{{#Wiki_filter:DONALD C.COOK UNITS 1 R 2 MIJN STEAM SAHHY VALVE LIFI'ETPOINT TOLERANCE RELAXATION Nuclear and Advanced Technology Division Westinghouse Electric Corporation December 1993 e1993 Westinghouse Electric Corporation All Rights Reserved 9312230047 931217 PDR ADOCK 05000315.P PDR SECL-91<29, Revision 2 TABLE OF CONTENTS~SE I~N PA E List of Tables List of Figures nI Safety Evaluation Check List Introduction Licensing Basis Evaluations VI Non-LOCA LOCA Containment Integrity Steam Generator Tube Rupture Component Performance Systems Evaluation Radiological Evaluation Plant Risk Analysis/PE)Plant Risk Analysis (non-IPE)I&C Systems Technical Specifications 5 17 24 24 25 26 26 26 26 27 27 Assessment of No Unreviewed Safety Question Conclusion References Appendix A: Significant Hazards Evaluation Appendix B: Recommended Technical Specification Marked-Ups 28 31 32 91429R2.wpf LIST OF TABLES TABLE PA E Table 1: Main Steam Safety Valve Lift Setpoints Table 2: DNB Design Basis Transients Not Affected by MSSV Lift Setpoint Tolerance Increase Table 3: Unit 1 Turbine Trip Sequence of Events Table 4: Unit 2 Turbine Trip Sequence of Events Table 5: Current Licensing Basis Steam Line Safety Valves per Loop Table 6: MSSV Setpoint Increase Steam Line Safety Valves per Loop Table 7: Unit 1 Low Pressure Low Temperature Input Parameters Table 7a: Unit 1 Initial Input Parameters for the Small Break LOCA Analysis Table 8: Unit 1 Low Pressure High Temperature Input Parameters Table 9: Unit 2 Low Pressure High Temperature Input Parameters Table 10: Unit 1 Small Break LOCA Evaluation Time Sequence of Events Table 10a: Unit 1 Small Break LOCA Analysis Time Sequence of Events Table 11: Unit 1 Small Break LOCA Evaluation Summary of Results Table 11a: Unit 1 Small Break LOCA Analysis Summary of Results 33 35 37 38 39 41 42 43 45 Table 12: Unit.2 Small Break LOCA Evaluation 46 Time Sequence of Events 47 Table 13: Unit 2 Small Break LOCA Evaluation Summary of Results 48 ubxxx.wpf:
{{#Wiki_filter:DONALD C. COOK UNITS 1 R 2 MIJN STEAM SAHHY VALVE LIFI'ETPOINT TOLERANCE RELAXATION Nuclear and Advanced Technology Division Westinghouse Electric Corporation December 1993 e1993 Westinghouse Electric Corporation All Rights Reserved 9312230047 931217 PDR ADOCK 05000315
Id-121393 SECI 91<29, Revision 2 LIST OF FIGURES~IGURB Figure la: Illustration of Overtemperature and Overpower hT Protection for Unit 1 Figure 1b-c: Illustration of Overtemperature and Overpower hT Protection for Unit 2 (mixed and full V-SH cores)Figure 2: Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 3: Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Nuclear Power and DNBR Figure 4: Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 5: Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback;Steam Generator Pressure and MSSV Relief Rate Figure 6: Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Pressurizer Relief Rate Figure 7: Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 8: Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Nuclear Power and DNBR Figure 9: 'nit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 10: Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 11: Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Pressurizer Relief Rate Figure 12: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 13: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Nuclear Power and DNBR Figure 14: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Core Average Temperature and Loop Temperature
. P             PDR
'1429R2.wp f
 
SECL-91<29, Revision 2 TABLE OF CONTENTS
        ~SE   I~N                                                         PA E List of Tables List of Figures                                                                 nI Safety Evaluation Check List                                                   VI Introduction Licensing Basis Evaluations Non-LOCA                                                                 5 LOCA                                                                   17 Containment Integrity                                                 24 Steam Generator Tube Rupture                                           24 Component Performance                                                 25 Systems Evaluation                                                     26 Radiological Evaluation                                               26 Plant Risk Analysis /PE)                                               26 Plant Risk Analysis (non-IPE)                                         26 I&C Systems                                                           27 Technical Specifications                                               27 Assessment   of No Unreviewed   Safety Question                               28 Conclusion                                                                     31 References                                                                     32 Appendix A: Significant Hazards Evaluation Appendix B: Recommended Technical Specification Marked-Ups 91429R2.wpf
 
LIST OF TABLES TABLE                                                                       PA E Table 1:         Main Steam Safety Valve LiftSetpoints Table 2:         DNB Design Basis Transients Not Affected by MSSV LiftSetpoint  Tolerance Increase Table 3:         Unit 1 Turbine Trip Sequence of Events                               33 Table 4:         Unit 2 Turbine Trip Sequence of Events                               35 Table 5:         Current Licensing Basis Steam Line Safety Valves per Loop           37 Table 6:         MSSV Setpoint Increase Steam Line Safety Valves per Loop             38 Table 7:         Unit 1 Low Pressure Low Temperature Input Parameters                 39 Table 7a:       Unit 1 Initial Input Parameters for the Small Break LOCA Analysis Table 8:         Unit 1 Low Pressure High Temperature Input Parameters               41 Table 9:         Unit 2 Low Pressure High Temperature Input Parameters               42 Table 10:       Unit 1 Small Break LOCA Evaluation Time Sequence of Events           43 Table 10a:       Unit 1 Small Break LOCA Analysis Time Sequence of Events Table 11:       Unit 1 Small Break LOCA Evaluation Summary of Results               45 Table 11a:       Unit 1 Small Break LOCA Analysis Summary of Results Table 12:       Unit.2 Small Break LOCA Evaluation 46 Time Sequence of Events                                                           47 Table 13:       Unit 2 Small Break LOCA Evaluation Summary of Results               48 ubxxx.wpf: Id-121393
 
SECI 91<29, Revision 2 LIST OF FIGURES
      ~IGURB Figure la:     Illustration of Overtemperature and Overpower hT Protection for Unit   1 Figure 1b-c:   Illustration of Overtemperature and Overpower hT Protection for Unit 2 (mixed and full V-SH cores)
Figure 2:     Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback:   Pressurizer Pressure and Water Volume Figure 3:     Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback:   Nuclear Power and DNBR Figure 4:     Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback:   Core Average Temperature and Loop Temperature Figure 5:     Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback;   Steam Generator Pressure and MSSV Relief Rate Figure 6:     Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback:   Pressurizer Relief Rate Figure 7:     Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback:   Pressurizer Pressure and Water Volume Figure 8:     Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback:   Nuclear Power and DNBR Figure 9:     'nit   1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 10:     Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback:   Steam Generator Pressure and MSSV Relief Rate Figure 11:     Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback:   Pressurizer Relief Rate Figure 12:     Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback:   Pressurizer Pressure and Water Volume Figure 13:     Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback:   Nuclear Power and DNBR Figure 14:     Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback:     Core Average Temperature and Loop Temperature f                                                                '1429R2.wp
 
SECL-91<29, Revision 2 LIST OF FIGURES (Continued)
SECL-91<29, Revision 2 LIST OF FIGURES (Continued)
~FI@RE Figure 15: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 16: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Pressurizer Relief Rate Figure 17: Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 18: Figure 19: Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Nuclear Power and DNBR Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 20: Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 21: Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Pressurizer Relief Rate Figure 22a-b: Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 23a-b: Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Nuclear Power and DNBR Figure 24a-b: Figure 25a-b: Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Core Average Temperature and Loop Temperature Unit 2 Turbine Trip Event Without OPressure Control, Minimum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 26a-b: Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Pressurizer Relief Rate Figure 27a-b: Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 28a-b: Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Nuclear Power and DNBR 91429Rz.wpf 1v  
        ~FI @RE Figure 15:     Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback:   Steam Generator Pressure and MSSV Relief Rate Figure 16:     Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback:   Pressurizer Relief Rate Figure 17:     Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback:   Pressurizer Pressure and Water Volume Figure 18:     Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback:   Nuclear Power and DNBR Figure 19:      Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback:   Core Average Temperature and Loop Temperature Figure 20:     Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback:   Steam Generator Pressure and MSSV Relief Rate Figure 21:     Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback:   Pressurizer Relief Rate Figure 22a-b:         Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback:   Pressurizer Pressure and Water Volume Figure 23a-b:         Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Nuclear Power and DNBR Figure 24a-b:         Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback:   Core Average Temperature and Loop Temperature Figure 25a-b:        Unit 2 Turbine Trip Event Without OPressure Control, Minimum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 26a-b:         Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Pressurizer Relief Rate Figure 27a-b:         Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback:   Pressurizer Pressure and Water Volume Figure 28a-b:         Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Nuclear Power and DNBR 91429Rz.wpf                                     1v


SECI 91-429, Revision 2 LIST OF FIGURES (Continued)
SECI 91-429, Revision 2 LIST OF FIGURES (Continued)
FI URE Figure 29a-b: Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 30a-b: Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 31a-b: Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Pressurizer Relief Rate Figure 32a-b: Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 33a-b: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Nuclear Power and DNBR Figure 34a-b: Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 35a-b: Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 36a-b: Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Pressurizer Relief Rate Figure 37a-b: Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 38a-b: Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Nuclear Power and DNBR Figure 39a-b: Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 40a-b: Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 41a-b: Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Pressurizer Relief Rate 9 1 429R2.wp f v SECI 91-429, Revision 2 Customer Reference No(s).PO: 04877-040-IN Westinghouse Reference No(s).WESTINGHOUSE NUCLEAR SAFETY SAFETY EVALUATION CHECK LIST 1)NUCLEAR PLANT(S): DONALD'C COOK NITS 1 AND 2 2)SUBJECT (TITLE): RELAXATI N F MSSV SETPOINT TOLERANCE TO+/-%3)The written safety evaluation of the revised procedure, design change or modification required by 1OCFR50.59 (b)has been prepared to the extent required and is attached.If a safety evaluation is not required or is incomplete for any reason, explain on Page 2.Parts A and B of this Safety Evaluation Check List are to be completed only on the basis of the safety evaluation performed.
FI URE Figure 29a-b:         Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback:   Core Average Temperature and Loop Temperature Figure 30a-b:         Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 31a-b:         Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback:   Pressurizer Relief Rate Figure 32a-b:         Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback:   Pressurizer Pressure and Water Volume Figure 33a-b:         Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback:   Nuclear Power and DNBR Figure 34a-b:         Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback:   Core Average Temperature and Loop Temperature Figure 35a-b:         Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback:   Steam Generator Pressure and MSSV Relief Rate Figure 36a-b:         Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Pressurizer Relief Rate Figure 37a-b:         Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback:   Pressurizer Pressure and Water Volume Figure 38a-b:         Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback:   Nuclear Power and DNBR Figure 39a-b:         Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback:   Core Average Temperature and Loop Temperature Figure 40a-b:   Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback:   Steam Generator Pressure and MSSV Relief Rate Figure 41a-b:         Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Pressurizer Relief Rate 9 1 429R2.wp f                                   v
CHECK LIST-PART A 10CFR50.59(a)(1)
 
(3.1)Yes X No A change to the plant as described in the UFSAR?(3.2)Yes No X,,A change to procedures as described in the UFSAR?(3.3)Yes No X A test or experiment not described in the UFSAR?(3.4)Yes X No A change to the plant technical specifications?(See note on Page 2.)4)CHECK LIST-Part B 10CFR50.59(a)(2)(Justification for Part B answers must be included on Page 2.)(4.1)Yes (4.2)Yes (4.3)Yes (4.4)Yes (4.5)Yes (4.6)Yes (4.7)Yes No X Will the probability of an accident previously evaluated in the UFSAR be increased?
SECI 91-429, Revision 2 Customer Reference No(s).
No X Will the consequences of an accident previously evaluated in the UFSAR be increased?
PO: 04877-040-IN Westinghouse Reference No(s).
No X May the possibility of an accident which is different than any already evaluated in the UFSAR be created?No X Will the probability of a malfunction of equipment important to safety previously evaluated in the UFSAR be increased?
WESTINGHOUSE NUCLEAR SAFETY SAFETY EVALUATIONCHECK LIST
No X Will the consequences of a malfunction of equipment important to safety previously evaluated in the UFSAR be increased?
: 1)     NUCLEAR PLANT(S): DONALD'C COOK                     NITS   1 AND 2
No X May the possibility of a malfunction of equipment important to safety different than any already evaluated in the UFSAR be created?No X Will the margin'of safety as defined in the bases to any technical specifications be reduced?91429R2.wpf vi SECL-91-429, Revision 2 NOTES: If the answers to any of the above questions are unknown, indicate under 5)REMARKS and explain below.If the answers to any of the above questions in Part A 3.4 or Part B cannot be answered in the negative, based on the written safety evaluation, the change review would require an application for license amendment as required by 10CFR50.59(c) and submitted to the NRC pursuant to 1OCFR50.90.
: 2)     SUBJECT (TITLE):         RELAXATI N F MSSV SETPOINT TOLERANCE TO +/-                       %
5)REMARKS: The attached safety evaluation summarizes the justification for answers given in Part A 3.4 and Part B of this safety evaluation check list: 'Reference to documents containing written safety evaluation:
: 3)     The written safety evaluation of the revised procedure, design change or modification required by 10CFR50.59 (b) has been prepared to the extent required and is attached. If a safety evaluation is not required or is incomplete for any reason, explain on Page 2.
F R UF AR PDATE Pages: Tables: Figures: Reason for/Description of Change: UFSAR Mark-u s e rovided b se arate transmittal 6)SAFETY EVALUATION APPROVAL LADDER: 1 6.1)Prepared by (Nuclear Safety): 6.2)Reviewed by (Nuclear Safety): dccook.wp f-121093 vn SECI 91<29, Revision 2 DONALD C.COOK UNITS 1&2 INCREASED IVORY&#xc3;ST1MH SAFRXY VALVE SEIPOINT TOLERANCE SAFEIY EVALUATION I.INTRODUCTI N American Electric Power Service Corporation (AEPSC)has found that over an operating cycle the setpoint of the Main Steam Safety Valves (MSSVs)can change by more than 1%from the original set-pressure.
Parts A and B of this Safety Evaluation Check List are to be completed only on the basis     of the safety evaluation performed.
AEPSC has requested that Westinghouse perform an evaluation to increase the lift setpoint tolerance on the MSSVs at Donald C.Cook Units 1&2.The following safety evaluation is provided to support changing the as-found lift setpoint tolerance as stated by the Technical Specifications from J1%to+3%.During normal surveillance, if the valves are found to be within+3%, they will be within the bases of the accident analyses, however, the valves will be reset to J1%to account for future accumulation of drift.Thus, this evaluation permits a J3%setpoint tolerance to address as-found conditions.
CHECK LIST - PART A 10CFR50.59(a)(1)
The MSSVs are located outside containment upstream of the Main Steam Isolation Valves.The purpose of the valves is to prevent overpressurization of the steam generators.
(3.1)   Yes X     No           A change to the plant   as described in the UFSAR?
In order to accomplish this, a bank of five valves is located on each of the four steam generators, and the relief capacity is designed such that the total steam flow from the 20 valves will bound that produced by the limiting licensing-basis analysis.For Donald C.Cook, the total relief capacity of the 20 valves is 17.153 E6 ibm/hr at 1186.5 psia (1171.5 psig).The lift setpoints of the individual valves on each steamline are staggered at different pressures to minimize chattering once the valves are actuated.Staggering the valves also minimizes the total number of valves actuated during those transients where less than the maximum relief capacity is required thereby reducing maintenance requirements on the valves.The actual setpoints are provided in Table 1 and are documented in Tables 4.7-1 and 3.7-4 of the Units 1 and 2 Technical Specifications, respectively (Reference 1).91429Rz.wpf SECL-91<29, Revision 2 The operation of the Class 2 main steam safety valves (MSSVs)is governed by the ASME Code (Reference 2).AEPSC will maintain the design basis of the MSSVs by ensuring that the valves, if outside the J1%tolerance, will be recalibrated to within J1%.The purpose of this evaluation is to provide a quantification of the effects of a higher as-found lift setpoint tolerance.
(3.2)   Yes       No     X,,A change       to procedures as described in the UFSAR?
This safety evaluation will address the effects of the J3%as-found tolerance on UFSAR accident analyses (non-LOCA, LOCA, SGTR)and will document how the effects are accounted for within the accident analyses and the acceptability of the increase in the lift setpoint tolerance.
(3.3)   Yes       No     X     A test or experiment not described in the UFSAR?
91<29R2.wpf SECI 91-429, Revision 2 TABLE 1 MAIN STEAM SATINY VALVE LIFI'ETPOINT Value Number SV-1 SV-1 SV-2 SV-2 SV-3.Lift Se oint 1 1065 psig (1080 psia)1065 psig (1080 psia)1075 psig (1090 psia)1075 psig (1090 psia)1085 psig (1100 psia)
(3.4)   Yes X     No           A change to the plant technical specifications?
(See note on Page 2.)
: 4)     CHECK LIST - Part B 10CFR50.59(a)(2) (Justification for Part B answers must be included on Page 2.)
(4.1)   Yes       No    X      Will the probability of an accident previously evaluated in the UFSAR be increased?
(4.2)   Yes       No    X      Will the  consequences of an accident previously evaluated in the UFSAR be increased?
(4.3)    Yes        No     X     May the possibility of an accident which is different than any already evaluated in the UFSAR be created?
(4.4)    Yes        No    X      Will the probability of a malfunction of equipment important to safety previously evaluated in the UFSAR be increased?
(4.5)    Yes        No     X     Will the consequences of a malfunction of equipment important to safety previously evaluated in the UFSAR be increased?
(4.6)  Yes        No     X     May the possibility of a malfunction of equipment important to safety different than any already evaluated in the UFSAR be created?
(4.7)  Yes        No     X     Will the margin'of safety as defined in the bases to any technical specifications be reduced?
91429R2.wpf                                           vi
 
SECL-91-429, Revision 2 NOTES:
If the answers to any of the above questions are unknown, indicate under 5) REMARKS and explain below.
If the answers to any of the above questions in Part A 3.4 or Part B cannot be answered in the negative, based on the written safety evaluation, the change review would require an application for license amendment as required by 10CFR50.59(c) and submitted to the NRC pursuant to 10CFR50.90.
: 5)       REMARKS:
The attached safety evaluation summarizes the justification for answers given in Part A 3.4 and Part B of this safety evaluation check list:
          'Reference to documents containing written safety evaluation:
F R UF AR     PDATE Pages:                 Tables:               Figures:
Reason for/Description   of Change:
UFSAR Mark-u       s   e   rovided b se arate transmittal
: 6)       SAFETY EVALUATIONAPPROVAL LADDER:
1 6.1)     Prepared by (Nuclear Safety):
6.2)     Reviewed by (Nuclear Safety):
dccook.wp f-121093                                     vn
 
SECI 91<29, Revision 2 DONALD C. COOK UNITS               1 &2 INCREASED       IVORY&#xc3; ST1MH       SAFRXY VALVESEIPOINT TOLERANCE SAFEIY EVALUATION I. INTRODUCTI N American Electric Power Service Corporation (AEPSC) has found that over an operating cycle the setpoint   of the Main Steam   Safety Valves (MSSVs) can change by more than 1% from the original set-pressure. AEPSC has requested that Westinghouse perform an evaluation to increase the           lift setpoint tolerance on the MSSVs at Donald C. Cook Units             1 & 2. The following safety evaluation is provided to support changing the as-found       liftsetpoint  tolerance as stated by the Technical Specifications from     J1% to +3%.
During normal surveillance,     if the valves are found to be within     +3%, they will be within the bases of the accident   analyses, however, the valves   will be reset to J1% to account for future accumulation of drift. Thus, this evaluation permits     a J3% setpoint tolerance to     address as-found conditions.
The MSSVs are located outside containment upstream of the Main Steam Isolation Valves. The purpose   of the valves is to prevent overpressurization of the steam generators. In order to accomplish this, a bank of five valves is located on each of the four steam generators, and the relief capacity is designed such that the total steam flow from the 20 valves will bound that produced by the limiting licensing-basis analysis. For Donald C. Cook, the total relief capacity of the 20 valves is
: 17. 153 E6   ibm/hr at 1186.5 psia (1171.5 psig).
The   lift setpoints of the individual valves on each steamline are staggered at different pressures to minimize chattering once the valves are actuated.         Staggering the valves also minimizes the total number     of valves actuated during those transients where less than the maximum relief capacity is required thereby reducing maintenance requirements on the valves. The actual setpoints are provided in Table   1 and are documented in Tables 4.7-1 and 3.7-4         of the Units 1 and 2 Technical Specifications, respectively (Reference 1).
91429Rz.wpf
 
SECL-91<29, Revision 2 The operation of the Class 2 main steam safety valves (MSSVs) is governed by the ASME Code (Reference 2). AEPSC     will maintain the design   basis of the MSSVs by ensuring that the valves, if outside the J1% tolerance, will be     recalibrated to within J1%. The purpose of this evaluation is to provide a quantification of the effects of a higher as-found   liftsetpoint  tolerance. This safety evaluation will address the effects of the J3% as-found tolerance on UFSAR accident analyses (non-LOCA, LOCA, SGTR) and will document how the effects are accounted for within the accident analyses and the acceptability of the increase in the liftsetpoint  tolerance.
91<29R2.wpf
 
SECI 91-429, Revision 2 TABLE 1 MAINSTEAM SATINY VALVELIFI'ETPOINT Value Number               .Lift Se oint   1 SV-1                   1065 psig (1080 psia)
SV-1                    1065 psig (1080 psia)
SV-2                    1075 psig (1090 psia)
SV-2                    1075 psig (1090 psia)
SV-3                    1085 psig (1100 psia)


==References:==
==References:==
Table 4.7-1 of the Unit 1 Technical Specifications and Table 3.7-4 of the Unit 2 Technical Specifications 91429R2.wpf
SECL-91<29, Revision 2 II. LICENSING BASIS Title 10 of the  Code  of Federal Regulations, Section 50.59 (10CFR50.59) allows the holder of a license authorizing operation of a nuclear power facility the capacity to initiate certain changes, tests and experiments not described in the Updated Final Safety Analysis Report (UFSAR). Prior Nuclear Regulatory Commission (NRC) approval is not required to implement the modification provided that the proposed change, test or experiment does not involve an unreviewed safety question or result in a change to the plant technical specifications incorporated in the license. While the proposed change to the MSSV    liftsetpoint tolerances involves a change to the Donald C. Cook Technical Specifications and requires a licensing amendment request, this evaluation      will be performed using the  method outlined under 10CFR50.59 to provide the bases for the determination that the proposed change does not involve an unreviewed safety question.      In addition, an evaluation will demonstrate that the proposed change does not represent a significant hazards consideration, as required by 10CFR50.91 (a) (1) and will address the three  test factors required by 10CFR50.92 (c).
The non-LOCA safety analyses will be examined to determine the impact of the MSSV            liftsetpoint tolerance relaxation on the DNB design basis as well as the applicable primary and secondary system pressure limits. The long-term core cooling capability      of the secondary side will also be considered.
The LOCA evaluation      will investigate the  effects on the licensing basis small break analysis in terms of peak clad temperature,    and any adverse effects on the steam generator tube rupture event and subsequent dose release calculations    will also be determined.
91429R2.wpf


Table 4.7-1 of the Unit 1 Technical Specifications and Table 3.7-4 of the Unit 2 Technical Specifications 91429R2.wpf  
SECI 91<29, Revision 2 III. EVALUATIONS The results  of the various    evaluations from the Nuclear Safety related disciplines within Westinghouse scope are discussed in the following sections.
: 1.      Non-LOCA Evaluation The non-LOCA accident analyses that are currently presented in the UFSAR modelled the MSSVs                              as a'ank of five valves, all of which having                  a  lift setpoint equal to that of the highest  set valve (1100 psia) plus 3% to account for accumulation.                       All of the analyses and evaluations performed for this report modelled the staggered behavior                  of the MSSVs. Specifically, each valve was assumed to operate  individually. Moreover, the analyses/evaluations of this report modelled the flow rate of each valve to ramp linearly from no flow at its                  lift setpoint  (nominal Technical Specification setpoint plus or minus the 3% tolerance value) to full open flow at its full open point (3% above the pressure at which the valves were assumed to pop open - i.e., accumulation effect).
For the purposes of this evaluation, all 20 MSSVs are assumed to                        lift3%  above the Technical Specification  lift setpoint  and achieve            full rated flow (normally at 3%      abov:: the setpoint) 6% above the setpoint.
hT Protection The increase in the MSSV          liftsetpoint          tolerance has the potential to impact the Overtemperature      hT and Overpower      hT setpoint      equations.          Referring to Figure la for Unit       1 and Figures 1b and 1c (which are the most limiting case for each unit/core type), increasing the point at which the MSSVs lift will lower the  steam generator safety valve line.
If the current  OTAT setpoint coefficients (K1 through K3) result in protection lines that just bound the thermal core limits,    it is possible that by lowering the              SG safety valve line to the right, a portion of the core limits will be uncovered.
                                          '1429R2.wpf


