(2 intermediate revisions by the same user not shown) |
Line 3: |
Line 3: |
| | issue date = 06/04/2012 | | | issue date = 06/04/2012 |
| | title = 2011 Annual Assessment Meeting Summary | | | title = 2011 Annual Assessment Meeting Summary |
| | author name = Bellamy R R | | | author name = Bellamy R |
| | author affiliation = NRC/RGN-I/DRP/PB5 | | | author affiliation = NRC/RGN-I/DRP/PB5 |
| | addressee name = | | | addressee name = |
Line 19: |
Line 19: |
| ==SUMMARY== | | ==SUMMARY== |
|
| |
|
| LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC. | | LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC. |
| FACILITY: VERMONT YANKEE NUCLEAR POWER STATION | | FACILITY: VERMONT YANKEE NUCLEAR POWER STATION |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
Line 27: |
Line 27: |
| OF PUBLIC MEETING On Wednesday, May 23, 2012, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Brattleboro Union High School in Brattleboro, VT. | | OF PUBLIC MEETING On Wednesday, May 23, 2012, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Brattleboro Union High School in Brattleboro, VT. |
| Following the open house, the NRC held a public meeting from 7:00 p.m. to 8:30 p.m. The NRC conducted the open house and public meeting to discuss its assessment of the safety performance at Vermont Yankee Nuclear Power Station (Vermont Yankee) for 2011. | | Following the open house, the NRC held a public meeting from 7:00 p.m. to 8:30 p.m. The NRC conducted the open house and public meeting to discuss its assessment of the safety performance at Vermont Yankee Nuclear Power Station (Vermont Yankee) for 2011. |
| A notice of the open house and public meeting was issued on April 30, 2012, and was posted on the NRC's external (public) Web page. The meeting notice can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession No. ML12121A628. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. | | A notice of the open house and public meeting was issued on April 30, 2012, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML12121A628. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. |
| The NRC presented poster boards and was available to discuss its assessment of the safety performance of Vermont Yankee for the period of January 1 through December 31, 2011, as documented in our letter dated March 5, 2012 (ADAMS Accession No. ML12061A247). The NRC poster boards included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Vermont Yankee can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. | | The NRC presented poster boards and was available to discuss its assessment of the safety performance of Vermont Yankee for the period of January 1 through December 31, 2011, as documented in our letter dated March 5, 2012 (ADAMS Accession No. ML12061A247). The NRC poster boards included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Vermont Yankee can be found on the NRC's web site at: |
| Members of the public, local officials, State officials, and members of the media attended the open house and public meeting and were offered the opportunity to question the NRC regarding Vermont Yankee's performance and the role of the agency in ensuring safe plant operations. | | www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. |
| | Members of the public, local officials, State officials, and members of the media attended the open house and public meeting and were offered the opportunity to question the NRC regarding Vermont Yankees performance and the role of the agency in ensuring safe plant operations. |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| Public Meeting Sign In Sheets (ADAMS ML12151A149)
| |
|
| |
|
| /RA/ Ronald R. Bellamy, Chief Projects Branch 5 Division of Reactor Projects
| | Public Meeting Sign In Sheets (ADAMS ML12151A149) |
| | /RA/ |
| | Ronald R. Bellamy, Chief Projects Branch 5 Division of Reactor Projects |
|
| |
|
| ML12061A247). The NRC poster boards included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Vermont Yankee can be found on the NRC's web site at: www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. Members of the public, local officials, State officials, and members of the media attended the open house and public meeting and were offered the opportunity to question the NRC regarding Vermont Yankee's performance and the role of the agency in ensuring safe plant operations. | | ML12061A247). The NRC poster boards included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Vermont Yankee can be found on the NRC's web site at: |
