| issue date = 09/02/2014
| issue date = 09/02/2014
| title = Mid-Cycle Assessment Letter for Byron Station, Unit 1 and 2
| title = Mid-Cycle Assessment Letter for Byron Station, Unit 1 and 2
| author name = Duncan E R
| author name = Duncan E
| author affiliation = NRC/RGN-III/DRP/B3
| author affiliation = NRC/RGN-III/DRP/B3
| addressee name = Pacilio M J
| addressee name = Pacilio M
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| addressee affiliation = Exelon Generation Co, LLC, Exelon Nuclear
| docket = 05000454, 05000455
| docket = 05000454, 05000455
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUIT E 210 LISLE, IL 60532
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 September 2, 2014 Mr. Michael J. Pacilio Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555
-4352   September 2, 2014 Mr. Michael J. Pacilio Senior VP, Exelon Generation Co.,
LLC   President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555


==SUBJECT:==
==SUBJECT:==
Line 23: Line 21:


==Dear Mr. Pacilio:==
==Dear Mr. Pacilio:==
On August 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Byron Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 20 13 through June 30, 20
: 14. This letter informs you of the NRC's assessment of your facility during this period and its plans for future inspections at your facility.


The NRC determined that overall, B yron Station, Units 1 and 2, was operated in a manner that preserved public health and safety and met all cornerstone objectives.
On August 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Byron Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013 through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.
The NRC determined that the performance at Byron Station
The NRC determined that overall, Byron Station, Units 1 and 2, was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at Byron Station, Units 1 and 2, during the most recent quarter, as well as the previous three quarters of the assessment period, was within the Licensee Response column of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The NRC also plans to conduct infrequently performed inspection activities in accordance with Inspection Procedure 60855.1, Operation of an ISFSI [Independent Spent Fuel Storage Installation] at Operating Plants, related to your ISFSI; and Inspection Procedure 71002, License Renewal Inspection, associated with your license renewal application.
, Units 1 and 2, during the most recent quarter
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.
, as well as the previous three quarters of the assessment period, was within the Licensee Response column of the NRC's Reactor Oversight Process (ROP) Action Matrix, because all inspectio n findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The NRC also plans to conduct infrequently performed inspection activities in accordance with Inspection Procedure 60855.1, "Operation of an ISFSI [Independent Spent Fuel Storage Installation] at Operating Plants," related to your ISFSI; and Inspection Procedure 71002, "License Renewal Inspection," associated with your license renewal application.
Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.
As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross
The enclosed inspection plan lists the inspections scheduled through December 31, 2015.
-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.
Routine inspections performed by resident inspectors are not included in the inspection plan.
Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross
The inspections listed during the last 9-months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC
-reference in IMC 0310 during the mid
-cycle assessment review and evaluated for cross
-cutting themes and potential substantive cross
-cutting issues in accordance with IMC 0305.


The enclosed inspection plan lists the inspections scheduled through December 31, 20
M. Pacilio                                     will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
: 15. Routine inspections performed by resident inspectors are not included in the inspection plan.
In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).
The inspections listed during the last 9
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
-months of the inspection plan are tentative and may be revised at the end
-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC M. Pacilio
 
will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security
-related inspections, which will be sent via separate, non
-publicly available correspondenc
: e.
In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.
Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
  /RA/
                                              /RA/
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454, 50-455 License Nos. NPF-37, NPF-66
-454, 50-455 License Nos. NPF
-37, NPF-66


==Enclosure:==
==Enclosure:==
Byron Station Inspection/Activity Plan cc w/encl: Distribution via LISTSERV


Byron Station Inspection/Activity Plan cc w/encl:  Distribution via LISTSERV
M. Pacilio                                           will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.
 
