ML17222A469: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:I ACCELERATED IHSTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DOCKET 05000335 CCESSION NBR:8809140329 DOC.DATE: 88/09/12 NOTARIZED:
{{#Wiki_filter:I ACCELERATED           IHSTRIBUTION                   DEMONSTRATION               SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
NO CIL:50-335 St.Lucie Plant, Unit 1, Florida Power&Light Co.UTH.NAME AUTHOR AFFILIATION ONWAY,W.F.
CCESSION NBR:8809140329                   DOC.DATE: 88/09/12     NOTARIZED: NO         DOCKET CIL:50-335 St. Lucie Plant, Unit 1, Florida                     Power & Light   Co. 05000335 UTH.NAME           AUTHOR AFFILIATION ONWAY,W.F.         Florida Power & Light Co.
Florida Power&Light Co.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)NOTES:
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document                 Control Desk)


==SUBJECT:==
==SUBJECT:==
Responds to NRC 880816 ltr re violations noted in Insp Rept 50-335/88-16.
Responds     to 50-335/88-16.
DISTRIBUTION CODE: IEOID COPIES RECEIVED:LTR 2 ENCL SIZE: TITLE: General (50 Dkt)-Insp Rept/Notice of Violation esponse, RECIPIENT ID CODE/NAME PD2-2 PD INTERNAL: ACRS DEDRO NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB 10'RR/PMAS/I LRB 1 2 O I-E.B, J G FWE 02 GN2~P 01 0 RNAL: LPDR NSIC COPIES LTTR ENCL 1 1 2 2 1 1 1 1 1 1 2 2 1 1 1 1 1 1 1 1 1 1 1 1 RECIPIENT , ID.'CODE/NAME; TOURIGNY,E AEOD NRR MORISSEAU,D NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RES/DSIR DEPY NRC PDR COPIES LTTR ENCL 2'''1 1 1 1 1 1 1 1.1'1 1 1 1 1 1 1 1 1 A D ig 8 TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25  
NRC           880816 ltr re violations noted in Insp Rept DISTRIBUTION CODE: IEOID TITLE: General   (50 COPIES RECEIVED:LTR Dkt)-Insp Rept/Notice of Violation esponse, 2  ENCL    SIZE:
NOTES:
ID RECIPIENT CODE/NAME PD2-2 PD COPIES LTTR ENCL 1     1 RECIPIENT ID .'CODE/NAME; TOURIGNY,E COPIES 2
LTTR ENCL INTERNAL: ACRS                              2    2    AEOD                     1      1 DEDRO                            1    1    NRR MORISSEAU,D           1      1 NRR/DLPQ/PEB 11                  1    1    NRR/DLPQ/QAB 10           1      1 NRR/DOEA DIR 11                  1    1    NRR/DREP/EPB 10           1      1 NRR/DREP/RPB 10                  2    2    NRR/DRIS DIR 9A         .1    '1 LRB                              NUDOCS-ABSTRACT           1      1 O
G I-E.B, FWE 12 J
02
                              'RR/PMAS/I 1
1 1
1 1
1 OGC/HDS2 RES/DSIR DEPY 1
1 1
1 GN2~ P        01              1     1 0 RNAL: LPDR NSIC 1     1     NRC PDR                  1     1 1     1 A
D ig 8
TOTAL NUMBER OF COPIES REQUIRED: LTTR                   25     ENCL     25


