ML17208A992: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/06/1980
| issue date = 09/06/1980
| title = Forwards Monthly Operating Repts for Aug 1980
| title = Forwards Monthly Operating Repts for Aug 1980
| author name = SCHMIDT A D
| author name = Schmidt A
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:'/ACCESS IOiV"EBB F AC IL: 50 250 50-251 50 335 AU TH~tlAHE SCHt'.IDTE A~D~REC IP~4A'<E REGULA'RY INFOR lATION OISTRIBUTIO SYSTE'l (R[DS):8009170279 OOC.DATEs 80/09/06 NOTARIZED:
{{#Wiki_filter:REGULA 'RY INFOR lATION       OISTRIBUTIO               SYSTE'l (R [DS)
No DOCKET 4 Turkey Point Planti Unit 3E Florida Power and Light C 05000250 Turkey Point Planti Unit 4E Florida Power and Light C 05000251 St~Lucie Planti Unit 1E Florida Power 8 Light Co~0 AUTHOR AFFILIATION Florida Power 8 Light Co~RECIP IEVT AFF ILIAT IOV Office of'4lanagement and Program Analysis SUBJECT;Forwards monthly ooeratina reots for Aug 1980'ISTR ISUTIO I CODE;AOOSS COPIES RECEIVED;LTR
      '/
/EVCL J'IIE: TITl.E: Annual'emi Annus'l,i, Monthly Ooerating Reoorts (OL Stag NOTESt RECI~!EV T ID C3OE/VA'1E ACTIOiv.'ARGAE S~04 INTERNAl.:
ACCESS IOiV "EBB :8009170279                   OOC.DATEs 80/09/06             NOTARIZED: No                 DOCKET 4 F AC  IL: 50  250 Turkey         Point Planti Unit 3E Florida Power and Light                         C 05000250 50-251 Turkey Point Planti Unit 4E Florida Power and Light                                   C 05000251 50 335 St       ~ Lucie Planti Unit 1E Florida Power 8 Light Co                         ~     0 AU TH ~ tlAHE                AUTHOR   AFFILIATION SCHt'.IDTE    A ~ D ~        Florida Power 8 Light Co         ~
AEOO OIR HU" FAC 08 R)A 13 EX EVAL BR09 REG F II.E 01 COPIES LTTR ENCL 7 7 1 1 1 1 2 2 1 1 1 1 REC I P IEVT IO CODE/NAvTE CLARKERD 04 D/9 IR g AU~i F AC07 ICE 06 NRC POR 02 OR ASSESS BR 10 CUTIES LTTR ENCL 7 7 1 1 2 2 1 1 1, 1 UTERI'vAL; ACRS LPDR 03 B R O:3 I','H A V E V VSIC 05 1 1 1'gy gs~s~o TJ'I KL y J""E 1=CI=OS RRE i.ll l=D: LT T"~EVCL
REC  IP ~ 4A'<E            RECIP IEVT AFF ILIATIOV Office of '4lanagement and Program Analysis SUBJECT;       Forwards monthly ooeratina reots for Aug 1980 ISUTIO   I   CODE;     AOOSS     COPIES RECEIVED;LTR TITl.E: Annual'emi Annus'l,i, Monthly Ooerating Reoorts
()/Of~i)
                                                                                /EVCL      J'IIE:
P.O.BOX 529100, MIAMI, FL 33162 yllgi',:.i:~.i5:-,=Ji A~eiXi FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U.S.Regulatory Commission Washington, D.C.20555 Gentlemen:
                                                                                          'ISTR (OL Stag NOTESt RECI~! EV T               COPIES            REC      I P IEVT                CUTIES ID C3OE/VA'1E               LTTR ENCL      IO CODE/NAvTE                    LTTR ENCL ACTIOiv.'ARGAES              ~         04       7    7    CLARKERD                  04          7    7 INTERNAl.:       AEOO                             1   1     D/9 IR g AU~i         F AC07         1    1 OIR HU" FAC 08                  1    1    ICE                       06         2    2 R)A                    13        2    2    NRC     POR               02         1    1 EX EVAL BR09                1    1    OR     ASSESS         BR 10         1,    1 REG    F II.E        01        1   1 UTERI'vAL; ACRS                                             B R O:3 I', 'H A V E V                       1 LPDR                  03                  VSIC                       05         1     1
Attached are the August, 1980, Operating Status Reports for Turkey Point Unit Nos.3 and 4.and St.Lucie Unit No.l.Very truly yours, A.D.Schmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire/DOER'i 1o~~/PEOPLE...SERVING PEOPLE I 4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.*COMPLETED II Y V.T.Chilson TELEPHONE MONTH AUGUSTA 1980 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I 643 639 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)653 l7 IS l0 l3 l4 IS 16 INSTRUCTIONS 63 637 646 503 664 658 655 658 656 656 656 649 656 19 20 12 23 24 25 26 27 2S 29 30 31 NOTE: 647 653 647 652 657 652 642 643 644 648 Average daily power level greater than 646 MWe due to cooler condenser cooling water.On this format.list the average daily unit power (evel in MWe Net for each day in the reporting ntonth.Compute to the nearest whole megawatt.(')(77)  
                                                                                        'gy     gs~s~o TJ'I KL   y J""E     1=           RRE CI=OS     i.ll l=D: LT T" ~       EVCL
.OPERATING DATA REPORT'OPERATING STATUS Turke'oint Unit No.3 760 693 680 1.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): DOCKET NO.oATE SeSs~.980.COMPLETED BY J~~hilson TELEPHONE 4851~2-3824 Notes-Unit No.3 operated at approximately 1008 R.P.>except for outage of Aug.6-7, 1980 8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: Maximum De endable Ca acit Gross MWe has been rerated to the mbst restricted seasonal conditions (summer)experienced.
 