SECL-91<29, Revision 2 II.LICENSING BASIS Title 10 of the Code of Federal Regulations, Section 50.59 (10CFR50.59) allows the holder of a license authorizing operation of a nuclear power facility the capacity to initiate certain changes, tests and experiments not described in the Updated Final Safety Analysis Report (UFSAR).Prior Nuclear Regulatory Commission (NRC)approval is not required to implement the modification provided that the proposed change, test or experiment does not involve an unreviewed safety question or result in a change to the plant technical specifications incorporated in the license.While the proposed change to the MSSV lift setpoint tolerances involves a change to the Donald C.Cook Technical Specifications and requires a licensing amendment request, this evaluation will be performed using the method outlined under 10CFR50.59 to provide the bases for the determination that the proposed change does not involve an unreviewed safety question.In addition, an evaluation will demonstrate that the proposed change does not represent a significant hazards consideration, as required by 10CFR50.91 (a)(1)and will address the three test factors required by 10CFR50.92 (c).The non-LOCA safety analyses will be examined to determine the impact of the MSSV lift setpoint tolerance relaxation on the DNB design basis as well as the applicable primary and secondary system pressure limits.The long-term core cooling capability of the secondary side will also be considered.
SECI 91<29, Revision       2, In order to evaluate the effects of the increase in the setpoint tolerance, the Overtemperature hT and Overpower   dT setpoint   equations (K1 through K6) were examined to determine           if the equations remained valid assuming that all 20 MSSVs opened with a +3% tolerance.               The results of that evaluation showed that there was sufficient margin in the generation         of the current   setpoint equations to offset the lowering   of the SG safety valve line. Thus, changes to the Overtemperature and Overpower Technical Specifications are not needed.         The results of this evaluation   are presented as Figures la,   lb, and 1c.
The LOCA evaluation will investigate the effects on the licensing basis small break analysis in terms of peak clad temperature, and any adverse effects on the steam generator tube rupture event and subsequent dose release calculations will also be determined.
~DNB Even The transients identified in Table 2 are analyzed in the D. C. Cook UFSAR to demonstrate that the DNB design basis is satisfied. With one exception, these events are a) of such           a short duration that they do not result in the actuation   of the MSSVs,   b) core-related analyses that focus on the active fuel region only (i.e., only the core is modelled), or c) cooldown events which result in a decrease in secondary steam pressure.     The single exception is the loss of external load/turbine trip event which is addressed   explicitly in the ANALYSIS section of this safety evaluation. Thus, based on the above, these yon-LOCA DNB transients are not adversely impacted by the proposed change, and the results and conclusions presented in the UFSAR remain valid, Boron Dilution Event The boron dilution event (14.1.5) is analyzed to demonstrate that the operators (or the automatic mitigation circuitry) have sufficient time to respond prior to reactor criticality. The secondary system is not modeled in the analysis   of this event, and thus, changes to the MSSVs have no impact on this event. Therefore, the results and conclusions presented in the UFSAR remain valid.
91429R2.wpf SECI 91<29, Revision 2 III.EVALUATIONS The results of the various evaluations from the Nuclear Safety related disciplines within Westinghouse scope are discussed in the following sections.1.Non-LOCA Evaluation The non-LOCA accident analyses that are currently presented in the UFSAR modelled the MSSVs as a'ank of five valves, all of which having a lift setpoint equal to that of the highest set valve (1100 psia)plus 3%to account for accumulation.
Steamline Break Mass &: Ene             Releases For the steamline break mass and energy releases, the'steam release calculations are insensitive to the changes in the MSSV     liftsetpoints  since the vast majority   of these calculations result in depressurizations   of the secondary side such that the MSSVs are not actuated.         For the 91429Rz.wpf
All of the analyses and evaluations performed for this report modelled the staggered behavior of the MSSVs.Specifically, each valve was assumed to operate individually.
Moreover, the analyses/evaluations of this report modelled the flow rate of each valve to ramp linearly from no flow at its lift setpoint (nominal Technical Specification setpoint plus or minus the 3%tolerance value)to full open flow at its full open point (3%above the pressure at which the valves were assumed to pop open-i.e., accumulation effect).For the purposes of this evaluation, all 20 MSSVs are assumed to lift 3%above the Technical Specification lift setpoint and achieve full rated flow (normally at 3%abov:: the setpoint)6%above the setpoint.hT Protection The increase in the MSSV lift setpoint tolerance has the potential to impact the Overtemperature hT and Overpower hT setpoint equations.
Referring to Figure la for Unit 1 and Figures 1b and 1c (which are the most limiting case for each unit/core type), increasing the point at which the MSSVs lift will lower the steam generator safety valve line.If the current OTAT setpoint coefficients (K1 through K3)result in protection lines that just bound the thermal core limits, it is possible that by lowering the SG safety valve line to the right, a portion of the core limits will be uncovered.
'1429R2.wpf SECI 91<29, Revision 2, In order to evaluate the effects of the increase in the setpoint tolerance, the Overtemperature hT and Overpower dT setpoint equations (K1 through K6)were examined to determine if the equations remained valid assuming that all 20 MSSVs opened with a+3%tolerance.
The results of that evaluation showed that there was sufficient margin in the generation of the current setpoint equations to offset the lowering of the SG safety valve line.Thus, changes to the Overtemperature and Overpower Technical Specifications are not needed.The results of this evaluation are presented as Figures la, lb, and 1c.~DNB Even The transients identified in Table 2 are analyzed in the D.C.Cook UFSAR to demonstrate that the DNB design basis is satisfied.
With one exception, these events are a)of such a short duration that they do not result in the actuation of the MSSVs, b)core-related analyses that focus on the active fuel region only (i.e., only the core is modelled), or c)cooldown events which result in a decrease in secondary steam pressure.The single exception is the loss of external load/turbine trip event which is addressed explicitly in the ANALYSIS section of this safety evaluation.
Thus, based on the above, these yon-LOCA DNB transients are not adversely impacted by the proposed change, and the results and conclusions presented in the UFSAR remain valid, Boron Dilution Event The boron dilution event (14.1.5)is analyzed to demonstrate that the operators (or the automatic mitigation circuitry) have sufficient time to respond prior to reactor criticality.
The secondary system is not modeled in the analysis of this event, and thus, changes to the MSSVs have no impact on this event.Therefore, the results and conclusions presented in the UFSAR remain valid.Steamline Break Mass&: Ene Releases For the steamline break mass and energy releases, the'steam release calculations are insensitive to the changes in the MSSV lift setpoints since the vast majority of these calculations result in depressurizations of the secondary side such that the MSSVs are not actuated.For the 91429Rz.wpf SECI 91-429, Revision 2 TABLE 2 DNB DESIGN BASIS TRANSIENTS NOT AFFECTED BY MSSV LIFI'ETPOINT TOLERANCE INCREASE"'vent Excessive Heat Removal Due to Feedwater System Malfunction Excessive Load Increase Incident Rupture of a Steam Pipe (Steamline Break-Core Response)Loss of Reactor Coolant Flow includes Locked Rotor Analysis)Uncontrolled RCCA Bank Withdrawal From a Subcritical Condition Uncontrolled RCCA Bank Withdrawal at Power RCCA Misalignment UFSAR Section 14.1.10 14.1.11 14.2.5 14.1.6 14.1.1 14.1.2 14.1.3 91429R2.wpf SECI 91-429, Revision 2 smaller break cases that might result in a heatup, one MSSV per steam generator is sufficient (based on the existing analyses)to provide any required heat removal following reactor trip.The secondary pressures will be no greater than those presently calculated.
Thus the existing steamline break mass and energy release calculations remain valid.Event Steamline Rupture Mass&Energy Releases Inside Containment
'teamline Rupture Mass&Energy Releases Outside Containment for Equipment Environmental Qualification UFSAR Sectio WCAP-11902 Supplement 1.WCAP-10961 Rev 1 (current)Submittal AEP:NRC:1140*(approved 11/20/9 1)Submittal AEP:NRC:1140"Technical Specification Change Request, BIT Boron Concentration Reduction," March 26, 1991.(included in WCAP-11902, Supplement 1)Lon-Term Heat Removal Events The only non-LOCA transients remaining are the long-term heatup events.The long-term heat removal events are analyzed to determine if the auxiliary feedwater (AFW)heat removal capability is sufficient to ensure that the peak RCS and secondary pressures do not exceed allowable limits, the pressurizer does not fill (LONF/LOOP), and the core remains covered and in a eoolable geometry (FLB).These transients are listed below.Event Loss of All AC Power to the Plant Auxiliaries (Loss of Offsite Power-LOOP)Loss of Normal Feedwater (LONF)14.1.12 14.1.9 14.1.8 Feedwater System Pipe Break (FLB)*C*The Feedwater System Pipe Break event is not part of the Unit 1 licensing basis and is presented in the Unit 1 UFSAR for information purposes only.These transients are impacted by the increase in the MSSV lift setpoint tolerance because the calculations determining the amount of AFW flow available must assume a maximum given steam generator backpressure in order to determine the amount of AFW that can be delivered.
As the steam 4 91429Rz.wp f
SECL-91<29, Revision 2 generator back pressure increases, the amount of AFW delivered will be reduced.For the loss of normal feedwater and the loss of all AC power to the Plant Auxiliaries events, evaluations were performed in which the staggered actuation of the MSSVs was taken into account.The safety analysis presented in the current UFSAR assumed an AFW flow rate of 450 gpm, split evenly to all four steam generators.
The evaluations done for this report concerning loss of normal feedwater (LONF)for Units 1 and 2, as well as loss of all AC power to the plant auxiliaries (LOOP)for Unit 1, demonstrated that the secondary side pressures will not exceed 1123 psia during the time AFW is delivered to the steam generators.
Based on Reference 10, the AFW assumptions modeled in the safety analysis remain valid for steam generator backpressures up to 1123 psia.Since the evaluation, in which a+3%MSSV setpoint tolerance was assumed, showed that the secondary side pressure transient will not preclude the AFW flow rates assumed in the analysis from being supplied to the steam generators, the existing analyses remain valid for Unit 1 LONF/LOOP and Unit 2 LONF.The Loss of Offsite Power event (LOOP)for Unit 2 was also evaluated for this-report.
The LOOP safety analysis presented in the current UFSAR for Unit 2 assumed an AFW flow rate of 430 gpm split evenly to all four steam generators.
The recent'evaluation done for this report took credit for the staggered actuation of the MSSVs as well as a+3%setpoint tolerance, as discussed earlier.The evaluation yielded results similar to those discussed above for Unit 1.The secondary side pressure for this Unit 2 evaluation was demonstrated not to exceed 1133 psia during the period AFW is supplied.Based on Reference 10, the secondary side pressure transient was found not to preclude the AFW flow rates assumed in the analysis from being delivered to the steam generators.
Therefore, the existing Loss of Offsite Power analysis for Unit 2 remain valid.The evaluations for the LONF/LOOP events for both Unit 1 and Unit 2, as discussed above, demonstrate that the respective analyses are still applicable even if a MSSV lift setpoint tolerance of+3%is assumed.Therefore the results and conclusions presented in the Donald C.Cook Unit 1&2 UFSAR remain valid.The evaluation done for this report for the Unit 2 Feedline Break event demonstrated that, the secondary side pressure will not exceed 1133 psia during the period when AFW is being delivered.
91429R2.wpf  


SECL-91<29, Revision 2 At 1133 psia, an AFW flow rate of 685 gpm with asymmetric flow splits to the three intact steam generators could be supplied based on information contained in Reference,10.
SECI 91-429, Revision 2 TABLE 2 DNB DESIGN BASIS TRANSIENTS NOT AFFECTED BY MSSV LIFI'ETPOINT TOLERANCE INCREASE"'vent UFSAR Section Excessive Heat Removal Due to                 14.1.10 Feedwater System Malfunction Excessive Load Increase Incident              14.1.11 Rupture of a Steam Pipe (Steamline              14.2.5 Break - Core Response)
The current analysis for this event assumed a total AFW flow rate of 600 gpm with an even split of 200 gpm to the three intact steam generators.
Loss of Reactor Coolant Flow                  14.1.6 includes Locked Rotor Analysis)
Since the total AFW flow rate is more than sufficient to accommodate AFW flow split deviations of as much as 25 gpm per loop, the current Feedline Break analysis continue to be applicable and remain bounding for this evaluation.
Uncontrolled RCCA Bank Withdrawal              14.1.1 From a Subcritical Condition Uncontrolled RCCA Bank Withdrawal              14.1.2 at Power RCCA Misalignment                              14.1.3 91429R2.wpf
Therefore, the results and conclusions presented in the Unit 2 UFSAR (14.2.8)remain valid.-3%Tolerance:
 
The secondary steam releases generated for the locked rotor offsite dose calculations for Unit 2 could be potentially affected by an increase in the MSSV setpoint tolerance from-1%to-3%.Reference 9 transmitted the most recent locked rotor dose analysis.Given that the radiological assumptions used in the Reference 9 analysis do not change with an increase in MSSV setpoint tolerance (i.e., rods-in-DNB and primary to secondary leakage remain at 11%and 1 gpm respectively) the only effect the tolerance increase would have would be on the mass release values.The methodology used to calculate these masses is based on determining the amount of secondary side inventory required to cool down the RCS.During the first two hours (0-2 hours), the operators are assumed to lower the RCS average temperature to no-load conditions (547'F)by bleeding steam.Over the next 6 hours (2-8 hours), the operators will cool the plant down such that Mode 4 operation (hot shutdown)can be entered.The existing steam release calculations for the 0-2 hour period used enthalpies corresponding to saturated conditions at both the nominal full power RCS average temperature and the no-load temperature (581.3'F and 547'F, respectively).
SECI 91-429, Revision 2 smaller break cases that might result in a heatup, one MSSV per steam generator is sufficient (based on the existing analyses) to provide any required heat removal following reactor trip. The secondary pressures  will be no greater than  those presently calculated. Thus the existing steamline break mass and energy release calculations remain valid.
Thus, as long as the increased lift setpoint tolerance (-3%)does not result in the MSSVs remaining open at a saturation temperature outside of the range identified above, the existing mass releases remain valid (Reference 9), The existing mass release calculations were performed using the temperatures previously identified (581.3'F and 547'F).Per the Donald C.Cook Technical Specifications, the lowest set MSSV on each steam generator will open at 1080 psia (1065 psig)not including any tolerance.
Event                                                                UFSAR Sectio Steamline Rupture Mass    & Energy  Releases                        WCAP-11902 Inside Containment                                                  Supplement 1
Based on the ASME Steam Tables (Reference 6)at saturated conditions, 547'F corresponds to 1020.1 psia and 9 l-429R2.wp f 10 SECL-91-429, Revision 2 represents the lowest steam pressure considered in the mass calculations.
  'teamline    Rupture Mass & Energy Releases                            WCAP-10961 Rev 1 Outside Containment for                                                (current)
Thus, the existing releases include a reseat pressure approximately 5.5%below the lowest Technical Specification lift setpoint.As long as the valves continue to reseat within this.pressure range, the current mass releases remain valid.The operating windows that are applicable for Unit 1 operation are bounded by the Unit 2 dose analysis.Therefore, the mass releases for Unit 2, as found in Reference 9, are applicable to Unit 1.Evaluation Summa Thus, based on the discussions presented above, only one UFSAR non-LOCA transient is impacted'uch that a new analysis must be performed in order to address the effects of the MSSV lift setpoint tolerance increase from J1%to J3%.This event is the loss of external load/turbine trip accident.For the other transients, the results and conclusions presented in the Donald C.Cook Unit 1&2 UFSAR remain valid.Loss of External Load/Turbine Tri The loss of external load/turbine trip event is presented in Section 14.1.8 of the Donald C.Cook UFSAR.This transient is caused by a turbine-generator trip which results in the immediate termination of steam flow.Since no credit is taken for a direct reactor trip on turbine trip, primary and secondary pressure and temperature will begin to increase, actuating the pressurizer and steam generator safety valves.The reactor will eventually be tripped by one of the other reactor protection system (RPS)functions; specifically, overtemperature hT, high pressurizer pressure, or low-low steam generator water level.The turbine trip event is the limiting non-LOCA event for potential overpressurization, i.e., this transient forms the design basis for the primary and secondary safety valves.Since the MSSVs will now potentially be opening at a higher pressure due to the increase in the lift setpoint tolerance, it is necessary to analyze this transient in order to demonstrate that all the applicable acceptance criteria 91429R2.wpf SECL-91<29, Revision 2 are satisfied.
Equipment Environmental Qualification                                Submittal AEP:NRC:1140*
A turbine trip is classified as an ANS condition II event, a fault of moderate frequency.
(approved 11/20/9 1)
As such, the appropriate acceptance criteria are DNBR, peak primary pressure, and peak secondary pressure.The transient is described in greater detail in the UFSAR.The turbine trip event is analyzed using a modified version of the LOFTRAN digital computer code (Reference 6).This modified version of LOFTRAN only differs from the standard code version in the way the MSSVs are modelled.The program simulates neutron kinetics, reactor coolant system, pressurizer, pressurizer relief and safety valves, pressurizer spray, steam generators, and main steam safety valves.With the modified code, the MSSVs are explicitly modeled as a bank of 5 valves on each steam generator with staggered lift setpoints.
Submittal AEP:NRC:1140 "Technical Specification Change Request, BIT Boron Concentration Reduction," March 26, 1991.
Whereas the standard LOFTRAN version program conservatively models the MSSVs as a bank of five valves, all having one common lift setpoint.By modelling the staggered behavior of the MSSVs, a more accurate simulation of how the valves actually behave is achieved.Since higher steam pressures are conservative for this event, no blowdown or hysteresis behavior was assumed.Consistent with the existing UFSAR analysis, all assumptions were the same as previously used unless specifically noted.The following assumptions were used in this analysis: a.Initial power, temperature, and pressure were at their nominal values consistent with: 1)ITDP methodology (WCAP-8567) for Unit 1, with the exception that a 2%conservatism on initial core power was assumed.2)RTDP methodology (WCAP-11397) for Unit 2, with no exceptions.
(included in WCAP-11902, Supplement 1)
b.Turbine trip was analyzed with both minimum and maximum reactivity feedback.C.Turbine trip was analyzed both with and without pressurizer pressure control.The PORVs and sprays were assumed operable in the'cases with pressure control.The cases with pressure control minimize the increase in primary pressure which is conservative for the DNBR transient.
Lon -Term Heat Removal Events The only non-LOCA transients remaining are the long-term heatup events. The long-term heat removal events are analyzed to determine    if the auxiliary feedwater (AFW) heat removal capability is sufficient to ensure that the peak RCS and secondary pressures do not exceed allowable limits, the pressurizer does not  fill (LONF/LOOP),     and the core remains covered and in a eoolable geometry (FLB). These transients are listed below.
The cases without pressure control maximize the increase in pressure which is conservative for the RCS overpressurization criterion.
Event Loss  of All AC Power to the Plant                                    14.1.12 Auxiliaries (Loss of Offsite Power - LOOP)
Loss  of Normal Feedwater (LONF)                                     14.1.9 Feedwater System Pipe Break (FLB)*                                    14.1.8 C
* The Feedwater System Pipe Break event is not part of the Unit 1 licensing basis          and is presented in the Unit 1 UFSAR for information purposes only.
These transients are impacted by the increase in the MSSV        lift setpoint tolerance because the calculations determining the amount    of AFW flow available must assume a maximum given steam generator backpressure    in order to determine the amount of AFW that can be delivered. As the steam 4
91429Rz.wp f
 
SECL-91<29, Revision 2 generator back pressure increases, the amount      of AFW delivered will be    reduced. For the loss of normal feedwater and the loss    of all AC power to the Plant Auxiliaries events, evaluations were performed in which the staggered actuation of the MSSVs was taken into account.
The safety analysis presented in the current UFSAR assumed an AFW flow rate of 450 gpm, split evenly to all four steam generators. The evaluations done for this report concerning loss of normal feedwater (LONF) for Units      1 and 2, as well as loss  of all AC power to    the plant auxiliaries (LOOP) for Unit 1, demonstrated  that the secondary side pressures    will not exceed  1123 psia during the time AFW is delivered to the steam generators.       Based on Reference 10, the AFW assumptions modeled in the safety analysis remain valid for steam generator backpressures up to 1123 psia. Since the evaluation, in which a +3% MSSV setpoint tolerance was assumed, showed that the secondary side pressure transient  will not preclude  the AFW flow rates assumed in the analysis from being supplied to the steam generators, the existing analyses remain valid for Unit      1 LONF/LOOP and Unit 2 LONF.
The Loss  of Offsite Power  event (LOOP) for Unit 2 was also evaluated for this-report. The LOOP safety analysis presented in the current UFSAR for Unit 2 assumed an AFW flow rate              of 430 gpm split evenly to all four steam generators. The recent'evaluation done for this report took credit for the staggered actuation  of the MSSVs     as well as a +3% setpoint tolerance,     as discussed  earlier. The evaluation yielded results similar to those discussed above for Unit 1. The secondary side pressure for this Unit 2 evaluation was demonstrated not to exceed 1133 psia during the period AFW is supplied. Based on Reference 10, the secondary side pressure transient was found not to preclude the AFW flow rates assumed in the analysis from being delivered to the steam generators.             Therefore, the existing Loss  of Offsite Power    analysis for Unit 2 remain valid.
The evaluations for the LONF/LOOP events for both Unit          1 and  Unit 2,  as discussed above, demonstrate that the respective analyses are still applicable even    if a MSSV liftsetpoint    tolerance  of
+3% is assumed. Therefore the results and conclusions presented in the Donald C. Cook Unit             1 &2 UFSAR remain valid.
The evaluation done for this report for the Unit 2 Feedline Break event demonstrated that, the secondary side pressure   will not exceed    1133 psia during the period when    AFW is being delivered.
91429R2.wpf
91429R2.wpf
.12 SECI 91<29, Revision 2 d.The steam generator PORV and steam dump valves were not assumed operable.This assumption maximizes secondary pressure which in turn maximizes the primary temperature for DNBR and primary pressure for pressure cases.e.Main feedwater flow was assumed to be lost coincident with the turbine trip.This assumption maximizes the heatup effects.f.Only the overtemperature dT, high pressurizer pressure, and low-low steam generator water level reactor trips were assumed operable for the purposes of this analysis.g.The flow rate for each MSSV was modelled to ramp linearly from no flow at its lift setpoint (3%above the nominal Technical Specification setpoint)to full open flow at its full open point (6%above the nominal setpoint), The full open flow rate is based on a reference full flow capacity of 238 ibm/sec at 1186.5 psia (based on the ASME rated flow for these valves).For secondary side pressures between the initial full open point for each valve and 1186.5 psia, the full open flow rate was modelled to vary proportionally with pressure.This assumption maximizes secondary pressure which in turn maximizes the primary temperature for DNBR and primary pressure for pressure cases.R~esul Four cases for each unit/core type (i.e.Unit 1, Unit 2 mixed core,and Unit 2 full V5 core)were analyzed: a)minimum feedback without pressure control, b)maximum feedback without pressure control, c)maximum feedback with pressure control, and d)minimum feedback with pressure control.The most limiting cases in the current UFSAR continue to be the most limiting cases.The calculated sequence of events for the four cases for each unit are presented in Tables 3 and 4.9l429R2.wp f 13 SECI 91<29, Revision 2 Case A: Figures 2 through 6 show the transient response for the turbine trip event under minimum reactivity feedback conditions without pressure control.The reactor is tripped on high pressurizer pressure.The neutron flux remains essentially constant at full power until the reactor is tripped, and the DNBR remains above the initial value for the duration of the transient.
The pressurizer safety valves are actuated and maintain primary pressure below 110%of the design value.The main steam safety valves are also actuated and maintain secondary pressure below 110%of the design value.Case B: Figures 7 through 11 show the transient response for the turbine trip event under rnaxirnum reactivity feedback conditions without pressure control.The core power is observed to undergo a momentary increase.This is due to positive reactivity being inserted as a result of the increase in coolant density caused by the increase in primary pressure.This affect is quickly countered by the subsequent temperature rise brought on by the abrupt loss of the heat sink.The reactor is tripped on high pressurizer pressure.The DNBR increases throughout the transient and never drops below the initial value.The pressurizer safety valves are actuated and maintain primary pressure below 110%of the design value.The main steam safety valves are also actuated and maintain secondary pressure below 110%of the design value.Case C: Figures 12 through 16 show the transient response for the turbine trip event under maximum reactivity feedback conditions with pressure control~The core power is observed to undergo a momentary increase.This is due to positive reactivity being inserted as a result of the increase in coolant density caused by the rapid increase in primary pressure.This affect is quickly countered by the subsequent temperature rise brought on by the abrupt loss of the heat sink.The reactor is tripped\on low-low steam generator water level.The DNBR increases throughout the transient and never drops below the initial value, The pressurizer relief valves.and sprays maintain primary pressure 91429R2.wpf 14 SECI 91-429, Revision 2 below 110%of the design value.The main steam safety valves are also actuated and maintain secondary pressure below 110%of the design value.Case D: Figures 17 through 21 show the transient response for the turbine trip event under minimum reactivity feedback conditions with pressure control.The reactor is tripped on high pressurizer pressure.Although the DNBR value decreases below the initial value, it remains well above the limit throughout the entire transient.
The pressurizer relief valves and sprays maintain primary pressure below 110%of the design value.The main steam safety valves are also actuated and maintain secondary pressure below 110%of the design value.Anal i Concl ion nit 1 Based on the results of these Unit 1 turbine trip analyses with a+3%tolerance on the MSSV lift setpoints, all of the applicable acceptance criteria are met.The minimum DNBR for each case is greater than the limit value.The peak primary and secondary pressures remain below 110%of design at all times.UNIT 2: a mixed and b full V-5 cores Case A: Figures 22a through 26b ("a" designates mixed core figures and"b" denotes full V-5 core figures)show the transient response for the turbine trip event under minimum reactivity feedback conditions without pressure control for both core types.The reactor is tripped on high pressurizer pressure., The neutron flux remains essentially constant at full power until the reactor is tripped, and the DNBR remains above the initial value for the duration of the transient.
The pressurizer safety valves are actuated and maintain primary pressure below 110%of the design value.The main steam safety valves are also actuated and maintain secondary pressure below 110%of the design value.91429R2.wpf 15 SECL-91<29, Revision 2Case B: Figures 27a through 31b show the transient response for the turbine trip event under maximum reactivity feedback conditions without pressure control for both mixed and full V-5 core types.The core power is observed to undergo a momentary increase, This is due to positive reactivity being inserted as a result of the increase in coolant density caused by the rapid increase in primary pressure.This affect is quickly countered by the subsequent temperature rise brought on by the abrupt loss of the heat sink.The reactor is tripped on high pressurizer pressure.The DNBR increases throughout the transient and never drops below the initial value.The pressurizer safety valves are actuated and maintain primary pressure below 110%of the design value.The main steam safety valves are also actuated and maintain secondary pressure below 110%of the design value.Case C: Figures 32a through 36b show the transient response for the turbine trip event under maximum reactivity feedback conditions with pressure control for the two applicable Unit 2 core types.The core power is observed to undergo a momentary increase.This is due to positive reactivity being inserted as a result of the increase in coolant density caused by the rapid increase in primary pressure.This affect is quickly countered by the subsequent temperature rise brought on by the abrupt loss of the heat sink.The reactor is tripped on low-low steam generator water level~The DNBR increases throughout the transient and never drops below the initial value..The pressurizer relief valves and sprays maintain primary pressure below 110%of the design value.The main steam safety valves are also actuated and maintain secondary pressure below 110%of the design value.Case D: Figures 37a through 41b show the transient response for the turbine trip event under minimum reactivity feedback conditions with pressure control for both the mixed and full V-5 cores.The reactor is tripPed on high pressurizer pressure.Although the DNBR value decreases below the initial value, it remains well above the limit throughout the entire transient.
The pressurizer relief valves and sprays maintain primary pressure below 110%of the design value.The 91429R2.wpf 16 SECL-91<29, Revision 2 main steam safety valves are also actuated and maintain secondary pressure below 110%of the design value.Anal is Conclusion nit 2 Based on the results of these Unit 2 mixed and full core turbine trip analyses with a+3%tolerance on the MSSV lift setpoints, all of the applicable acceptance criteria are met.The minimum DNBR for each case is greater than the limit value.The peak primary and secondary pressures remain below 110%of design at all times.N n-A Conclusio The effects of increasing the as-found lift setpoint tolerance on the main steam safety valves have been examined, and it has been determined that, with one exception, the current accident analyses as presented in the UFSAR remain valid.The loss of load/turbine trip event was analyzed in order to quantify the impact of the setpoint tolerance relaxation.
As previously demonstrated in this safety evaluation, all applicable acceptance criteria for this event have been satisfied and the conclusions presented in the UFSAR are s'till valid.Thus, with respect to the non-LOCA transients, the proposed Technical Specification change does not constitute an unreviewed safety question, and the non-LOCA accident analyses, as presented in the report, support the proposed change, 2.CA and A Related Evaluations La e Break CA The current large break LOCA analyses for Donald C.Cook Units 1 and 2 were performed with the NRC approved 1981 Evaluation Model plus BASH.After a postulated large break LOCA occurs, the heat transfer between the reactor coolant system (RCS)and the secondary system may be in either direction, depending on the relative temperatures.
In the case of continued heat addition to the secondary system, the secondary system pressure increases and the MSSVs may actuate to limit the pressure.However, this does not occur in the large break evaluation model since no credit is taken for auxiliary feedwater actuation.
Consequently, the secondary system acts as a heat source.in the 91429R2.wpf 17 SECL-91<29, Revision 2 l postulated large break LOCA transient and the secondary pressure does not increase.Since the secondary system pressure does not increase, it is not necessary to model the MSSV setpoint in the large break evaluation model.Therefore, an increase in the allowable MSSV setpoint tolerance for Donald C.Cook Units 1 and 2 will not impact the current UFSAR large break LOCA analyses.mall Break CA The small break LOCA analyses for Donald C.Cook Units 1 and 2 were performed with the NRC approved Evaluation Model using the NOTRUMP code.After a postulated small break LOCA occurs, the heat transfer between the RCS and the secondary system may be in either direction depending on the relative temperatures.
In the case of continued heat addition to the secondary system, the secondary system pressure increases which leads to steam relief via the MSSVs.In the small break LOCA, the secondary flow aids in the reduction of RCS pressure.Subsequently, Donald C.Cook Units 1 and 2 were reanalyzed to determine the impact of an increased MSSV setpoint tolerance of 3%.The licensing basis small break LOCA analysis for Donald C.Cook Unit 1 included a safety evaluation to address a 25 gpm charging pump flow imbalance and operation with the high head safety injection cross tie valve closed at 3250 MWt core power level.Also, a safety evaluation had been performed which modeled an increased auxiliary feedwater enthalpy delay time.These assumptions were incorporated in the increased MSSV setpoint tolerance NOTRUMP analysis of the limiting 3 inch break for Unit 1.However, in order to obtain a direct sensitivity for the increased MSSV setpoint tolerance, a NOTRUMP analysis was also performed incorporating these assumptions but modelling the original MSSV setpoints.
In addition, a 3 inch NOTRUMP analysis was performed for the low pressure, high temperature operating condition for Unit 1 since a safety evaluation had been originally performed as part of the licensing basis analysis.The increased MSSV setpoint tolerance, a core power level of 3250 MWt.with the.high head cross tie valve closed, and a 25 gpm charging pump flow imbalance were assumed for the analysis of the low pressure, high temperature case.91429Rz.wp f 18 SECL-91-429, Revision 2 Donald C.Cook Unit 2 was reanalyzed for the limiting 3 inch break, low pressure and high temperature operating condition with the high head cross tie valve closed.The power shape axial offset was reduced from the licensing basis analysis of+30%to+13%for the MSSV increase analysis.An axial offset of+13%is equal to the value assumed in the licensing basis large break LOCA analysis.In addition, the licensing basis analysis conservatively assumed a maximum" assembly average power (P+of 1.519.The 3%increased MSSV setpoint tolerance analysis assumed a P~which was reduced to 1.46.In order to obtain a direct sensitivity for the increased MSSV setpoint tolerance, a NOTRUMP analysis was performed incorporating these assumptions but modelling the original MSSV setpoints.
Tables 5 and 6 summarize the MSSV setpoints used in the Donald C.Cook Units 1 and 2 current licensing basis small break LOCA analyses and the increased MSSV setpoint tolerance analyses, respectively.
Tables 7 and 8 summarize the initial input assumptions used in the Unit 1 analysis.The Unit 2 initial input assumptions are summarized in Table 9, The time sequence of events and results of the Unit 1 analysis are summarized in Tables 10 and 11, respectively.
The limiting peak clad temperature calculated is 1879'F, including a 25'F burst and blockage penalty, for the 3%increased MSSV setpoint tolerance case at 3250 MWt and the low pressure, low temperature operating conditions'.
This value is less than the acceptance criteria limit of 2200'F.The maximum local metal-water reaction is 3A7%, which is well below the embrittlement limit of 17%as required by 10CFR50.46.
The total core metal-water reaction is less than 1.0%, corresponding to less than 1.0 percent hydrogen generation, as compared to the 1%criterion of 10CFR50.46.
The time sequence of events and results of the Unit 2 analysis are summarized in Tables 12 and 13, respectively.
'Ihe limiting peak clad temperature calculated is 2125'F, including a 12'F artificial leak-by penalty and 157'F burst and blockage penalty, for the 3%increased MSSV setpoint tolerance case at 3250 MWt and low pressure, high temperature operating condition.
This value is less than the acceptance criteria limit of 2200'F.The maximum local metal-water reaction is 4.26%, which is These results are from calculations using a nominal auxiliary fcedwater flow.A subsequent analysis using a morc conservative minimum auxiliary feedwater flow rate is presented in thc next section.91429R2.wpf 19 SECI 91<29, Revision 2well below the embrittlement limit of 17%as required by 10CFR50.46.
The total core metal-water reaction is less than 1.0%, corresponding to less than 1.0 percent hydrogen generation, as compared to the 1%criterion of 10CFR50.46.
Additional Small Break CA Anal ses The small break LOCA analysis for Cook Unit 1, previously discussed, used nominal Auxiliary Feedwater (AFW)flow rates (1258 gpm total delivery), whereas minimum AFW flow rates were used for Cook Unit 2, Since minimum AFW flow rates are more limiting, the small break LOCA for Cook Unit 1 for+3%MMSV setpoint tolerance was reanalyzed using lower auxiliary feedwater flow rates (750 gpm total delivery).
The following presents the results of the revised small break LOCA analyses performed for Donald C.Cook Unit 1.Based on the Cook Unit 1 analyses presented in the previous section, two additional small break LOCA cases were run to address a relaxation to+3%for the MSSV setpoint tolerance.
First, the original LPLT (Low Pressure, Low Temperature) case presented above, the results of which are shown in Tables 10 and 11, was rerun modeling 750 gpm total AFW system flow rate.As was demonstrated in References 11 and 12, the LPLT case is the limiting case for the pressure/temperature operating window for Cook Unit 1, and that will not change due to the reduction in AFW flow.In addition, since only the limiting break size (3 inch)was previously analyzed, a 2 inch break was also analyzed for the 750 gpm AFW flow rate to provide further assurance that the limiting break size has not shifted to a smaller break size due to the reduction in the AFW flow rate.Note that since both the reduction in AFW delivered flow and the increase in the setpoint tolerance to>3%tend to shift the limiting break size to a smaller break, it is not necessary to consider that the limiting break could be larger than was presented in the current licensing basis analysis which demonstrated that the 3 inch break is limiting.The MSSV performance assumed in these new cases is shown in Table 6.The initial input parameters assumed for these new cases are shown in Table 7a, and are compared with the original licensing basis in Reference 11.If the new analysis values from Table 7a are compared with the original evaluation cases shown in Table 7, very few differences are evident.Except for the auxiliary feedwater flow rate an'd a slight increase in the accumulator water temperature, the initial RCS 91429R2.wpf 20 SECL-91<29, Revision 2 pressure was lowered to cover a safety evaluation that was performed for pressurizer pressure uncertainty.
Incorporating this new RCS pressure had a negligible effect on the vessel inlet and outlet temperatures and the steam pressure assumed for reactor steady-state operation (prior to initiation of the transient).
One final additional change is in the AFW enthalpy delay.The lower AFW flow rate would result in a longer delay.The current NOTRUMP model has been improved to model the volume of hot main feedwater that must be purged from the piping prior to cold AFW being delivered to the steam generator, and the delay is calculated by the model.Other than these minor differences, and the intended change (i.e., reduce AFW flow rate and increase accumulator water temperature), the initial conditions assumed for the additional runs are identical to the runs performed for the previous section.The time sequence of events and results of the Unit 1 analyses are summarized in Tables 10a and 11a, respectively.
The limiting Peak Clad Temperature (P~calculated is 2068'F, including a 117'F burst and blockage penalty, for the+3%increased MSSV setpoint tolerance case at 3250 MWt and low pressure, low temperature operating condition.
This value is less than the acceptance criteria limit of 2200'F, and is almost the same computed result that is seen for D.'.Cook Unit 2 (the pre-burst/blockage PCT of 1951'F versus 1956'F).The maximum local metal-water reaction is 5.06%, which is well below the embrittlement limit of 17%as required by 10 CFR 50.46.The total core metal-water reaction is less than 1.0%, corresponding to less than 1.0 percent hydrogen generation, as compared to the 1%criterion of 10 CFR 50.46.The>3%increased MSSV setpoint tolerance has been analyzed for the Donald C.Cook Nuclear Plant Unit 1 for the small break LOCA analyses performed by Westinghouse.
The potential effect of this change on the FSAR analysis results for the small break LOCA analysis was examined via reanalysis and although the results are more limiting than previous analysis cases, it was shown that the effect of the increased MSSV setpoint tolerance did not result in exceeding any of the following design or regulatory limits: 1.The calculated peak fuel element cladding temperature is below the requirements of 2200'F.2.The amount of fuel element cladding that reacts chemically with water or steam does not exceed 1 percent of the total amount of Zircaloy in the reactor.91429Rz.wpf 21 SECI 91-429, Revision 2 3.The cladding temperature transient is terminated at a time when the core geometry is still amenable to cooling.The localized cladding oxidation limit of 17 percent is not exceeded during or after quenching.
4.The core remains amenable to cooling during and after the break.5.The core temperature is reduced and decay heat is removed for an extended period of time, as required by the long-lived radioactivity remaining in the core.Therefore, it is concluded that a relaxation to J3%for the MSSV setpoint tolerance is acceptable from the standpoint of the small break LOCA FSAR accident analyses discussed in this safety evaluation.
Post-LOCA Lon Term Core Coolin The Westinghouse licensing position for satisfying the requirements of 10CFR50.46 Paragraph (b), Item (5),"Long Term Cooling," concludes that the reactor will remain shut down by borated ECCS water residing in the RCS/sump after a LOCA.Since credit for the control rods.is not taken for a large break LOCA, the borated ECCS water provided by the accumulators and the RWST must have a boron concentration that', when mixed with other water sources, will result in the reactor core remaining subcritical assuming all control rods out.The calculation is based upon the reactor steady state conditions at the initiation of a LOCA and considers sources of both borated and unborated fluid in the post-LOCA containment sump.The steady state conditions are obtained from the large break LOCA analysis which, as stated above, does not take credit for MSSV actuation.
Thus the post-LOCA long-term core cooling evaluation is independent of the MSSV setpoint tolerance, and there will be no change in the calculated RCS/sump boron concentration after a postulated LOCA for Donald C.Cook Units 1 and 2.Hot Switchover to Prevent Potential Boron Preci itation Post-LOCA hot leg recirculation time is determined for inclusion in emergency operating procedures to ensure no boron precipitation in the reactor vessel following boiling in the core.This time is 91429R2.wpf 22


