ML16126A089: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 05/05/2016
| issue date = 05/05/2016
| title = EOC Meeting Summary
| title = EOC Meeting Summary
| author name = Sandal S R
| author name = Sandal S
| author affiliation = NRC/RGN-II/DRP
| author affiliation = NRC/RGN-II/DRP
| addressee name =  
| addressee name =  
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 5, 2016  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 5, 2016 MEMORANDUM TO:                 File FROM:                         Shane Sandal, Chief /RA/
 
Reactor Projects Branch 2 Division of Reactor Projects
MEMORANDUM TO: File FROM:   Shane Sandal, Chief   /RA/ Reactor Projects Branch 2     Division of Reactor Projects  


==SUBJECT:==
==SUBJECT:==
Line 24: Line 23:
==SUMMARY==
==SUMMARY==
- VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3 AND 4, DOCKET NO. 50-424, 50-425, 52-025, AND 52-026 On April 14, 2016, the Nuclear Regulatory Commission (NRC) held an open house session at the Augusta Technical College in Waynesboro, Georgia from 6:00 p.m. to 7:30 p.m. local time.
- VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3 AND 4, DOCKET NO. 50-424, 50-425, 52-025, AND 52-026 On April 14, 2016, the Nuclear Regulatory Commission (NRC) held an open house session at the Augusta Technical College in Waynesboro, Georgia from 6:00 p.m. to 7:30 p.m. local time.
The open house was to provide an opportunity to discuss the NRC's annual assessment of Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 for the period of January 1, 2015, through December 31, 2015. No formal presentation was made by the NRC and two members of the public attended the open house.
The open house was to provide an opportunity to discuss the NRCs annual assessment of Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 for the period of January 1, 2015, through December 31, 2015. No formal presentation was made by the NRC and two members of the public attended the open house.
The following NRC staff attended the public meeting:  
The following NRC staff attended the public meeting:
 
Shane Sandal, (RII) Chief, Reactor Projects Branch 2, Division of Reactor Projects Michael Ernstes, (RII) Chief, Construction Projects Branch 4, Division of Construction Projects Wesley Deschaine, (RII) Acting Senior Resident Inspector, Vogtle 1 and 2 Sarah Temple, (RII) Acting Senior Resident Inspector, Vogtle 3 and 4 Alejandro Alen, (RII) Resident Inspector, Vogtle 1 and 2 Pauline Braxton, (RII) Resident Inspector, Vogtle 3 and 4 Joey Ledford, (RII) Public Affairs Officer Docket Nos.: 50-424/50-425/52-025/52-026 License Nos.: DPR-57/NPF-5/NPF-91/NPF-92
Shane Sandal, (RII) Chief, Reactor Projects Branch 2, Division of Reactor Projects Michael Ernstes, (RII) Chief, Construction Projects Branch 4, Division of Construction Projects Wesley Deschaine, (RII) Acting Senior Resident Inspector, Vogtle 1 and 2 Sarah Temple, (RII) Acting Senior Resident Inspector, Vogtle 3 and 4 Alejandro Alen, (RII) Resident Inspector, Vogtle 1 and 2 Pauline Braxton, (RII) Resident Inspector, Vogtle 3 and 4  
 
Joey Ledford, (RII) Public Affairs Officer  
 
Docket Nos.: 50-424/50-425/52-025/52-026 License Nos.: DPR-57/NPF-5/NPF-91/NPF-92
 
___ ML16126A089_______  SUNSI REVIEW COMPLETE  FORM 665 ATTACHED OFFICE RII:DRP      SIGNATURE SRS5      NAME Shane Sandal      DATE 5/5/2016 5/    /2016 5/    /2016 5/    /2016 5/    /2016 5/    /2016 5/    /2016 E-MAIL COPY?    YES NO      YES NO      YES NO      YES NO      YES NO      YES NO      YES NO UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA  30303-1257 May 5, 2016