Maximum Dependable Capacity (Net MWe)has been rerated accordingly.
()/Of ~i )
9.Power Level To Which Restricted.
P.O. BOX 529100, MIAMI,FL 33162 yllgi
If Any (Net MWe): 10.Reasons For Restrictions, If Any: This Month Yr:to-Date 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical~13.Reactor Reserve Shutdown Hours 14.Hours Generator On.Line 15.Unit Reserve Shutdown Hours 16.Gross Thermal Energy Ge'nerated (MWH)17.Gross Electrical Energy Generated (MWH)18.Net Electrical Energy Generated (MWH)19.Unit Service Factor 20.Unit Availability Factor 21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using DER Net)23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months 744.0 4 979.7 0 4 809.4 737.9 1 613 090 10"410 368 3 275 415 503 570 3 104 278 478 174 82.1 99.2 99.2 82.1 99.5'2.1 76.5 0.8 1.3 (Type, Date, and Duration of Each): P o ram-Oct.5-Nov.1 1980.Cumulative 7 6 6 52 249.2 213.4 50 499;6 121.8 101 879 002 32 356 415 30 626 372 74.4 74.6 70.2 65.1 2.5 25.If Shut Down At End Of Report Period, Esthnated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):
                                                      ',:.i:~. i5:-,= Ji A~ eiXi FLORIDA POWER   8 LIGHT COMPANY September         6, l980 Office of Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77)
Attached are the August, 1980, Operating Status Reports for Turkey Point Unit Nos. 3 and 4. and St. Lucie Unit No. l.
Very truly yours, A. D. Schmidt Vice President Power Resources VTC/ddc cc:   Mr. James P. O'Reilly Robert Lowenstein, Esquire
/DOER'i   1o~~/
PEOPLE... SERVING PEOPLE
 
I 4
 
AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.
COMPLETED IIY      V. T. Chilson TELEPHONE MONTH           AUGUSTA         1980 DAY       AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAILYPOWER LEVEL (MWe.Net)                                                   (MWe-Net)
I                        643                                  l7                      653 639                                  IS 63                                   19                      647 637                                 20                      653 646                                                         647 12 503                                 23                      652 664                                 24 658                                 25                      657 l0                        655                                 26                      652 658                                 27 656                                 2S                      642 l3                        656                                 29                      643 l4                        656                                 30                      644 IS                        649                                 31                      648 656 16 NOTE:       Average       daily power level greater than 646 MWe due to cooler condenser         cooling INSTRUCTIONS water.
On this format. list the average daily unit power (evel in MWe Net for each day in the reporting ntonth. Compute to the nearest whole megawatt.
(')(77)
 
                                                  . OPERATING DATA REPORT DOCKET NO.
oATE SeSs~.            980  .
COMPLETED BY        J~~hilson TELEPHONE      4851~2-3824
      'OPERATING STATUS
: 1. Unit Name:                Turke 'oint Unit No.       3           Notes    Unit No. 3 operated
: 2. Reporting Period:
at  approximately 1008 R.P.>
: 3. Licensed Thermal Power (MWt):
except    for  outage      of  Aug.
760                  6-7,  1980
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):            693
: 6. Maximum Dependable Capacity (Gross MWe):              680
: 7. Maximum Dependable Capacity (Net MWe):
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Maximum De endable Ca             acit     Gross MWe has been rerated to the mbst restricted                       seasonal conditions (summer) experienced. Maximum Dependable Capacity (Net                               MWe)   has been rerated accordingly.
: 9. Power Level To Which Restricted. If Any (Net MWe):
: 10. Reasons For Restrictions, IfAny:
This Month             Yr:to-Date             Cumulative
: 11. Hours In Reporting Period                                                                         7    6 6
: 12. Number Of Hours Reactor Was Critical                 744. 0            4 979.7                52 249.2
~
: 13. Reactor Reserve Shutdown Hours                                                 0                  213. 4
: 14. Hours Generator On. Line                             737.9              4 809.4                50 499;6
: 15. Unit Reserve Shutdown Hours                                                                         121.8
: 16. Gross Thermal Energy Ge'nerated (MWH)             1 613 090            10 "410 368          101 879 002
: 17. Gross Electrical Energy Generated (MWH)             503  570          3 275 415              32 356 415
: 18. Net Electrical Energy Generated (MWH)               478 174            3 104 278              30 626 372
: 19. Unit Service Factor                                   99.2                  82.1                    74.4
: 20. Unit Availability Factor                             99.2                  82.1                    74.6
: 21. Unit Capacity Factor (Using MDC Net)                 99.5                  '2.1                    70.2
: 22. Unit Capacity Factor (Using DER Net)                                         76.5                    65.1
: 23. Unit Forced Outage Rate                                 0.8                    1.3                    2.5
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
P o ram Oct. 5 Nov. 1             1980.
: 25. IfShut Down At End Of Report Period, Esthnated Date     of Startup:
: 26. Units ln Test Status (Prior to Commercial Operation):                       Forecast               Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77)
 
