ML17221A372: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 09/02/1987 | | issue date = 09/02/1987 | ||
| title = Forwards Rev 0 to MCI-PSL-100, Inservice Insp Second 10-yr Summary Program. Util Requested That Revised Inservice Insp Tech Specs,Submitted on 870817,be Issued Prior to Start of Start of 10-yr Insrvice Insp Interval | | title = Forwards Rev 0 to MCI-PSL-100, Inservice Insp Second 10-yr Summary Program. Util Requested That Revised Inservice Insp Tech Specs,Submitted on 870817,be Issued Prior to Start of Start of 10-yr Insrvice Insp Interval | ||
| author name = | | author name = Woody C | ||
| author affiliation = FLORIDA POWER & LIGHT CO. | | author affiliation = FLORIDA POWER & LIGHT CO. | ||
| addressee name = | | addressee name = | ||
Line 17: | Line 17: | ||
=Text= | =Text= | ||
{{#Wiki_filter:REGULATO INFORMATION DISTRIBUTION TEM (RIDS),~ | {{#Wiki_filter:iy ne REGULATO INFORMATION DISTRIBUTION TEM (RIDS), ~ | ||
NQ FACIL: 50-335 St.Lucie Planti Un'it ii Florida Poeer h Light Co.AUTH.NAME AUTHOR AFFILIATION MOODY>C.O.Florida Poeer 8c Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | ACCESSION NBR: 8709090259 DQC. DATE: 67/09/02 NOTARIZED: NQ DOCKET I FACIL: 50-335 St. Lucie Planti Un'it ii Florida Poeer h Light Co. 05000335 AUTH. NAME AUTHOR AFFILIATION MOODY> C. O. Florida Poeer 8c Light Co. | ||
RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk) | |||
==SUBJECT:== | ==SUBJECT:== | ||
ForUjards proposed"Inservice Insp Second 10-gr Summary Program." Util requested that revised inservice insp Tech Specsi submitted on 870817'e issued prior to start of second 10-gr insrvice insp interval.Wept s.DISTRIBUTION CODE: AQ47D COPIES RECEIVED: LTR ENCL SIZE: TITLE: OR Submittal: | ForUjards proposed "Inservice Insp Second 10-gr Summary Program. " Util requested that revised inservice insp Tech Specsi submitted on 870817'e issued prior to start of second 10-gr insrvice insp interval. | ||
Inservice Inspection/Testing RECIPIENT ID CODE/NAME PD2-2 LA TOURIGNYi E lNTERNAL: AEOD/DOA ARM/DAF/LFMB NRR/DEST/MTB OGC/HDS2 RES/DE/EI 8 | Wept s. | ||
('t hp 1 11 r'~4 P.O.14000, JUNO BEACH, FL 33408.0420 gillie~ann" SEPTEMBER 0 2 1987 L-87-368 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gent I emen: Re: St.Lucie Unit I Docket No.50-335 Second Ten-Year Inservice Ins ction Pro ram By letter L-85-43I dated November l3, l985, Florida Power&Light Company (FPL)requested NRC's approval to extend the first ten-year inspection interval for St.Lucie Unit I to February I I, l988.By letter dated November 20, l985 (Denton to Williams), the NRC staff approved the extension and, as a result, the second ten-year inservice inspection interval for St.Lucie Unit I will begin on February I I, l988.The purpose of this letter is to transmit the proposed St.Lucie Unit I Inservice Inspection Program for the second ten-year interval.The enclosed document describes the basis and plans for the Second Ten-Year Inservice Inspection Summary Program for St.Lucie Unit I.The summary addresses the requirements of the ASME Boiler and Pressure Vessel (B&PV)Code Section XI, 1983 Edition through the Summer l983 Addenda, and is subject to the limitations and modifications stated in IO CFR 50.55a (b)(2)(i). | DISTRIBUTION CODE: AQ47D COPIES RECEIVED: LTR ENCL SIZE: | ||
In addition, Code Case N-408, Alternative Rules for examination of Class 2 Piping Section XI, Division I is incorporated as applicable. | TITLE: OR Submittal: Inservice Inspection/Testing RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD TOURIGNYi E lNTERNAL: AEOD/DOA AEOD/DSP/TPAB ARM/DAF/LFMB NRR/BEST/MEB NRR/DEST/MTB N /ILRB OGC/HDS2 G FIL 01 1 1 RES/DE/EI 8 EXTERNAL: LPDR 1 1$ NRC PDR NSIC TOTAL NUMBER OF COPIES REGUlRED: LTTR 19 ENCL | ||
Requirements for augmented examinations are also addressed. | |||
By letter L-87-337 dated August 17, l987, FPL submitted revised technical specifications with respect to inservice inspections, superceding the original submittals of 1977 and l978.With approval pending on the original Inservice Inspection Technical Specification submittal, FPL decided to revise the subject technical specifications in order to reflect changes in the Combustion Engineering | (' | ||
-Standard Technical Specifications and to reflect the format of the St.Lucie Unit 2 Technical Specifications. | t hp 1 | ||
