ML17319B378: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:IiOWew 8 elcefewe EEECYNIC COMPANY DONALD C COOK NUCLEAR PLANT PROCEDURE COVER SHEET Procedure No.PMP 2081 EPP.005 Revision No.TITLE PERSONNEL EYACUATION SCOPE OF REVISION Rev.1: Changed SOE to SS.DCR MAY 2 81982 SIGNATURES ORIGINAL Rev.I REV.2 Rev.S PREPARED BY QUALITY ASSURANCE REVIEW INTERFACING DEPARTMENT HEAD CONCURRENCE DEPARTMENT HEAD APPROVAL PLANT NUCLEAR SAFETY COMMITI iE PLANT MANAGER APPROVAL DATE OF ISSUE N.A.N.A.3-31-81 i.A./(lP((iii/
{{#Wiki_filter:IiOWew       8 elcefewe EEECYNIC COMPANY DONALD C COOK NUCLEAR PLANT PROCEDURE COVER SHEET Procedure No. PMP 2081 EPP.005 Revision No.
Fss Na M Kla I'zow50ms5 5~05~+PDR*DDCY, 05000515 PDR F l~~e*>>~ggry, PLN7 pa<~',~~VINS--,)~BG>l aalu''-"i~BR.'4~I I~g, 4 II
TITLE PERSONNEL EYACUATION SCOPE OF REVISION Rev. 1:   Changed           SOE to SS.
.~PMP 2 EPP.005 LIST OF EFFECTIVE PAGES Pa e Numbers page 1 of 6 Page 2 of 6 Page 3 of 6 EXHIBIT A Page 4 of 6 EXHIBIT B Page 5 of 6 EXHIBIT C Page 6 of 6 CHECKLIST Revision Number and Oate Revision 1-5/25/82 Revision 1-5/25/82 Revision 0-4/~/8~Revision 0-4/t/Bt Revision 0-4/1/81 Revision 1-5/25/82 Page 1 of 1 Rev.1, 5/25/82 0'3~N-l I I OF<<PV''t" P*'Y~"~P'lN i+, PrWV JtP,'n ef''.l*g''~>t t,,''g o 1 t, J
DCR MAY 2 81982 SIGNATURES ORIGINAL         Rev. I           REV. 2         Rev. S PREPARED BY QUALITY ASSURANCE REVIEW INTERFACING DEPARTMENT HEAD CONCURRENCE                       N.A.
~~PMP 208 PP.005 INDIANA 5 MICHIGAN ELECTRIC COMPANY DONALD C.COOK NUCLEAR PLANT PERSONNEL EVACUATION
DEPARTMENT HEAD APPROVAL                              N.A.             i. A.
PLANT NUCLEAR SAFETY COMMITIiE                                    /(lP((iii/
PLANT MANAGER APPROVAL DATE OF ISSUE                          3-31-81 Fss Na M Kla I 5~05~+
05000515
                    'zow50ms5 PDR *DDCY,                   PDR F


==1.0 OBJECTIVES==
l
This procedure describes the actions necessary to assure safe and expeditious evacuation from local work areas to predesignated on-site assembly areas and to alternate off-site reassembly areas, if necessary.
                              ~      ~
e ggry, PLN7
  >> ~<~',~ ~VINS pa l aalu'
          )~  BG>                  I I
'-"i~BR .'4~
                        ~ g, 4 II