O.
O.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKETNO.50-250 No.Date Vl~J L rl IA Q Q~Q~CA Liccnscc Event Report-4l Cl'n cn G R~Q CI O Cr Cause 4 Corrective Action to Prevent Recurrence 16 80-08-06 F 6.1: N/A CB MOTOR X Unit No.3 was removed from service due to low oil level in reactor coolant pump motor No.3C.Cor-rective actions included adding oil.(Nuclear System)F: Forced S: Scheduled<<I/v7)Reason: A-Equipment Failure (Explain)B.Maintenance oi Test~C-Refueling D.Regulatory Restriction E-Operator Training 8r, Liccnsc Examination F-Administrative G-Operational Error (Explain)II.Other (Explain)3 Method: I-Manual 2.Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-OI 6 I)5 Exhibit I-Sante Source 0 AVERAGE DAlLY UNIT POWER LEVEL DOCKET NO.COMPLETED BY V-T.ChilSon MONTH AUGUST 1980 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)I 633 DAY AVERAGE DAILY POWER LEVEL (M We.Net)639 17 8 10 12 13 14 l5 16 635 630 633 640 644 645 644 640 641 639 640 18 19 20 21 22 24 25 26 27 28>9 30 31 634 635 634 635 636 638 640 642 634 630 632 636 INSTRUCTIONS On this format.list the'average daily unit I>>>wer levt.l in MWe.Net for each day i>>the reporting>n>>nth.C>>n>pute to the nearest whole megawat t.('t(77)
DOCKETNO. 50 250 UNITSHUTDOWNS AND POWER REDUCTIONS rl         Q ~
OPERATING DATA REPORT DOCKET NO.~~2L DATE M~~980 COMPLETED BY 2LZ~~son TELEPHONE OPERATING STATUS Notes-Unit No.4 operated at approximately 100%R.P.1.Unit Name: Turke Point Unit No.4 Reporting Period AU ust 1980 3.I.icensed Thermal Power (MWt): 2200 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): e~7.Maximum De ndable Ca acit Net MWe: 646 conditions summer ex erienced.Maximum De endable Ca acit Net MWe has been p y()8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: Maximum De endable Ca acit (Grass MWe)has been rerated to the most restricted seasonal rerated accordingly.
Q                             R~CI Vl                        Liccnscc   4l Cl     Q Cause  4 Corrective No.          Date          ~ J      IA Event        'n                                Action to L
9.Power Level To Which Restricted, If Any (Net MWe): 10.Reasons For Restrictions, If Any: NONE This Month Yr.-to-Date Cumula tive 6X 584.0 744.0 5 3 9.166.6-0-43 627;3 31'90.848 116-0-1 633 024 28 900 833 2 5 70.8 70.9 69.0 64.1 3.0 11.Hours In Reporting Period 12.Number Of Hours Reactor Was Critical 13.Reactor Reserve Shutdown Hours 12 03 14.Hours Generator On-Line 15.Unit Reserve Shutdown Hours 12.3 16.Gross Thermal Energy Ge'nerated (MWH)9 629 136 17.Gross Electrical Energy Generated (MWH)2 997 355 19.Unit Service Factor 75.9 20.Unit Availability Factor 100.076.1 21.Unit Capacity Factor (Using MDC Net)98'.6"75.1 22.Unit Capacity Factor (Using DER Net)92.0 70.0 23.Unit Forced Outage Rate-0-0.3 24.Shutdowns Scheduled Over Next 6 Months(Type, Date, and Duration of Each): maintenance and ins ections-Nov.9 1980-Jan.10, 1981.25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units In Test Status (Prior to Commercial Operation):
Q Report    cn G     O                   Prevent Recurrence
Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (lp/77) r UNIT SHUTDOWNS AND POWER REDUCTIONS nit No.4 REPORT hiONTH AUGUST, 1980 305 552-82 No.Date Ih 4 A J a~C/7$Liccnscc Event Report~i~CP 4)o~G CJ~CJ Q C~Cause&Corrective Action to Prevent Recurrence N 0 N F: Forced S: Schedu!ed (')/77)Reason: A.Equipment Failure (Explain)B.Maintenance or Test C-Refueling.
                                                ~ CA                                Cr 16       80-08-06 F       6.1 :                             N/A     CB     MOTOR X   Unit No. 3 was removed from service due to low oil level in reactor coolant pump motor No. 3C. Cor-rective actions included adding oil.   (Nuclear System) 3                              4 F: Forced         Reason:                                            Method:                          Exhibit G - Instructions S: Scheduled     A-Equipment Failure (Explain)                       I-Manual                          for Preparation of Data B.Maintenance oi Test   ~
D.Regulatory Restriction EZperator Training&.License Examination F-Administrative G-Operational Error (Explain)II.Other (Explain)Method: I-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-OI 6 I)Exlwbrt I-Same Source AVERAGE DAII.Y UNIT POWER LEVEL DOCKET NO.St.Lucre II"-"" COMPLETEDIIY V-T.Chilson MONTH AUGUST 1980 DAY AVERAGE DAILY POWER LEVEL (MWe.Net)I 75 794 796 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)17 18 673 19 787 10 11 13 14 15 16 INSTRUCTIONS 77 770 792 791 790 791 798 797 718 126 255 394 20 21 22 23 24 25 26 27 28 30 31 NOTE: 786 725 783 78 782 757 759 781 779 780 749 Average daily power level greater than 777 MWe due to cooler condenser cooling water.On this format.list the average daily unit power level in MWe.Net for each day in the reporting month.Compute to the nearest whole megawatt.I')/77)
2.Manual Scram.                  Entry Sheets for Licensee C-Refueling                                        3-Automatic Scram.                Event Report (LER) File (NUREG-D.Regulatory Restriction                            4-Other (Explain)                 OI 6 I )
OPERATING STATUS OPERATING DATA REPORT DOCKETNO.~~DATE MI~~980 COMPLETED BY T Chilson TELEPHONE 05 552-3824 St.Lucie Unit No.1 2560 850 802 l.Unit Name: 2.Reporting Period: 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross MWe): 5.Design Electrical Rating (Net MWe): 6.Maximum Dependable Capacity (Gross MWe): 7.Maximum Dependable Capacity (Net MWe): 22 Notes-Unit operated at approximately 100%R.P., except for outages of Aug.14, 14-15, and 16-18, 1980, and reduced load operation of Aug.14-18, 1980.8.If Changes Occur in Capacity Ratings (Items Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level To Which Restricted.
E-Operator Training 8r, Liccnsc Examination F-Administrative                                                                  5 G-Operational Error (Explain)                                                         Exhibit I - Sante Source
If Any (Net MWe): 10.Reasons For Restrictions, If Any: NONE This Month Yr:to-Date 5 855.0 4 0.2-0-3 889.7 7.3 3 101 490 2 915 036 66.4 64;1 62.1 11.Hours In Reporting Period 744.0 12.Number Of Hours Reactor Was Critical 720.0 13.Reactor Reserve Shutdown Hours-0-~14.Hours Generator On-Line 701.4 15.Unit Reserve Shutdown Hours 7~3 17.Gross Electrical Energy Generated (MWH)551 240 18.Net Electrical Energy Generated (MWH)519 201 19.Unit Service Factor 94.3 20.Unit Availability Factor 22.Unit Capacity Factor (Using DER Net)87.0 23.Unit Forced Outage Rate-0-24.Shutdowns Scheduled Over Next 6 Months (Type.Date, and Duration of Each): Cumulative 32 399.0-2 129.5 24 719;7 39.3 19 395 990 18 242 932 76.3 72.5'70.2 6.4 25.If Shut Down At End Of Report Period, Estimated Date of Startup: 26.Units ln Test Status (Prior to Commercial Operation):
<<I/v7)              II.Other (Explain)
N/A Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION (u/77)
 