FPL has requested that the revised Inservice Inspection Technical Specifications be issued prior to the start of the St.Lucie Unit I second ten-year inservice inspection interval.'" 8709090259" 870~0~-~I.'..'DR,- | 11 r' | ||
If there should be any questions or concerns, please contact us.Very truly yo rs,.O.W y Group ice President N~uclear Energy PA P~COW/MSD/gp Enclosure | ~ | ||
4 | |||
P. O. 14000, JUNO BEACH, FL 33408.0420 gillie | |||
~ann" SEPTEMBER 0 2 1987 L-87-368 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gent I emen: | |||
Re: St. Lucie Unit I Docket No. 50-335 Second Ten-Year Inservice Ins ction Pro ram By letter L-85-43I dated November l3, l985, Florida Power & Light Company (FPL) requested NRC's approval to extend the first ten-year inspection interval for St. Lucie Unit I to February I I, l988. By letter dated November 20, l985 (Denton to Williams), the NRC staff approved the extension and, as a result, the second ten-year inservice inspection interval for St. Lucie Unit I will begin on February I I, l988. The purpose of this letter is to transmit the proposed St. Lucie Unit I Inservice Inspection Program for the second ten-year interval. | |||
The enclosed document describes the basis and plans for the Second Ten-Year Inservice Inspection Summary Program for St. Lucie Unit I. The summary addresses the requirements of the ASME Boiler and Pressure Vessel (B&PV) Code Section XI, 1983 Edition through the Summer l983 Addenda, and is subject to the limitations and modifications stated in IO CFR 50.55a (b)(2)(i). In addition, Code Case N-408, Alternative Rules for examination of Class 2 Piping Section XI, Division I is incorporated as applicable. Requirements for augmented examinations are also addressed. | |||
By letter L-87-337 dated August 17, l987, FPL submitted revised technical specifications with respect to inservice inspections, superceding the original submittals of 1977 and l978. With approval pending on the original Inservice Inspection Technical Specification submittal, FPL decided to revise the subject technical specifications in order to reflect changes in the Combustion Engineering - Standard Technical Specifications and to reflect the format of the St. Lucie Unit 2 Technical Specifications. FPL has requested that the revised Inservice Inspection Technical Specifications be issued prior to the start of the St. | |||
Lucie Unit I second ten-year inservice inspection interval. | |||
oA'I | |||
'" 8709090259" | |||
*DOCH, 870~0~ | |||
05000335l | |||
-~I . | |||
'..'DR,- | |||
PDR ~l' MSD I /035/ I an FPL Group company | |||
V | |||
~ o f ~ | |||
till W | |||
( W I W 1 | |||
4 tfaa t ~ ll W, ~ ~ ~ | |||
W | |||
~ A ~ W If | |||
'I rt W | |||
ha Wr II A | |||
* A If\ | |||
~ | |||
~ ~ | |||
<<W A ', W I ' | |||
v r W,"I A | |||
~ I It tt lI WA | |||
~ hf ', A t II | |||
-ll lf, W. | |||
/ <<W I | |||
I,,'4,,th f ~ AW<<h<< . | |||
a VI ( k'W r ~ ~ | |||
t ,ll | |||
* W A lt | |||
~. t f | |||
"h I a Il If A IJ '<<W(,'. | |||
g t r lf, lt lf I I 'g'K W" P t | |||
~, ( II r h 1 | |||
~ A Wf | |||
=r' ~ | |||
t I, 1 a | |||
A' h hr | |||
~ t | |||
~ Wt =I ~ I r (I' | |||
U; S. Nuclear Regulatory Commission L-87-368 Page two On February I I, l988, FPL will commence the St. Lucie Unit I Inservice Inspection Program under the requirements of the ASME B&PV Code Section XI, l983 Edition through the Summer l983 Addenda, except where specific relief has been requested. | |||
If there should be any questions or concerns, please contact us. | |||
Very truly yo rs, | |||
.O.W y Group ice President N~uclear Energy PA P~ COW/MSD/gp Enclosure Dr. J. Nelson Grace, Regional Adminstrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Q | |||
MSD I /035/2 | |||
4'E ~ ~ | |||
I n II 4 J1 E | |||
r p ~ | |||
1 II k lt II II m | |||
+Pl e | |||
I P, | |||
CO. '~ | |||
I A | |||
'C f | |||
L a 'g ip 4 | |||
ki N "l 4d}} |
Latest revision as of 13:30, 4 February 2020
ML17221A372 | |
Person / Time | |
---|---|
Site: | Saint Lucie |
Issue date: | 09/02/1987 |
From: | Woody C FLORIDA POWER & LIGHT CO. |
To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
Shared Package | |
ML17221A373 | List: |
References | |
L-87-368, NUDOCS 8709090259 | |
Download: ML17221A372 (6) | |
Text
iy ne REGULATO INFORMATION DISTRIBUTION TEM (RIDS), ~
ACCESSION NBR: 8709090259 DQC. DATE: 67/09/02 NOTARIZED: NQ DOCKET I FACIL: 50-335 St. Lucie Planti Un'it ii Florida Poeer h Light Co. 05000335 AUTH. NAME AUTHOR AFFILIATION MOODY> C. O. Florida Poeer 8c Light Co.
RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
ForUjards proposed "Inservice Insp Second 10-gr Summary Program. " Util requested that revised inservice insp Tech Specsi submitted on 870817'e issued prior to start of second 10-gr insrvice insp interval.
Wept s.
DISTRIBUTION CODE: AQ47D COPIES RECEIVED: LTR ENCL SIZE:
TITLE: OR Submittal: Inservice Inspection/Testing RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD TOURIGNYi E lNTERNAL: AEOD/DOA AEOD/DSP/TPAB ARM/DAF/LFMB NRR/BEST/MEB NRR/DEST/MTB N /ILRB OGC/HDS2 G FIL 01 1 1 RES/DE/EI 8 EXTERNAL: LPDR 1 1$ NRC PDR NSIC TOTAL NUMBER OF COPIES REGUlRED: LTTR 19 ENCL
('
t hp 1
11 r'
~
4
P. O. 14000, JUNO BEACH, FL 33408.0420 gillie
~ann" SEPTEMBER 0 2 1987 L-87-368 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gent I emen:
Re: St. Lucie Unit I Docket No. 50-335 Second Ten-Year Inservice Ins ction Pro ram By letter L-85-43I dated November l3, l985, Florida Power & Light Company (FPL) requested NRC's approval to extend the first ten-year inspection interval for St. Lucie Unit I to February I I, l988. By letter dated November 20, l985 (Denton to Williams), the NRC staff approved the extension and, as a result, the second ten-year inservice inspection interval for St. Lucie Unit I will begin on February I I, l988. The purpose of this letter is to transmit the proposed St. Lucie Unit I Inservice Inspection Program for the second ten-year interval.
The enclosed document describes the basis and plans for the Second Ten-Year Inservice Inspection Summary Program for St. Lucie Unit I. The summary addresses the requirements of the ASME Boiler and Pressure Vessel (B&PV) Code Section XI, 1983 Edition through the Summer l983 Addenda, and is subject to the limitations and modifications stated in IO CFR 50.55a (b)(2)(i). In addition, Code Case N-408, Alternative Rules for examination of Class 2 Piping Section XI, Division I is incorporated as applicable. Requirements for augmented examinations are also addressed.
By letter L-87-337 dated August 17, l987, FPL submitted revised technical specifications with respect to inservice inspections, superceding the original submittals of 1977 and l978. With approval pending on the original Inservice Inspection Technical Specification submittal, FPL decided to revise the subject technical specifications in order to reflect changes in the Combustion Engineering - Standard Technical Specifications and to reflect the format of the St. Lucie Unit 2 Technical Specifications. FPL has requested that the revised Inservice Inspection Technical Specifications be issued prior to the start of the St.
Lucie Unit I second ten-year inservice inspection interval.
oA'I
'" 8709090259"
- DOCH, 870~0~
05000335l
-~I .
'..'DR,-
PDR ~l' MSD I /035/ I an FPL Group company
V
~ o f ~
till W
( W I W 1
4 tfaa t ~ ll W, ~ ~ ~
W
~ A ~ W If
'I rt W
ha Wr II A
- A If\
~
~ ~
<<W A ', W I '
v r W,"I A
~ I It tt lI WA
~ hf ', A t II
-ll lf, W.
/ <<W I
I,,'4,,th f ~ AW<<h<< .
a VI ( k'W r ~ ~
t ,ll
- W A lt
~. t f
"h I a Il If A IJ '<<W(,'.
g t r lf, lt lf I I 'g'K W" P t
~, ( II r h 1
~ A Wf
=r' ~
t I, 1 a
A' h hr
~ t
~ Wt =I ~ I r (I'
U; S. Nuclear Regulatory Commission L-87-368 Page two On February I I, l988, FPL will commence the St. Lucie Unit I Inservice Inspection Program under the requirements of the ASME B&PV Code Section XI, l983 Edition through the Summer l983 Addenda, except where specific relief has been requested.
If there should be any questions or concerns, please contact us.
Very truly yo rs,
.O.W y Group ice President N~uclear Energy PA P~ COW/MSD/gp Enclosure Dr. J. Nelson Grace, Regional Adminstrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant Q
MSD I /035/2
4'E ~ ~
I n II 4 J1 E
r p ~
1 II k lt II II m
+Pl e
I P,
CO. '~
I A
'C f
L a 'g ip 4
ki N "l 4d