ML17215A302: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 03/08/1984
| issue date = 03/08/1984
| title = Advises That Request to Revise Tech Specs to Provide Requirements for Overtime Limits & Reporting of Relief & Safety Valve Failures Will Be Submitted Per Generic Ltr 82-16 (NUREG-0737) by 840515
| title = Advises That Request to Revise Tech Specs to Provide Requirements for Overtime Limits & Reporting of Relief & Safety Valve Failures Will Be Submitted Per Generic Ltr 82-16 (NUREG-0737) by 840515
| author name = WILLIAMS J W
| author name = Williams J
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = MILLER J R
| addressee name = Miller J
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000335, 05000389
| docket = 05000335, 05000389
Line 14: Line 14:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 3
| page count = 3
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:REGULATORY          FORMATION DISTRIBUTION                                  S      EM    (RIDS)
ACCESSION NBRS8u03130o66                  Ooc. DATEs 80/03/08                                  NOTARIZED:      NO          DOCKET.¹ FACILs50 335 St:,.        Lucie Plant~ Uni:t                    ir              Flor-ida Power    8  L)ght      Co. 05000335 50 389 St,        Lucie Plantr Unit                    2'r              Flor ida Power    L  Light      Co. 05000389 AUTH, NAME                AUTHOR  AFFILIATION NILLIAMSiJ~N ~            Flor ida  Power                  8  Light              Co+
RKCIP ~ NAME'ECIPIENT                    AFFILIATION'II LERrJ ~  RE                Operating Re'actors Branch                                  3
  -SUBJECTs    Advises.',that<< request                      to revise Tech Specs to provide requirements for o'ver time limits a,reporting of                                                relief      5 safety val ve fai 1 ur is wi 1 1 be submi t ted per Gener                                          i*
c  Ltr 80~16 (NUREG~0737)gaby 800515
                    'CODE: >>AOA6S        COPIES RKCEIVEOsLTR, 'NCL      'ISTRIBUTION SIZEs TITLE:  OR  'Submittal';
M TMI Action Plan Rgmt                                  NUREG  0737    8  NUREG      0660 NOTES!
RECIPIENT              <<C>>OP              IES                          RECIP IENT              'COPIES "ID CODE/NAME<<            L'TTR EN                                      ID  CODE/NAME          LT'TR ENCL NRR ORB3      'BC    01    "7                                          NRR'RBS      BC 01 INTERNAL:                                                                            =IE/DEPER DIR 33                1      1 ELO/HDS2'E/OEPER/EPB 3                                      =IE/DEPER/IRB                  1      1 NRR  ERICKSON'                                                          NRR PAULSONrH ~                      1 NRR/OHFS OEPY29                                                          NRR/DL DIR        10          1      1.
NRR/DL/ORAS 18.                >>3>>                                      NRR/DSI'/ADRS 27              1 NRR/OS    I/AEB                1                                        NRR/DS I/ASB B,                                                    NRR/DST DIR 30                1 REG F                04                                                RGN2                          1 EXTERNAL; ACRS                      3Q      10                  1                    LPDR              03.
NRC> PDR              02>>      1                                        NSIC              05 NTIS                            i
<<TOTAL NUMBER OF COPIES            REQUIREDs                  LTTR                  48  ENCL
HWH
'L)
P I lk<<g)tg
                                                  )
                                                  ')
H) I 'f    jpi )  raW)f )
f ")I<<If
                                                                                                              . Ili
                                                                                                                        )  )kl) fjirlhl I t      H    Il f    <<lht
                                                                                                  )I't  "                      ),"
J,    l ),      h
                                                                            , f h") )fr<'lf                        )Ig    ~
                                                                                                                              /    I I
j Hit,  f                                  hf
                                                                , i ") ii W 6 i
                                                                                'l    ' il r I,hf  ihh)II      I    I i
fr  <f    4' hh H ff
                                  'rrk          W)f 0 )W<<  liq                    f,-h(. [      r,                                                    ') I;il      'i,l  W i'  I  1
                      '<<g I            ir)r) II          'l),) I'HC                          lf f  ff  J              )'WH'f        jf'l        ,
l)i fr, I
i                                                        'lf      bi~ <<l)
I to<<<<H<<<<H<<" <<He<< +                <<8 I  Ih ll,".      If l i W  tf
                                                                                                                  )I ji                                            itfk  ]
nfl            W h    II q h<< ',
FLORIDA POWER 5 LIGHT COMPANY March  8,  1984 L-84-67 Office of Nuclear Reactor        Regul  ation
.'ttention:        Mr. James  R, Hiller, Chief Operating Reactors Branch g3 Division of Licensing U. S. Nuclear Regul atory Commission Washington, D.C. 20555
==Dear Mr. Miller:==
Re:    St. Lucie Units    1 and 2 Docket Nos. 50-335, 50-389 Com  li ance with Generic Letter 82-16 We  have reviewed your      letter  dated January 30, 1984 which provided the staff's review of FPL's conformance with the guidance of Generic Letter 82-16 (NUREG 0797 Technical Speci fications).
We  will  submit a request to revise the St. Lucie 1 Technical Specifications to provide requirements for overtime limits and reporting of relief valve and safety valve failures and challenges as requested in your letter. These changes will use the St. Lucie Unit 2 format to increase the consistency of the two units. We expect to include these revisions as part of an anendment request which is nbw being prepared to address the recent changes to reportable event requirements as provided by Generic Letter 83-43. We expect these changes to be submitted by May 15, 1984.
As  stated in the contractor's evaluation provided with your letter, FPL has not received an NRC review of our previously submitted positions on containment purge operation and surveillance requirements.            We are not prepared    to  address  technical    specifications  for this system  until these items are resolved. Our positions were provided in our letter L-82-317, dated July 30, 1982.
Should you or your      staff  have any questions    on this information, please contact us.
Very  truly yours, J. W. Willians, Jr.
Vice President Nuclear Energy.                                840308 8403130066 05000335 PDR ADOCK PDR JWW/PLpgJs p
cc:    J. P. O'Reilly, Region II,        USNRC Harold F. Reis, Esquire P NS-L I-84-85 PEOPLE... SERVING PEOPLE}}