Page 1 of 2 80 UNIT SHUTDOWNS AND POWER REDUCTIONS 552-3824 DOCKET NO.l30Sl-No.l No.I Q~tS c 5 tx.'C/I Llccllscc Event Rcport-Cl C~Q Cr Cause&Corrective Action to Prevent Recurrcncc 80-08-14 S 10.7 A N/A EG TRANSF Unit was removed from service to isolate main power transformer No.1B to repair oil leak.Cor-rective actions included installing new bushing.(Non-nuclear system)12 80-08-14-0-B N/A EG TRANSF Load was limited to the capacity of main transformer No.1A.(Non-nuclear system)13 80-08-14 7.3*F N/A EG TRANSP Unit was removed from service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No.1B.(Non-nuclear system)I F: Forced S: Schedu!ed ('I/77)Reason: A-Equipment Failure (Explain)B-Maintenance oi Test.C.Refueling D Regulatory Restriction E-Operator Training Sc Liccnsc Examination F-Administrative G-Operational Error (Explain)II-Other (Explain)3 Method: I-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)4 Exhibit G-Instructions for Preparation of Data Entry Sheets Ior Licensee Event Report (LER)File (NUREG-016I)Exhibit I-Same Source UNIT SHUTDOWNS AND POWER REDUCTIONS Page 2 of 2 80*COMPLETED BY I-"'-'Ni).rl MI l J Llcenscc Event Report=CP CJ MI cn G C o~E~Cause Ec Corrective Action to Prevent Recurrence 14 80-08-'17'24.6-B N/A EG TRANSF Unit was removed from service to install new bushing'and return main power transformer No.1B to service.(Non-nuclear system)F: Forced S: Scheduled ('>/77)Reason: A.Equipment Failure (Explain)B-hlaintenance or Test.C-Refueling D Regulatory Restriction E-Operator Training Ec License Examination F-Administrative G-Operational Error (Explain)H-Other (Explairt) h(ethod: I-Manual 2-h(anuai Scram.3-Automatic Scranl.4-Other (Explain)Exhibit G-Instructions
0 AVERAGE DAlLYUNIT POWER LEVEL DOCKET NO.
.for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG.OI 6I)Exhibit I-Salnc Source P.O.BOX 529100, MIAMI, FL 33162+<Illy~l,==FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U.S.Regulatory Commission Washington, D.C.20555 Gentlemen:
COMPLETED BY         V- T. ChilSon MONTH         AUGUST           1980 DAY       AVERAGE DAILYPOWER LEVEL                              DAY        AVERAGE DAILYPOWER LEVEL (MWe-Net)                                                     (MWe.Net )
Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos.3 and 4 and St.Lucie Unit No.l.Very truly yours, D.Schmidt Vice President Power Resources VTC/ddc cc: Mr.James P.O'Reilly Robert Lowenstein, Esquire PEOPLE...SERVING PEOPLE
I                        633                                    17                    639 18                    634 635                                  19                      635 630                                   20                      634 633                                   21                      635 640                                   22                      636 644                                                           638 8                        645                                   24                      640 644                                   25                       642 10                                                                26                       634 27                       630 12                                                                28                       632 13                          640                                    >9 14                          641                                  30                       636 l5                          639                                  31 16                          640 INSTRUCTIONS On this format. list the'average daily unit I>>>wer levt.l in MWe.Net for each day i>> the reporting >n>>nth. C>>n>pute to the nearest whole megawat t.
'L  
('t(77)
.
 
OPERATING DATAREPORT DOCKET NO.
DATE
                                                                                                      ~~2L M~~980 COMPLETED BY       2LZ~~son TELEPHONE
                                                  ~
OPERATING STATUS Turke    Point Unit No.      4          Notes Unit   No. 4 operated
: 1. Unit Name:
Reporting Period         AU ust     1980                           at approximately      100%    R.P.
: 3. I.icensed Thermal Power (MWt):               2200
: 4. Nameplate Rating (Gross MWe):
: 5. Design Electrical Rating (Net MWe):
e
: 7. Maximum De ndable Ca p acit y(Net MWe:   )              646
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
Maximum De endable Ca           acit   (Grass MWe) has been rerated to the most                 restricted seasonal conditions summer ex erienced. Maximum                      De  endable  Ca  acit    Net  MWe      has been rerated accordingly.
: 9. Power Level To Which Restricted, If Any (Net MWe):          NONE
: 10. Reasons For Restrictions, If Any:
This Month           Yr.-to-Date           Cumula tive
: 11. Hours In Reporting Period                                                                  6X 584.0
: 12. Number Of Hours Reactor Was Critical                744.0                                     5 3 9.
: 13. Reactor Reserve Shutdown Hours                                          12 03                166.6
: 14. Hours Generator On-Line                                                                    43 627;3
: 15. Unit Reserve Shutdown Hours                                            12.3                  31 '
: 16. Gross Thermal Energy Ge'nerated (MWH)            1 633 024           9 629 136            90 .848 116
: 17. Gross Electrical Energy Generated (MWH)                                2 997 355            28 900 833 2 5
: 19. Unit Service Factor                                                          75.9                   70.8
: 20. Unit Availability Factor                            100.0                 76.1                   70.9
: 21. Unit Capacity Factor (Using MDC Net)                  98'.6                "75.1                  69.0
: 22. Unit Capacity Factor (Using DER Net)                 92.0                  70.0                  64.1
: 23. Unit Forced Outage Rate                                                  0.3                    3.0
: 24. Shutdowns Scheduled Over Next 6 Months(Type, Date, and Duration of Each):
maintenance and ins ections  Nov. 9 1980  Jan.                     10, 1981.
: 25. If Shut Down At End Of Report Period, Estimated Date    of Startup:
: 26. Units In Test Status (Prior to Commercial Operation):                     Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (lp/77)
 
r UNIT SHUTDOWNS AND POWER REDUCTIONS                                          nit No.4 REPORT hiONTH AUGUST, 1980                             305    552- 82 AJ                  i~        CJ~
Cause  & Corrective Ih                  a      Liccnscc  CP  4)        CJ No.           Date 4
Event        o      Q            Action to Report ~  ~G        C ~    Prevent Recurrence
                                                ~ C/7 $
N    0    N F: Forced          Reason:                                          Method:              Exhibit G - instructions S: Schedu!ed        A.Equipment Failure (Explain)                   I -Manual            for Preparation of Data B.Maintenance or Test                            2-Manual Scram.      Entry Sheets for Licensee C-Refueling.                                    3-Automatic Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction                        4-Other (Explain)   OI 6 I )
EZperator Training &. License Examination F-Administrative G-Operational Error (Explain)                                         Exlwbrt I - Same Source
(')/77)                 II.Other (Explain)
 