| | www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html. |
| | Members of the public, local officials, State officials, and members of the media attended the open house and public meeting and were offered the opportunity to question the NRC regarding Vermont Yankees performance and the role of the agency in ensuring safe plant operations. |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
|
| |
|
| Public Meeting Sign In Sheets (ADAMS ML12151A149) | | Public Meeting Sign In Sheets (ADAMS ML12151A149) |
| /RA/ Ronald R. Bellamy, Chief Projects Branch 5 Division of Reactor Projects
| | /RA/ |
| | | Ronald R. Bellamy, Chief Projects Branch 5 Division of Reactor Projects Distribution: (via email) |
| Distribution: (via email) R. Bellamy T. Setzer E. Keighley S. Rutenkroger, SRI S. Rich, RI A. Rancourt, Admin RidsNRRPMResource DOC NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2011 EOC\VY 2011 Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML12156A157 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer RBellamy DATE 05/30/12 06/04/12}} | | R. Bellamy S. Rutenkroger, SRI RidsNRRPMResource T. Setzer S. Rich, RI E. Keighley A. Rancourt, Admin DOC NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2011 EOC\VY 2011 Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML12156A157 SUNSI Review |
| | ; Non-Sensitive ; Publicly Available |
| | ; Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer RBellamy DATE 05/30/12 06/04/12}} |
|
---|
Category:Meeting Summary
MONTHYEARML19317D0762019-11-18018 November 2019 Summary of Meeting Near Vermont Yankee Power Station Regarding Establishment and Opration of Community Advisory Boards ML18107A4972018-04-27027 April 2018 April 10, 2017, Summary of Public Meeting with Entergy Nuclear Operations, Inc. Regarding Upcoming License Amendment Request to Add Setpoint Verification Requirement to Technical Specification Surveillance Requirements ML17173A7672017-07-28028 July 2017 Summary of 6/20/2017 Meeting with Entergy to Discuss Plan for Decommissioning Licensing Actions of Palisades, Pilgrim, Indian Point, Units 2 and 3, and Vermont Yankee ML17192A3752017-05-25025 May 2017 Summary of Vermont Nuclear Decommissioning Citizens Advisory Panel Public Meeting of May 25, 2017 ML17031A2772017-02-0101 February 2017 January 24, 2017, Summary of NRC Public Meeting on the Proposed License Transfer of Vermont Yankee for Decommissioning ML15068A2672015-03-0909 March 2015 Summary of Meeting with Vermont Yankee and the Public Webinar Regarding the Decommissioning of Vermont Yankee ML14154A4422014-06-0303 June 2014 Summary of Annual Assessment Meeting for Vermont Yankee Nuclear Power Station on 5/28/14 ML13181A0062013-07-0303 July 2013 6/12/13 Summary of Conference Call with Entergy Nuclear Operations, Inc. to Discuss Draft Requests for Additional Information for Vermont Yankee NRC Order Number EA-12-049 Related to Mitigation Strategies ML13127A0372013-05-0606 May 2013 4/30/13 - Summary of Annual Assessment Meeting with Vermont Yankee ML12333A2222012-11-30030 November 2012 Summary of Pre-Application Meeting with Entergy Nuclear Operations, Inc., Regarding the Proposed License Amendment Request to Revise the Vermont Yankee Licensing Basis for Station Blackout Diesel Generator ML12156A1572012-06-0404 June 2012 2011 Annual Assessment Meeting Summary ML11292A1612011-10-20020 October 2011 Summary of Meeting with Beyond Nuclear Regarding Their 10 CFR 2.206 Petition to Suspend Operating Licenses of General Electric Mark I Boiling Water Reactors ML1118613262011-07-0505 July 2011 Summary of the June 22, 2011 Annual Assessment Public Meeting ML1117906392011-06-28028 June 2011 Summary of Meeting with Entergy Operations Inc ML11166A1342011-06-22022 June 2011 Meeting Summary with the Beyond Nuclear Petitioners Regarding Their 2.206 Petition to Suspend Operating Licenses (Ols) of General Electric (GE) Boiling Water Reactors (Bwrs) Mark I (Bwrs) ML1110401712011-04-27027 April 2011 04/5/2011 Summary of Preapplication Meeting with