ML17320A349: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:t~re0IIDIAIIIA.B iÃICN'GAIII EIECTBICCOMPAil/Y DONALDC.COOKNUCLEARPLANTinstruction orPI'ocedure Temporary SheetThistemporary sheetappliestoACTIVATION ANDOPERATION OFTHEEMERGENCY OPERATE)NS FACILITYInstruction orProceaure IlopMp2O81EppO22RevisionNo.2Thefollowing change()newrequirement (X)shallbeinstituted effective (Date)TEMPORARY SHEETNO.Subsitute Page4withAttachment.
{{#Wiki_filter:t         re IIDIAIIIA.B iÃICN'GAIII
Items~Chd.ChangedStep4.4.5toStep4.3.10Reason:Toassignproperresponsibi1ity AddednewStep4.4.5-Assigning responsibility ofprintdistribution atE.O.F.,Reason:()AAudit'82-18 discrepancy.'his changeshouldbemadeapermanent revisiontotheInstruction orProcedure:
  ~
gYESoNO0NOTKNOWN,.additional reviewrequiredExpiration patNeXtProOriginator:
0 EIECTBIC COMPAil/Y DONALD C. COOK NUCLEAR PLANT instruction or PI'ocedure Temporary Sheet TEMPORARY This temporary sheet applies to ACTIVATION AND OPERATION OF THE EMERGENCY OPERATE)NS FACILITY                                          SHEET NO.
Nhnagement Staff:SeniorReactorOpeIator:
Instruction or Proceaure    Ilo pMp 2O81 Epp O22 Revision No. 2 The following change (         )       new requirement ( X)                 shall be instituted effective (Date)
PNSRC.,'i-"ureRevisionDIte//StandardDist.ListNo.:Distribution:
Subsitute     Page 4    with Attachment.
FormNo.4330RRvIsRD'r17a, J8302090062 830131-PGIurPDRADQCK"''05000315' PDRWHITRORIGINALCANARY-ORIGINATOR COPYPINKWORKINGCOPY lWWQl~>e+I'',II(C1 PMP2081EPP.0224.44.3.10Assumeresponsibility forthedoseassessment andradiation protection functionfromtheTSC.ITheCommunications Directorshallperformthefollowing functions:
                    ~Ch Items             d.
4.4.14.4.2-4.4.3Establish achronological historylogofeventsandmakethislogava'ilable tocommunications, dose.assessment, radiation protection, andothe~EOFpersonnel.
Changed    Step 4.4.5 to Step 4.3. 10 Reason:       To assign  proper responsibi1ity Added new Step      4.4.5 - Assigning responsibility of print distribution at        E.O.F.
Ensurethatdetailed'eventdata,PMP2081EPP.020,ExhibitB,ismadeavailable regularly tocommunications, doseassessment, andradiation protection personnel.
Reason:       ()A Audit'82-18 discrepancy.'his change should be made a permanent revision    to the Instruction or Procedure:
Normallythisdatawillbeprovidedeveryfifteenminutesbytelecopier fromtheTSC.Ensurethecommunicators, doseassessment, andradiation protection personnel'iare broughtup-to-date regarding eventdataandinformation requiredtoperformtheirfunctions.
gYES            oNO            0 NOT KNOWN,.additional review required Expiration pat      NeXt Pro      ure Revision                            Standard Dist. List No.:
4,4.4Establish commurdcation withtheBerrien=CountySheriff's Department, MichiganStatePolice,NuclearRegulatory Commission (Emergency Notification SystemandHealthPhysicsNetwork),
Originator:                                                                Distribution:
AmericanElectricPowerInitialAssessment Group,andPublicAffairs.Assumeresponsibility forthisfunctionfromtheTSC.4.4.5Assign"anindividual, therunnerifavailable, todistribute twosetsofflowdiagramsandone-linediagramstothePublicAffairsCommunication deskandtherecoveryandcontrolmanagersoffice.4.4.6Communicate requestsfromoff-sitegroupstotheTechnical Director.
Nhnagement   Staff:
4.5TheRadiological Assessment Directorisresponsible for:4.5.14.5.2Performing dosecalculations foron-siteandoff-siteareasandreporting theseresultstotheCommunications DirectorandRadiation ControlandWasteHandlingManager.Recommending Protective actionson-siteandoff-sitewhenappropriate.
Senior Reactor OpeIator:
Page4of5Rev.2(TP-1)
PNSRC   .,'i -"                     DIte  //
L1<<x~yl'PMPEPPINDEXINDIANA5MICHIGANPOWERCOMPANYDONALDC.COOKNUCLEARPLANTPLANTMANAGERPROCEDURE IndexIdentification NumberTitleRevisionNo.lAndDateCcmt}ants PMP2881EPP.014EPP.015EPP.016EPP.017EPP.018EPP.019EPP.020EPP.021EPP.022EPP.023EPP.024Off-SiteDoseAssessments SamplingandAnalysisofWaterborne ReleasesCollection andAnalysisofLiquidandGaseousSamplesInterpretation ofLiquidandGaseousSamplesTransportation, Accidents Involving Radioactive
Form No. 4330              RRvIsRD'r17a, ORIGINAL WHITR ORIGINATOR COPY J
'aterialAEPEmergency ResponseOrganization Activation andManagement Activation andOperation oftheTechnical SupportCenter(TSC)Activation andOperatio'n oftheOperations StagingArea(OSA)andPersonnel Accountability ActiVation andOperation oftheEmergency Operations
8302090062 830131-                                                                     CANARY PINK    WORKING COPY PGIu r PDR    ADQCK"''05000315' PDR
.Facility Activation andOperation oftheEmergency ControlCenter(ECC)(AnEmergency Operations Facility)
 