==2.0 RESPONSIBILITIES==
                    . ~                          PMP 2     EPP.005 LIST OF EFFECTIVE PAGES Pa e Numbers                                  Revision Number and Oate page 1 of 6                                    Revision 1  - 5/25/82 Page 2 of 6                                    Revision 1  - 5/25/82 Page 3 of 6  EXHIBIT A                          Revision 0  - 4/~/8~
The Shi ft Supervisor (SS)On-Si te Emergency Coordinator (OSEC)i s responsible for determining the need for initial evacuation to on-site assembly areas, The Radiological Assessment Director (RAD)in coordination with the Radiation Protection Director (RPD)is responsible for recommending further evacuation requirements to off-site reassembly areas based on radiological assessment and/or projections.
Page 4 of 6 EXHIBIT B                          Revision 0  - 4/t/Bt Page 5 of 6 EXHIBIT C                          Revision 0 - 4/1/81 Page 6 of 6 CHECKLIST                           Revision 1 - 5/25/82 Page  1 of 1 Rev. 1, 5/25/82
All personnel at DCCNP are responsible for knowing evacuation routes from assigned working areas;knowing the locations of their designated assembly areas and reporting to their designated assembly area when directed..
The Emergency Security Team is responsible to assist and support evacuation operations as requested by SS/OSEC.3 0 INSTRUCTIONS 0 OPTIONAL CHECKLIST, ENTRY PROVIDED 8 3.1 The SS/OSEC shall: 3.1.1 Determine need for evacuation of site personnel using criteria contained in EXHIBIT A, AFFECTED AREA EVACUATION CR ITER IA.3.1.2 Initiate evacuation notification.
8 3.2 The RPD shall: 3.2.1 Initiate monitoring activity of TSC and OSA as soon as possible after evacuation notification to determine habitability of pre-designated on-site assembly areas shown in EXHIBIT B, PLANT ASSEMBLY AREAS FOR ON-DUTY PERSONNEL AND REPORTING OFF-DUTY PERSONNEL.


====3.2.2 Report====
0
all pre-designated on-site assembly areas that are unhabitable to SS/OSEC.Page 1 of 6 Revision 1, 5/25/82 P 2081.EPP.005~~3.3 The RAD, shall: 3.3.1 Recommend potential reassembly areas to SS/OSEC if necessary.
                                                                        '3
NOTE: POTENTIAL OFF-SITE REASSEMBLY AREAS ARE SHOWN IN EXHIBIT C, OFF-SITE REASSEMBLY AREAS.3.3.2 Recommend evacuati on routes that minimi ze personnel radi ati on expos ures to SS/OSEC.3.4 The ESTL shall assist in controlling evacuation routes as requested by the RAD/RPD.4'.5 Emergency Center Managers involved in evacuation to reassembly areas shall report personnel accountability status to the OSA Manager or SS/OSEC as appropriate.
                                                                      ~ Nl I
Paqe 2 of 6 Revision 1, 5/25/82 AFFECTED AREA EVACUATION CRITERIA PMP 2081 r 05 EXHIBIT A OUTSIDE AFFECTED AREA INS DE AFFECTED AREA Precautionary Release of Personnel Dose Rate (mrem/h)(unanticipated)
I 1
Airborne Agtivity (uCi/coP)unevaluated d 0.5 (lasting 10h)1.0E-10(b)nessen>a ersonne 2.5 9.0E-09 ssen la ersonne 1000(a)3.6E-07(c)Notes: (a)As deemed necessary, the OSEC may elect to utilize higher dose rates for emergency response personnel for life-saving and facility saving actions based on pre-planned occupational radiation exposures under emergency conditions.
    ' g t,
Assessment actions should be planned within regulatory and administrative exposure limits.(See EPP 2.7).(b)Equal to 25K of weekly limit (unrestricted area).(c)Equal to 40 MPC/h unevaluated.
OF <<PV ' 't J
Respiratory protection should be utilized unless unfeasible.(d)Equal to 520 MPC/h unevaluated (quarterly Limit 10CFR20.103(a)(l)).
                  " P *'Y~"~P 'lN o
Respiratory protection should be utilized unless unfeasible.
i +, PrWV JtP,'n ef '' . l *g''~>t t,,'
Page of 6 Revisio 0, 4-1-81 0)hq I~'I w*, ,J PHP 2081 EP" EXHIBIT 0 PLANT ASSEHBLY AREA FOR ON-DUTY PERSONNEL AND REPORTING OFF-DUTY PERSONNEL Control Room A ec e ns Technical Su ort en er 0 erations Sta in rea Security Control en er*Plant Hanager**SS Operations Supt.Shift Techn.Advisor Prod.Supv.Operations (affected unit)On-Shift Operators Emer enc News Source Ener Information Center Techn.Support Hgr.Asst.Plt.Hgrs.Techn.Supt.Plt.Chem.Supv.Plt.Rad Prot.Supv.NRC Repr.2 Westinghouse Repr.1 Prod.Supv.Operations (unaffected unit)Plant C&I Engr.Perf.Supv.Engr.Envir.Supv.Prod Supv.Techn.Avail.ST Advisors*Ha intenance Supt.All others within Protected Area excluding SAS Peronnel (Security)
*Emergency Security Team Leader SAS personnel Emergency Security Team Escort Personnel Off-Duty Personnel Should Report to Primary (or Alternate)
Assembly Area, as Directed*Hgr.Cook Nuclear Ctr.E IC Employees EIC Visitors Alternate~evensv le Substation Primar ate House*Directors (of personnel resources)
Page 4 of 6 Revision 0, 4-1-81
~W 4 2081 EPP.005 IBIT C OFF-SITE REASSEMBLY AREAS Reassembl Area One Proceed east along the main entrance road and reassemble across Red Arrow Highway along main access road.Reassembly Area Two Proceed norw a ong a e sc igan and reassemble on the beach at the pl ant property line or Rosemary Road.Reassembl Area Three Proceed south along Lake Michigan Beach and reassemble on the Beach at the end of Livingston Road.Page 5 of 6 Revision 0, 4-1-81 t i'jf 4 a"'F'P' r~l~r~~*2081 EPP.005 CHECKLIST PMP 2081 EPP.005 PERSONNEL EVACUAT ION 3.1 SS/OSEC Oetermine need for evacuation:


===3.2 Personnel===
~ ~
movement to designated Assembly Areas: 3.5 Hove to Off-Site Reassembly Areas if appropriate:
PMP  208    PP.005 INDIANA 5 MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT PERSONNEL EVACUATION
lnl la s lnl Cia 5 lnltla s lme time time Page 6 of 6 Revision 1, 5/25/82  
: 1. 0  OBJECTIVES This procedure describes the actions necessary to assure safe and expeditious evacuation from local work areas to predesignated on-site assembly areas and to alternate off-site reassembly areas, if  necessary.
*A~~~~~'.w'I 00>>Al9 C.CO"..K PL,."tl," C.~QQA'l<,lg 3-: idaho e 1~ll l, P T h E-~4'H p t}}
: 2. 0  RESPONSIBILITIES The Shi  ft Supervisor    (SS) On-Si te Emergency  Coordinator (OSEC) i s responsible for determining the        need for  initial  evacuation to on-site assembly areas, The  Radiological Assessment Director (RAD) in coordination with the Radiation Protection Director (RPD) is responsible for recommending further evacuation requirements to off-site reassembly areas based on radiological assessment and/or projections.
All personnel at      DCCNP are responsible for knowing evacuation routes from assigned working areas; knowing the locations of their designated assembly areas and reporting to their designated assembly area when directed..
The Emergency    Security Team is responsible to assist and support evacuation operations as requested by SS/OSEC.
3 0    INSTRUCTIONS      0 OPTIONAL CHECKLIST,ENTRY PROVIDED 8 3. 1  The SS/OSEC    shall:
: 3. 1. 1  Determine need    for evacuation of  site  personnel  using criteria    contained in EXHIBIT A,  AFFECTED AREA EVACUATION CR ITER IA.
3.1.2    Initiate    evacuation  notification.
8 3.2    The RPD  shall:
3.2.1    Initiate monitoring activity of TSC and OSA as soon as possible after evacuation notification to determine habitability of pre-designated on-site assembly areas shown  in  EXHIBIT B, PLANT ASSEMBLY AREAS    FOR ON-DUTY PERSONNEL AND REPORTING OFF-DUTY PERSONNEL.
3.2.2    Report all pre-designated on-site assembly areas that are unhabitable to SS/OSEC.
Page  1 of  6 Revision 1, 5/25/82
 
P  2081. EPP. 005
                                                              ~    ~
3.3 The  RAD,  shall:
3.3. 1  Recommend    potential reassembly areas to    SS/OSEC    if necessary.
NOTE:    POTENTIAL OFF-SITE REASSEMBLY AREAS ARE      SHOWN    IN EXHIBIT C, OFF-SITE REASSEMBLY AREAS.
3.3. 2   Recommend    evacuati on routes that minimi ze personnel radi ati on expos ures to SS/OSEC.
3.4 The ESTL shall assist      in controlling evacuation routes      as requested by the RAD/RPD.
4'.5  Emergency Center Managers      involved in evacuation to reassembly areas shall report personnel accountability status to the OSA Manager or SS/OSEC as appropriate.
Paqe  2  of  6 Revision 1, 5/25/82
 