MEMORANDUM TO: File FROM:   Shane Sandal, Chief   /RA/ Reactor Projects Branch 2     Division of Reactor Projects  
___ ML16126A089_______                  SUNSI REVIEW COMPLETE    FORM 665 ATTACHED OFFICE            RII:DRP SIGNATURE        SRS5 NAME              Shane Sandal DATE                  5/5/2016    5/  /2016      5/  /2016    5/ /2016      5/ /2016    5/ /2016      5/  /2016 E-MAIL COPY?        YES    NO  YES    NO    YES      NO    YES    NO    YES    NO    YES    NO    YES    NO UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 5, 2016 MEMORANDUM TO:                 File FROM:                         Shane Sandal, Chief /RA/
Reactor Projects Branch 2 Division of Reactor Projects


==SUBJECT:==
==SUBJECT:==
Line 42: Line 35:
==SUMMARY==
==SUMMARY==
- VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3 AND 4, DOCKET NO. 50-424, 50-425, 52-025, AND 52-026 On April 14, 2016, the Nuclear Regulatory Commission (NRC) held an open house session at the Augusta Technical College in Waynesboro, Georgia from 6:00 p.m. to 7:30 p.m. local time.
- VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3 AND 4, DOCKET NO. 50-424, 50-425, 52-025, AND 52-026 On April 14, 2016, the Nuclear Regulatory Commission (NRC) held an open house session at the Augusta Technical College in Waynesboro, Georgia from 6:00 p.m. to 7:30 p.m. local time.
The open house was to provide an opportunity to discuss the NRC's annual assessment of Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 for the period of January 1, 2015, through December 31, 2015. No formal presentation was made by the NRC and two members of the public attended the open house.
The open house was to provide an opportunity to discuss the NRCs annual assessment of Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 for the period of January 1, 2015, through December 31, 2015. No formal presentation was made by the NRC and two members of the public attended the open house.
The following NRC staff attended the public meeting:  
The following NRC staff attended the public meeting:
 
Shane Sandal, (RII) Chief, Reactor Projects Branch 2, Division of Reactor Projects Michael Ernstes, (RII) Chief, Construction Projects Branch 4, Division of Construction Projects Wesley Deschaine, (RII) Acting Senior Resident Inspector, Vogtle 1 and 2 Sarah Temple, (RII) Acting Senior Resident Inspector, Vogtle 3 and 4 Alejandro Alen, (RII) Resident Inspector, Vogtle 1 and 2 Pauline Braxton, (RII) Resident Inspector, Vogtle 3 and 4 Joey Ledford, (RII) Public Affairs Officer Docket Nos.: 50-424/50-425/52-025/52-026 License Nos.: DPR-57/NPF-5/NPF-91/NPF-92
Shane Sandal, (RII) Chief, Reactor Projects Branch 2, Division of Reactor Projects Michael Ernstes, (RII) Chief, Construction Projects Branch 4, Division of Construction Projects Wesley Deschaine, (RII) Acting Senior Resident Inspector, Vogtle 1 and 2 Sarah Temple, (RII) Acting Senior Resident Inspector, Vogtle 3 and 4 Alejandro Alen, (RII) Resident Inspector, Vogtle 1 and 2 Pauline Braxton, (RII) Resident Inspector, Vogtle 3 and 4  
 
Joey Ledford, (RII) Public Affairs Officer  
 
Docket Nos.: 50-424/50-425/52-025/52-026 License Nos.: DPR-57/NPF-5/NPF-91/NPF-92


___ ML16126A089_______   SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP       SIGNATURE SRS5       NAME Shane Sandal       DATE 5/5/2016 5/   /2016 5/   /2016 5/   /2016 5/   /2016 5/   /2016 5/   /2016 E-MAIL COPY?    YES NO       YES NO       YES NO       YES NO       YES NO       YES NO       YES NO}}
___ ML16126A089_______                   SUNSI REVIEW COMPLETE   FORM 665 ATTACHED OFFICE           RII:DRP SIGNATURE         SRS5 NAME             Shane Sandal DATE                 5/5/2016   5/ /2016       5/ /2016     5/ /2016       5/ /2016     5/ /2016     5/ /2016 E-MAIL COPY?       YES     NO YES     NO     YES     NO   YES   NO     YES     NO   YES   NO     YES     NO}}