Activation andOperation oftheJointPublicInformation Center(JPIC)(AnEmergency Operations Facility)-
l W  WI'',IQ l
RevisionI110-12-82Revision04-1-81Revision04-1-81Revision04-1-81Revision16-24-82'evision 04-1-83Revision18-24-82Revision15-25-82Revision211-15-82CANCELLED 82Revision16-24-82TP-1,9-9-82 ExpNATP-l,l.-'12-83.
    ~     >e+
ExpNAAQfc3Re'I.Det='I-Qo-}IR-I'0~"Ifit%t'Ih,I"'kl}}
I
( C 1
 
PMP  2081 EPP.022 4.3. 10    Assume responsibility for the dose assessment and radiation protection function from the TSC.
I 4.4 The Communications    Director shall perform the following functions:
4.4.1        Establish  a chronological history log of events and make this log ava'ilable to communications, dose. assessment, radiation protection, and othe~ EOF personnel.
4.4.2-      Ensure that detailed 'event data, PMP 2081 EPP.020, Exhibit B, is made available regularly to communications, dose assessment, and  radiation protection personnel.      Normally this data will be provided every      fifteen minutes by telecopier from the TSC.
4.4. 3      Ensure the communicators,   dose assessment, and radiation protection personnel'iare brought up-to-date regarding event data and information required to perform their functions.
4,4.4        Establish commurdcation with the Berrien
              =County Sheriff's Department, Michigan State Police, Nuclear Regulatory Commission (Emergency Notification System and Health Physics Network), American Electric Power Initial Assessment Group, and Public Affairs.
Assume responsibility for this function from the TSC.
4.4.5        Assign  "an individual, the runner    if  available, to distribute two sets of flow diagrams and one-line diagrams to the Public Affairs Communication desk and the recovery and control managers office.
4.4.6        Communicate requests    from off-site    groups to the Technical Director.
4.5 The  Radiological Assessment Director is responsible for:
4.5.1        Performing dose calculations for on-site and off-site  areas and reporting these results to the Communications Director and Radiation Control and Waste Handling Manager.
: 4. 5.2      Recommending Protective actions    on-site  and off-site when appropriate.
Page 4  of 5 Rev. 2   (TP-1)
 
L 1
yl x ~
                          '                                                                     PMP EPP  INDEX INDIANA 5 MICHIGAN POWER COMPANY DONALD C. COOK NUCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification                    Title                Revision No.l Ccmt}ants Number                                                And Date PMP  2881 EPP.014    Off-Site  Dose Assessments        Revi sionI      1 10-12-82 EPP.015    Sampling and Analysis    of    Revision        0 Waterborne Releases                4-1-81 EPP.016    Collection  and Analysis of    Revision 0 Liquid and  Gaseous Samples      4-1-81 EP P. 017  Interpretation of Liquid        Revision        0 and Gaseous  Samples              4-1-81 EPP.018    Transportation, Accidents       Revision        1 Involving Radioactive
                              'aterial                          6-24-82'evision EPP.019    AEP Emergency Response                          0 Organization Activation and        4-1-83 Management EPP.020    Activation   and Operation of  Revision          1  TP-1,9-9-82 Exp    NA the Technical Support Center    8-24-82 (TSC)
EPP. 021    Activation   and Operatio'n of Revision        1 the Operations Staging Area        5-25-82 (OSA) and Personnel Accountability EPP.022    ActiVation   and Operation  of Revision 2          TP-l,  l.-'12-83. Exp  NA the  Emergency Operations       11-15-82
                              .Facility EPP.023    Activation   and Operation of  CANCELLED the Emergency Control Center      82 (ECC) (An Emergency Operations   Facility)
EPP.024    Activation and Operation of      Revision        1 the Joint Public Information    6-24-82 Center (JPIC) (An Emergency Operations Facility)-
A Qfc      3 Re'I. Det=   'I-Qo-}IR-
 
I' 0         ~"
I fit% t
            'I h,
I "'k l}}

Latest revision as of 02:44, 4 February 2020

Public Version of Procedure Temporary Sheet 1 to Rev 2 to Emergency Plan Implementing Procedure PMP 2081 EPP.022, Activation & Operation of Emergency Operations Facility.
ML17320A349
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 01/20/1983
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17320A347 List:
References
PMP-2081-EPP.02, PMP-2081-EPP.2, NUDOCS 8302090062
Download: ML17320A349 (5)


Text

t re IIDIAIIIA.B iÃICN'GAIII

~

0 EIECTBIC COMPAil/Y DONALD C. COOK NUCLEAR PLANT instruction or PI'ocedure Temporary Sheet TEMPORARY This temporary sheet applies to ACTIVATION AND OPERATION OF THE EMERGENCY OPERATE)NS FACILITY SHEET NO.

