ML17216A715: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(7 intermediate revisions by the same user not shown)
Line 3: Line 3:
| issue date = 09/26/1986
| issue date = 09/26/1986
| title = Responds to Generic Ltr 86-14 Re Plans for Operator Licensing & Requalification Exams During FY87-90.Schedules Encl
| title = Responds to Generic Ltr 86-14 Re Plans for Operator Licensing & Requalification Exams During FY87-90.Schedules Encl
| author name = WOODY C O
| author name = Woody C
| author affiliation = FLORIDA POWER & LIGHT CO.
| author affiliation = FLORIDA POWER & LIGHT CO.
| addressee name = BOGER B
| addressee name = Boger B
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| addressee affiliation = NRC OFFICE OF NUCLEAR REACTOR REGULATION (NRR)
| docket = 05000335, 05000389
| docket = 05000335, 05000389
Line 13: Line 13:
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| document type = CORRESPONDENCE-LETTERS, INCOMING CORRESPONDENCE, UTILITY TO NRC
| page count = 7
| page count = 7
| revision = 0
}}
}}
=Text=
{{#Wiki_filter:~
REGULATORY      FORNATION DISTRIBUTION SY      EN <R  IDS) q ACCE~MION NBR: 8610090023          DOC. DATE:  86/09/26    NOTAR  I D: NO        DOCKET FAdIL: 50-335 St. Lucie Planti Unit ii Florida Po~er 5 Light                Co. 05000335 50-389 St. Lucie Plant. Unit 2i Florida Power 8r Light            Co. 05000389 AUTH. NANE          AUTHOR AFFILIATION WOODYi C. O.          Florida    Potoer 8c Light Co.
RECIP. NANE          RECIPIENT AFFILIATION BOGER> B.              Operator Licensing Branch
==SUBJECT:==
Responds    to Generic Ltr 86-14 re plans for operator licensing  8c requalif ication  exam    during FY87-90. Sch edules enc  l.
DISTRIBUTION CODE: N003D COPIES RECEIVED: LTR                ENCL      SI ZE:
TITLE: Operator Requa1      if ication Program NOTES RECIPIENT          COP lES            RECIPIENT        COPIES ID CODE/NANE        LTTR ENCL        ID CODE/NAt'lE    LTTR ENCL PNR-B PD8 LA              1    0      P4/R-B PD8 PD                  1 TOUR IQNYi E              1 INTERNAL: AEOD/PTB,                    1    1      N        T/HF IB              1 NRR/DHFT/I'1TB            1    1      REQ  FIL      04      1      1 RQN2                      1    1 EXTERNAL: LPDR                03                                    02      1      1 NSIC            05 TOTAL NUl'1BER OF COPIES      REQUIRED'TTR        11  ENCL    10
P)OI ~( 1Ig      '" P,.'...g'lOI f    ti'i    1  '(',',',            ]i/")',',')YI                                      ac.
73M,') i i(I                      .'<( i%3      >V'0"i u~xPe",aS                    '~ <,-sV    . l"  "(        i'c-"'Ay'00> ~')1i                  : HGVi            l "<) I i ~ 3 ">
P,.~C'Ol)CO              .~l.)    gdp  1'      )~i  '.94lgR 4OX'AEGIR              c.I  +.i l~(J      ~fff"I "~    <) X    l(<            j                            ()"r  ~            1 >  3
~ P.t.GQOP,O            ,>)  ) 'nfl!> a    1    Pi    ~i9hlo " -<<b f0 I 3
                                                                          ~,            ~~  ~ J. AJ      e i A~" 1 "i    ) >. )'I J                                        ()lg VGI    fAI      i~ i ~ lr~ 8~31(f(J.'>>                                      ~
                                                                                                                                                                        >~t,  +Ngi    1          1
                                                                                                                                                                                                        'E [P,.
                                                                              .DD    f l ll p 3, >~a 's")M4>        ',,>4  P.'"fl'I (
NOITAI 1I i 2!~ fl,~i.".0t'; t)',                                              'l'ihl i fl.>lTS'YG P>1l 'ff~3 4 J. 1 'c'> s tg'T
                                        ~'I")Qo '70%              ~Aci 3 J                                    .~." t J>IGcr    0'~,.b~iGg                      ~
                                                                                                                                                                    )';
                  ~ a lube      d gP..OK"        a>)Y'9      pni rub        QF~xs    PQ):l ~~3 < j x        ~ 60/9'f      8>>              pPi.'4:>        s K 1 4 )l$ 9 1)113      "...".li'.I ;G3MI333R BGI'it),3 GC()Qt";;:-(1J ','AI 4.'"                                                  >
                                                                                                                                                                                        ',""'".I'-