PMP  2081 r      05 EXHIBIT A AFFECTED AREA EVACUATION CRITERIA OUTSIDE AFFECTED AREA                                                    INS DE AFFECTED AREA nessen >a  ersonne            ssen la    ersonne Precautionary Release of Personnel Dose Rate (mrem/h)                0.5 (lasting 10h)                        2.5                        1000(a)
(unanticipated)
Airborne Agtivity                1.0E -  10(b)                            9.0E  - 09                3.6E  - 07(c)
(uCi/coP) unevaluated  d Notes:      (a)  As deemed  necessary,  the OSEC may  elect to utilize higher  dose rates for emergency response personnel for life-saving    and facility saving  actions based on pre-planned occupational radiation exposures under emergency conditions.      Assessment actions should be planned within regulatory and administrative exposure limits. (See EPP      2.7).
(b)  Equal  to 25K of weekly limit (unrestricted area).
(c)  Equal  to 40 MPC/h unevaluated. Respiratory protection should  be utilized  unless unfeasible.
(d)  Equal  to 520 MPC/h unevaluated    (quarterly Limit 10CFR20.103(a)(l)). Respiratory protection should be utilized unless unfeasible.
Page    of  6 Revisio    0, 4-1-81
 
0    )
hq I
  ~ 'I w
        *,  ,J
 
PHP 2081 EP" EXHIBIT 0 PLANT ASSEHBLY AREA FOR ON-DUTY PERSONNEL AND REPORTING OFF-DUTY PERSONNEL Control    Room                    Technical  Su ort                0  erations Sta in          Security Control A    ec e    ns                            en  er                              rea                        en er
* Plant    Hanager
* Techn. Support Hgr.
* Ha intenance Supt.
* Emergency Security
* SS                                Asst. Plt. Hgrs.                  All others within            Team Leader Operations Supt.                  Techn. Supt.                        Protected Area            SAS personnel Shift Techn. Advisor              Plt. Chem. Supv.                    excluding SAS Peronnel    Emergency  Security Prod. Supv. Operations            Plt. Rad Prot. Supv.                (Security)                  Team (affected unit)                NRC Repr. 2                                                    Escort Personnel On-Shift Operators                Westinghouse Repr. 1 Prod. Supv. Operations (unaffected unit)
Plant C&I Engr.
Emer enc    News  Source            Perf. Supv. Engr.
Ener    Information              Envir. Supv.
Center                    Prod Supv. Techn.                Off-Duty Personnel Should Report Avail. ST Advisors              to Primary (or Alternate)
Assembly Area, as Directed
* Hgr. Cook Nuclear    Ctr.
E IC Employees EIC Visitors                                                        Alternate                    Primar
                                                                      ~evensv le                          ate House Substation
* Directors (of personnel resources)
Page 4 of 6 Revision 0, 4-1-81
 
~ W 4 2081 EPP.005 IBIT C OFF-SITE REASSEMBLY AREAS Reassembl    Area One Proceed east along the main entrance road and reassemble across Red Arrow Highway along main access road.
Reassembly Area Two Proceed norw a ong a e sc igan and reassemble on the beach at the pl ant property line or Rosemary Road.
Reassembl    Area Three Proceed  south along Lake Michigan Beach and reassemble    on the Beach  at the end of Livingston    Road.
Page 5 of  6 Revision 0, 4-1-81
 
t i'
jf 4 a" 'F'P'
 
r
    ~
l ~ r                                                                  2081 EPP.005
~    ~
CHECKLIST  PMP  2081 EPP.005 PERSONNEL    EVACUATION 3.1 SS /OSEC  Oetermine need for evacuation:
lnl la  s          lme 3.2 Personnel movement to designated Assembly Areas:
lnl Cia  5        time 3.5 Hove to Off-Site Reassembly Areas if appropriate:                                   lnltla   s       time Page 6 of 6 Revision 1, 5/25/82
 
A   ~   ~
                                                        ~ ~ ~
                                                            .w'I idaho PL,."tl,"
00>>Al9 ~QQAC. CO"..K
                            'l<,lg C.
e 1 ~ ll l, 3-:
P t
T h                                       H E-                                       p 4'
                ~}}

Latest revision as of 01:48, 4 February 2020

Public Version of Reissued Revision 1 to Emergency Plan Implementing Procedure PMP 2081 EPP.005, Personnel Evacuation.
ML17319B378
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/28/1982
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17319B376 List:
References
PMP-2081-EPP., PMP-2081-EPP.00, NUDOCS 8206160286
Download: ML17319B378 (14)


Text

IiOWew 8 elcefewe EEECYNIC COMPANY DONALD C COOK NUCLEAR PLANT PROCEDURE COVER SHEET Procedure No. PMP 2081 EPP.005 Revision No.