P.O.BOX 14000, JUNO BEACH, FL 33408.0420 SEt'TEh18ER 1 2 1989 L-88-393 U.S.Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.20555 Gentlemen:
P. O. BOX 14000, JUNO BEACH, FL 33408.0420 SEt'TEh18ER 1 2 1989 L-88-393 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.       20555 Gentlemen:
Re: St.Lucie Unit 1 Docket No.50-335 Ins ection Re ort 335 88-16 Florida Power&Light Company has reviewed the subject inspection report, and pursuant to NRC letter (A.R.Herdt to W.F.Conway)dated August 16, 1988, the response is attached.Very truly yours,~Sr~~~W.F.Conwag Senior Vice President-Nuclear WFC/GR 1/cm Attachment cc: Dr.J.Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St.Lucie Plant GRMIR335 3309'1 00~29'v0922 PDR ADOCK 05000"'35 PDC an Fpl Group company  
Re:   St. Lucie Unit   1 Docket No. 50-335 Ins ection   Re ort 335 88-16 Florida   Power & Light   Company has reviewed the subject inspection report, and pursuant to   NRC letter   (A. R. Herdt to W. F. Conway) dated August 16, 1988, the response   is attached.
Very truly yours,
~Sr~~~
W. F. Conwag Senior Vice President - Nuclear WFC/GR 1/cm Attachment cc:   Dr. J. Nelson Grace, Regional Administrator, Region         II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant GRMIR335 3309'1 00 ~29'v0922 PDR   ADOCK   05000"'35 PDC                                         an Fpl Group company
 
NRC REPORT  50-335/88-16 DEVIATION The Uni:t 1 FSAR,    Section 8.3.1.1.7, requires the diesel generators to be capable of    reaching full speed and voltage within 10 seconds after receiving a    signal to start.
Contrary to the above,        during Unit 1 emergency diesel generator surveillance testing on March 29, 1987, emergency diesel generators 1A and 1B attained rated speed and voltage in 10.1 seconds and 12.7 seconds, respectively.        As such, Unit 1 surveillance testing on two occasions failed to demonstrate the diesel generators are capable of satisfying FSAR design requirements.
 
===RESPONSE===
: 1. Reason  for deviation:
FPL  has investigated this deviation with the operators involved.
Because of the time lapse (greater than 15 months), no specific reasons could be given as to why they would have entered start times for the diesels in excess of the design values and not have notified the responsible supervision.        Subsequent entries in the same data sheet are within the design values and records of maintenance activities show no conclusive evidence that start times were affected.      In addition, the diesels were tested as part of the integrated    response    time tests    for  safeguards equipment  in July and found  to  be satisfactory.
: 2. Corrective steps:
Since the    diesels  had met the design start times      subsequent  to the dates  identified,    no immediate action was taken.
: 3. Corrective steps to preclude further deviation:
FPL  has changed the monthly diesel periodic test to require the design start time be verified within specifications.          In addition, the responsible personnel have been instructed to notify the operations      supervisor    in instances where surveillances are satisfactory but the equipment is known not to meet its design requirements.
: 4. Corrective action is considered complete.


NRC REPORT 50-335/88-16 DEVIATION The Uni:t 1 FSAR, Section 8.3.1.1.7, requires the diesel generators to be capable of reaching full speed and voltage within 10 seconds after receiving a signal to start.Contrary to the above, during Unit 1 emergency diesel generator surveillance testing on March 29, 1987, emergency diesel generators 1A and 1B attained rated speed and voltage in 10.1 seconds and 12.7 seconds, respectively.
As such, Unit 1 surveillance testing on two occasions failed to demonstrate the diesel generators are capable of satisfying FSAR design requirements.
RESPONSE 1.Reason for deviation:
FPL has investigated this deviation with the operators involved.Because of the time lapse (greater than 15 months), no specific reasons could be given as to why they would have entered start times for the diesels in excess of the design values and not have notified the responsible supervision.
Subsequent entries in the same data sheet are within the design values and records of maintenance activities show no conclusive evidence that start times were affected.In addition, the diesels were tested as part of the integrated response time tests for safeguards equipment in July and found to be satisfactory.
2.Corrective steps: Since the diesels had met the design start times subsequent to the dates identified, no immediate action was taken.3.Corrective steps to preclude further deviation:
FPL has changed the monthly diesel periodic test to require the design start time be verified within specifications.
In addition, the responsible personnel have been instructed to notify the operations supervisor in instances where surveillances are satisfactory but the equipment is known not to meet its design requirements.
4.Corrective action is considered complete.
i'}}
i'}}

Latest revision as of 14:21, 4 February 2020

Responds to NRC 880816 Ltr Re Violations Noted in Insp Rept 50-335/88-16.Corrective Actions:Monthly Diesel Periodic Test Changed to Require That Design Start Time Be Verified within Specs
ML17222A469
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 09/12/1988
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
L-88-393, NUDOCS 8809140329
Download: ML17222A469 (6)


Text

I ACCELERATED IHSTRIBUTION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

CCESSION NBR:8809140329 DOC.DATE: 88/09/12 NOTARIZED: NO DOCKET CIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 UTH.NAME AUTHOR AFFILIATION ONWAY,W.F. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to 50-335/88-16.