Latest revision as of 15:05, 4 February 2020

Advises That Request to Revise Tech Specs to Provide Requirements for Overtime Limits & Reporting of Relief & Safety Valve Failures Will Be Submitted Per Generic Ltr 82-16 (NUREG-0737) by 840515
ML17215A302
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/08/1984
From: Williams J
FLORIDA POWER & LIGHT CO.
To: John Miller
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737 GL-82-16, GL-84-67, NUDOCS 8403130066
Download: ML17215A302 (3)


Text

REGULATORY FORMATION DISTRIBUTION S EM (RIDS)

ACCESSION NBRS8u03130o66 Ooc. DATEs 80/03/08 NOTARIZED: NO DOCKET.¹ FACILs50 335 St:,. Lucie Plant~ Uni:t ir Flor-ida Power 8 L)ght Co. 05000335 50 389 St, Lucie Plantr Unit 2'r Flor ida Power L Light Co. 05000389 AUTH, NAME AUTHOR AFFILIATION NILLIAMSiJ~N ~ Flor ida Power 8 Light Co+

RKCIP ~ NAME'ECIPIENT AFFILIATION'II LERrJ ~ RE Operating Re'actors Branch 3

-SUBJECTs Advises.',that<< request to revise Tech Specs to provide requirements for o'ver time limits a,reporting of relief 5 safety val ve fai 1 ur is wi 1 1 be submi t ted per Gener i*

c Ltr 80~16 (NUREG~0737)gaby 800515

'CODE: >>AOA6S COPIES RKCEIVEOsLTR, 'NCL 'ISTRIBUTION SIZEs TITLE: OR 'Submittal';

M TMI Action Plan Rgmt NUREG 0737 8 NUREG 0660 NOTES!

RECIPIENT <<C>>OP IES RECIP IENT 'COPIES "ID CODE/NAME<< L'TTR EN ID CODE/NAME LT'TR ENCL NRR ORB3 'BC 01 "7 NRR'RBS BC 01 INTERNAL: =IE/DEPER DIR 33 1 1 ELO/HDS2'E/OEPER/EPB 3 =IE/DEPER/IRB 1 1 NRR ERICKSON' NRR PAULSONrH ~ 1 NRR/OHFS OEPY29 NRR/DL DIR 10 1 1.

NRR/DL/ORAS 18. >>3>> NRR/DSI'/ADRS 27 1 NRR/OS I/AEB 1 NRR/DS I/ASB B, NRR/DST DIR 30 1 REG F 04 RGN2 1 EXTERNAL; ACRS 3Q 10 1 LPDR 03.

NRC> PDR 02>> 1 NSIC 05 NTIS i

<<TOTAL NUMBER OF COPIES REQUIREDs LTTR 48 ENCL

HWH

'L)

P I lk<<g)tg

)

')

H) I 'f jpi ) raW)f )

f ")I<<If

. Ili

) )kl) fjirlhl I t H Il f <<lht

)I't " ),"

J, l ), h

, f h") )fr<'lf )Ig ~

/ I I

j Hit, f hf

, i ") ii W 6 i

'l ' il r I,hf ihh)II I I i

fr <f 4' hh H ff

'rrk W)f 0 )W<< liq f,-h(. [ r, ') I;il 'i,l W i' I 1

'<<g I ir)r) II 'l),) I'HC lf f ff J )'WH'f jf'l ,

l)i fr, I

i 'lf bi~ <<l)

I to<<<<H<<<<H<<" <<He<< + <<8 I Ih ll,". If l i W tf

)I ji itfk ]

nfl W h II q h<< ',

FLORIDA POWER 5 LIGHT COMPANY March 8, 1984 L-84-67 Office of Nuclear Reactor Regul ation

.'ttention: Mr. James R, Hiller, Chief Operating Reactors Branch g3 Division of Licensing U. S. Nuclear Regul atory Commission Washington, D.C. 20555

Dear Mr. Miller:

Re: St. Lucie Units 1 and 2 Docket Nos. 50-335, 50-389 Com li ance with Generic Letter 82-16 We have reviewed your letter dated January 30, 1984 which provided the staff's review of FPL's conformance with the guidance of Generic Letter 82-16 (NUREG 0797 Technical Speci fications).

We will submit a request to revise the St. Lucie 1 Technical Specifications to provide requirements for overtime limits and reporting of relief valve and safety valve failures and challenges as requested in your letter. These changes will use the St. Lucie Unit 2 format to increase the consistency of the two units. We expect to include these revisions as part of an anendment request which is nbw being prepared to address the recent changes to reportable event requirements as provided by Generic Letter 83-43. We expect these changes to be submitted by May 15, 1984.

As stated in the contractor's evaluation provided with your letter, FPL has not received an NRC review of our previously submitted positions on containment purge operation and surveillance requirements. We are not prepared to address technical specifications for this system until these items are resolved. Our positions were provided in our letter L-82-317, dated July 30, 1982.

Should you or your staff have any questions on this information, please contact us.

Very truly yours, J. W. Willians, Jr.

Vice President Nuclear Energy. 840308 8403130066 05000335 PDR ADOCK PDR JWW/PLpgJs p

cc: J. P. O'Reilly, Region II, USNRC Harold F. Reis, Esquire P NS-L I-84-85 PEOPLE... SERVING PEOPLE