Entergy Operations, Inc. to Discuss Fleetwide Submittal for Proposed Technical Specification and Quality Assurance Program Manual Changes Related to Unit Staff Qualification Requirements ML1022204552010-08-10010 August 2010 Summary of Vermont Yankee Annual Assessment Open House and Public Meeting ML1022204782010-08-10010 August 2010 Summary of the July 14, 2010 Roundtable Meeting with Representatives of Stakeholder and Public Interest Groups Regarding Vermont Yankee ML1011100082010-04-21021 April 2010 Summary of Public Meeting to Discuss the Results of Entergy Nuclear Plant Safety Culture Workplace Survey ML1006802992010-03-0303 March 2010 Transcript of 2.206 Petition Vermont Yankee and Raymond Shadis Teleconference Dated March 3, 2010. Pages 1-30 ML0916304732009-06-17017 June 2009 Summary of Public Meeting with Duke Energy Carolinas, LLC, to Discuss a Proposed License Amendment for the Use of a Fiber-Reinforced Polymer (FRP) System ML0908603802009-05-0808 May 2009 Audit Summary Regarding the Vermont Yankee Nuclear Power Station License Renewal Application ML0835100522008-12-0101 December 2008 Summary of October 14, 2008 Vermont Yankee Cooling Tower Special Inspection Public Meeting, Dated 12/01/08 ML0815601802008-05-29029 May 2008 Summary of Annual Assessment Meeting with Entergy Nuclear Operations, Inc ML0805202692008-02-29029 February 2008 02/01/2008 Summary of Telephone Conference Call Between the NRC & Entergy Nuclear Operations, Inc., Concerning Confirmatory Analysis Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0802205082008-01-31031 January 2008 01/08/2008 Summary of Meeting Between the NRC Staff and Entergy Nuclear Operations, Inc. to Discuss the Response to a Request for Additional Information Pertaining to the Vermont Yankee License Renewal ML0803501662008-01-15015 January 2008 (PA-LR) Draft January 8, 2008 NRC-VY/Entergy Meeting Summary ML0736104692008-01-0202 January 2008 Summary of Telephone Conf Call Held on 10/23/07 Between NRC and Entergy Nuclear Operations Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station LRA ML0736501182007-12-21021 December 2007 (PA-LR) 12/18 Meeting Summary and Draft RAI ML0733001522007-11-26026 November 2007 Summary of Telephone Conference Call Held on October 16, 2007, Between U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station License Renewa ML0733902012007-11-19019 November 2007 (PA-LR) 10/16/2007 Summary of Telephone Conference Call Between NRC and Entergy Nuclear Operations, Inc., Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0731101582007-11-16016 November 2007 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Requests for Additional Information Pertaining to Vermont Yankee ML0730202072007-11-16016 November 2007 Summary of Telephone Conference Call Held on September 14, 2007, Between the NRC and Entergy Nuclear Operations, Inc., Concerning a Request for Additional Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Ap ML0731803742007-11-16016 November 2007 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Audit Questions Pertaining to the Vermont Yankee Nuclear Power Station LRA ML0729200762007-10-25025 October 2007 08/20/2007 Summary of Telephone Conference Call with Entergy Nuclear Operation, Inc., Concerning License Renewal Application ML0733811982007-10-24024 October 2007 (PA-LR) 08/27/2007 and 09/15/2007 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning a Draft Request for Additional Information Pertaining to the Vermont Yank ML0733811942007-10-24024 October 2007 (PA-LR) 10/20/07 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Vermont Yankee Nuclear Power Station License Renewal Application ML0726300102007-10-0101 October 2007 08/13/2007 Summary of Meeting with Entergy Nuclear Operation, Inc., Representatives Re License Renewal Application ML0727403852007-09-18018 September 2007 (PA-LR) 8/17 Summary of Telephone Conference - August 17, 2007, Between the NRC and Entergy Nuclear Operations, Inc., Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0723601112007-09-0505 September 2007 08/08/2007 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning Information Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0722703942007-08-28028 August 2007 Summary of Telephone Conference Call Held on August 1, 2007, Between