TITLE PERSONNEL EYACUATION SCOPE OF REVISION Rev. 1: Changed SOE to SS.

DCR MAY 2 81982 SIGNATURES ORIGINAL Rev. I REV. 2 Rev. S PREPARED BY QUALITY ASSURANCE REVIEW INTERFACING DEPARTMENT HEAD CONCURRENCE N.A.

DEPARTMENT HEAD APPROVAL N.A. i. A.

PLANT NUCLEAR SAFETY COMMITIiE /(lP((iii/

PLANT MANAGER APPROVAL DATE OF ISSUE 3-31-81 Fss Na M Kla I 5~05~+

05000515

'zow50ms5 PDR *DDCY, PDR F

l

~ ~

e ggry, PLN7

>> ~<~',~ ~VINS pa l aalu'

)~ BG> I I

'-"i~BR .'4~

~ g, 4 II

. ~ PMP 2 EPP.005 LIST OF EFFECTIVE PAGES Pa e Numbers Revision Number and Oate page 1 of 6 Revision 1 - 5/25/82 Page 2 of 6 Revision 1 - 5/25/82 Page 3 of 6 EXHIBIT A Revision 0 - 4/~/8~

Page 4 of 6 EXHIBIT B Revision 0 - 4/t/Bt Page 5 of 6 EXHIBIT C Revision 0 - 4/1/81 Page 6 of 6 CHECKLIST Revision 1 - 5/25/82 Page 1 of 1 Rev. 1, 5/25/82

0

'3

~ Nl I

I 1

' g t,

OF <<PV ' 't J

" P *'Y~"~P 'lN o

i +, PrWV JtP,'n ef . l *g~>t t,,'

~ ~

PMP 208 PP.005 INDIANA 5 MICHIGAN ELECTRIC COMPANY DONALD C. COOK NUCLEAR PLANT PERSONNEL EVACUATION

1. 0 OBJECTIVES This procedure describes the actions necessary to assure safe and expeditious evacuation from local work areas to predesignated on-site assembly areas and to alternate off-site reassembly areas, if necessary.
2. 0 RESPONSIBILITIES The Shi ft Supervisor (SS) On-Si te Emergency Coordinator (OSEC) i s responsible for determining the need for initial evacuation to on-site assembly areas, The Radiological Assessment Director (RAD) in coordination with the Radiation Protection Director (RPD) is responsible for recommending further evacuation requirements to off-site reassembly areas based on radiological assessment and/or projections.

All personnel at DCCNP are responsible for knowing evacuation routes from assigned working areas; knowing the locations of their designated assembly areas and reporting to their designated assembly area when directed..

The Emergency Security Team is responsible to assist and support evacuation operations as requested by SS/OSEC.

3 0 INSTRUCTIONS 0 OPTIONAL CHECKLIST,ENTRY PROVIDED 8 3. 1 The SS/OSEC shall:

3. 1. 1 Determine need for evacuation of site personnel using criteria contained in EXHIBIT A, AFFECTED AREA EVACUATION CR ITER IA.

3.1.2 Initiate evacuation notification.

8 3.2 The RPD shall:

3.2.1 Initiate monitoring activity of TSC and OSA as soon as possible after evacuation notification to determine habitability of pre-designated on-site assembly areas shown in EXHIBIT B, PLANT ASSEMBLY AREAS FOR ON-DUTY PERSONNEL AND REPORTING OFF-DUTY PERSONNEL.

3.2.2 Report all pre-designated on-site assembly areas that are unhabitable to SS/OSEC.

Page 1 of 6 Revision 1, 5/25/82

P 2081. EPP. 005

~ ~

3.3 The RAD, shall:

3.3. 1 Recommend potential reassembly areas to SS/OSEC if necessary.

NOTE: POTENTIAL OFF-SITE REASSEMBLY AREAS ARE SHOWN IN EXHIBIT C, OFF-SITE REASSEMBLY AREAS.