AVERAGE DAII.YUNIT POWER LEVEL DOCKET NO.
II"""
St. Lucre COMPLETEDIIY        V- T. Chilson MONTH            AUGUST          1980 DAY        AVERAGE DAILYPOWER LEVEL                            DAY        AVERAGE DAILYPOWER LEVEL (MWe.Net)                                                    (MWe-Net)
I                           75                                17 794                                  18                      673 796                                  19                      787 77                                  20                      786 770                                21                      725 792                                  22                      783 791                                  23                      78 790                                  24 791                                  25                      782 10                                                              26                      757 11                        798                                  27                      759 797                                  28                      781 13                        718                                                          779 14                        126                                  30                      780 15                        255                                  31                      749 16                        394                                NOTE:        Average        daily power level greater than 777    MWe    due    to cooler condenser cooling water.
INSTRUCTIONS On this format. list the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megawatt.
I')/77)
 
OPERATING DATA REPORT DOCKETNO.
DATE COMPLETED BY
                                                                                                      ~~
MI~~980 T Chilson TELEPHONE        05 552-3824 OPERATING STATUS
: l. Unit Name:                St. Lucie Unit No.         1              Notes  - Unit  operated at
: 2. Reporting Period:                                                    approximately 100% R.P.,
: 3. Licensed Thermal Power (MWt):                  2560                except for outages of Aug.
: 4. Nameplate Rating (Gross MWe):                   850                14, 14-15, and 16-18, 1980, 802                and reduced load operation
: 5. Design Electrical Rating (Net MWe):
: 6. Maximum Dependable Capacity (Gross MWe):                   22 of Aug.14-18, 1980.
: 7. Maximum Dependable Capacity (Net MWe):
: 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
: 9. Power Level To Which Restricted. If Any (Net MWe):           NONE
: 10. Reasons For Restrictions, If Any:
This Month           Yr:to-Date           Cumulative
: 11. Hours In Reporting Period                             744.0             5  855.0            32 399.0-
: 12. Number Of Hours Reactor Was Critical                 720.0             4    0.2            2
: 13. Reactor Reserve Shutdown Hours                             ~                             129.5
: 14. Hours Generator On-Line                               701.4             3  889.7            24 719;7
: 15. Unit Reserve Shutdown Hours                             7 ~3                 7.3                  39.3
: 17. Gross Electrical Energy Generated (MWH)               551 240           3 101    490        19 395 990
: 18. Net Electrical Energy Generated (MWH)                 519 201           2 915 036            18 242 932
: 19. Unit Service Factor                                     94.3                 66.4                  76.3
: 20. Unit Availability Factor 64;1                  72.5
: 22. Unit Capacity Factor (Using DER Net)                     87.0                 62.1                  '70.2
: 23. Unit Forced Outage Rate                                                                           6.4
: 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration   of Each):
: 25. IfShut Down At End Of Report Period, Estimated Date of Startup:      N/A
: 26. Units ln Test Status (Prior to Commercial Operation):                      Forecast              Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (u/77)
 
UNIT SHUTDOWNS AND POWER REDUCTIONS                        DOCKET NO.
No.l Page 1 of  2 80 l30Sl  552-3824 I
Q~
tS    Llccllscc                  Cl                Cause  & Corrective No.                                         c  5  tx.'    Event C ~
Action to C/I      Rcport-                    Q                    Prevent Recurrcncc Cr 80-08-14  S      10.7        A                      N/A         EG      TRANSF  Unit  was removed from          service to isolate  main power transformer No. 1B  to repair oil leak. Cor-rective actions included installing new  bushing.     (Non-nuclear system) 12        80-08-14                 B                      N/A         EG     TRANSF   Load was limited to the capacity              of main transformer No. 1A. (Non-nuclear system) 13        80-08-14           7.3 F                      N/A         EG     TRANSP  Unit  was removed from          service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No. 1B.           (Non-nuclear system)
I                                                                        3                               4 F: Forced        Reason:                                              Method:                            Exhibit G - Instructions S: Schedu!ed      A-Equipment Failure (Explain)                         I-Manual                          for Preparation of Data B-Maintenance oi Test .                               2-Manual Scram.                  Entry Sheets Ior Licensee C.Refueling                                           3-Automatic Scram.                Event Report (LER) File (NUREG-D Regulatory Restriction                             4-Other (Explain)                  016I )
E-Operator Training Sc Liccnsc Examination F-Administrative G-Operational Error (Explain)                                                           Exhibit  I - Same Source
('I/77)               II-Other (Explain)
 
Ni).
rl MI UNIT SHUTDOWNS AND POWER REDUCTIONS Page 2 Llcenscc Event of CP 2
CJ C
80 o ~
COMPLETED BY Cause I
Ec Corrective Action to Jl MI Report =     cn G     E ~                 Prevent Recurrence Unit was removed from service to 14         80-08-'17           24. 6-     B                   N/A           EG     TRANSF install new bushing 'and return main power transformer No. 1B to service.
(Non-nuclear system)
F: Forced             Reason:                                             h(ethod:                         Exhibit G - Instructions .
S: Scheduled          A.Equipment Failure (Explain)                         I-Manual                        for Preparation of Data B-hlaintenance or Test .                             2-h(anuai Scram.                  Entry Sheets for Licensee C-Refueling                                         3-Automatic Scranl.              Event Report (LER) File (NUREG.
D Regulatory Restriction                             4-Other (Explain)                OI 6I )
E-Operator Training Ec License Examination F-Administrative G-Operational Error (Explain)                                                         Exhibit  I- Salnc Source
('>/77)                   H-Other (Explairt)
 
P.O. BOX 529100, MIAMI,FL 33162
                                                                    +<Illy~
l,==
FLORIDA POWER 8 LIGHT COMPANY September        6, l980 Office of  Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:
Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.
Very  truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc:  Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE
 