NRC 880816 ltr re violations noted in Insp Rept DISTRIBUTION CODE: IEOID TITLE: General (50 COPIES RECEIVED:LTR Dkt)-Insp Rept/Notice of Violation esponse, 2 ENCL SIZE:

NOTES:

ID RECIPIENT CODE/NAME PD2-2 PD COPIES LTTR ENCL 1 1 RECIPIENT ID .'CODE/NAME; TOURIGNY,E COPIES 2

LTTR ENCL INTERNAL: ACRS 2 2 AEOD 1 1 DEDRO 1 1 NRR MORISSEAU,D 1 1 NRR/DLPQ/PEB 11 1 1 NRR/DLPQ/QAB 10 1 1 NRR/DOEA DIR 11 1 1 NRR/DREP/EPB 10 1 1 NRR/DREP/RPB 10 2 2 NRR/DRIS DIR 9A .1 '1 LRB NUDOCS-ABSTRACT 1 1 O

G I-E.B, FWE 12 J

02

'RR/PMAS/I 1

1 1

1 1

1 OGC/HDS2 RES/DSIR DEPY 1

1 1

1 GN2~ P 01 1 1 0 RNAL: LPDR NSIC 1 1 NRC PDR 1 1 1 1 A

D ig 8

TOTAL NUMBER OF COPIES REQUIRED: LTTR 25 ENCL 25

P. O. BOX 14000, JUNO BEACH, FL 33408.0420 SEt'TEh18ER 1 2 1989 L-88-393 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 Gentlemen:

Re: St. Lucie Unit 1 Docket No. 50-335 Ins ection Re ort 335 88-16 Florida Power & Light Company has reviewed the subject inspection report, and pursuant to NRC letter (A. R. Herdt to W. F. Conway) dated August 16, 1988, the response is attached.

Very truly yours,

~Sr~~~

W. F. Conwag Senior Vice President - Nuclear WFC/GR 1/cm Attachment cc: Dr. J. Nelson Grace, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant GRMIR335 3309'1 00 ~29'v0922 PDR ADOCK 05000"'35 PDC an Fpl Group company

NRC REPORT 50-335/88-16 DEVIATION The Uni:t 1 FSAR, Section 8.3.1.1.7, requires the diesel generators to be capable of reaching full speed and voltage within 10 seconds after receiving a signal to start.

Contrary to the above, during Unit 1 emergency diesel generator surveillance testing on March 29, 1987, emergency diesel generators 1A and 1B attained rated speed and voltage in 10.1 seconds and 12.7 seconds, respectively. As such, Unit 1 surveillance testing on two occasions failed to demonstrate the diesel generators are capable of satisfying FSAR design requirements.

RESPONSE

1. Reason for deviation:

FPL has investigated this deviation with the operators involved.

Because of the time lapse (greater than 15 months), no specific reasons could be given as to why they would have entered start times for the diesels in excess of the design values and not have notified the responsible supervision. Subsequent entries in the same data sheet are within the design values and records of maintenance activities show no conclusive evidence that start times were affected. In addition, the diesels were tested as part of the integrated response time tests for safeguards equipment in July and found to be satisfactory.

2. Corrective steps:

Since the diesels had met the design start times subsequent to the dates identified, no immediate action was taken.

3. Corrective steps to preclude further deviation:

FPL has changed the monthly diesel periodic test to require the design start time be verified within specifications. In addition, the responsible personnel have been instructed to notify the operations supervisor in instances where surveillances are satisfactory but the equipment is known not to meet its design requirements.

4. Corrective action is considered complete.