vPa~'f rruii'.~i':>sIci~!~aH aii.i., r ><1~.'
I, F 3 I 'll'1;,)                    '~ "<i.l I'lI, )"']at                  P.')  l'li)")                    1Vi              kI'')I') )>1 J W~>3    H 1'"    I          '-.)t'iAl>>%3003 QI                      3"" l'3 AT l          1          HPi(lIA.M~)') Af Q <<1 8(g tg Q. ~~lg ~.                9            f.                  's              '30'~      G YNl)I gl/0            1 f\()
6 I RH X l ~Hi%% ~q ilM
                                                              ~
                                                                =).>>'>>
a~A'(l                                            U.l
                                                                                                                                                    >jT 1'g())! 1(~
1'lkT  ll <t'i'i)1511:1
                                                                                                                                                              '. N'-)      1 j4'AVl )
g1
                                                                                                                                                                                                            'c'
                                                                                                                        <<'()                                  ") Eely<
MT '0"1)1I<'>'!i<; IVl".)3 30                                          fi, l>11:<>i>)          Jg                <<,1)
P. 0  X 14000, JUNO BEACH, FL 33408 JA ~  AQ FLORIDA POWER & LIGHT COMPANY SEPTEMBER 26 1986 L-86-388 Mr. Bruce Boger, Chief Operator Licensing Branch Office of Nuclear Reactor Regulation Nuclear Regulatory Commission AR-522 I Washington, D.C. 20555
==Dear Mr. Boger:==
Re:  St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Generic Letter 86-14 Response 0 erator Licensin and Re uglification Schedule Generic Letter 86-I4, dated August 20, I 986, requested Licensees to provide their best estimate plans for operator licensing examinations during FY l987, FY l988, FY 1989 and FY l990 (October I to September 30 of each year). In addition, Generic Letter 86-l4 requested          the planned dates for our scheduled requalification examinations and the anticipated number of examinations and dates for each licensing examination site visit.
Enclosures I and 2 provide FPL's estimated operator licensing examination schedule and requalification schedule for our Plant St. Lucie.
Very truly yours, C.O. Wo    y Group    ic  resident Nuclear Energy COW/GR M/cvb Enclosures cc:  Dr. J. Nelson Grace, Region II, USNRC Harold F. Reis, Esquire E. G. Tourigny, PWR Project Directorate I/8 g9 0
8610090023 860926 PDR  *DOCK 05000335 V                    PDR GRM4/009/I PEOPLE... SERVING PEOPLE
IE W
II      I II    n              A II  ~I            U N,
at~
Enclosure  1 OPERATOR LICENSING EXAMINATION SCHEDULE Facility      st:. Lucie                                  NRC Region FY  1987                      FY 1988        FY 1989        FY 1990
    !.    !                            Date 10/5/87  Date l.o/ss      Date lo/89 PRO      8 PSRO BSRD  Upgrade    2,1**            10                5
        .-PInstructor Certification PSRO  Limited to Fuel Handling
          .!                            Date~xzs/88    Date~sse        Date 2/oo PRO                                                  5 PSRO 4SRD  Upgrade      2                10 PInstructor Certification PSRO  Limited to Fuel Handling
: 3. Date                          Date  7/ll/88  Date            Date PRO                                25
          &#xb9;SRO fSRQ Upgrade                        10
        , PInstructor Certification PSRO  Limited to Fuel Handling Please indicate initial cold license examinations by placing an ast'erisk (*)
by the date.      Please indicate examinations intended to extend an operator 's license to a second or subsequent, unit with two asterisks (**) (e.g., Unit One is in operation and Unit Two is approaching fuel load.        Three RO candidates with no previous license are to be examined on both Units One and Two and five RO candidates with licenses on Unit One are to be examined to extend their licenses to Unit Two. Indicate (2/15/87, RO 3,5**)).
Enclosure 2 REQUAL IFICAT ION EXAMINATION SCHEDULE Facility      s~. Lucre                          NRC Region xz FY  1987                FY  1988          FY 1989          FY 1990
: 1. Date~s    a sv          Date~ass          Date~xo ss      Date~sos
: 2. Date                    Date              Date            Date
: 3. Date                    Date              Date            Date
: 4. Date                    Date              Date            Date
~L~}}