Latest revision as of 03:56, 5 February 2020

EOC Meeting Summary
ML16126A089
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 05/05/2016
From: Shane Sandal
Division Reactor Projects II
To:
Division Reactor Projects II
References
Download: ML16126A089 (2)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 5, 2016 MEMORANDUM TO: File FROM: Shane Sandal, Chief /RA/

Reactor Projects Branch 2 Division of Reactor Projects

SUBJECT:

PUBLIC MEETING

SUMMARY

- VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3 AND 4, DOCKET NO. 50-424, 50-425,52-025, AND 52-026 On April 14, 2016, the Nuclear Regulatory Commission (NRC) held an open house session at the Augusta Technical College in Waynesboro, Georgia from 6:00 p.m. to 7:30 p.m. local time.

The open house was to provide an opportunity to discuss the NRCs annual assessment of Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 for the period of January 1, 2015, through December 31, 2015. No formal presentation was made by the NRC and two members of the public attended the open house.

The following NRC staff attended the public meeting:

Shane Sandal, (RII) Chief, Reactor Projects Branch 2, Division of Reactor Projects Michael Ernstes, (RII) Chief, Construction Projects Branch 4, Division of Construction Projects Wesley Deschaine, (RII) Acting Senior Resident Inspector, Vogtle 1 and 2 Sarah Temple, (RII) Acting Senior Resident Inspector, Vogtle 3 and 4 Alejandro Alen, (RII) Resident Inspector, Vogtle 1 and 2 Pauline Braxton, (RII) Resident Inspector, Vogtle 3 and 4 Joey Ledford, (RII) Public Affairs Officer Docket Nos.: 50-424/50-425/52-025/52-026 License Nos.: DPR-57/NPF-5/NPF-91/NPF-92

___ ML16126A089_______ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP SIGNATURE SRS5 NAME Shane Sandal DATE 5/5/2016 5/ /2016 5/ /2016 5/ /2016 5/ /2016 5/ /2016 5/ /2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 May 5, 2016 MEMORANDUM TO: File FROM: Shane Sandal, Chief /RA/

Reactor Projects Branch 2 Division of Reactor Projects

SUBJECT:

PUBLIC MEETING

SUMMARY

- VOGTLE ELECTRIC GENERATING PLANT, UNITS 1, 2, 3 AND 4, DOCKET NO. 50-424, 50-425,52-025, AND 52-026 On April 14, 2016, the Nuclear Regulatory Commission (NRC) held an open house session at the Augusta Technical College in Waynesboro, Georgia from 6:00 p.m. to 7:30 p.m. local time.

The open house was to provide an opportunity to discuss the NRCs annual assessment of Vogtle Electric Generating Plant, Units 1, 2, 3, and 4 for the period of January 1, 2015, through December 31, 2015. No formal presentation was made by the NRC and two members of the public attended the open house.

The following NRC staff attended the public meeting:

Shane Sandal, (RII) Chief, Reactor Projects Branch 2, Division of Reactor Projects Michael Ernstes, (RII) Chief, Construction Projects Branch 4, Division of Construction Projects Wesley Deschaine, (RII) Acting Senior Resident Inspector, Vogtle 1 and 2 Sarah Temple, (RII) Acting Senior Resident Inspector, Vogtle 3 and 4 Alejandro Alen, (RII) Resident Inspector, Vogtle 1 and 2 Pauline Braxton, (RII) Resident Inspector, Vogtle 3 and 4 Joey Ledford, (RII) Public Affairs Officer Docket Nos.: 50-424/50-425/52-025/52-026 License Nos.: DPR-57/NPF-5/NPF-91/NPF-92

___ ML16126A089_______ SUNSI REVIEW COMPLETE FORM 665 ATTACHED OFFICE RII:DRP SIGNATURE SRS5 NAME Shane Sandal DATE 5/5/2016 5/ /2016 5/ /2016 5/ /2016 5/ /2016 5/ /2016 5/ /2016 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO