ML17298C171: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:8505290095 850523 PDR ADQCK 05000528 F PDR Q PROC NO: 7N409~03 00 REVISION: 0 PAGE DATE: ll/30~84 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN REVIEW AND APPROVAL RECORD OF CHANGES AND REVISIONS PAGE REVISION PAGE'REVISION PAGE REVISION co~<Approve PV816.08A (8 84)Signature Date Effective Date: 11 30 84 Form 1N001.02A Rev.0 t/g K>,f jg'(J~C~tl g C C h Arizona Nuclear Power Project PROC NO: 7N409.03.00 VISION: 0 PAGE 1 OF 3 DATE: 11/03/84 TITLE: EMERGENCY PLAN REVIEW AND APPROVAL 1.0 PURPOSE AND SCOPE This Procedure establishes guidelines for providing technical and administrative review, update and approval of the PVNGS Emergency Plan.2.0 DEFINITIONS AND ABBREVIATIONS 2.1 ANS-American National Standards 2.2 EPRI-Electric Power Research Institute 2.3 FEMA-Federal Emergency Management Agency 2.4 INPO-Institute of Nuclear Power Operations 2.5 NRC-Nuclear Regulatory Commission
{{#Wiki_filter:8505290095 850523 PDR   ADQCK 05000528 F                   PDR Q PROC NO:   7N409 ~ 03 00 REVISION:   0 PAGE DATE:   ll/30~84 Arizona Nuclear Power Project TITLE:     EMERGENCY PLAN REVIEW AND APPROVAL RECORD OF CHANGES AND REVISIONS PAGE             REVISION       PAGE         'REVISION     PAGE             REVISION co~<
Approve                                                     Effective Date:
11 30 84 Signature                      Date PV816.08A (8 84)
Form 1N001.02A Rev. 0


==3.0 RESPONSIBILITIES==
t/
The Manager, Emergency Planning and Preparedness Department (EP&P)is responsible for coordinating the review and approval of the PVNGS Emergency Plan and submittal to NRC for approval.4.0 PROCEDURE 4.1 The review and any revisions shall consider the following:
                      ~
NOTE The PVNGS Emergency Plan shall be reviewed at least annually.4.1.1 4.1.2 Deficiencies in procedures, personne1 or equipment discovered during drills and exercises.
tl g g K  >,f jg'(J ~C C
Changes in personnel assignments within Emergency Plan organization.
C h


====4.1.3 Changes====
PROC NO:  7N409.03.00 VISION:    0 PAGE  1 OF 3 DATE:  11/03/84 Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN REVIEW AND APPROVAL 1.0      PURPOSE AND SCOPE This  Procedure    establishes    guidelines    for providing technical and administrative review, update      and approval    of the PVNGS Emergency Plan.
in state and federal regulations or policies.4.1.4 Recommendations from INPO, EPRI, ANS or consultants.
2.0      DEFINITIONS AND ABBREVIATIONS 2.1    ANS    American    National Standards 2.2    EPRI      Electric  Power Research  Institute 2.3    FEMA      Federal Emergency Management Agency 2.4    INPO      Institute of  Nuclear Power Operations 2.5    NRC    Nuclear Regulatory Commission 3.0      RESPONSIBILITIES The Manager,    Emergency    Planning and Preparedness Department (EP&P) is responsible  for    coordinating the review and approval of the PVNGS Emergency Plan and    submittal to  NRC  for approval.
4.0      PROCEDURE 4.1    The  review and any revisions shall consider the following:
NOTE      The  PVNGS  Emergency    Plan  shall    be  reviewed    at  least annually.
4.1.1    Deficiencies    in    procedures,    personne1    or    equipment discovered during    drills  and exercises.
4.1.2    Changes    in personnel    assignments    within  Emergency  Plan organization.
4.1.3     Changes in state   and federal regulations or policies.
4.1.4     Recommendations   from INPO, EPRI,   ANS   or consultants.
4.1.5    Changes  to. facilities,  area or status.
PV21648A (8 8i) 0012D/0033D


====4.1.5 Changes====
PROC NO:   7N409.03.00 REVISION:     0 PAGE 2 OF 3 DATE:   11/03/84 Arizona Nuclear Power Project TITLE:       EMERGENCY PLAN REVIEW AND APPROVAL 4.1.6     Results of appraisals or audits from           NRC, INPO, FEMA     or APS independent audit teams.
to.facilities, area or status.PV21648A (8 8i)0012D/0033D Arizona Nuclear Power Project PROC NO: 7N409.03.00 REVISION: 0 PAGE 2 OF 3 DATE: 11/03/84 TITLE: EMERGENCY PLAN REVIEW AND APPROVAL 4.1.6 Results of appraisals or audits from NRC, INPO, FEMA or APS independent audit teams.4.2 The EP&P staff will coordinate any changes to the implementing procedures from Section 4.1 above.4.3 The Manager, EP&P shall review and distribute to appropriate organizations.
4.2   The EP&P     staff will coordinate         any   changes   to the implementing procedures   from Section 4.1 above.
4.4 The Emergency Plan Revisions are distributed to the following organizations for review and comment: Emergency Planning and Preparedness Department Director, Nuclear Operations Manager, PVNGS Radiation Protection and Chemistry Manager, Administrative Services Manager, Maintenance Manager, Administrative Services PVNGS Compliance Licensing Department APS Public Information Office ANPP Construction APS Corporate Health Physics Arizona Division of Emergency Services Arizona Radiation Regulatory Agency Maricopa County Department of Civil Defense and Emergency Services 4.5 All comments shall be addressed to the Emergency Planning and Preparedness Department for resolution and disposition.
4.3   The   Manager,     EP&P shall review       and   distribute to appropriate organizations.
4.6 The completed draft shall be reviewed and approved by the Manager, EP&P and submitted to the PRB review and approval cycle in accordance with Reference 5.1.1.4.7 Upon approval by PRB, the Emergency Plan shall be sent to the Assistant Vice President, Nuclear Production; the Vice President, Nuclear Production; and the Executive Vice President, ANPP for concurrence.
4.4   The   Emergency Plan Revisions are distributed                 to the   following organizations for review and comment:
4.8 The Licensing'Department shall be responsible for submitting the approved Emergency Plan to the NRC for their approval.P>21648A (8')
Emergency Planning and Preparedness         Department Director, Nuclear Operations Manager, PVNGS Radiation Protection         and Chemistry Manager, Administrative Services Manager, Maintenance Manager, Administrative Services PVNGS Compliance Licensing Department APS Public Information Office ANPP Construction APS Corporate Health Physics Arizona Division of Emergency Services Arizona Radiation Regulatory Agency Maricopa     County   Department     of Civil Defense         and   Emergency Services 4.5   All   comments   shall   be   addressed   to the Emergency       Planning   and Preparedness     Department   for resolution     and disposition.
Arizona Nuclear Power Project PROC NO: 7N409.03.00 REVISION:'
4.6   The completed draft     shall   be reviewed and approved by the Manager, EP&P and     submitted   to   the   PRB review and       approval cycle in accordance with Reference 5.1.1.
PAGE 3 OF 3 DATE: 11/03/84 TITLE: EMERGENCY PLAN REVIEW AND APPROVAL
4.7   Upon   approval by     PRB,   the Emergency Plan shall be sent to the Assistant Vice President,         Nuclear Production; the Vice President, Nuclear Production;       and the Executive Vice President,             ANPP for concurrence.
4.8   The   Licensing 'Department shall be responsible for submitting the approved Emergency Plan to the NRC for their approval.
P>21648A (8')


==5.0 REFERENCES==
PROC NO: 7N409.03.00 REVISION:'
PAGE 3 OF 3 DATE:  11/03/84 Arizona Nuclear Power Project TITLE:          EMERGENCY PLAN REVIEW AND APPROVAL
: 5. 0       REFERENCES 5.1    Im lementin  References 5.1.1  PVNGS  Station Manual Procedure  70AC-OZZ06,  Plant  Review Board 5.2. Develo mental References 5.2.1  PVNGS  Emergency Plan, Revision 3 5.2.2  EPIP Reference    Document Control 5.2.3  Unit One Interim Technical Specifications,    Administrative Controls 6.5.1.6                I
'0 h
5.2.4  PVNGS  Final Safety Analysis Report,.13.3 6 '        FORMS AND ATTACHMENTS None.
PV2}6 08A i8 84)


5.1 Im lementin References
Pp ~
* j Ig
      ,'l          I "id
        ~
    ,fj&/\
P 0
h I
p
                  ~


====5.1.1 PVNGS====
PROC NO:  7N409. 04. 00 REVISION:    0 PAGE    OF DATE:  11/12/84 Arizona Nuclear Power Project TITLE:    EMERGENCY PLAN CHANGE NOTICE RECORD OF CHANGES AND REVISIONS PAGE            REVISION    PAGE          RE VIS ION ~    PAGE              REVISION
Station Manual Procedure 70AC-OZZ06, Plant Review Board 5.2.Develo mental References
                                                                ~ i Effective Date:
P~        11/30/84 Signature                      Date PV216 08A (8.84)
Form 1N001. 02A Rev. 0


====5.2.1 PVNGS====
    'l I
Emergency Plan, Revision 3 5.2.2 EPIP Reference Document Control'0 5.2.3 5.2.4 Unit One Interim Technical Specifications, Administrative Controls 6.5.1.6 I h PVNGS Final Safety Analysis Report,.13.3 6'FORMS AND ATTACHMENTS None.PV2}6 08A i8 84)
  ~j
Pp~*j Ig ,'l~P ,"id h" fj&/\I 0 p I~-
Arizona Nuclear Power Project PROC NO: 7N409.04.00 REVISION: 0 PAGE OF DATE: 11/12/84 TITLE: EMERGENCY PLAN CHANGE NOTICE RECORD OF CHANGES AND REVISIONS PAGE REVISION PAGE RE VIS ION~PAGE REVISION~i PV216 08A (8.84)Signature Effective Date:-P~11/30/84 Date Form 1N001.02A Rev.0
'l I~j Arizona Nuclear Power Project PROC NO: 7N409.04.00 REVISION: 0 PAGE 1 OF 3 DATE: ll/12/84 TITLE: EMERGENCY PLAN CHANGE NOTICE l.0 PURPOSE AND SCOPE This Procedure provides for inclusion of significant changes into the Palo Verde Nuclear Generating Station Emergency Plan concurrent with the established review and approval procedure for the annual update of the PVNGS Emergency Plan.2.0 DEFINITIONS AND ABBREVIATIONS 2.1 ANS-American National Standards 2.2 EPRI-Electric Power Research Institute 2.3 FEMH-Federal Emergency Management Agency 2.4 INPO-Institute of Nuclear Power Operations 2.5 NRC-Nuclear Regulatory Commission


==3.0 RESPONSIBILITIES==
PROC NO:  7N409. 04. 00 REVISION:    0 PAGE 1 OF 3 DATE:  ll/12/84 Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN CHANGE NOTICE
The Manager, Emergency Planning and Preparedness Department (E?&?)is responsible for coordinating the review and approval of the PViNGS Emergency Plan and submittal to the Nuclear Regulatory Commission for approval.4.0 PROCEDURE 4.1 The significant changes will be prepared in a written report entitled"PVNGS Emergency Plan Interim Change Notice" (see Appendix A)by the EP&P staff, and will be presented directly to the Manager, EP&P for review and approval.Changes will be shown by numbered review bars on necessary copies of text accompanying the Interim Change Notice.4.2 The PViNGS Emergency Plan Interim Change Notice shall be sent to the Plant Review Board to review and approve the changes in accordance with Reference 5.1.1.PV 216.08A (8.84l0011D/0020D Arizona Nuclear Power Project PROC NO: 7N409.04.0 REVIS ION: 0 PAGE 2 OF 3 DATE: 11/12/84 TITLE: EMERGENCY PLAN CHANGE NOTICE 4.3 Upon the Plant Review Board approval, the Emergency Plan Change Notice will be returned to the EP&P Department, from which one copy will be transmitted to licensing for review and'another copy is forwarded in sequence to the following for confirmation:
: l. 0       PURPOSE AND SCOPE This Procedure provides for inclusion of significant changes into the Palo Verde Nuclear Generating Station Emergency Plan concurrent with the established review and approval procedure for the annual update of the PVNGS Emergency Plan.
Assistant Vice President, Nuclear Vice President, Nuclear Executive Vice President, ANPP 4.4 Following signed approvals, EP&P will request the licensing department to forward the change (with review bars)to the Nuclear Regulatory Commission.
2.0 DEFINITIONS          AND ABBREVIATIONS 2.1    ANS      American  National Standards 2.2    EPRI      Electric Power Research  Institute 2.3    FEMH      Federal Emergency Management Agency 2.4    INPO      Institute of  Nuclear Power Operations 2.5    NRC    Nuclear Regulatory Commission
4.5 The fully approved Emergency Plan Change Notice is returned to the Emergency Planning and Preparedness Department for incorporation into the working control copy as an approved change and for submission to Drawing and Document Control (DDC)for dissemination to control copy holders.NOTE: The working control copy is submitted, as a minimum, annually for update in accordance with established Emergency Plan review and approval procedure.
: 3. 0      RESPONSIBILITIES The Manager,     Emergency Planning and Preparedness   Department   (E?&?)   is responsible     for coordinating the review       and   approval of the PViNGS Emergency Plan and submittal to the Nuclear Regulatory Commission for approval.
: 4. 0       PROCEDURE 4.1     The   significant changes will be prepared in a written report entitled "PVNGS Emergency Plan Interim Change Notice" (see Appendix A) by the EP&P staff, and will be presented               directly to the Manager, EP&P for review and approval.         Changes will be shown by numbered review bars on necessary copies of text accompanying the Interim   Change Notice.
4.2   The PViNGS Emergency Plan Interim Change Notice shall be sent to the Plant Review Board to review and approve the changes in accordance with Reference 5.1.1.
PV 216.08A (8.84 l 0011D/0020D


==5.0 REFERENCES==
PROC NO: 7N409. 04. 0 REVIS ION: 0 PAGE 2 OF 3 DATE:    11/12/84 Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN CHANGE NOTICE 4.3    Upon the Plant Review Board approval, the Emergency Plan Change Notice will be returned to the EP&P Department, from which one copy will be transmitted to licensing for review and 'another copy is forwarded in sequence to the following for confirmation:
Assistant Vice President, Nuclear Vice President,  Nuclear Executive Vice President,      ANPP 4.4    Following    signed approvals,      EP&P  will request the licensing department  to forward the change (with review bars) to the Nuclear Regulatory Commission.
4.5   The fully approved Emergency Plan Change Notice is returned to the Emergency Planning and Preparedness        Department for incorporation into the working control copy as an approved change and for submission to Drawing and Document Control (DDC) for dissemination to control copy holders.
NOTE:    The  working    control copy is submitted,        as  a  minimum, annually    for    update    in  accordance  with    established Emergency Plan review and approval procedure.


5.1 Im lementi References
==5.0      REFERENCES==


====5.1.1 PVNGS====
5.1    Im lementi    References 5.1.1   PVNGS   Station Manual Procedure       70AC-OZZ06,   Plant   Review Board 5.2     Develo mental References 5.2.1    PVNGS  Emergency  Plan,'evision    3 5.2.2    Unit One Interim Technical Specifications,          Administrative Controls 6.5.1.6.
Station Manual Procedure 70AC-OZZ06, Plant Review Board 5.2 Develo mental References
6.0      FORMS AND ATTACHMENTS 6.1    Appendix A,    PVNGS Emergency Plan    Interim  Change Notice PV216.08A I8 841


====5.2.1 PVNGS====
PROC NO:  7N409. 04. 00 REVISION:  0 PAGE 3 OF 3 DATE:  11/12/84 Arizona Nuclear Power Project TITLE:    EMERGENCY PLAN CHANGE NOTICE APPENDIX A PVNGS EMERGENCY PLAN INTERIM CHANGE NOTICE DATE PAGE 1 OF E-PLAN EEV. NO.
Emergency Plan,'evision 3 5.2.2 Unit One Interim Technical Specifications, Administrative Controls 6.5.1.6.6.0 FORMS AND ATTACHMENTS
AFFECTED SECTION:
CHANGE REQUIRED:
'       REASON FOR CHANGE:
SOURCE DOCFiKNTS    IDENTIFYING C>MV":
SUBMITTED BY                                                  DATE:
EP&P STAFF REVIEN                                              DATE:
MANAGER EP&P APPROVAL                                          DATE:
PRB APPROVAL                                                  DATE:
ASST. V. P. NUCLEAR PROD. APPROVAL                            DATE:
VICE PRES. NUCLEAR PROD. CONCURRENCE                          DATE:
EXEC. V. P. ANPP APPROVAL                                      DATE:
SUBMITTED TO NRC BY:
DATE'ATE:
NRC APPROVAL PV216.08A I B.SA)


===6.1 Appendix===
t P
A, PVNGS Emergency Plan Interim Change Notice PV216.08A I8 841 Arizona Nuclear Power Project PROC NO: 7N409.04.00 REVISION: 0 PAGE 3 OF 3 DATE: 11/12/84 TITLE: EMERGENCY PLAN CHANGE NOTICE APPENDIX A PVNGS EMERGENCY PLAN INTERIM CHANGE NOTICE AFFECTED SECTION: CHANGE REQUIRED: DATE PAGE 1 OF E-PLAN EEV.NO.'REASON FOR CHANGE: SOURCE DOCFiKNTS IDENTIFYING C>MV": SUBMITTED BY EP&P STAFF REVIEN MANAGER EP&P APPROVAL PRB APPROVAL ASST.V.P.NUCLEAR PROD.APPROVAL VICE PRES.NUCLEAR PROD.CONCURRENCE EXEC.V.P.ANPP APPROVAL DATE: DATE: DATE: DATE: DATE: DATE: DATE: SUBMITTED TO NRC BY: NRC APPROVAL DATE'ATE: PV216.08A I B.SA) t P~fc C Arizona Nuclear Power Project PROC NO: 7N409~07'0 REVISION:, 0 PAGE OF DATE: 01/16/85 TITLE: EMERGENCY PLAN IMPLEMENTING PROCEDURES, REVIEW AND APPROVAL RECORD OF CHANGES AND REVISIONS PAGE REVISION REASON FOR REVISION+SSg/n c o Approved By: Signature Date Effective Date: 2/22/85 PVNGS Plant Manager's Signature (if required)Date PV21648A (844)PRB Review (if required Date Form 1N001.02A Rev.1 0 t',)+~~E A a J'J Arizona Nuclear Power Project PROC NO: 7N409.07.00 REVISION: 0 PAGE 1 OF 4 DATE: 01/16/85 TXTLE: EMERGENCY PLAN XMPLEMENTXNG PROCEDURES, REVIEW AND APPROVAL 1.0 PURPOSE AND SCOPE To establish guidelines for providing technical and administrative review, update and approval of Emergency Plan Implementing Procedures (EPIPs).2'.DEFINITIONS 2.1 ANSI-American National Standards Institute 2.2 DDC-Drawing and Document Control 2.3 EPIP-Emergency Plan Implementing Procedure 2.4 EPRI-Electric Power Research Institute 2.5 INPO-Institute of Nuclear Power Operations 2.6 NRC-Nuclear Regulatory Commission 2.7 PCN-Procedure Change Notice 2.8 PRB-Plant Review Board 3.0 RESPONSIBILITIES 3.1 The Supervisor, Site Emergency Planning shall be responsible for updating or.revising the Emergency Plan Implementing Procedures (EPIPs)as a result of audits or deficiencies identified by emer-gency drills or exercises.
~fc
3.2 DDC shall be responsible for-notifying the department head when an EPIP review is required.3.3 The Manager, Emergency Planning and Preparedness shall be 3.4 The PRB shall be responsible for reviewing and recommending approval of EPIPs to the PVNGS Plant Manager.PV21648A (8%i)3.5 The Manager, Licensing shall be responsible for submitting all new or revised EPXPs to the NRC Regional Office and the Document Control Desk.0192D/0034D Arizona Nuclear Power Project PROC NO: 7N409.07.0 REVISION: 0 PAGE 2 OF 4 DATE: 01/16/85 TITLE: EMERGENCY PLAN IMPLEMENTING PROCEDURES, REVIEW AND APPROVAL.4.0 PROCEDURE 4.1 The review and any subsequent revisions should consider the follow-ing items: 4.1.1 Deficiencies in training, procedures, personnel or equip-ment which may have been discovered during drills/exercises.


====4.1.2 Changes====
C PROC NO:  7N409 ~ 07 '0 REVISION:, 0 PAGE    OF DATE:  01/16/85 Arizona Nuclear Power Project TITLE:    EMERGENCY PLAN IMPLEMENTING PROCEDURES,  REVIEW AND APPROVAL RECORD OF CHANGES AND REVISIONS PAGE              REVISION                    REASON FOR REVISION
in personnel assignments within the Emergency organization.
                                                          +SSg/n        c  o Approved By:                                                  Effective Date:
2/22/85 Signature                      Date PVNGS  Plant Manager's Signature          Date (if required)
PRB  Review (if required                Date PV21648A (844)
Form 1N001.02A Rev. 1


====4.1.3 Changes====
0 t',)
in functions, assignments or response capabilities of supporting agencies.4.1.4 Changes in applicable federal or state statutes, regula-tions or policies.4.1.5 Recommended modifications to procedures or equipment from other agencies such as INPO, EPRI or ANSI.4.1.6 Modifications to the plant or site area.4.1.7 Changes in construction or operation status.4.1.8 Results of Emergen'cy Preparedness appraisals/reviews by the NRC, INPO, Emergency Planning or an independent review organization.
+ ~
A a  J'
    ~ E J


===4.2 Attachment===
PROC NO:  7N409.07.00 REVISION: 0 PAGE 1 OF 4 DATE:  01/16/85 Arizona Nuclear Power Project TXTLE:      EMERGENCY PLAN XMPLEMENTXNG PROCEDURES,      REVIEW AND APPROVAL 1.0      PURPOSE AND SCOPE To  establish  guidelines  for providing technical        and  administrative review, update    and approval    of  Emergency    Plan Implementing Procedures (EPIPs).
1 shall be used to document this revision and shall be signed by the approving authority of the original procedure.
2'    . DEFINITIONS 2.1    ANSI  American  National Standards Institute 2.2    DDC    Drawing and Document    Control 2.3    EPIP  Emergency Plan Implementing Procedure 2.4    EPRI  Electric Power Research      Institute 2.5    INPO  Institute  of Nuclear    Power Operations 2.6    NRC    Nuclear  Regulatory Commission 2.7    PCN    Procedure  Change  Notice 2.8    PRB    Plant Review Board 3.0      RESPONSIBILITIES 3.1    The Supervisor, Site Emergency Planning shall be responsible for updating or .revising the Emergency Plan Implementing Procedures (EPIPs) as a result of audits or deficiencies        identified  by emer-gency drills or exercises.
4.3 DDC shall notify the Manager, Emergency Planning and Preparedness when a review is required.4.4 Deficiencies found during the review process shall be corrected by either revising the procedure or issuing a PCN per Reference 5.1.1.4.5 Quarterly, the Supervisor, Site Emergency Planning shall initiate a verification of telephone numbers listed in the EPIPs.4.5.1 Verification may be conducted in conjunction with Emergency Planning drills or exercises.
3.2      DDC shall be responsible      for -notifying the department      head when an EPIP review is required.
3.3      The  Manager,  Emergency    Planning    and  Preparedness    shall  be 3.4      The PRB shall be responsible          for reviewing and      recommending approval of EPIPs to the PVNGS Plant Manager.
3.5      The Manager, Licensing    shall  be  responsible for submitting all new or revised EPXPs to      the  NRC  Regional Office and the Document Control Desk.
PV21648A (8%i) 0192D/0034D
 
PROC NO:  7N409.07.0 REVISION:    0 PAGE 2 OF 4 Arizona Nuclear Power Project                                                DATE:    01/16/85 TITLE:      EMERGENCY PLAN IMPLEMENTING PROCEDURES,      REVIEW AND APPROVAL.
4  .0    PROCEDURE 4.1    The review and any subsequent    revisions should consider the follow-ing items:
4.1.1    Deficiencies in training, procedures,        personnel  or equip-ment which may have been discovered during      drills/exercises.
4.1.2    Changes    in  personnel    assignments    within the      Emergency organization.
4.1.3    Changes in functions, assignments        or response  capabilities of supporting agencies.
4.1.4    Changes in applicable federal or state statutes,            regula-tions or policies.
4.1.5    Recommended  modifications to procedures or equipment from other agencies such as INPO, EPRI or ANSI.
4.1.6    Modifications to the plant or site area.
4.1.7    Changes  in construction or operation status.
4.1.8    Results of Emergen'cy Preparedness appraisals/reviews        by the NRC,  INPO, Emergency Planning or an independent              review organization.
4.2   Attachment 1 shall be used to document         this revision and shall     be signed by the approving authority of the       original procedure.
4.3   DDC shall notify the   Manager,   Emergency   Planning and Preparedness when a review   is required.
4.4   Deficiencies found during the review process shall be corrected by either revising the procedure or issuing a PCN per Reference 5.1.1.
4.5   Quarterly, the Supervisor, Site Emergency Planning shall         initiate   a verification of telephone   numbers listed in   the EPIPs.
4.5.1   Verification   may be conducted   in conjunction with   Emergency Planning   drills or exercises.
PV21648A (844}
PV21648A (844}
Arizona Nuclear Power Project PROC NO: 7N409.07.00 REVISION: 0 PAGE 3 OF'DATE: 01/16/85 TITLE: EMERGENCY PLAN IMPLEMENTING PROCEDURES, REVIEW AND APPROVAL 4.5.2 To verify, dial the, listed number'and receive concurrence from the answering party that the number dialed is the current number for the location listed in the EPIPs.4.5.3 If any numbers require correcting, a PCN or procedure revision to affected procedures shall be initiated within 5 working days.4.6 Revisions or PCNs to the EPIPs shall be forwarded to the Manager, Emergency Planning and Preparedness for approval to insure that thereis no conflict with Licensing commitments, the PVNGS Emergency Plan or so that changes may be incorporated into the Emergency Plan, and review of EPIPs for consistency with overall PVNGS Emergency Planning goals and objectives.
4.7 The PRB shall review and recommend approval of EPIPs per Reference 5.1.2.4.8 Within 30 days after approval of a new or revised EPIP, Licensing shall submit one copy of the Procedure to the Administrator of the NRC Regional Office and two copies to the Document Control Desk.


==5.0 REFERENCES==
PROC NO:  7N409.07.00 REVISION:    0 PAGE 3 OF' Arizona Nuclear Power Project                                                DATE:    01/16/85 TITLE:    EMERGENCY PLAN IMPLEMENTING PROCEDURES,          REVIEW AND APPROVAL 4.5.2    To  verify, dial the, listed number 'and receive concurrence from the answering      party that the number dialed is the current number for the location listed in the EPIPs.
4.5.3    If  any numbers require correcting,          a  PCN  or procedure revision to affected procedures shall        be  initiated within    5 working days.
4.6    Revisions or PCNs to the EPIPs shall be forwarded to the Manager, Emergency Planning and Preparedness            for approval to insure that there  is no conflict with Licensing commitments, the PVNGS Emergency Plan or so that changes may be incorporated into the Emergency Plan, and review of EPIPs for consistency with overall PVNGS Emergency Planning goals and objectives.
4.7    The PRB  shall review    and recommend    approval of EPIPs per Reference 5.1.2.
4.8  Within  30 days after approval of a new or revised EPIP, Licensing shall submit    one copy of the Procedure to the Administrator of the NRC Regional Office and two copies to the Document Control Desk.


5.1 Im lementin References 5.1.1 70AC-OZZ02,"Review and Approval of Station Procedures" 5.1.2 70AC-OZZ06,"Plant Review Board" 5.2 Develo mental References
==5.0    REFERENCES==


====5.2.1 PVNGS====
5.1  Im lementin      References 5.1.1    70AC-OZZ02, "Review and Approval        of Station Procedures" 5.1.2    70AC-OZZ06,    "Plant Review Board" 5.2  Develo mental References 5.2.1     PVNGS   Emergency Plan, Rev. 5 5.2.2     PVNGS   Unit One   Technical     Specifications,   Section   6.5.2.7 and   6.8.1 6.0   FORMS AND ATTACHMENTS HW'
Emergency Plan, Rev.5 5.2.2 PVNGS Unit One Technical Specifications, Section 6.5.2.7 and 6.8.1 6.0 FORMS AND ATTACHMENTS HW'.1 Procedure Pe riodic Review Control Form , Attachment 1 PV216O8A ISM)
              .1   Procedure   Pe riodic Review Control Form , Attachment 1 PV216O8A ISM)
Arizona Nuclear Power Project PROC NO: 7N409.07.00 REVISION: 0 PAGE 4 OF 4 DATE: 01/16/85 TITLE: EMERGENCY PLAN IMPLEMENTING PROCEDURES, REVIEW AND APPROVAL ATTACHMENT 1 PROCEDURE PERIODIC REVIEW CONTROL FORM Procedure No.Procedure Title Due Date Revision No.Change RequiredP Yes No Comments: Reviewed by Date procedure Revision Initiated to incorporate comments, if required.Signature Date Procedure Rev.No.Approved: PV21648A (8M)Date I~I Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS PROC NO: 7N409.08.00 REVISION: 1 PAGE OF DATE: 01/23/86 RECORD OF CHANGES AND REVISIONS PAGE REVISION PAGE REVISION PAGE REVISION NPRM COIIITIM IL&#xc3;Approved By: Signatu ate Effective Date: 2/28/86 PV21848A (8.84)Form 1N001.02A Rev.0 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ROC NO: 7N409.08.00 ISION: 1 AGE 1 OF 20 ATE: 01/23/86 1.0 PURPOSE AND SCOPE 1.1 To establish guidelines for developing, conducting, evaluating and documenting emergency preparedness drills.1.2 To provide guidance to test emergency response personnel, equipment, communications, plans, and procedures as an extension'of classroom training.1.3 To provide guidance to verify the adequacy of the PVNGS Emergency Plan and Implementing Procedures and the overall effectiveness of emergency preparedness at PVNGS.2.0 DEFINITIONS AND ABBREVIATIONS


===2.1 Definitions===
PROC NO:  7N409.07.00 REVISION:  0 PAGE 4 OF 4 DATE:  01/16/85 Arizona Nuclear Power Project TITLE:  EMERGENCY PLAN IMPLEMENTING PROCEDURES,  REVIEW AND APPROVAL ATTACHMENT 1 PROCEDURE PERIODIC REVIEW CONTROL FORM Procedure No.
Procedure  Title Due Date Revision No.
Change RequiredP    Yes      No Comments:
Reviewed by                                              Date procedure Revision  Initiated to incorporate comments,  if required.
Signature                      Date        Procedure Rev. No.
Approved:                                                Date PV21648A (8M)


====2.1.1 Controller====
I ~
-Individual assigned to direct the.drill and provide messages, data and instructions.
I
Controllers also serve as evaluators during the drill.2.1.2 2.1.3 Drill-A supervised instruction period aimed at testing, developing and maintaining skills in a particular operation(s).
 
Emergency Planning Action Item List-A listing of open items related to the drill requiring corrective action.2.2 Abbreviations 2.2.1 ADES-Arizona Division of Emergency Services 2.2.2 ALARA-As Low As Reasonably Achievable 2.2.3 ARRA-Arizona Radiation Regulatory Agency 2.2.4 CEC-Corporate Emergency Center PV 216-08 A (8-84)0124D/0031D Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS PROC NO: 7N409.08.00 REVISION: 1 PAGE 2 OF 20 DATE: 01/23/86 2;2.5 CEO-Chief Executive Officer 2.2.6 CHIC-Corporate Headquarters Information Center 2.2.7 DPS-Arizona Department of Public Safety 2.2.8 EC-Emergency'Coordinator 2.2.9 2.2.10 ENS-Emergency Notification System EOC-Emergency Operations Center 2.2.11 EOD-Emergency Operations Director 2.2.12 EOF-Emergency Operations Facility 2.2.13 EPIP-Emergency Plan Implementing Procedure 2.2.14 EPZ-Emergency Planning Zone 2.2.15 JENC-Joint Emergency News Center 2.2.16 MCDCDES-Maricopa County Department o f Civil Defense and Emergency Services 2.2.17 MCSO-Maricopa County Sheriff's Office 2.2.18 NAN-Notification Alert Network 2.2.19 NRC-Nuclear Regulatory Commission 2.2.20 2.2.21 2.2.22 OSC-Operations Support Center STSC-Satellite Technical Support Center e>TSC-Technical Support Center PV21648A (8-84)
PROC NO:  7N409. 08. 00 REVISION:    1 PAGE    OF DATE:  01/23/86 Arizona Nuclear Power Project TITLE:    EMERGENCY PREPAREDNESS DRILLS RECORD OF CHANGES AND REVISIONS PAGE              REVISION    PAGE          REVISION      PAGE              REVISION NPRM COIIITIM IL &#xc3; Approved By:                                                Effective Date:
Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS PROC NO: 7N409.08.00 REVISION: 1 PAGE 3 OF 20 DATE: 01/23/86 3.0 RESPONSIBILITIES 3.1 The Manager, Emergency Planning shall have overall responsibility for the development, approval, conduct, evaluation and documentation of drills.3.2 The Onsite and Offsite Emergency Planning Supervisors shall assign deficiencies as action items on the Emergency Planning Action Item List and task them to the affected departments or personnel.
2/28/86 Signatu                      ate PV21848A (8.84)                                                          Form 1N001.02A Rev. 0
3.3 The Onsite and Offsite Emergency Planning Supervisors shall be reponsible for ensuring appropriate corrective actions are taken to resolve deficiencies identified during drills.3.4 The PVNGS Plant Manager shall review and approve Drill Obgectives, date, time, location, and participating organizations for onsite drills.4.0 PROCEDURE NOTE: Drills shall be conducted on a periodic basis as outlined in Attachment l.4.1 Onsite and Offsite Drills 4'.l.l The Onsite and/or Offsite Emergency Planning Supervisor shall coordinate the planning and scheduling of each drill.The Manager, Emergency Planning shall approve the drill schedule.4.1.2 4.1.3 Drills shall'e developed, scheduled and conducted in such a manner to meet the requirements of 10CFR50, Appendix E, guidance of NUREG654, Rev.1 and other appropriate regulatory guidance.Drills shall be scheduled and conducted so as to minimize conflicts with normal plant operations.
 
ROC NO:  7N409.08.00 ISION:  1 AGE 1 OF 20 ATE:  01/23/86 Arizona Nuclear Power Project TITLE:          EMERGENCY PREPAREDNESS    DRILLS 1.0        PURPOSE AND SCOPE 1.1    To  establish guidelines for developing, conducting, evaluating and documenting emergency preparedness      drills.
1.2    To    provide    guidance    to test emergency response personnel, equipment,    communications,  plans, and procedures as an extension 'of classroom training.
1.3    To  provide guidance to verify the adequacy of the PVNGS Emergency Plan and Implementing Procedures and the overall effectiveness of emergency preparedness at PVNGS.
2.0        DEFINITIONS AND ABBREVIATIONS 2.1    Definitions 2.1.1    Controller     Individual assigned to direct the     . drill and provide messages, data and instructions.         Controllers also serve as evaluators during the drill.
2.1.2   Drill A   supervised instruction period aimed at testing, developing     and   maintaining skills in a particular operation(s).
2.1.3    Emergency   Planning Action Item List A listing of open items related to the drill requiring corrective action.
2.2   Abbreviations 2.2.1   ADES     Arizona   Division of Emergency Services 2.2.2   ALARA As Low As Reasonably     Achievable 2.2.3   ARRA     Arizona   Radiation Regulatory Agency 2.2.4   CEC     Corporate Emergency Center PV 216-08 A (8-84) 0124D/0031D
 
PROC NO: 7N409.08.00 REVISION: 1 PAGE 2 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE:    EMERGENCY PREPAREDNESS  DRILLS 2;2.5   CEO   Chief Executive Officer 2.2.6   CHIC   Corporate Headquarters     Information Center 2.2.7   DPS   Arizona Department   of Public Safety 2.2.8   EC     Emergency 'Coordinator 2.2.9   ENS    Emergency  Notification  System 2.2.10   EOC   Emergency Operations   Center 2.2.11   EOD   Emergency   Operations Director 2.2.12   EOF   Emergency   Operations Facility 2.2.13   EPIP   Emergency Plan Implementing Procedure 2.2.14   EPZ   Emergency Planning Zone 2.2.15   JENC   Joint Emergency News Center 2.2.16   MCDCDES   Maricopa County Department     o f Civil Defense and Emergency Services 2.2.17   MCSO   Maricopa County   Sheriff 's Office 2.2.18 NAN     Notification   Alert Network 2.2.19 NRC     Nuclear Regulatory Commission 2.2.20   OSC    Operations Support Center 2.2.21   STSC   Satellite   Technical Support Center e>
2.2.22  TSC   Technical Support Center PV21648A (8-84)
 
PROC NO: 7N409.08.00 REVISION: 1 PAGE 3 OF 20 DATE:   01/23/86 Arizona Nuclear Power Project TITLE:      EMERGENCY PREPAREDNESS      DRILLS
: 3. 0     RESPONSIBILITIES 3.1   The Manager,     Emergency   Planning shall have overall responsibility for     the     development,       approval,     conduct,     evaluation   and documentation of drills.
3.2   The Onsite and Offsite Emergency Planning Supervisors shall assign deficiencies as action items on the Emergency Planning Action Item List and task them to the affected departments or personnel.
3.3   The Onsite and Offsite Emergency Planning Supervisors                 shall be reponsible for ensuring appropriate corrective actions are taken to resolve deficiencies identified during drills.
3.4   The PVNGS   Plant Manager shall review and approve Drill Obgectives, date,   time, location, and participating organizations for onsite drills.
4.0       PROCEDURE NOTE: Drills shall       be   conducted   on a periodic basis     as outlined in Attachment   l.
4.1   Onsite and Offsite       Drills 4'.l. l   The   Onsite shall coordinate and/or   Offsite the Emergency Planning Supervisor planning   and scheduling of each drill. The Manager,         Emergency Planning shall approve the drill schedule.
4.1.2     Drills shall'e       developed,   scheduled and conducted   in such a manner   to meet the requirements of 10CFR50, Appendix E, guidance of NUREG654,           Rev. 1 and other appropriate regulatory guidance.
4.1.3    Drills shall     be scheduled   and conducted   so as to minimize conflicts with normal plant operations.
PV21648A (844)
PV21648A (844)
Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ROC NO-7N409.08.00 VISION: 1 AGE 4 OF 20 ATE: 01/23/86 4.1.4 Drill scenarios may be developed on a real time basis or on an accelerated schedule so that more activities are tested in a shorter time frame.4.1.5 The Onsite and/or Offsite Emergency Planning Supervisor shall submit the drill objectives, date, time, location and participating organizations using the Drill Scenario Approval Form (Attachment 2)to the Manager, Emergency Planning and the PVNGS Plant Manager (onsite drills only)for review and approval.4.1.6 The Onsite and/or Offsite Emergency Planning Supervisor shall review and approve the drill scenario and coordinate the assignment of controllers.


====4.1.7 Prior====
ROC NO-  7N409.08.00 VISION:    1 AGE 4 OF 20 ATE:  01/23/86 Arizona Nuclear Power Project TITLE:    EMERGENCY PREPAREDNESS  DRILLS 4.1.4  Drill scenarios    may be developed  on a  real time basis or    on an accelerated schedule so    that  more  activities    are tested in a shorter time frame.
to the drill, the Onsite and/or Offsite Emergency Planning Supervisor shall ensure that: 4.1.7.1 The Predrill Checklist Form (Attachment 3)is completed.
4.1.5  The  Onsite and/or Offsite Emergency Planning Supervisor shall submit the drill objectives, date, time, location and participating organizations using the Drill Scenario Approval Form (Attachment 2) to the Manager, Emergency Planning and the PVNGS Plant Manager (onsite drills only) for review and approval.
4.1.7.2 A Lead Controller is assigned for the drill.4.1.7.3 A predrill briefing is held to inform the con-trollers of the objectives of the drill, extent of play, pre-staging requirements, which portions of the scenario require strong'control and which portions of the scenario permit free play.Attachment 4, Controller Briefing Checklist, shall be completed.
4.1.6  The  Onsite  and/or  Offsite  Emergency    Planning  Supervisor shall review    and approve the  drill scenario    and coordinate the assignment of controllers.
4.1.7.4 Players are briefed concerning the objectivesp precautions and extent of play.Attachment 5, Player Briefing Checklist, shall be completed or a memo addressing these items shall be provided to the players.4.1.8 Following the drill, the Lead Controller (or Onsite or Offsite Emergency Planning Supervisor) shall meet with all controllers and conduct a critique.PV21648A (844)
4.1.7   Prior to the     drill, the Onsite and/or       Offsite   Emergency Planning Supervisor shall ensure that:
Arizona Nuclear Power Project TITLE-'MERGENCY PREPAREDNESS DRILLS ROC NO: 7N409.08 00 ISION: 1 AGE 5 OF 20 ATE: 01/23/86 4.1.9 Upon completion of the critique, the Lead Controller shall brief the Onsite and Offsite Emergency Planning Supervisors on the results of the drill.4.1.10 The Onsite and Offsite Emergency Planning Supervisors shall assign deficiencies as action items bn the Emergency Planning Action Item List, task them to the affected departments or personnel, as applicable, and submit this to the Manager, Emergency Planning for approval.4.1.11 Upon receipt of the approved Emergency Planning Action Item List, the Onsite and Offsite Emergency Planning Supervisors shall then submit to the Manager, Emergency Planning a written Drill Report which shall include the following:
4.1.7.1     The   Predrill Checklist   Form   (Attachment   3) is completed.
4.1.11.1 A cover sheet, in memo form, to identify the drill by name and number;to list sections which are included in the report, and to provide an approval signature block for the Manager, Emergency Planning to approve the report.4.1.11.2 Section 1-date, time and duration of the drill;the participating agencies by name;the purpose of the-drill;the narrative summary;and the list of assigned controllers.
4.1.7.2   A Lead   Controller is assigned for the     drill.
4.1.11.3 Section 2-comparison of the drill objectives against actual performance.
4.1.7.3   A   predrill briefing is held to inform the con-trollers of the objectives of the drill, extent of play, pre-staging requirements, which portions of the scenario require strong 'control and which portions of the scenario permit free play.
4.1.11.4 Section 3-significant findings of such a nature that, if uncorrected, would reduce the effectiveness of the emergency response program and shall be tracked on the Emergency Planning Action Item List.General observations shall be noted but not included on the'Emergency Planning Action Item List.4.1.11.5 Section 4-actual drill sequence of events (time line).4.1.11.6 Section 5-utility drill participants.
Attachment 4, Controller Briefing Checklist, shall be completed.
4.1.7.4   Players are briefed concerning the objectivesp precautions and extent of play. Attachment 5, Player Briefing Checklist, shall be completed or a memo addressing these items shall be provided to the players.
4.1.8   Following the drill, the Lead Controller (or Onsite or Offsite Emergency Planning Supervisor) shall meet with all controllers and conduct a critique.
PV21648A (844)
 
ROC NO: 7N409.08 00 ISION:   1 AGE 5 OF 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE-'MERGENCY PREPAREDNESS DRILLS 4.1.9 Upon completion of the critique, the Lead Controller shall brief the Onsite and Offsite Emergency Planning Supervisors on the results of the drill.
4.1.10 The Onsite and   Offsite   Emergency Planning Supervisors     shall assign deficiencies as action items bn the Emergency Planning Action Item List, task them to the affected departments or personnel, as applicable, and submit this to the Manager, Emergency Planning     for approval.
4.1.11 Upon receipt of the approved     Emergency Planning Action Item List, the Onsite and Offsite Emergency Planning Supervisors shall then submit to the Manager, Emergency Planning a written Drill Report which shall include the following:
4.1.11.1   A cover sheet,     in memo   form, to identify the drill by   name and number;     to list sections which are included in the report, and to provide an approval     signature   block for the Manager, Emergency Planning to approve the report.
4.1.11.2   Section 1 - date, time and duration of the drill; the participating agencies by name; the purpose of the- drill; the narrative summary; and the list of assigned controllers.
4.1.11.3   Section 2 - comparison of the         drill objectives against actual performance.
4.1.11.4   Section 3 - significant findings of     such a nature that,   if     uncorrected,     would   reduce of the emergency response program the effectiveness and shall be tracked on the Emergency Planning Action Item List. General observations shall be noted but not included on the 'Emergency Planning Action Item List.
4.1.11.5   Section 4 - actual   drill sequence   of events (time line).
4.1.11.6   Section 5 - utility drill participants.
PV216-08A (8.84)
PV216-08A (8.84)
Arizona Nuclear Power Project PROC NO: 7N409~08.00 REVISION: 1 PAGE 6 OF 20 DATE: 01/23/86 TITLE-EMERGENCY PREPAREDNESS DRILLS 4.1.12 After the Manager, Emergency Planning approves the Drill Report, a copy of the Drill Report, the completed Drill Scenario Approval Form (Attachment 2)and Predrill Checklist Form (Attachment 3)shall be submitted to Drawing and Document Control for retention.
 
4.1.13 A complete copy of the drill scenario, Drill Report, and other drill related materials shall be retained in the Emergency Planning Department files as long as deemed appropriate by the Manager, Emergency Planning.4.1.14 Copies of the Emergency Planning Action Item List for each drill shall be submitted to the Plant Manager, Asst.Vice-President, Nuclear Production and other appropriate ANPP departments.
PROC NO: 7N409 ~ 08.00 REVISION:   1 PAGE 6 OF 20 DATE:   01/23/86 Arizona Nuclear Power Project TITLE-     EMERGENCY PREPAREDNESS   DRILLS 4.1.12 After the   Manager,   Emergency   Planning approves the Drill Report,   a copy   of the   Drill   Report, the completed Drill Scenario   Approval     Form     (Attachment   2) and Predrill Checklist Form (Attachment 3) shall be submitted to Drawing and Document   Control for retention.
4.1.1S The Onsite and Offsite Emergency Planning Supervisors shall track the status of corrective actions related to deficiencies identified on the, Emergency Planning Action Item List and ensure appropriate resolution.
4.1.13 A complete   copy   of the drill scenario, Drill Report, and other   drill   related materials shall be retained in the Emergency   Planning Department files as long as             deemed appropriate by the Manager, Emergency Planning.
4.2 Fire Drills 4.2.1 Drill scenarios, predrill actions, drill critiques, reports of drill performance and corrective actions shall be administered and implemented by the PVNGS Fire Prevention Department in accordance with 83TR-OZZ07, Fire Team Training, Revision 1.4.3 Communications Drills 4.3.1 The weekly communications testing of the NAN lines to state and county response agencies shall be performed without a drill scenario or controller.
4.1.14 Copies of the   Emergency Planning Action Item List for each drill   shall   be submitted to the Plant Manager, Asst.
This shall be completed by the Operations Department using forms provided in PVNGS Station Manual, 410P-1QF02 and 420P-2QF02.
Vice-President, Nuclear Production and other appropriate ANPP departments.
4.1.1S The Onsite and     Offsite Emergency Planning Supervisors     shall track the status of corrective actions related to deficiencies identified on the, Emergency Planning Action Item List and ensure appropriate resolution.
4.2   Fire Drills 4.2.1   Drill scenarios, predrill     actions,   drill critiques,   reports of   drill   performance and corrective actions shall be administered and implemented by the PVNGS Fire Prevention Department     in accordance with 83TR-OZZ07, Fire Team Training, Revision 1.
4.3   Communications Drills 4.3.1   The weekly communications     testing of the NAN lines to state and county response     agencies   shall be performed without a drill scenario or controller. This shall be completed by the Operations     Department   using forms provided     in   PVNGS Station Manual,   410P-1QF02 and 420P-2QF02.
PV21648A (8M)
PV21648A (8M)
Arizona Nuclear Power Project TITLE-'MERGENCY'REPAREDNESS DRILLS PROC NO: 7N409.08.00 REVISION: 1 PAGE 7 OF 20 DATE: 01/23/86 4.3.2 The monthly communications testing of the ENS line from the Control Room(s), TSC and EOF to the NRC Headquarters Operations Center and of the two extension commercial phones (replacing the HPN and Federal Telephone System which are not installed at PVNGS)shall be performed without a drill scenario or controller.
This shall be completed by the Emergency Planning Department using Attachment 6.4.3.3 The quarterly communicatio~esting with the state in the ingestion exposure EPZ shall be performed without a scenario or controller.
This shall be performed by the Emergency Planning Department using Attachment 7.NOTE: 4.3.4 Pursuant to ANPP Administrative Policies and Procedures, 7N409.07.00, all phone numbers listed in the EPIPs are checked on a quarterly basis.Annual communications testing shall be performed during the annual exercise.Records shall be prepared and maintained pursuant to ANPP Policies and Procedures 7N409.09.00.


====4.3.5 Deficiencies====
PROC NO:  7N409.08.00 REVISION:  1 PAGE 7 OF  20 DATE:  01/23/86 Arizona Nuclear Power Project TITLE-'MERGENCY'REPAREDNESS DRILLS 4.3.2  The monthly communications testing of the ENS line from the Control Room(s), TSC and EOF to the NRC Headquarters Operations Center and of the two extension commercial phones (replacing the HPN and Federal Telephone System which are not installed at PVNGS) shall be performed without a    drill  scenario or controller.      This shall be completed by the Emergency Planning Department using Attachment 6.
noted during communications testing will be brought to the attention of the Manager, Emergency Planning.4.3.6 Records of communications testing described above shall be collected by the Emergency Planning Department for subsequent transmittal to Drawing and Document Control.
4.3.3  The quarterly communicatio~esting with the state in the ingestion exposure EPZ shall be performed without a scenario or controller. This shall be performed by the Emergency Planning Department using Attachment 7.
NOTE:  Pursuant to    ANPP  Administrative Policies    and  Procedures, 7N409.07.00,    all  phone  numbers listed in    the EPIPs are checked on a  quarterly basis.
4.3.4  Annual communications testing shall be performed during the annual exercise.      Records shall be prepared and maintained pursuant to ANPP Policies and Procedures 7N409.09.00.
4.3.5   Deficiencies noted during communications testing will be brought to the attention of the Manager, Emergency Planning.
4.3.6   Records of communications testing described     above shall be collected     by the     Emergency   Planning   Department   for subsequent   transmittal to Drawing and Document Control.


==5.0 REFERENCES==
==5.0       REFERENCES==


5.1 Im lementin References None 5.2 Develo mental References
5.1   Im lementin   References None 5.2   Develo mental References 5.2.1  PVNGS  Emergency Plan, Revision 6 PV216MA (8-84)


====5.2.1 PVNGS====
PROC NO: 7N409.08.00 REVISION-   1 PAGE 8 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PREPAREDNESS  DRILLS 5.2.2   NUREG&654 FEMA REP-1,       "Criteria for Preparation   and Eval-uation   of Radiological Emergency Response             Plans   and Preparedness in Support of Nuclear     Power Plants," Revision 1 5.2.3   80PR-,OZZ01, "Training Program," Revision     3 5.2.4   10CFR50,   Appendix E, "Emergency Planning and Preparedness for Production   and Utilization Facilities" 5.2.5   83TR-OZZ07,   "Fire Team Training", Revision 1.
Emergency Plan, Revision 6 PV216MA (8-84)
5.2.6   PVNGS   Station Manual, 410P-1QF02, Revision 1, "Notification Alert Network (NAN) Tests."
Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS PROC NO: 7N409.08.00 REVISION-1 PAGE 8 OF 20 DATE: 01/23/86 5.2.2 NUREG&654 FEMA REP-1,"Criteria for Preparation and Eval-uation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," Revision 1 5.2.3 80PR-,OZZ01,"Training Program," Revision 3 5.2.4 10CFR50, Appendix E,"Emergency Planning and Preparedness for Production and Utilization Facilities" 5.2.5 83TR-OZZ07,"Fire Team Training", Revision 1.5.2.6 PVNGS Station Manual, 410P-1QF02, Revision 1,"Notification Alert Network (NAN)Tests." 5.2.7 5.2.8 5.2.9 NRC IE Information Notice No.85-55,"Revised Emergency Exercise Frequency Rule." July 15, 1985.ANPP Administrative Policies and Procedures, 7N409.07.00,"Emergency Planning Implementing Proceduxes, Review and Approval." ANPP Administrative Policies and Procedures, 7N409.09.00,"Emergency Preparedness Exercise." 6'FORMS AND ATTACHMENTS
5.2.7   NRC   IE Information Notice No. 85-55, "Revised           Emergency Exercise Frequency Rule." July 15, 1985.
5.2.8  ANPP   Administrative Policies and Procedures,         7N409.07.00, "Emergency   Planning     Implementing Proceduxes,   Review and Approval."
5.2.9  ANPP   Administrative Policies and Procedures,         7N409.09.00, "Emergency Preparedness     Exercise."
6 '       FORMS AND ATTACHMENTS 6.1    Attachment 1  Drill Frequencies 6.2    Attachment  2  Drill Scenario    Approval Form 6.3    Attachment 3  Predrill Checklist Form 6.4    Attachment 4  Controller Briefing Checklist 6.5    Attachment 5  Player Briefing Checklist 6.6    Attachment  6  Monthly  Communications  Drill Record 6.7    Attachment  7  Quarterly    Communications Drill Record PV216MA (8.84)


===6.1 Attachment===
ROC NO:  7N409.08.00 ISION:    1 AGE 9 OF 20 ATE:  01/23/86 Arizona Nuclear Power Project 4 TITLE:        EMERGENCY PREPAREDNESS  DRILLS ATTACHMENT 1 DRILL FREQUENCIES
1-Drill Frequencies
: 1. 0      WEEKLY 1.1    Communications links and notification procedures with offsite state and local agencies within the plume exposure pathway (10 mile EPZ) shall be tested on a.weekly basis.
2.0      MONTHLY 2.1    Communications    links with the    NRC  shall  Qe  tested    monthly as follows:
From                      To NRC Head uarters  0 erations Center Control Room(s)          ENS TSC                        ENS and two extension commercial phones EOF                      ENS  and two extension commerical phones NOTE: The    two extension commercial phones shall be used instead of the Health Physics Network and Federal Telecommunications System lines which are not installed at PVNGS.
3.0      ~UAEYEKLY 3.1    Drills shall  be conducted  quarterly for  each shift fire  brigade  for each unit.
3.2    Communications links and notification procedures            with Federal response organizations and state organizations      within  the ingestion pathway (50 mile EPZ) shall be tested    on a  quarterly  basis.
4.0      SEMI-ANNUALLY 4.1    Health Physics drills shall be conducted send.-annually generally in conjunction with exercises or radiological monitoring drills.
Health Physics drills involve response to, and analysis of, simulated elevated radiation levels both . liquid and airborne, as well as direct radiation measurements in the environment.
PY21648A (8441


===6.2 Attachment===
ROC NO: 7N409.08 00 ISION:   1 AGE 10 OF 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE:      EMERGENCY PREPAREDNESS    DRILLS ATTACHMENT 1 (Cont'd)'RILL FREQUENCIES
2-Drill Scenario Approval Form 6.3 Attachment 3-Predrill Checklist Form 6.4 Attachment 4-Controller Briefing Checklist 6.5 Attachment 5-Player Briefing Checklist 6.6 Attachment 6-Monthly Communications Drill Record 6.7 Attachment 7-Quarterly Communications Drill Record PV216MA (8.84)
: 5. 0    ANNUALLY 5.1    Communications between PVNGS, Federal and state emergency response organizations, and field assessment teams shall be tested annually generally in conjunction with the annual exercise.
Arizona Nuclear Power Project 4 TITLE: EMERGENCY PREPAREDNESS DRILLS ROC NO: 7N409.08.00 I SION: 1 AGE 9 OF 20 ATE: 01/23/86 ATTACHMENT 1 DRILL FREQUENCIES
5.2    Medical emergency drills involving treatment of a simulated con-taminated person with provision for participation by offsite support service agencies (ambulance, helicopter or hosp1tal) shall be conducted annually.
5.3    Radiolog1cal monitoring drills for personnel assigned to inplant,
                  "'nsite  and offsite monitoring teams, involving communications, use of instruments, calculation of offs1te dose projections and the collect1on of sample    med1a  shall            be conducted  annually.
5.4    Health Physics and chemistry      drills involving                analysis of inplant liquid  samples  with actual elevated                  radiation levels, including usage  of the postaccident        sampling system shall be conducted annually.
5.5    An  emergency    exercise of the PVNGS Emergency Plan shall be conducted    annually. Offsite emergency management organizations shall  be  requested to participate in each annual exercise; however, full  participation by offsite agencies is requ1red                          b1annually pursuant to NRC IE Information Notice No. 85-55.
5.6    Addit1onal    drills  may  be  conducted              as  necessary    to maintain proficiency of response personnel.
PV21648A (844)


===1.0 WEEKLY===
PROC NO-  7N409.08.00 REVISION:    1 PAGE  11  OF 20 DATE:    01/23/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PREPAREDNESS  DRIRLS ATTACHMENT 2 DRILL SCENARIO APPROVAL FORM Prepared By:                                  Approved By:
1.1 Communications links and notification procedures with offsite state and local agencies within the plume exposure pathway (10 mile EPZ)shall be tested on a.weekly basis.2.0 MONTHLY 2.1 Communications links with the NRC shall Qe tested monthly as follows: From To NRC Head uarters 0 erations Center Control Room(s)TSC EOF ENS ENS and two extension commercial phones ENS and two extension commerical phones NOTE: The two extension commercial phones shall be used instead of the Health Physics Network and Federal Telecommunications System lines which are not installed at PVNGS.3.0~UAEYEKLY 3.1 Drills shall be conducted quarterly for each shift fire brigade for each unit.3.2 Communications links and notification procedures with Federal response organizations and state organizations within the ingestion pathway (50 mile EPZ)shall be tested on a quarterly basis.4.0 SEMI-ANNUALLY
Manager, Emergency Planning Reviewed By:                                  Approved By:
Offsite Emergency Planning Supervisor                                Plant Manager (Onsi~ills        aa.y)
Reviewed By:
Onsite Emergency Planning Supervisor
: 1.         Type  of Drill:                                  Number:
: 2.         Date and Time  of Commencement:                  Duration:
: 3.         Participating Organizations.'rill
: 4.         Objectives:
: 5.         Scope:  (simulated events, extent of play, locations)
T
: 6.         Precautions/Limitations:
PV21648A (8-84)


===4.1 Health===
)
Physics drills shall be conducted send.-annually generally in conjunction with exercises or radiological monitoring drills.Health Physics drills involve response to, and analysis of, simulated elevated radiation levels both.liquid and airborne, as well as direct radiation measurements in the environment.
  'I 4
PY21648A (8441 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ROC NO: 7N409.08 00 ISION: 1 AGE 10 OF 20 ATE: 01/23/86 ATTACHMENT 1 (Cont'd)'RILL FREQUENCIES
C


===5.0 ANNUALLY===
PROC NO: 7N409.08.00 REVISION: 1 PAGE 12 OF 20 DATE:  01/23/86 Arizona Nuclear Power Project TITLE-'MERGENCY PREPAREDNESS DRILLS ATTACHMENT 3 PREDRILL CHECKLIST FORM DRILL TITLE:                        DRILL NUMBER:              DRILL DATE:
5.1 Communications between PVNGS, Federal and state emergency response organizations, and field assessment teams shall be tested annually generally in conjunction with the annual exercise.5.2 Medical emergency drills involving treatment of a simulated con-taminated person with provision for participation by offsite support service agencies (ambulance, helicopter or hosp1tal)shall be conducted annually.5.3 Radiolog1cal monitoring drills for personnel assigned to inplant,"'nsite and offsite monitoring teams, involving communications, use of instruments, calculation of offs1te dose projections and the collect1on of sample med1a shall be conducted annually.5.4 Health Physics and chemistry drills involving analysis of inplant liquid samples with actual elevated radiation levels, including usage of the postaccident sampling system shall be conducted annually.5.5 An emergency exercise of the PVNGS Emergency Plan shall be conducted annually.Offsite emergency management organizations shall be requested to participate in each annual exercise;however, full participation by offsite agencies is requ1red b1annually pursuant to NRC IE Information Notice No.85-55.5.6 Addit1onal drills may be conducted as necessary to maintain proficiency of response personnel.
Initials/Date
: 1. Objectives of drill developed and approved.
(Drill Scenario Approval Form  Attachment 2)
: 2. Scenarios developed and approved.
: 3. Drills scheduled so as not to affect essential plant operations or activities.
: 4. Offsite agencies notified  as necessary:
(1)  Maricopa County Department of  Civil Defense  &
Emergency Services  (MCDCDES)
(2) Arizona Radiation Regulatory Agency    (ARRA)
(3)  Maricopa County  Sheriff's Office  (MSCO)
(4) Arizona Department of Emergency Services    (ADES)
(5) Arizona Department of Public Safety (DPS)
(6)  Nuclear Regulatory Commission  (NRC) Region V (7)  NRC Resident Inspector(s)
(8)  Others (specify)
PV21648A (8~)
 
ROC NO: 7N409.08.00 EVISION: 1 AGE 13 OF 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE:      EMERGENCY PREPAREDNESS  DRILLS ATTACHMENT 3  (Cont'd)
PREDRILL CHECKLIST FORM
: 5. ANPP  departments and others  notified  as necessary:
(1)  PVNGS  Plant Manager (2)  Manager, Operations (3)  Manager, Technical Support (4)  Director, Technical Services (5)  Manager,  Administrative Support (6)  Security  (ANPP, APS, Construction)
(7)  ANPP  Communications Center (8)  Media Relations Department (9)  Telephone Operators (10) Unit Operations Superintendent    (Affected Unit(8))
(ll) Systems  Electric Department (12) Others (specify)
PV21648A (844)
PV21648A (844)
Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRIRLS PROC NO-7N409.08.00 REVISION: 1 PAGE 11 OF 20 DATE: 01/23/86 ATTACHMENT 2 DRILL SCENARIO APPROVAL FORM Prepared By: Approved By: Manager, Emergency Planning Reviewed By: Approved By: Offsite Emergency Planning Supervisor Reviewed By: Onsite Emergency Planning Supervisor Plant Manager (Onsi~ills aa.y)1.Type of Drill: 2.Date and Time of Commencement:
3.Participating Organizations.'rill Number: Duration: 4.Objectives:
5.Scope: (simulated events, extent of play, locations)
T 6.Precautions/Limitations:
PV21648A (8-84)
)'I 4 C Arizona Nuclear Power Project TITLE-'MERGENCY PREPAREDNESS DRILLS PROC NO: 7N409.08.00 REVISION: 1 PAGE 12 OF 20 DATE: 01/23/86 ATTACHMENT 3 PREDRILL CHECKLIST FORM DRILL TITLE: DRILL NUMBER: DRILL DATE: Initials/Date 1.Objectives of drill developed and approved.(Drill Scenario Approval Form-Attachment 2)2.Scenarios developed and approved.3.Drills scheduled so as not to affect essential plant operations or activities.
4.Offsite agencies notified as necessary:
(1)Maricopa County Department of Civil Defense&Emergency Services (MCDCDES)(2)Arizona Radiation Regulatory Agency (ARRA)(3)Maricopa County Sheriff's Office (MSCO)(4)Arizona Department of Emergency Services (ADES)(5)Arizona Department of Public Safety (DPS)(6)Nuclear Regulatory Commission (NRC)Region V (7)NRC Resident Inspector(s)
(8)Others (specify)PV21648A (8~)
Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ROC NO: 7N409.08.00 EVISION: 1 AGE 13 OF 20 ATE: 01/23/86 ATTACHMENT 3 (Cont'd)PREDRILL CHECKLIST FORM 5.ANPP departments and others notified as necessary:
(1)PVNGS Plant Manager (2)Manager, Operations (3)Manager, Technical Support (4)Director, Technical Services (5)Manager, Administrative Support (6)Security (ANPP, APS, Construction)
(7)ANPP Communications Center (8)Media Relations Department (9)Telephone Operators (10)Unit Operations Superintendent (Affected Unit(8))(ll)Systems Electric Department (12)Others (specify)PV21648A (844)
Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ROC NO: 7N409.08.00 ISION: 1 AGE 14 OF 20 ATE: 01/23/86 ATTACHMENT 3 (Cont'd)PREDRILL CHECKLIST FORM 6.Support organizations notified as appropriate.
(1)Maryvale Samaritan Hospital (2)Good Samaritan Hospital (3)Backup Ambulance (Bechtel Power Corporation)
(4)National Weather Service e (5)Arizona State University (6)Others (specify)7.Players designated and informed of drill (Attachment 5 or memo).8.Controllers designated and informed of drill (Attachment 4).9.Facility walkdown, procedure check and communication test completed.
10.Equipment and materials check (e.g., mock-ups, moulage)ll.Drill Notice posted on plant bulletin board as appropriate.
Performed By: Signature Date Reviewed By: Onsite Emergency Planning Supervisor Date Reviewed By: Offsite Emergency Planning Supervisor Date Approved By: (If Re uired)Manager, Emergency Planning Date PV21&08A (8 84j


Arizona Nuclear Power Project TITLE: EMERGENCY.PREPAREDNESS DRILLS ROC NO: 7N409.08.00 ISION: 1 AGE 15 OF 20 ATE: 01/23/86 ATTACHMENT 4 CONTROLLER BRIEPING CHECKLIST 1)Distribute scenario packages and identify Controller stations.2)Review of Obgectives.
ROC NO:  7N409.08.00 ISION:  1 AGE 14 OF 20 ATE:  01/23/86 Arizona Nuclear Power Project TITLE:     EMERGENCY PREPAREDNESS   DRILLS ATTACHMENT 3  (Cont'd)
3)Review of Scenario: Narrative Time line Messages Data 4)Review of Controller responsibilities:
PREDRILL CHECKLIST FORM
Keeping play on schedule and in line Maintaining contact with Lead Controller Issuance of Messages Flexibility of play Stationed promptly Evaluation forms 5)Review of cautions to be observed: Plant operation interference Excessive prompting Player/Plant safety Crlticiring players actions 6)Stress data capture and importance of complete records (This inc1udes both player records and controller records).I I I I I I I I I I I I 7)Review plans for the critique.8)Other comments.DRILL TITLE: DRILL NUMBERs DRILL DATE: CONDUCTED BY j DATE!I I PV21648A (8.84)
: 6.      Support organizations  notified  as appropriate.
Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ROC NO: 7N409.08.00 kEVISION: 1 AGE 16 OP 20 ATE: 01/23/86 ATTACHMENT 5 PLAYERS BRIEFING CHECKLIST 1)Identify Player stations.2)Review of ob5ectives.
(1) Maryvale Samaritan Hospital (2) Good Samaritan Hospital (3) Backup Ambulance (Bechtel Power Corporation)
3)Review cautions to be observed: Plant operation interference Player/Plant safety 4)Items to be remembered:
(4) National Weather Service                      e (5) Arizona State University (6) Others (specify)
Talking thru drill play Play as much as possible The scenario may not be realistic Be conscious of information flow Expiditing Development of Emergency Teams I I I I I I I I I 5)Stress data capture and importance of complete logs and'ther documents.
: 7. Players designated and informed of    drill (Attachment 5 or memo).
Times documented should be time of event rather than time of receipt of information.
: 8. Controllers designated    and informed  of drill (Attachment  4).
~I-I 6)Facilities activated (i.e., actual unit control room or the simulator)
: 9.      Facility walkdown,  procedure check and communication test completed.
~7)Review plans for the critique.I 8)Other comments.I I 0'RILL TITLE: DRILL NUMBER: DRILL DATE: CONDUCTED BY DATE: PV21848A (844)  
: 10. Equipment and materials check        (e.g., mock-ups,    moulage) ll. asDrill  Notice posted appropriate.
~.Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS PROC NO: 7N409.08.00 REVISION: 1 PAGE 17 OF 20 DATE: 01/23/86 ATTACHMENT 6 MONTHLY COMMUNICATIONS DRILL RECORD Date Tested ENS TESTED SAT/UNSAT COMMENTS Unit 1 Unit 1 Unit.2 Unit 2 Unit 3 Unit 3 TSC CR Shift.Sup.Off.CR Shift.Sup.Off.CR Shift.Sup.Off.EOF COMMERCIAL LINES TO NRC TSC EOF Performed By.'pproved By: Date: Date: PV21648A (8-84) 0  
on  plant bulletin board Performed By:
, Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS PROC NO: 7N409.08.00 REVISION: 1 PAGE 18 OF 20 DATE: 01/23/86 ATTACHMENT 7 QUARTERLY COMMUNICATIONS DRILL RECORD DATE TESTED OPERATIONS RINGDOMN/31 TESTED SAT/UNSAT COMMENTS ADES CEC UNIT 1 STSC UNIT 2 STSC UNIT 3 STSC TSC EOF OPERATIONS RINGDOWN//2 ADES CEC SIMULATOR STSC TSC EOF OPERATIONS RINGDOWN 83 ADES CEC UNIT 1 STSC UNIT 2 STSC UNIT 3 STSC TSC EOF PV21648A (8-84)
Signature                                  Date Reviewed By:
Arizona Nuclear Power Project TITLE-EMERGENCY PREPAREDNESS DRILLS PROC NO: 7N409.08.00 REVISION-1 PAGE 19 OF 20 DATE: Ol/23/86 ATTACHMENT 7 (Cont'd)QUARTERLY COMMUNICATIONS DRILL RECORD TESTED OPERATIONS RINGDOWN//4 SAT/UNSAT COMMENTS ADES CEC SIMULATOR STSC TSC EOF.Perfomed by: Approved by: Manager, Emergency Planning Date: Date: PV216418A (8.84)t
Onsite Emergency Planning Supervisor                    Date Reviewed By:
~It~I I 1'41~
Offsite  Emergency Planning Supervisor                  Date Approved By:                                                (If Re uired)
Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS PROC NO-7N409.08.00 REVISION: 1 PAGE 20 OF 20 DATE: 01/23/86 ATTACHMENT 7: (Cont'd)QUARTERLY COMMUNICATIONS DRILL RECORD DATE'ESTED PUBLIC INFORMATION RINGDOWN//1 JENC CHIC EOF CEC TESTED SAT/UNSAT COMMENTS PUBLIC INFORMATION RINGDOMN/>2 JENC CHIC EXECUTIVE RINGDOWN CEC CEO EOD Perfomed by: Approved by: Manager, Emergency Planning Date: Date: PV21648A (8 84j C 0 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS EXERCISE PROC NO: 7N409.09.00 EVISION: 1 AGE OF ATE: 01/23/86 RECORD OF CHANGES AND REVISIONS PAGE REVISION PAGE REVISION PAGE REVISION NII RSI CONTR~'L 8 Approved By: Signa ure Dat Effective Date: 2/28/86 PV21648A (8.84)Form 1N001.02A Rev.0
Manager, Emergency Planning                      Date PV21&08A (8 84j
 
ROC NO:     7N409.08.00 ISION:     1 AGE 15 OF     20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE:        EMERGENCY .PREPAREDNESS        DRILLS ATTACHMENT 4 CONTROLLER BRIEPING CHECKLIST
: 1) Distribute scenario packages and identify Controller stations.
: 2) Review of Obgectives.
: 3) Review of Scenario:
Narrative                                             I          I Time line                                             I          I Messages Data
: 4) Review   of Controller responsibilities:
Keeping play on schedule and   in line Maintaining contact with Lead Controller Issuance of Messages Flexibility of play Stationed promptly Evaluation forms
: 5) Review of cautions to be observed:
Plant operation interference Excessive prompting                                   I          I Player / Plant safety                                 I            I Crlticiring players actions                             I          I
: 6)   Stress data capture and importance of complete records (This inc1udes both player records and controller records). I           I
: 7) Review plans for the critique.
: 8) Other comments.                                               I          I DRILL TITLE:                               CONDUCTED BY j DRILL NUMBERs                                       DATE!
DRILL DATE:
PV21648A (8.84)
 
ROC NO: 7N409.08.00 kEVISION:   1 AGE 16 OP 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE:      EMERGENCY PREPAREDNESS        DRILLS ATTACHMENT 5 PLAYERS BRIEFING CHECKLIST
: 1) Identify Player stations.
: 2) Review of ob5ectives.
: 3)   Review cautions   to be observed:
Plant operation interference                                               I Player/Plant safety                                                         I
: 4) Items to be remembered:
Talking thru   drill play                                                 I Play as much as possible                                                   I The scenario   may not be realistic                                     I Be conscious of information flow                                           I Expiditing   Development   of Emergency Teams                               I
: 5)   Stress data capture and importance of complete logs and documents. Times documented should be time of event 'ther rather than time of receipt of information.                       ~
I-I
: 6)   Facilities activated (i.e., actual unit control       room or the simulator) ~                                                    I          I
: 7)   Review plans   for the critique.                                       I          I I
: 8)   Other comments.
0'RILL               TITLE:
DRILL NUMBER:
CONDUCTED BY DATE:
DRILL DATE:
PV21848A (844)
 
PROC NO: 7N409.08.00
~ .
REVISION: 1 PAGE 17 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PREPAREDNESS        DRILLS ATTACHMENT 6 MONTHLY COMMUNICATIONS DRILL RECORD Date Tested TESTED ENS                         SAT/UNSAT                     COMMENTS Unit       1 CR Unit       1 Shift. Sup.         Off.
Unit.      2 CR Unit      2 Shift.         Sup. Off.
Unit      3 CR Unit      3 Shift.         Sup. Off.
TSC EOF COMMERCIAL LINES TO NRC TSC EOF Performed                                                             Date:
By.'pproved By:                                                   Date:
PV21648A (8-84)
 
0 PROC NO: 7N409.08.00 REVISION: 1 PAGE 18 OF 20 DATE: 01/23/86
, Arizona Nuclear Power Project TITLE:    EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 7 QUARTERLY COMMUNICATIONS DRILL RECORD DATE TESTED TESTED OPERATIONS RINGDOMN /31     SAT/UNSAT                     COMMENTS ADES CEC UNIT 1 STSC UNIT 2 STSC UNIT 3 STSC TSC EOF OPERATIONS RINGDOWN //2 ADES CEC SIMULATOR STSC TSC EOF OPERATIONS RINGDOWN 83 ADES CEC UNIT 1 STSC UNIT 2 STSC UNIT 3 STSC TSC EOF PV21648A (8-84)
 
PROC NO: 7N409.08.00 REVISION- 1 PAGE 19 OF 20 DATE: Ol/23/86 Arizona Nuclear Power Project TITLE-      EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 7 (Cont'd)
QUARTERLY COMMUNICATIONS DRILL RECORD TESTED OPERATIONS RINGDOWN //4     SAT/UNSAT                       COMMENTS ADES CEC SIMULATOR STSC TSC EOF
    .Perfomed by:                                                     Date:
Approved by:                                                   Date:
Manager, Emergency Planning PV216418A (8.84 )
t


Arizona Nuclear Power Project ROC NO: 7N409.09.00 VISION: 1 AGE 1 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE 1.0 PURPOSE AND SCOPE 1.1 To establish guidelines for developing, conducting, evaluating and.documenting annual emergency preparedness exercises.
        ~ It~
1.2 To provide guidance to test both onsite and offsite emergency personnel, equipment, communications, plans and procedures, including the coordination and interface with federal, state, and county governments.
I    I 1   41  ~
1.3 To provide guidance to verify the adequacy of the Palo Verde Nuclear Generating Station Emergency Plan and Implementing Procedures and the overall effectiveness of onsite and offsite emergency preparedness.


==2.0 DEFINITIONS==
PROC NO- 7N409.08.00 REVISION: 1 PAGE 20 OF 20 DATE:  01/23/86 Arizona Nuclear Power Project TITLE:      EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 7: (Cont'd)
AND ABBREVIATIONS
QUARTERLY COMMUNICATIONS DRILL RECORD DATE'ESTED PUBLIC INFORMATION          TESTED RINGDOWN //1        SAT/UNSAT                      COMMENTS JENC CHIC EOF CEC PUBLIC INFORMATION RINGDOMN />2 JENC CHIC EXECUTIVE RINGDOWN CEC CEO EOD Perfomed by:                                                    Date:
Approved by:                                                    Date:
Manager, Emergency Planning PV21648A (8 84j


===2.1 Definitions===
C 0


====2.1.1 Controller====
PROC NO:    7N409.09.00 EVISION:    1 AGE    OF ATE:  01/23/86 Arizona Nuclear Power Project TITLE:      EMERGENCY PREPAREDNESS EXERCISE RECORD OF CHANGES AND REVISIONS PAGE              REVISION    PAGE          REVISION      PAGE              REVISION NII RSI CONTR~'L        8 Approved By:                                                Effective Date:
-Individual assigned to direct the exercise and provide messages and data.Controllers also serve as evaluators during the exercise.2.1.2 Emergency Planning Action Item List-A listing of open items related to the exercise requiring corrective action.~2.1.3 Exercise-An event that tests the.integrated'apability of the major portion of the basic elements within emergency preparedness plans and organizations.
2/28/86 Signa ure                  Dat PV21648A (8.84)                                                          Form 1N001.02A Rev. 0


===2.2 Abbreviations===
ROC NO: 7N409.09.00 VISION: 1 AGE 1 OF 15 ATE: 01/23/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PREPAREDNESS  EXERCISE 1.0      PURPOSE AND SCOPE 1.1    To  establish guidelines for developing, conducting, evaluating        and.
2.2.1 ADES-Arizona Division of Emergency Services 2.2.2 ARRA-Arizona Radiation Regulatory Agency 2.2.3 DPS-Arizona Department of Public Safety 2.2.4 FEMA-Federal Emergency Management Agency 2.2.5 MCDCDES-Maricopa County Department of Civil Defense and Emergency Services PV2164SA (8.84)0144D/0031D Arizona Nuclear Power Project ROC NO: 7N409.09.00 VISION: 1 AGE 2 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE 2.2.6 MCSO-Maricopa County Sheriff's Office 2.2.7 NRC-Nuclear Regulatory Commission 2.2.8 RAC-Radiological Assistance Committee 3.0 RESPONSIBILITIES 3.1 The Manager, Emergency Planning shall have overall responsibility for the development, approval, conduct, evaluation and documentation of annual.emergency preparedness exercises.
documenting annual emergency preparedness      exercises.
3.2 The Onsite and Offsite Emergency Planning Supervisors shall be responsible for assigning deficiencies as action items using the Emergency Planning Action Item List and tasking items to the appropriate department or personnel.
1.2    To  provide guidance to test both onsite and offsite emergency personnel,    equipment,    communications,    plans    and  procedures, including the coordination and interface with federal, state, and county governments.
The Onsite and Offsite Emergency Planning Supervisors shall be responsible for ensuring appropriate corrective actions are taken to resolve deficiencies identified during the annual exercises.'.4 The Vice-President, Nuclear Production and the PVNGS Plant Manager shall approve exercise objectives.
1.3    To provide guidance to verify the adequacy            of the Palo Verde Nuclear Generating      Station Emergency Plan and Implementing Procedures and the overall effectiveness of onsite and offsite emergency preparedness.
2.0      DEFINITIONS AND ABBREVIATIONS 2.1    Definitions 2.1.1    Controller  Individual assigned    to direct the exercise and provide  messages    and data. Controllers also serve as evaluators during the exercise.
2.1.2   Emergency  Planning Action Item List  A listing of open items related to the exercise requiring corrective action. ~
2.1.3    Exercise  An event that tests the .integrated'apability of the major portion of the basic elements within emergency preparedness plans and organizations.
2.2    Abbreviations 2.2.1   ADES Arizona   Division of Emergency Services 2.2.2   ARRA Arizona   Radiation Regulatory Agency 2.2.3   DPS Arizona   Department of Public Safety 2.2.4   FEMA Federal   Emergency Management Agency 2.2.5   MCDCDES   Maricopa County Department     of Civil   Defense and Emergency Services PV2164SA (8.84) 0144D/0031D


===4.0 PROCEDURE===
ROC NO:              7N409.09.00 VISION:              1 AGE 2 OF              15 ATE:              01/23/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PREPAREDNESS  EXERCISE 2.2.6    MCSO  Maricopa County  Sheriff's Office 2.2.7    NRC  Nuclear Regulatory Commission 2.2.8    RAC  Radiological  Assistance Committee 3.0      RESPONSIBILITIES 3.1    The Manager,    Emergency  Planning shall have overall responsibility for the development,          approval,    conduct,    evaluation                and documentation of  annual. emergency  preparedness  exercises.
4.1 The Manager, Emergency Planning shall provide the opportunity for state and county response agencies to participate in each annual exercise.Full participation by state and county response agencies is required biannually and evaluated by the Federal Emergency Management Agency.4.2 The Manager, Emergency Planning shall coordinate the scheduling of the annual exercises in consultation with the Arizona Division of Emergency Services (if appropriate),'uclear Regulatory Commission
3.2  The  Onsite  and  Offsite  Emergency  Planning  Supervisors              shall  be responsible  for assigning deficiencies as action items using the Emergency Planning Action Item List and tasking items to the appropriate department or personnel.
~and Federal Emergency Management Agency (if appropriate).
The  Onsite and Offsite Emergency Planning Supervisors shall be responsible for ensuring appropriate corrective actions are taken to resolve deficiencies identified during the annual      exercises.'.4 The  Vice-President, Nuclear Production and the      PVNGS              Plant Manager shall approve exercise objectives.
4.0       PROCEDURE 4.1   The Manager,   Emergency Planning shall provide the opportunity for state and county response agencies to participate in each annual exercise. Full participation by state and county response agencies is required biannually and evaluated by the Federal Emergency Management Agency.
4.2   The Manager,   Emergency Planning shall coordinate the scheduling of the annual exercises in consultation with the Arizona Division of Emergency Services     (if appropriate),'uclear Regulatory Commission
                  ~
and Federal Emergency Management Agency     (if appropriate).
PV21648A (8.84)
PV21648A (8.84)
Arizona Nuclear Power Project ROC NO: 7N409.09.00 VISION: 1 AGE 3 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE , 4.3 The Manager, Emergency Planning, in cooperation with the Arizona Division of Emergency Services (if appropriate), sha33.insure that.the exercise scenario is developed within the time frame of Attach-.ment 1.4.4 The Onsite and Offsite Emergency Planning Supervisors shall coordinate preparation of the exercise scenario and ensure that: 4.4.1 Annual exercises are developed, scheduled and conducted in a manner consistent with the regulations and guidance of 10CFR50, Appendix E, NUREG-0654, Rev.1 and other appropriate regulatory guidance.4.4.2 The scenario's simulated events and station initial condi-tions are developed in a manner'hat adequately tests the level of emergency preparedness of the groups involved in'he exercise.4.4.3 The exercise simulates an emergency that results in offsite radiological releases which require response by offsite authorities, if offsite response agencies are participating in the annual exercise.4~4~4 The scenario is varied from year to year so that all major elements of the response plans and preparedness organiza-tions are tested within a five-year period.4.4.5 Once every six years, the exercise starts between 6:00 p.m.and midnight and another between midnight and 6:00 a.m.4.4.6 Exercises are conducted under various weather conditions.
 
4.4.7 Some exercises are unannounced-.
ROC NO:     7N409.09.00 VISION:     1 AGE 3 OF     15 ATE:     01/23/86 Arizona Nuclear Power Project TITLE:       EMERGENCY PREPAREDNESS     EXERCISE
4.4.8 The Exercise scenario is treated as confidential information prior to the annual exercise and no players have access to this information.
          , 4.3   The Manager,     Emergency Planning,       in cooperation with     the Arizona Division of     Emergency Services     (if appropriate),   sha33. insure that.
the exercise scenario is developed within the time frame of Attach-.
ment 1.
4.4   The     Onsite and Offsite Emergency Planning Supervisors                     shall coordinate   preparation   of the exercise scenario and ensure     that:
4.4.1     Annual exercises     are developed,   scheduled   and conducted in a manner     consistent with the regulations         and guidance of 10CFR50,     Appendix     E,   NUREG-0654,   Rev. 1 and       other appropriate regulatory guidance.
4.4.2     The   scenario's simulated events and station initial condi-tions are developed in a manner'hat adequately tests the level of emergency preparedness of the groups involved in exercise.                                                          'he 4.4.3     The   exercise simulates an emergency that results in offsite radiological releases which require response by offsite authorities,     if offsite response agencies are participating in the annual exercise.
4 ~4 ~4   The   scenario is varied from year to year so that all major elements of the response plans and preparedness               organiza-tions are   tested   within a five-year period.
4.4.5     Once every six years, the exercise starts between 6:00 p.m.
and midnight and another between midnight and 6:00 a.m.
4.4.6     Exercises are conducted under various weather conditions.
4.4.7     Some exercises are unannounced-.
4.4.8     The   Exercise     scenario     is treated     as     confidential information prior to the annual exercise             and   no players have access to this information.
PV216MA (8 84)
PV216MA (8 84)
Arizona Nuclear Power Project ROC NO: 7N409.09.00 VISION: 1 AGE 4 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE 4.5 The Manager, Emergency Planning and Preparedness shall submit the exercise objectives to the Vice President, Nuclear Production and PVNGS Plant Manager for approval prior to submittal to the NRC and FEMA (if appropriate).
4.6 The Onsite and Offsite Emergency Planning Supervisors shall review and approve the exercise scenario and coordinate the assignment of controllers.
4.7 The Manager, Emergency Planning shall review and approve the exercise scenario.4.7.1 After Manager, Emergency Planning approval, the scenario shall be submitted to the NRC and FEMA in accordance with Attachment


====1.4.8 Prior====
ROC NO:    7N409.09.00 VISION:    1 AGE 4 OF    15 Arizona Nuclear Power Project                                              ATE:    01/23/86 TITLE:      EMERGENCY PREPAREDNESS    EXERCISE 4.5    The Manager,    Emergency Planning and Preparedness      shall submit the exercise objectives to the Vice President, Nuclear Production and PVNGS Plant Manager for approval prior to submittal to the NRC and FEMA  (if appropriate).
to the exercise, the Onsite and Offsite Emergency Planning Supervisors shall ensure that: 4.8.1 The Pre-Exercise Checklist Form (Attachment 2)is completed.
4.6    The Onsite and    Offsite  Emergency Planning Supervisors shall review and approve the    exercise scenario and coordinate the assignment of controllers.
4.8.2 A Lead Controller is assigned for the exercise.4.8.3 A pre-exercise briefing is held to inform the controllers of the exercise objectives, extent of play, pre-staging requirements, which portions of the scenario require strong control and which portions of the scenario permit free play.Attachment 3, Controller Briefing Checklist, shall be completed.
4.7    The  Manager,    Emergency  Planning  shall review    and    approve  the exercise scenario.
Copies of the exercise scenario are distributed at the controller briefing.4.8.4 Players are informed of the date and time of the exercise and are provided with exercise ground rules.This is accomplished by preparing and issuing a memo to all players.4.8.5 Players will not be informed of the date and time of unannouced exercises.
4.7.1    After  Manager,  Emergency  Planning  approval,  the scenario shall  be submitted to the    NRC  and FEMA  in  accordance    with Attachment 1.
PV21$4SA (8%4)
4.8   Prior to the exercise, the Onsite         and Offsite Emergency     Planning Supervisors shall ensure that:
Arizona Nuclear Power Project ROC NO: 7N409.09.00 VISION: 1 AGE 5 OF 15 ATE: 01/23/86'TITLE: EMERGENCY PREPAREDNESS EXERCISE 4.9 Upon termination of the exercise play, the following activities shall be completed onsite and at the EOF.4.9.1 The chief controller in each emergency response facility shall assemble the controllers and players to critique play action in that facility.NRC evaluators shall be invited to attend facility specific critiques.
4.8.1   The Pre-Exercise Checklist Form (Attachment 2)       is completed.
4.9.1.1 The manager of the facility and players shall provide comments.4.9.1.2 The controllers shall then summarize their evaluations.
4.8.2   A Lead   Controller is assigned for the exercise.
4.9.1.3 The chief controller will record manager and player comments and collect material (forms, etc.)completed during the exercise.4.9.2 Following the facility specific critiques, all onsite controllers and key onsite players shall assemble in the EOF Command Center.NRC evaluators shall be invited to attend the critique.4.9.2.1 The Lead Controller for the exercise shall conduct theqcritique.
4.8.3   A pre-exercise briefing is held to inform the controllers of the exercise objectives, extent of play, pre-staging requirements, which portions of the scenario require strong control and which portions of the scenario permit free play. Attachment 3, Controller Briefing Checklist, shall be   completed. Copies   of the exercise scenario are distributed at the controller briefing.
4.9.2.2'he managers of the emergency response facilities and key players shall provide comments.4.9.2.3 The chief controllers and other controllers shall provide the results of their evaluations.
4.8.4   Players are informed of the date and time of the exercise and   are provided with exercise ground rules.               This is accomplished by preparing and issuing a memo to all players.
4.9.2.4 The Lead Controller shall collect all evaluation forms and exercise material.-
4.8.5   Players   will   not be informed of the date         and   time of unannouced   exercises.
PV21$ 4SA (8%4)
 
ROC NO:   7N409.09.00 VISION:   1 AGE 5 OF 15 Arizona Nuclear Power Project                                              ATE:   01/23/86 TITLE:       EMERGENCY PREPAREDNESS   EXERCISE 4.9   Upon termination of the exercise play, the following activities shall be completed onsite and at the EOF.
4.9.1   The chief controller in each emergency response facility shall assemble the controllers and players to critique play action in that facility. NRC evaluators shall be invited to attend facility specific critiques.
4.9.1.1   The manager of the facility and players shall provide comments.
4.9.1.2   The     controllers   shall   then   summarize   their evaluations.
4.9.1.3   The   chief controller     will   record   manager   and player   comments   and   collect material       (forms, etc.) completed during the exercise.
4.9.2   Following the     facility specific critiques, all           onsite controllers   and key   onsite players shall assemble in the EOF Command   Center. NRC evaluators     shall be invited to attend the critique.
4.9.2.1   The   Lead   Controller     for the     exercise   shall conduct theqcritique.
4.9.2.2 'he   managers of the emergency response       facilities and key players shall provide comments.
4.9.2.3   The chief controllers   and   other controllers shall provide the results of   their evaluations.
4.9.2.4   The Lead   Controller shall collect     all evaluation forms and   exercise material.-
PV21648A (S44)
PV21648A (S44)
Arizona Nuclear Power Project ROC NO: 7N409.09.00 VISION: 1 AGE 6 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE 4.10 Upon termination of the exercise play, offsite controllers and players shall hold critiques similar to those.described in Section 4.9 of this procedure.
 
4.11 Key onsite and offsite controllers shall meet to discuss the results of critiques and to prepare the exercise time line.4.11.1 Significant findings and observations will be recorded.4.12 The significant findings and observations shall.be presented to the NRC and FEMA (if appropriate).
ROC NO: 7N409.09.00 VISION:   1 AGE 6 OF 15 ATE:   01/23/86 Arizona Nuclear Power Project TITLE:     EMERGENCY PREPAREDNESS   EXERCISE 4.10 Upon   termination of the exercise play, offsite controllers and players shall hold critiques similar to those .described in Section 4.9 of this procedure.
4.13 The NRC and FEMA (if appropriate) shall conduct exit interviews with ANPP, State and County Management personnel to present preliminary findings in accordance with Attachment l.4.14 Aftex receipt of the formal evaluations from the NRC and FEMA (if appropriate), the Onsite and Offsite Emergency Planning Supervisors shall assign deficiencies.as action items on the Emergency Planning Action Item List, task them to affected departments and personnel and submit this to the Manager, Emergency Planning for approval.Deficiencies recorded shall include those significant findings identified by the controllers and improvement areas and/or violations identified by the NRC and FEMA (if appropriate).
4.11 Key   onsite and offsite controllers shall meet to discuss               the results of critiques and to prepare the exercise time line.
4.15 Upon receipt of the approved Emergency Planning Action Item List, the Onsite and Offsite Emergency Planning Supervisors shall then submit to the Manager, Emergency Planning a written Exercise Report which shaU.include the following:
4.11.1   Significant findings   and observations will be recorded.
4.15.1 A cover sheet, in memo form, to identify the exercise by name and date;to list the sections included in report;and to provide for approval by the Manager, Emergency Planning.4.15.2 Section 1-date, time and duration of participating agencies by name;the exercise;the initial conditions and the and the list of assigned controllers.
4.12 The significant findings     and observations shall. be presented to the NRC and FEMA (if appropriate).
the exercise;the purpose of the narrative summary;4.15.3 Section 2-comparison of the exercise objectives against actual performance.
4.13 The NRC and     FEMA   (if appropriate)   shall conduct exit interviews to present with ANPP,     State   and   County Management personnel preliminary findings in     accordance with Attachment   l.
4.14 Aftex receipt of the formal evaluations from the NRC and FEMA (if appropriate), the Onsite and Offsite Emergency Planning Supervisors shall assign deficiencies .as action items on the Emergency Planning Action Item List, task them to affected departments and personnel and submit this to the Manager, Emergency Planning for approval.
Deficiencies recorded shall include those significant findings identified by the controllers and improvement areas and/or violations identified by the NRC and FEMA (if appropriate).
4.15 Upon   receipt of the approved Emergency Planning Action Item List, the Onsite and Offsite Emergency Planning Supervisors shall then submit to the Manager, Emergency Planning a written Exercise Report which shaU. include the following:
4.15.1   A cover   sheet, in memo form, to identify the exercise by name and   date; to list the sections included in report; and to provide for approval by the Manager, Emergency Planning.
4.15.2   Section 1 date, time and duration of the exercise; the participating agencies by name; the purpose of the exercise; the initial conditions and the narrative summary; and the list of assigned controllers.
4.15.3   Section   2   comparison   of the exercise objectives against actual performance.
PV21648A (844)
PV21648A (844)
Arizona Nuclear Power Project OC NO: 7N409.09.00 VISION: 1 GE 7 OF 15 TE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE 4.15.4.Section 3-significant findings of such a nature that, if uncorrec'ted, would reduce the effectiveness of the emergency response proglam and shall be tracked on the Emergency Planning Action Item List.General observations shall be noted but not included on the Emergency Planning Action Item List.4.15.5 Section 4-the actual exercise sequence of events (time line).4.15.6 Section 5-utility exercise players.4.16 After the Manager, Emergency Planning approves the Exercise Report, a copy of the Exercise Report, exercise scenario, and Pre-'xercise Checklist Form (Attachment 2)shall be submitted to Drawing and Document Control.4.17 Copies of the Exercise Report and'Emergency Planning Action Item List shall be submitted to the PVNGS Plant Manager, Vice-President, Nuclear Production and others as appropriate.
 
4.18 A complete copy of the exercise scenario, Exercise Report, evaluation forms and other exercise related material shall be retained in the Emergency Planning Department files as long as deemed apprt>priate by the Manager, Emergency Planning.4.19 The Onsite and Offsite Emergency Planning Supervisors shall track the status of corrective actions related to deficiencies identified on the Emergency Planning Action Item List and ensure appropriate resolution.
OC NO: 7N409.09.00 VISION:   1 GE 7 OF 15 TE:   01/23/86 Arizona Nuclear Power Project TITLE:       EMERGENCY PREPAREDNESS   EXERCISE 4.15.4. Section 3 significant findings of such a nature that, the effectiveness        of the if uncorrec'ted,   would reduce emergency response proglam and shall be tracked on the Emergency Planning Action Item List. General observations shall be noted but not included on the Emergency Planning Action Item List.
4.15.5   Section   4   the actual exercise   sequence   of events   (time line).
4.15.6   Section   5 utility exercise players.
4.16 After the Manager, Emergency Planning approves the Exercise Report, a copy of the Exercise Report, exercise scenario, and Pre-'xercise Checklist Form (Attachment 2) shall be submitted to Drawing and Document   Control.
4.17 Copies   of the Exercise Report   and 'Emergency Planning Action Item List shall be submitted to the     PVNGS Plant Manager, Vice-President, Nuclear Production and others as appropriate.
4.18 A   complete copy of the exercise           scenario, Exercise Report, evaluation forms and other exercise related material shall be retained in the Emergency Planning Department files as long as deemed apprt>priate by the Manager, Emergency Planning.
4.19 The Onsite and Offsite Emergency Planning Supervisors shall track the status of corrective actions related to deficiencies identified on the Emergency Planning Action Item List and ensure appropriate resolution.
PV21648A (8.84)
PV21648A (8.84)
Arizona Nuclear Power Project ROC NO: 7N409.09.00 REVISION: 1 kAGE 8 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE


==5.0 REFERENCES==
ROC NO:  7N409.09.00 REVISION:  1 kAGE 8 OF 15 Arizona Nuclear Power Project                                              ATE:  01/23/86 TITLE:        EMERGENCY PREPAREDNESS  EXERCISE
 
==5.0       REFERENCES==


5.1 Im lementin References None 5.2 Develo mental References
5.1   Im lementin   References None 5.2   Develo mental References 5.2.1  PVNGS  Emergency Plan, Revision 6 5.2.2  80PR-OZZ01,  "Training Program", Revision  3 5.2.3  NUREG-0654 FEMA-REP-1,    "Criteria for Preparation    and  Eval-uation of Radiological Emergency Response      Plans and    Pre-paredness in Support of Nuclear Power Plants," Revision    1 5.2.4  10CFR50,  Appendix E,    Emergency Planning and Preparedness for Production  and Utilization Facilities."
5.2.5  .NRC  IE Information Notice No. 85-55, "Revised        Emergency Exercise Frequency Rule", July 15, 1985.
6.0        FORMS AND ATTACHMENTS 6.1    Attachment 1  "Milestones  for Exercise Observation  and  Critiques" 6.2    Attachment 2  "Pre-Exercise Checklist Form" 6.3    Attachment 3  "Controller Briefing Checklist" PV2164SA (8.84)


====5.2.1 PVNGS====
ROC NO:  7N409.09.00 VISION:    1 AGE 9 OF  15 Arizona Nuclear Power Project                                                      ATE:  01/23/86 TITLE:      EMERGENCY PREPAREDNESS            EXERCISE ATTACHMENT 1 MILESTONES FOR EXERCISE OBSERVATION AND CRITIQUES 75 days          State and licensee submit exercise              objectives to      FEHA  and  NRC Regional Offices, respectively.
Emergency Plan, Revision 6 5.2.2 80PR-OZZ01,"Training Program", Revision 3 5.2.3 NUREG-0654 FEMA-REP-1,"Criteria for Preparation and Eval-uation of Radiological Emergency Response Plans and Pre-paredness in Support of Nuclear Power Plants," Revision 1 5.2.4 10CFR50, Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities." 5.2.5.NRC IE Information Notice No.85-55,"Revised Emergency Exercise Frequency Rule", July 15, 1985.6.0 FORMS AND ATTACHMENTS
60 days          Fggd and NRC Reg!.cna1 Offices discase              and  meet  with licensee/
state as necessary to prepare response.
45 days          State and licensee scenario developers            submit exercise scenario to FEMA and NRC regions for review.
35 days          FEMA         and  NRC  regions  notify state  and   licensee    of scenario acceptability.
30 days        . FEMA          and   NRC  regions develop specific postexercise critique schedule with the state and advise FEMA and NRC headquarters.
15 days          The RAC Chairman            and NRC Team Leader should meet to develop observer action plan (where stationed, how many from each organ-ization, what to look for).
3e day          Meeting,         in the exercise area, of all Federal observers both onsite and           offsite, to finalize assignments and give instruc-tions.
E day            Exercise'EHA E day                          and  RAC  observers  caucus  to collate observations.         NRC observers also caucus to collate observations.
E day            RAC          Chairman  and  NRC Team  Leader meet,    as  soon .,after their respective caucuses as practical, to coordinate 'federal                  partici-pation in critique.
E to +    1 day  Joint          RAC/NRC  critique.
, PV216MA l8.84)


===6.1 Attachment===
ROC NO: 7N409.09.00 VISION: 1 AGE 10 OF 15 Arizona Nuclear Power Project                                         ATE: 01/23/86 TITLE:   EMERGENCY PREPAREDNESS   EXERCISE ATTACHMENT 1 (Cont'd)
1-"Milestones for Exercise Observation and Critiques" 6.2 Attachment 2-"Pre-Exercise Checklist Form" 6.3 Attachment 3-"Controller Briefing Checklist" PV2164SA (8.84)
MILESTONES FOR EXERCISE OBSERVATION AND CRITIJUES General A enda (1)   State, locals and licensee present their views.
Arizona Nuclear Power Project ROC NO: 7N409.09.00 VISION: 1 AGE 9 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 1 MILESTONES FOR EXERCISE OBSERVATION AND CRITIQUES-75 days State and licensee submit exercise objectives to FEHA and NRC Regional Offices, respectively.
(2)  Critique of offsite actions by RAC Chairman.
-60 days Fggd and NRC Reg!.cna1 Offices discase and meet with licensee/state as necessary to prepare response.-45 days State and licensee scenario developers submit exercise scenario to FEMA and NRC regions for review.-35 days FEMA and NRC regions notify state and licensee of scenario acceptability.
(3)  Critique of onsite actions by NRC.
-30 days.FEMA and NRC regions develop specific postexercise critique schedule with the state and advise FEMA and NRC headquarters.
(4)  Critique of federal response (if applicable) by     RAC Chair-man.
-15 days The RAC Chairman and NRC Team Leader should meet to develop observer action plan (where stationed, how many from each organ-ization, what to look for).-3e day Meeting, in the exercise area, of all Federal observers both onsite and offsite, to finalize assignments and give instruc-tions.E day E day Exercise'EHA and RAC observers caucus to collate observations.
(5)  Opportunity for clarification questions or comments by licenses, state and locals (press and public questions shall not be entertained during the critique).
NRC observers also caucus to collate observations.
    +15 days       Written critiques by     FEMA region to the state, 'with copies to FEMA   headquarters and NRC     and by NRC region to licensee with copies to NRC headquarters and     FEMA.
E day RAC Chairman and NRC Team Leader meet, as soon.,after their respective caucuses as practical, to coordinate
NOTE:          FEMA and RAC will observe and evaluate exercises biannually.
'federal partici-pation in critique.E to+1 day Joint RAC/NRC critique., PV216MAl8.84)
Arizona Nuclear Power Project ROC NO: 7N409.09.00 VISION: 1 AGE 10 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 1 (Cont'd)MILESTONES FOR EXERCISE OBSERVATION AND CRITIJUES (1)(2)(3)(4)(5)General A enda State, locals and licensee present their views.Critique of offsite actions by RAC Chairman.Critique of onsite actions by NRC.Critique of federal response (if applicable) by RAC Chair-man.Opportunity for clarification questions or comments by licenses, state and locals (press and public questions shall not be entertained during the critique).
+15 days NOTE: Written critiques by FEMA region to the state,'with copies to FEMA headquarters and NRC and by NRC region to licensee with copies to NRC headquarters and FEMA.FEMA and RAC will observe and evaluate exercises biannually.
PV21648A (8%4)
PV21648A (8%4)
Arizona Nuclear Power Project ROC NO: 7N409.09.00 VISION: 1 AGE 11 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 2 PRE-EXERCISE CHECKLIST FORM Initials/Date l.Exercise objectives approved by Manager, Emergency Planning, PVNGS Plant Manager and Vice President, Nuclear Production.
2.Exercise objectives submitted to NRC/FEMA.3.NRC/FEMA approval of objectives.
4.Exercise scenario submitted to NRC/FEMA for review and approval.5.NRC/FEMA approval of scenario.6.Offsite agencies noti.fied as necessary:
(1)Maricopa County Department of Civil Defense 6 Emergency Services (MCDCDES)(2)Maricopa County Sheriff's Office (MCSO)(3)Arizona Department of Public Safety (DPS)(4)Nuclear Re'gulatory Commission (NRC)Resident Inspector(s)
(5)Arizona Division of Emergency Services (ADES)(6)Arizona Radiation Regulatory Agency (ARRA)(7)Others (specify)/~PV216%SA (8.84 j


Arizona Nuclear Power Project ROC NO: 7N409.09.00 VISION: 1 AGE 12 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 2 (Cont'd)PRE-EXERCISE CHECKLIST FORM Initials/Date 7.ANPP departments and others notified of date and time as necessary:
ROC NO: 7N409.09.00 VISION: 1 AGE 11 OF 15 Arizona Nuclear Power Project                                        ATE: 01/23/86 TITLE:     EMERGENCY PREPAREDNESS   EXERCISE ATTACHMENT 2 PRE-EXERCISE CHECKLIST FORM Initials/Date
(1)PVNGS Plant Manager (2)Manager, Operations (3)Manager, Technical Support (4)Manager, Administration Support (5)Vice President, Nuclear Production (6)Director, Technical Services (7)Security (ANPP, APS, Construction)
: l.     Exercise objectives approved by Manager, Emergency Planning, PVNGS Plant Manager and Vice President, Nuclear Production.
(8)ANPP Communications Center (9)Media Relations Department (10)Telephone Operators (ll)System Electric Department (12)Affected Unit Operations Superintendent (13)Others (specify)PV216%SA (8.84)
: 2.      Exercise objectives submitted to  NRC/FEMA.
Arizona Nuclear Power Project ROC NO: 7N409.09.00 VISION: 1 AGE 13 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 2 (Cont'd)PRE-EXERCISE CHECKLIST FORM Initials/Date 8.Support organizations notified as ap~priate:
: 3.     NRC/FEMA approval of objectives.
(1)Maryvale Samaritan Hospital (2)Good Samaritan Hospital (3)Backup Ambulance (Bechtel Power Corp.)(4)National Weather Service (5)Arizona State University (6)Combustion Engineering (7)Bechtel Power Corporation (8)Others (Specify):
: 4.      Exercise scenario submitted to  NRC/FEMA  for review and approval.
9.Players designated and informed of date of exercise and player rules (memo)10.Controllers designated, briefed,and
: 5.      NRC/FEMA approval of scenario.                                      /     ~
>provided with exercise scenario package (Attachment 3)PV21648A (8-84)
: 6.      Offsite agencies noti.fied  as necessary:
(1) Maricopa County Department of Civil Defense 6 Emergency  Services  (MCDCDES)
(2) Maricopa County Sheriff's Office      (MCSO)
(3) Arizona Department of Public Safety      (DPS)
(4) Nuclear Re'gulatory Commission    (NRC)
Resident Inspector(s)
(5) Arizona Division of Emergency Services      (ADES)
(6) Arizona Radiation Regulatory Agency      (ARRA)
(7) Others (specify)
PV216%SA (8.84 j


Arizona Nuclear Power Project OC NO: 7N409.09.00
ROC NO: 7N409.09.00 VISION:   1 AGE 12 OF 15 Arizona Nuclear Power Project                                    ATE: 01/23/86 TITLE:       EMERGENCY PREPAREDNESS   EXERCISE ATTACHMENT 2 (Cont'd)
~~~VISION: 1 AGE 14 OF 15 ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 2 (Cont'd)PRE-EXERCISE CHECKLIST'ORM Initials/Date ll.Facility.walkdown, procedure check and communications test completed.
PRE-EXERCISE CHECKLIST FORM Initials/Date
12.Equipment and materials check (e.g., moulage, mock-ups)13.Exercise Notice posted on plant bulletin board (not applicable for unannounced exercises)
: 7.     ANPP  departments and others  notified of date and time as necessary:
Performed By: Signature Date Reviewed By: Onsite Emergency Planning Supervisor Date Reviewed By: Offsite Emergency Planning Supervisor Approved By: Manager, Emergency Planning Date Date PV21648A (844)  
(1)  PVNGS  Plant Manager (2) Manager, Operations (3) Manager, Technical Support (4) Manager, Administration Support (5)  Vice President, Nuclear Production (6) Director, Technical Services (7)  Security  (ANPP, APS, Construction)
(8)  ANPP  Communications Center (9) Media Relations Department (10) Telephone Operators (ll) System  Electric Department (12) Affected Unit Operations Superintendent (13) Others (specify)
PV216%SA (8.84)


Arizona Nuclear Power Project ROC.NO: 7N409.09.00 VISION: 1 AGE 15 OF 15 ATE: '01/23/86 i TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 3 CONTROLLER BRIEFING CHECKLIST 1)Distribute Scenario Packages and identify Controller stations 2)Review of Ob)ectives 3)Review of Scenario: Narrative Time line Messages I I~.4)Review of Controller responsibilities:
ROC NO: 7N409.09.00 VISION: 1 AGE 13 OF 15 ATE: 01/23/86 Arizona Nuclear Power Project TITLE:       EMERGENCY PREPAREDNESS   EXERCISE ATTACHMENT 2 (Cont'd)
keeping play on schedule and in line Maintaining contact with Lead ControUer Issuance of Messages Plexibility of play Stationed promptly Evaluation forms 5)Review of cautions to be observed: Plant operation interference Ezcessive prompting Player/Plant safety Criticising players actions 6)Stress data capture and importance of complete records (thde dcc1cdee both players records aad coatrolder records)I I 7)Review plans for critiques 8)Other comments EXERCISE DATE!CONDUCTED BY: DATE: PVss1648A (8-84)
PRE-EXERCISE CHECKLIST FORM Initials/Date
Arizona Nuclear Power Project PROC NO:.8N718-04.00 REVISION: 3.-PAGE OF DATE: 01/02/86 TITLE: EMERGENCY PLAN TRAINING RECORD OF CHANGES AND REVISIONS PAGE REVISION PAGE REVISION PAGE REVISION Approved By: Signa t e PV21648A (8.84),~/rs I(~Date Effective Date: 1/27/86 Form 1N001.02A Rev.0
: 8. Support organizations    notified as ap~priate:
/AT"h 4 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO: 8N718'04.00 REVISION: 3 PAGE l.OF'13 DATE: 01/02/86 1.0 PURPOSE AND SCOPE 1.1 This Procedure implements the ANPP policy to provide Emergency Plan training appropriate to the needs of ANPP and APS personnel, to on-site and off-site personnel who functionally participate in Emergency Plan activities, and to certain affected segments of the public.1.2 This Procedure describes methods of providing and documenting Emergency Plan training for on-site and off-site Emergency Plan participants and for appropriate segments of the public.1.3 This Procedure meets the functional definition of an Emergency Plan Implementing Procedure and as such, shall require an annual (12 month)review and filing with the NRC.2.0 DEFINITIONS AND ABBREVIATIONS 2.1 CEC-Corporate Emergency Center 2.2 CHIC-Corporate Headquarters Information Center 2.3 EOF-Emergency Operations Facility 2.4 EPIP-Emergency Plan Implementing Procedure 2.5 JENC-Joint Emergency News Center!2.6 OSC-Operations Support Center 2.7 PCN-Procedure Change Notice 2.8 STSC-Satellite Technical Support Center 2.9 TSC-Technical Support Center 2.10 Yearl Trainin C cle-A cycle of training retraining is required twelve (12)months from the of the last successfully completed course.In the is completed in less than twelve (12)months, the may be adjusted to twelve (12)months from the date where periodic completion date event retraining retraining date of completion.
(1) Maryvale Samaritan Hospital (2) Good  Samaritan Hospital (3) Backup Ambulance (Bechtel Power Corp.)
PV21648A (8 84)7213D/0042D 0171D/0033D
(4) National Weather Service (5) Arizona State University (6)   Combustion Engineering (7)   Bechtel Power Corporation (8)   Others (Specify):
: 9.     Players designated and informed of date of exercise and player rules (memo)
: 10. Controllers designated, briefed,and >
provided with exercise scenario package (Attachment 3)
PV21648A (8-84)


Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO: 8N718.04.00 REVISION: 3 PAGE 2 OF 13 DATE: 01/02/86 2.11 Retrainin Date-That date by which retraining in a particular training course should be received and successfully completed.
OC  NO: 7N409.09.00
The retraining date is the last day of the month in which an individual completed a particular course in the previous year.3.0 RESPONSIBILITIES 3.1 Manager, Emergenc Plannin shall be responsible for: 3.1.1 Reviewing the contents of courses developed for Emergency Plan training and for ensuring that off-site (excluding EOF)Emergency Plan training is conducted.
                                                                                      ~  ~
VISION:~  1 AGE 14 OF 15 Arizona Nuclear Power Project                                          ATE:   01/23/86 TITLE:      EMERGENCY PREPAREDNESS  EXERCISE ATTACHMENT 2 (Cont'd)
PRE-EXERCISE CHECKLIST'ORM Initials/Date ll. Facility.walkdown,    procedure check and communications test  completed.
: 12. Equipment and materials check      (e.g., moulage, mock-ups)
: 13. Exercise Notice posted on      plant bulletin board (not applicable for unannounced exercises)
Performed By:
Signature                                Date Reviewed By:
Onsite Emergency Planning Supervisor                          Date Reviewed By:
Offsite  Emergency Planning Supervisor                        Date Approved By:
Manager, Emergency Planning                                    Date PV21648A (844)


====3.1.2 Providing====
ROC .NO: 7N409.09.00 VISION:    1 AGE 15 OF 15 ATE: '01/23/86 Arizona Nuclear Power Project i
to the PVNGS Training Manager a listing of personnel assigned to positions by Social Security Number vice job code who require initial training.3.1.3 Providing to supervisors on a bimonthly bas1s, the Emergency Plan Staffing List for review and update of personnel currently assigned to their group.3.1.4 Notifying the PVNGS Training Manager of any Procedure Change Notice (PCN)or revision to an Emergency Plan Implementing Procedure (EPIP).3.1.5 Coordinating tra1n1ng for o f f-site organizations 1nvolved in rendering assistance to PVNGS (corporate, news media, external assisting agencies)as required.3.1.6 Ensuring the Emergency Planning S ta f f ing List 1s curren t af ter receiving input from the PVNGS Training Manager and/or responsible supervisors.
TITLE:    EMERGENCY PREPAREDNESS          EXERCISE ATTACHMENT 3 CONTROLLER BRIEFING CHECKLIST
: 1)  Distribute Scenario Packages  and identify Controller stations
: 2) Review of Ob)ectives
: 3)  Review of Scenario:
Narrative                                                I      I Time  line Messages
~ .
: 4) Review of Controller responsibilities:
keeping play on schedule and    in line Maintaining contact with Lead ControUer Issuance of Messages Plexibility of play Stationed promptly                                        I      I Evaluation forms
: 5) Review  of cautions to be observed:
Plant operation interference Ezcessive prompting Player  /  Plant safety Criticising players actions
: 6)  Stress data capture and importance of complete records (thde dcc1cdee both players records aad coatrolder records)
: 7) Review plans    for critiques
: 8)  Other comments EXERCISE DATE!                                  CONDUCTED BY:
DATE:
PVss1648A (8-84)


====3.1.7 Providing====
PROC NO:. 8N718-04.00 REVISION: 3 .-
to all ANPP employees each calendar year, a letter describing the Onsite Siren System, its sounds, actions to be taken and the phone number of recorded siren sounds'PV21648A (8.84)  
PAGE    OF Arizona Nuclear Power Project                                        DATE:  01/02/86 TITLE:    EMERGENCY PLAN TRAINING RECORD OF CHANGES AND REVISIONS PAGE              REVISION    PAGE          REVISION      PAGE            REVISION Approved By:                                                Effective Date:
                                        /rs I(                    1/27/86 Signa t  e                  ~Date PV21648A (8.84),    ~
Form 1N001.02A Rev. 0


Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO: 8N718.04.00
/ AT"h 4 PROC NO:   8N718'04.00 REVISION:   3 PAGE l. OF'13 DATE:   01/02/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN TRAINING 1.0      PURPOSE AND SCOPE 1.1    This Procedure implements the ANPP policy to provide Emergency Plan training appropriate to the needs of ANPP and APS personnel, to on-site and off-site personnel who functionally participate in Emergency Plan activities, and to certain affected segments of the public.
'EVISION: 3 PAGE 3 OF 13 DATE: 01/02/86 3.2 Manager, Plant Services Responsible for development and implementation of appropriate Emergency Plan training for ANPP personnel that have specific on-site emergency plan responsibilities.
1.2    This  Procedure  describes methods of providing and documenting Emergency   Plan training for on-site and off-site Emergency Plan participants and for appropriate segments of the public.
1.3    This Procedure meets the functional definition of an Emergency Plan Implementing Procedure and as such, shall require an annual (12 month) review and filing with the NRC.
2.0      DEFINITIONS AND ABBREVIATIONS 2.1    CEC  Corporate Emergency Center 2.2    CHIC  Corporate  Headquarters  Information Center 2.3    EOF  Emergency  Operations  Facility 2.4    EPIP  Emergency Plan Implementing Procedure 2.5    JENC  Joint Emergency News    Center 2.6    OSC  Operations  Support Center 2.7    PCN  Procedure  Change  Notice 2.8    STSC  Satellite Technical Support Center 2.9    TSC  Technical  Support Center 2.10  Yearl    Trainin C cle  A cycle of training            where    periodic retraining is required twelve (12) months from the      completion date of the last successfully completed course. In the      event retraining is completed in less than twelve (12) months, the        retraining date may be adjusted to twelve (12) months from the date    of completion.
PV21648A (8 84) 7213D/0042D 0171D/0033D


===3.3 PVNGS===
PROC NO:  8N718.04.00 REVISION:    3 PAGE 2 OF  13 DATE:    01/02/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN TRAINING 2.11  Retrainin    Date  That date by which      retraining in a particular training course    should be received and    successfully completed. The retraining date is the last day of the month in which an individual completed a particular course in the previous year.
Training Manager shall be res onsible for: 3.3.1 Updating, preparing, approving, coordinating and conducting on-site PVNGS Emergency Response Training (On-shift, On-site and EOF ANPP personnel).
3.0        RESPONSIBILITIES 3.1    Manager, Emergenc    Plannin  shall   be responsible    for:
3.1.1   Reviewing the contents of courses developed for Emergency Plan training and for ensuring that off-site (excluding EOF) Emergency Plan training is conducted.
3.1.2    Providing    to the PVNGS Training Manager a listing of personnel assigned to positions by Social Security Number vice job code who require initial training.
3.1.3    Providing    to  supervisors    on  a    bimonthly    bas1s,  the Emergency   Plan  Staffing List for review          and  update of personnel currently assigned to their group.
3.1.4    Notifying the      PVNGS  Training Manager of any Procedure Change    Notice (PCN) or revision          to an Emergency Plan Implementing Procedure (EPIP).
3.1.5    Coordinating tra1n1ng for o ff-site organizations 1nvolved in rendering assistance to PVNGS (corporate, news media, external assisting agencies) as required.
3.1.6    Ensuring the Emergency      Planning  S ta ffing List 1s curren t af ter receiving input from the            PVNGS  Training Manager and/or responsible supervisors.
3.1.7    Providing to      all  ANPP   employees each calendar year, a letter describing      the  Onsite Siren System, its sounds, actions to be taken and the phone number of recorded siren sounds' PV21648A (8.84)


====3.3.2 Providing====
PROC NO:  8N718.04.00 3        'EVISION:
to the Manager, Emergency Planning, on a bi-monthly basis, names of individuals who are now fully qualified for inclusion on the Emergency Plan Staffing List.3.4 ANPP Su ervisors shall be res onsible for: 3.4.1 Ensuring their designated personnel maintain Emergency Plan qualifications by meeting all applicable Emergency Plan Training/Retraining requirements within the yearly training cycle.3.4.2 Reviewing the Emergency Plan Staffing List, as provided, and forwarding any personnel additions or deletions to the Manager, Emergency Planning.The lack of response by a supervisor shall be construed as no changes to the staffing list were necessary at that time.3.5 Individual employees are responsible for attending Emergency Plan Training/Retraining on dates assigned by their supervisor.
PAGE 3 OF  13 DATE:  01/02/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN TRAINING 3.2    Manager, Plant Services Responsible  for development and implementation          of appropriate Emergency Plan training for ANPP personnel          that  have specific on-site emergency plan responsibilities.
3.3    PVNGS  Training Manager shall be res onsible for:
3.3.1    Updating, preparing, approving, coordinating and conducting on-site    PVNGS    Emergency    Response  Training    (On-shift, On-site and  EOF ANPP personnel).
3.3.2   Providing to the Manager, Emergency           Planning, on a bi-monthly basis, names of individuals       who are now fully qualified for inclusion   on the Emergency Plan   Staffing List.
3.4   ANPP Su ervisors shall   be res onsible for:
3.4.1   Ensuring their designated personnel maintain     Emergency Plan qualifications by meeting all applicable         Emergency Plan Training/Retraining requirements within the yearly training cycle.
3.4.2   Reviewing the Emergency Plan Staffing List, as provided, and forwarding any personnel additions or deletions to the Manager, Emergency Planning.       The lack of response     by a supervisor shall be construed as no changes to the staffing list were necessary at that time.
3.5   Individual employees are responsible for attending Emergency Plan Training/Retraining on dates assigned by their supervisor.
4.0        PROCEDURE On-shift, On-site and EOF Staff training shall be conducted in accordance with References 5.1.1, 5.1.2, 5.2.1. Offsite staff training shall be conducted in accordance with Reference 5.1.6.
PV21648A (8-84)


===4.0 PROCEDURE===
PROC NO:.8N718.04.00;.
On-shift, On-site and EOF Staff training shall be conducted in accordance with References 5.1.1, 5.1.2, 5.2.1.Offsite staff training shall be conducted in accordance with Reference 5.1.6.PV21648A (8-84)
REVISION:     3 PAGE 4 OF   13 DATE:   01/02/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN TRAINING 4.1   Basic Trainin and Indoctrination 4.1.1   Personnel   requiring unescorted access into the security protected area shall receive general instructions on the Emergency Plan annually as part of Site Access (Re)Training:
 
4.2   Emergenc   Or anization Trainin 4.2.1   ANPP   personnel     assigned   to   the   On-shift,     On-site   or Off-site Emergency Organizations shall receive initial and annual retraining specific to their emergency assignment or facility (See   Attachment 1, 2 and 3).
Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO:.8N718.04.00;.
4.2.1.1     Personnel should be rescheduled           for   Emergency Plan retraining on, or before,           the   retraining date for that course.
REVISION: 3 PAGE 4 OF 13 DATE: 01/02/86 4.1 Basic Trainin and Indoctrination
4.2.1.2     The individual   may exceed   the retraining date by up   to   90   days without changing       the yearly training cycle for that course.
 
4.2.1.3     If the 15-month training cycle is exceeded any authority or qualification based on that training shall be rescinded.           Initial Emergency Plan training shall then be required to restore qualification.
====4.1.1 Personnel====
4.2.2   Personnel   who   are   unable   to successfully       complete   an initial   training class shall be rescheduled for that class or, at the discretion of the instructor may receive remedial training.
requiring unescorted access into the security protected area shall receive general instructions on the Emergency Plan annually as part of Site Access (Re)Training:
4.2.3   Personnel who are unable to pass the retraining examination shall be rescheduled for initial training of that class.
 
4.2.4   Additional retraining of individuals shall be conducted whenever   necessitated     by significant revisions to the Emergency Plan and/or implementing procedures         as determined by the Manager, Emergency Planning.
===4.2 Emergenc===
4.2.5   In addition to formal classroom instruction, drills and exercises shall be conducted to enable personnel to furthex develop their skills in dealing with an emergency.
Or anization Trainin 4.2.1 ANPP personnel assigned to the On-shift, On-site or Off-site Emergency Organizations shall receive initial and annual retraining specific to their emergency assignment or facility (See Attachment 1, 2 and 3).4.2.1.1 Personnel should be rescheduled for Emergency Plan retraining on, or before, the retraining date for that course.4.2.1.2 The individual may exceed the retraining date by up to 90 days without changing the yearly training cycle for that course.4.2.1.3 If the 15-month training cycle is exceeded any authority or qualification based on that training shall be rescinded.
PV21648A (8.84)
Initial Emergency Plan training shall then be required to restore qualification.
 
====4.2.2 Personnel====
who are unable to successfully complete an initial training class shall be rescheduled for that class or, at the discretion of the instructor may receive remedial training.4.2.3 Personnel who are unable to pass the retraining examination shall be rescheduled for initial training of that class.4.2.4 Additional retraining of individuals shall be conducted whenever necessitated by significant revisions to the Emergency Plan and/or implementing procedures as determined by the Manager, Emergency Planning.4.2.5 In addition to formal classroom instruction, drills and exercises shall be conducted to enable personnel to furthex develop their skills in dealing with an emergency.
PV21648A (8.84)  


e Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO:-8N718.04.00 REVISION: 3, PAGE 5 OF 13 DATE: 01/02/86 4.2.6 Annually, the Manager, Emergency Planning shall review the lesson plans used for teaching emergency planning courses.4.3 Off-site Agency Training 4.3.1 The Manager, Emergency Planning shall ensure coordination of annual training for members of the following off-site support agencies: Maricopa County Department of Civil Defense and Emergency Services.Arizona Radiation Regulation Agency.Maryvale Samaritan Hospital.Good Samaritan Medical Center.Backup Ambulance Service.Bechtel Fire Department.
e PROC NO: - 8N718.04.00 REVISION:   3, PAGE 5 OF   13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE:      EMERGENCY PLAN TRAINING 4.2.6   Annually, the Manager, Emergency Planning shall review the lesson plans used for teaching emergency planning courses.
4.3   Off-site Agency   Training 4.3.1   The Manager,   Emergency   Planning shall ensure coordination of annual training for       members of the following off-site support agencies:
Maricopa   County   Department   of   Civil   Defense     and Emergency Services.
Arizona Radiation Regulation Agency.
Maryvale Samaritan Hospital.
Good Samaritan Medical Center.
Backup Ambulance   Service.
Bechtel Fire Department.
Others as deemed necessary.
Others as deemed necessary.
 
4.3.2   Training should be specific to the agencies'esponse assignment and, at a minimum, include the following:
====4.3.2 Training====
should be specific to the agencies'esponse assignment and, at a minimum, include the following:
Basic radiation protection and emergency dosimetry.
Basic radiation protection and emergency dosimetry.
Emergency response procedures.
Emergency response procedures.
Interactions with the ANPP emergency organization.
Interactions with the ANPP emergency organization.
4.3.3 The PVNGS Training Manager may assist the Emergency Planning Department as necessary to conduct training.4.4 Media Familiarization 4.4.1 Annually, in cooperation with state and county government, training shall be given to local and regional news media.The program will include,: PVNGS Emergency Plan and EPIPs.Basic information concerning PVNGS operation and radia-tion.Locations and means for release of public information in an emergency.
4.3.3   The   PVNGS   Training Manager may assist the Emergency Planning Department as necessary to conduct training.
Familiarization tour of the Joint Emergency News Center.PV21648A (844)  
4.4   Media Familiarization 4.4.1   Annually, in cooperation with state and county government, training shall be given to local and regional news media.
The program will include,:
PVNGS Emergency Plan and EPIPs.
Basic information concerning PVNGS operation and radia-tion.
Locations and   means for release of public information in an emergency.
Familiarization tour of the Joint     Emergency News Center.
PV21648A (844)


Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO: 8N718.04.00
PROC NO: 8N718.04.00 .
.REVISION: 3 PAGE 6 OF 13 DATE: 01/02/86 3 4.4.2 The ANPP Public Information Department, with the assistance of the Emergency Planning Department, shall conduct the news media familiarization.
REVISION:   3 PAGE 6 OF 13 DATE:   01/02/86 3
Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN TRAINING 4.4.2     The ANPP   Public Information Department, with the assistance of the Emergency Planning Department, shall conduct the news media familiarization.
4.5    Documentation 4.5.1    On-shift,    On-site  and    EOF  Staff  Emergency    Response Personnel Training shall be documented in accordance with References 5.1.3 and 5.1.4. The PVNGS Training Department shall maintain these records.
4.5.2    Off-site staff training shall    be documented in accordance with Reference 5.1.6.        The  Manager,  Emergency Planning shall maintain these records.
4.5.3    Lesson  plans shall be used for all classroom instruction (References 5.1.1, 5.1.2).        All lesson plans shall be reviewed and updated annually or as required due to EPIP revision and documented by the reissuing of the lesson plans.
4.5.4    Written examinations shall be administered,        as  required, with an established minimum passing score.
4.5.5    Lesson plans and examinations are not required for off-site agency training.      Briefing forms and outline are an
                              ~
acceptable  means of documentation.


===4.5 Documentation===
==5.0      REFERENCES==
4.5.1 On-shift, On-site and EOF Staff Emergency Response Personnel Training shall be documented in accordance with References 5.1.3 and 5.1.4.The PVNGS Training Department shall maintain these records.4.5.2 Off-site staff training shall be documented in accordance with Reference 5.1.6.The Manager, Emergency Planning shall maintain these records.4.5.3 Lesson plans shall be used for all classroom instruction (References 5.1.1, 5.1.2).All lesson plans shall be reviewed and updated annually or as required due to EPIP revision and documented by the reissuing of the lesson plans.4.5.4 Written examinations shall be administered, as required, with an established minimum passing score.4.5.5 Lesson plans and examinations are not required for off-site agency training.Briefing forms and outline are an~acceptable means of documentation.


==5.0 REFERENCES==
5.1    Im  lementin    References 5.1.1    Procedure 8N718.01.00, Systematic Training Development 5.1.2    PVNGS  Procedure 80PR-OZZ01, Training Program 5.1.3    PVNGS  Procedure 81AC-OZZ01,  PVNGS  Training Records 5.1.4    ANPP    Procedure    8N718.09.00,    ANPP    Training    Approval, Registration  and Documentation.
PV21648A (8-84)


5.1 Im lementin References
PROC NO:    8N718.04.00 REVISION:      3 PAGE 7 OF    13 DATE:  . Ol/02/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN TRAINING 5.1.5  PVNGS    Procedure  83TR-OZZ04,    General    Employee      Training Pathway 5.1.6  ANPP  Department Instruction 8I718.04.01,      Emergency    Planning Off-site Training Program 5.2    Develo mental References 5.2.1  Policy 8P718.00.00,      Qualification, Training        and  Certifi-cation Policy 5.2.2  Code of Federal Regulations,        Title 10,    Chapter    1,  Part 50.47 (10CFR50.47), "Emergency Plans" 5.2.3  Code    of Federal Regulations,    Title  10, Chapter 1, Appen-dix  E    (10CFR50  Appendix    E),  "Emergenc'y    Planning and Preparedness    for Production  and  Utilization Facilities" 5.2.4  Regulatory    Guide 3.42  "Emergency Planning in Fuel Cycle Facilities    and Plants Licensed Under 10CFR Parts 50 and 70" 5.2.5  NUREG-0654/FEMA-REP-1      "Criteria for Preparation              and Evaluation of Radiological Emergency Response Plans                and Preparedness in Support of Nuclear Power Plants" 5.2.6  PVNGS  Emergency Plan 6.0        FORMS AND ATTACHMENTS 6.1    Attachment 1, Emergency Plan Training Assignement and Course Content 6.2    Attachment 2, Corporate Emergency Response      Personnel  Emergency    Plan Training Program 6.3    Attachment  3,  Joint Public Information Personnel        Emergency    Plan Training Program PV21648A (8.84)


====5.1.1 Procedure====
PROC NO:  8N718.04.00 REVISION:  3 PAGE 8 OF  13 DATE:  01/02/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN TRAINING EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT The      following    initial training/retraining  courses shall be  provided to the designated emergency response personnel as        listed.
8N718.01.00, Systematic Training Development
Overview (NGE01/NGE09)
Status Board Keeper/Clerical Aides DDC Dosimetry Clerk Computer Support Emergency Coordinator (NGE02)
Emergency Coordinator (On-Shift)
Emergency Coordinator (On-Site)
Operations Advisor Operations Coordinator STSC/OSC      Staff  (NGE03/NGEll)
STSC  Communicator OSC Coordinator Repairs Coordinator Nurse TSC/EOF        Staff  (NGE04/NGE12)
NRC  Liaison, Operations Technical Engineering Coordinator Security Director Information Monitor Hazards Control Coordinator Computer Support  Coordinator/Staff Reactor Analyst Chemistry Coordinator Technical Engineering Assistant/STA Personnel Resources Coordinator Electrical Coordinator Attachment 1 Page 1 of  4 PV216~A (8.84)


====5.1.2 PVNGS====
PROC NO: 8N718.04.00 .
Procedure 80PR-OZZ01, Training Program 5.1.3 PVNGS Procedure 81AC-OZZ01, PVNGS Training Records 5.1.4 ANPP Procedure 8N718.09.00, ANPP Training Approval, Registration and Documentation.
REVISION:   3 PAGE 9 OF 13 DATE: 01/02/86-Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN TRAINING EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT TSC/EOF      Staff  (NGE04/NGE12)  (Continued)
PV21648A (8-84)
Mechanical Coordinator I and C Coordinator Technical Analysis Coordinator Emergency Maintenance Coordinator Emergency Operations Director Administrative and Logistics Coordinator Government Liaison Engineer EOF Contact          I Logistics Communicator Security Coordinator Offsite Technical Representative NRC Liaison, Health Physics Radiological Protection Coordinator Radiological Assessment Coordinator Radiological Protection Support Staff Fire Department Training (NGE05/NGE13)
 
Fire Department Personnel Surveys and Sampling (NGE06/NGE14)
Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO: 8N718.04.00 REVISION: 3 PAGE 7 OF 13 DATE:.Ol/02/86 5.1.5 PVNGS Procedure 83TR-OZZ04, General Employee Training Pathway 5.1.6 ANPP Department Instruction 8I718.04.01, Emergency Planning Off-site Training Program 5.2 Develo mental References
Radiation Protection Technicians (Unit Technicians and Radioactive Haste Technicians)
Field Team Communicator Radiological Assessment Communicator Dose Assessment        (NGE07/NGE15)
Radiological Protection Coordinator Radiological Assessment Coordinator Radiation Protection Support Staff Radiation Protection Monitor Subjects contained within each training course are      listed  below:
Attachment 1 Page 2  of  4 Pv21648 A (8.841


====5.2.1 Policy====
PROC NO: 8N718.04.00 REVISION: 3 PAGE 10 OF 13 DATE:  01/02/86 Arizona Nuclear Power Project TITLE:        EMERGENCY PLAN TRAINING EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT Overview NGE01  Overview  for  Support  Staff NGE09  Retraining for Support Staff Emergency Coordinator        (Initial and  Retraining)
8P718.00.00, Qualification, Training and Certifi-cation Policy 5.2.2 Code of Federal Regulations, Title 10, Chapter 1, Part 50.47 (10CFR50.47),"Emergency Plans" 5.2.3 5.2.4 Code of Federal Regulations, Title 10, Chapter 1, Appen-dix E (10CFR50 Appendix E),"Emergenc'y Planning and Preparedness for Production and Utilization Facilities" Regulatory Guide 3.42"Emergency Planning in Fuel Cycle Facilities and Plants Licensed Under 10CFR Parts 50 and 70" 5.2.5 NUREG-0654/FEMA-REP-1"Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" 5.2.6 PVNGS Emergency Plan 6.0 FORMS AND ATTACHMENTS
NGE02  Overview    for  Emergency Coordinator STSC/TSC/EOF for Emergency Coordinators Emergency Classifications Emergency Exposure Guidelines/KI Administration STSC/OSC Staff NGE03  Overview    for  STSC/OSC  Staff Activation e
STSC OSC  Activation Search and Rescue Reentry Emergency Exposure    Guidelines/KI Administration NGEll  Retraining    for STSC/OSC  Staff TSC/EOF      Staff NGE04  Overview  for  TSC/EOF  Staff TSC Activation EOF  Activation Emergency Exposure    Guidelines/KI Administration NGE12  Retraining for    TSC/EOF  Staff Fire Department Training NGE05    Overview for Fire Department Actuation and Responsibilities NGE13    Retraining for Fire Department Surveys and Sampling NGE06  Overview    for  STSC/OSC  Staff OSC Activation STSC Activation Search and Rescue Emergency Exposure    Guidelines/KI Administration Attachment 1 Page 3  of 4 PV21648A (8.84)


===6.1 Attachment===
PROC NO:
1, Emergency Plan Training Assignement and Course Content 6.2 Attachment 2, Corporate Emergency Response Personnel Emergency Plan Training Program 6.3 Attachment 3, Joint Public Information Personnel Emergency Plan Training Program PV21648A (8.84)
8N718.04.00'EVISION:
Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO: 8N718.04.00 REVISION: 3 PAGE 8 OF 13 DATE: 01/02/86 EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT The following initial training/retraining courses shall be provided to the designated emergency response personnel as listed.Overview (NGE01/NGE09)
                                                                                                    ,3 PAGE 11 OF 13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE:      EMERGENCY PLAN TRAINING EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT Surveys and Sampling (Continued)
Status Board Keeper/Clerical Aides DDC Dosimetry Clerk Computer Support Emergency Coordinator (NGE02)Emergency Coordinator (On-Shift)
Surveys and Sampling Surveys and Sampling Practical NGE14  Retraining for Surveys and Sampling Dose Assessment NGE07    Fundamentals  of  Dose Assessment Dose Assessment  Procedure Practical Dose Assessment  Computer Practical NGE15  Retraining for  Dose Assessment Attachment 1 Page 4                    of 4 PV21648A (8.84)
Emergency Coordinator (On-Site)Operations Advisor Operations Coordinator STSC/OSC Staff (NGE03/NGEll)
STSC Communicator OSC Coordinator Repairs Coordinator Nurse TSC/EOF Staff (NGE04/NGE12)
NRC Liaison, Operations Technical Engineering Coordinator Security Director Information Monitor Hazards Control Coordinator Computer Support Coordinator/Staff Reactor Analyst Chemistry Coordinator Technical Engineering Assistant/STA Personnel Resources Coordinator Electrical Coordinator Attachment 1 Page 1 of 4 PV216~A (8.84)  


Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO: 8N718.04.00
PROC NO: 8N718.04.00, REVISION: 3 PAGE 12 OP.13 DATE:   01/02/86 Arizona Nuclear Power Project TITLE:      EMERGENCY PLAN TRAINING CORPORATE EMERGENCY RESPONSE    PERSONNEL EMERGENCY PLAN TRAINING PROGRAM The    following  initial training/retraining    subjects  shall  be  provided to  all Corporate Emergency Response        person- nel:
.REVISION: 3 PAGE 9 OF 13 DATE: 01/02/86-EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT TSC/EOF Staff (NGE04/NGE12)(Continued)
: 1. Principles of nuclear reactors        (not given to CEC technical staff, i.e.,
Mechanical Coordinator I and C Coordinator Technical Analysis Coordinator Emergency Maintenance Coordinator Emergency Operations Director Administrative and Logistics Coordinator Government Liaison Engineer EOF Contact I Logistics Communicator Security Coordinator Offsite Technical Representative NRC Liaison, Health Physics Radiological Protection Coordinator Radiological Assessment Coordinator Radiological Protection Support Staff Fire Department Training (NGE05/NGE13)
Corporate    Technical   Coordinator and Corporate        Engineering    Support Coordinator primaries, alternates and support staff).
Fire Department Personnel Surveys and Sampling (NGE06/NGE14)
: 2. Emergency  classifications.
Radiation Protection Technicians (Unit Technicians and Radioactive Haste Technicians)
: 3. Emergency  notification callout.
Field Team Communicator Radiological Assessment Communicator Dose Assessment (NGE07/NGE15)
: 4. Emergency  facilities:     functions and interfaces.
Radiological Protection Coordinator Radiological Assessment Coordinator Radiation Protection Support Staff Radiation Protection Monitor Subjects contained within each training course are listed below: Attachment 1 Page 2 of 4 Pv21648 A (8.841 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO: 8N718.04.00 REVISION: 3 PAGE 10 OF 13 DATE: 01/02/86 EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT e Overview NGE01-Overview for Support Staff NGE09-Retraining for Support Staff Emergency Coordinator (Initial and Retraining)
: 5. Corporate Emergency Procedures      overview.
NGE02-Overview for Emergency Coordinator STSC/TSC/EOF for Emergency Coordinators Emergency Classifications Emergency Exposure Guidelines/KI Administration STSC/OSC Staff NGE03-Overview for STSC/OSC Staff STSC Activation OSC Activation Search and Rescue Reentry Emergency Exposure Guidelines/KI Administration NGEll-Retraining for STSC/OSC Staff TSC/EOF Staff NGE04-Overview for TSC/EOF Staff TSC Activation EOF Activation Emergency Exposure Guidelines/KI Administration NGE12-Retraining for TSC/EOF Staff Fire Department Training NGE05-Overview for Fire Department Actuation and Responsibilities NGE13-Retraining for Fire Department Surveys and Sampling NGE06-Overview for STSC/OSC Staff OSC Activation STSC Activation Search and Rescue Emergency Exposure Guidelines/KI Administration Attachment 1 Page 3 of 4 PV21648A (8.84)
: 6. CEC  function  and  positions.
: 7. CEC  notification, activation,    and operatin.
Attachment 2 Pv216~A (8 84i


Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO: 8N718.04.00'EVISION:
f PROC NO: 8N718.04.00 REVISION: 3 PAGE 13 OF 13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE:       EMERGENCY PLAN TRAINING JOINT PUBLIC INFORMATION PERSONNEL EMERGENCY PLAN TRAINING PROGRAM The     following initial training/retraining subjects shall   be provided   to all Public Information personnel:
,3 PAGE 11 OF 13 DATE: 01/02/86 EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT Surveys and Sampling (Continued)
: 1. Principles of nuclear reactors.
Surveys and Sampling Surveys and Sampling Practical NGE14-Retraining for Surveys and Sampling Dose Assessment NGE07 Fundamentals of Dose Assessment Dose Assessment Procedure Practical Dose Assessment Computer Practical NGE15-Retraining for Dose Assessment Attachment 1 Page 4 of 4 PV21648A (8.84)
: 2. Principles of radiation.
Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO: 8N718.04.00, REVISION: 3 PAGE 12 OP.13 DATE: 01/02/86 CORPORATE EMERGENCY RESPONSE PERSONNEL EMERGENCY PLAN TRAINING PROGRAM The following initial training/retraining subjects shall be provided to all Corporate Emergency Response person-nel: 1.Principles of nuclear reactors (not given to CEC technical staff, i.e., Corporate Technical Coordinator and Corporate Engineering Support Coordinator primaries, alternates and support staff).2.Emergency classifications.
: 3. Emergency   classifications.
3.Emergency notification callout.4.Emergency facilities:
: 4. Emergency   facilities and telecommunications.
functions and interfaces.
: 5. Government agencies     emergency response.
5.Corporate Emergency Procedures
: 6.     Flow of public information.
-overview.6.CEC function and positions.
7.CEC notification, activation, and operatin.Attachment 2 Pv216~A (8 84i f
Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING PROC NO: 8N718.04.00 REVISION: 3 PAGE 13 OF 13 DATE: 01/02/86 JOINT PUBLIC INFORMATION PERSONNEL EMERGENCY PLAN TRAINING PROGRAM The following initial training/retraining subjects shall be provided to all Public Information personnel:
1.Principles of nuclear reactors.2.Principles of radiation.
3.Emergency classifications.
4.Emergency facilities and telecommunications.
5.Government agencies-emergency response.6.Flow of public information.
Attachment 3 PV216MA (8.84)}}
Attachment 3 PV216MA (8.84)}}

Latest revision as of 05:05, 4 February 2020

Revs 0 to Administrative Procedures 7N409.03.00 Re Emergency Plan Review & approval,7N409.04.00 Re Emergency Plan Change notice,7N409.07.00 Re Emergency Plan Implementing Procedures Approval & 7N409.08 Re Emergency Preparedness Drills
ML17298C171
Person / Time
Site: Palo Verde  Arizona Public Service icon.png
Issue date: 05/23/1985
From:
ARIZONA PUBLIC SERVICE CO. (FORMERLY ARIZONA NUCLEAR
To:
Shared Package
ML17298C170 List:
References
PROC-850523, NUDOCS 8505290495
Download: ML17298C171 (90)


Text

8505290095 850523 PDR ADQCK 05000528 F PDR Q PROC NO: 7N409 ~ 03 00 REVISION: 0 PAGE DATE: ll/30~84 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN REVIEW AND APPROVAL RECORD OF CHANGES AND REVISIONS PAGE REVISION PAGE 'REVISION PAGE REVISION co~<

Approve Effective Date:

11 30 84 Signature Date PV816.08A (8 84)

Form 1N001.02A Rev. 0

t/

~

tl g g K >,f jg'(J ~C C

C h

PROC NO: 7N409.03.00 VISION: 0 PAGE 1 OF 3 DATE: 11/03/84 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN REVIEW AND APPROVAL 1.0 PURPOSE AND SCOPE This Procedure establishes guidelines for providing technical and administrative review, update and approval of the PVNGS Emergency Plan.

2.0 DEFINITIONS AND ABBREVIATIONS 2.1 ANS American National Standards 2.2 EPRI Electric Power Research Institute 2.3 FEMA Federal Emergency Management Agency 2.4 INPO Institute of Nuclear Power Operations 2.5 NRC Nuclear Regulatory Commission 3.0 RESPONSIBILITIES The Manager, Emergency Planning and Preparedness Department (EP&P) is responsible for coordinating the review and approval of the PVNGS Emergency Plan and submittal to NRC for approval.

4.0 PROCEDURE 4.1 The review and any revisions shall consider the following:

NOTE The PVNGS Emergency Plan shall be reviewed at least annually.

4.1.1 Deficiencies in procedures, personne1 or equipment discovered during drills and exercises.

4.1.2 Changes in personnel assignments within Emergency Plan organization.

4.1.3 Changes in state and federal regulations or policies.

4.1.4 Recommendations from INPO, EPRI, ANS or consultants.

4.1.5 Changes to. facilities, area or status.

PV21648A (8 8i) 0012D/0033D

PROC NO: 7N409.03.00 REVISION: 0 PAGE 2 OF 3 DATE: 11/03/84 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN REVIEW AND APPROVAL 4.1.6 Results of appraisals or audits from NRC, INPO, FEMA or APS independent audit teams.

4.2 The EP&P staff will coordinate any changes to the implementing procedures from Section 4.1 above.

4.3 The Manager, EP&P shall review and distribute to appropriate organizations.

4.4 The Emergency Plan Revisions are distributed to the following organizations for review and comment:

Emergency Planning and Preparedness Department Director, Nuclear Operations Manager, PVNGS Radiation Protection and Chemistry Manager, Administrative Services Manager, Maintenance Manager, Administrative Services PVNGS Compliance Licensing Department APS Public Information Office ANPP Construction APS Corporate Health Physics Arizona Division of Emergency Services Arizona Radiation Regulatory Agency Maricopa County Department of Civil Defense and Emergency Services 4.5 All comments shall be addressed to the Emergency Planning and Preparedness Department for resolution and disposition.

4.6 The completed draft shall be reviewed and approved by the Manager, EP&P and submitted to the PRB review and approval cycle in accordance with Reference 5.1.1.

4.7 Upon approval by PRB, the Emergency Plan shall be sent to the Assistant Vice President, Nuclear Production; the Vice President, Nuclear Production; and the Executive Vice President, ANPP for concurrence.

4.8 The Licensing 'Department shall be responsible for submitting the approved Emergency Plan to the NRC for their approval.

P>21648A (8')

PROC NO: 7N409.03.00 REVISION:'

PAGE 3 OF 3 DATE: 11/03/84 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN REVIEW AND APPROVAL

5. 0 REFERENCES 5.1 Im lementin References 5.1.1 PVNGS Station Manual Procedure 70AC-OZZ06, Plant Review Board 5.2. Develo mental References 5.2.1 PVNGS Emergency Plan, Revision 3 5.2.2 EPIP Reference Document Control 5.2.3 Unit One Interim Technical Specifications, Administrative Controls 6.5.1.6 I

'0 h

5.2.4 PVNGS Final Safety Analysis Report,.13.3 6 ' FORMS AND ATTACHMENTS None.

PV2}6 08A i8 84)

Pp ~

  • j Ig

,'l I "id

~

,fj&/\

P 0

h I

p

~

PROC NO: 7N409. 04. 00 REVISION: 0 PAGE OF DATE: 11/12/84 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN CHANGE NOTICE RECORD OF CHANGES AND REVISIONS PAGE REVISION PAGE RE VIS ION ~ PAGE REVISION

~ i Effective Date:

P~ 11/30/84 Signature Date PV216 08A (8.84)

Form 1N001. 02A Rev. 0

'l I

~j

PROC NO: 7N409. 04. 00 REVISION: 0 PAGE 1 OF 3 DATE: ll/12/84 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN CHANGE NOTICE

l. 0 PURPOSE AND SCOPE This Procedure provides for inclusion of significant changes into the Palo Verde Nuclear Generating Station Emergency Plan concurrent with the established review and approval procedure for the annual update of the PVNGS Emergency Plan.

2.0 DEFINITIONS AND ABBREVIATIONS 2.1 ANS American National Standards 2.2 EPRI Electric Power Research Institute 2.3 FEMH Federal Emergency Management Agency 2.4 INPO Institute of Nuclear Power Operations 2.5 NRC Nuclear Regulatory Commission

3. 0 RESPONSIBILITIES The Manager, Emergency Planning and Preparedness Department (E?&?) is responsible for coordinating the review and approval of the PViNGS Emergency Plan and submittal to the Nuclear Regulatory Commission for approval.
4. 0 PROCEDURE 4.1 The significant changes will be prepared in a written report entitled "PVNGS Emergency Plan Interim Change Notice" (see Appendix A) by the EP&P staff, and will be presented directly to the Manager, EP&P for review and approval. Changes will be shown by numbered review bars on necessary copies of text accompanying the Interim Change Notice.

4.2 The PViNGS Emergency Plan Interim Change Notice shall be sent to the Plant Review Board to review and approve the changes in accordance with Reference 5.1.1.

PV 216.08A (8.84 l 0011D/0020D

PROC NO: 7N409. 04. 0 REVIS ION: 0 PAGE 2 OF 3 DATE: 11/12/84 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN CHANGE NOTICE 4.3 Upon the Plant Review Board approval, the Emergency Plan Change Notice will be returned to the EP&P Department, from which one copy will be transmitted to licensing for review and 'another copy is forwarded in sequence to the following for confirmation:

Assistant Vice President, Nuclear Vice President, Nuclear Executive Vice President, ANPP 4.4 Following signed approvals, EP&P will request the licensing department to forward the change (with review bars) to the Nuclear Regulatory Commission.

4.5 The fully approved Emergency Plan Change Notice is returned to the Emergency Planning and Preparedness Department for incorporation into the working control copy as an approved change and for submission to Drawing and Document Control (DDC) for dissemination to control copy holders.

NOTE: The working control copy is submitted, as a minimum, annually for update in accordance with established Emergency Plan review and approval procedure.

5.0 REFERENCES

5.1 Im lementi References 5.1.1 PVNGS Station Manual Procedure 70AC-OZZ06, Plant Review Board 5.2 Develo mental References 5.2.1 PVNGS Emergency Plan,'evision 3 5.2.2 Unit One Interim Technical Specifications, Administrative Controls 6.5.1.6.

6.0 FORMS AND ATTACHMENTS 6.1 Appendix A, PVNGS Emergency Plan Interim Change Notice PV216.08A I8 841

PROC NO: 7N409. 04. 00 REVISION: 0 PAGE 3 OF 3 DATE: 11/12/84 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN CHANGE NOTICE APPENDIX A PVNGS EMERGENCY PLAN INTERIM CHANGE NOTICE DATE PAGE 1 OF E-PLAN EEV. NO.

AFFECTED SECTION:

CHANGE REQUIRED:

' REASON FOR CHANGE:

SOURCE DOCFiKNTS IDENTIFYING C>MV":

SUBMITTED BY DATE:

EP&P STAFF REVIEN DATE:

MANAGER EP&P APPROVAL DATE:

PRB APPROVAL DATE:

ASST. V. P. NUCLEAR PROD. APPROVAL DATE:

VICE PRES. NUCLEAR PROD. CONCURRENCE DATE:

EXEC. V. P. ANPP APPROVAL DATE:

SUBMITTED TO NRC BY:

DATE'ATE:

NRC APPROVAL PV216.08A I B.SA)

t P

~fc

C PROC NO: 7N409 ~ 07 '0 REVISION:, 0 PAGE OF DATE: 01/16/85 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN IMPLEMENTING PROCEDURES, REVIEW AND APPROVAL RECORD OF CHANGES AND REVISIONS PAGE REVISION REASON FOR REVISION

+SSg/n c o Approved By: Effective Date:

2/22/85 Signature Date PVNGS Plant Manager's Signature Date (if required)

PRB Review (if required Date PV21648A (844)

Form 1N001.02A Rev. 1

0 t',)

+ ~

A a J'

~ E J

PROC NO: 7N409.07.00 REVISION: 0 PAGE 1 OF 4 DATE: 01/16/85 Arizona Nuclear Power Project TXTLE: EMERGENCY PLAN XMPLEMENTXNG PROCEDURES, REVIEW AND APPROVAL 1.0 PURPOSE AND SCOPE To establish guidelines for providing technical and administrative review, update and approval of Emergency Plan Implementing Procedures (EPIPs).

2' . DEFINITIONS 2.1 ANSI American National Standards Institute 2.2 DDC Drawing and Document Control 2.3 EPIP Emergency Plan Implementing Procedure 2.4 EPRI Electric Power Research Institute 2.5 INPO Institute of Nuclear Power Operations 2.6 NRC Nuclear Regulatory Commission 2.7 PCN Procedure Change Notice 2.8 PRB Plant Review Board 3.0 RESPONSIBILITIES 3.1 The Supervisor, Site Emergency Planning shall be responsible for updating or .revising the Emergency Plan Implementing Procedures (EPIPs) as a result of audits or deficiencies identified by emer-gency drills or exercises.

3.2 DDC shall be responsible for -notifying the department head when an EPIP review is required.

3.3 The Manager, Emergency Planning and Preparedness shall be 3.4 The PRB shall be responsible for reviewing and recommending approval of EPIPs to the PVNGS Plant Manager.

3.5 The Manager, Licensing shall be responsible for submitting all new or revised EPXPs to the NRC Regional Office and the Document Control Desk.

PV21648A (8%i) 0192D/0034D

PROC NO: 7N409.07.0 REVISION: 0 PAGE 2 OF 4 Arizona Nuclear Power Project DATE: 01/16/85 TITLE: EMERGENCY PLAN IMPLEMENTING PROCEDURES, REVIEW AND APPROVAL.

4 .0 PROCEDURE 4.1 The review and any subsequent revisions should consider the follow-ing items:

4.1.1 Deficiencies in training, procedures, personnel or equip-ment which may have been discovered during drills/exercises.

4.1.2 Changes in personnel assignments within the Emergency organization.

4.1.3 Changes in functions, assignments or response capabilities of supporting agencies.

4.1.4 Changes in applicable federal or state statutes, regula-tions or policies.

4.1.5 Recommended modifications to procedures or equipment from other agencies such as INPO, EPRI or ANSI.

4.1.6 Modifications to the plant or site area.

4.1.7 Changes in construction or operation status.

4.1.8 Results of Emergen'cy Preparedness appraisals/reviews by the NRC, INPO, Emergency Planning or an independent review organization.

4.2 Attachment 1 shall be used to document this revision and shall be signed by the approving authority of the original procedure.

4.3 DDC shall notify the Manager, Emergency Planning and Preparedness when a review is required.

4.4 Deficiencies found during the review process shall be corrected by either revising the procedure or issuing a PCN per Reference 5.1.1.

4.5 Quarterly, the Supervisor, Site Emergency Planning shall initiate a verification of telephone numbers listed in the EPIPs.

4.5.1 Verification may be conducted in conjunction with Emergency Planning drills or exercises.

PV21648A (844}

PROC NO: 7N409.07.00 REVISION: 0 PAGE 3 OF' Arizona Nuclear Power Project DATE: 01/16/85 TITLE: EMERGENCY PLAN IMPLEMENTING PROCEDURES, REVIEW AND APPROVAL 4.5.2 To verify, dial the, listed number 'and receive concurrence from the answering party that the number dialed is the current number for the location listed in the EPIPs.

4.5.3 If any numbers require correcting, a PCN or procedure revision to affected procedures shall be initiated within 5 working days.

4.6 Revisions or PCNs to the EPIPs shall be forwarded to the Manager, Emergency Planning and Preparedness for approval to insure that there is no conflict with Licensing commitments, the PVNGS Emergency Plan or so that changes may be incorporated into the Emergency Plan, and review of EPIPs for consistency with overall PVNGS Emergency Planning goals and objectives.

4.7 The PRB shall review and recommend approval of EPIPs per Reference 5.1.2.

4.8 Within 30 days after approval of a new or revised EPIP, Licensing shall submit one copy of the Procedure to the Administrator of the NRC Regional Office and two copies to the Document Control Desk.

5.0 REFERENCES

5.1 Im lementin References 5.1.1 70AC-OZZ02, "Review and Approval of Station Procedures" 5.1.2 70AC-OZZ06, "Plant Review Board" 5.2 Develo mental References 5.2.1 PVNGS Emergency Plan, Rev. 5 5.2.2 PVNGS Unit One Technical Specifications, Section 6.5.2.7 and 6.8.1 6.0 FORMS AND ATTACHMENTS HW'

.1 Procedure Pe riodic Review Control Form , Attachment 1 PV216O8A ISM)

PROC NO: 7N409.07.00 REVISION: 0 PAGE 4 OF 4 DATE: 01/16/85 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN IMPLEMENTING PROCEDURES, REVIEW AND APPROVAL ATTACHMENT 1 PROCEDURE PERIODIC REVIEW CONTROL FORM Procedure No.

Procedure Title Due Date Revision No.

Change RequiredP Yes No Comments:

Reviewed by Date procedure Revision Initiated to incorporate comments, if required.

Signature Date Procedure Rev. No.

Approved: Date PV21648A (8M)

I ~

I

PROC NO: 7N409. 08. 00 REVISION: 1 PAGE OF DATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS RECORD OF CHANGES AND REVISIONS PAGE REVISION PAGE REVISION PAGE REVISION NPRM COIIITIM IL Ã Approved By: Effective Date:

2/28/86 Signatu ate PV21848A (8.84) Form 1N001.02A Rev. 0

ROC NO: 7N409.08.00 ISION: 1 AGE 1 OF 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS 1.0 PURPOSE AND SCOPE 1.1 To establish guidelines for developing, conducting, evaluating and documenting emergency preparedness drills.

1.2 To provide guidance to test emergency response personnel, equipment, communications, plans, and procedures as an extension 'of classroom training.

1.3 To provide guidance to verify the adequacy of the PVNGS Emergency Plan and Implementing Procedures and the overall effectiveness of emergency preparedness at PVNGS.

2.0 DEFINITIONS AND ABBREVIATIONS 2.1 Definitions 2.1.1 Controller Individual assigned to direct the . drill and provide messages, data and instructions. Controllers also serve as evaluators during the drill.

2.1.2 Drill A supervised instruction period aimed at testing, developing and maintaining skills in a particular operation(s).

2.1.3 Emergency Planning Action Item List A listing of open items related to the drill requiring corrective action.

2.2 Abbreviations 2.2.1 ADES Arizona Division of Emergency Services 2.2.2 ALARA As Low As Reasonably Achievable 2.2.3 ARRA Arizona Radiation Regulatory Agency 2.2.4 CEC Corporate Emergency Center PV 216-08 A (8-84) 0124D/0031D

PROC NO: 7N409.08.00 REVISION: 1 PAGE 2 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS 2;2.5 CEO Chief Executive Officer 2.2.6 CHIC Corporate Headquarters Information Center 2.2.7 DPS Arizona Department of Public Safety 2.2.8 EC Emergency 'Coordinator 2.2.9 ENS Emergency Notification System 2.2.10 EOC Emergency Operations Center 2.2.11 EOD Emergency Operations Director 2.2.12 EOF Emergency Operations Facility 2.2.13 EPIP Emergency Plan Implementing Procedure 2.2.14 EPZ Emergency Planning Zone 2.2.15 JENC Joint Emergency News Center 2.2.16 MCDCDES Maricopa County Department o f Civil Defense and Emergency Services 2.2.17 MCSO Maricopa County Sheriff 's Office 2.2.18 NAN Notification Alert Network 2.2.19 NRC Nuclear Regulatory Commission 2.2.20 OSC Operations Support Center 2.2.21 STSC Satellite Technical Support Center e>

2.2.22 TSC Technical Support Center PV21648A (8-84)

PROC NO: 7N409.08.00 REVISION: 1 PAGE 3 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS

3. 0 RESPONSIBILITIES 3.1 The Manager, Emergency Planning shall have overall responsibility for the development, approval, conduct, evaluation and documentation of drills.

3.2 The Onsite and Offsite Emergency Planning Supervisors shall assign deficiencies as action items on the Emergency Planning Action Item List and task them to the affected departments or personnel.

3.3 The Onsite and Offsite Emergency Planning Supervisors shall be reponsible for ensuring appropriate corrective actions are taken to resolve deficiencies identified during drills.

3.4 The PVNGS Plant Manager shall review and approve Drill Obgectives, date, time, location, and participating organizations for onsite drills.

4.0 PROCEDURE NOTE: Drills shall be conducted on a periodic basis as outlined in Attachment l.

4.1 Onsite and Offsite Drills 4'.l. l The Onsite shall coordinate and/or Offsite the Emergency Planning Supervisor planning and scheduling of each drill. The Manager, Emergency Planning shall approve the drill schedule.

4.1.2 Drills shall'e developed, scheduled and conducted in such a manner to meet the requirements of 10CFR50, Appendix E, guidance of NUREG654, Rev. 1 and other appropriate regulatory guidance.

4.1.3 Drills shall be scheduled and conducted so as to minimize conflicts with normal plant operations.

PV21648A (844)

ROC NO- 7N409.08.00 VISION: 1 AGE 4 OF 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS 4.1.4 Drill scenarios may be developed on a real time basis or on an accelerated schedule so that more activities are tested in a shorter time frame.

4.1.5 The Onsite and/or Offsite Emergency Planning Supervisor shall submit the drill objectives, date, time, location and participating organizations using the Drill Scenario Approval Form (Attachment 2) to the Manager, Emergency Planning and the PVNGS Plant Manager (onsite drills only) for review and approval.

4.1.6 The Onsite and/or Offsite Emergency Planning Supervisor shall review and approve the drill scenario and coordinate the assignment of controllers.

4.1.7 Prior to the drill, the Onsite and/or Offsite Emergency Planning Supervisor shall ensure that:

4.1.7.1 The Predrill Checklist Form (Attachment 3) is completed.

4.1.7.2 A Lead Controller is assigned for the drill.

4.1.7.3 A predrill briefing is held to inform the con-trollers of the objectives of the drill, extent of play, pre-staging requirements, which portions of the scenario require strong 'control and which portions of the scenario permit free play.

Attachment 4, Controller Briefing Checklist, shall be completed.

4.1.7.4 Players are briefed concerning the objectivesp precautions and extent of play. Attachment 5, Player Briefing Checklist, shall be completed or a memo addressing these items shall be provided to the players.

4.1.8 Following the drill, the Lead Controller (or Onsite or Offsite Emergency Planning Supervisor) shall meet with all controllers and conduct a critique.

PV21648A (844)

ROC NO: 7N409.08 00 ISION: 1 AGE 5 OF 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE-'MERGENCY PREPAREDNESS DRILLS 4.1.9 Upon completion of the critique, the Lead Controller shall brief the Onsite and Offsite Emergency Planning Supervisors on the results of the drill.

4.1.10 The Onsite and Offsite Emergency Planning Supervisors shall assign deficiencies as action items bn the Emergency Planning Action Item List, task them to the affected departments or personnel, as applicable, and submit this to the Manager, Emergency Planning for approval.

4.1.11 Upon receipt of the approved Emergency Planning Action Item List, the Onsite and Offsite Emergency Planning Supervisors shall then submit to the Manager, Emergency Planning a written Drill Report which shall include the following:

4.1.11.1 A cover sheet, in memo form, to identify the drill by name and number; to list sections which are included in the report, and to provide an approval signature block for the Manager, Emergency Planning to approve the report.

4.1.11.2 Section 1 - date, time and duration of the drill; the participating agencies by name; the purpose of the- drill; the narrative summary; and the list of assigned controllers.

4.1.11.3 Section 2 - comparison of the drill objectives against actual performance.

4.1.11.4 Section 3 - significant findings of such a nature that, if uncorrected, would reduce of the emergency response program the effectiveness and shall be tracked on the Emergency Planning Action Item List. General observations shall be noted but not included on the 'Emergency Planning Action Item List.

4.1.11.5 Section 4 - actual drill sequence of events (time line).

4.1.11.6 Section 5 - utility drill participants.

PV216-08A (8.84)

PROC NO: 7N409 ~ 08.00 REVISION: 1 PAGE 6 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE- EMERGENCY PREPAREDNESS DRILLS 4.1.12 After the Manager, Emergency Planning approves the Drill Report, a copy of the Drill Report, the completed Drill Scenario Approval Form (Attachment 2) and Predrill Checklist Form (Attachment 3) shall be submitted to Drawing and Document Control for retention.

4.1.13 A complete copy of the drill scenario, Drill Report, and other drill related materials shall be retained in the Emergency Planning Department files as long as deemed appropriate by the Manager, Emergency Planning.

4.1.14 Copies of the Emergency Planning Action Item List for each drill shall be submitted to the Plant Manager, Asst.

Vice-President, Nuclear Production and other appropriate ANPP departments.

4.1.1S The Onsite and Offsite Emergency Planning Supervisors shall track the status of corrective actions related to deficiencies identified on the, Emergency Planning Action Item List and ensure appropriate resolution.

4.2 Fire Drills 4.2.1 Drill scenarios, predrill actions, drill critiques, reports of drill performance and corrective actions shall be administered and implemented by the PVNGS Fire Prevention Department in accordance with 83TR-OZZ07, Fire Team Training, Revision 1.

4.3 Communications Drills 4.3.1 The weekly communications testing of the NAN lines to state and county response agencies shall be performed without a drill scenario or controller. This shall be completed by the Operations Department using forms provided in PVNGS Station Manual, 410P-1QF02 and 420P-2QF02.

PV21648A (8M)

PROC NO: 7N409.08.00 REVISION: 1 PAGE 7 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE-'MERGENCY'REPAREDNESS DRILLS 4.3.2 The monthly communications testing of the ENS line from the Control Room(s), TSC and EOF to the NRC Headquarters Operations Center and of the two extension commercial phones (replacing the HPN and Federal Telephone System which are not installed at PVNGS) shall be performed without a drill scenario or controller. This shall be completed by the Emergency Planning Department using Attachment 6.

4.3.3 The quarterly communicatio~esting with the state in the ingestion exposure EPZ shall be performed without a scenario or controller. This shall be performed by the Emergency Planning Department using Attachment 7.

NOTE: Pursuant to ANPP Administrative Policies and Procedures, 7N409.07.00, all phone numbers listed in the EPIPs are checked on a quarterly basis.

4.3.4 Annual communications testing shall be performed during the annual exercise. Records shall be prepared and maintained pursuant to ANPP Policies and Procedures 7N409.09.00.

4.3.5 Deficiencies noted during communications testing will be brought to the attention of the Manager, Emergency Planning.

4.3.6 Records of communications testing described above shall be collected by the Emergency Planning Department for subsequent transmittal to Drawing and Document Control.

5.0 REFERENCES

5.1 Im lementin References None 5.2 Develo mental References 5.2.1 PVNGS Emergency Plan, Revision 6 PV216MA (8-84)

PROC NO: 7N409.08.00 REVISION- 1 PAGE 8 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS 5.2.2 NUREG&654 FEMA REP-1, "Criteria for Preparation and Eval-uation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants," Revision 1 5.2.3 80PR-,OZZ01, "Training Program," Revision 3 5.2.4 10CFR50, Appendix E, "Emergency Planning and Preparedness for Production and Utilization Facilities" 5.2.5 83TR-OZZ07, "Fire Team Training", Revision 1.

5.2.6 PVNGS Station Manual, 410P-1QF02, Revision 1, "Notification Alert Network (NAN) Tests."

5.2.7 NRC IE Information Notice No. 85-55, "Revised Emergency Exercise Frequency Rule." July 15, 1985.

5.2.8 ANPP Administrative Policies and Procedures, 7N409.07.00, "Emergency Planning Implementing Proceduxes, Review and Approval."

5.2.9 ANPP Administrative Policies and Procedures, 7N409.09.00, "Emergency Preparedness Exercise."

6 ' FORMS AND ATTACHMENTS 6.1 Attachment 1 Drill Frequencies 6.2 Attachment 2 Drill Scenario Approval Form 6.3 Attachment 3 Predrill Checklist Form 6.4 Attachment 4 Controller Briefing Checklist 6.5 Attachment 5 Player Briefing Checklist 6.6 Attachment 6 Monthly Communications Drill Record 6.7 Attachment 7 Quarterly Communications Drill Record PV216MA (8.84)

ROC NO: 7N409.08.00 ISION: 1 AGE 9 OF 20 ATE: 01/23/86 Arizona Nuclear Power Project 4 TITLE: EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 1 DRILL FREQUENCIES

1. 0 WEEKLY 1.1 Communications links and notification procedures with offsite state and local agencies within the plume exposure pathway (10 mile EPZ) shall be tested on a.weekly basis.

2.0 MONTHLY 2.1 Communications links with the NRC shall Qe tested monthly as follows:

From To NRC Head uarters 0 erations Center Control Room(s) ENS TSC ENS and two extension commercial phones EOF ENS and two extension commerical phones NOTE: The two extension commercial phones shall be used instead of the Health Physics Network and Federal Telecommunications System lines which are not installed at PVNGS.

3.0 ~UAEYEKLY 3.1 Drills shall be conducted quarterly for each shift fire brigade for each unit.

3.2 Communications links and notification procedures with Federal response organizations and state organizations within the ingestion pathway (50 mile EPZ) shall be tested on a quarterly basis.

4.0 SEMI-ANNUALLY 4.1 Health Physics drills shall be conducted send.-annually generally in conjunction with exercises or radiological monitoring drills.

Health Physics drills involve response to, and analysis of, simulated elevated radiation levels both . liquid and airborne, as well as direct radiation measurements in the environment.

PY21648A (8441

ROC NO: 7N409.08 00 ISION: 1 AGE 10 OF 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 1 (Cont'd)'RILL FREQUENCIES

5. 0 ANNUALLY 5.1 Communications between PVNGS, Federal and state emergency response organizations, and field assessment teams shall be tested annually generally in conjunction with the annual exercise.

5.2 Medical emergency drills involving treatment of a simulated con-taminated person with provision for participation by offsite support service agencies (ambulance, helicopter or hosp1tal) shall be conducted annually.

5.3 Radiolog1cal monitoring drills for personnel assigned to inplant,

"'nsite and offsite monitoring teams, involving communications, use of instruments, calculation of offs1te dose projections and the collect1on of sample med1a shall be conducted annually.

5.4 Health Physics and chemistry drills involving analysis of inplant liquid samples with actual elevated radiation levels, including usage of the postaccident sampling system shall be conducted annually.

5.5 An emergency exercise of the PVNGS Emergency Plan shall be conducted annually. Offsite emergency management organizations shall be requested to participate in each annual exercise; however, full participation by offsite agencies is requ1red b1annually pursuant to NRC IE Information Notice No. 85-55.

5.6 Addit1onal drills may be conducted as necessary to maintain proficiency of response personnel.

PV21648A (844)

PROC NO- 7N409.08.00 REVISION: 1 PAGE 11 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRIRLS ATTACHMENT 2 DRILL SCENARIO APPROVAL FORM Prepared By: Approved By:

Manager, Emergency Planning Reviewed By: Approved By:

Offsite Emergency Planning Supervisor Plant Manager (Onsi~ills aa.y)

Reviewed By:

Onsite Emergency Planning Supervisor

1. Type of Drill: Number:
2. Date and Time of Commencement: Duration:
3. Participating Organizations.'rill
4. Objectives:
5. Scope: (simulated events, extent of play, locations)

T

6. Precautions/Limitations:

PV21648A (8-84)

)

'I 4

C

PROC NO: 7N409.08.00 REVISION: 1 PAGE 12 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE-'MERGENCY PREPAREDNESS DRILLS ATTACHMENT 3 PREDRILL CHECKLIST FORM DRILL TITLE: DRILL NUMBER: DRILL DATE:

Initials/Date

1. Objectives of drill developed and approved.

(Drill Scenario Approval Form Attachment 2)

2. Scenarios developed and approved.
3. Drills scheduled so as not to affect essential plant operations or activities.
4. Offsite agencies notified as necessary:

(1) Maricopa County Department of Civil Defense &

Emergency Services (MCDCDES)

(2) Arizona Radiation Regulatory Agency (ARRA)

(3) Maricopa County Sheriff's Office (MSCO)

(4) Arizona Department of Emergency Services (ADES)

(5) Arizona Department of Public Safety (DPS)

(6) Nuclear Regulatory Commission (NRC) Region V (7) NRC Resident Inspector(s)

(8) Others (specify)

PV21648A (8~)

ROC NO: 7N409.08.00 EVISION: 1 AGE 13 OF 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 3 (Cont'd)

PREDRILL CHECKLIST FORM

5. ANPP departments and others notified as necessary:

(1) PVNGS Plant Manager (2) Manager, Operations (3) Manager, Technical Support (4) Director, Technical Services (5) Manager, Administrative Support (6) Security (ANPP, APS, Construction)

(7) ANPP Communications Center (8) Media Relations Department (9) Telephone Operators (10) Unit Operations Superintendent (Affected Unit(8))

(ll) Systems Electric Department (12) Others (specify)

PV21648A (844)

ROC NO: 7N409.08.00 ISION: 1 AGE 14 OF 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 3 (Cont'd)

PREDRILL CHECKLIST FORM

6. Support organizations notified as appropriate.

(1) Maryvale Samaritan Hospital (2) Good Samaritan Hospital (3) Backup Ambulance (Bechtel Power Corporation)

(4) National Weather Service e (5) Arizona State University (6) Others (specify)

7. Players designated and informed of drill (Attachment 5 or memo).
8. Controllers designated and informed of drill (Attachment 4).
9. Facility walkdown, procedure check and communication test completed.
10. Equipment and materials check (e.g., mock-ups, moulage) ll. asDrill Notice posted appropriate.

on plant bulletin board Performed By:

Signature Date Reviewed By:

Onsite Emergency Planning Supervisor Date Reviewed By:

Offsite Emergency Planning Supervisor Date Approved By: (If Re uired)

Manager, Emergency Planning Date PV21&08A (8 84j

ROC NO: 7N409.08.00 ISION: 1 AGE 15 OF 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY .PREPAREDNESS DRILLS ATTACHMENT 4 CONTROLLER BRIEPING CHECKLIST

1) Distribute scenario packages and identify Controller stations.
2) Review of Obgectives.
3) Review of Scenario:

Narrative I I Time line I I Messages Data

4) Review of Controller responsibilities:

Keeping play on schedule and in line Maintaining contact with Lead Controller Issuance of Messages Flexibility of play Stationed promptly Evaluation forms

5) Review of cautions to be observed:

Plant operation interference Excessive prompting I I Player / Plant safety I I Crlticiring players actions I I

6) Stress data capture and importance of complete records (This inc1udes both player records and controller records). I I
7) Review plans for the critique.
8) Other comments. I I DRILL TITLE: CONDUCTED BY j DRILL NUMBERs DATE!

DRILL DATE:

PV21648A (8.84)

ROC NO: 7N409.08.00 kEVISION: 1 AGE 16 OP 20 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 5 PLAYERS BRIEFING CHECKLIST

1) Identify Player stations.
2) Review of ob5ectives.
3) Review cautions to be observed:

Plant operation interference I Player/Plant safety I

4) Items to be remembered:

Talking thru drill play I Play as much as possible I The scenario may not be realistic I Be conscious of information flow I Expiditing Development of Emergency Teams I

5) Stress data capture and importance of complete logs and documents. Times documented should be time of event 'ther rather than time of receipt of information. ~

I-I

6) Facilities activated (i.e., actual unit control room or the simulator) ~ I I
7) Review plans for the critique. I I I
8) Other comments.

0'RILL TITLE:

DRILL NUMBER:

CONDUCTED BY DATE:

DRILL DATE:

PV21848A (844)

PROC NO: 7N409.08.00

~ .

REVISION: 1 PAGE 17 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 6 MONTHLY COMMUNICATIONS DRILL RECORD Date Tested TESTED ENS SAT/UNSAT COMMENTS Unit 1 CR Unit 1 Shift. Sup. Off.

Unit. 2 CR Unit 2 Shift. Sup. Off.

Unit 3 CR Unit 3 Shift. Sup. Off.

TSC EOF COMMERCIAL LINES TO NRC TSC EOF Performed Date:

By.'pproved By: Date:

PV21648A (8-84)

0 PROC NO: 7N409.08.00 REVISION: 1 PAGE 18 OF 20 DATE: 01/23/86

, Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 7 QUARTERLY COMMUNICATIONS DRILL RECORD DATE TESTED TESTED OPERATIONS RINGDOMN /31 SAT/UNSAT COMMENTS ADES CEC UNIT 1 STSC UNIT 2 STSC UNIT 3 STSC TSC EOF OPERATIONS RINGDOWN //2 ADES CEC SIMULATOR STSC TSC EOF OPERATIONS RINGDOWN 83 ADES CEC UNIT 1 STSC UNIT 2 STSC UNIT 3 STSC TSC EOF PV21648A (8-84)

PROC NO: 7N409.08.00 REVISION- 1 PAGE 19 OF 20 DATE: Ol/23/86 Arizona Nuclear Power Project TITLE- EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 7 (Cont'd)

QUARTERLY COMMUNICATIONS DRILL RECORD TESTED OPERATIONS RINGDOWN //4 SAT/UNSAT COMMENTS ADES CEC SIMULATOR STSC TSC EOF

.Perfomed by: Date:

Approved by: Date:

Manager, Emergency Planning PV216418A (8.84 )

t

~ It~

I I 1 41 ~

PROC NO- 7N409.08.00 REVISION: 1 PAGE 20 OF 20 DATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS DRILLS ATTACHMENT 7: (Cont'd)

QUARTERLY COMMUNICATIONS DRILL RECORD DATE'ESTED PUBLIC INFORMATION TESTED RINGDOWN //1 SAT/UNSAT COMMENTS JENC CHIC EOF CEC PUBLIC INFORMATION RINGDOMN />2 JENC CHIC EXECUTIVE RINGDOWN CEC CEO EOD Perfomed by: Date:

Approved by: Date:

Manager, Emergency Planning PV21648A (8 84j

C 0

PROC NO: 7N409.09.00 EVISION: 1 AGE OF ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS EXERCISE RECORD OF CHANGES AND REVISIONS PAGE REVISION PAGE REVISION PAGE REVISION NII RSI CONTR~'L 8 Approved By: Effective Date:

2/28/86 Signa ure Dat PV21648A (8.84) Form 1N001.02A Rev. 0

ROC NO: 7N409.09.00 VISION: 1 AGE 1 OF 15 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS EXERCISE 1.0 PURPOSE AND SCOPE 1.1 To establish guidelines for developing, conducting, evaluating and.

documenting annual emergency preparedness exercises.

1.2 To provide guidance to test both onsite and offsite emergency personnel, equipment, communications, plans and procedures, including the coordination and interface with federal, state, and county governments.

1.3 To provide guidance to verify the adequacy of the Palo Verde Nuclear Generating Station Emergency Plan and Implementing Procedures and the overall effectiveness of onsite and offsite emergency preparedness.

2.0 DEFINITIONS AND ABBREVIATIONS 2.1 Definitions 2.1.1 Controller Individual assigned to direct the exercise and provide messages and data. Controllers also serve as evaluators during the exercise.

2.1.2 Emergency Planning Action Item List A listing of open items related to the exercise requiring corrective action. ~

2.1.3 Exercise An event that tests the .integrated'apability of the major portion of the basic elements within emergency preparedness plans and organizations.

2.2 Abbreviations 2.2.1 ADES Arizona Division of Emergency Services 2.2.2 ARRA Arizona Radiation Regulatory Agency 2.2.3 DPS Arizona Department of Public Safety 2.2.4 FEMA Federal Emergency Management Agency 2.2.5 MCDCDES Maricopa County Department of Civil Defense and Emergency Services PV2164SA (8.84) 0144D/0031D

ROC NO: 7N409.09.00 VISION: 1 AGE 2 OF 15 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS EXERCISE 2.2.6 MCSO Maricopa County Sheriff's Office 2.2.7 NRC Nuclear Regulatory Commission 2.2.8 RAC Radiological Assistance Committee 3.0 RESPONSIBILITIES 3.1 The Manager, Emergency Planning shall have overall responsibility for the development, approval, conduct, evaluation and documentation of annual. emergency preparedness exercises.

3.2 The Onsite and Offsite Emergency Planning Supervisors shall be responsible for assigning deficiencies as action items using the Emergency Planning Action Item List and tasking items to the appropriate department or personnel.

The Onsite and Offsite Emergency Planning Supervisors shall be responsible for ensuring appropriate corrective actions are taken to resolve deficiencies identified during the annual exercises.'.4 The Vice-President, Nuclear Production and the PVNGS Plant Manager shall approve exercise objectives.

4.0 PROCEDURE 4.1 The Manager, Emergency Planning shall provide the opportunity for state and county response agencies to participate in each annual exercise. Full participation by state and county response agencies is required biannually and evaluated by the Federal Emergency Management Agency.

4.2 The Manager, Emergency Planning shall coordinate the scheduling of the annual exercises in consultation with the Arizona Division of Emergency Services (if appropriate),'uclear Regulatory Commission

~

and Federal Emergency Management Agency (if appropriate).

PV21648A (8.84)

ROC NO: 7N409.09.00 VISION: 1 AGE 3 OF 15 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS EXERCISE

, 4.3 The Manager, Emergency Planning, in cooperation with the Arizona Division of Emergency Services (if appropriate), sha33. insure that.

the exercise scenario is developed within the time frame of Attach-.

ment 1.

4.4 The Onsite and Offsite Emergency Planning Supervisors shall coordinate preparation of the exercise scenario and ensure that:

4.4.1 Annual exercises are developed, scheduled and conducted in a manner consistent with the regulations and guidance of 10CFR50, Appendix E, NUREG-0654, Rev. 1 and other appropriate regulatory guidance.

4.4.2 The scenario's simulated events and station initial condi-tions are developed in a manner'hat adequately tests the level of emergency preparedness of the groups involved in exercise. 'he 4.4.3 The exercise simulates an emergency that results in offsite radiological releases which require response by offsite authorities, if offsite response agencies are participating in the annual exercise.

4 ~4 ~4 The scenario is varied from year to year so that all major elements of the response plans and preparedness organiza-tions are tested within a five-year period.

4.4.5 Once every six years, the exercise starts between 6:00 p.m.

and midnight and another between midnight and 6:00 a.m.

4.4.6 Exercises are conducted under various weather conditions.

4.4.7 Some exercises are unannounced-.

4.4.8 The Exercise scenario is treated as confidential information prior to the annual exercise and no players have access to this information.

PV216MA (8 84)

ROC NO: 7N409.09.00 VISION: 1 AGE 4 OF 15 Arizona Nuclear Power Project ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE 4.5 The Manager, Emergency Planning and Preparedness shall submit the exercise objectives to the Vice President, Nuclear Production and PVNGS Plant Manager for approval prior to submittal to the NRC and FEMA (if appropriate).

4.6 The Onsite and Offsite Emergency Planning Supervisors shall review and approve the exercise scenario and coordinate the assignment of controllers.

4.7 The Manager, Emergency Planning shall review and approve the exercise scenario.

4.7.1 After Manager, Emergency Planning approval, the scenario shall be submitted to the NRC and FEMA in accordance with Attachment 1.

4.8 Prior to the exercise, the Onsite and Offsite Emergency Planning Supervisors shall ensure that:

4.8.1 The Pre-Exercise Checklist Form (Attachment 2) is completed.

4.8.2 A Lead Controller is assigned for the exercise.

4.8.3 A pre-exercise briefing is held to inform the controllers of the exercise objectives, extent of play, pre-staging requirements, which portions of the scenario require strong control and which portions of the scenario permit free play. Attachment 3, Controller Briefing Checklist, shall be completed. Copies of the exercise scenario are distributed at the controller briefing.

4.8.4 Players are informed of the date and time of the exercise and are provided with exercise ground rules. This is accomplished by preparing and issuing a memo to all players.

4.8.5 Players will not be informed of the date and time of unannouced exercises.

PV21$ 4SA (8%4)

ROC NO: 7N409.09.00 VISION: 1 AGE 5 OF 15 Arizona Nuclear Power Project ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE 4.9 Upon termination of the exercise play, the following activities shall be completed onsite and at the EOF.

4.9.1 The chief controller in each emergency response facility shall assemble the controllers and players to critique play action in that facility. NRC evaluators shall be invited to attend facility specific critiques.

4.9.1.1 The manager of the facility and players shall provide comments.

4.9.1.2 The controllers shall then summarize their evaluations.

4.9.1.3 The chief controller will record manager and player comments and collect material (forms, etc.) completed during the exercise.

4.9.2 Following the facility specific critiques, all onsite controllers and key onsite players shall assemble in the EOF Command Center. NRC evaluators shall be invited to attend the critique.

4.9.2.1 The Lead Controller for the exercise shall conduct theqcritique.

4.9.2.2 'he managers of the emergency response facilities and key players shall provide comments.

4.9.2.3 The chief controllers and other controllers shall provide the results of their evaluations.

4.9.2.4 The Lead Controller shall collect all evaluation forms and exercise material.-

PV21648A (S44)

ROC NO: 7N409.09.00 VISION: 1 AGE 6 OF 15 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS EXERCISE 4.10 Upon termination of the exercise play, offsite controllers and players shall hold critiques similar to those .described in Section 4.9 of this procedure.

4.11 Key onsite and offsite controllers shall meet to discuss the results of critiques and to prepare the exercise time line.

4.11.1 Significant findings and observations will be recorded.

4.12 The significant findings and observations shall. be presented to the NRC and FEMA (if appropriate).

4.13 The NRC and FEMA (if appropriate) shall conduct exit interviews to present with ANPP, State and County Management personnel preliminary findings in accordance with Attachment l.

4.14 Aftex receipt of the formal evaluations from the NRC and FEMA (if appropriate), the Onsite and Offsite Emergency Planning Supervisors shall assign deficiencies .as action items on the Emergency Planning Action Item List, task them to affected departments and personnel and submit this to the Manager, Emergency Planning for approval.

Deficiencies recorded shall include those significant findings identified by the controllers and improvement areas and/or violations identified by the NRC and FEMA (if appropriate).

4.15 Upon receipt of the approved Emergency Planning Action Item List, the Onsite and Offsite Emergency Planning Supervisors shall then submit to the Manager, Emergency Planning a written Exercise Report which shaU. include the following:

4.15.1 A cover sheet, in memo form, to identify the exercise by name and date; to list the sections included in report; and to provide for approval by the Manager, Emergency Planning.

4.15.2 Section 1 date, time and duration of the exercise; the participating agencies by name; the purpose of the exercise; the initial conditions and the narrative summary; and the list of assigned controllers.

4.15.3 Section 2 comparison of the exercise objectives against actual performance.

PV21648A (844)

OC NO: 7N409.09.00 VISION: 1 GE 7 OF 15 TE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS EXERCISE 4.15.4. Section 3 significant findings of such a nature that, the effectiveness of the if uncorrec'ted, would reduce emergency response proglam and shall be tracked on the Emergency Planning Action Item List. General observations shall be noted but not included on the Emergency Planning Action Item List.

4.15.5 Section 4 the actual exercise sequence of events (time line).

4.15.6 Section 5 utility exercise players.

4.16 After the Manager, Emergency Planning approves the Exercise Report, a copy of the Exercise Report, exercise scenario, and Pre-'xercise Checklist Form (Attachment 2) shall be submitted to Drawing and Document Control.

4.17 Copies of the Exercise Report and 'Emergency Planning Action Item List shall be submitted to the PVNGS Plant Manager, Vice-President, Nuclear Production and others as appropriate.

4.18 A complete copy of the exercise scenario, Exercise Report, evaluation forms and other exercise related material shall be retained in the Emergency Planning Department files as long as deemed apprt>priate by the Manager, Emergency Planning.

4.19 The Onsite and Offsite Emergency Planning Supervisors shall track the status of corrective actions related to deficiencies identified on the Emergency Planning Action Item List and ensure appropriate resolution.

PV21648A (8.84)

ROC NO: 7N409.09.00 REVISION: 1 kAGE 8 OF 15 Arizona Nuclear Power Project ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE

5.0 REFERENCES

5.1 Im lementin References None 5.2 Develo mental References 5.2.1 PVNGS Emergency Plan, Revision 6 5.2.2 80PR-OZZ01, "Training Program", Revision 3 5.2.3 NUREG-0654 FEMA-REP-1, "Criteria for Preparation and Eval-uation of Radiological Emergency Response Plans and Pre-paredness in Support of Nuclear Power Plants," Revision 1 5.2.4 10CFR50, Appendix E, Emergency Planning and Preparedness for Production and Utilization Facilities."

5.2.5 .NRC IE Information Notice No. 85-55, "Revised Emergency Exercise Frequency Rule", July 15, 1985.

6.0 FORMS AND ATTACHMENTS 6.1 Attachment 1 "Milestones for Exercise Observation and Critiques" 6.2 Attachment 2 "Pre-Exercise Checklist Form" 6.3 Attachment 3 "Controller Briefing Checklist" PV2164SA (8.84)

ROC NO: 7N409.09.00 VISION: 1 AGE 9 OF 15 Arizona Nuclear Power Project ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 1 MILESTONES FOR EXERCISE OBSERVATION AND CRITIQUES 75 days State and licensee submit exercise objectives to FEHA and NRC Regional Offices, respectively.

60 days Fggd and NRC Reg!.cna1 Offices discase and meet with licensee/

state as necessary to prepare response.

45 days State and licensee scenario developers submit exercise scenario to FEMA and NRC regions for review.

35 days FEMA and NRC regions notify state and licensee of scenario acceptability.

30 days . FEMA and NRC regions develop specific postexercise critique schedule with the state and advise FEMA and NRC headquarters.

15 days The RAC Chairman and NRC Team Leader should meet to develop observer action plan (where stationed, how many from each organ-ization, what to look for).

3e day Meeting, in the exercise area, of all Federal observers both onsite and offsite, to finalize assignments and give instruc-tions.

E day Exercise'EHA E day and RAC observers caucus to collate observations. NRC observers also caucus to collate observations.

E day RAC Chairman and NRC Team Leader meet, as soon .,after their respective caucuses as practical, to coordinate 'federal partici-pation in critique.

E to + 1 day Joint RAC/NRC critique.

, PV216MA l8.84)

ROC NO: 7N409.09.00 VISION: 1 AGE 10 OF 15 Arizona Nuclear Power Project ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 1 (Cont'd)

MILESTONES FOR EXERCISE OBSERVATION AND CRITIJUES General A enda (1) State, locals and licensee present their views.

(2) Critique of offsite actions by RAC Chairman.

(3) Critique of onsite actions by NRC.

(4) Critique of federal response (if applicable) by RAC Chair-man.

(5) Opportunity for clarification questions or comments by licenses, state and locals (press and public questions shall not be entertained during the critique).

+15 days Written critiques by FEMA region to the state, 'with copies to FEMA headquarters and NRC and by NRC region to licensee with copies to NRC headquarters and FEMA.

NOTE: FEMA and RAC will observe and evaluate exercises biannually.

PV21648A (8%4)

ROC NO: 7N409.09.00 VISION: 1 AGE 11 OF 15 Arizona Nuclear Power Project ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 2 PRE-EXERCISE CHECKLIST FORM Initials/Date

l. Exercise objectives approved by Manager, Emergency Planning, PVNGS Plant Manager and Vice President, Nuclear Production.
2. Exercise objectives submitted to NRC/FEMA.
3. NRC/FEMA approval of objectives.
4. Exercise scenario submitted to NRC/FEMA for review and approval.
5. NRC/FEMA approval of scenario. / ~
6. Offsite agencies noti.fied as necessary:

(1) Maricopa County Department of Civil Defense 6 Emergency Services (MCDCDES)

(2) Maricopa County Sheriff's Office (MCSO)

(3) Arizona Department of Public Safety (DPS)

(4) Nuclear Re'gulatory Commission (NRC)

Resident Inspector(s)

(5) Arizona Division of Emergency Services (ADES)

(6) Arizona Radiation Regulatory Agency (ARRA)

(7) Others (specify)

PV216%SA (8.84 j

ROC NO: 7N409.09.00 VISION: 1 AGE 12 OF 15 Arizona Nuclear Power Project ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 2 (Cont'd)

PRE-EXERCISE CHECKLIST FORM Initials/Date

7. ANPP departments and others notified of date and time as necessary:

(1) PVNGS Plant Manager (2) Manager, Operations (3) Manager, Technical Support (4) Manager, Administration Support (5) Vice President, Nuclear Production (6) Director, Technical Services (7) Security (ANPP, APS, Construction)

(8) ANPP Communications Center (9) Media Relations Department (10) Telephone Operators (ll) System Electric Department (12) Affected Unit Operations Superintendent (13) Others (specify)

PV216%SA (8.84)

ROC NO: 7N409.09.00 VISION: 1 AGE 13 OF 15 ATE: 01/23/86 Arizona Nuclear Power Project TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 2 (Cont'd)

PRE-EXERCISE CHECKLIST FORM Initials/Date

8. Support organizations notified as ap~priate:

(1) Maryvale Samaritan Hospital (2) Good Samaritan Hospital (3) Backup Ambulance (Bechtel Power Corp.)

(4) National Weather Service (5) Arizona State University (6) Combustion Engineering (7) Bechtel Power Corporation (8) Others (Specify):

9. Players designated and informed of date of exercise and player rules (memo)
10. Controllers designated, briefed,and >

provided with exercise scenario package (Attachment 3)

PV21648A (8-84)

OC NO: 7N409.09.00

~ ~

VISION:~ 1 AGE 14 OF 15 Arizona Nuclear Power Project ATE: 01/23/86 TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 2 (Cont'd)

PRE-EXERCISE CHECKLIST'ORM Initials/Date ll. Facility.walkdown, procedure check and communications test completed.

12. Equipment and materials check (e.g., moulage, mock-ups)
13. Exercise Notice posted on plant bulletin board (not applicable for unannounced exercises)

Performed By:

Signature Date Reviewed By:

Onsite Emergency Planning Supervisor Date Reviewed By:

Offsite Emergency Planning Supervisor Date Approved By:

Manager, Emergency Planning Date PV21648A (844)

ROC .NO: 7N409.09.00 VISION: 1 AGE 15 OF 15 ATE: '01/23/86 Arizona Nuclear Power Project i

TITLE: EMERGENCY PREPAREDNESS EXERCISE ATTACHMENT 3 CONTROLLER BRIEFING CHECKLIST

1) Distribute Scenario Packages and identify Controller stations
2) Review of Ob)ectives
3) Review of Scenario:

Narrative I I Time line Messages

~ .

4) Review of Controller responsibilities:

keeping play on schedule and in line Maintaining contact with Lead ControUer Issuance of Messages Plexibility of play Stationed promptly I I Evaluation forms

5) Review of cautions to be observed:

Plant operation interference Ezcessive prompting Player / Plant safety Criticising players actions

6) Stress data capture and importance of complete records (thde dcc1cdee both players records aad coatrolder records)
7) Review plans for critiques
8) Other comments EXERCISE DATE! CONDUCTED BY:

DATE:

PVss1648A (8-84)

PROC NO:. 8N718-04.00 REVISION: 3 .-

PAGE OF Arizona Nuclear Power Project DATE: 01/02/86 TITLE: EMERGENCY PLAN TRAINING RECORD OF CHANGES AND REVISIONS PAGE REVISION PAGE REVISION PAGE REVISION Approved By: Effective Date:

/rs I( 1/27/86 Signa t e ~Date PV21648A (8.84), ~

Form 1N001.02A Rev. 0

/ AT"h 4 PROC NO: 8N718'04.00 REVISION: 3 PAGE l. OF'13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING 1.0 PURPOSE AND SCOPE 1.1 This Procedure implements the ANPP policy to provide Emergency Plan training appropriate to the needs of ANPP and APS personnel, to on-site and off-site personnel who functionally participate in Emergency Plan activities, and to certain affected segments of the public.

1.2 This Procedure describes methods of providing and documenting Emergency Plan training for on-site and off-site Emergency Plan participants and for appropriate segments of the public.

1.3 This Procedure meets the functional definition of an Emergency Plan Implementing Procedure and as such, shall require an annual (12 month) review and filing with the NRC.

2.0 DEFINITIONS AND ABBREVIATIONS 2.1 CEC Corporate Emergency Center 2.2 CHIC Corporate Headquarters Information Center 2.3 EOF Emergency Operations Facility 2.4 EPIP Emergency Plan Implementing Procedure 2.5 JENC Joint Emergency News Center 2.6 OSC Operations Support Center 2.7 PCN Procedure Change Notice 2.8 STSC Satellite Technical Support Center 2.9 TSC Technical Support Center 2.10 Yearl Trainin C cle A cycle of training where periodic retraining is required twelve (12) months from the completion date of the last successfully completed course. In the event retraining is completed in less than twelve (12) months, the retraining date may be adjusted to twelve (12) months from the date of completion.

PV21648A (8 84) 7213D/0042D 0171D/0033D

PROC NO: 8N718.04.00 REVISION: 3 PAGE 2 OF 13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING 2.11 Retrainin Date That date by which retraining in a particular training course should be received and successfully completed. The retraining date is the last day of the month in which an individual completed a particular course in the previous year.

3.0 RESPONSIBILITIES 3.1 Manager, Emergenc Plannin shall be responsible for:

3.1.1 Reviewing the contents of courses developed for Emergency Plan training and for ensuring that off-site (excluding EOF) Emergency Plan training is conducted.

3.1.2 Providing to the PVNGS Training Manager a listing of personnel assigned to positions by Social Security Number vice job code who require initial training.

3.1.3 Providing to supervisors on a bimonthly bas1s, the Emergency Plan Staffing List for review and update of personnel currently assigned to their group.

3.1.4 Notifying the PVNGS Training Manager of any Procedure Change Notice (PCN) or revision to an Emergency Plan Implementing Procedure (EPIP).

3.1.5 Coordinating tra1n1ng for o ff-site organizations 1nvolved in rendering assistance to PVNGS (corporate, news media, external assisting agencies) as required.

3.1.6 Ensuring the Emergency Planning S ta ffing List 1s curren t af ter receiving input from the PVNGS Training Manager and/or responsible supervisors.

3.1.7 Providing to all ANPP employees each calendar year, a letter describing the Onsite Siren System, its sounds, actions to be taken and the phone number of recorded siren sounds' PV21648A (8.84)

PROC NO: 8N718.04.00 3 'EVISION:

PAGE 3 OF 13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING 3.2 Manager, Plant Services Responsible for development and implementation of appropriate Emergency Plan training for ANPP personnel that have specific on-site emergency plan responsibilities.

3.3 PVNGS Training Manager shall be res onsible for:

3.3.1 Updating, preparing, approving, coordinating and conducting on-site PVNGS Emergency Response Training (On-shift, On-site and EOF ANPP personnel).

3.3.2 Providing to the Manager, Emergency Planning, on a bi-monthly basis, names of individuals who are now fully qualified for inclusion on the Emergency Plan Staffing List.

3.4 ANPP Su ervisors shall be res onsible for:

3.4.1 Ensuring their designated personnel maintain Emergency Plan qualifications by meeting all applicable Emergency Plan Training/Retraining requirements within the yearly training cycle.

3.4.2 Reviewing the Emergency Plan Staffing List, as provided, and forwarding any personnel additions or deletions to the Manager, Emergency Planning. The lack of response by a supervisor shall be construed as no changes to the staffing list were necessary at that time.

3.5 Individual employees are responsible for attending Emergency Plan Training/Retraining on dates assigned by their supervisor.

4.0 PROCEDURE On-shift, On-site and EOF Staff training shall be conducted in accordance with References 5.1.1, 5.1.2, 5.2.1. Offsite staff training shall be conducted in accordance with Reference 5.1.6.

PV21648A (8-84)

PROC NO:.8N718.04.00;.

REVISION: 3 PAGE 4 OF 13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING 4.1 Basic Trainin and Indoctrination 4.1.1 Personnel requiring unescorted access into the security protected area shall receive general instructions on the Emergency Plan annually as part of Site Access (Re)Training:

4.2 Emergenc Or anization Trainin 4.2.1 ANPP personnel assigned to the On-shift, On-site or Off-site Emergency Organizations shall receive initial and annual retraining specific to their emergency assignment or facility (See Attachment 1, 2 and 3).

4.2.1.1 Personnel should be rescheduled for Emergency Plan retraining on, or before, the retraining date for that course.

4.2.1.2 The individual may exceed the retraining date by up to 90 days without changing the yearly training cycle for that course.

4.2.1.3 If the 15-month training cycle is exceeded any authority or qualification based on that training shall be rescinded. Initial Emergency Plan training shall then be required to restore qualification.

4.2.2 Personnel who are unable to successfully complete an initial training class shall be rescheduled for that class or, at the discretion of the instructor may receive remedial training.

4.2.3 Personnel who are unable to pass the retraining examination shall be rescheduled for initial training of that class.

4.2.4 Additional retraining of individuals shall be conducted whenever necessitated by significant revisions to the Emergency Plan and/or implementing procedures as determined by the Manager, Emergency Planning.

4.2.5 In addition to formal classroom instruction, drills and exercises shall be conducted to enable personnel to furthex develop their skills in dealing with an emergency.

PV21648A (8.84)

e PROC NO: - 8N718.04.00 REVISION: 3, PAGE 5 OF 13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING 4.2.6 Annually, the Manager, Emergency Planning shall review the lesson plans used for teaching emergency planning courses.

4.3 Off-site Agency Training 4.3.1 The Manager, Emergency Planning shall ensure coordination of annual training for members of the following off-site support agencies:

Maricopa County Department of Civil Defense and Emergency Services.

Arizona Radiation Regulation Agency.

Maryvale Samaritan Hospital.

Good Samaritan Medical Center.

Backup Ambulance Service.

Bechtel Fire Department.

Others as deemed necessary.

4.3.2 Training should be specific to the agencies'esponse assignment and, at a minimum, include the following:

Basic radiation protection and emergency dosimetry.

Emergency response procedures.

Interactions with the ANPP emergency organization.

4.3.3 The PVNGS Training Manager may assist the Emergency Planning Department as necessary to conduct training.

4.4 Media Familiarization 4.4.1 Annually, in cooperation with state and county government, training shall be given to local and regional news media.

The program will include,:

PVNGS Emergency Plan and EPIPs.

Basic information concerning PVNGS operation and radia-tion.

Locations and means for release of public information in an emergency.

Familiarization tour of the Joint Emergency News Center.

PV21648A (844)

PROC NO: 8N718.04.00 .

REVISION: 3 PAGE 6 OF 13 DATE: 01/02/86 3

Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING 4.4.2 The ANPP Public Information Department, with the assistance of the Emergency Planning Department, shall conduct the news media familiarization.

4.5 Documentation 4.5.1 On-shift, On-site and EOF Staff Emergency Response Personnel Training shall be documented in accordance with References 5.1.3 and 5.1.4. The PVNGS Training Department shall maintain these records.

4.5.2 Off-site staff training shall be documented in accordance with Reference 5.1.6. The Manager, Emergency Planning shall maintain these records.

4.5.3 Lesson plans shall be used for all classroom instruction (References 5.1.1, 5.1.2). All lesson plans shall be reviewed and updated annually or as required due to EPIP revision and documented by the reissuing of the lesson plans.

4.5.4 Written examinations shall be administered, as required, with an established minimum passing score.

4.5.5 Lesson plans and examinations are not required for off-site agency training. Briefing forms and outline are an

~

acceptable means of documentation.

5.0 REFERENCES

5.1 Im lementin References 5.1.1 Procedure 8N718.01.00, Systematic Training Development 5.1.2 PVNGS Procedure 80PR-OZZ01, Training Program 5.1.3 PVNGS Procedure 81AC-OZZ01, PVNGS Training Records 5.1.4 ANPP Procedure 8N718.09.00, ANPP Training Approval, Registration and Documentation.

PV21648A (8-84)

PROC NO: 8N718.04.00 REVISION: 3 PAGE 7 OF 13 DATE: . Ol/02/86 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING 5.1.5 PVNGS Procedure 83TR-OZZ04, General Employee Training Pathway 5.1.6 ANPP Department Instruction 8I718.04.01, Emergency Planning Off-site Training Program 5.2 Develo mental References 5.2.1 Policy 8P718.00.00, Qualification, Training and Certifi-cation Policy 5.2.2 Code of Federal Regulations, Title 10, Chapter 1, Part 50.47 (10CFR50.47), "Emergency Plans" 5.2.3 Code of Federal Regulations, Title 10, Chapter 1, Appen-dix E (10CFR50 Appendix E), "Emergenc'y Planning and Preparedness for Production and Utilization Facilities" 5.2.4 Regulatory Guide 3.42 "Emergency Planning in Fuel Cycle Facilities and Plants Licensed Under 10CFR Parts 50 and 70" 5.2.5 NUREG-0654/FEMA-REP-1 "Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants" 5.2.6 PVNGS Emergency Plan 6.0 FORMS AND ATTACHMENTS 6.1 Attachment 1, Emergency Plan Training Assignement and Course Content 6.2 Attachment 2, Corporate Emergency Response Personnel Emergency Plan Training Program 6.3 Attachment 3, Joint Public Information Personnel Emergency Plan Training Program PV21648A (8.84)

PROC NO: 8N718.04.00 REVISION: 3 PAGE 8 OF 13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT The following initial training/retraining courses shall be provided to the designated emergency response personnel as listed.

Overview (NGE01/NGE09)

Status Board Keeper/Clerical Aides DDC Dosimetry Clerk Computer Support Emergency Coordinator (NGE02)

Emergency Coordinator (On-Shift)

Emergency Coordinator (On-Site)

Operations Advisor Operations Coordinator STSC/OSC Staff (NGE03/NGEll)

STSC Communicator OSC Coordinator Repairs Coordinator Nurse TSC/EOF Staff (NGE04/NGE12)

NRC Liaison, Operations Technical Engineering Coordinator Security Director Information Monitor Hazards Control Coordinator Computer Support Coordinator/Staff Reactor Analyst Chemistry Coordinator Technical Engineering Assistant/STA Personnel Resources Coordinator Electrical Coordinator Attachment 1 Page 1 of 4 PV216~A (8.84)

PROC NO: 8N718.04.00 .

REVISION: 3 PAGE 9 OF 13 DATE: 01/02/86-Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT TSC/EOF Staff (NGE04/NGE12) (Continued)

Mechanical Coordinator I and C Coordinator Technical Analysis Coordinator Emergency Maintenance Coordinator Emergency Operations Director Administrative and Logistics Coordinator Government Liaison Engineer EOF Contact I Logistics Communicator Security Coordinator Offsite Technical Representative NRC Liaison, Health Physics Radiological Protection Coordinator Radiological Assessment Coordinator Radiological Protection Support Staff Fire Department Training (NGE05/NGE13)

Fire Department Personnel Surveys and Sampling (NGE06/NGE14)

Radiation Protection Technicians (Unit Technicians and Radioactive Haste Technicians)

Field Team Communicator Radiological Assessment Communicator Dose Assessment (NGE07/NGE15)

Radiological Protection Coordinator Radiological Assessment Coordinator Radiation Protection Support Staff Radiation Protection Monitor Subjects contained within each training course are listed below:

Attachment 1 Page 2 of 4 Pv21648 A (8.841

PROC NO: 8N718.04.00 REVISION: 3 PAGE 10 OF 13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT Overview NGE01 Overview for Support Staff NGE09 Retraining for Support Staff Emergency Coordinator (Initial and Retraining)

NGE02 Overview for Emergency Coordinator STSC/TSC/EOF for Emergency Coordinators Emergency Classifications Emergency Exposure Guidelines/KI Administration STSC/OSC Staff NGE03 Overview for STSC/OSC Staff Activation e

STSC OSC Activation Search and Rescue Reentry Emergency Exposure Guidelines/KI Administration NGEll Retraining for STSC/OSC Staff TSC/EOF Staff NGE04 Overview for TSC/EOF Staff TSC Activation EOF Activation Emergency Exposure Guidelines/KI Administration NGE12 Retraining for TSC/EOF Staff Fire Department Training NGE05 Overview for Fire Department Actuation and Responsibilities NGE13 Retraining for Fire Department Surveys and Sampling NGE06 Overview for STSC/OSC Staff OSC Activation STSC Activation Search and Rescue Emergency Exposure Guidelines/KI Administration Attachment 1 Page 3 of 4 PV21648A (8.84)

PROC NO:

8N718.04.00'EVISION:

,3 PAGE 11 OF 13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING EMERGENCY PLAN TRAINING ASSIGNMENT AND COURSE CONTENT Surveys and Sampling (Continued)

Surveys and Sampling Surveys and Sampling Practical NGE14 Retraining for Surveys and Sampling Dose Assessment NGE07 Fundamentals of Dose Assessment Dose Assessment Procedure Practical Dose Assessment Computer Practical NGE15 Retraining for Dose Assessment Attachment 1 Page 4 of 4 PV21648A (8.84)

PROC NO: 8N718.04.00, REVISION: 3 PAGE 12 OP.13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING CORPORATE EMERGENCY RESPONSE PERSONNEL EMERGENCY PLAN TRAINING PROGRAM The following initial training/retraining subjects shall be provided to all Corporate Emergency Response person- nel:

1. Principles of nuclear reactors (not given to CEC technical staff, i.e.,

Corporate Technical Coordinator and Corporate Engineering Support Coordinator primaries, alternates and support staff).

2. Emergency classifications.
3. Emergency notification callout.
4. Emergency facilities: functions and interfaces.
5. Corporate Emergency Procedures overview.
6. CEC function and positions.
7. CEC notification, activation, and operatin.

Attachment 2 Pv216~A (8 84i

f PROC NO: 8N718.04.00 REVISION: 3 PAGE 13 OF 13 DATE: 01/02/86 Arizona Nuclear Power Project TITLE: EMERGENCY PLAN TRAINING JOINT PUBLIC INFORMATION PERSONNEL EMERGENCY PLAN TRAINING PROGRAM The following initial training/retraining subjects shall be provided to all Public Information personnel:

1. Principles of nuclear reactors.
2. Principles of radiation.
3. Emergency classifications.
4. Emergency facilities and telecommunications.
5. Government agencies emergency response.
6. Flow of public information.

Attachment 3 PV216MA (8.84)