Instruction or Proceaure Ilo pMp 2O81 Epp O22 Revision No. 2 The following change ( ) new requirement ( X) shall be instituted effective (Date)

Subsitute Page 4 with Attachment.

~Ch Items d.

Changed Step 4.4.5 to Step 4.3. 10 Reason: To assign proper responsibi1ity Added new Step 4.4.5 - Assigning responsibility of print distribution at E.O.F.

Reason: ()A Audit'82-18 discrepancy.'his change should be made a permanent revision to the Instruction or Procedure:

gYES oNO 0 NOT KNOWN,.additional review required Expiration pat NeXt Pro ure Revision Standard Dist. List No.:

Originator: Distribution:

Nhnagement Staff:

Senior Reactor OpeIator:

PNSRC .,'i -" DIte //

Form No. 4330 RRvIsRD'r17a, ORIGINAL WHITR ORIGINATOR COPY J

8302090062 830131- CANARY PINK WORKING COPY PGIu r PDR ADQCK"05000315' PDR

l W WI,IQ l

~ >e+

I

( C 1

PMP 2081 EPP.022 4.3. 10 Assume responsibility for the dose assessment and radiation protection function from the TSC.

I 4.4 The Communications Director shall perform the following functions:

4.4.1 Establish a chronological history log of events and make this log ava'ilable to communications, dose. assessment, radiation protection, and othe~ EOF personnel.

4.4.2- Ensure that detailed 'event data, PMP 2081 EPP.020, Exhibit B, is made available regularly to communications, dose assessment, and radiation protection personnel. Normally this data will be provided every fifteen minutes by telecopier from the TSC.

4.4. 3 Ensure the communicators, dose assessment, and radiation protection personnel'iare brought up-to-date regarding event data and information required to perform their functions.

4,4.4 Establish commurdcation with the Berrien

=County Sheriff's Department, Michigan State Police, Nuclear Regulatory Commission (Emergency Notification System and Health Physics Network), American Electric Power Initial Assessment Group, and Public Affairs.

Assume responsibility for this function from the TSC.

4.4.5 Assign "an individual, the runner if available, to distribute two sets of flow diagrams and one-line diagrams to the Public Affairs Communication desk and the recovery and control managers office.

4.4.6 Communicate requests from off-site groups to the Technical Director.

4.5 The Radiological Assessment Director is responsible for:

4.5.1 Performing dose calculations for on-site and off-site areas and reporting these results to the Communications Director and Radiation Control and Waste Handling Manager.

4. 5.2 Recommending Protective actions on-site and off-site when appropriate.

Page 4 of 5 Rev. 2 (TP-1)

L 1

yl x ~

' PMP EPP INDEX INDIANA 5 MICHIGAN POWER COMPANY DONALD C. COOK NUCLEAR PLANT PLANT MANAGER PROCEDURE Index Identification Title Revision No.l Ccmt}ants Number And Date PMP 2881 EPP.014 Off-Site Dose Assessments Revi sionI 1 10-12-82 EPP.015 Sampling and Analysis of Revision 0 Waterborne Releases 4-1-81 EPP.016 Collection and Analysis of Revision 0 Liquid and Gaseous Samples 4-1-81 EP P. 017 Interpretation of Liquid Revision 0 and Gaseous Samples 4-1-81 EPP.018 Transportation, Accidents Revision 1 Involving Radioactive

'aterial 6-24-82'evision EPP.019 AEP Emergency Response 0 Organization Activation and 4-1-83 Management EPP.020 Activation and Operation of Revision 1 TP-1,9-9-82 Exp NA the Technical Support Center 8-24-82 (TSC)

EPP. 021 Activation and Operatio'n of Revision 1 the Operations Staging Area 5-25-82 (OSA) and Personnel Accountability EPP.022 ActiVation and Operation of Revision 2 TP-l, l.-'12-83. Exp NA the Emergency Operations 11-15-82

.Facility EPP.023 Activation and Operation of CANCELLED the Emergency Control Center 82 (ECC) (An Emergency Operations Facility)

EPP.024 Activation and Operation of Revision 1 the Joint Public Information 6-24-82 Center (JPIC) (An Emergency Operations Facility)-

A Qfc 3 Re'I. Det= 'I-Qo-}IR-

I' 0 ~"

I fit% t

'I h,

I "'k l