ML17298C020: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:LIST I U 8-1 R.Sdlman M.A.Gates Com liance Leon Brown J.G.Sarver EPIP NO.INDEX/Ol/18/85 EPIP jj03 PCN02 kev.5, DATE 01/18 85/f27 PCN01 Rev.3,$/38 PCN01 Rev.4, Cancellation
{{#Wiki_filter:U LIST I EPIP NO. INDEX/Ol/18/85 EPIP jj03 PCN02 kev. 5,                     DATE 01/18 85
/)01 Rev.2 A C V.Elish 6-8 Unit 1 Control Room G.Fiorelli Kris Oberdorf 5-37 G.Olson 5<<103 Unit 1 Radwaste 5-17 OSC Coordinator 5<<33 A.Porter 5-102 T.Warren 5-2B 5-6 3-2 5-43 3-15 3-3 5-21 V.Rhodes o h T.Exum DDC Librarv M.W.Lantz Penn E ebrecht 1Jarrv Riel in@F..J.Haves J.Ceder uist T.Shriver T.Barsuk D.Best R.Johnson Sec Cpt E.Cullen EOF FOF EOF FOF EOF (Room 12)EOF Unit 2 Rad Protection Jack Sims 5-15 5-40 1-2 5-35 5-91 17-9 5-34 5-20 5-86 5-88 5-42 15-1 5-41 17-1A 17-18 17-1C 17-1D 17-1F.17-1F 5-95 17-2 B.Ro ers TSC John Cole TSC Les Barlow Steve Grnve Gro~Roott er D D.asnacht M.Zimmerman W.J;S tubble f ield F WRF/DDC Bob Adne Unit II Maintenance Mana er TSC F.Plan Anal John Kirbv Unit 2 Control Room 5-94 3-10 3-8 3-4 5-99 3-11 3-5A 2-4 5-25 19-1 20-1 14-47, 1-7 5-39 Mike Crusa Bob Pa e Jerrv Self Marv Gerdes Dennis Yows Bill Kni hton Russ Pa worth Bruce Rash Dan Philli s 17-4 17-5 5-79 13-12 5-36 15-2 13-18 FOR NRC TAKE TO KARL GROSS ON R A Jack Martin Adm.Document Cont.Desk Gail M.Temole Falk Kantor PROCEDURE GROUP 8-9A 8-6=W.Fernow'*C.Anderson Sim Obs Rm C.R.Dunawav D.Nelson M.Whitaker J.Tench A.Perouthka J.R.Bvnum B.Simmons 5-14 6-7 5-89 5-9 5-38 6-6 5-22 6-10 Dennis Yows 5-36A thru 5-36I Emer enc Kits coordinate w/J.Sims 8504i00135 850222 PDR ADOCK 05000528 F PDR F.Hicks 010 6-9 (:ONTROLLED DOCuM~I4T  
              /f27 PCN01 Rev. 3, $/38 PCN01 Rev. 4, Cancellation /)01 Rev. 2 A                                                     C V. Elish                               6-8           Unit     1   Control   Room             5-2B G. Fiorelli                           8-1          Kris Oberdorf                             5-6 R. Sdlman                                5-37         G. Olson                                 3-2 M. A. Gates                              5<<103       Unit     1   Radwaste                   5-43 Com  liance                            5-17         OSC   Coordinator                       3-15 Leon Brown                              5<<33         A. Porter                               3-3 J. G. Sarver                          5-102       T. Warren                               5-21 V. Rhodes o       h                             5-15                                  D T. Exum                                 5-40        B. Ro ers TSC                            5-94 DDC   Librarv                           1-2          John Cole                                3-10 M. W. Lantz                           5-35        TSC Penn E ebrecht                           5-91        Les Barlow                              3-8 1Jarrv Riel in@                           17-9        Steve Grnve                              3-4 F.. J. Haves                             5-34        Gro Roott er
'0 I 4 t, t I~
                                                              ~                                  5-99 J. Ceder uist                             5-20        Maintenance Mana er                      3-11 T. Shriver                                             TSC F. Plan Anal                        3-5A T. Barsuk                                 5-86        John Kirbv                              2-4 D. Best                                   5-88        Unit    2    Control  Room              5-25 R. Johnson                               5-42 Sec Cpt                                   15-1 E. Cullen                                 5-41        D.      asnacht                          19-1 EOF                                      17-1A        M. Zimmerman                            20-1 FOF                                      17-18        W. J;    S tubble field              14-47, EOF                                      17-1C                                 F FOF                                      17-1D       WRF/DDC                                  1-7 EOF (Room 12)                            17-1F.
gAS e seri~o Cy n O I IA 0 r+0+w*w+a DOCKET No.ETN 50-528 UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C.20555 April 1, 1985 MEMORANDUM FOR: Docketing and Service Branch Office of the Secretary of the Commission FROM: Office of Nuclear Reactor Regulation
EOF                                      17-1F Unit    2 Rad  Protection                5-95         Bob Adne         Unit II               5-39 Jack Sims                                17-2 Mike Crusa                                17-4                               FOR NRC Bob Pa e                                 17-5         TAKE TO KARL GROSS ON R A Jerrv Self                                5-79        Jack Martin Adm.
Marv Gerdes                              13-12        Document Cont. Desk                     8-9A Dennis Yows                              5-36 Bill Kni hton                            15-2          Gail M. Temole Russ Pa worth                                          Falk Kantor                             8-6 Bruce Rash                                13-18 Dan  Philli    s PROCEDURE GROUP Dennis Yows                  5-36A thru 5-36I
=W. Fernow                               5-14          Emer enc        Kits coordinate w/ J. Sims C. Anderson                             6-7 Sim Obs Rm                               5-89 C. R. Dunawav                           5-9 D. Nelson M. Whitaker                           5-38 J. Tench                                             8504i00135 850222 A. Perouthka                             6-6        PDR        ADOCK 05000528 J. R. Bvnum                           5-22        F                          PDR B. Simmons                               6-10 F. Hicks                                 6-9 010
(:ONTROLLED DOCuM~I4T
 
        '0 I
4 t,
        ~
t I
 
gAS e seri                                           UNITED STATES
                              ~o                       NUCLEAR REGULATORY COMMISSION Cy nO                                  WASHINGTON, D.C. 20555 I
IA 0                                                         April 1,      1985 r+           0 a
                    +w*w+
DOCKET No.         ETN   50-528 MEMORANDUMFOR:                   Docketing and Service Branch Office of the Secretary of the Commission FROM:                           Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
ARIZONA PUBLIC SERVICE COMPANY, ET AL PALO VERDE NUCLEAR GENERATING STATION, UNIT 3.One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication.
ARIZONA PUBLIC SERVICE COMPANY, ET AL PALO VERDE NUCLEAR GENERATING STATION, UNIT 3.
Additional conformed copies (6)of the Notice are enclosed for your use.Q Notice of Receipt of Application for Construction Permit(s)and Operating License(s)
One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 6           ) of the Notice are enclosed for your use.
Notice of Receipt of Partial Application for Construction Permit(s)and Facility License(s):
Q     Notice of Receipt of Application for Construction Permit(s) and Operating License(s)
Time for Submission of Views on Antitrust Matters.U C3 Notice of Consideration of Issuance of Amendment to Facility Operating License.m~LJ Notice of Receipt of Application for Facility License(s);
Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.
Notice of Availability of Applicant's Environmental Report;and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.C3 Notice of Availability of NRC Draft/Final Environmental Statement.
U C3 Notice of Consideration of Issuance of Amendment to Facility Operating         License.
LJ Notice of Limited Work Authorization.
m
O Notice of Availability of Safety Evaluation Report.C]Notice of Issuance of Construction Permit(s), Notice of Issuance of Facility Operating License(s) or Amendment(s)
              ~ Notice of LJ                Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.
~Q Order.Exemption.
C3 Notice of Availability of NRC Draft/Final Environmental Statement.
O Notice of Granting of Relief.Other: Office of Nuclear Reactor Regulation OFrtcC)SURHAMI)oA'rc
LJ     Notice of Limited Work Authorization.
O     Notice of Availability of Safety Evaluation Report.
C]     Notice of Issuance of Construction Permit(s),
Notice of Issuance of Facility Operating License(s) or Amendment(s)   ~
Q     Order.
Exemption.
O     Notice of Granting of Relief.
Other:
Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==