In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
M. Pacilio will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security
Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.
-related inspections, which will be sent via separate, non
-publicly available correspondence
. In accordance with Title 10 of the Code of Federal Regulations 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html (the Public Electronic Reading Room).
Please contact me at 630
-829-9620 with any questions you may have regarding this letter or the inspection plan.
Sincerely,
Sincerely,
  /RA/ Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50
                                                      /RA/
-454, 50-455 License Nos. NPF
Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454, 50-455 License Nos. NPF-37, NPF-66
-37, NPF-66


==Enclosure:==
==Enclosure:==
Byron Station Inspection/Activity Plan cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl
Byron Station Inspection/Activity Plan cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl:
: Anthony Bowers RidsNrrDorlLpl3
Anthony Bowers RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov DOCUMENT NAME: Byron 2014 MOC Letter Publicly Available             Non-Publicly Available                 Sensitive             Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE         RIII NAME           Boston:mt               EDuncan DATE           08/21/14                 08/22/14 OFFICIAL RECORD COPY
-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov DOCUMENT NAME: Byron 2014 MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII       NAME Boston:mt EDuncan   DATE 08/21/14 08/22/14   OFFICIAL RECORD COPY
 
Page 1 of 2                                                                                  Byron 08/22/2014    09:31:25                                                        Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit        Planned Dates                                                                                                                No. of Staff Number        Start      End    Inspection Activity                                                              Title                    on Site BI ISI        - INSERVICE INSPECTION UNIT 2                                                                      2 2      09/29/2014  10/23/2014  IP 7111108P            Inservice Inspection Activities - PWR BI RP          - RADIATION PROTECTION BASELINE INSPECTION                                                        1 1, 2      10/06/2014  10/10/2014  IP 71124.02            Occupational ALARA Planning and Controls 1, 2      10/06/2014  10/10/2014  IP 71151                Performance Indicator Verification BI EPRTN      - EP ROUTINE INSPECTION / PI VERIFICATION                                                          1 1, 2      10/20/2014  10/24/2014  IP 7111402              Alert and Notification System Testing 1, 2      10/20/2014  10/24/2014  IP 7111403              Emergency Preparedness Organization Staffing and Augmentation System 1, 2      10/20/2014  10/24/2014  IP 7111405              Correction of Emergency Preparedness Weaknesses and Deficiencies 1          10/20/2014  10/24/2014  IP 71151                Performance Indicator Verification BI RP          - RADIATION PROTECTION BASELINE INSPECTION                                                        1 1, 2      11/03/2014  11/07/2014  IP 71124.07            Radiological Environmental Monitoring Program 1          11/03/2014  11/07/2014  IP 71151-BI01 1          11/03/2014  11/07/2014  IP 71151-OR01 1          11/03/2014  11/07/2014  IP 71151-PR01 BI OLRQ        - BIENNIAL REQUAL PROGRAM INSPECTION                                                              2 1, 2      12/01/2014  12/05/2014  IP 7111111B            Licensed Operator Requalification Program ISFSI          - ISFSI                                                                                            2 1, 2      02/01/2015  03/31/2015  IP 60855.1              Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI RP          - RADIATION PROTECTION BASELINE INSPECTION                                                        1 1          02/23/2015  02/27/2015  IP 71124.06            Radioactive Gaseous and Liquid Effluent Treatment BI CDBI        - COMPONENT DESIGN BASIS INSPECTION                                                                6 1          04/20/2015  05/22/2015  IP 7111121              Component Design Bases Inspection BI RP          - RADIATION PROTECTION BASELINE INSPECTION                                                        1 1          04/13/2015  04/17/2015  IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1          04/13/2015  04/17/2015  IP 71124.02            Occupational ALARA Planning and Controls BL EPX        - EP EXERCISE INSPECTION / PI VERIFICATION                                                        2 1, 2      04/13/2015  04/17/2015  IP 7111407              Exercise Evaluation - Hostile Action (HA) Event 1, 2      04/13/2015  04/17/2015  IP 7111408              Exercise Evaluation - Scenario Review 1          04/13/2015  04/17/2015  IP 71151                Performance Indicator Verification BI RP          - RADIATION PROTECTION BASELINE INSPECTION                                                        1 1          05/11/2015  05/15/2015  IP 71124.03            In-Plant Airborne Radioactivity Control and Mitigation 1          05/11/2015  05/15/2015  IP 71124.04            Occupational Dose Assessment This report does not include INPO and OUTAGE activities.
This report shows only on-site and announced inspection procedures.


Page 1 of 2 08/22/2014 09:31:25Report 22 UnitNumberPlanned Dates Start          EndInspection ActivityTitleNo. of Staff on SiteByronInspection / Activity Plan 09/01/2014
Page 2 of 2                                                                                   Byron 08/22/2014     09:31:25                                                        Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit        Planned Dates                                                                                         No. of Staff Number        Start      End    Inspection Activity                                                          Title  on Site PI&R           - PROBLEM I & R BIENNIAL                                                     4 1, 2       07/20/2015   08/07/2015   IP 71152B              Problem Identification and Resolution BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                   1 1          08/17/2015   08/21/2015   IP 71124.01            Radiological Hazard Assessment and Exposure Controls 1         08/17/2015   08/21/2015   IP 71151-BI01 1         08/17/2015   08/21/2015   IP 71151-OR01 1         08/17/2015   08/21/2015   IP 71151-PR01 BI ISI         - INSERVICE INSPECTION UNIT 1                                               1 1          09/08/2015   09/29/2015   IP 7111108P            Inservice Inspection Activities - PWR BI RP         - RADIATION PROTECTION BASELINE INSPECTION                                   1 1          11/16/2015  11/20/2015   IP 71124.05            Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.
-12/31/2015 BI ISI-INSERVICE INSPECTION UNIT 2 2  2  IPInservice Inspection Activities - PWR7111108P09/29/2014 10/23/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 11, 2  IPOccupational ALARA Planning and Controls71124.0210/06/2014 10/10/2014 1, 2  IPPerformance Indicator Verification7115110/06/2014 10/10/2014 BI EPRTN-EP ROUTINE INSPECTION / PI VERIFICATION 11, 2  IPAlert and Notification System Testing711140210/20/2014 10/24/2014 1, 2  IPEmergency Preparedness Organization Staffing and Augmentation System711140310/20/2014 10/24/2014 1, 2  IPCorrection of Emergency Preparedness Weaknesses and Deficiencies711140510/20/2014 10/24/2014 1    IPPerformance Indicator Verification7115110/20/2014 10/24/2014 BI RP-RADIATION PROTECTION BASELINE INSPECTION 11, 2  IPRadiological Environmental Monitoring Program71124.0711/03/201411/07/2014 1    IP71151-BI0111/03/201411/07/2014 1    IP71151-OR0111/03/201411/07/2014 1    IP71151-PR0111/03/201411/07/2014 BI OLRQ-BIENNIAL REQUAL PROGRAM INSPECTION 21, 2  IPLicensed Operator Requalification Program7111111B12/01/2014 12/05/2014 ISFSI-ISFSI21, 2  IPOperation of an Independent Spent Fuel Storage Installation at Operating Plants 60855.102/01/2015 03/31/2015 BI RP-RADIATION PROTECTION BASELINE INSPECTION 11    IPRadioactive Gaseous and Liquid Effluent Treatment71124.0602/23/2015 02/27/2015 BI CDBI-COMPONENT DESIGN BASIS INSPECTION 61    IPComponent Design Bases Inspection711112104/20/2015 05/22/2015 BI RP-RADIATION PROTECTION BASELINE INSPECTION 11    IPRadiological Hazard Assessment and Exposure Controls71124.0104/13/2015 04/17/2015 1    IPOccupational ALARA Planning and Controls71124.0204/13/2015 04/17/2015BL EPX-EP EXERCISE INSPECTION / PI VERIFICATION 21, 2  IPExercise Evaluation - Hostile Action (HA) Event711140704/13/2015 04/17/2015 1, 2  IPExercise Evaluation - Scenario Review711140804/13/2015 04/17/2015 1    IPPerformance Indicator Verification7115104/13/2015 04/17/2015 BI RP-RADIATION PROTECTION BASELINE INSPECTION 11    IPIn-Plant Airborne Radioactivity Control and Mitigation71124.0305/11/2015 05/15/2015 1    IPOccupational Dose Assessment71124.0405/11/2015 05/15/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.}}
Page 2 of 2 08/22/2014 09:31:25Report 22 UnitNumberPlanned Dates Start          EndInspection ActivityTitleNo. of Staff on SiteByronInspection / Activity Plan 09/01/2014
-12/31/2015 PI&R-PROBLEM I & R BIENNIAL 41, 2   IPProblem Identification and Resolution71152B07/20/2015 08/07/2015 BI RP-RADIATION PROTECTION BASELINE INSPECTION 11    IPRadiological Hazard Assessment and Exposure Controls71124.0108/17/2015 08/21/2015 1     IP71151-BI01 08/17/2015 08/21/2015 1     IP71151-OR01 08/17/2015 08/21/2015 1     IP71151-PR01 08/17/2015 08/21/2015 BI ISI-INSERVICE INSPECTION UNIT 1 11    IPInservice Inspection Activities - PWR7111108P09/08/2015 09/29/2015 BI RP-RADIATION PROTECTION BASELINE INSPECTION 11     IPRadiation Monitoring Instrumentation71124.0511/16/201511/20/2015 This report does not include INPO and OUTAGE activities. This report shows only on-site and announced inspection procedures.}}