'L


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-250 Turkey Point UNIT Unit No.3 DATE Se t.6, 1980 COMPLETED BY V..T.Chilson REPORT MONTH AUGUST, 1980 TELEPHONE (305)552-.3824 Unit No.3 operated at approximately 100%R.P., except for outage of Aug.6-7, 1980.Refer to"Unit Shutdowns and'ower Reductions" section of August, 1980, Operating Status Report for additional infor-mation.Major Safety-'related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
OF OPERATING EXPERIENCE DOCKET NO. 50 - 250 Turkey Point UNIT   Unit   No. 3 DATE   Se t. 6, 1980 COMPLETED BY     V.. T. Chilson TELEPHONE     (305) 552-. 3824 REPORT MONTH      AUGUST, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of Aug. 6-7, 1980. Refer to "Unit Shutdowns and'ower Reductions" section of August, 1980, Operating Status Report for additional infor-mation.
Florida Power a Light Company commitments for NUREG-0578 implementation are continuing.
Major Safety-'related maintenance   activities performed during the month included:
Refer to correspondence between FPL and.NRC for ad-ditional information.
Inspections and requirements of IE Bulletins and NUREG-0578   are continuing.
.
Florida Power a Light Company commitments for NUREG-0578   implementation are continuing. Refer to correspondence between FPL and. NRC for ad-ditional information.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-'251 Turkey Point UNIT Unit No.4 DATE Sept.6, 1980 COMPLETED BY V.T.Chilson REPORT MONTH AUGUST 1980 TELEPHONE (305)552-3824 Unit No.4 operated at approximately 100%.R.P.Refer to"Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.
OF OPERATING EXPERIENCE DOCKET NO. 50 '251 Turkey Point UNIT   Unit No. 4 DATE   Sept. 6, 1980 COMPLETED BY     V. T. Chilson TELEPHONE     (305) 552-3824 REPORT MONTH      AUGUST  1980 Unit No. 4 operated at approximately 100%. R.P. Refer to "Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.
Major Safety-related maintenance activities performed duning the month included: Inspections and requirements of IE Bulletins and NUREG-0578 in progress.Florida Power a Light Company commitments for NUREG-'0578 implementation are continuning.
Major Safety-related maintenance activities performed duning the     month included:
Refer to correspondence between FPL and NRC for ad-ditional information.
Inspections and requirements   of IE Bulletins and NUREG-0578 in progress.
.
Florida Power a Light Company commitments for NUREG-'0578 implementation are continuning. Refer to correspondence between FPL and NRC for ad-ditional information.


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.50-335 St.Lucie UNIT Unit No.1 DATE Se t.6 1980 COMPLETED BY TELEPHONE V.T.Chilson ('305)552-3824 REPORT MONTH Unit operated at approximately 100%R.P., except for outages of August 14, 14-15, and 16.-18, 1980, and reduced load operation of August 14-18, 1980.Refer to"Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.
OF OPERATING EXPERIENCE DOCKET NO. 50 - 335 St. Lucie UNIT     Unit No. 1 DATE     Se t. 6 1980 COMPLETED BY     V. T. Chilson TELEPHONE      ('305) 552-3824 REPORT MONTH Unit operated at approximately 100% R.P., except for outages of August 14, 14-15, and 16.-18, 1980, and reduced load operation of August 14-18, 1980. Refer to "Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.
Major Safety-related maintenance activities performed during the month included: Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Major Safety-related maintenance activities performed during the month included:
Florida Power 6 Light Company Commitments for NUREG-0578 implementation are continuing.
Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.
Refer to correspondence between FPL and NRC for ad-ditional information.
Florida Power 6 Light Company Commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.
A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.}}
A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.}}

Latest revision as of 16:05, 4 February 2020

Forwards Monthly Operating Repts for Aug 1980
ML17208A992
Person / Time
Site: Saint Lucie, Turkey Point  NextEra Energy icon.png
Issue date: 09/06/1980
From: Schmidt A
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML17208A993 List:
References
NUDOCS 8009170279
Download: ML17208A992 (21)


Text

REGULA 'RY INFOR lATION OISTRIBUTIO SYSTE'l (R [DS)

'/

ACCESS IOiV "EBB :8009170279 OOC.DATEs 80/09/06 NOTARIZED: No DOCKET 4 F AC IL: 50 250 Turkey Point Planti Unit 3E Florida Power and Light C 05000250 50-251 Turkey Point Planti Unit 4E Florida Power and Light C 05000251 50 335 St ~ Lucie Planti Unit 1E Florida Power 8 Light Co ~ 0 AU TH ~ tlAHE AUTHOR AFFILIATION SCHt'.IDTE A ~ D ~ Florida Power 8 Light Co ~

REC IP ~ 4A'<E RECIP IEVT AFF ILIATIOV Office of '4lanagement and Program Analysis SUBJECT; Forwards monthly ooeratina reots for Aug 1980 ISUTIO I CODE; AOOSS COPIES RECEIVED;LTR TITl.E: Annual'emi Annus'l,i, Monthly Ooerating Reoorts

/EVCL J'IIE:

'ISTR (OL Stag NOTESt RECI~! EV T COPIES REC I P IEVT CUTIES ID C3OE/VA'1E LTTR ENCL IO CODE/NAvTE LTTR ENCL ACTIOiv.'ARGAES ~ 04 7 7 CLARKERD 04 7 7 INTERNAl.: AEOO 1 1 D/9 IR g AU~i F AC07 1 1 OIR HU" FAC 08 1 1 ICE 06 2 2 R)A 13 2 2 NRC POR 02 1 1 EX EVAL BR09 1 1 OR ASSESS BR 10 1, 1 REG F II.E 01 1 1 UTERI'vAL; ACRS B R O:3 I', 'H A V E V 1 LPDR 03 VSIC 05 1 1

'gy gs~s~o TJ'I KL y J""E 1= RRE CI=OS i.ll l=D: LT T" ~ EVCL

()/Of ~i )

P.O. BOX 529100, MIAMI,FL 33162 yllgi

',:.i:~. i5:-,= Ji A~ eiXi FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the August, 1980, Operating Status Reports for Turkey Point Unit Nos. 3 and 4. and St. Lucie Unit No. l.

Very truly yours, A. D. Schmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire

/DOER'i 1o~~/

PEOPLE... SERVING PEOPLE

I 4

AVERAGE DAILYUNIT POWER LEVEL DOCKET NO.

COMPLETED IIY V. T. Chilson TELEPHONE MONTH AUGUSTA 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe-Net)

I 643 l7 653 639 IS 63 19 647 637 20 653 646 647 12 503 23 652 664 24 658 25 657 l0 655 26 652 658 27 656 2S 642 l3 656 29 643 l4 656 30 644 IS 649 31 648 656 16 NOTE: Average daily power level greater than 646 MWe due to cooler condenser cooling INSTRUCTIONS water.