As stated n 2~e.~ZL 4/3,.85.........
As stated OFrtcC  )            n     2   ~ e. ~
OFFICIAL RECORD COPY "I\4 7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ARIZONA PUBLIC SERVICE COMPANY, SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT, SOUTHERN CAI IFORNIA FDISON COMPANY, EL PASO ELECTRIC COMPANY, PUBLIC SERVICE COMPANY OF NEW MEXICO, LOS ANGELES DEPARTMENT OF WATER AND POWER, AND SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY Docket No.STN 50-528 ORDER The Arizona Public Service Company, et al.*(the licensees and co-owners) are the holders of Facility Operating License No.NPF-34, dated December 31, 1984, which authorizes operation of the Palo Verde Nuclear Generating Station, Unit 1 at 3800 megawatts thermal.However, pending Commission approval, operation is restricted to five percent of rated power (190 megawatts thermal).One of the utilities included as a co-owner on the license is the Los Angeles Department of Water and Power.The Los Angeles Department of Water and Power (LADWP)was identified as a co-owner for the facility in Amendment No.5 to the Palo Verde Final Safety Analysis Report (FSAR)dated August 1981.Amendment No.5 to the FSAR states that LADWP will acquire an"...undivided ownership interest as a tenant in common with the other Participants in the Palo Verde Nuclear Generating Station, including each of Palo Verde Units 1, 2 and 3, at such time as Palo Verde Unit 1 is placed into commerical operation..." e ot er owners are: Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Compa'ny, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority.
SURHAMI
li Ih VV (
        )        ZL oA'rc          4/3, .85.........
Because LADWP is not offically a co-owner at this time, Facility Operating License No.NPF-34 is amended to include the following footnote on page 1 of the license: "Los Angeles Department of Water and Power will be included as an owner in this license on the date it officially acquires an ownership interest in the facility which is expected to occur shortly after Palo Verde Unit 1 achieves commerical operation." Dated at Bethesda, Maryland, this 29th day of March, 1985.FOR THE NUCLEAR REGULATORY COMMISSION Hug.Thompson, r., 0 ector Div>sion of Licensing Office of Nuclear Reactor Regulation  
OFFICIAL RECORD COPY
,f I(i lt ep.+R<cy, (4 P 0 4V p p I IA P r IP+a*+~UNITED STATES NUCLEAR REGULATORY COMMISSIO WASHINGTON, D.C.20555 Pebruary 12, 1985 DOCKET No.5O-528 MEMORANDUM FOR:, Docketing and Service Branch Office of the Secretary of the Commission FROM: Office of Nuclear Reactor Regulation
 
"I
  \ 4
 
7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter   of ARIZONA PUBLIC SERVICE COMPANY, SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT,                       Docket No. STN  50-528 SOUTHERN CAI IFORNIA FDISON COMPANY, EL PASO ELECTRIC COMPANY, PUBLIC SERVICE COMPANY OF NEW MEXICO, LOS ANGELES DEPARTMENT OF WATER AND POWER, AND SOUTHERN CALIFORNIA PUBLIC POWER   AUTHORITY ORDER The Arizona   Public Service   Company,   et al.* (the licensees   and co-owners) are the holders     of Facility Operating License     No. NPF-34, dated December 31, 1984, which authorizes operation       of the Palo Verde Nuclear Generating Station, Unit       1 at   3800 megawatts   thermal. However, pending Commission approval, operation is restricted to five percent of rated       power (190 megawatts   thermal). One of the utilities   included   as a co-owner on the   license is the Los Angeles Department of   Water and Power.
The Los Angeles Department     of Water and Power (LADWP) was   identified   as a co-owner   for the facility in     Amendment No. 5   to the Palo Verde Final Safety Analysis Report     (FSAR) dated August 1981.       Amendment No. 5 to the   FSAR states that   LADWP will acquire an "...undivided ownership interest     as a   tenant in common   with the other Participants in the Palo Verde Nuclear Generating Station, including each of Palo Verde Units 1,       2 and   3, at such time as Palo Verde Unit       1 is placed into commerical operation..."
e ot er owners are:   Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Compa'ny, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority.
 
li Ih VV
(
 
Because   LADWP is not offically a co-owner at this time, Facility Operating License No. NPF-34 is amended to include the following footnote on page       1 of the license:
      "Los Angeles Department   of Water and Power will be   included as an owner in this license on the date it officially acquires an ownership interest in the facility which is expected to occur shortly after Palo Verde Unit 1 achieves commerical operation."
Dated   at Bethesda, Maryland, this 29th   day of March,   1985.
FOR THE NUCLEAR REGULATORY COMMISSION Hug   . Thompson,   r., 0 ector Div>sion of Licensing Office of Nuclear Reactor Regulation
 
,f I(
i lt
 
R<cy,                                           UNITED STATES (4ep.+      P 0                       NUCLEAR REGULATORY COMMISSIO 4V pp                                  WASHINGTON, D.C. 20555 I
IA P r                                                    Pebruary 12, 1985 IP
                    +a*+~
DOCKET No.         5O-528 MEMORANDUM FOR:,                 Docketing and Service Branch Office of the Secretary of the Commission FROM:                           Office of Nuclear Reactor Regulation


==SUBJECT:==
==SUBJECT:==
ARIZONA PUBLIC SERVICE COEIPANY, ET AL PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication, Additional conformed copies (6)of the Notice are enclosed for your use.Q Notice of Receipt of Application for Construction Permit(s)and Operating License(s).
ARIZONA PUBLIC SERVICE COEIPANY, ET AL PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication, Additional conformed copies (         6 ) of the Notice are enclosed for your use.
Notice of Receipt of Partial Application for Construction Permit(s)and Facility License(s):
Q       Notice of Receipt of Application for Construction Permit(s) and Operating License(s).
Time for Submission of Views on Antitrust Matters.Notice of Consideration of Issuance of Amendment to Facility Operating License.Cl Notice of Receipt of Application for Eacility License(s);
Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.
Notice of Availability of Applicant's Environmental Report;and Notice of Conslderat)on of Issuance of Facility License(s) and Notice of Opportunity for Hearing.Notice of Availability of NRC Draft/Final Environmental Statement.
Notice of Consideration of Issuance of Amendment to Facility Operating License.
Cl     Notice of Receipt of Application for Eacility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Conslderat)on of Issuance of Facility License(s) and Notice of Opportunity for Hearing.
Notice of Availability of NRC Draft/Final Environmental Statement.
Notice of Limited Work Authorization.
Notice of Limited Work Authorization.
C3 Notice of Availability of Safety Evaluation Report.Q Notice of Issuance of Construction Permit(s), Notice of Issuance of Facility Operating License(s) or Amendment(s).
C3 Notice of Availability of Safety Evaluation Report.
G Order.Q Exemption.
Q       Notice of Issuance of Construction Permit(s),
Notice of Granting of Relief.H Other: nder 10 CFR 2.206 dtd 2/ll/85 Office of Nuclear Reactor Regulation
Notice of Issuance of Facility Operating License(s) or Amendment(s).
G       Order.
Q       Exemption.
Notice of Granting of Relief.
H Other:                                       nder 10     CFR   2.206     dtd 2/ll/85 Office of Nuclear Reactor Regulation


==Enclosure:==
==Enclosure:==


As stated pence)susrcaMS oaTC):L Ig.....2..85 OFFICIAL RECORD COPY p V I gl  
As stated pence )           :L Ig susrcaMS oaTC )   .....2 ..85 OFFICIAL RECORD COPY
~l7;C)l,e (7590-01)NUCLEAR REGULATORY COMMISSION (Docket No.50-528)ARIZONA PUBLIC SERVICE COMPANY, ET AL.(Palo'Verde Nuclear Generating Station, Unit 1)RE VEST FOR ACTION UNDER 10 CFR 52.206 Notice is hereby given that by letter dated December 18, 1984, Myron L.Scott on behalf of the Coalition for Responsible Energy Education, Tempe, Az., has requested that the NRC withhold issuance of a low-power license for Unit 1 of the Arizona Public Service Company's Palo Verde Nuclear Generating Station until appropriate reviews for safety impact are undertaken of certain incentive plans initiated by the company and-the Arizona Corporation Commission and questions about the adequacy of funding for State and local emergency plans are resolved.Mr.Scott's letter is being treated as a request for action under 10 CFR 5 2.206 and, accordingly, appropriate action will be taken on the request within a reasonable time.A copy of the'request-is available for public inspection in the Commission's Public Document Room at 1717 H Street, N.W., Washington, D.C.20555, and at the local public document room for the Palo Verde facility located at the Phoenix Public Library, Business, Science and Technology Department, 12 East McDowell Road, Phoenix, Arizona 85004.Dated at Bethesda, Maryland, this lit"Hay of February, 1985.FOR THE NUCLEAR REGULATORY COMMISSION Harold R.Denton, Director Office of Nuclear Reactor Regulation 1}}
 
p V
I gl
 
~ l7; C)l,e (7590-01)
NUCLEAR REGULATORY COMMISSION (Docket No. 50-528)
ARIZONA PUBLIC SERVICE COMPANY, ET AL.
(Palo'Verde Nuclear Generating Station, Unit 1)
RE VEST FOR   ACTION UNDER 10 CFR 52.206 Notice is hereby given that by         letter dated December 18, 1984, Myron L.
Scott   on behalf of the Coalition for Responsible Energy Education,           Tempe, Az.,
has requested     that the   NRC withhold issuance of     a low-power license   for Unit 1 of the Arizona Public Service         Company's Palo Verde Nuclear Generating Station until appropriate reviews for safety           impact are undertaken   of certain incentive plans   initiated   by the company and- the Arizona Corporation Commission and questions about the adequacy of funding           for State and local emergency plans are resolved. Mr. Scott's letter is being treated       as a request   for action   under 10 CFR   5 2.206 and, accordingly, appropriate action         will be taken on the request within     a reasonable   time.
A copy of the'request -is available for public inspection in the Commission's Public Document     Room at 1717 H Street, N.W., Washington, D.C.     20555, and at the local public document       room for the   Palo Verde facility located at   the Phoenix Public Library, Business, Science and Technology Department,             12 East McDowell Road, Phoenix, Arizona         85004.
Dated   at Bethesda, Maryland, this lit"Hay of February, 1985.
FOR THE NUCLEAR REGULATORY COMMISSION Harold R. Denton, Director Office of Nuclear Reactor Regulation
 
1}}

Latest revision as of 06:06, 4 February 2020

Public Version of Revised Emergency Plan Implementing Procedures,Including EPIP-03 Re Notification of Unusual event,EPIP-27 Re post-accident Sampling & Analysis & EPIP-38 Re Equipment inventory.W/850402 Release Memo
ML17298C020
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 02/22/1985
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17298C019 List:
References
PROC-850222, NUDOCS 8504100135
Download: ML17298C020 (12)


Text

U LIST I EPIP NO. INDEX/Ol/18/85 EPIP jj03 PCN02 kev. 5, DATE 01/18 85

/f27 PCN01 Rev. 3, $/38 PCN01 Rev. 4, Cancellation /)01 Rev. 2 A C V. Elish 6-8 Unit 1 Control Room 5-2B G. Fiorelli 8-1 Kris Oberdorf 5-6 R. Sdlman 5-37 G. Olson 3-2 M. A. Gates 5<<103 Unit 1 Radwaste 5-43 Com liance 5-17 OSC Coordinator 3-15 Leon Brown 5<<33 A. Porter 3-3 J. G. Sarver 5-102 T. Warren 5-21 V. Rhodes o h 5-15 D T. Exum 5-40 B. Ro ers TSC 5-94 DDC Librarv 1-2 John Cole 3-10 M. W. Lantz 5-35 TSC Penn E ebrecht 5-91 Les Barlow 3-8 1Jarrv Riel in@ 17-9 Steve Grnve 3-4 F.. J. Haves 5-34 Gro Roott er

~ 5-99 J. Ceder uist 5-20 Maintenance Mana er 3-11 T. Shriver TSC F. Plan Anal 3-5A T. Barsuk 5-86 John Kirbv 2-4 D. Best 5-88 Unit 2 Control Room 5-25 R. Johnson 5-42 Sec Cpt 15-1 E. Cullen 5-41 D. asnacht 19-1 EOF 17-1A M. Zimmerman 20-1 FOF 17-18 W. J; S tubble field 14-47, EOF 17-1C F FOF 17-1D WRF/DDC 1-7 EOF (Room 12) 17-1F.

EOF 17-1F Unit 2 Rad Protection 5-95 Bob Adne Unit II 5-39 Jack Sims 17-2 Mike Crusa 17-4 FOR NRC Bob Pa e 17-5 TAKE TO KARL GROSS ON R A Jerrv Self 5-79 Jack Martin Adm.

Marv Gerdes 13-12 Document Cont. Desk 8-9A Dennis Yows 5-36 Bill Kni hton 15-2 Gail M. Temole Russ Pa worth Falk Kantor 8-6 Bruce Rash 13-18 Dan Philli s PROCEDURE GROUP Dennis Yows 5-36A thru 5-36I

=W. Fernow 5-14 Emer enc Kits coordinate w/ J. Sims C. Anderson 6-7 Sim Obs Rm 5-89 C. R. Dunawav 5-9 D. Nelson M. Whitaker 5-38 J. Tench 8504i00135 850222 A. Perouthka 6-6 PDR ADOCK 05000528 J. R. Bvnum 5-22 F PDR B. Simmons 6-10 F. Hicks 6-9 010

(:ONTROLLED DOCuM~I4T

'0 I

4 t,

~

t I

gAS e seri UNITED STATES

~o NUCLEAR REGULATORY COMMISSION Cy nO WASHINGTON, D.C. 20555 I

IA 0 April 1, 1985 r+ 0 a

+w*w+

DOCKET No. ETN 50-528 MEMORANDUMFOR: Docketing and Service Branch Office of the Secretary of the Commission FROM: Office of Nuclear Reactor Regulation

SUBJECT:

ARIZONA PUBLIC SERVICE COMPANY, ET AL PALO VERDE NUCLEAR GENERATING STATION, UNIT 3.

One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication. Additional conformed copies ( 6 ) of the Notice are enclosed for your use.

Q Notice of Receipt of Application for Construction Permit(s) and Operating License(s)

Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

U C3 Notice of Consideration of Issuance of Amendment to Facility Operating License.

m

~ Notice of LJ Receipt of Application for Facility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Consideration of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

C3 Notice of Availability of NRC Draft/Final Environmental Statement.

LJ Notice of Limited Work Authorization.

O Notice of Availability of Safety Evaluation Report.

C] Notice of Issuance of Construction Permit(s),

Notice of Issuance of Facility Operating License(s) or Amendment(s) ~

Q Order.

Exemption.

O Notice of Granting of Relief.

Other:

Office of Nuclear Reactor Regulation

Enclosure:

As stated OFrtcC ) n 2 ~ e. ~

SURHAMI

) ZL oA'rc 4/3, .85.........

OFFICIAL RECORD COPY

"I

\ 4

7590-01 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION In the Matter of ARIZONA PUBLIC SERVICE COMPANY, SALT RIVER PROJECT AGRICULTURAL IMPROVEMENT AND POWER DISTRICT, Docket No. STN 50-528 SOUTHERN CAI IFORNIA FDISON COMPANY, EL PASO ELECTRIC COMPANY, PUBLIC SERVICE COMPANY OF NEW MEXICO, LOS ANGELES DEPARTMENT OF WATER AND POWER, AND SOUTHERN CALIFORNIA PUBLIC POWER AUTHORITY ORDER The Arizona Public Service Company, et al.* (the licensees and co-owners) are the holders of Facility Operating License No. NPF-34, dated December 31, 1984, which authorizes operation of the Palo Verde Nuclear Generating Station, Unit 1 at 3800 megawatts thermal. However, pending Commission approval, operation is restricted to five percent of rated power (190 megawatts thermal). One of the utilities included as a co-owner on the license is the Los Angeles Department of Water and Power.