Latest revision as of 13:51, 4 February 2020

Responds to Generic Ltr 86-14 Re Plans for Operator Licensing & Requalification Exams During FY87-90.Schedules Encl
ML17216A715
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/26/1986
From: Woody C
FLORIDA POWER & LIGHT CO.
To: Boger B
Office of Nuclear Reactor Regulation
References
GL-86-14, L-86-388, NUDOCS 8610090023
Download: ML17216A715 (7)


Text

~

REGULATORY FORNATION DISTRIBUTION SY EN <R IDS) q ACCE~MION NBR: 8610090023 DOC. DATE: 86/09/26 NOTAR I D: NO DOCKET FAdIL: 50-335 St. Lucie Planti Unit ii Florida Po~er 5 Light Co. 05000335 50-389 St. Lucie Plant. Unit 2i Florida Power 8r Light Co. 05000389 AUTH. NANE AUTHOR AFFILIATION WOODYi C. O. Florida Potoer 8c Light Co.

RECIP. NANE RECIPIENT AFFILIATION BOGER> B. Operator Licensing Branch

SUBJECT:

Responds to Generic Ltr 86-14 re plans for operator licensing 8c requalif ication exam during FY87-90. Sch edules enc l.

DISTRIBUTION CODE: N003D COPIES RECEIVED: LTR ENCL SI ZE:

TITLE: Operator Requa1 if ication Program NOTES RECIPIENT COP lES RECIPIENT COPIES ID CODE/NANE LTTR ENCL ID CODE/NAt'lE LTTR ENCL PNR-B PD8 LA 1 0 P4/R-B PD8 PD 1 TOUR IQNYi E 1 INTERNAL: AEOD/PTB, 1 1 N T/HF IB 1 NRR/DHFT/I'1TB 1 1 REQ FIL 04 1 1 RQN2 1 1 EXTERNAL: LPDR 03 02 1 1 NSIC 05 TOTAL NUl'1BER OF COPIES REQUIRED'TTR 11 ENCL 10

P)OI ~( 1Ig '" P,.'...g'lOI f ti'i 1 '(',',', ]i/")',',')YI ac.

73M,') i i(I .'<( i%3 >V'0"i u~xPe",aS '~ <,-sV . l" "( i'c-"'Ay'00> ~')1i  : HGVi l "<) I i ~ 3 ">

P,.~C'Ol)CO .~l.) gdp 1' )~i '.94lgR 4OX'AEGIR c.I +.i l~(J ~fff"I "~ <) X l(< j ()"r ~ 1 > 3

~ P.t.GQOP,O ,>) ) 'nfl!> a 1 Pi ~i9hlo " -<. )'I J ()lg VGI fAI i~ i ~ lr~ 8~31(f(J.'>> ~

>~t, +Ngi 1 1

'E [P,.

.DD f l ll p 3, >~a 's")M4> ',,>4 P.'"fl'I (

NOITAI 1I i 2!~ fl,~i.".0t'; t)', 'l'ihl i fl.>lTS'YG P>1l'ff~3 4 J. 1 'c'> s tg'T

~'I")Qo '70% ~Aci 3 J .~." t J>IGcr 0'~,.b~iGg ~

)';

~ a lube d gP..OK" a>)Y'9 pni rub QF~xs PQ):l ~~3 < j x ~ 60/9'f 8>> pPi.'4:> s K 1 4 )l$ 9 1)113 "...".li'.I ;G3MI333R BGI'it),3 GC()Qt";;:-(1J ','AI 4.'" >

',""'".I'-

vPa~'f rruii'.~i':>sIci~!~aH aii.i., r ><1~.'

I, F 3 I 'll'1;,) '~ "<i.l I'lI, )"']at P.') l'li)") 1Vi kI)I') )>1 J W~>3 H 1'" I '-.)t'iAl>>%3003 QI 3"" l'3 AT l 1 HPi(lIA.M~)') Af Q <<1 8(g tg Q. ~~lg ~. 9 f. 's '30'~ G YNl)I gl/0 1 f\()

6 I RH X l ~Hi%% ~q ilM

~

=).>>'>>

a~A'(l U.l

>jT 1'g())! 1(~

1'lkT ll <t'i'i)1511:1

'. N'-) 1 j4'AVl )

g1

'c'

<<'() ") Eely<

MT '0"1)1I<'>'!i<; IVl".)3 30 fi, l>11:<>i>) Jg <<,1)

P. 0 X 14000, JUNO BEACH, FL 33408 JA ~ AQ FLORIDA POWER & LIGHT COMPANY SEPTEMBER 26 1986 L-86-388 Mr. Bruce Boger, Chief Operator Licensing Branch Office of Nuclear Reactor Regulation Nuclear Regulatory Commission AR-522 I Washington, D.C. 20555

Dear Mr. Boger:

Re: St. Lucie Units I and 2 Docket Nos. 50-335 and 50-389 Generic Letter 86-14 Response 0 erator Licensin and Re uglification Schedule Generic Letter 86-I4, dated August 20, I 986, requested Licensees to provide their best estimate plans for operator licensing examinations during FY l987, FY l988, FY 1989 and FY l990 (October I to September 30 of each year). In addition, Generic Letter 86-l4 requested the planned dates for our scheduled requalification examinations and the anticipated number of examinations and dates for each licensing examination site visit.

Enclosures I and 2 provide FPL's estimated operator licensing examination schedule and requalification schedule for our Plant St. Lucie.

Very truly yours, C.O. Wo y Group ic resident Nuclear Energy COW/GR M/cvb Enclosures cc: Dr. J. Nelson Grace, Region II, USNRC Harold F. Reis, Esquire E. G. Tourigny, PWR Project Directorate I/8 g9 0

8610090023 860926 PDR *DOCK 05000335 V PDR GRM4/009/I PEOPLE... SERVING PEOPLE

IE W

II I II n A II ~I U N,

at~

Enclosure 1 OPERATOR LICENSING EXAMINATION SCHEDULE Facility st:. Lucie NRC Region FY 1987 FY 1988 FY 1989 FY 1990

!.  ! Date 10/5/87 Date l.o/ss Date lo/89 PRO 8 PSRO BSRD Upgrade 2,1** 10 5

.-PInstructor Certification PSRO Limited to Fuel Handling

.! Date~xzs/88 Date~sse Date 2/oo PRO 5 PSRO 4SRD Upgrade 2 10 PInstructor Certification PSRO Limited to Fuel Handling

3. Date Date 7/ll/88 Date Date PRO 25

¹SRO fSRQ Upgrade 10

, PInstructor Certification PSRO Limited to Fuel Handling Please indicate initial cold license examinations by placing an ast'erisk (*)

by the date. Please indicate examinations intended to extend an operator 's license to a second or subsequent, unit with two asterisks (**) (e.g., Unit One is in operation and Unit Two is approaching fuel load. Three RO candidates with no previous license are to be examined on both Units One and Two and five RO candidates with licenses on Unit One are to be examined to extend their licenses to Unit Two. Indicate (2/15/87, RO 3,5**)).

Enclosure 2 REQUAL IFICAT ION EXAMINATION SCHEDULE Facility s~. Lucre NRC Region xz FY 1987 FY 1988 FY 1989 FY 1990

1. Date~s a sv Date~ass Date~xo ss Date~sos
2. Date Date Date Date
3. Date Date Date Date
4. Date Date Date Date

~L~