On this format. list the average daily unit power (evel in MWe Net for each day in the reporting ntonth. Compute to the nearest whole megawatt.

(')(77)

. OPERATING DATA REPORT DOCKET NO.

oATE SeSs~. 980 .

COMPLETED BY J~~hilson TELEPHONE 4851~2-3824

'OPERATING STATUS

1. Unit Name: Turke 'oint Unit No. 3 Notes Unit No. 3 operated
2. Reporting Period:

at approximately 1008 R.P.>

3. Licensed Thermal Power (MWt):

except for outage of Aug.

760 6-7, 1980

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe): 693
6. Maximum Dependable Capacity (Gross MWe): 680
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Maximum De endable Ca acit Gross MWe has been rerated to the mbst restricted seasonal conditions (summer) experienced. Maximum Dependable Capacity (Net MWe) has been rerated accordingly.

9. Power Level To Which Restricted. If Any (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr:to-Date Cumulative

11. Hours In Reporting Period 7 6 6
12. Number Of Hours Reactor Was Critical 744. 0 4 979.7 52 249.2

~

13. Reactor Reserve Shutdown Hours 0 213. 4
14. Hours Generator On. Line 737.9 4 809.4 50 499;6
15. Unit Reserve Shutdown Hours 121.8
16. Gross Thermal Energy Ge'nerated (MWH) 1 613 090 10 "410 368 101 879 002
17. Gross Electrical Energy Generated (MWH) 503 570 3 275 415 32 356 415
18. Net Electrical Energy Generated (MWH) 478 174 3 104 278 30 626 372
19. Unit Service Factor 99.2 82.1 74.4
20. Unit Availability Factor 99.2 82.1 74.6
21. Unit Capacity Factor (Using MDC Net) 99.5 '2.1 70.2
22. Unit Capacity Factor (Using DER Net) 76.5 65.1
23. Unit Forced Outage Rate 0.8 1.3 2.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

P o ram Oct. 5 Nov. 1 1980.

25. IfShut Down At End Of Report Period, Esthnated Date of Startup:
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (u/77)

O.

DOCKETNO. 50 250 UNITSHUTDOWNS AND POWER REDUCTIONS rl Q ~

Q R~CI Vl Liccnscc 4l Cl Q Cause 4 Corrective No. Date ~ J IA Event 'n Action to L

Q Report cn G O Prevent Recurrence

~ CA Cr 16 80-08-06 F 6.1 : N/A CB MOTOR X Unit No. 3 was removed from service due to low oil level in reactor coolant pump motor No. 3C. Cor-rective actions included adding oil. (Nuclear System) 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I-Manual for Preparation of Data B.Maintenance oi Test ~

2.Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction 4-Other (Explain) OI 6 I )

E-Operator Training 8r, Liccnsc Examination F-Administrative 5 G-Operational Error (Explain) Exhibit I - Sante Source

<9 14 641 30 636 l5 639 31 16 640 INSTRUCTIONS On this format. list the'average daily unit I>>>wer levt.l in MWe.Net for each day i>> the reporting >n>>nth. C>>n>pute to the nearest whole megawat t.

('t(77)

OPERATING DATAREPORT DOCKET NO.

DATE

~~2L M~~980 COMPLETED BY 2LZ~~son TELEPHONE

~

OPERATING STATUS Turke Point Unit No. 4 Notes Unit No. 4 operated

1. Unit Name:

Reporting Period AU ust 1980 at approximately 100% R.P.

3. I.icensed Thermal Power (MWt): 2200
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):

e

7. Maximum De ndable Ca p acit y(Net MWe: ) 646
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

Maximum De endable Ca acit (Grass MWe) has been rerated to the most restricted seasonal conditions summer ex erienced. Maximum De endable Ca acit Net MWe has been rerated accordingly.

9. Power Level To Which Restricted, If Any (Net MWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumula tive

11. Hours In Reporting Period 6X 584.0
12. Number Of Hours Reactor Was Critical 744.0 5 3 9.
13. Reactor Reserve Shutdown Hours 12 03 166.6
14. Hours Generator On-Line 43 627;3
15. Unit Reserve Shutdown Hours 12.3 31 '
16. Gross Thermal Energy Ge'nerated (MWH) 1 633 024 9 629 136 90 .848 116
17. Gross Electrical Energy Generated (MWH) 2 997 355 28 900 833 2 5
19. Unit Service Factor 75.9 70.8
20. Unit Availability Factor 100.0 76.1 70.9
21. Unit Capacity Factor (Using MDC Net) 98'.6 "75.1 69.0
22. Unit Capacity Factor (Using DER Net) 92.0 70.0 64.1
23. Unit Forced Outage Rate 0.3 3.0
24. Shutdowns Scheduled Over Next 6 Months(Type, Date, and Duration of Each):

maintenance and ins ections Nov. 9 1980 Jan. 10, 1981.

25. If Shut Down At End Of Report Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION (lp/77)

r UNIT SHUTDOWNS AND POWER REDUCTIONS nit No.4 REPORT hiONTH AUGUST, 1980 305 552- 82 AJ i~ CJ~

Cause & Corrective Ih a Liccnscc CP 4) CJ No. Date 4

Event o Q Action to Report ~ ~G C ~ Prevent Recurrence

~ C/7 $

N 0 N F: Forced Reason: Method: Exhibit G - instructions S: Schedu!ed A.Equipment Failure (Explain) I -Manual for Preparation of Data B.Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling. 3-Automatic Scram. Event Report (LER) File (NUREG-D.Regulatory Restriction 4-Other (Explain) OI 6 I )

EZperator Training &. License Examination F-Administrative G-Operational Error (Explain) Exlwbrt I - Same Source

(')/77) II.Other (Explain)

AVERAGE DAII.YUNIT POWER LEVEL DOCKET NO.

II"""

St. Lucre COMPLETEDIIY V- T. Chilson MONTH AUGUST 1980 DAY AVERAGE DAILYPOWER LEVEL DAY AVERAGE DAILYPOWER LEVEL (MWe.Net) (MWe-Net)

I 75 17 794 18 673 796 19 787 77 20 786 770 21 725 792 22 783 791 23 78 790 24 791 25 782 10 26 757 11 798 27 759 797 28 781 13 718 779 14 126 30 780 15 255 31 749 16 394 NOTE: Average daily power level greater than 777 MWe due to cooler condenser cooling water.