The Los Angeles Department of Water and Power (LADWP) was identified as a co-owner for the facility in Amendment No. 5 to the Palo Verde Final Safety Analysis Report (FSAR) dated August 1981. Amendment No. 5 to the FSAR states that LADWP will acquire an "...undivided ownership interest as a tenant in common with the other Participants in the Palo Verde Nuclear Generating Station, including each of Palo Verde Units 1, 2 and 3, at such time as Palo Verde Unit 1 is placed into commerical operation..."

e ot er owners are: Salt River Project Agricultural Improvement and Power District, El Paso Electric Company, Southern California Edison Compa'ny, Public Service Company of New Mexico, Los Angeles Department of Water and Power, and Southern California Public Power Authority.

li Ih VV

(

Because LADWP is not offically a co-owner at this time, Facility Operating License No. NPF-34 is amended to include the following footnote on page 1 of the license:

"Los Angeles Department of Water and Power will be included as an owner in this license on the date it officially acquires an ownership interest in the facility which is expected to occur shortly after Palo Verde Unit 1 achieves commerical operation."

Dated at Bethesda, Maryland, this 29th day of March, 1985.

FOR THE NUCLEAR REGULATORY COMMISSION Hug . Thompson, r., 0 ector Div>sion of Licensing Office of Nuclear Reactor Regulation

,f I(

i lt

R<cy, UNITED STATES (4ep.+ P 0 NUCLEAR REGULATORY COMMISSIO 4V pp WASHINGTON, D.C. 20555 I

IA P r Pebruary 12, 1985 IP

+a*+~

DOCKET No. 5O-528 MEMORANDUM FOR:, Docketing and Service Branch Office of the Secretary of the Commission FROM: Office of Nuclear Reactor Regulation

SUBJECT:

ARIZONA PUBLIC SERVICE COEIPANY, ET AL PALO VERDE NUCLEAR GENERATING STATION, UNIT 1 One signed original of the Federal Register Notice identified below is enclosed for your transmittal to the Office of the Federal Register for publication, Additional conformed copies ( 6 ) of the Notice are enclosed for your use.

Q Notice of Receipt of Application for Construction Permit(s) and Operating License(s).

Notice of Receipt of Partial Application for Construction Permit(s) and Facility License(s): Time for Submission of Views on Antitrust Matters.

Notice of Consideration of Issuance of Amendment to Facility Operating License.

Cl Notice of Receipt of Application for Eacility License(s); Notice of Availability of Applicant's Environmental Report; and Notice of Conslderat)on of Issuance of Facility License(s) and Notice of Opportunity for Hearing.

Notice of Availability of NRC Draft/Final Environmental Statement.

Notice of Limited Work Authorization.

C3 Notice of Availability of Safety Evaluation Report.

Q Notice of Issuance of Construction Permit(s),

Notice of Issuance of Facility Operating License(s) or Amendment(s).

G Order.

Q Exemption.

Notice of Granting of Relief.

H Other: nder 10 CFR 2.206 dtd 2/ll/85 Office of Nuclear Reactor Regulation

Enclosure:

As stated pence ) :L Ig susrcaMS oaTC ) .....2 ..85 OFFICIAL RECORD COPY

p V

I gl

~ l7; C)l,e (7590-01)

NUCLEAR REGULATORY COMMISSION (Docket No. 50-528)

ARIZONA PUBLIC SERVICE COMPANY, ET AL.

(Palo'Verde Nuclear Generating Station, Unit 1)

RE VEST FOR ACTION UNDER 10 CFR 52.206 Notice is hereby given that by letter dated December 18, 1984, Myron L.

Scott on behalf of the Coalition for Responsible Energy Education, Tempe, Az.,

has requested that the NRC withhold issuance of a low-power license for Unit 1 of the Arizona Public Service Company's Palo Verde Nuclear Generating Station until appropriate reviews for safety impact are undertaken of certain incentive plans initiated by the company and- the Arizona Corporation Commission and questions about the adequacy of funding for State and local emergency plans are resolved. Mr. Scott's letter is being treated as a request for action under 10 CFR 5 2.206 and, accordingly, appropriate action will be taken on the request within a reasonable time.

A copy of the'request -is available for public inspection in the Commission's Public Document Room at 1717 H Street, N.W., Washington, D.C. 20555, and at the local public document room for the Palo Verde facility located at the Phoenix Public Library, Business, Science and Technology Department, 12 East McDowell Road, Phoenix, Arizona 85004.

Dated at Bethesda, Maryland, this lit"Hay of February, 1985.

FOR THE NUCLEAR REGULATORY COMMISSION Harold R. Denton, Director Office of Nuclear Reactor Regulation

1