SECL-91<29, Revision 2 dependent on power level and the RCS, RWST, and accumulator water volumes and with their associated boron concentrations.
SECL-91<29, Revision 2 At 1133 psia,   an AFW flow rate of 685 gpm with asymmetric flow splits to the three intact steam generators could be supplied based on information contained in Reference,10. The current analysis for this event assumed a total AFW flow rate      of 600 gpm with an    even split of 200 gpm to the three intact steam generators. Since the total AFW flow rate is more than sufficient to accommodate AFW flow split deviations of as much    as 25 gpm per loop, the current Feedline Break analysis continue to be applicable and remain bounding     for this evaluation. Therefore, the results  and conclusions presented in the   Unit 2 UFSAR (14.2.8) remain valid.
The proposed MSSV setpoint tolerance increase to 3%does not affect the power level or the boron concentrations assumed for the RCS, RWST, and accumulator in the hot leg switchover calculation for Unit 1.The proposed MSSV setpoint tolerance increase to 3%'oes not affect the boron concentrations assumed for the RCS, RWST, and accumulator in the hot leg switchover calculation for Unit 2.The current licensing basis hot leg.switchover calculation for Unit 2 is at full power, 3413 MWt, with cross tie valve at closed position.With MSSV setpoint tolerance increased to 3%, Unit 2 LOCA analyses assumed a reduced core power, 3250 MWt, with cross tie valve at closed position.A reduction in power reduces the boil-off rate in the hot leg switchover calculation.
-3% Tolerance:
A reduction in the boilwff rate results in the rate of boron build up also being reduced.Therefore, the licensing basis hot leg switchover calculation for the Donald C.Cook Units 1 and 2 remains bounding.LOCA H draulic Forci Functions The peak hydraulic forcing functions on the reactor vessel and internals occur very early in the large break LOCA transient.
The secondary steam releases generated for the locked rotor offsite dose calculations for Unit 2 could be potentially affected by an increase in the MSSV setpoint tolerance from -1% to -3%. Reference 9 transmitted the most recent locked rotor dose analysis.       Given that the radiological assumptions used in the Reference 9 analysis do not change with an increase in MSSV setpoint tolerance (i.e.,
Typically, the peak forcing functions occur between 10 and 50 milliseconds (0.01 and 0.05 seconds)and have subsided well before 500 milliseconds (0.50 seconds).Any change in time associated with an increased MSSV setpoint tolerance would occur several seconds into the transient.
rods-in-DNB and primary to secondary leakage remain at 11% and            1 gpm respectively) the only effect the tolerance increase would have would be on the mass release values. The methodology used to calculate these masses is based on determining the amount       of secondary side inventory required to cool down the RCS. During the first two hours (0-2 hours), the operators are assumed to lower the RCS average temperature to no-load conditions        (547'F) by bleeding steam. Over the next 6 hours (2-8 hours), the operators  will cool the plant down    such that Mode 4 operation (hot shutdown) can be entered.
Since the LOCA hydraulic forcing functions have peaked and subsided before the time at which the MSSV may actuate, the increase in the MSSV setpoint tolerance to 3%will not impact the LOCA hydraulic forcing functions calculation for Donald C.Cook Units 1 and 2.LOCA Conclusio The effect of increasing the MSSV setpoint tolerance to 3%for Donald C.Cook Units 1 and 2 has been evaluated for each of the LOCA related analyses addressed in the UFSAR.For currently analyzed conditions, or for Unit 2 operation at a reduced power level of 3250 MWt when the high head cross tie valves are closed, it was shown that the 3%MSSV setpoint tolerance does not result in any design or Regulatory limit being exceeded.Therefore, with respect to the LOCA analyses, it can be concluded that increasing the MSSV setpoint tolerance to 3%for Donald C.Cook Units 1 and 2 will be acceptable from.the standpoint of the UFSAR accident analyses discussed in the safety'valuation.
The existing steam release calculations for the 0-2 hour period used enthalpies corresponding to saturated conditions at both the nominal    full power RCS average temperature      and the no-load temperature (581.3'F and 547'F, respectively).         Thus, as long as the increased  liftsetpoint tolerance
91429Rz.wp f 23 SECI 91429, Revision 2 3.Containment Tnt ri Evaluation
(-3%) does not result in the MSSVs remaining open at a saturation temperature outside of the range identified above, the existing mass releases remain valid (Reference 9),
~~Relaxation of the Donald C.Cook Units 1&2 Technical Specification Main Steam Safety Valve setpoint tolerances from+1%to+3%do not adversely affect the short term or long term LOCA mass and energy releases and, subsequently, the related containment analyses.Since there is no impact on the main steaml inc break mass and energy release calculations, there is also no impact on that associated containment response analysis.The proposed change does not affect the normal plant operating parameters, system actuations, accident mitigating capabilities or assumptions important to the mass and energy release and containment analyses, or create more limiting conditions than those already assumed in the current analyses.Therefore, the conclusions presented in the Donald C, Cook UFSAR remain valid with respect to containment.
The existing mass release calculations were performed using the temperatures previously identified (581.3'F and 547'F). Per the Donald C. Cook Technical Specifications, the lowest set MSSV on each steam generator    will open  at 1080 psia (1065 psig) not including any tolerance.     Based on the ASME Steam Tables (Reference 6) at saturated conditions, 547'F corresponds to 1020.1 psia and 9 l-429R2.wp f                                          10
4.Steam Generator Tube Ru ture To demonstrate that an unreviewed safety question does not exist for the steam generator tube rupture (SGTR)event, the increased MSSV setpoint tolerance was evaluated for Donald C.Cook Units 1 and 2.The analysis for uprating to 3600 MWT considered up to 15%steam generator tube plugging for both Units 1 and 2.The limiting cases from this analysis were reevaluated for the increased MSSV setpoint tolerance.
An increased steam generator tube plugging level of 20%was also considered at power levels of 3262 MWT for Unit 1 and 3425 MWT for Unit 2.The criteria stated in the UFSAR analysis for Donald C.Cook were used in establishing the continued applicability of the SGTR licensing basis safety analysis by demonstrating that the conclusions for SGTR UFSAR analysis remain valid.An evaluation has been performed to determine the impact on the Donald C.Cook Units'GTR analysis of record for increased MSSV setpoint tolerance for all the cases with different steam generator tube plugging and power levels stated above.The primary thermal hydraulic parameters which affect the calculation of offsite radiation doses for a SGTR are the amount of radioactivity assumed to be present in the reactor coolant, the aniount of reactor coolant transferred to the secondary side of the ruptured steam generator through the ruptured tube, and the amount of steam released from the ruptured steam generator to the atmosphere.
Thus, the calculated offsite radiation doses for an SGTR'for Donald C.Cook are dependent on these three factors.91429R2.wpf 24 SECI 91<29, Revision 2 For the UFSAR SGTR analysis, the activity in the reactor coolant is based on an assumption of 1%defective fuel, and this assumption will not be affected by the increased MSSV setpoint tolerance.
The two remaining factors are affected by the increased MSSV setpoint tolerance, and the evaluation was performed to quantify this effect.To evaluate the effect of the increased MSSV setpoint tolerance on the Donald C.Cook SGTR analysis, the revised SG safety valve set pressure was lowered by 3%from 1080 psia to 1047.6 psia.This resulted in a slightly higher equilibrium primary-to-secondary break flow (approximately 0.5%), since there was an increase in the pressure differential between the RCS and secondary side assumed in the analysis.The steam released to the atmosphere subsequently increased (by approximately 0.2%)because of the lower pressure assumed for the main steam safety valves.The limiting cases, for all power levels and steam generator tube plugging levels considered, were at 3600 MVft.The thyroid and whole body doses estimated for Units 1 and 2, based on the analyses described above, are bounded by those previously determined for the rerating program.The actual estimated dose factors (compared to the results of the rerating calculation) are as follows: Unit f: thyroid 0.7, whole body 1.005 Unit 2: thyroid 0.99, whole body 0.98 Although the Unit 1 whole body dose exceeds the previous value by approximately 0.5%, this increase is well within the acceptable limit.Thus, the results and conclusion in the Donald C.Cook UFSAR that the offsite doses for an SGTR event would be within a small fraction of the 10CFR100 guidelines remains valid.5.Com nent Performance The relaxation of the lift setpoint tolerance for the MSSVs at Donald C.Cook does not directly or indirectly involve mechanical component hardware considerations.
Direct effects as well as indirect effects on equipment important to safety (ITS)have been considered.
Indirect effects include activities which involve non-safety related equipment which may affect ITS equipment.
Component hardware considerations may include overall component integrity, sub-component integrity, and the 9 I 429R2.wpf 25 SECI 91<29, Revision 2 adequacy of component supports during all plant conditions.
An evaluation is not required to determine whether the condition alters the design, material, construction standards, function or method of performing the function of any ITS equipment.
6.S ste Evaluation The relaxation of the lift setpoint tolerance for the MSSVs at Donald C.Cook as described would not affect the integrity of a plant auxiliary fluid system or the ability of any auxiliary system to perform its intended safety function.7.Radiolo ical Evaluation The relaxation of the lift setpoint tolerance for the MSSVs at Donald C.Cook as described do not affect radiological concerns other than those identified above in Section III.4 or post-LOCA hydrogen production.
The evaluation in Sections III.1 and GI.3 concluded that the existing mass releases used in the remaining offsite dose calculations (i.e., steamline break, rod ejection, locked rotor, and short-term
&long-term LOCA)are still applicable, 8.Plant Ri k Anal activities affecti IP The relaxation of the lift setpoint tolerance for the MSSVs at Donald C.Cook does not adversely affect the Individual Plant Examination
/PE)for the plant.This test does not affect the normal plant operating parameters, system actuations, accident mitigating capabilities, operating procedures or assumptions important to the IPE analyses, or create conditions that would significantly affect core damage or plant damage frequency or the frequency of core damage initiating events.Therefore, the conclusions presented in the IPE remain valid.9.Plant Risk Anal es ch es other than IPF relat The relaxation of the lift setpoint tolerance for the MSSVs does not result in an increase in the probability of occurrence of accidents previously evaluated in the UFSAR.This proposed change to the Technical Specifications does not result in, an increase in the probability of occurrence of a 91429R2.wpf 26 SECI 91<29, Revision 2 malfunction of equipment important to safety or of equipment that could indirectly affect equipment important to safety.10.The relaxation of the lift setpoint tolerance for the MSSVs does not directly or indirectly involve electrical systems, components, or instrumentation considerations.
Direct effects as well as indirect effects on equipment important to safety have been considered.
Indirect effects include conditions or activities which involve non-safety related electrical equipment which may affect Class 1E, post accident monitoring systems, or plant control electrical equipment.
Consideration has been given to seismic and environmental qualification, design and performance criteria per IEEE standards, functional requirements, and plant technical specifications with respect to all plant conditions.
An evaluation is not required to determine whether the MSSV setpoint tolerance relaxation alters the design, configuration, qualification, or performance of safety related electrical systems or components.
The MSSV setpoint tolerance relaxation has no potential for impact to the identification 1 of an unresolved safety question as it would relate to the safety related function of electrical systems of components.
11.Technical S ficatio A review of the Donald C.Cook Unit 1 and Unit 2 Technical Specifications was performed to address a change in the lift setpoint tolerance for the Main Steam Safety Valves.The Technical Specification review, inclusive of Amendments 157 and 141 for Units 1 and 2, respectively.
Proposed markups are attached to this evaluation for both Unit 1 and Unit 2, and reflect changes to Table 4.7-1 and 3.7-4, respectively.
A change to the basis for both units is also proposed and discusses the relationship between the J1%and J3%tolerances.
91429R2.wpf 27


SECL-91-429, Revision 2 IV.ASSESSMENT OF NO SAI'KFV UPON The relaxation in the lift setpoint tolerance for the MSSVs at Donald C.Cook Units 1 and 2 has been evaluated consistent with the requirements of 10CFR50.59 and does not involve an unreviewed safety question on the basis of the following justifications:
SECL-91-429, Revision 2 represents the lowest steam pressure considered in the mass calculations.         Thus, the existing releases include a reseat pressure approximately 5.5% below the lowest Technical Specification            lift setpoint.
Will the probability of an accident previously evaluated in the SAR be increased?
As long as the valves continue to reseat within this. pressure range, the current mass releases remain valid.
No.The+3%tolerance on the MSSV setpoint does not increase the probability of an accident previously evaluated in the UFSAR.There are no hardware modifications to the valves and, therefore, there is no increase in the probability of a spurious opening of a MSSV.The MSSVs are actuated to protect the secondary systems from overpressurization after an accident is initiated.
The operating windows that are applicable for Unit      1  operation are bounded by the Unit 2 dose analysis. Therefore, the mass releases for Unit 2,  as  found in Reference 9, are applicable to Unit 1.
Sufficient margin exists between the normal steam system operating pressure and the valve setpoints with the increased tolerance to preclude an increase in the probability of actuating the valves.Therefore, the probability of an accident previously evaluated in the UFSAR would not be increased as a result of increasing the MSSV lift setpoint tolerance by 3%above or below the current Technical Specification setpoint value.2.Will the consequences of an accident previously evaluated in the SAR be increased?
Evaluation Summa Thus, based on the discussions presented above, only one UFSAR non-LOCA transient is impacted
No.Based on the'discussions presented within, all of the applicable LOCA and non-LOCA design basis acceptance criteria remain valid both for the transients evaluated and the single event analyzed.Additionally, no new limiting single failure is introduced by the proposed change.The DNBR and PCT values remain within the specified limits'of the licensing basis.Although increasing the valve setpoint will increase the steam release from the ruptured steam generator above the UFSAR value by approximately 0.2%, the SGTR analysis indicates that , the calculated doses are bounded by those determined for the rerating program which, in turn, are within a small fraction of the 10CFR100 dose guidelines.
'uch    that a new analysis must be performed in order to address the effects        of the MSSV lift setpoint tolerance increase from    J1% to J3%. This event        is the loss  of external load/turbine trip accident.
The evaluation also concluded that the existing mass releases used in the offsite dose calculations for the remaining transients (i.e., steamline break, rod ej ation)are still applicable.
For the other transients, the results and conclusions presented in the Donald C. Cook Unit              1 &2 UFSAR remain valid.
Therefore, based on the above, there is no increase in the dose consequences.
Loss  of External Load/Turbine Tri The loss  of external load/turbine trip event is presented in Section 14.1.8    of the Donald C. Cook UFSAR. This transient is caused by a turbine-generator trip which results in the immediate termination  of steam flow. Since no credit is taken for a direct reactor trip on turbine trip, primary and secondary pressure and temperature      will begin to    increase, actuating the pressurizer and steam generator safety valves. The reactor    will eventually  be tripped by one  of the other reactor protection system (RPS) functions; specifically, overtemperature        hT, high pressurizer pressure, or low-low steam generator water level.
91429R2.wpf 28
The turbine trip event is the limiting non-LOCA event for potential overpressurization, i.e., this transient forms the design basis for the primary and secondary safety valves. Since the MSSVs will now potentially be opening at a higher pressure due to the increase in the         lift setpoint tolerance,   it is necessary to analyze this transient in order to demonstrate that all the applicable acceptance criteria 91429R2.wpf


SECL-91<29, Revision 2 3.May the possibility of an accident which is different than any already evaluated in the SAR be created?No.As previously indicated in Section III.1, the Inadvertent Opening of a SG Relief or Safety Valve event is currently presented in the Donald C.Cook UFSAR (Section 14.2.5)and is bounded by the Steamline Break analysis.Increasing the as-found lift setpoint tolerance on the MSSVs does not introduce a new accident initiator mechanism.
SECL-91<29, Revision 2 are satisfied. A turbine trip is classified as an  ANS condition  II event,  a fault of moderate frequency.
No new failure modes have been defined for any system or component important to safety nor has any new limiting single failure been identified.
As such, the appropriate acceptance criteria are DNBR, peak primary pressure, and peak secondary pressure. The transient is described in greater detail in the UFSAR.
No accident will be created that will increase the challenge to the MSSVs and result in increased actuation of the valves.Therefore, the possibility of an accident different than any already evaluated in the UFSAR is not created.4.Will the probability of a malfunction of equipment important to safety previously evaluated in the SAR be increased?
The turbine trip event is analyzed using a modified version      of the LOFTRAN digital computer        code (Reference 6). This modified version      of LOFTRAN only differs from the      standard code version in the way the MSSVs are modelled. The program simulates neutron kinetics, reactor coolant system, pressurizer, pressurizer relief and safety valves, pressurizer spray, steam generators, and main steam safety valves. With the modified code, the MSSVs are explicitly modeled        as a bank  of 5 valves on each steam generator    with staggered lift setpoints. Whereas the standard LOFTRAN version program conservatively models the MSSVs as a bank of five valves, all having one common            liftsetpoint. By modelling the staggered behavior of the MSSVs, a more accurate simulation of how the valves actually behave is achieved. Since higher steam pressures are conservative for this event, no blowdown or hysteresis behavior was assumed.
No.Although the proposed change takes place in equipment utilized to prevent overpressurization on the secondary side and to provide an additional heat removal path, increasing the as-found lift setpoint tolerance on the MSSVs will not adversely affect the operation of the reactor protection system, any of the protection setpoints, or any other device required for accident mitigation.
Consistent with the existing UFSAR analysis, all assumptions were the same as previously used unless specifically noted. The following assumptions were used in this analysis:
Therefore, the probability of a malfunction of equipment important to safety previously evaluated in the UFSAR will not be increased.
: a. Initial power, temperature, and pressure were at their nominal values consistent with:
5.Will the consequences of a malfunction of equipment important to safety previously evaluated in the SAR be increased?
: 1)    ITDP methodology (WCAP-8567) for Unit          1, with the exception that  a  2%
No.As discussed in the response to Questions 2 and 4, there is no increase in the dose release consequences as a result of increasing the as-found lift setpoint tolerance on the MSSVs as defined in the attached safety evaluation.
conservatism on initial core power was assumed.
91429R2.wpf 29 SECI 91429, Revision 2 6.May the possibility of a malfunction of equipment important to safety different than any already evaluated in the SAR be created?No.As discussed in Question 4, an increase in the as-found lift setpoint tolerance on the MSSVs will not impact any other equipment important to safety.Therefore, the possibility of a malfunction of equipment important to safety different thari any already evaluated in the UFSAR will not be created.7.Will the margin of safety as defined in the bases to any technical specification be reduced?No.As discussed in the a~ched safety evaluation, the proposed increase in the as-found MSSV lift setpoint tolerance will not invalidate the LOCA or non-LOCA conclusions presented in the UFSAR accident analyses.The new loss of load/turbine trip analysis concluded that all applicable acceptance criteria are still satisfied.
: 2)      RTDP methodology (WCAP-11397) for Unit 2, with no exceptions.
For all the UFSAR non-LOCA transients, the DNB design basis, primary and secondary pressure limits, and dose limits continue to be met.Peak cladding temperatures remain below the limits specified in 10CFR50.46.
: b. Turbine trip was analyzed with both minimum and maximum reactivity feedback.
The calculated doses resulting from a steam generator tube rupture event remain within a small fraction of the 10CFR100 permissible releases.Thus, there is no reduction in the margin to safety.Note that, as identified earlier, changes will be required to the plant Technical Specifications in order to implement the proposed change.9l429R2.wpf 30 SECL-91<29, Revision 2 SD The proposed change to main steam safety valve lift setpoint tolerances from+1%to+3%has been evaluated by Westinghouse.
C. Turbine trip was analyzed both with and without pressurizer pressure control. The PORVs and sprays were assumed operable in the'cases with pressure control. The cases  with pressure control minimize the increase in primary pressure which          is conservative for the DNBR transient. The cases without pressure control maximize the increase in pressure which is conservative for the RCS overpressurization criterion.
The preceding analyses and evaluations have determined that operation with the MSSV setpoints within a J3%tolerance about the nominal values will have no adverse impact upon the licensing basis analyses, as well as the steamline break mass&energy release rates inside and outside of containment.
91429R2.wpf                                            . 12
In addition, it is concluded that the J3%tolerance on the MSSV setpoint does not adversely affect the overpower or overtemperature protection system.As a result, adequate protection to the core limit lines continues to exists.Therefore, all licensing basis criteria continue to be satisfied and the conclusions in the UFSAR remain valid.Thus, based on the information presented above, it can be concluded that the proposed increase of main steam safety valve lift setpoint tolerances from J1%to J3%does not represent an unreviewed safety question per the definition and requirements defined in 10CFR50.59.
 
SECI 91<29, Revision 2
: d.      The steam generator PORV and steam dump valves were not assumed operable.            This assumption maximizes secondary pressure which in turn maximizes the primary temperature for DNBR and primary pressure for pressure cases.
: e.      Main feedwater flow was assumed to be lost coincident with the turbine trip. This assumption maximizes the heatup effects.
: f.      Only the overtemperature dT, high pressurizer pressure, and low-low steam generator water level reactor trips were assumed operable for the purposes of this analysis.
: g.      The flow rate for each MSSV was modelled to ramp linearly from no flow at its        lift setpoint (3% above the nominal Technical Specification setpoint) to full open flow at its full open point (6% above the nominal setpoint), The full open flow rate    is based on a reference full flow capacity  of 238 ibm/sec  at 1186.5 psia (based on the ASME rated flow for these valves). For secondary side pressures between the initial full open point for each valve  and 1186.5 psia, the  full open flow rate  was modelled to vary proportionally with pressure. This assumption maximizes secondary pressure which in turn maximizes the primary temperature for DNBR and primary pressure for pressure cases.
R~esul Four cases for each unit/core type (i.e. Unit 1, Unit 2 mixed core,and Unit 2 full V5 core) were analyzed:    a) minimum feedback without pressure control, b) maximum feedback without pressure control, c) maximum feedback with pressure control, and d) minimum feedback with pressure control.
The most limiting cases in the current UFSAR continue to be the most limiting cases.          The calculated sequence    of events for the four cases for each unit are  presented in Tables 3 and 4.
9l429R2.wp f                                            13
 
SECI 91<29, Revision 2 Case  A:
Figures 2 through 6 show the transient response for the turbine trip event under minimum reactivity feedback conditions without pressure control. The reactor is tripped on high pressurizer pressure.
The neutron flux remains essentially constant at full power until the reactor is tripped, and the DNBR remains above the initial value for the duration  of the transient. The pressurizer safety valves are actuated and maintain primary pressure below 110%        of the design value. The main steam safety valves are also actuated and maintain secondary pressure below 110%        of the  design value.
Case B:
Figures 7 through 11 show the transient response for the turbine trip event under rnaxirnum reactivity feedback conditions without pressure control. The core power is observed to undergo a momentary increase. This is due to positive reactivity being inserted  as a result of the increase in coolant density caused by the increase  in primary pressure. This affect is quickly countered by the subsequent temperature rise brought on by the abrupt loss    of the heat sink. The reactor    is tripped on high pressurizer pressure. The DNBR increases throughout the transient and never drops below the initial value. The pressurizer safety valves are actuated and maintain primary pressure below 110%            of the design value. The main steam safety valves are also actuated and maintain secondary pressure below 110%  of the design value.
Case C:
Figures 12 through 16 show the transient response for the turbine trip event under maximum reactivity feedback conditions with pressure control  ~  The core power is observed to undergo a momentary increase. This is due to positive reactivity being inserted  as a  result of the increase in coolant density caused by the rapid increase in primary pressure.      This affect is quickly countered by the subsequent temperature
                  \
rise brought on by the abrupt loss  of the heat sink. The reactor is tripped on low-low steam generator water level. The DNBR increases throughout the transient and never drops below the initial value, The pressurizer relief valves.and sprays maintain primary pressure 91429R2.wpf                                          14
 
SECI 91-429, Revision 2 below 110%    of the  design value. The main steam safety valves are also actuated and maintain secondary pressure below 110%      of the design value.
Case D:
Figures 17 through 21 show the transient response for the turbine trip event under minimum reactivity feedback conditions with pressure control. The reactor is tripped on high pressurizer pressure.
Although the DNBR value decreases below the initial value, it remains well above the limit throughout the entire transient. The pressurizer relief valves and sprays maintain primary pressure below 110%    of the  design value. The main steam safety valves are also actuated and maintain secondary pressure below 110%      of the design value.
Anal i Concl        ion    nit 1 Based on the results    of these Unit 1 turbine trip analyses with a +3%    tolerance on the MSSV    lift setpoints, all of the applicable  acceptance criteria are met. The minimum DNBR for each case is greater than the  limit value. The peak primary    and secondary pressures remain below 110%      of design at all times.
UNIT 2: a mixed and b full V-5 cores Case  A:
Figures 22a through 26b ("a" designates mixed core figures and "b" denotes full V-5 core figures) show the transient response for the turbine trip event under minimum reactivity feedback conditions without pressure control for both core types. The reactor is tripped on high pressurizer pressure.,
The neutron flux remains essentially constant at full power until the reactor is tripped, and the DNBR remains above the initial value for the duration  of the transient. The pressurizer safety valves  are actuated and maintain primary pressure below 110%        of the design value. The main steam    safety valves are also actuated and maintain secondary    pressure below 110% of the design value.
91429R2.wpf                                            15
 
SECL-91<29, Revision 2 Case B:
Figures 27a through 31b show the transient response for the turbine trip event under maximum reactivity feedback conditions without pressure control for both mixed and full V-5 core types. The core power is observed to undergo a momentary increase,          This is due to positive reactivity being inserted as a result of the  increase in coolant density caused by the rapid increase in primary pressure.
This affect is quickly countered by the subsequent temperature rise brought on by the abrupt loss of the heat sink. The reactor is tripped on high pressurizer pressure.      The DNBR increases throughout the transient and never drops below the initial value. The pressurizer safety valves are actuated and maintain primary pressure below 110%      of the  design value. The main steam safety valves are also actuated and maintain secondary pressure below 110%        of the design value.
Case C:
Figures 32a through 36b show the transient response for the turbine trip event under maximum reactivity feedback conditions with pressure control for the two applicable Unit 2 core types. The core power is observed to undergo a momentary increase.          This is due to positive reactivity being inserted as a result of the  increase in coolant density caused by the rapid increase in primary pressure.
This affect is quickly countered by the subsequent temperature rise brought on by the abrupt loss of the heat sink. The reactor is tripped on low-low steam generator water level      ~  The DNBR increases throughout the transient and never drops below the initial value.. The pressurizer relief valves and sprays maintain primary pressure below 110%        of the design value. The main steam safety valves are also actuated and maintain secondary pressure below 110%          of the design value.
Case  D:
Figures 37a through 41b show the transient response for the turbine trip event under minimum reactivity feedback conditions with pressure control for both the mixed and          full V-5 cores. The reactor is tripPed on high pressurizer pressure.        Although the DNBR value decreases below the initial value,  it remains well above  the limit throughout the entire transient. The pressurizer relief valves and sprays    maintain primary pressure below 110% of the design value. The 91429R2.wpf                                            16
 
SECL-91<29, Revision 2 main steam safety valves are also actuated and maintain secondary pressure below 110%          of the design value.
Anal is Conclusion          nit 2 Based on the results  of these Unit 2 mixed and full core turbine trip analyses with a +3% tolerance on the  MSSV lift setpoints, all of the applicable acceptance criteria are met. The minimum DNBR for each case is greater than the limit value. The peak primary and secondary pressures remain below 110%  of design at all times.
N n-        A Conclusio The effects  of increasing the as-found lift setpoint tolerance on the main steam safety valves have been examined, and it has been determined that, with one exception, the current accident analyses          as presented in the UFSAR remain valid. The loss of load/turbine trip event was analyzed in order to quantify the impact of the setpoint tolerance relaxation. As previously demonstrated in this safety evaluation, all applicable acceptance criteria for this event have been satisfied and the conclusions presented in the UFSAR are s'till valid. Thus, with respect to the non-LOCA transients, the proposed Technical Specification change does not constitute an unreviewed safety question, and the non-LOCA accident analyses, as presented in the report, support the proposed change,
: 2.          CA and          A Related Evaluations La    e Break      CA The current large break LOCA analyses for Donald C. Cook Units          1  and 2 were performed with the NRC approved 1981 Evaluation Model plus BASH. After a postulated large break LOCA occurs, the heat transfer between the reactor coolant system (RCS) and the secondary system may be in either direction, depending on the relative temperatures. In the case of continued  heat addition to the secondary system, the secondary system pressure increases and the MSSVs may actuate to          limit the pressure. However, this does not occur in the large break evaluation model since no credit is taken for auxiliary feedwater actuation. Consequently, the secondary system acts      as a heat source. in the 91429R2.wpf                                          17
 
SECL-91<29, Revision 2 l
postulated large break LOCA transient and the secondary pressure does not increase.                Since the secondary system pressure does not increase,        it is not necessary to model the MSSV setpoint in the large break evaluation model. Therefore, an increase in the allowable MSSV setpoint tolerance for Donald C. Cook Units      1 and 2  will not impact the current UFSAR large break LOCA analyses.
mall Break        CA The small break LOCA analyses for Donald C. Cook Units              1  and 2 were performed with the NRC approved Evaluation Model using the NOTRUMP code. After a postulated small break LOCA occurs, the heat transfer between the RCS and the secondary system may be in either direction depending on the relative temperatures.      In the  case  of continued  heat addition to the secondary system, the secondary system pressure increases which leads to steam relief via the MSSVs. In the small break LOCA, the secondary flow aids in the reduction            of RCS pressure. Subsequently, Donald C. Cook Units      1 and 2 were reanalyzed    to determine the impact of an increased MSSV setpoint tolerance  of 3%.
The licensing basis small break LOCA analysis for Donald C. Cook Unit                1 included a safety evaluation to address a 25 gpm charging pump flow imbalance and operation with the high head safety injection cross tie valve closed at 3250 MWt core power level. Also, a safety evaluation had been performed which modeled an increased auxiliary feedwater enthalpy delay time. These assumptions were incorporated in the increased MSSV setpoint tolerance NOTRUMP analysis                    of the limiting 3 inch break for Unit 1. However, in order to obtain            a direct sensitivity for the increased MSSV setpoint tolerance, a NOTRUMP analysis was also performed incorporating these assumptions but modelling the original MSSV setpoints.
In addition,  a 3 inch  NOTRUMP analysis was performed for the low pressure, high temperature operating condition for Unit    1 since a safety evaluation had been originally performed as part        of the licensing basis analysis. The increased MSSV setpoint tolerance, a core power level of 3250 MWt
.with the. high head cross tie valve closed, and      a 25 gpm charging pump        flow imbalance were assumed for the analysis of the low pressure, high temperature        case.
91429Rz.wp f                                              18
 
SECL-91-429, Revision 2 Donald C. Cook Unit 2 was reanalyzed for the limiting 3 inch break, low pressure and high temperature operating condition with the high head cross tie valve closed.                    The power shape axial offset was reduced from the licensing basis analysis of +30% to +13% for the MSSV increase analysis. An axial offset of +13% is equal to the value assumed in the licensing basis large break LOCA analysis. In addition, the licensing basis analysis conservatively assumed                      a maximum" assembly average power          (P+ of 1.519.        The 3% increased MSSV setpoint tolerance analysis assumed a    P~ which was      reduced to 1.46. In order to obtain a direct sensitivity for the increased MSSV setpoint tolerance, a NOTRUMP analysis was performed incorporating these assumptions but modelling the original MSSV setpoints.
Tables 5 and 6 summarize the MSSV setpoints used in the Donald C. Cook Units                          1 and 2 current licensing basis small break LOCA analyses and the increased MSSV setpoint tolerance analyses, respectively. Tables 7 and 8 summarize the initial input assumptions used in the Unit                      1  analysis.
The Unit 2 initial input assumptions are summarized in Table 9, The time sequence      of events    and results  of the Unit 1    analysis are summarized in Tables 10 and 11, respectively. The limiting peak clad temperature calculated is 1879'F, including a 25'F burst and blockage penalty, for the 3% increased MSSV setpoint tolerance case at 3250 MWt and the low pressure, low temperature operating conditions'. This value is less than the acceptance criteria                      limit of 2200'F. The maximum local metal-water reaction is 3A7%, which is well below the embrittlement limit of 17% as required by 10CFR50.46. The total core metal-water reaction                            is less than 1.0%, corresponding to less than 1.0 percent hydrogen generation, as compared to the 1%
criterion of 10CFR50.46.
The time sequence      of events    and results  of the Unit 2    analysis are summarized in Tables 12 and 13, respectively. 'Ihe limiting peak clad temperature calculated is 2125'F, including a 12'F artificial leak-by penalty and 157'F burst and blockage penalty, for the 3% increased MSSV setpoint tolerance case at 3250    MWt and low pressure, high temperature operating condition. This value is less than the acceptance criteria limit of 2200'F. The maximum local metal-water reaction is 4.26%, which is These results are from calculations using a nominal auxiliary fcedwater flow. A subsequent  analysis using a morc conservative minimum auxiliary feedwater flow rate is presented in thc next section.
91429R2.wpf                                                    19
 
SECI 91<29, Revision 2 well below the embrittlement limit of 17%      as required by 10CFR50.46. The total core metal-water reaction is less than 1.0%, corresponding to less than 1.0 percent hydrogen generation, as compared to the 1% criterion  of 10CFR50.46.
Additional Small Break          CA Anal ses The small break LOCA analysis for Cook Unit 1, previously discussed, used nominal Auxiliary Feedwater (AFW) flow rates (1258 gpm total delivery), whereas minimum AFW flow rates were used for Cook Unit 2, Since minimum AFW flow rates are more limiting, the small break LOCA for Cook Unit    1 for +3% MMSV setpoint tolerance was reanalyzed using lower auxiliary feedwater flow rates (750 gpm total delivery). The following presents the results of the revised small break LOCA analyses performed for Donald C. Cook Unit 1.
Based on the Cook    Unit 1  analyses presented in the previous section, two additional small break LOCA cases were run to address      a relaxation to +3% for the MSSV setpoint tolerance. First, the original LPLT (Low Pressure, Low Temperature) case presented above, the results of which are shown in Tables 10 and 11, was rerun modeling 750 gpm total AFW system flow rate. As was demonstrated in References 11 and 12, the LPLT case is the limiting case for the pressure/temperature    operating window for Cook Unit 1, and that will not change due to the reduction in AFW flow. In addition, since only the limiting break size (3 inch) was previously analyzed, a 2 inch break was also analyzed for the 750 gpm AFW flow rate to provide further assurance that the limiting break size has not shifted to a smaller break size due to the reduction in the AFW flow rate.
Note that since both the reduction in AFW delivered flow and the increase in the setpoint tolerance to
>3% tend to shift the limiting break size to a smaller break, it is not necessary to consider that the limiting break could be larger than was presented in the current licensing basis analysis which demonstrated that the 3 inch break is limiting.
The MSSV performance assumed in these new cases is shown in Table 6. The initial input parameters assumed for these new cases are shown in Table 7a, and are compared with the original licensing basis in Reference 11. If the new analysis values from Table 7a are compared with the original evaluation cases shown in Table 7, very few differences are evident. Except for the auxiliary feedwater flow rate an'd a slight increase in the accumulator water temperature, the initial RCS 91429R2.wpf                                            20
 
SECL-91<29, Revision 2 pressure was lowered to cover a safety evaluation that was performed for pressurizer pressure uncertainty. Incorporating this new RCS pressure had a negligible effect on the vessel inlet and outlet temperatures and the steam pressure assumed for reactor steady-state operation (prior to initiation of the transient). One final additional change is in the AFW enthalpy delay. The lower AFW flow rate would result in a longer delay. The current NOTRUMP model has been improved to model the volume  of hot main feedwater that must be      purged from the piping prior to cold AFW being delivered to the steam generator, and the delay is calculated by the model. Other than these minor differences, and the intended change (i.e., reduce      AFW flow rate and increase accumulator water temperature),
the initial conditions assumed for the additional runs are identical to the runs performed for the previous section.
The time sequence      of events and results of the Unit 1 analyses are summarized in Tables 10a and 11a, respectively. The limiting Peak Clad Temperature        (P~    calculated is 2068'F, including a 117'F burst and blockage penalty, for the +3% increased MSSV setpoint tolerance case at 3250 MWt and low pressure, low temperature operating condition. This value is less than the acceptance criteria limit of 2200'F, and is almost the      same computed result that is seen  for D.'. Cook Unit 2 (the pre-burst/blockage PCT      of 1951'F  versus 1956'F). The maximum local metal-water reaction is 5.06%,
which is well below the embrittlement limit of 17% as required by 10 CFR 50.46. The total core metal-water reaction is less than 1.0%, corresponding to less than 1.0 percent hydrogen generation, as compared to the 1% criterion      of 10 CFR 50.46.
The >3% increased MSSV setpoint tolerance has been analyzed for the Donald C. Cook Nuclear Plant Unit  1 for the small break LOCA analyses performed by Westinghouse. The potential effect of this change on the FSAR analysis results for the small break LOCA analysis was examined via reanalysis and although the results are more limiting than previous analysis cases,      it was shown that the effect  of the  increased MSSV setpoint tolerance did not result in exceeding any    of the following design or regulatory limits:
: 1. The calculated peak fuel element cladding temperature is below the requirements of 2200'F.
: 2. The amount of fuel element cladding that reacts chemically with water or steam does not exceed    1  percent of the total amount of Zircaloy in the reactor.
91429Rz.wpf                                            21
 
SECI 91-429, Revision 2
: 3. The cladding temperature transient is terminated at a time when the core geometry is still amenable to cooling. The localized cladding oxidation      limit of 17 percent  is not exceeded during or after quenching.
: 4. The core remains amenable to cooling during and after the break.
: 5. The core temperature is reduced and decay heat is removed for an extended period of time,          as required by the long-lived radioactivity remaining in the core.
Therefore,  it is concluded that a relaxation to J3% for the MSSV setpoint tolerance is acceptable from the standpoint of the small break LOCA FSAR accident analyses discussed in this safety evaluation.
Post-LOCA Lon Term Core Coolin The Westinghouse licensing position for satisfying the requirements      of 10CFR50.46      Paragraph (b),
Item (5), "Long Term Cooling," concludes that the reactor will remain shut down by borated ECCS water residing in the RCS/sump after a LOCA. Since credit for the control rods. is not taken for a large break LOCA, the borated ECCS water provided by the accumulators and the RWST must have a boron concentration that', when mixed with other water sources,      will result in the reactor core remaining subcritical assuming all control rods out. The calculation is based upon the reactor steady state conditions at the initiation of a  LOCA and considers sources of both borated and unborated fluid in the post-LOCA containment sump. The steady state conditions are obtained from the large break LOCA analysis which,      as stated above, does not take credit for MSSV actuation. Thus the post-LOCA long-term core cooling evaluation is independent of the MSSV setpoint tolerance, and there  will be  no change in the calculated RCS/sump boron concentration after a postulated LOCA for Donald C. Cook Units      1 and 2.
Hot        Switchover to Prevent Potential Boron Preci itation Post-LOCA hot leg recirculation time is determined for inclusion in emergency operating procedures to ensure no boron precipitation in the reactor vessel following boiling in the core. This time is 91429R2.wpf                                            22
 
SECL-91<29, Revision 2 dependent on power level and the RCS, RWST, and accumulator water volumes and with their associated boron concentrations. The proposed MSSV setpoint tolerance increase to 3% does not affect the power level or the boron concentrations assumed for the RCS, RWST, and accumulator in the hot leg switchover calculation for Unit 1. The proposed MSSV setpoint tolerance increase to 3%'oes not affect the boron concentrations assumed for the RCS, RWST, and accumulator in the hot leg switchover calculation for Unit 2. The current licensing basis hot leg.switchover calculation for Unit 2 is at full power, 3413 MWt, with cross tie valve at closed position. With MSSV setpoint tolerance increased to 3%,    Unit 2 LOCA analyses    assumed a reduced core power, 3250    MWt, with cross tie valve at closed position. A reduction in power reduces the boil-off rate in the hot leg switchover calculation. A reduction in the boilwffrate results in the rate  of boron build up  also being reduced.
Therefore, the licensing basis hot leg switchover calculation for the Donald C. Cook Units      1  and 2 remains bounding.
LOCA H draulic Forci          Functions The peak hydraulic forcing functions on the reactor vessel and internals occur very early in the large break LOCA transient.      Typically, the peak forcing functions occur between 10 and 50 milliseconds (0.01 and 0.05 seconds) and have subsided well before 500 milliseconds (0.50 seconds).        Any change in time associated with an increased MSSV setpoint tolerance would occur several seconds into the transient. Since the LOCA hydraulic forcing functions have peaked and subsided before the time at which the MSSV may actuate, the increase in the MSSV setpoint tolerance to 3% will not impact the LOCA hydraulic forcing functions calculation for Donald C. Cook Units        1 and 2.
LOCA Conclusio The effect of increasing the MSSV setpoint tolerance to 3% for Donald C. Cook Units        1 and 2 has been evaluated  for each of the LOCA related analyses addressed in the UFSAR. For currently analyzed conditions,  or for Unit 2 operation at  a reduced power  level of 3250 MWt when the high head cross tie valves are closed,  it was shown that the 3% MSSV setpoint tolerance does not result in any design or Regulatory    limit being  exceeded. Therefore, with respect to the LOCA analyses,    it can be concluded that increasing the MSSV setpoint tolerance to 3%      for Donald C. Cook Units    1  and 2 will be acceptable from. the standpoint of the UFSAR accident    analyses discussed in the safety
'valuation.
91429Rz.wp f                                          23
 
SECI 91429, Revision 2 3.~
                ~
Containment Tnt      ri Evaluation Relaxation  of the Donald C. Cook Units    1 & 2 Technical  Specification Main Steam Safety Valve setpoint tolerances from +1% to +3% do not adversely affect the short term or long term LOCA mass and energy releases and, subsequently, the related containment analyses.        Since there is no impact on the main steaml inc break mass and energy release calculations, there is also no impact on that associated containment response analysis. The proposed change does not affect the normal plant operating parameters, system actuations, accident mitigating capabilities or assumptions important to the mass and energy release and containment analyses, or create more limiting conditions than those already assumed in the current analyses.      Therefore, the conclusions presented in the Donald C, Cook UFSAR remain valid with respect to containment.
: 4.      Steam Generator Tube Ru ture To demonstrate that an unreviewed safety question does not exist for the steam generator tube rupture (SGTR) event, the increased MSSV setpoint tolerance was evaluated for Donald C. Cook Units            1 and 2. The analysis    for uprating to 3600 MWT considered up to 15% steam generator tube plugging for both Units    1 and 2. The limiting cases from this analysis were reevaluated for the increased MSSV setpoint tolerance.      An increased steam generator tube plugging level of 20% was also considered at power levels    of 3262 MWT for Unit 1    and 3425  MWT for Unit 2. The criteria    stated in the UFSAR analysis for Donald C. Cook were used in establishing the continued applicability of the SGTR licensing basis safety analysis by demonstrating that the conclusions for SGTR UFSAR analysis remain valid.
An evaluation has been performed to determine the impact on the Donald C. Cook Units'GTR analysis  of record for increased MSSV setpoint tolerance for all the    cases with different steam generator tube plugging and power levels stated above. The primary thermal hydraulic parameters which affect the calculation of offsite radiation doses for a SGTR are the amount of radioactivity assumed to be present    in the reactor coolant, the aniount of reactor coolant transferred to the secondary side of the ruptured steam generator through the ruptured tube, and the amount of steam released from the ruptured steam generator to the atmosphere.        Thus, the calculated offsite radiation doses  for an SGTR'for Donald C. Cook are dependent on these three factors.
91429R2.wpf                                            24
 
SECI 91<29, Revision 2 For the UFSAR SGTR analysis, the activity in the reactor coolant is based on an assumption of 1%
defective fuel, and this assumption    will not be affected by the  increased MSSV setpoint tolerance.
The two remaining factors are affected by the increased MSSV setpoint tolerance, and the evaluation was performed to quantify this effect.
To evaluate the effect of the increased MSSV setpoint tolerance on the Donald C. Cook SGTR analysis, the revised SG safety valve set pressure was lowered by 3% from 1080 psia to 1047.6 psia.
This resulted in a slightly higher equilibrium primary-to-secondary break flow (approximately 0.5%),
since there was an increase in the pressure differential between the RCS and secondary side assumed in the analysis. The steam released to the atmosphere subsequently increased (by approximately 0.2%) because of the lower pressure assumed for the main steam safety valves. The limiting cases, for all power levels and steam generator tube plugging levels considered, were at 3600 MVft.
The thyroid and whole body doses estimated for Units        1  and 2, based on the analyses described above, are bounded by those previously determined        for the rerating program. The actual estimated dose factors (compared to the results    of the rerating calculation)  are as follows:
Unit f: thyroid 0.7, whole body 1.005 Unit 2: thyroid 0.99, whole body 0.98 Although the Unit    1 whole body dose exceeds the previous value by approximately 0.5%, this increase is well within the acceptable    limit. Thus, the results and conclusion in the Donald C. Cook UFSAR that the offsite doses for an SGTR event would be within a small fraction of the 10CFR100 guidelines remains valid.
: 5.        Com    nent Performance The relaxation of the  lift setpoint tolerance for the MSSVs at Donald C. Cook does not directly or indirectly involve mechanical component hardware considerations.            Direct effects  as well as indirect effects on equipment important to safety (ITS) have been considered.          Indirect effects include activities which involve non-safety related equipment which may affect ITS equipment.              Component hardware considerations may include overall component integrity, sub-component integrity, and the 9 I 429R2.wpf                                          25
 
SECI 91<29, Revision 2 adequacy  of component    supports during all plant conditions. An evaluation is not required to determine whether the condition alters the design, material, construction standards, function or method  of performing the function of any ITS equipment.
: 6.      S ste    Evaluation The relaxation of the  liftsetpoint  tolerance for the MSSVs at Donald C. Cook      as described would not affect the integrity of a plant auxiliary fluid system or the ability of any auxiliary system to perform its intended safety function.
: 7.      Radiolo ical Evaluation The relaxation  of the lift setpoint tolerance for the MSSVs    at Donald C. Cook as described do not affect radiological concerns other than those identified above in Section    III.4 or post-LOCA hydrogen production. The evaluation in Sections III.1 and GI.3 concluded that the existing mass releases used in the remaining offsite dose calculations (i.e., steamline break, rod ejection, locked rotor, and short-term  & long-term LOCA) are still applicable,
: 8.      Plant Ri k Anal          activities affecti  IP The relaxation  of the liftsetpoint tolerance for the MSSVs    at Donald C. Cook does not adversely affect the Individual Plant Examination      /PE) for the plant. This test does not affect the normal plant operating parameters, system actuations, accident mitigating capabilities, operating procedures or assumptions important to the IPE analyses, or create conditions that would significantly affect core damage    or plant damage frequency or the frequency of core damage initiating events. Therefore, the conclusions presented in the IPE remain valid.
: 9.      Plant Risk Anal      es  ch    es other than IPF relat The relaxation of the  liftsetpoint  tolerance for the MSSVs does not result in an increase in the probability of occurrence of accidents previously evaluated in the UFSAR. This proposed change to the Technical Specifications does not result in, an increase in the probability    of occurrence of a 91429R2.wpf                                            26
 
SECI 91<29, Revision 2 malfunction of equipment important to safety or of equipment that could indirectly affect equipment important to safety.
10.
The relaxation of the  lift setpoint  tolerance for the MSSVs does not directly or indirectly involve electrical systems, components, or instrumentation considerations.          Direct effects  as well  as indirect effects on equipment important to safety have been considered.          Indirect effects include conditions or activities which involve non-safety related electrical equipment which may affect Class 1E, post accident monitoring systems, or plant control electrical equipment.          Consideration has been given to seismic and environmental qualification, design and performance criteria per IEEE standards, functional requirements, and plant technical specifications with respect to all plant conditions. An evaluation is not required to determine whether the MSSV setpoint tolerance relaxation alters the design, configuration, qualification, or performance      of safety related electrical  systems or components. The MSSV setpoint tolerance relaxation has no potential for impact to the identification 1
of an unresolved safety question    as  it would relate to the safety related function  of electrical systems of components.
: 11.      Technical S      ficatio A review of the Donald C. Cook Unit 1          and Unit 2 Technical Specifications was performed to address a change in the  liftsetpoint  tolerance for the Main Steam Safety Valves. The Technical Specification review, inclusive of Amendments 157 and 141 for Units            1 and 2, respectively.
Proposed markups are attached to this evaluation for both Unit        1  and  Unit 2, and reflect changes to Table 4.7-1 and 3.7-4, respectively.        A change to the  basis for both units is also proposed and discusses the relationship between the      J1%  and  J3% tolerances.
91429R2.wpf                                              27
 