INSTRUCTIONS On this format. list the average daily unit power level in MWe.Net for each day in the reporting month. Compute to the nearest whole megawatt.

I')/77)

OPERATING DATA REPORT DOCKETNO.

DATE COMPLETED BY

~~

MI~~980 T Chilson TELEPHONE 05 552-3824 OPERATING STATUS

l. Unit Name: St. Lucie Unit No. 1 Notes - Unit operated at
2. Reporting Period: approximately 100% R.P.,
3. Licensed Thermal Power (MWt): 2560 except for outages of Aug.
4. Nameplate Rating (Gross MWe): 850 14, 14-15, and 16-18, 1980, 802 and reduced load operation
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe): 22 of Aug.14-18, 1980.
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe): NONE
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date Cumulative

11. Hours In Reporting Period 744.0 5 855.0 32 399.0-
12. Number Of Hours Reactor Was Critical 720.0 4 0.2 2
13. Reactor Reserve Shutdown Hours ~ 129.5
14. Hours Generator On-Line 701.4 3 889.7 24 719;7
15. Unit Reserve Shutdown Hours 7 ~3 7.3 39.3
17. Gross Electrical Energy Generated (MWH) 551 240 3 101 490 19 395 990
18. Net Electrical Energy Generated (MWH) 519 201 2 915 036 18 242 932
19. Unit Service Factor 94.3 66.4 76.3
20. Unit Availability Factor 64;1 72.5
22. Unit Capacity Factor (Using DER Net) 87.0 62.1 '70.2
23. Unit Forced Outage Rate 6.4
24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
25. IfShut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units ln Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION (u/77)

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

No.l Page 1 of 2 80 l30Sl 552-3824 I

Q~

tS Llccllscc Cl Cause & Corrective No. c 5 tx.' Event C ~

Action to C/I Rcport- Q Prevent Recurrcncc Cr 80-08-14 S 10.7 A N/A EG TRANSF Unit was removed from service to isolate main power transformer No. 1B to repair oil leak. Cor-rective actions included installing new bushing. (Non-nuclear system) 12 80-08-14 B N/A EG TRANSF Load was limited to the capacity of main transformer No. 1A. (Non-nuclear system) 13 80-08-14 7.3 F N/A EG TRANSP Unit was removed from service to pro-tect personnel using a crane to re-move a faulty bushing from main power transformer No. 1B. (Non-nuclear system)

I 3 4 F: Forced Reason: Method: Exhibit G - Instructions S: Schedu!ed A-Equipment Failure (Explain) I-Manual for Preparation of Data B-Maintenance oi Test . 2-Manual Scram. Entry Sheets Ior Licensee C.Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 016I )

E-Operator Training Sc Liccnsc Examination F-Administrative G-Operational Error (Explain) Exhibit I - Same Source

('I/77) II-Other (Explain)

Ni).

rl MI UNIT SHUTDOWNS AND POWER REDUCTIONS Page 2 Llcenscc Event of CP 2

CJ C

80 o ~

COMPLETED BY Cause I

Ec Corrective Action to Jl MI Report = cn G E ~ Prevent Recurrence Unit was removed from service to 14 80-08-'17 24. 6- B N/A EG TRANSF install new bushing 'and return main power transformer No. 1B to service.

(Non-nuclear system)

F: Forced Reason: h(ethod: Exhibit G - Instructions .

S: Scheduled A.Equipment Failure (Explain) I-Manual for Preparation of Data B-hlaintenance or Test . 2-h(anuai Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scranl. Event Report (LER) File (NUREG.

D Regulatory Restriction 4-Other (Explain) OI 6I )

E-Operator Training Ec License Examination F-Administrative G-Operational Error (Explain) Exhibit I- Salnc Source

('>/77) H-Other (Explairt)

P.O. BOX 529100, MIAMI,FL 33162

+<Illy~

l,==

FLORIDA POWER 8 LIGHT COMPANY September 6, l980 Office of Management Information and Program Controls U. S. Regulatory Commission Washington, D. C. 20555 Gentlemen:

Attached are the August, 1980, Operating Summary Reports for Turkey Point Unit Nos. 3 and 4 and St. Lucie Unit No. l.

Very truly yours, D. Schmidt Vice President Power Resources VTC/ddc cc: Mr. James P. O'Reilly Robert Lowenstein, Esquire PEOPLE... SERVING PEOPLE

'L

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 - 250 Turkey Point UNIT Unit No. 3 DATE Se t. 6, 1980 COMPLETED BY V.. T. Chilson TELEPHONE (305) 552-. 3824 REPORT MONTH AUGUST, 1980 Unit No. 3 operated at approximately 100% R.P., except for outage of Aug. 6-7, 1980. Refer to "Unit Shutdowns and'ower Reductions" section of August, 1980, Operating Status Report for additional infor-mation.

Major Safety-'related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power a Light Company commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and. NRC for ad-ditional information.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 '251 Turkey Point UNIT Unit No. 4 DATE Sept. 6, 1980 COMPLETED BY V. T. Chilson TELEPHONE (305) 552-3824 REPORT MONTH AUGUST 1980 Unit No. 4 operated at approximately 100%. R.P. Refer to "Unit Shut-downs and Power Reductions" section of the August, 1980 Operating Status Report for additional information.

Major Safety-related maintenance activities performed duning the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 in progress.

Florida Power a Light Company commitments for NUREG-'0578 implementation are continuning. Refer to correspondence between FPL and NRC for ad-ditional information.

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50 - 335 St. Lucie UNIT Unit No. 1 DATE Se t. 6 1980 COMPLETED BY V. T. Chilson TELEPHONE ('305) 552-3824 REPORT MONTH Unit operated at approximately 100% R.P., except for outages of August 14, 14-15, and 16.-18, 1980, and reduced load operation of August 14-18, 1980. Refer to "Unit Shutdowns and Power Reductions" section of the August, 1980, Operating Status Report for additional information.

Major Safety-related maintenance activities performed during the month included:

Inspections and requirements of IE Bulletins and NUREG-0578 are continuing.

Florida Power 6 Light Company Commitments for NUREG-0578 implementation are continuing. Refer to correspondence between FPL and NRC for ad-ditional information.

A modification to provide redundant 15 volt power supply to each Control Element Assembly drive mechanism core power programmer is in progress.