (NRC) conducted an audit (Reference 45), to review the General Electric Hitachi (GEH) documents pertaining to the GGNS steam dryer evaluations. By two letters dated October 10, 2011 (References 32 and 33),

Entergy submitted responses to the request for additional information (RAI) for GGNS. Based on a review of the licensee's responses, the NRC staff has identified the following areas for which additional information is required.

GGNS-SD-AA1-RAI-01 The response to the audit action item 1 did not provide updated data for frequency dependent Bias and Uncertainties (B&U) and GGNS dryer loads. The licensee is requested to provide this information.

GGNS-SD-AA3-RAI2 In response to the audit action item 3, the licensee has assessed the potential errors and uncertainties aSSOCiated with its load mapping algorithm, which projects pressures from its acoustic models to loads applied to its structural models. GEH subdivided its GGNS dryer model into GEH computed However, it is unclear whether the analyses include model regions where the load mapping procedure fails. The NRC staff notes that may not capture the impacts of load mapping errors on the high-stress regions. The licensee has also not supplied some of the tables and figures discussed in its response. In addition, the licensee has not provided an assessment of load mapping errors on Further, the NRC Enclosure OFFICIAL UBI! ONLY PROPRII!TARY INFORMATION t~

9FnO....L Il6E 9NL¥ PR9PR1ETAR¥ INF9RMATION k(

- 2 staff is concerned that if load mapping errors are endemic to the current load mapping code, their effects may not be fully captured by a The licensee is requested to provide:

  • Table 1 (cited on page 12 of 46, but not provided)
  • Figures 5 and 6 (cited on page 13 of 46, but not provided)
  • Contours of local load mapping errors (worst-case at peak loading frequencies) over the and corresponding discussions of the potential impacts of the errors on high stress locations (from Table 2 on page 36 or 46).
  • An assessment of load mapping errors on the This should be based on projected effects on
  • A quantitative deSCription of the load mapping errors - their root cause(s) and potential impacts on dryer components, and proof that the assessments made on the GGNS dryer capture the worst-case potential impacts.

The NRC staff notes that the corrective action report (CAR) seen by the staff during the audit specifically pointed out errors near the Therefore, the licensee is further requested to demonstrate that the that were described in the internal CAR which seem to lead to the worst load mapping errors.

  • The licensee is requested to provide GEH's plans on how it will resolve the load mapping error issue for GGNS and/or future plants.

GGNS-50-AA5*RAI3 In response to the audit action item 5. the licensee provided a plot (Figure 2) which gives appropriate However, the explanation is not clear about how the appropriateness of the is determined. Since the greater than that given by Figure 2 would also provide analytically acceptable results for the a criterion needs to be specified for determining the appropriateness of the The licensee is requested to clarify if (for Figure 1),

The licensee is also requested to confirm if this criterion is utillzed in preparing Figure 2.

OFFICIAL USE ONLY PROPRIETARY INFORMATION

OFFICIAL USE ONLY PROPRIETARY INFORMATION

-3 GGNS-SD-AA7-RAI4 In response to audit action item 7 pertaining to incorporating the into the GGNS dryer analysis, the licensee did not provide the Figures 1 through 6 and Tables 1 and 2 referenced in its response. The licensee is requested to provide the accompanying figures and tables.

GGNS-SD-AAii-RAI 5 In response to audit action item 11, the licensee provided a summary of all adjustments made to its GGNS replacement dryer stress calculations, and a table updating the maximum stresses and stress ratios. The licensee also stated that based on the reanalysis.

from the original submission. The licensee is requested to revise this table based on its responses to the follow-up questions for audit action items 1, 3, 5, and 7 noted above.

GGNSi-SD-New-RAIS In Section 3.3.2.4 ofthe GEH report NEDC-33601P, "Engineering Report - Grand Gulf Replacement Steam Dryer Fatigue Stress Analysis Using PBLE Methodology,* the applicant discusses (Section 3.3.2.4.5, see in Table 3-22 ).