3.3. 2 Recommend evacuati on routes that minimi ze personnel radi ati on expos ures to SS/OSEC.

3.4 The ESTL shall assist in controlling evacuation routes as requested by the RAD/RPD.

4'.5 Emergency Center Managers involved in evacuation to reassembly areas shall report personnel accountability status to the OSA Manager or SS/OSEC as appropriate.

Paqe 2 of 6 Revision 1, 5/25/82

PMP 2081 r 05 EXHIBIT A AFFECTED AREA EVACUATION CRITERIA OUTSIDE AFFECTED AREA INS DE AFFECTED AREA nessen >a ersonne ssen la ersonne Precautionary Release of Personnel Dose Rate (mrem/h) 0.5 (lasting 10h) 2.5 1000(a)

(unanticipated)

Airborne Agtivity 1.0E - 10(b) 9.0E - 09 3.6E - 07(c)

(uCi/coP) unevaluated d Notes: (a) As deemed necessary, the OSEC may elect to utilize higher dose rates for emergency response personnel for life-saving and facility saving actions based on pre-planned occupational radiation exposures under emergency conditions. Assessment actions should be planned within regulatory and administrative exposure limits. (See EPP 2.7).

(b) Equal to 25K of weekly limit (unrestricted area).

(c) Equal to 40 MPC/h unevaluated. Respiratory protection should be utilized unless unfeasible.

(d) Equal to 520 MPC/h unevaluated (quarterly Limit 10CFR20.103(a)(l)). Respiratory protection should be utilized unless unfeasible.

Page of 6 Revisio 0, 4-1-81

0 )

hq I

~ 'I w

  • , ,J

PHP 2081 EP" EXHIBIT 0 PLANT ASSEHBLY AREA FOR ON-DUTY PERSONNEL AND REPORTING OFF-DUTY PERSONNEL Control Room Technical Su ort 0 erations Sta in Security Control A ec e ns en er rea en er

  • Plant Hanager
  • Techn. Support Hgr.
  • Ha intenance Supt.
  • Emergency Security
  • SS Asst. Plt. Hgrs. All others within Team Leader Operations Supt. Techn. Supt. Protected Area SAS personnel Shift Techn. Advisor Plt. Chem. Supv. excluding SAS Peronnel Emergency Security Prod. Supv. Operations Plt. Rad Prot. Supv. (Security) Team (affected unit) NRC Repr. 2 Escort Personnel On-Shift Operators Westinghouse Repr. 1 Prod. Supv. Operations (unaffected unit)

Plant C&I Engr.

Emer enc News Source Perf. Supv. Engr.

Ener Information Envir. Supv.

Center Prod Supv. Techn. Off-Duty Personnel Should Report Avail. ST Advisors to Primary (or Alternate)

Assembly Area, as Directed

  • Hgr. Cook Nuclear Ctr.

E IC Employees EIC Visitors Alternate Primar

~evensv le ate House Substation

  • Directors (of personnel resources)

Page 4 of 6 Revision 0, 4-1-81

~ W 4 2081 EPP.005 IBIT C OFF-SITE REASSEMBLY AREAS Reassembl Area One Proceed east along the main entrance road and reassemble across Red Arrow Highway along main access road.

Reassembly Area Two Proceed norw a ong a e sc igan and reassemble on the beach at the pl ant property line or Rosemary Road.

Reassembl Area Three Proceed south along Lake Michigan Beach and reassemble on the Beach at the end of Livingston Road.

Page 5 of 6 Revision 0, 4-1-81

t i'

jf 4 a" 'F'P'

r

~

l ~ r 2081 EPP.005

~ ~

CHECKLIST PMP 2081 EPP.005 PERSONNEL EVACUATION 3.1 SS /OSEC Oetermine need for evacuation:

lnl la s lme 3.2 Personnel movement to designated Assembly Areas:

lnl Cia 5 time 3.5 Hove to Off-Site Reassembly Areas if appropriate: lnltla s time Page 6 of 6 Revision 1, 5/25/82

A ~ ~

~ ~ ~

.w'I idaho PL,."tl,"

00>>Al9 ~QQAC. CO"..K

'l<,lg C.

e 1 ~ ll l, 3-:

P t

T h H E- p 4'

~