the Us NRC and Entergy Nuclear Operations, Inc., Concerning New Information Pertaining to the Vermont Yankee Nuclear Power Station, License Renewal Application ML0727403672007-08-23023 August 2007 (PA-LR) 08/08 Teleconference Letter Comments ML0727403862007-08-23023 August 2007 (PA-LR) August 8 Call Summary ML0724705292007-08-20020 August 2007 (PA-LR) Review and Response ML0724705342007-08-0101 August 2007 (PA-LR) Call Summaries for Your Review and Comment ML0718301872007-07-10010 July 2007 06/01/2007 Summary of Telephone Conference Call Between the NRC and Entergy Nuclear Operations, Inc., Concerning Items Pertaining to the Vermont Yankee License Renewal Safety Evaluation Report ML0718301562007-06-29029 June 2007 Summary of Telephone Conference Call Held on May 29, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Concerning the Vermont Yankee Nuclear Power Station License Renewal Application ML0717100572007-06-25025 June 2007 03/23/2007 Summary of Telephone Conference Call Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0717101412007-06-25025 June 2007 Summary of Telephone Conference Call Held on April 2, 2007, Between the U.S. Nuclear Regulatory Commission and Entergy Nuclear Operations, Inc., Pertaining to the Vermont Yankee Nuclear Power Station License Renewal Application ML0715000282007-05-30030 May 2007 Meeting Summary for Vermont Yankee AA Meeting 2019-11-18
[Table view] |
Text
June 4, 2012 MEETING
SUMMARY
LICENSEE: ENTERGY NUCLEAR OPERATIONS, INC.
FACILITY: VERMONT YANKEE NUCLEAR POWER STATION
SUBJECT:
SUMMARY
OF PUBLIC MEETING On Wednesday, May 23, 2012, at 5:30 p.m., the U. S. Nuclear Regulatory Commission (NRC) conducted a public open house at the Brattleboro Union High School in Brattleboro, VT.
Following the open house, the NRC held a public meeting from 7:00 p.m. to 8:30 p.m. The NRC conducted the open house and public meeting to discuss its assessment of the safety performance at Vermont Yankee Nuclear Power Station (Vermont Yankee) for 2011.
A notice of the open house and public meeting was issued on April 30, 2012, and was posted on the NRCs external (public) Web page. The meeting notice can be found in the NRCs Agencywide Documents Access and Management System (ADAMS) with Accession No. ML12121A628. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html.
The NRC presented poster boards and was available to discuss its assessment of the safety performance of Vermont Yankee for the period of January 1 through December 31, 2011, as documented in our letter dated March 5, 2012 (ADAMS Accession No. ML12061A247). The NRC poster boards included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Vermont Yankee can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the public, local officials, State officials, and members of the media attended the open house and public meeting and were offered the opportunity to question the NRC regarding Vermont Yankees performance and the role of the agency in ensuring safe plant operations.
Enclosures:
Public Meeting Sign In Sheets (ADAMS ML12151A149)
/RA/
Ronald R. Bellamy, Chief Projects Branch 5 Division of Reactor Projects
ML12061A247). The NRC poster boards included background on the Reactor Oversight Process (ROP). Additional information relative to the NRC's Annual Assessment Process and the safety performance of Vermont Yankee can be found on the NRC's web site at:
www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
Members of the public, local officials, State officials, and members of the media attended the open house and public meeting and were offered the opportunity to question the NRC regarding Vermont Yankees performance and the role of the agency in ensuring safe plant operations.
Enclosures:
Public Meeting Sign In Sheets (ADAMS ML12151A149)
/RA/
Ronald R. Bellamy, Chief Projects Branch 5 Division of Reactor Projects Distribution: (via email)
R. Bellamy S. Rutenkroger, SRI RidsNRRPMResource T. Setzer S. Rich, RI E. Keighley A. Rancourt, Admin DOC NAME: G:\DRP\BRANCH5\Annual Assessment Meetings\2011 EOC\VY 2011 Annual Assessment Meeting Summary.docx ADAMS Accession No.: ML12156A157 SUNSI Review
- Non-Sensitive ; Publicly Available
- Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP NAME TSetzer RBellamy DATE 05/30/12 06/04/12