(a) The licensee is requested to explain whether and also explain how does one determine whether to perform sub-modeling at a given high stress location.

(b) The licensee is requested to explain why the (c) It appears that the strength of materials approach determines the The licensee is requested to explain whether this stress is compared with the GGNSi-SD-New-RAI 7 In Appendix F (Section F.2) of the GEH report NEDC-33601 P, Revision 0, it is stated that during power ascension from CLTP to EPU.

OFFlelAL I;ISE ONLY

  • PROPRIETARY INFORMMlON ~

OFFICIAL liSE ONIoV PROPRIETAR¥ INFORMATION ~

-4 However, this comparison does not confirm whether the projected loads are less than or equal to the design loads expected at that specific power level; these design loads may be determined by properly interpolating the EPU acceptance limits for the steam dryer pressures. The licensee is requested to revise or clarify the monitoring plan used during power ascension to confirm that the loads acting on the steam dryer at any given power level do not exceed the corresponding deSign loads.

GGNS1-SD-New-RAI8 (a) In the background section of topical report, BWRVIP-139, "Steam Dryer Inspection and Flaw Evaluation Guidelines," it is stated that fOI (i) The licensee is requested to explain what the frequency of the low frequency loading was and how long it might have taken to cause the failure.

(ii) Since the high-cycle fatigue cracking due to low frequency loading can potentially manifest after a longer period of operation (longer than few operating cycles) at EPU loading, the licensee is requested to describe the long-term inspection requirements for the GGNS replacement steam dryer.

(b) In the "Results & Findings" section of topical report BWRVIP-139. it is stated that, for the dryer because the high-cycle fatigue cracking caused by the low-frequency pressure loading is not likely to be present in the baseline inspection results. The licensee is therefore requested to explain how the baseline inspection results would help in determining the re-inspection requirements for the GGNS replacement dryer operating at EPU.

GGNS1-SD-New-RAI9 (a) The licensee is requested to identify the American Society of Mechanical Engineers (ASME) Code requirements that are followed for the deSign and fabrication of the partial penetration welds in the GGNS replacement steam dryer.

(b) The licensee is requested to describe how the fatigue assessment of the partial penetration weld is performed.

(c) If the size of the partial penetration weld is smaller than that required by the ASME Code, the licensee is requested to describe how the undersize effect of OFFICIAL liSE ONLY PROPRIETARY INFORMATlON ~

OFIP'ICIAL. USE ONLY PROPRIETARY INFORMATION ENCLOSURE3-REFERENCES

1. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 8, 2010 (GNRO-2010/00056) (ADAMS Accession No. ML102660409).
2. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 18,2010 (GNRO-2010/00071) (ADAMS Accession No. ML103260003).
3. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommisSion, "Supplemental License Amendment Request, Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,' dated November 23, 2010 (GNRO-2010/00073) (ADAMS Accession No. ML103330146).
4. Krupa, M. A" Entergy Operations, Inc.. letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23,2011 (GNRO-2011/00007) (ADAMS Accession No. ML110540534).
5. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23, 2011 (GNRO-2011/00012) (ADAMS Accession No. ML110540540).
6. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23, 2011 (GNRQ-2011/00011) (ADAMS Accession No. ML110540545).
7. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 23, 2011 (GNRO-2011/00013) (ADAMS Accession No. ML110550318).
8. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate. Grand Gulf Nuclear Station, Unit 1," dated March 9,2011 (GNRO-2011/00017) (ADAMS Accession No. ML110680507).
9. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommiSSion, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 9,2011 (GNRO-2011/00016) (ADAMS Accession No. ML110730025).

1 of 5 OFFICIAL USE ONLY* PROPRIETARY INFORMATION

OFFIO....L USE ONLY* PROPRIE_INFORMA1l0N ~

10. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1." dated March 22,2011 (GNRO-2011/00019) (ADAMS Accession No. ML110820262).
11. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 30,2011 (GNRO-2011/00018) (ADAMS Accession No. ML110900275).
12. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommisSion, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1 dated March 31,2011 (GNRO-2011/00021) (ADAMS Accession I"

No. ML110900586).

13. Krupa, M. A.. Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,n dated April 14, 2011 (GNRO*2011/00024) (ADAMS Accession No. ML111050134).
14. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated April 21, 2011 (GNRO-2011100025) (ADAMS Accession No. ML111120329).
15. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 3,2011 (GNRO-2011/00034) (ADAMS Accession No. ML111240288).
16. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 5,2011 (GNRO*2011100035) (ADAMS Accession No. ML111250552).
17. Krupa, M. A" Entergy Operations. Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated May 11, 2011 (GNRO-2011/00037) (ADAMS Accession No. ML111320263).
18. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 8, 2011 (GNRO-2011/00043) (ADAMS Accession No. ML111590836).
19. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 15, 2011 (GNRO-2011/00046) (ADAMS Accession No. ML111670059).

20f5 OFFICIAL USE ONLY* PROPRIETARY INFORMATION

OFFIGIAL liSE ONL¥ PROPRIETARY INFORMATION ~

20. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 21,2011 (GNRO-2011/00050) (ADAMS AcceSSion No. ML111730235).
21. Krupa, M. A, Entergy Operations, Inc.. letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated June 23, 2011 (GNRO-2011/00052) (ADAMS Accession No. ML111750244).
22. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission,

~Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated July 6,2011 (GNRO-2011/00053) (ADAMS Accession No. ML111880138).

23. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate. Grand Gulf Nuclear Station, Unit 1, n dated July 28, 2011 (GNRO-2011/00055) (ADAMS Accession No. ML112101485).
24. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated August 25, 2011 (GNRO-2011/00070) (ADAMS Accession No. ML112370770).
25. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated August 29, 2011 (GNRO-2011/00073) (ADAMS Accession No. ML112410566).
26. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated August 30,2011 (GNRO-2011/00074) (ADAMS Accession No. ML112420169).
27. Krupa. M. A. Entergy Operations. Inc.. letter to U.S. Nuclear Regulatory Commission.

"Supplemental Information Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,"

dated September 2, 2011 (GNRO-2011/00075) (ADAMS Accession No. ML112490050).

28. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,"

dated September 9, 2011 (GNRO-2011/00033) (ADAMS Accession No. ML112521284).

29. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 12, 2011 (GNR0-2011/00079) (ADAMS Accession No. ML112550495).

30f5 OFFICIAL USE ONLY PROPRIETARY INFORMATION

OPPleIA~ liSE ONLY. PROPRIETARY INFORMATION ~

30. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 15, 2011 (GNRO-2011/00080)

(ADAMS Accession No. ML112580223).

31. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated September 26,2011 (GNRO-2011/00082)

(ADAMS Accession No. ML112690143).

32. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate , Grand Gulf Nuclear Station, Unit 1,w dated October 10, 2011 (GNRO-2011/00087) (ADAMS Accession No. ML112840155).
33. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nu!=lear Station, Unit 1,* dated October 10, 2011 (GNRO-2011/00088) (ADAMS Accession No. ML112840171).
34. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Supplemental Information Pertaining to Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated October 24,2011 (GNRO-2011/00092) (ADAMS Accession No. ML112980113).
35. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 14, 2011 (GNRO-2011/00101) (ADAMS Accession No. ML113190403).
36. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory CommiSSion, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 25, 2011 (GNRO-2011/00105) (ADAMS Accession No. ML113290137).
37. Krupa. M. A. Entergy Operations. Inc .. letter to U.S. Nuclear Regulatory Commission.

"Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated November 28, 2011 (GNRO-2011/001 07) (ADAMS Accession No. ML113320403).