Latest revision as of 18:56, 5 February 2020

Mid-Cycle Assessment Letter for Byron Station, Unit 1 and 2
ML14245A092
Person / Time
Site: Byron  Constellation icon.png
Issue date: 09/02/2014
From: Eric Duncan
Region 3 Branch 3
To: Pacilio M
Exelon Generation Co, Exelon Nuclear
References
Download: ML14245A092 (5)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, IL 60532-4352 September 2, 2014 Mr. Michael J. Pacilio Senior VP, Exelon Generation Co., LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555

SUBJECT:

MID-CYCLE ASSESSMENT LETTER FOR BYRON STATION, UNITS 1 AND 2

Dear Mr. Pacilio:

On August 5, 2014, the U.S. Nuclear Regulatory Commission (NRC) completed its mid-cycle performance review of Byron Station, Units 1 and 2. The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from July 1, 2013 through June 30, 2014. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined that overall, Byron Station, Units 1 and 2, was operated in a manner that preserved public health and safety and met all cornerstone objectives. The NRC determined that the performance at Byron Station, Units 1 and 2, during the most recent quarter, as well as the previous three quarters of the assessment period, was within the Licensee Response column of the NRCs Reactor Oversight Process (ROP) Action Matrix, because all inspection findings had very low (i.e., Green) safety significance, and all PIs indicated that your performance was within the nominal, expected range (i.e., Green). Therefore, the NRC plans to conduct ROP baseline inspections at your facility. The NRC also plans to conduct infrequently performed inspection activities in accordance with Inspection Procedure 60855.1, Operation of an ISFSI [Independent Spent Fuel Storage Installation] at Operating Plants, related to your ISFSI; and Inspection Procedure 71002, License Renewal Inspection, associated with your license renewal application.

As a result of the Safety Culture Common Language Initiative, the terminology and coding of cross-cutting aspects were revised. All cross-cutting aspects identified during inspections conducted in calendar year 2014 reflect this revision to Inspection Manual Chapter (IMC) 0310.

Cross-cutting aspects identified in 2013 using the 2013 terminology were converted to the latest revision in accordance with the cross-reference in IMC 0310 during the mid-cycle assessment review and evaluated for cross-cutting themes and potential substantive cross-cutting issues in accordance with IMC 0305.

The enclosed inspection plan lists the inspections scheduled through December 31, 2015.

Routine inspections performed by resident inspectors are not included in the inspection plan.