SECL-91-429, Revision 2 IV. ASSESSMENT OF NO                                  SAI'KFV    UPON The relaxation in the  lift setpoint tolerance for the MSSVs at Donald C. Cook Units        1 and 2 has been evaluated consistent with the requirements      of 10CFR50.59    and does not involve an unreviewed safety question on the basis  of the following justifications:
Will the probability of an accident previously evaluated in the SAR be      increased?
No. The +3% tolerance on the MSSV setpoint does not increase the probability of an accident previously evaluated in the UFSAR. There are no hardware modifications to the valves and, therefore, there is no increase in the probability    of a spurious  opening  of a MSSV. The MSSVs are actuated to protect the secondary systems from overpressurization after an accident is initiated. Sufficient margin exists between the normal steam system operating pressure and the valve setpoints with the increased tolerance to preclude an increase in the probability of actuating the valves. Therefore, the probability of an accident previously evaluated in the UFSAR would not be increased as a result        of increasing the MSSV lift setpoint tolerance by 3% above or below the current Technical Specification setpoint value.
: 2.      Will the  consequences    of an accident previously  evaluated in the SAR be increased?
No. Based on the'discussions presented within, all of the applicable LOCA and non-LOCA design basis acceptance criteria remain valid both for the transients evaluated and the single event analyzed. Additionally, no new limiting single failure is introduced by the proposed change. The DNBR and PCT values remain within the specified limits'of the licensing basis.
Although increasing the valve setpoint will increase the steam release from the ruptured steam generator above the UFSAR value by approximately 0.2%, the SGTR analysis indicates that
      , the calculated doses are bounded by those determined for the rerating program which, in turn, are within a small fraction    of the 10CFR100    dose guidelines. The evaluation also concluded that the existing mass releases used in the offsite dose calculations for the remaining transients (i.e., steamline break, rod ej ation) are still applicable. Therefore, based on the above, there is no increase  in the dose consequences.
91429R2.wpf                                            28
 
SECL-91<29, Revision 2
: 3.      May the possibility of an accident which is different than any already evaluated in the SAR be created?
No. As previously indicated in Section III.1, the Inadvertent Opening of a SG Relief or Safety Valve event is currently presented in the Donald C. Cook UFSAR (Section 14.2.5) and is bounded by the Steamline Break analysis.       Increasing the as-found liftsetpoint tolerance on the MSSVs does not introduce a new accident initiator mechanism.           No new failure modes have been defined for any system or component important to safety nor has any new limiting single failure been identified. No accident will be created that will increase the challenge to the MSSVs and result in increased actuation       of the valves. Therefore,   the possibility of an accident different than any already evaluated in the UFSAR is not created.
: 4.     Will the probability of a malfunction of equipment important to safety previously evaluated in the SAR be increased?
No. Although the proposed change takes place in equipment utilized to prevent overpressurization on the secondary side and to provide an additional heat removal path, increasing the as-found   liftsetpoint  tolerance on the MSSVs will not adversely affect the operation   of the reactor protection   system, any of the protection setpoints, or any other device required for accident mitigation. Therefore, the probability of a malfunction of equipment important to safety previously evaluated in the UFSAR will not be increased.
: 5.     Will the consequences   of a malfunction of equipment important to safety previously       evaluated in the SAR be increased?
No. As discussed in the response to Questions 2 and 4, there is no increase in the dose release consequences     as a result of increasing the as-found liftsetpoint tolerance on the MSSVs   as defined in the attached safety evaluation.
91429R2.wpf                                             29
 
SECI 91429, Revision 2
: 6.     May the possibility of a malfunction of equipment important to safety different than any already evaluated in the SAR be created?
No. As discussed in Question 4, an increase in the as-found         liftsetpoint tolerance on the MSSVs   will not impact   any other equipment important to safety. Therefore, the possibility     of a malfunction of equipment important to safety different thari any already evaluated in the UFSAR will not be created.
: 7.     Will the margin of safety     as defined in the bases to any technical specification be reduced?
No. As discussed in the a~ched safety evaluation, the proposed increase in the as-found MSSV   lift setpoint tolerance will not invalidate the LOCA or non-LOCA conclusions presented in the UFSAR accident analyses.         The new loss of load/turbine trip analysis concluded that all applicable acceptance criteria are still satisfied. For all the UFSAR non-LOCA transients, the DNB design basis, primary and secondary pressure limits, and dose limits continue to be met. Peak cladding temperatures remain below the limits specified in 10CFR50.46.     The calculated doses resulting from     a steam generator tube rupture event remain within a small fraction     of the 10CFR100 permissible     releases. Thus, there is no reduction in the margin to safety. Note that,     as identified earlier, changes will be required to the plant Technical Specifications in order to implement the proposed change.
9l429R2.wpf                                             30
 
SECL-91<29, Revision 2 SD The proposed change to main steam safety valve       liftsetpoint tolerances from +1% to +3% has been evaluated by Westinghouse.     The preceding analyses and evaluations have determined that operation with the MSSV setpoints within a J3% tolerance about the nominal values will have no adverse impact upon the licensing basis analyses, as well as the steamline break mass       & energy release rates inside and outside of containment. In addition, it is     concluded that the J3% tolerance on the MSSV setpoint does not adversely affect the overpower or overtemperature protection system.         As a result, adequate protection to the core   limit lines continues to exists. Therefore, all licensing basis criteria continue to be satisfied and the conclusions in the UFSAR remain valid.
Thus, based on the information presented above,       it can be concluded that the proposed increase   of main steam safety valve   lift setpoint tolerances from     J1% to J3%     does not represent an unreviewed safety question per the definition and requirements defined in 10CFR50.59.
The recommended Technical Specification changes, along with a no significant hazards evaluation, are presented as appendices to this evaluation.
The recommended Technical Specification changes, along with a no significant hazards evaluation, are presented as appendices to this evaluation.
91429Rz.wp f 31 SECL-91-429, Revision 2 VI.REFERENCES 1)Donald C.Cook Units 1&2 Technical Specifications through Amendments 157 and 141, respectively, 10/1/91.2)ANSI/ASME BPV-I11-1-NB,"ASME Boiler and Pressure Vessel Code-Section III Rules for Construction of Nuclear Power Plant Components," ASME, 1983.3)ANSUASME OM-1-1981,"Requirements for Inservice Performance Testing of Nuclear Power Plant Pressure Relief Devices," ASME, 1981.4)"Donald C.Cook Units 1&2 Updated Final Safety Analysis Report (UFSAR), dated through July 1991.5)ASME Steam Tables, Fifth Edition, 1983.6)'urnett, T.W.T., et al.,"LOFTRAN Code Description," WCAP-7907-P-A, June 1972.7)Chelemer, H.et al~,"Improved Thermal Design Procedure," WCAP-8567-P-A, February 1989.8)Butler, J.C.and D.S.Love,"Steamline Break Mass/Energy Releases for Equipment Environmental Qualification Outside Containment," WCAP-10961-P, October 1985.9)90AE*-G4126 W/AEP2-0098 Transmittal regarding"Locked Rotor Dose Analysis for Donald C.Cook Unit 2 Cycles 8&9," 7/19/90.10)Letter regarding AFW flow rates from R.B.Bennett of American Electric Power to J.N.Steinmetz of Westinghouse Electric, 9/24/91.11)WCAP-10054-P-A (Proprietary), WCAP-10081 (Non-Proprietary), Lee, H., et al., Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code, August 1985.12)WCAP-12135, Donald C.Cook Nuclear Plant Units 1 and 2 Rerating Engineering Report, Vol.1, September 1989.91429R2.wpf 32 SECL-91<29, Revision 2 TABLE 3 UNIT I TURBINE TRIP SEQUENCE Accident Without pressurizer control (minimum reactivity feedback)Without pressurizer control (maximum reactivity feedback)With pressurizer control (maximum reactivity feedback)With pressurizer control (minimum reactivity feedback)'vent Turbine trip, loss of main feedwater flow High pressurizer pressure reactor trip setpoint reached Rods begin to drop Peak pressurizer pressure occurs Minimum DNBR occurs Turbine trip, loss of main feedwater flow High pressurizer pressure reactor trip setpoint reached Rods begin to drop Peak pressurizer pressure occurs Minimum DNBR occurs Turbine trip, loss of main feedwater flow Peak pressurizer pressure occurs Low-low steam generator water level reactor trip setpoint reached Rods begin to drop Minimum DNBR occurs Turbine trip, loss of main feedwater flow High-pressurizer pressure reactor trip setpoint reached Time sec 0.0 77 9.7 10.5 0.0 7.9 9.9 10.5 0.0 10.0 47.1 49.1 0.0 12.4 91429Rz.wp f 33 SECL-91<29, Revision 2 TABLE 3 (continued)
91429Rz.wp f                                           31
UNIT I TURBINE TRIP SEQUENCE Accident Event Rods begin to drop Peak pressurizer pressure occurs Minimum DNBR occurs T~ime sec 14.4 16.0 15.5*DNBR does not decrease below its initial value.91429R2.wpf 34 SECL-91<29, Revision 2 TABLE 4 UNIT 2 TURBINE TRIP SEQUENCE OF EVENTS Accident Without pressurizer control (minimum reactivity feedback)Without pressurizer control (maximum reactivity feedback)Event Turbine trip, loss of main feedwater flow High pressurizer pressure reactor trip setpoint reached Rods begin to drop Peak pressurizer pressure occurs Minimum DNBR occurs Turbine trip, loss of main feedwater flow High pressurizer pressure reactor trip setpoint reached Rods begin to drop Peak pressurizer pressure occurs Minimum DNBR occurs T~ime eee Inixed core 0.0 5.5 7.5 9.5 0.0 5.5 7.5 9.0 full core 0.0 7.5 9.5 11.0 0.0 7.6 9.6 10.0*DNBR does not decrease below its initial value.91429R2.wp f 35  
 
SECL-91-429, Revision 2 VI. REFERENCES
: 1)     Donald C. Cook Units     1 & 2 Technical Specifications through Amendments 157 and 141, respectively, 10/1/91.
: 2)     ANSI/ASME BPV-I11-1-NB, "ASME Boiler and Pressure Vessel Code - Section III Rules for Construction of Nuclear Power Plant Components," ASME, 1983.
: 3)     ANSUASME OM-1-1981, "Requirements for Inservice Performance Testing of Nuclear Power Plant Pressure Relief Devices," ASME, 1981.
: 4)     "Donald C. Cook Units       1 & 2 Updated Final Safety Analysis Report (UFSAR), dated through July 1991.
: 5)     ASME Steam Tables, Fifth Edition, 1983.
6)'urnett,         T.W.T., et al., "LOFTRAN Code Description," WCAP-7907-P-A,           June 1972.
: 7)     Chelemer, H. et al ~,"Improved Thermal Design Procedure," WCAP-8567-P-A, February 1989.
: 8)     Butler, J.C. and D.S. Love,"Steamline Break Mass/Energy Releases for Equipment Environmental Qualification Outside Containment," WCAP-10961-P, October 1985.
: 9)     90AE*-G4126 W/AEP2-0098 Transmittal regarding "Locked Rotor Dose Analysis for Donald C. Cook Unit 2 Cycles 8 & 9," 7/19/90.
: 10)     Letter regarding AFW flow rates from R. B. Bennett of American Electric Power to J. N.
Steinmetz of Westinghouse Electric, 9/24/91.
: 11)     WCAP-10054-P-A (Proprietary), WCAP-10081 (Non-Proprietary), Lee, H., et al.,
Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code, August 1985.
: 12)     WCAP-12135, Donald C. Cook Nuclear Plant Units           1 and 2 Rerating Engineering Report, Vol. 1, September 1989.
91429R2.wpf                                         32
 
SECL-91<29, Revision 2 TABLE 3 UNIT I TURBINE TRIP SEQUENCE Accident                                               Time sec Without pressurizer control   Turbine trip, loss of main             0.0 (minimum reactivity feedback) feedwater flow High pressurizer pressure               77 reactor trip setpoint reached Rods begin to drop                     9.7 Peak pressurizer pressure               10.5 occurs Minimum DNBR occurs Without pressurizer control    Turbine trip, loss of main             0.0 (maximum reactivity feedback) feedwater flow High pressurizer pressure               7.9 reactor trip setpoint reached Rods begin to drop                     9.9 Peak pressurizer pressure               10.5 occurs Minimum DNBR occurs With pressurizer control      Turbine trip, loss of main             0.0 (maximum reactivity feedback) feedwater flow feedback)'vent Peak pressurizer pressure               10.0 occurs Low-low steam generator                 47.1 water level reactor trip setpoint reached Rods begin to drop                     49.1 Minimum DNBR occurs With pressurizer control      Turbine trip, loss of main               0.0 (minimum reactivity          feedwater flow High-pressurizer pressure               12.4 reactor trip setpoint reached 91429Rz.wp f                                   33
 
SECL-91<29, Revision 2 TABLE 3 (continued)
UNIT I TURBINE TRIP SEQUENCE Accident                           Event         T~ime sec Rods begin to drop             14.4 Peak pressurizer pressure       16.0 occurs Minimum DNBR occurs             15.5
* DNBR does not decrease below its initial value.
91429R2.wpf                                       34
 
SECL-91<29, Revision 2 TABLE 4 UNIT 2 TURBINE TRIP SEQUENCE OF EVENTS T~ime eee Accident                           Event Inixed          full core          core Without pressurizer control   Turbine trip, loss of main     0.0            0.0 (minimum reactivity feedback)  feedwater flow High pressurizer pressure       5.5            7.5 reactor trip setpoint reached Rods begin to drop             7.5            9.5 Peak pressurizer pressure       9.5          11.0 occurs Minimum DNBR occurs Without pressurizer control    Turbine trip, loss of main     0.0            0.0 (maximum reactivity feedback)  feedwater flow High pressurizer pressure       5.5            7.6 reactor trip setpoint reached Rods begin to drop             7.5           9.6 Peak pressurizer pressure      9.0           10.0 occurs Minimum DNBR occurs
*DNBR does not decrease below its initial value.
91429R2.wp f                                     35


SECL-91<29, Revision 2 TABLE 4 (continued)
SECL-91<29, Revision 2 TABLE 4 (continued)
UNIT 2 TURBINE TRIP SEQUENCE OF EVENTS Accident With pressurizer control (maximum reactivity feedback)With pressurizer control (minimum reactivity feedback)Event Turbine trip, loss of main feedwater flow Peak pressurizer pressure occurs Low-low steam generator water level reactor trip setpoint reached Rods begin to drop Minimum DNBR occurs Turbine trip, loss of main feedwater flow High pressurizer pressure reactor trip setpoint reached Rods begin to drop Peak pressurizer pressure occurs Minimum DNBR occurs core 0.0 7.0 60.1 62.1 0.0 10.6 12.6 13.5 14.5 Time ec full core 0.0 7.5 52.8 54.8 0.0 11.2 13.2 14.5 15.0*DNBR does not decrease below its initial value.91429R2.wp f 36 SECI 91-429, Revision 2 TABLE 5 CURREN'I'ICENSING BASIS STEAM LINE SAFETY VALVES PER LOOP Safety Valve 1A 1B 2A 2B Setpoint 1065 1065 1075 1075 1085 Percent Accumulation 10.0 10.0 8.98 8.98, 7.97 Accumulation 1171.5 1171.5 1171.5 1171.5 1171.5 FlowrateAcc.857690 857690 857690 857690 857690 The rated valve capacity at full accumulation pressure was calculated as follows: 51.5 x A x K x P=Actual Flowrate where: A=Valve orifice area=16 in'=Coefficient of discharge=0.975 P=Pressure (psia)at accumulation pressure The above actual fiowrate is reduced by 0.9 to get the valve rated capacity.91429R2.wpf 37 SECI 91<29, Revision 2 TABLE 6 MSSV SETPOINT INCREASE STEAM LINE SAFEIV VALVES PER LOOP Safety Valve 1A 1B 2A 2B Setpoint Pressure 1096.95 1096.95 1107.25 1107.25 1117.55 Percent ccumulation 3.0 3.0 3.0 3.0 3.0 Accumulation 1129.86 1129.86 1140.47 1140.47 1151.08 FlowrateAcc 827585.6 827585.6 835257.2 835257.2 842928.9 The rated valve capacity at full accumulation pressure was calculated as follows: 51.5 x A x K x P'=Actual Flowrate where: A=Valve orifice area=16 in K=Coefficient of discharge=0.975 P=Pressure (psia)at accumulation pressure The above actual flowrate is reduced by 0.9 to get the valve rated capacity.91429R2.wpf 38 SECL-91-429, Revision?PRESSURE, LOW TEMPERATURE Current Licensing Basis 3588'.32+30 1.55 1.433 15 946 1350 600 354000 509.89 581.71 2100 564.36 15 120 120 275 1860 1715 27 10 10 Closed 2.0 4,4 0.0 8.0 60'able 5 License Core Power'MWt)
UNIT 2 TURBINE TRIP SEQUENCE OF EVENTS Time ec Accident                         Event full core          core With pressurizer control       Turbine trip, loss of main         0.0          0.0 (maximum reactivity feedback)  feedwater flow Peak pressurizer pressure         7.0          7.5 occurs Low-low steam generator           60.1          52.8 water level reactor trip setpoint reached Rods begin to drop               62.1          54.8 Minimum DNBR occurs With pressurizer control        Turbine trip, loss of main         0.0          0.0 (minimum reactivity feedback)  feedwater flow High pressurizer pressure         10.6          11.2 reactor trip setpoint reached Rods begin to drop                 12.6          13.2 Peak pressurizer pressure         13.5         14.5 occurs Minimum DNBR occurs                14.5         15.0
Total Peaking Factor, F<Axial Offset (%)Hot Channel Enthalpy Rise Factor, FMaximum Assembly Average Power, P~Fuel Assembly Array Accumulator Water Volume (ft')Accumulator Tank Volume (ft')Minimum Accumulator Gas Pressure, (psia)Loop Flow (gpm)Vessel Inlet Temperature (F)'essel Outlet Temperature (F)'CS Pressure (psia)Steam Pressure (psia)'team Generator Tube Plugging Level (%)Maximum Refueling Water Storage Tank Temperature (F)Maximum Condensate Storage Tank Temperature (F)Fuel Backfill Pressure (psig)Reactor Trip Setpoint (psia)Safety Injection Signal Setpoint (psia)Safety Injection Delay Time (sec)Safety Injection Pump Degradation
*DNBR does not decrease below its initial value.
(%)Charging Pump Flow Imbalance (gpin)HHSI Cross Tie Valve Position Signal Processing Delay and Rod Drop Time (sec)Reactor Coolant Pump Delay Time (sec)Main Feedwater Isolation Delay Time (sec)Main Feedwater Valve Closure Time (sec)Auxiliary Feedwater Enthalpy Delay Time (sec)Main Steam Safety Valve Setpoint (psia)MSSV Setpoint Increase 3250 2.32+30 1.55 1.433'15 OFA 946 1350 600 354000 513.23 578.57 2100 596.48 15 120 120 275 1860 1715 27 10 25 Closed 4,4 4,4 0.0 8.0 272 Table 6 Two percent is added to this power to account for calorimetric error.A safety evaluation for 25 gpm charging flow imbalance limits operation with HHSI cross tie valve closed to 3250 MWt.Value is based on 102%core power, main coolant pump heat neglected, and best estimate Tavg.A safety evaluation was performed to account for a auxiliary feedwater enthalpy delay of 272 seconds.9l429R2.wpf 39 SECI 91-429, Revision 2 TABLE 7a Initial Input Parameters for the Small Break LOCA Analysis License Core Power'MWt)
91429R2.wp f                                     36
Total Peaking Factor, F<.AxM Offset (%)Hot Channel Enthalpy Rise Factor, P~Maximum Assembly Average Power, P~Fuel Assembly Array Accumulator Water Volume (ft')Accumulator Tank Volume (ft)Mirumum Accumulator Gas Pressure, (psia)Loop Flow (gpm)Vessel Inlet Temperature
 
('F)'essel Outlet Temperature
SECI 91-429, Revision 2 TABLE 5 CURREN'I'ICENSING BASIS STEAM LINE SAFETY VALVES PER LOOP Safety             Setpoint          Percent          Accumulation        Flowrate    Acc .
('F)'CS Pressure (psia)Steam Pressure (psia)'team Generator Tube Plugging Level (%)Maximum Refueling Water Storage Tank Temperature Maximum Condensate Storage Tank Temperature
Valve                             Accumulation 1A                 1065               10.0             1171.5                857690 1B                  1065                10.0             1171.5                857690 2A                  1075                8.98             1171.5                 857690 2B                  1075                8.98,            1171.5                 857690 1085              7.97              1171.5                 857690 The rated valve capacity at full accumulation pressure was calculated as follows:
('F)Fuel Backfill Pressure (psig)Reactor Trip Setpoint (psia)Safety Injection Signal Setpoint (psia)Safety Injection Delay Time (sec)Safety Injection Pump Degradation
51.5 x A x K x P   = Actual Flowrate where:
(%)Charging Pump Flow Imbalance (gpm)HHSI Cross Tie Valve Position Signal Processing Delay and Rod Drop Time (sec)Reactor Coolant Pump Delay Time (sec)Main Feedwater Isolation Delay Time (sec)Main Feedwater Valve Closure Time (sec)Auxiliary Feedwater Total Delivery (gpm)Auxiliary Feedwater Delivery Delay Time (sec)Main Steam Safety Valve Setpoint (psia)Accumulator Temperature
A = Valve orifice area = 16 in'
('F)('F)Current Licensing~Bas'588'.32
                  = Coefficient of discharge = 0.975 P = Pressure (psia) at accumulation pressure The above actual fiowrate is reduced by 0.9 to get the valve rated capacity.
+30 1.55 1.433 15 X 15 0 946 1350 600 354000 509.89 581.71 2100 564.36 15 120 120 275 1860 1715 27 10 10 Closed 2.0 4.4 0.0 8.0 1258 60'able 1 120 MSSV Setpoint Increase 3250 2'.32+30 1.55 1.433 FA 946 1350 600 354000 513.20 578.44 2033 596.11 15 120 120 275 1860 1715 27 10 25 Closed 4.4 4.4 0.0 8.0 750 60'able 2 130 Two percent is added to this power to account for calorimetric error.A safety evaluation for 25 gpm charging fiow imbalance limits operation with HHSI cross tie valve closed to 3250 MWt.Value is based on 102%core power, main coolant pump heat neglected, and best estimate TAvo..A safety evaluation was performed to account for an auxiliary feedwater enthalpy delay of 272 seconds.Enthalpy delay computed internally based on AFW flow rate and 75 ft'urge volume.40
91429R2.wpf                                         37
 
SECI 91<29, Revision 2 TABLE 6 MSSV SETPOINT INCREASE STEAM LINE SAFEIV VALVES PER LOOP Safety       Setpoint Pressure        Percent          Accumulation        Flowrate    Acc Valve                                 ccumulation 1A               1096.95               3.0              1129.86              827585.6 1B                1096.95                3.0             1129.86              827585.6 2A                1107.25                3.0             1140.47               835257.2 2B                1107.25                3.0              1140.47              835257.2 1117.55                3.0              1151.08              842928.9 The rated valve capacity at full accumulation pressure was calculated as follows:
51.5 x A x K x P'= Actual Flowrate where:
A = Valve orifice area = 16 in K = Coefficient of discharge = 0.975 P = Pressure (psia) at accumulation pressure The above actual flowrate is reduced by 0.9 to get the valve rated capacity.
91429R2.wpf                                         38
 
SECL-91-429, Revision?
PRESSURE, LOW TEMPERATURE Current             MSSV Licensing           Setpoint Basis           Increase License Core Power'MWt)                                                     3588'.32 3250 Total Peaking Factor, F<                                                                       2.32 Axial Offset (%)                                                             +30                +30 Hot Channel Enthalpy Rise Factor, F                                        1.55              1.55 Maximum Assembly Average Power, P~                                         1.433              1.433 Fuel Assembly Array                                                                   15 15 OFA Accumulator Water Volume (ft')                                               946              946 Accumulator Tank Volume (ft')                                               1350              1350 Minimum Accumulator Gas Pressure, (psia)                                     600              600 Loop Flow (gpm)                                                           354000              354000 Vessel Inlet Temperature (F)                                               509.89            513.23 Outlet Temperature          'essel 581.71            578.57 (F)'CS Pressure (psia)                                                       2100              2100 Steam Pressure                                                             564.36            596.48 (psia)'team Generator Tube Plugging Level (%)                                       15                15 Maximum Refueling Water Storage Tank Temperature (F)                           120              120 Maximum Condensate Storage Tank Temperature (F)                               120                120 Fuel Backfill Pressure (psig)                                                 275              275 Reactor Trip Setpoint (psia)                                                 1860              1860 Safety Injection Signal Setpoint (psia)                                     1715              1715 Safety Injection Delay Time (sec)                                             27                27 Safety Injection Pump Degradation (%)                                           10                10 Charging Pump Flow Imbalance (gpin)                                           10              25 HHSI Cross Tie Valve Position                                               Closed            Closed Signal Processing Delay and Rod Drop Time (sec)                               2.0              4,4 Reactor Coolant Pump Delay Time (sec)                                         4,4              4,4 Main Feedwater Isolation Delay Time (sec)                                     0.0              0.0 Main Feedwater Valve Closure Time (sec)                                       8.0              8.0 Auxiliary Feedwater Enthalpy Delay Time (sec)                                                   272 60'able Main Steam Safety Valve Setpoint (psia)                                               5      Table 6 Two percent is added to this power to account for calorimetric error.
A safety evaluation for 25 gpm charging flow imbalance limits operation with HHSI cross tie valve closed to 3250 MWt.
Value is based on 102% core power, main coolant pump heat neglected, and best estimate Tavg.
A safety evaluation was performed to account for a auxiliary feedwater enthalpy delay of 272 seconds.
9l429R2.wpf                                           39


SECI 91-429, Revision 2 TABLE 8 LOW PRESSURE, HIGH TEMPERATURE License Core Power'MWt)
SECI 91-429, Revision 2 TABLE 7a Initial Input Parameters for the Small Break LOCA Analysis Current            MSSV Licensing          Setpoint Increase License Core Power'MWt)                                         ~Bas'588'.32 3250 Total Peaking Factor, F<.                                                            2'.32 AxM Offset (%)                                                   +30                +30 Hot Channel Enthalpy Rise Factor, P~                              1.55                1.55 Maximum Assembly Average Power, P~                                1.433              1.433 Fuel Assembly Array                                               15      X 15 0 FA Accumulator Water Volume (ft')                                   946                946 Accumulator Tank Volume (ft )                                     1350                1350 Mirumum Accumulator Gas Pressure, (psia)                         600                600 Loop Flow (gpm)                                                   354000              354000 Vessel Inlet Temperature                                         509.89              513.20 581.71              578.44
Total Peaking Factor, F<Axial Offset (%)Hot Channel Enthalpy Rise Factor, FMaximum Assembly Average Power, PuFuel Assembly Array Accumulator Water Volume (ft')Accumulator Tank Volume (ft')Minimum Accumulator Gas Pressure, (psia)Loop Flow (gpm)Vessel Inlet Temperature (F)'essel Outlet Temperature (F)'CS Pressure (psia)Steam Pressure (psia)'team Generator Tube Plugging Level (%)Maximum Refueling Water Storage Tank Temperature (F)Maximum Condensate Storage Tank Temperature (F)Fuel Backfill Pressure (psig)Reactor Trip Setpoint (psia)Safety Injection Signal Setpoint ('psia)Safety Injection Delay Time (sec)Safety Injection Pump Degradation
('F)'essel Outlet Temperature               ('F)'CS Pressure (psia)                                             2100                2033 Steam Pressure                                                   564.36              596.11 (psia)'team Generator Tube Plugging Level (%)                         15                  15 Maximum Refueling Water Storage Tank Temperature         ('F)   120                120 Maximum Condensate Storage Tank Temperature ('F)                 120                120 Fuel Backfill Pressure (psig)                                     275                275 Reactor Trip Setpoint (psia)                                     1860                1860 Safety Injection Signal Setpoint (psia)                           1715                1715 Safety Injection Delay Time (sec)                                 27                  27 Safety Injection Pump Degradation (%)                             10                  10 Charging Pump Flow Imbalance (gpm)                               10                  25 HHSI Cross Tie Valve Position                                     Closed              Closed Signal Processing Delay and Rod Drop Time (sec)                   2.0                4.4 Reactor Coolant Pump Delay Time (sec)                             4.4                4.4 Main Feedwater Isolation Delay Time (sec)                         0.0                0.0 Main Feedwater Valve Closure Time (sec)                           8.0                8.0 Auxiliary Feedwater Total Delivery (gpm)                          1258                750 Auxiliary Feedwater Delivery Delay Time (sec)                     60'able            60'able Main Steam Safety Valve Setpoint (psia)                                       1              2 Accumulator Temperature ('F)                                      120                130 Two percent is added to this power to account for calorimetric error.
(%)Charging Pump Flow Imbalance (gpm)HHSI Cross Tie Valve Position Signal Processing Delay and Rod Drop Time (sec)Reactor Coolant Pump Delay Time (sec)Main Feedwater Isolation Delay Time (sec)Main Feedwater Valve Closure Time (sec)Auxiliary Feedwater Enthalpy Delay Time (sec)Main Steam Safety Valve Setpoint (psia)Current Licensing Basis NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA NA MSSV Setp oint Increase 3250 232+30 1.55'.433 15X15 OFA 946 1350 600 354000 543.63 606.79 2100 793.90 15 120 120 275 1860 1715 27 10 25 Closed 4.4 4.4 0.0 8.0 272 Table 6 1 Two percent is added to this power to account for calorimetric error.2 A safety evaluation for the low pressure, high temperature operating condition was performed in the licensing basis analysis.3 Value is based.on 102%core power, main coolant pump heat neglected, and best estimate Tavg.91429R2.wpf 41 SECL-91<29, Revision 2 TABLE 9 LOW PRESSURE, HIGH TEMPERATURE Current Licensing Basis 3413 2.34+30 Factor, F1.644 e Power, Pn1.519 17 946 1350 600 354000 544.41 610.19 2100 807.03 15 120 120 275 1860 1715 27 10 25 Closed 4.7 4.4 0.0 8.0 349 Table 5 License Core Power'MWt)
A safety evaluation for 25 gpm charging fiow imbalance limits operation with HHSI cross tie valve closed to 3250 MWt.
Total Peaking Factor, Fz Axial Offset (%)Hot Channel Enthalpy Rise Maximum Assembly Averag Fuel Assembly Array Accumulator Water Volume (fP)Accumulator Tank Volume (ft')Minimum Accumulator Gas Pressure, (psia)Loop Flow (gpm)Vessel Inlet Temperature (F)~Vessel Outlet Temperature (F)'CS Pressure Including Uncertainties (psia)Steam Pressure (psia)'team Generator Tube Plugging Level (%)Maximum Refueling Water Storage Tank Temperature (F)Maximum Condensate Storage Tank Temperature (F)Fuel Backfill Pressure (psig)Reactor Trip Setpoint (psia)Safety Injection Signal Setpoint (psia)Safety Injection Delay Time (sec)Safety Injection Pump Degradation
Value is based on 102% core power, main coolant pump heat neglected, and best estimate TAvo.
(%)Charging Pump Flow Imbalance (gpm)HHSI Cross Tie Valve Position Signal Processing Delay and Rod Drop Time (sec)Reactor Coolant Pump Delay Time (sec)Main Feedwater Isolation Delay Time (sec)Main Feedwater Valve Closure Time (sec)Auxiliary Feedwater Enthalpy Delay Time (sec)Main Steam Safety Valve Setpoint (psia)MSSV Setp oint Increase 3250 2.357+13 1.666 1.46'17V5 946 1350 600 354000 544.41 610.19 2100 807.03 15 120 120 275 1860 1715 27 10 25 Closed 4.7 44 2.0 6.0 349 Table 6 1 Two percent is added to this power to account for calorimetric error.2 Value is based on 102%core power, main coolant pump heat neglected, and best estimate Tavg.91<29R2.wpf SECI 91<29, Revision 2 TABLE 10 TIME SEQUENCE OF EVENTS Event LPLT LPLT LPHT LPHT w/MSSV w/o MSSV w/MSSV w/o MSSV Break Occurs Reactor trip signal Safety injection signal Start of safety injection signal Loop seal venting Loop seal core uncovery Loop seal core recovery Boil-off core uncovery Accumulator injection begins Peak clad temperature occurs Top of core covered SI flow rate exceeds break flow rate 0 11.23 19.28 46.28 643.4 NA NA 1139.2 1730.0 1935.5 NA 1988 0 0 0 11.23 13.54 13.54 19.28 22.42 22.42 46.28 49.42 49.42 644.7 601.8 608.3 NA NA NA NA NA NA 1077.3 1073.4 1057.8 1751.0 1647.8 1695.8 1831.4 1872.3 1824.7 NA NA NA 2024 2293 2284 LPLT is low pressure, low temperature operating condition.
      . A safety evaluation was performed to account for an auxiliary feedwater enthalpy delay of 272 seconds.
Enthalpy delay computed internally based on AFW flow rate and 75 ft'urge volume.
40
 
SECI 91-429, Revision 2 TABLE 8 LOW PRESSURE, HIGH TEMPERATURE Current         MSSV Licensing       Setp oint Basis        Increase License Core Power'MWt)                                                      NA            3250 Total Peaking Factor, F<                                                      NA            232 Axial Offset (%)                                                              NA            +30 Hot Channel Enthalpy Rise Factor, F                                          NA 1.55'.433 Maximum Assembly Average Power, Pu                                          NA Fuel Assembly Array                                                          NA        15X15 OFA Accumulator Water Volume (ft')                                                NA            946 Accumulator Tank Volume (ft')                                                NA            1350 Minimum Accumulator Gas Pressure, (psia)                                      NA            600 Loop Flow (gpm)                                                              NA          354000 Vessel Inlet Temperature (F)                                                  NA          543.63 Outlet Temperature  (F)'CS
                                    'essel NA          606.79 Pressure (psia)                                                        NA            2100 Steam Pressure (psia)'team NA          793.90 Generator Tube Plugging Level (%)                                      NA              15 Maximum Refueling Water Storage Tank Temperature (F)                          NA              120 Maximum Condensate Storage Tank Temperature (F)                              NA              120 Fuel Backfill Pressure (psig)                                                NA            275 Reactor Trip Setpoint (psia)                                                  NA            1860 Safety Injection Signal Setpoint ('psia)                                      NA            1715 Safety Injection Delay Time (sec)                                            NA              27 Safety Injection Pump Degradation (%)                                        NA              10 Charging Pump Flow Imbalance (gpm)                                            NA              25 HHSI Cross Tie Valve Position                                                NA          Closed Signal Processing Delay and Rod Drop Time (sec)                              NA              4.4 Reactor Coolant Pump Delay Time (sec)                                        NA              4.4 Main Feedwater Isolation Delay Time (sec)                                    NA              0.0 Main Feedwater Valve Closure Time (sec)                                      NA              8.0 Auxiliary Feedwater Enthalpy Delay Time (sec)                                NA              272 Main Steam Safety Valve Setpoint (psia)                                      NA          Table 6 1   Two percent is added to this power to account for calorimetric error.
2   A safety evaluation for the low pressure, high temperature operating condition was performed in the licensing basis analysis.
3   Value is based. on 102% core power, main coolant pump heat neglected, and best estimate Tavg.
91429R2.wpf                                       41
 
SECL-91<29, Revision 2 TABLE 9 LOW PRESSURE, HIGH TEMPERATURE Current       MSSV Licensing     Setp oint Basis       Increase License Core Power'MWt)                                                     3413        3250 Total Peaking Factor, Fz                                                     2.34        2.357 Axial Offset (%)                                                             +30          +13 Hot Channel Enthalpy Rise Factor, F                                        1.644        1.666 Maximum Assembly Averag e Power, Pn                                        1.519          1.46 Fuel Assembly Array                                                               17 17V5 Accumulator Water Volume (fP)                                                 946          946 Accumulator Tank Volume (ft')                                               1350          1350 Minimum Accumulator Gas Pressure, (psia)                                     600          600 Loop Flow (gpm)                                                           354000        354000 Vessel Inlet Temperature (F) ~                                             544.41      544.41 Vessel Outlet Temperature                                                   610.19      610.19 (F)'CS Pressure Including Uncertainties (psia)                               2100          2100 Steam Pressure (psia)                                                       807.03        807.03 Generator Tube Plugging Level (%)
                      'team 15            15 Maximum Refueling Water Storage Tank Temperature (F)                           120          120 Maximum Condensate Storage Tank Temperature (F)                               120          120 Fuel Backfill Pressure (psig)                                                 275          275 Reactor Trip Setpoint (psia)                                                 1860          1860 Safety Injection Signal Setpoint (psia)                                       1715          1715 Safety Injection Delay Time (sec)                                             27            27 Safety Injection Pump Degradation (%)                                           10            10 Charging Pump Flow Imbalance (gpm)                                             25            25 HHSI Cross Tie Valve Position                                               Closed        Closed Signal Processing Delay and Rod Drop Time (sec)                               4.7          4.7 Reactor Coolant Pump Delay Time (sec)                                         4.4          44 Main Feedwater Isolation Delay Time (sec)                                     0.0          2.0 Main Feedwater Valve Closure Time (sec)                                       8.0          6.0 Auxiliary Feedwater Enthalpy Delay Time (sec)                                 349          349 Main Steam Safety Valve Setpoint (psia)                                     Table 5      Table 6 1   Two percent is added to this power to account for calorimetric error.
2   Value is based on 102% core power, main coolant pump heat neglected, and best estimate Tavg.
91<29R2.wpf
 
SECI 91<29, Revision 2 TABLE 10 TIME SEQUENCE OF EVENTS LPLT       LPLT       LPHT       LPHT Event                w/ MSSV w/o MSSV w/ MSSV w/o MSSV Break Occurs                                   0            0          0          0 Reactor trip signal                           11.23       11.23     13.54     13.54 Safety injection signal                      19.28       19.28      22.42     22.42 Start of safety injection signal              46.28       46.28      49.42     49.42 Loop seal venting                            643.4      644.7       601.8     608.3 Loop seal core uncovery                        NA           NA         NA         NA Loop seal core recovery                        NA           NA         NA        NA Boil-offcore uncovery                        1139.2    1077.3     1073.4     1057.8 Accumulator injection begins                  1730.0    1751.0     1647.8     1695.8 Peak clad temperature occurs                  1935.5    1831.4     1872.3     1824.7 Top of core covered                            NA           NA         NA         NA SI flow rate exceeds break flow rate          1988        2024       2293       2284 LPLT is low pressure, low temperature operating condition.
LPHT is low pressure, high temperature operating condition.
LPHT is low pressure, high temperature operating condition.
W/MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.W/0 MSSV is licensing basis main steam safety valve setpoint tolerance case at 3250 MWt core power.91429R2.wpf 43 TABLE 10a TIME SEQUENCE OF EVFATS SECL-91-429, Revision 2 Event LPLT w/MSSV 2 inch Break Time (seconds)LPLT w/MSSV 3 inch Break Break Occurs Reactor trip signal Safety injection signal Start of safety injection Start of auxiliary feedwater delivery Loop seal venting Loop seal core uncovery Loop seal core recovery Boil-off core uncovery Accumulator injection begins Peak clad temperature occurs'op of core covered SI flow rate exceeds break flow rate 0.0 8.64 17.13 44.13 68.6 592 N/A N/A 984 1680 1890 N/A 1890 0.0 19.03 37.11 64.11 79.1 1390 N/A N/A 2312 N/A 4042 N/A 4091 LPLT is low pressure, low temperature operating condition.
W/ MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.
W/MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.
W/0 MSSV is licensing basis main steam safety valve setpoint tolerance case at 3250 MWt core power.
SECL-91-429, Revision 2 TABLE 11 SUMMITRY OF RFSULTS NOTRUMP Peak Clad Temperature
91429R2.wpf                                     43
('F)Peak Clad Temperature Location (ft)Peak Clad Temperature Time (sec)Local Zr/H,O Reaction Maximum (%)Local Zr/H,O Reaction Location (ft)Total Zr/H,O Reaction (%)Rod Burst Burst and Blockage Penalty ('F)Total Peak Clad Temperature
 
('F)LPLT w/MSSV 1853.7 11.75 1935.5 3.47 11.75<1.0 None 25 1878.7 LPLT w/o MSSV 1772.9 11.75 1831.4 2.47 11.75<1.0 None 15 1787.9 LPHT LPHT w/MSSV w/o MSSV 1837.7 1710.3 11.75 11.75 1872.3 1824.7 3.13 1.82 11.75 11.75<1.0<1.0 None None 16 15 1853.7 1725.3 LPLT is low pressure, low temperature operating condition.
SECL-91-429, Revision 2 TABLE 10a TIME SEQUENCE OF EVFATS Time (seconds)
LPLT                      LPLT w/MSSV               w/MSSV Event                                                  3 inch Break        2 inch Break Break Occurs                                           0.0                  0.0 Reactor trip signal                                     8.64                  19.03 Safety injection signal                                 17.13                37.11 Start of safety injection                               44.13                64.11 Start of auxiliary feedwater delivery                   68.6                  79.1 Loop seal venting                                       592                  1390 Loop seal core uncovery                                 N/A                  N/A Loop seal core recovery                                 N/A                  N/A Boil-offcore uncovery                                   984                  2312 Accumulator injection begins                           1680                  N/A Peak clad temperature   occurs'op 1890                  4042 of core covered                                   N/A                  N/A SI flow rate exceeds break flow rate                   1890                 4091 LPLT is low pressure, low temperature operating condition.
W/ MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.
 
SECL-91-429, Revision 2 TABLE 11 SUMMITRY OF RFSULTS LPLT      LPLT        LPHT        LPHT w/ MSSV w/o MSSV w/ MSSV w/o MSSV NOTRUMP Peak Clad Temperature ('F)           1853.7    1772.9      1837.7      1710.3 Peak Clad Temperature Location (ft)           11.75      11.75      11.75      11.75 Peak Clad Temperature Time (sec)             1935.5    1831.4      1872.3      1824.7 Local Zr/H,O Reaction Maximum (%)             3.47        2.47        3.13        1.82 Local Zr/H,O Reaction Location (ft)           11.75      11.75      11.75      11.75 Total Zr/H,O Reaction (%)                     < 1.0      < 1.0      <1.0      <1.0 Rod Burst                                     None        None      None        None Burst and Blockage Penalty ('F)                 25          15          16          15 Total Peak Clad Temperature ('F)             1878.7     1787.9       1853.7     1725.3 LPLT is low pressure, low temperature operating condition.
LPHT is low pressure, high temperature operating condition.
LPHT is low pressure, high temperature operating condition.
W/MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.W/0 MSSV is licensing basis main steam safety valve setpoint tolerance case at 3250 MWt core power.91429R2.wpf 45  
W/ MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.
W/0 MSSV is licensing basis main steam safety valve setpoint tolerance case at 3250 MWt core power.
91429R2.wpf                                     45


TABLE 11a  
SECL-91-429, Revision 2 TABLE 11a


==SUMMARY==
==SUMMARY==
OF RESULTS SECL-91-429, Revision 2 LPLT w/MSSV 3 inch Break LPLT w/MSSV 2 inch Break NOTRUMP Peak Clad Temperature
OF RESULTS LPLT                     LPLT w/MSSV              w/MSSV 3 inch Break         2 inch Break NOTRUMP Peak Clad Temperature ('F)                     1951                1833 Peak Clad Temperature Location (ft)                     12.0                12.0 Peak Clad Temperature Time (sec)                       1890                4042 Local Zr/H,O Reaction Maximum   (I)                   5.06                3.75 Local Zr/H~O Reaction Location (ft)                     12.0                12.0 Total Zr/H,O Reaction (%)                               0.568                0.397 Rod Burst                                               None                None Burst and Blockage Penalty ('F)                         117                  15 Total Peak Clad Temperature ('F)                       2068                 1848 LPLT is low pressure, low temperature operating condition.
('F)Peak Clad Temperature Location (ft)Peak Clad Temperature Time (sec)Local Zr/H,O Reaction Maximum (I)Local Zr/H~O Reaction Location (ft)Total Zr/H,O Reaction (%)Rod Burst Burst and Blockage Penalty ('F)Total Peak Clad Temperature
W/ MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.
('F)1951 12.0 1890 5.06 12.0 0.568 None 117 2068 1833 12.0 4042 3.75 12.0 0.397 None 15 1848 LPLT is low pressure, low temperature operating condition.
46
W/MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.46 SECI 91<29, Revision 2 TABLE 12 TIIKE SEQUENCE OF EVI<22lTS Event Break Occurs Reactor trip signal Safety injection signal Start of safety injection signal Loop seal venting Loop seal core uncovery Loop seal core recovery Boil-off core uncovery Accumulator injection begins Peak clad temperature occurs Top of core covered SI flow rate exceeds break flow rate LPHT w/MSSV 0 11.01 20.92 47.92 620.0 NA NA 620.0 1604.3 1691.0 NA 1683.0 Time LPHT~w/0 MS V 0 11.01 20.92 47.92 627.2 NA NA 627.2 1631.7 1720.6 NA 1984.0 LPHT is low pressure, high temperature operating condition.
 
W/MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.W/0 MSSV is licensing basis main steam safety valve setpoint tolerance case at 3413 MWt core power.91429R2.wp f 47 SECI 91429, Revision 2 TABLE 13 SUlVPdARY OF RESULTS NOTRUMP Peak Clad Temperature
SECI 91<29, Revision 2 TABLE 12 TIIKE SEQUENCE OF       EVI<22lTS Time Event                               LPHT                  LPHT w/ MSSV              ~w/0 MS V Break Occurs                                                 0                      0 Reactor trip signal                                         11.01                  11.01 Safety injection signal                                     20.92                  20.92 Start of safety injection signal                           47.92                  47.92 Loop seal venting                                           620.0                  627.2 Loop seal core uncovery                                     NA                      NA Loop seal core recovery                                     NA                      NA Boil-offcore uncovery                                       620.0                  627.2 Accumulator injection begins                               1604.3                1631.7 Peak clad temperature occurs                               1691.0                1720.6 Top of core covered                                         NA                      NA SI flow rate exceeds break flow rate                       1683.0                 1984.0 LPHT is low pressure, high temperature operating condition.
('F)Peak Clad Temperature Location (ft)Peak Clad Temperature Time (sec)Local Zr/H,O Reaction Maximum (%)Local Zr/H>0 Reaction Location (ft)Total Zr/H,O Reaction (%)Rod Burst Artificial Leak-By Penalty ('F)Burst and Blockage Penalty ('F)Total Peak Clad Temperature
W/ MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.
('F)LPHT w/MSSV 1955.9 11.75 1691.0 4.26 11.75<1.0 None 12 157 2124.9 LPHT w/o MSSV 1947.1 11.75 1720.6 4.83 11.75<1.0 None 12 143 2102.1 LPHT is low pressure, high temperature operating condition.
W/0 MSSV is licensing     basis main steam safety valve setpoint tolerance case at 3413 MWt core power.
W/MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.W/0 MSSV is licensing basis main steam safety valve setpoint tolerance case at 3413 MWt core power.91429R2.wpf 48 SECL-91<29, Revision 2FIGU1H~5 91429R2.wpf 49 W QQ RSIA 24OO PSIA 68 1840>SIA'000 i PsaA 2100 x PSIA 45~gglgQTOl~VA1.VES O'EN 578 575 598..595 5" 8'l5 688 685 613 615 628 625 638 avg (P: eaaaaa p+Core Ltmits Nominal Tave~578.7'F.'(ominal PI.assure~2100 ps.'a OONALO C.COOK UNIT 1 FIGURE la ILLUSTRATION OF OVERTEHPERATURE ANO.OVERPOWER OELTA T PROTECTION i'I 75 OPaT 65 1922 PSIA 2250 PSIA 4 0 2000 PSIA 2400 PSlA<5 STEAN GENERATOR SAPPY VALVES OPEN 568 56S 578 575 58B 585 5'%'tS 688 685 618 615 628 625 T eve leF')-----OTaT Protectfon Lfnes Cars Thsrtasl Ssfsty Ltsfts Nominal Vessel Average Teaperature 576'F Noafnal Pressurfzer Pressure 2250 psfa DONALD C COOK UNIT 2 (MIXED CORE)FIGURE 1b ILLUSTRATION OF OVERTEMPERATURE ANO OVERPOWER DELTA T PROTECTION 73~1922 PSIA OPaT 2400'.PSIA 53 2000 PSIA STGN GENERATOR SAFETY VALVES OPEN 2250 PSIA 575 S88 585 5 I8 S~S 688 685 618 6 I 5 628 625 ai3 nvg (~F'!-----OTaT Protect)on Lines Core Therssal Safety Lfeits Nominal Vessel Average Temperature 5S1.3'F Nominal Pressurizer Pressure 2100 psia.DONALD C.COOK UNIT 2 (FULL V5 CORE)FIGURE Ic ILLUSTRATION OF OVERTEHPERATURE AND OVERPOWER DELTA T PROTECTION
91429R2.wp f                                   47
'
 
h~v VV I:CC~4 h V A C v p l'v4 I I"lCC." 300.l 900.2300.lo.20.30.40.50.60.~C, 80.90.T MK (SEC~F800.>600 1~00'4 1200 Jl IQOO.0.10.20.30.40.50'0.70.80.90.>00.T ME (SEC)DONALD C.COOK UNIT I FIGURE 2 TURBINE TRIP EVENT'WITHOUT PRESSURE CONTROL, HINUHUH REACTIVITY FEEDBACK  
SECI 91429, Revision 2 TABLE 13 SUlVPdARY OF RESULTS LPHT                  LPHT w/ MSSV              w/o MSSV NOTRUMP Peak Clad Temperature ('F)                       1955.9                1947.1 Peak Clad Temperature Location (ft)                       11.75                11.75 Peak Clad Temperature Time (sec)                         1691.0                1720.6 Local Zr/H,O Reaction Maximum (%)                         4.26                  4.83 Local Zr/H>0 Reaction Location (ft)                       11.75                  11.75 Total Zr/H,O Reaction (%)                                 <1.0                  <1.0 Rod Burst                                                 None                  None ArtificialLeak-By Penalty ('F)                             12                    12 Burst and Blockage Penalty ('F)                           157                    143 Total Peak Clad Temperature ('F)                         2124.9               2102.1 LPHT is low pressure, high temperature operating condition.
W/ MSSV is main steam safety valve setpoint tolerance increase   case at 3250 MWt core power.
W/0 MSSV is licensing   basis main steam safety valve setpoint tolerance case at 3413 MWt core power.
91429R2.wpf                                 48
 
SECL-91<29, Revision 2 FIGU1H~5 91429R2.wpf   49
 
W QQ RSIA               24OO PSIA 68           1840
                >SIA
                                            '000 i PsaA 2100 x PSIA 45
              ~
              ~     gglgQTOl VA1.VES O'EN 578   575 598 .. 595   5" 8     'l5   688     685   613   615   628   625   638 avg   ( P:
eaaaaa   p+                       Nominal Tave ~ 578.7'F Core Ltmits              .'(ominal PI.assure ~ 2100 ps.'a OONALO C. COOK   UNIT 1 FIGURE la ILLUSTRATION OF OVERTEHPERATURE ANO. OVERPOWER OELTA T PROTECTION i
                                                                                          'I
 
75 OPaT 1922 2250 PSIA PSIA 65 04 2000 PSIA                                                 2400 PSlA
  <5               STEAN GENERATOR SAPPY VALVES OPEN 568   56S   578   575 58B   585   5'%'tS     688   685   618   615   628 625 T eve leF')
      -----OTaT Protectfon Lfnes Cars Thsrtasl Ssfsty Ltsfts Nominal Vessel Average Teaperature       576'F Noafnal Pressurfzer Pressure     2250 psfa DONALD C COOK UNIT 2 (MIXED CORE)
FIGURE 1b ILLUSTRATION OF OVERTEMPERATURE ANO OVERPOWER DELTA T PROTECTION
 
OPaT 1922 73~       PSIA 2400 '.
PSIA 2000 53 PSIA 2250 STGN GENERATOR                                           PSIA SAFETY VALVES OPEN 575   S88     585   5 I8   S~S 688     685     618   6 I5  628     625 ai3 nvg (~F'!
    -----OTaT Protect)on Lines Core Therssal Safety Lfeits Nominal Vessel Average Temperature 5S1.3'F Nominal Pressurizer Pressure     2100   psia.
DONALD C. COOK UNIT 2 (FULL V5 CORE)
FIGURE Ic ILLUSTRATION OF OVERTEHPERATURE AND OVERPOWER DELTA T PROTECTION
 
h
    ~ v VV I
:CC
      ~ 4h V v p l
      'v4 I
I "lCC C
  ." 300.
l 900.
lo. 20. 30. 40. 50. 60.     ~C,   80. 90.
T MK     (SEC~
2300.
F800.
    >600 1~00
'4 1200 Jl IQOO.
: 0. 10. 20. 30. 40.
T  ME 50 '0.
(SEC)
: 70. 80. 90.   >00.
DONALD C. COOK   UNIT I FIGURE 2 TURBINE TRIP EVENT 'WITHOUT PRESSURE CONTROL, HINUHUH REACTIVITY FEEDBACK
 
~~
~~
r D~z~~i Z I I I I I 4 i 10 20 ic 40 53 60 70 80:C T~E (SEC)4 5 5 1.5 10 20 30 40 50 60 70 80 9C 1'K (SEC'ONALD C.COOK UNIT I FIGURE 3 TURBINE TRIP.EVENT WITHOUT PRESSURE CONTROL, HINUHUM REACTIVITY FEEDBACK 560 5~0 520 i 530 56C 5'0 520 500 0 10 20 3C<0 50 60 70 80 iClC T 0=(SEC)EGG'80 560 5<0 52G 500 2 560 560 i 5<0 520 500 0 10 20 30 40 50 60 70 SG 90 t"3 v=(SEC,'ONALD C.COOK UNIT I FIGURE 4 I TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, MINUMUM REACTIVITY FEEDBACK.
rD        ~
I~CC 1 1'JCO 9CC.;9CG.;700.50C.500 0.IO.20.30.40.50.60.70.90.90.lQQ.T uE (SEC)400 tQ 350 300 250 200 150 C', 100 50 0-50 10 20 30 40 50 50 70 dO 90'CO Ti&(SEC)DONALD C.COOK UNIT I FIGURE 5 I I TURSINE TRIP EVENT WITHOUT PRESSURE CONTROL, HININN REACTIVITY FEEDBACK 35 sp 25 20 15 OC tv ip 5 Ul 0-5-10 0 , 10 20 30 40 50 50 70 80 90 tCO TlhtK (SEC)OONALO C.COOK UNIT 1 FIGURE 6 TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, HININN REACTIVITY FEEDBACK  
z I
I I
I i
i I
4
~ ~
Z 10 20 ic 40 T ~E 53     60 (SEC) 70     80:C 4 5 5
1.5 10 20 30 40     50     60     70     80   9C 1'K (SEC'ONALD C. COOK UNIT I FIGURE 3 TURBINE TRIP. EVENT WITHOUT PRESSURE CONTROL, HINUHUM REACTIVITY FEEDBACK
 
560 5~0 520   i 530 56C 5'0 520 500 0 10 20 3C <0     50     60     70     80   iC    lC T 0=     (SEC)
EGG'80 560 5<0 52G 500 2
560 560   i 5<0 520 500                                       70          90    t"3 0 10 20 30 40     50     60             SG v=
(SEC,'ONALD C. COOK UNIT I FIGURE 4             I TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, MINUMUM REACTIVITY FEEDBACK .
 
I
      ~
CC 1
1
    'JCO 9CC.;
9CG.;
700.
50C.
500
: 0. IO. 20. 30. 40. 50. 60. 70. 90. 90.     lQQ.
T uE     (SEC) 400 tQ 350 300 250 200 150 C',
100 50 0
      -50 10   20 30 40       50     50     70     dO     90     'CO Ti &     (SEC)
DONALD C. COOK   UNIT   I FIGURE 5                 I I
TURSINE TRIP EVENT WITHOUT PRESSURE CONTROL, HININN REACTIVITY FEEDBACK
 
35 sp 25 20 15 OC tv   ip 5Ul 0
    -5
    -10 0 , 10 20 30 40     50     50     70     80     90     tCO TlhtK   (SEC)
OONALO C. COOK   UNIT 1 FIGURE 6 TURBINE TRIP EVENT WITHOUT PRESSURE   CONTROL, HININN REACTIVITY FEEDBACK
 
OC
    <OC a hAQ V
n 1  i~]
V C
  '30C t800.                io. 50.
Io. 20. 30.              60.    ~0.      50. 90.  <OC.
T:~E    (SEC)
  "300.
1900
  >500 ac cr i 400
  >200.
Jl
  >300.
: 0. 10. 20. JO. 40. 50. 60. 70. 60. 90. IOC.
ri~K    (sEc)
OONALD  C. COOK  UNIT I FI6URE TURBINE TRIP EVENT WITHOUT PRESSURE    CONTROL,
: NXINN REACTIVITY FEEOBACK
 
0.
10 20 30 +0      50    60      70      d0    90    lCQ T  vK    (SEC,'
2.5 1.5 1.
0 10 20 30 40      50    60      70      d0    90    tCQ TisK    (SEC)
DONALD C. CMK UNIT  I FIGURE 8 TURBINE TRIP EVENT WITHOUT PRESSURE  CONTROL, HAXII%N REACTIVITY FEEDBACK
 
66G 620  ~
    ~  V
  !30 560 dr.o 520 500 tO  20 SO  iO      50      do    Io    80      90 r vc      (sac)
  >oo 660 660 6<o 620 500 8
5do seo 5~0 520 500 to 20  30  40      50      do    70    80      90    too ritz      (sec)
ONALO C. COOK    UNIT I FISNE TURBINE TRIP EVENT ltITH0UT NESSVRE CONTROL,
                                        'NXINN REACTIVITY FEEDBACK
 
        ~
nC 2C
'A '.
300 A
300 I
'J) 3CC,;
700.
500.
500
: 0. 10. 20. 30. 40. 50.      60. 70. 80. 90. 100.
TlMK      (SEC) 400 350 300 250 200 150 100 50 0
          -50 0  tQ  2Q  30  40    50      50      70      d0      90      100 TIME      (SEC)
DNALD C. CXK UNIT      I FIGURE 10 TURBINE TRIP EVENT WITHOUT PRESSURE  CONTROL, NXINPl REACTIVITY FEEDBACK
 
25 20 tQ 15 10 ac QC A4 5
    -5
  -10 0 10 ~
20 30 40    50    60  ,  70      SO    90    1CO TlsK    (SEC) 0ONALP C. COOK    UNIT 1 FIGURE 11 TURBINE TRIP EVENT WITHOUT PRESSURE  CONTROL, NXINN REACTIVITY FEEDBACK
 
a o a  4ag    ~
      "500 n
50C 5  h j      40C
      " 'CC I
      "2OC n
        'OC 2300 1900.
1800
: 0. 10. 20. 30. io. 50.      do. 70. 40. 80 . iCC tivK      (SKC) 2300.
isoo.
t doo.
c  >400.
1200.
n n
t 000.
                    )0.            io.
20,  go.
T ill 50. (5CC)do. 70 ~  80,    90.    ~OC.
OQWLD C. COOK    NIT  1 FIQNE 12 mam      TaIe EVEN VITH PRESSVRE  CNTROL ~
NXINN REACTIVITY FEEoMCK
 
8 5
2 0 10 20 30 <0      50    d0    10    80      90 T>MK    (SEC) 4 5
  . 3.5 2.5 10 20 30 40      50    60    10    80      9G Tlirt    (5KC)
ONE  C. COOK . NIT I FIGNE 13 TtWSINE TRIP EVENT 'KITH PRESSNE CONTROL, NXINN REACTIVITY FEEDBACK
 
580 560 520 cBS
  ~60 540 520 500 lO 20 30 +0      50    50    VO T'Mg    (SKC) 700 560 5iQ 520 500 2
580 560 540 10 20 30 40      50    80    10    d0    9G  tCS TIIC    (SEC)
XNALD C. COOK  UNIT 1
                                      , FI6URE 14 TUNM TRIP    EVBIT QlTH PRESSNE CONTROL, NX1NN REACTIV?TY FEEDBACK
 
I IQQ 1500.
300.
BOO.
700:
600.
500
: 0. 10. 20. 30. 40.. 50. 60. 70. 60.
TlhlK    (SEC) 400 350 I
3OO 250 200 150 100 I
50 0
0  10  20  30  40      50      60      70      80    90  100 T1QK      (SEC)
OelALD C. COOK UNIT 2 (FULL YS CORE)
FIGURE 15 TURBINE TRIP EVENT WITH PRESSURE  CONTROL, NXINN    REACTIYITY FEEOBACK


OC<OC a hAQ V n C 1 i~]V'30C t800.Io.20.30.io.50.60.~0.50.90.<OC.T:~E (SEC)"300.1900>500 ac cr i 400>200.Jl>300.0.10.20.JO.40.50.60.70.60.90.IOC.ri~K (sEc)OONALD C.COOK UNIT I FI6URE TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL,: NXINN REACTIVITY FEEOBACK 0.10 20 30+0 50 60 70 d0 90 lCQ T vK (SEC,'2.5 1.5 1.0 10 20 30 40 50 60 70 d0 90 tCQ TisK (SEC)DONALD C.CMK UNIT I FIGURE 8 TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, HAXII%N REACTIVITY FEEDBACK 66G 620~~V!30 560 dr.o 520 500 tO 20 SO iO 50 do Io 80 90 r vc (sac)>oo 660 660 6<o 620 500 8 5do seo 5~0 520 500 to 20 30 40 50 do 70 80 90 too ritz (sec)ONALO C.COOK UNIT I FISNE TURBINE TRIP EVENT ltITH0UT NESSVRE CONTROL,'NXINN REACTIVITY FEEDBACK
25 20 Ql 1 5 10 5
~nC 2C'A'.300 A 300 I'J)3CC,;700.500.500 0.10.20.30.40.50.60.70.80.90.100.TlMK (SEC)400 350 300 250 200 150 100 50 0-50 0 tQ 2Q 30 40 50 50 70 d0 90 100 TIME (SEC)DNALD C.CXK UNIT I FIGURE 10 TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, NXINPl REACTIVITY FEEDBACK 25 20 tQ 15 10 ac QC 5 A4-5-10 0 10~20 30 40 50 60 , 70 SO 90 1CO TlsK (SEC)0ONALP C.COOK UNIT 1 FIGURE 11 TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, NXINN REACTIVITY FEEDBACK a o ag a 4~"500 n 50C 5 h 40C j"'CC I"2OC n'OC 2300 1900.1800 0.10.20.30.io.50.do.70.40.80.iCC tivK (SKC)2300.isoo.t doo.c>400.1200.n n t 000.)0.20, go.io.50.do.70~80, 90.~OC.T ill (5CC)OQWLD C.COOK NIT 1 FIQNE 12 mam TaIe EVEN VITH PRESSVRE CNTROL~NXINN REACTIVITY FEEoMCK 8 5 2 0 10 20 30<0 50 d0 10 80 90 T>MK (SEC)4 5.3.5 2.5 10 20 30 40 50 60 10 80 9G Tlirt (5KC)ONE C.COOK.NIT I FIGNE 13 TtWSINE TRIP EVENT'KITH PRESSNE CONTROL, NXINN REACTIVITY FEEDBACK 580 560 520 cBS~60 540 520 500 700 lO 20 30+0 50 50 VO T'Mg (SKC)560 5iQ 520 500 2 580 560 540 10 20 30 40 50 80 10 d0 9G tCS TIIC (SEC)XNALD C.COOK UNIT 1 , FI6URE 14 TUNM TRIP EVBIT QlTH PRESSNE CONTROL, NX1NN REACTIV?TY FEEDBACK I IQQ 1500.300.BOO.700: 600.500 0.10.20.30.40..50.60.70.60.TlhlK (SEC)400 350 I 3OO 250 200 150 100 I 50 0 0 10 20 30 40 50 60 70 80 90 100 T1QK (SEC)OelALD C.COOK UNIT 2 (FULL YS CORE)FIGURE 15 TURBINE TRIP EVENT WITH PRESSURE CONTROL, NXINN REACTIYITY FEEOBACK 25 20 Ql 1 5 10 5-10 0 10 20 30 40 50 50 70 d0 90 100 Ti~K (SEC)ONALG C.COOK UNIT 2 (FULL VS CORE)FIGURE 16 TURBINE TRIP EVENT WITH PRESSURE CONTROL, NXINtw REACTIVITY FEEOBACK 2500.2400.n n"~"C'v'n 2OOO.l 800.l d00, 0.l0.20.30.'0, 50 d0 70 g0.90.laC.T<~g (SKC)2300.l800.1 d00.1400.I 200.l 000, 800.lo 20 30.40.50.50, 70.So 90 lo (SEC)OONLD C.COOK UNIT 1 FI6NE 17 TURSINE TRIP EVENT MITH PRESSURE CONTROL, NINNN REACTIVITY FEEOBACK  
  -10 0 10 20 30 40     50     50     70     d0   90 100 Ti~K   (SEC)
ONALG C. COOK UNIT 2 (FULL VS CORE)
FIGURE 16 TURBINE TRIP EVENT WITH PRESSURE   CONTROL, NXINtw REACTIVITY FEEOBACK


2 5 a 4 x 2 0 10 20 30 40 50 do 70 do 9C)C" 1'iuK (SKC)5 2.5 2~0 10 20 30 io 50 00 70 do M iOO TiitE (SEC)ONNLD C.COOK UNIT I FI6NE 18 TNSINE TRIP EVENT'WITH PRESQNE CONTlSL, NINNN REACTIVITY FEEDBACK 56C'5@i 52" 5~0'$5 560 s~c 520 500 10 20 30 40 50 60 TO 80 9C'C" T'lK (SEC)700 680 560 6<0 525 600 580 51 555 5<0 520 4 14 20 30 40 50 T 1 IC~(SEC)DNQLD'C.CON NIT I FINRE-Ig TNSINE TRIP EVENT WITH PRESSVRE CONTROL, NINNN REACTIVITY FEEDBACK 1000.900.800.700.500.500 0.lp, 20, 30.40.50.dp.70.80.90.100.TiuK (SEC)500 CJ 4J Vl<00 4 300 200l00 0-100 0 10 20 30 40 50 dp 70 80 90 100 TiVK (SEC)00NALO C.CON NIT I FIGURE 20 TURBINE TRIP EVENT WITH PRESSURE CONTROL, NININN REACTIVITY FEEDBACK 30 25 20)5 10 QC 5 tA ac 0 CL-t0 0 I 0 20 30 40 50 60 70 80 90 100 Ti&(SEC)ONNLD C.CON UNIT I FI6URE 21 TURBINE TRIP EVENT WITH PRESSURE CONTROL, NININN REACTIVITY FEEDBACK 2500.n 250C.5<OC~CO x'V:2QC.2100." 00 F900.1/00 0.t0.20.30.40.50.50.70.50.9Q,)GG t~c (sac>2000.1800.1d00.x[400.1200.1300.0.10.20.30.40.50.80.10.80.90.t00.re%(5')OINED C.COOK NIT 2 (NIXEO CORK)FIQNK 22a TNSNE TRIP EVENT ltITHOUT PRESSNE CONTROL, NINNY REhCTIVITY FKEDBAC<
2500.
n 50C<c,PC'CC I\+yA~o e rV 43 tOC C""OC>90C.1800 0~le 20'0~<0~50.60.70.<0.g0.~PC~MK (SEC)"30C tSOC.l 500.t 40C.I 200.1300.0.t0.20.30.40.50.60.70.50.90.lOC (MC)tOMLD C.CON NIT 2 (fULL V5 CONK)fIQNK 22b TlNSINE TRIP EV9fT VITHOUT PRKSSlNK CONTROL, NINNN REKTIVITY FEEDSACK C c 5 x 2 0 0 l0 20 30~0 50 50>0 80 90~Co'Tissu (SKC)2.5 2.2 t.d l.2 4>0 20 30<0 50 50.10 50.SO iCa Tilg (SEC)OOOO C.COOK NIT 2 (NIXEO CORE)FICNE 23a TlNSINE TRIP EVBIT WITHOUT PRESQNK CSlTROf., NINNN REhCTIVITY FEEO84<<
2400.
tO ZO 3O.O a 6O (sec)to 20 30 40 50 60 70 80 K iCQ 7:~K (SEC)tONU)C;COOK UNIT 2 (FVLl, N CORE)FINRE 23b TVRIINE TRIP EVENT itITHOUT PRESSURE@NIAL, NINNN REACTIVITY FEEDBACK 0
nn
560 diQ 520 I 530 560 5cQ 520 500 700 Q l0 20 30 40 50 60 70 80 9Q~Ti~E (SEC)680 660 6+0 620 600 9 MQ MO 5<0]4 20'0 40 50 d0>0 60 90 T i&(SEC)DONALD C.CNX NlT 2 (NlXED CORE)FENRK 24a TNSlNE TRlP EVENT QlTHOUT PRESQNE CONTROL, MINN%REACT[VlTY FEEOBACK 53 I I c60 5ao 5ZQ 5:c.'30 c6 szo 500 OlO ZO SO 4O 50.6O rO ao aC.Cg r QK (SEC).00 Sao 560 5io 520 500 580 I 560 5co 520 0~0 20 30 iO 50 60 70 40 SO iCO r w (sKc)ONED C.COOK NIT 2 (RKL V5 CORK)FIQNE 24b TURSINE TRIP EVENT WITHOUT NESSNE COKTROL, NINNN REACTIVITY FEEDBACK
      "~"C'v
'20C 1000.z 300.BQO.o 700.600.500.0.Io.20.30.<0.50.60.70.60.9Q.IQQ.TIME (SEC)400 350 zoo 250 200 150 100 50 0 0 t0 20 30 40 50 60 70 80 90>00 7 i&(SEC)DNALD C.COOK NIT 2 (MIXED CORE)FIGURE 25a TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, MINN@REACTIVITY FEEDBACK
'n    2OOO.
:oc P 11QQ.100.300.BCQ.700.500.500 0.10.20.30.40.50.SO.70.80.90.1OO.TIME (SEC)400 rn 350 300 250 2OO 150 100 50 0-50 10 20 30<0 50 do 70 80 90 100 TiME (SEC)00NLD C.'COOK UNIT 2 (FULL VS CORE)FIGURE 251 TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, NINNN REACTIVITY FEEOBACK 40 30 25 20 15 10 5 Vl 0-5-10 0 10 20 30 40 50 d0 70 50 90)QQ TivK (SEC)DONALO C.COOK UNIT 2 (MIXED CORK)FIGURE 264 TURBINE TRIP EVENT WITHOUT'RESSURE CONTROL,.NINLNN REACTIVITY FEEOBACK 40 35 30 25 20 15 (Y 10 5 0-5-10 0 10 20 30 40 50 50 70 d0 90 100 Ti~E (SEC)DONALD C.COOK UNIT 2 (FULL VS CORE)FIGURE 26b TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, MIHUNN REACTIVITY FEEDBACK t V"50C n"50C=~OC i vs~1hP aavlo n 2 lQC C 2300.1300.1500.'0.10.20.30.40.50.50 70.dO.90.100 T i IE (SEC)2'300.1800.le00.ct 1400.'V 1200.'1 000.800.0.10.20.JO.40.$0.60.70.80.90.100.Ti~K fMC)004lLD C.CON NIT 2 (MIXED CORE)FIQURE 27a TURBINE TRIP'VENT M?THOUT PRESSURE CONTROL, NXINPI REACTIVITY FEEDBACK OA A~4"5GC n"504 C I hc a%%2 tQC"300>900.>500 0.t0.ZQ.30.44.50.d0 (~C)94>00 4.300 I/00.i 500.'00.>200.I 300.0.10.20.30.44, 50.d0.70.60.90.F00 T sK (MC)'ONAN C.COOK UNIT 2 (FULL V5 CORE)FI6NE 27b TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL,.NXISN REACTIVITY FEEDBACK 0.l0 20 30 40 50 50 70 d0 9Q T~vE (SKC)2.d 2.6 2.4 j2, 10 20 30 40 50 d0 70 d0 90 lC" (sac)OONLD C.COOK UNIT 2 (NIXEQ CORE)FIQNE 28a TVRSINE TRIP EVENT WITHOUT PRESQNE CONTROL, NXINN REACTIVITY FEEDBACK C IQ 2Q 30+0 50 60 70 I50 9C'CQ T: MK (SKC)5 5 2 5>.5 l.O tO 2O aO 4O 5O 6O~O aO eC tCa T:VK (SEC)OIWL9 C.COOK NIT 2 (RJLL VS CORE}fNNf 28b TlJRSINE TRIP EVENT'WITHOUT l%ESSVRE CONTROL, NXINN REACTIVITY FEED8ACK g2h i 1.~'0 I I 560 5<0 c2h 500 0 10 20 30 40 50 60 70 dO QQ r ME (sEC)700 580 560 6<0 620 600 8 580 580 540 520 IO.20 30 40 50 60'10 dO 90 I CQ rim (sac)ONlLD C.COOK LNIT 2 (MIXED CORE)'I6URK 29a TNSINE TRIP EVENT WITHOUT PRESSURE CNTROL, NXINN REACTIVITY
l 800.
: FEEDSACK, 60 540 520 500%%0>0 20 30 40 50 60 70 60 yp T vK (SEC)5150 5ip 620 500 8 5ao 560 5iO 520 0>0 20 SO ip 50 50 70.80 SC iCO T'MK (SKC)NNALD C.CON UNIT 2 (FULL VS CNE)FIQNE 29b TNBINE TRIP EVENT MlTHGUT-PRESSURE CNTROL, NXINN REACTIVITY FEEDBACK QC g 1~00 90C.n HPC 700.500.500 0, 10.20.30.40.50, 60.10.bp.90.100.~TIME (SEC), 300 250 200 150 w 100 CC 50 0 n 50 0 10 20 30 40 50 60 70 80 90 100 T1&(SEC)DONALD C.COOK UNIT 2 (MIXED CORE)FI6URE 30a TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, NXINN REACTIVITY FEEDBACK 300.30C 700.500.500.0.IO.20.30<0 50 60 70 80.90.IOC.T ME (SKC)400 350 300 250 200 l50 100 50 0-50]0 2Q 30 40 50 dQ 70 d0 90 1CO r uE (SEC)Ot)NALO C.COOK UNIT 2 (FULL VS CORE)FIGURE 30b TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, NXII%N REACTIVITY FEEDBACK
l d00,
: 0. l0 . 20. 30 . '0,T<~g 50     d0 (SKC) 70     g0. 90. laC.
2300.
l800.
1   d00.
1400.
I     200.
l 000, 800.                                 50, 70. So    90     lo lo  20 30. 40. 50.
(SEC)
OONLD C. COOK   UNIT 1 FI6NE    17 TURSINE TRIP EVENT MITH PRESSURE CONTROL, NINNN REACTIVITY     FEEOBACK


25 20 15 10 ac ac 5'4 ac 0 ac-5-10 0 10 20 30 40 50 60" 70 80 90)CO TIME (SEC)DONALD C.COOK'NIT 2 (MIXED CORE}FIGURE 3la TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, MAXIHLN REACTIVITY FEEDBACK.
2 5
25 20 V)IO 5 0-5-10 0 10 20 30<0 50 d0 70 So eo.CO TIME (SEC)DONALD C.COOK UNIT 2 (FULL V5 CORE}FIGURE 31b TURBINE TRIP.EVENT WITHOUT PRESSURE CONTROL, HAXIHN REACTIVITY FEEOBACK q%s a rv 25CC 500"<cc~leer~,v vv ltIA eevbr 2'QC 300.i90C.I t800 2300.10.20.30.40.50 50 T'LIE (ggg)1300.1500.<z 14QQ.'V 1 200.'A t QQQ.0.10.20.30.io.50.dO.ZO.50.90.tQC.TiMK (SKC)ONAu)C.COOK UNIT 2 (lIIXH)CORE)FIGVRE 32a TURBINE TRIP EVENT MITH PRESSVRE CONTROL, NXINN REACTIVITY FEEDBACK
a 4
~~%A%V I 50C t.cQC C n~<hF a V V C'900'800 20.30.<0.50.60.70.50.90:GC T vK (SEC)2".00>30C..~:tl j~i~>500>400>200 n t 300.0.10, 20.30.40.50.d0.10.50.90.iOC r~C'(SCC)'ONlD C.COOK UNIT 2 (FULL V5 CQRE)FI6NE 321 TURBINE TRIP EVENT MITH PRESSURE CONTROL, NXINN REACTIVITY FEEDBACK dt 4 Z 0.10 20 30<0 50 50 70 80 9C r vK (SKC)2.6 3~.z~2 0 10 20 30 40 50 50 70 d0 90 Tlat@(SEC)OOQLG C.COOK NIT 2 (MIXED CORE)FI6NE 33a TURBINE TRIP.EVENT MITH PRESQNE CONTROL, NXINN REACTIVITY FEEOSACK l0 20 30 40 50 50 10 80 90~vK (SKC)lO 20 30 40 50 dO 10 60 9C T~K (SKC)ONIALO C.COOK UNIT 2 (FULL VS CORE)FISuaz 33b TlJRSINE TRIP EVBIT MITH PRESSURE CONTROL, NXINN REACTIVITY FEEDSACK 5~0 620 I I r vS Car<<V 560 5<0 520 500 0!0 20 30 40 50 60 l0 80 9C r~E'SEc)700 580 560 640 520 500 8 580 g 560 5L0 520 0 l0 20 30 40 50 60 10 80 90 lC" TivK (SKC)00NLD C.COOK UNIT 2 (NIXEQ CORE}FI6URE 348 TURBINE TRIP EVENT KITH PRESSURE CONTROL, NXINN REACTIVITY FEEDBACK 550 t 54C e 520 500 0'0 20 30<0 50 60 70 80 T vK (SKC', 0 I I I 530 5~0 620 50C 2 580 3 560 5c0 520 500 io 20 30 io 50 60~0 ao ec:CO T ilK (SEC)ONALD C.COOK UNIT 2 (FULL V5 CORE)FIeNE 34b TURSINE TRIP EVENT'KITH PRESSURE CONTROL, NXINN REACTIVITY FEE08aCV.
x    2 0 10 20 30 40       50     do    70     do            )C" 1'iuK                            9C (SKC) 5 2.5 2 ~
c?.-QC.J7 z 30C.BCC.D 700.500.500.p.300 10'0'0.40.50.60.70.80.9p.1pc T MK (SEC)250 200 150 OC 10Q CZ 50 0 n-50 10 20 30 40 50'60 70 SO 90 1CP Tlute (SEC)DONALD C.COOK UNIT 2 (HIXED CORE)FIGURE 35a TURBINE TRIP EVENT WITH PRESSURE CONTROL, NXINN REACTIVITY FEEDBACK P'00 9CC 600.500.400 10.20.30'0.50.60.70.80.9p.Ipp T:ME (SEC)350 300 250 200 150 100 50 0-50 10 20 30 40 50 60 70 80 90 ICO TIME (SEC)DONALD C.COOK UNIT 2 (FULL V5 CORE)FIGURE 35b TURBINE TRIP EVENT WITH PRESSURE CONTROL, AXING REACTIVITY FEEDBACK 25 20'A)5)0 QC ac 5 5 0-5)Q 20 30 40 50 50 70 80 90)GO T)MK (SKC)PONALD C.COOK UNIT 2 (HIXEO CORE)-FIGURE 361 TURBINE TRIP FVENT MITH PRESSURE CONTROL, NX'INN REACTIVITY FEEOBACK 25 20 10 ac 5 ac 0-5-10 0 t0 20 30 40 50 50'0 80 90 ICO TIME (SEC)DONALD C.COOK UNIT 2 (FULL V5 CORE)FIGURE 36b TURBINE TRIP EVENT MITH PRESSURE CONTROL, MAX!NN REACTIVITY FEEDBACK
0 10 20 30 io      50     00    70     do    M      iOO TiitE    (SEC)
:5CC"5CC 1 n I C 2 ICC".QG.:900.I800.0.300 tp.20.30.iP.50.60.70.50.yp T uK (SKC)t300.'6QC ac'<OC C v>200 n n I QOC.0.l0.20.30.40.50.60.70.80, 90.IOO.T5VK (SE'C)DONALD C.COOK UNIT 2 (IIIXED CORE)FIGURE 37a TURBINE TRIP EVENT QITH PRESSURE CONTROL, MINN@REACTIVITY FEEOBACK
ONNLD C. COOK UNIT I FI6NE  18 TNSINE TRIP EVENT 'WITH PRESQNE CONTlSL, NINNN REACTIVITY FEEDBACK


5QC n w gAQ e v C~'n 2~00 V)1600)0.20.30.40.50.50.10.80.90.:OC.T: VK (SEC)2'300.1800.1600.I 400."4l200.1000.600.0.~0.20.30.i0.50.60.10.d0.90.~OC.7~&(SEC)OONLO C.COOK NIT 2 (FULL VS CORE)FIQIRE 37b TURBINE TRIP EVENT'MITH PRESSURE CONTROL, NINNN REACTIVITY FEE08ACK 10 20 50<0 50 60 7Q 60 gC r vK (SgC)2 8 6"2 1 6 4~Q 20 30 40'0 64 70 60 g)T1QK (SEC)OONU)C.COOK UNIT 2 (llIXEO CORE)fI6NE 38'URSINE TRIP EVENT MITH PRESSURE CONTROL, NINNPl REACTIVITY FEEDBACK Z 0.ic 20 30 40 50 d0 10 d0 90 T MK (SEC}4 5 3 5 2.5 I.S l.0 10 20 30.io 50 10 70 80 SO tCO Ti&(SEC)OQNLD C;COOK UNIT 2 (FULL VS CORE)FIQNE 38b'URSIHE TRIP EVENT NITH PRESSURE CONTROL SINN@REACTIVITY FEEDBACK 560 t 520 500 0 10 20 30 40 50 60 70 80 9C'"0 I MK (SEC)680 560 5~0~520 500 550 560 540 520 500 0" 10 20 30 40 50 60 10 80 90'00 TivK (SEC)00NALD C.COOK UN?T 2 (NIXED CORE)F lGURE 39a TURSlNE TRlP EVENT'MlTH PRESSURE CONTROL, NlHUNN REACTLVITY FEEOBACK
56C' 5@i 52" 5~0 5
560 s~c 520 500 10 20 30 40       50       60     TO    80           'C" 9C T'lK      (SEC) 700 680 560 6<0 525 600 580 51  555 5<0 520 4    14  20 30 40       50 T 1 IC    ~
(SEC)
DNQLD'C. CON    NIT I FINRE- Ig TNSINE TRIP  EVENT WITH PRESSVRE CONTROL, NINNN REACTIVITY FEEDBACK


4, I I cog i I I 520 500 0>0 20 30<0 50 60 70 T vK (SEC)30 I 68G 660 5<0 r.2r.630 580 3 560 5i0 520 500'l0 20 30 40 50 60 70 80 90 iCQ TivK (SKC)NXQLO'C.COOK UNIT 2 (FULL V5 CORE)FIGURE 3Sb TURBINE TRIP EVENT QITH PRESSURE CONTROL, NINNN REACTIVITY FEEDBACK n 13QC.700.500.500.40Q 10.20.30.40.50.60.70.80.9Q.!QC.T ME (SEC)s)350 300"50 200 150 100 50 0 50 0.10 20 30 40 50 60 70 80 90>00 TiMK (SEC)DONALD C.COOK UNIT 2 (MIXED CORE)FIGURE 40a TURBINE TRIP EVENT QITH PRESSURE CONTROL, MINIMUM REACTIVITY FEEDBACK el'00.3PG.M V 7PG.500.500 0~10'20 30'0'0'0'0~80.90.'CC.T ME (SEC)500 n 400 1 I (3OO<I 200 i 100 J)0 n-100 0 10 20 30 40 50 60 70 do 90 iCO TlMK (SEC)OONALO C.COOK UNIT 2 (FULL VS CORE)FIGURE 40b.TURBINE.TRIP EVENT WITH PRESSURE CONTROL, HININN REACTIYITY FEEOBACK 40 35 30 25 20 15 gA'4]Q 5-5-10 0 10 20 30 40 50 60 lO 80 90'C3 T'ME (SEC)DONALD C.COOK UNIT 2 (MIXED CORE)FIGURE 41 a TURBINE TRIP EVENT MITH PRESSURE CONTROL, HINIMN REACTIVITV FEEDBACK 30 41 2c 20 15 1Q Ag J7 0-1Q 0 10 20 30 40 50 60 70 80 90 TIME (SEC)DONALD C.COOK UNIT 2 (FULL V5 CORE)FIGURE 41b TURBINE TRIP EVENT MITM PRESSURE CONTROL, MINIHUH REACTIVITY FEEOBACK APPENDIX A SIGNIFICANT HAZARDS EVALUATION
1000.
>A SIGNIFICANT HAZARDS EVALUATION DONALD C.COOK UNITS 1&2 MSSV LIFT SETPOINT TOLERANCE TECHNICAL SPECIFICATION CHANGE INTRODUCTION:
900.
Pursuant to 10CFR50.92, each application for amendment to an operating license must be reviewed to determine if the proposed change involves a significant hazards consideration.
800.
The Commission has provided standards for determining whether a significant hazards consideration exists (1OCFR50.92(c)).
700.
A proposed amendment to an operating license for a facility involves no significant hazards consideration if operation of the facility in accordance with the proposed amendment would not: 1)involve a significant increase in the probability or consequences of an accident previously evaluated, or 2)create the possibility of a new or different kind of accident from any accident previously evaluated, or 3)involve a significant reduction in a margin of safety.DESCRIPTION Of AMENDMENT RE VEST: The purpose of this amendment request is to revise Technical Specification Section 3/4.7 for both Donald C.Cook units in order to relax the main steam safety valve (MSSV)lift setpoint tolerance from<1%to J3%.The currently specified tolerance of J1%of the lift setpoint can be difficult to meet when the valves are tested due to setpoint drift over the duration of the operating cycle.This evaluation will provide margin for American Electric Power Service Corporation (AEPSC)when they perform their surveillance testing.The ASME Code requires that the valves lift within 1%of the specified setpoint (NB-7512.2).
500.
The code also states that the valves must attain rated lift (i.e., full flow)within 3%of the specified setpoint (NB-7512.1).This evaluation will form the basis for taking exception to the ASME Code with respect to the lift setpoint tolerances.
500
As defined in NB-7512.2, exceptions can be made to the code providing the effects are accounted for in the accident analyses.A-1  
: 0. lp, 20, 30. 40. 50. dp. 70. 80. 90. 100.
TiuK    (SEC) 500 CJ 4J Vl
    <00 4
300 200 l00 0
  -100 0  10  20 30 40     50     dp    70     80     90   100 TiVK      (SEC) 00NALO C. CON    NIT I FIGURE 20 TURBINE TRIP EVENT WITH PRESSURE   CONTROL, NININN REACTIVITY FEEDBACK
 