38. Krupa, M. A. Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate. Grand Gulf Nuclear Station, Unit 1," dated December 19, 2011 (GNRO-2011/00111) (ADAMS Accession No. ML113530656).
39. Krupa, M. A., Entergy Operations. Inc., letter to U.S. Nuclear Regulatory Commission, "Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated February 6, 2012 (GNRO-2012/00006) (ADAMS Accession No. ML12039A071).

4 of 5 OFFICIAL USE ONLY PROPRIETARY INFORMATION

OFFICIAL USE ONLY* PROPRIETARY INFORMATION ~

40. Krupa, M. A., Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,n dated February 1S, 2012 (GNRO-2012100009)

(ADAMS Accession No. ML120470138).

41. Krupa, M. A.. Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1,- dated February 20,2012 (GNRO-2012100011)

(ADAMS Accession No. ML120540043).

42. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, KResponse to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station, Unit 1," dated March 13, 2012 (GNRO-2012100016)

(ADAMS Accession No. ML120740083).

43. Krupa, M. A. Entergy Operations, Inc.. letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate, Grand Gulf Nuclear Station. Unit 1,n dated March 21, 2012 (GNRO-2012100018)

(ADAMS Accession No. ML12082002S).

44. Krupa, M. A, Entergy Operations, Inc., letter to U.S. Nuclear Regulatory Commission, "Response to Request for Additional Information Regarding Extended Power Uprate.

Grand Gulf Nuclear Station, Unit 1," dated AprilS, 2012 (GNRO-2012100023) (ADAMS Accession No. ML12097AOSS).

4S. Wang, A. B., U.S. Nuclear Regulatory Commission, letter to Entergy Operations, Inc.,

"Grand Gulf Nuclear Station, Unit 1 - Audit of Calculations Related to Extended Power Uprate (TAe No. ME4679). dated October 19. 2011 (ADAMS Accession No.

II ML112790370).

S ofS OFFI61...L USE ONLY

  • PROPRIETARY INFORMlf<'fION ~

OFFIC:1Al U8E ONLY PROPRIETARY INFORMATION Lf

- 2 GGNS steam dryer evaluations. By two letters dated October 10, 2011 (References 32 and 33),

Entergy submitted responses to the request for additional information (RAI) for GGNS. Based on a review of the licensee's responses, the NRC staff has identified areas for which additional information is required. This RAI was discussed with Mr. Jerry Burford of your staff it was agreed that a response would be provided within 30 days of receipt of this letter.

The NRC staffs proprietary version of the RAI is provided in Enclosure 1 and a nonproprietary version is provided in Enclosure 2. A list of references is provided in Enclosure 3. The proprietary information in Enclosure 1 is identified by text enclosed within double brackets.

If circumstances result in the need to revise the requested response date, please contact me at (301) 415-1445 or via e-mail at Alan,Wang@nrc.gov.

Sincerely, IRAJ Alan B. Wang. Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-416

Enclosures:

1. Proprietary RAls
2. Non-proprietary RAls
3. References cc w/non-proprietary encl: Distribution via Listserv DISTRIBUTION:

NON*PUBLIC RidsNrrDeEmcb Resource RidsNrrPMGrandGulf Resource LPLlVrlf RldsNrrDorlLpl4 Resource RidsRgn4MailCenter Resource RidsAcrsAcnw_MailCTR Resource RidsNrrLAJBurkhardt Resource CBasavaraju. NRR/DElEMCB OFFICE NRRlOEIEMCB NRRlOORUlPL4IBC NRRIDORUlPL4IPM MMurphy AWang (NKalyanam NAME AWang JBurkhardt MMarkley for)

DATE 4/16112 4/13112 11/16111 4118/12 4/16112 OFFICIAL AGENCY RECORD OFFI61AL USE 6NLV - PRel'ftlETAftV INFORMATION ~