The inspections listed during the last 9-months of the inspection plan are tentative and may be revised at the end-of-cycle performance review. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC

M. Pacilio will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454, 50-455 License Nos. NPF-37, NPF-66

Enclosure:

Byron Station Inspection/Activity Plan cc w/encl: Distribution via LISTSERV

M. Pacilio will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security-related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) component of NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Please contact me at 630-829-9620 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Eric R. Duncan, Chief Branch 3 Division of Reactor Projects Docket Nos. 50-454, 50-455 License Nos. NPF-37, NPF-66

Enclosure:

Byron Station Inspection/Activity Plan cc w/encl: Distribution via LISTSERV DISTRIBUTION w/encl:

Anthony Bowers RidsNrrDorlLpl3-2 Resource RidsNrrPMByron Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Steven Orth Allan Barker Carole Ariano Linda Linn DRPIII DRSIII Patricia Buckley Carmen Olteanu ROPassessment.Resource@nrc.gov DOCUMENT NAME: Byron 2014 MOC Letter Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII NAME Boston:mt EDuncan DATE 08/21/14 08/22/14 OFFICIAL RECORD COPY

Page 1 of 2 Byron 08/22/2014 09:31:25 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site BI ISI - INSERVICE INSPECTION UNIT 2 2 2 09/29/2014 10/23/2014 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1, 2 10/06/2014 10/10/2014 IP 71124.02 Occupational ALARA Planning and Controls 1, 2 10/06/2014 10/10/2014 IP 71151 Performance Indicator Verification BI EPRTN - EP ROUTINE INSPECTION / PI VERIFICATION 1 1, 2 10/20/2014 10/24/2014 IP 7111402 Alert and Notification System Testing 1, 2 10/20/2014 10/24/2014 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1, 2 10/20/2014 10/24/2014 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 1 10/20/2014 10/24/2014 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1, 2 11/03/2014 11/07/2014 IP 71124.07 Radiological Environmental Monitoring Program 1 11/03/2014 11/07/2014 IP 71151-BI01 1 11/03/2014 11/07/2014 IP 71151-OR01 1 11/03/2014 11/07/2014 IP 71151-PR01 BI OLRQ - BIENNIAL REQUAL PROGRAM INSPECTION 2 1, 2 12/01/2014 12/05/2014 IP 7111111B Licensed Operator Requalification Program ISFSI - ISFSI 2 1, 2 02/01/2015 03/31/2015 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 02/23/2015 02/27/2015 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment BI CDBI - COMPONENT DESIGN BASIS INSPECTION 6 1 04/20/2015 05/22/2015 IP 7111121 Component Design Bases Inspection BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 04/13/2015 04/17/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/13/2015 04/17/2015 IP 71124.02 Occupational ALARA Planning and Controls BL EPX - EP EXERCISE INSPECTION / PI VERIFICATION 2 1, 2 04/13/2015 04/17/2015 IP 7111407 Exercise Evaluation - Hostile Action (HA) Event 1, 2 04/13/2015 04/17/2015 IP 7111408 Exercise Evaluation - Scenario Review 1 04/13/2015 04/17/2015 IP 71151 Performance Indicator Verification BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 05/11/2015 05/15/2015 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 05/11/2015 05/15/2015 IP 71124.04 Occupational Dose Assessment This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Byron 08/22/2014 09:31:25 Inspection / Activity Plan Report 22 09/01/2014 - 12/31/2015 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site PI&R - PROBLEM I & R BIENNIAL 4 1, 2 07/20/2015 08/07/2015 IP 71152B Problem Identification and Resolution BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 08/17/2015 08/21/2015 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 08/17/2015 08/21/2015 IP 71151-BI01 1 08/17/2015 08/21/2015 IP 71151-OR01 1 08/17/2015 08/21/2015 IP 71151-PR01 BI ISI - INSERVICE INSPECTION UNIT 1 1 1 09/08/2015 09/29/2015 IP 7111108P Inservice Inspection Activities - PWR BI RP - RADIATION PROTECTION BASELINE INSPECTION 1 1 11/16/2015 11/20/2015 IP 71124.05 Radiation Monitoring Instrumentation This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.