30 25 20
    )5 10 QC 5
tA ac    0 CL
  -t0 0 I 0 20 30 40    50     60     70     80   90    100 Ti&    (SEC)
ONNLD C. CON    UNIT I FI6URE 21 TURBINE TRIP EVENT WITH PRESSURE CONTROL, NININN REACTIVITY FEEDBACK
 
2500.
n 250C.
5
    <OC
    ~CO x
'V
:2QC.
2100.
  " 00 F900.
1/00
: 0. t0. 20. 30. 40. 50. 50. 70. 50. 9Q,    )GG t  ~c    (sac>
2000.
1800.
1d00.
x
[400.
1200.
1300.
: 0. 10. 20. 30. 40. 50. 80. 10. 80. 90. t00.
re%      (5')
OINED C. COOK NIT 2 (NIXEO CORK)
FIQNK 22a TNSNE TRIP   EVENT ltITHOUT PRESSNE  CONTROL, NINNY REhCTIVITY FKEDBAC<
 
50C n
    < c,PC
      'CC I
~
      \+
o e rV yA 43 tOC C
    ""OC
    >90C.
1800 0   ~  le 20 '0    ~ <0  ~
                                    ~ MK
: 50. 60.
(SEC)
: 70.    <0. g0.   ~PC "30C tSOC.
l 500.
t 40C.
I 200.
1300.
: 0. t0. 20. 30. 40. 50. 60. 70. 50. 90. lOC (MC) tOMLD C. CON NIT      2 (fULL V5 CONK) fIQNK  22b TlNSINE TRIP EV9fT VITHOUT PRKSSlNK CONTROL, NINNN REKTIVITY FEEDSACK
 
C c    5 x    2 0
0  l0  20  30 ~0    50    50    >0      80    90    ~Co
                      'Tissu    (SKC) 2.5 2.2 t.d l.2                  <0    50    50 . 10                  iCa 4  >0  20  30                            50    .SO Tilg    (SEC)
OOOO C. COOK  NIT 2 (NIXEO CORE)
FICNE 23a TlNSINE TRIP EVBIT WITHOUT PRESQNK CSlTROf.,
NINNN REhCTIVITY    FEEO84<<
 
tO  ZO 3O  .O      a    6O (sec) to 20  30  40    50      60    70      80    K    iCQ 7:~K    (SEC) tONU) C;    COOK  UNIT 2 (FVLl, N  CORE)
FINRE 23b TVRIINE TRIP EVENT itITHOUT PRESSURE @NIAL, NINNN REACTIVITY FEEDBACK
 
0 560 diQ 520 I
530 560 5cQ 520 500 Q  l0 20  30  40      50      60      70    80      9Q
                      ~
Ti~E      (SEC) 700 680 660 6+0 620 600 9
MQ MO 5<0
          ]4 20 '0  40 Ti &
50      d0 (SEC)
                                              >0    60      90 DONALD C. CNX    NlT  2 (NlXED CORE)
FENRK 24a TNSlNE TRlP    EVENT QlTHOUT PRESQNE    CONTROL, MINN% REACT[VlTY FEEOBACK
 
53      I I
c60 5ao 5ZQ 5:c
      .'30 c6 szo 500 O    lO ZO SO 4O      50  . 6O    rO      ao    aC    .Cg r QK    (SEC)
  .00 Sao 560 5io 520 500 580 I 560 5co 520 0    ~0 20 30 iO      50    60    70    40    SO    iCO r w    (sKc)
ONED C. COOK NIT      2 (RKL V5 CORK)
FIQNE 24b TURSINE TRIP EVENT WITHOUT NESSNE  COKTROL, NINNN REACTIVITY FEEDBACK
 
  '20C 1000.
z  300.
BQO.
o 700.
600.
500.
: 0. Io. 20. 30. <0.      50. 60. 70. 60. 9Q. IQQ.
TIME        (SEC) 400 350 zoo 250 200 150 100 50 0
0  t0  20  30  40        50      60    70      80      90    >00 7 i &      (SEC)
DNALD C. COOK  NIT 2 (MIXED CORE)
FIGURE 25a TURBINE TRIP EVENT WITHOUT PRESSURE  CONTROL, MINN@ REACTIVITY FEEDBACK
 
:oc P    11QQ.
100.
300.
BCQ.
700.
500.
500
: 0. 10. 20. 30. 40. 50. SO. 70.      80. 90. 1OO.
TIME      (SEC) 400 rn  350 300 250 2OO 150 100 50 0
      -50 10  20  30  <0      50      do      70      80    90    100 TiME      (SEC) 00NLD C.    'COOK UNIT 2 (FULL VS CORE)
FIGURE 251 TURBINE TRIP EVENT WITHOUT PRESSURE    CONTROL, NINNN REACTIVITY FEEOBACK
 
40 30 25 20 15 10 5Vl 0
    -5
    -10 0 10 20 30 40    50    d0      70    50  90    )QQ TivK    (SEC)
DONALO C. COOK UNIT 2 (MIXED CORK)
FIGURE 264 TURBINE TRIP EVENT WITHOUT
                                      'RESSURE CONTROL,
                                .NINLNN REACTIVITY  FEEOBACK
 
40 35 30 25 20 15 (Y
10 5
0
    -5
  -10 0 10 20 30 40    50    50      70    d0    90    100 Ti~E    (SEC)
DONALD C. COOK UNIT 2 (FULL VS CORE)
FIGURE 26b TURBINE TRIP EVENT WITHOUT PRESSURE  CONTROL, MIHUNN REACTIVITY FEEDBACK
 
tV "50C n
        "50C
      =~OC i vs
      ~ 1hP aavlo n
2 lQC C
2300.
1300.
1500.'0.
: 10. 20. 30. 40. 50.      50  70. dO. 90. 100 Ti IE      (SEC) 2'300.
1800.
le00.
ct  1400.
'V 1200.
    '1 000  .
800.
: 0. 10. 20. JO. 40.    $ 0. 60. 70.      80. 90. 100.
Ti~K      fMC) 004lLD C. CON      NIT 2 (MIXED CORE)
FIQURE 27a TURBINE    TRIP'VENT  M?THOUT PRESSURE  CONTROL, NXINPI    REACTIVITY FEEDBACK
 
OA A
        ~4 "5GC n
    "504 C
I hc a%%
2 tQC "300
    >900.
    >500
: 0. t0. ZQ. 30. 44. 50. d0                  94    >00
(~C)
: 4. 300 I/00.
i 500.
  '00.
  >  200.
I  300.
: 0. 10. 20. 30. 44,    50. d0. 70. 60. 90. F00 T  sK    (MC)
                                            'ONAN    C. COOK UNIT 2 (FULL V5 CORE)
FI6NE 27b TURBINE TRIP EVENT WITHOUT PRESSURE  CONTROL, .
NXISN    REACTIVITY FEEDBACK
 
0.
l0 20 30 40      50    50      70    d0      9Q T~vE    (SKC) 2.d 2.6 2.4 j2, 10 20 30 40      50    d0      70    d0      90  lC" (sac)
OONLD C. COOK UNIT 2 (NIXEQ CORE)
FIQNE 28a TVRSINE TRIP EVENT WITHOUT PRESQNE CONTROL, NXINN REACTIVITY FEEDBACK
 
C IQ  2Q  30  +0      50    60  70    I50    9C    'CQ T: MK      (SKC) 5  5 2  5
  >.5
: l. O tO          4O              6O ~O      aO      eC  tCa 2O  aO          5O T:VK      (SEC)
OIWL9 C. COOK  NIT  2 (RJLL  VS CORE}
fNNf 28b TlJRSINE TRIP EVENT 'WITHOUT l%ESSVRE CONTROL, NXINN REACTIVITY FEED8ACK
 
g2h i 1.
      ~ '0 I
I 560 5<0 c2h 500 0  10  20  30  40      50      60      70      dO    QQ r ME      (sEC) 700 580 560 6<0 620 600 8
580 580 540 520 IO. 20  30  40      50      60    '10      dO    90    I CQ rim        (sac)
ONlLD C. COOK  LNIT 2 (MIXED CORE) '
I6URK 29a TNSINE TRIP    EVENT WITHOUT PRESSURE    CNTROL, NXINN REACTIVITY FEEDSACK,
 
60 540 520 500
        >0 20 30 40      50    60  70      60    yp T vK    (SEC)
  %%0 5150 5ip 620 500 8
5ao 560 5iO 520 0 >0 20 SO ip      50    50    70    .80    SC    iCO T'MK    (SKC)
NNALD C. CON UNIT 2 (FULL VS CNE)
FIQNE 29b TNBINE TRIP  EVENT MlTHGUT-PRESSURE CNTROL, NXINN REACTIVITY FEEDBACK
 
QC g    1~00 90C.
n HPC 700.
500.
500 0, 10. 20. 30. 40. 50,    60. 10. bp. 90. 100.
                            ~  TIME    (SEC),
300 250 200 150 w    100 CC 50 0
n 50 0  10  20  30    40    50      60      70      80    90      100 T1&    (SEC)
DONALD C. COOK UNIT 2 (MIXED CORE)
FI6URE 30a TURBINE TRIP EVENT WITHOUT PRESSURE    CONTROL, NXINN REACTIVITY FEEDBACK
 
300.
30C 700.
500.
500.
: 0. IO. 20. 30  <0      50      60      70    80. 90. IOC.
T  ME      (SKC) 400 350 300 250 200 l50 100 50 0
-50
        ]0  2Q  30    40      50      dQ      70      d0      90      1CO r uE      (SEC)
Ot)NALO C. COOK UNIT 2 (FULL VS CORE)
FIGURE 30b TURBINE TRIP EVENT WITHOUT PRESSURE  CONTROL, NXII%N REACTIVITY      FEEDBACK
 
25 20 15 10 ac ac
'4    5 ac 0
ac
    -5
  -10                                "
0 10 20 30 40    50    60      70      80    90    )CO TIME    (SEC)
DONALD C. COOK'NIT    2 (MIXED CORE}
FIGURE  3la TURBINE TRIP EVENT WITHOUT PRESSURE  CONTROL, MAXIHLN REACTIVITY FEEDBACK    .
 
25 20 V)
IO 5
0
    -5
  -10 0 10 20 30 <0    50    d0    70      So    eo    .CO TIME    (SEC)
DONALD C. COOK UNIT 2 (FULL V5 CORE}
FIGURE 31b TURBINE TRIP. EVENT WITHOUT PRESSURE  CONTROL, HAXIHN REACTIVITY    FEEOBACK
 
q  %s a rv 25CC 500 leer
          "<cc
          ~
          ~,v  vv ltIA eevbr 2 'QC 300.
i90C.
I t800
: 10. 20. 30. 40. 50      50 T'LIE    (ggg) 2300.
1300.
1500.
  <z  14QQ      .
'V 1 200.
'A t QQQ.
: 0. 10. 20. 30. io. 50. dO. ZO. 50. 90. tQC.
TiMK      (SKC)
ONAu) C. COOK UNIT  2 (lIIXH) CORE)
FIGVRE  32a TURBINE TRIP EVENT MITH PRESSVRE CONTROL, NXINN REACTIVITY FEEDBACK
 
      ~ ~
    %A%
V I
50C  t
  .cQC C
n
  ~<hF a VV C
  '900
  '800              30.        <0. 50.      60. 70. 50. 90    :GC 20.
T vK      (SEC) 2".00
  >30C.              .~:tlj~i ~
  >500
  >400
  >200 n
t 300.
: 0. 10, 20. 30.        40. 50.      d0. 10. 50. 90. iOC r ~C    '(SCC)
                                                  'ONlD    C. COOK UNIT 2 (FULL V5 CQRE)
FI6NE 321 TURBINE TRIP EVENT MITH PRESSURE  CONTROL, NXINN REACTIVITY FEEDBACK
 
dt 4
Z 0.
10 20 30 <0      50    50      70    80    9C r vK    (SKC) 2.6 3 ~.z
  ~ 2 0 10 20 30 40      50    50    70    d0    90 Tlat@    (SEC)
OOQLG C. COOK NIT 2 (MIXED CORE)
FI6NE 33a TURBINE TRIP .EVENT MITH PRESQNE CONTROL, NXINN REACTIVITY FEEOSACK
 
l0 20 30 40      50    50      10    80    90
            ~ vK    (SKC) lO 20 30 40      50    dO      10    60    9C T  ~K    (SKC)
ONIALO C. COOK    UNIT 2 (FULL VS CORE)
FISuaz 33b TlJRSINE TRIP EVBIT MITH PRESSURE  CONTROL, NXINN REACTIVITY FEEDSACK
 
5~0 620 I
I r vS Car
    <<V 560 5<0 520 500 0  !0 20 30 40      50    60      l0      80    9C r ~E'SEc) 700 580 560 640 520 500 8
580 560 g
5L0 520 0  l0 20 30 40      50    60      10      80    90  lC" TivK    (SKC) 00NLD C. COOK UNIT 2 (NIXEQ CORE}
FI6URE 348 TURBINE TRIP EVENT KITH PRESSURE    CONTROL, NXINN REACTIVITY FEEDBACK
 
550  t 54C  e 520 500    '0 0    20 30 <0      50    60    70    80 T vK    (SKC',
0 I
I I
530 5~0 620 50C 2
580 3 560 5c0 520 500 io 20 30 io      50    60    ~0      ao    ec    :CO T  ilK    (SEC)
ONALD C. COOK UNIT 2 (FULL V5 CORE)
FIeNE 34b TURSINE TRIP EVENT 'KITH PRESSURE  CONTROL, NXINN REACTIVITY FEE08aCV.
 
c
?J7    .-QC.
z      30C.
BCC.
D 700.
500.
500.
: p. 10  '0 '0. 40.
T  MK
: 50. 60.
(SEC)
: 70. 80. 9p. 1pc 300 250 200 150 OC 10Q CZ 50 0
n
        -50                                  '60 10  20 30  40      50              70      SO      90    1CP Tlute      (SEC)
DONALD C. COOK UNIT 2 (HIXED CORE)
FIGURE 35a TURBINE TRIP EVENT WITH PRESSURE    CONTROL, NXINN REACTIVITY FEEDBACK
 
P'00 9CC 600.
500.
: 10. 20. 30 '0.
T:ME
: 50. 60.
(SEC)
: 70. 80. 9p. Ipp 400 350 300 250 200 150 100 50 0
    -50 10  20  30  40    50      60      70      80      90    ICO TIME      (SEC)
DONALD C. COOK UNIT 2 (FULL V5 CORE)
FIGURE 35b TURBINE TRIP EVENT WITH PRESSURE    CONTROL, AXING REACTIVITY FEEDBACK
 
25 20
'A  )5
    )0 QC ac 5
5 0
  -5
      )Q 20 30 40    50    50      70      80      90  )GO T)MK    (SKC)
PONALD C. COOK UNIT 2 (HIXEO CORE)
                                      -  FIGURE 361 TURBINE TRIP FVENT MITH PRESSURE    CONTROL, NX'INN REACTIVITY FEEOBACK
 
25 20 10 ac ac 5
0
    -5
  -10 0 t0 20 30 40 TIME 50    50 (SEC)
                                    '0        80    90  ICO DONALD C. COOK UNIT 2 (FULL V5 CORE)
FIGURE 36b TURBINE TRIP EVENT MITH PRESSURE  CONTROL, MAX!NN REACTIVITY FEEDBACK
 
:5CC "5CC 1
n    2  ICC I
C
    ".QG.
:900.
I800.
: 0. tp. 20. 30. iP. 50.      60. 70.      50. yp T uK      (SKC) 300 t300.
    '6QC ac
    '<OC C
v
    >200 n
n I  QOC.
: 0. l0. 20. 30. 40. 50.      60. 70. 80,    90. IOO.
T5VK      (SE'C)
DONALD C. COOK UNIT 2 (IIIXED CORE)
FIGURE 37a TURBINE TRIP EVENT QITH PRESSURE  CONTROL, MINN@ REACTIVITY FEEOBACK
 
5QC n
w  gAQ e v C
~
  'n 2 ~00 V) 1600                    40. 50. 50. 10. 80. 90.:OC.
                  ) 0. 20. 30.
T: VK    (SEC) 2'300  .
1800.
1600.
I  400.
  "4 l200.
1000.
600.
: 0. ~0. 20. 30. i0. 50. 60. 10. d0. 90.  ~OC.
7 ~ &    (SEC)
OONLO C. COOK NIT 2 (FULL VS CORE)
FIQIRE 37b TURBINE TRIP EVENT 'MITH PRESSURE CONTROL, NINNN REACTIVITY FEE08ACK
 
10 20 50 <0      50    60  7Q      60        gC r vK    (SgC) 2 8 6
"2 1 6 4 ~Q 20 30 40  '0 T1QK 64 (SEC) 70      60        g)
OONU) C. COOK UNIT 2 (llIXEO CORE) fI6NE 38'URSINE TRIP EVENT MITH PRESSURE  CONTROL, NINNPl    REACTIVITY FEEDBACK
 
Z
: 0. ic        40      50          10 20 30                  d0          d0    90 T MK    (SEC}
4  5 3  5 2.5 I.S
: l. 0      30 . io      50    10  70 10 20                                  80    SO            tCO Ti&      (SEC)
OQNLD C; COOK UNIT 2 (FULL VS CORE)
FIQNE 38b TRIP EVENT NITH
                                                          'URSIHE PRESSURE CONTROL SINN@ REACTIVITY            FEEDBACK
 
560 t
520 500 0    10 20 30 40      50    60    70      80      9C      '"0 I MK    (SEC) 680 560 5~0
~ 520 500 550 560 540 520 500    "
0    10  20 30 40      50    60    10      80      90      '00 TivK    (SEC) 00NALD C. COOK    UN?T 2 (NIXED CORE)
F lGURE 39a TURSlNE TRlP EVENT 'MlTH PRESSURE  CONTROL, NlHUNN REACTLVITY      FEEOBACK
 
4, I
I cog    iI I
520 500 0    >0 20 30 <0      50    60    70 T vK    (SEC) 30 I
68G 660 5<0
: r. 2r.
630 580 560 3
5i0 520 500        'l0 20 30 40      50    60    70    80    90    iCQ TivK    (SKC)
NXQLO'C. COOK UNIT 2 (FULL V5 CORE)
FIGURE 3Sb TURBINE TRIP EVENT QITH PRESSURE  CONTROL, NINNN REACTIVITY FEEDBACK
 
n    13QC.
700.
500.
500.
: 10. 20. 30. 40. 50. 60. 70. 80. 9Q.    !QC.
T  ME    (SEC) 40Q s)  350 300 "50 200 150 100 50 0
50
: 0. 10  20  30  40      50      60      70      80      90    >00 TiMK    (SEC)
DONALD C. COOK UNIT 2 (MIXED CORE)
FIGURE 40a TURBINE TRIP EVENT QITH PRESSURE  CONTROL, MINIMUM REACTIVITY FEEDBACK
 
  '00.
el 3PG.
MV 7PG.
500.
500 0  ~ 10 ' 20  30 '0'0 '0'0 T ME    (SEC)
                                                    ~    80. 90.  'CC.
500 n
400  1 I
(
3OO <
I 200  i 100 J)      0 n
  -100 0    10  20  30  40    50      60    70      do    90    iCO TlMK    (SEC)
OONALO  C. COOK UNIT 2 (FULL VS CORE)
FIGURE  40b.
TURBINE. TRIP EVENT WITH PRESSURE  CONTROL, HININN REACTIYITY FEEOBACK
 
40 35 30 25 20 15 gA
'4  ]Q 5
    -5
  -10 0 10 20 30 40      50    60      lO    80    90    'C3 T'ME    (SEC)
DONALD C. COOK UNIT 2 (MIXED CORE)
FIGURE 41 a TURBINE TRIP EVENT MITH PRESSURE  CONTROL, HINIMN REACTIVITV    FEEDBACK
 
30 41 2c 20 15 1Q Ag J7 0
  -1Q 0 10 20 30 40      50    60      70    80    90 TIME    (SEC)
DONALD C. COOK UNIT 2 (FULL V5 CORE)
FIGURE 41b TURBINE TRIP EVENT MITM PRESSURE  CONTROL, MINIHUH REACTIVITY FEEOBACK
 
APPENDIX A SIGNIFICANT HAZARDS EVALUATION
 
>A SIGNIFICANT HAZARDS EVALUATION DONALD C. COOK UNITS            1  & 2 MSSV LIFT SETPOINT TOLERANCE TECHNICAL SPECIFICATION CHANGE INTRODUCTION:
Pursuant to 10CFR50.92, each application for amendment to an operating license must be reviewed to determine  if the  proposed change involves a significant hazards consideration.          The Commission has provided standards for determining whether a significant hazards consideration exists (10CFR50.92(c)).
A proposed amendment to an operating license for a facility involves no significant hazards consideration ifoperation of the facility in accordance  with the proposed amendment would not:        1) involve a significant increase in the probability or consequences  of an accident previously evaluated, or 2) create    the possibility of a new or different kind of accident from any accident previously evaluated, or 3) involve a significant reduction in a margin of safety.
DESCRIPTION Of AMENDMENTRE VEST:
The purpose    of this amendment request is to revise Technical Specification Section 3/4.7 for both Donald C. Cook units in order to relax the main steam safety valve (MSSV)          lift setpoint  tolerance from <1%
to J3%. The currently specified tolerance of J1% of the liftsetpoint can be difficultto meet when the valves are tested due to setpoint drift over the duration of the operating cycle. This evaluation will provide margin for American Electric Power Service Corporation (AEPSC) when they perform their surveillance testing.
The ASME Code requires that the valves      liftwithin 1% of the specified setpoint (NB-7512.2). The code also states that the valves must attain  rated lift (i.e., full flow) within 3% of the specified setpoint (NB-7512. 1). This evaluation  will form the  basis for taking exception to the ASME Code with respect to the lift setpoint  tolerances. As defined in NB-7512.2, exceptions can be made to the code providing the effects are accounted for in the accident analyses.
A-1


BASIS FOR NO SI NIFICANT HAZAIU)S DETERMINATION:
BASIS FOR NO SI NIFICANT HAZAIU)S DETERMINATION:
The effects of increasing the as-found lift setpoint tolerance on the main steam safety valve have been examined for the non-LOCA accidents, and it has been determined that, with one exception, the current accident analyses as presented in the UFSAR remain valid.The loss of load/turbine trip event was analyzed in order to quantify the impact of the setpoint tolerance relaxation.
The effects of increasing the   as-found lift setpoint tolerance on the main steam safety valve have been examined for the non-LOCA accidents, and         it has been determined that, with one exception, the current accident analyses as presented in the UFSAR remain valid. The loss               of load/turbine trip   event was analyzed in order to quantify the impact   of the setpoint   tolerance relaxation. As previously demonstrated in this evaluation, all applicable acceptance criteria for this event have been satisfied and the conclusions presented in the UFSAR are still valid. Thus, the proposed Technical Specification change does not constitute an unreviewed safety question, and the non-LOCA accident analyses, as presented in the report, support the proposed change.
As previously demonstrated in this evaluation, all applicable acceptance criteria for this event have been satisfied and the conclusions presented in the UFSAR are still valid.Thus, the proposed Technical Specification change does not constitute an unreviewed safety question, and the non-LOCA accident analyses, as presented in the report, support the proposed change.The effect of an increase in the allowable Main Steam Safety Valve set pressure tolerance from+1%to+3%on the UFSAR LOCA analyses has been evaluated.
The effect of an increase in the allowable Main Steam Safety Valve set pressure tolerance from +1% to
In each case the applicable regulatory or design limit was satisfied.
+3% on the UFSAR LOCA analyses has been evaluated.                   In each case the applicable regulatory or design limitwas satisfied. Specific   analyses were performed       for small break LOCA assuming the current MSSV Technical Specification set pressures plus the proposed additional 3% uncertainty. The calculated peak cladding temperatures remained below the 10CFR50.46 2200'F limit.
Specific analyses were performed for small break LOCA assuming the current MSSV Technical Specification set pressures plus the proposed additional 3%uncertainty.
The steam generator tube rupture event was also analyzed to determine the effects of the               lift setpoint tolerance increase. The results of the analysis concluded that there was         a very slight increase in the whole body dose release for Unit 1, but the magnitude of the increase was SECL-91%29, Revision                     1 within the uncertainty associated with the calculation itself, and that the releases generated for the Donald C. Cook Rerating Program bound those calculated for this evaluation. The evaluation also determined that the current Unit 2 doses remain bounding. Thus, the conclusions presented in the Donald C. Cook UFSAR remain valid.
The calculated peak cladding temperatures remained below the 10CFR50.46 2200'F limit.The steam generator tube rupture event was also analyzed to determine the effects of the lift setpoint tolerance increase.The results of the analysis concluded that there was a very slight increase in the whole body dose release for Unit 1, but the magnitude of the increase was SECL-91%29, Revision 1 within the uncertainty associated with the calculation itself, and that the releases generated for the Donald C.Cook Rerating Program bound those calculated for this evaluation.
Neither the mass and energy release to the containment following a postulated loss of coolant accident (LOCA), nor the containment response following the LOCA analysis, credit the MSSV in mitigating the consequences   of an accident. Therefore, changing the MSSV liftsetpoint          tolerances   willhave  no impact on the containment integrity analysis. In addition, based on the conclusion           of the transient analyses, the change to the MSSV tolerance       will not affect the calculated steamline break       mass and energy releases inside containment.
The evaluation also determined that the current Unit 2 doses remain bounding.Thus, the conclusions presented in the Donald C.Cook UFSAR remain valid.Neither the mass and energy release to the containment following a postulated loss of coolant accident (LOCA), nor the containment response following the LOCA analysis, credit the MSSV in mitigating the consequences of an accident.Therefore, changing the MSSV lift setpoint tolerances will have no impact on the containment integrity analysis.In addition, based on the conclusion of the transient analyses, the change to the MSSV tolerance will not affect the calculated steamline break mass and energy releases inside containment.
A-2
A-2 The proposed change has been evaluated in accordance with the Significant Hazards criteria of 10CFR50.92.
 
The results of the evaluation demonstrate that the change does not involve any significant hazards as described below.1.A significant increase in the probability or consequences of an accident previously evaluated.
The proposed change has been evaluated in accordance                 with the Significant Hazards criteria of 10CFR50.92. The results of the evaluation demonstrate that the change does not involve any significant hazards as described below.
Relaxation of the MSSV setpoint tolerance from+1%to J3%does not increase the probability or consequences of an accident previously evaluated.
: 1. A significant increase in the probability or     consequences   of an accident previously   evaluated.
Component and system performance will not be adversely affected since equipment and system design criteria continue to be met.The MSSVs do not initiate any accident not already discussed in the UFSAR.Neither the mass and energy release to the containment following a postulated loss of coolant accident (LOCA), nor the containment response following the LOCA analysis, credit the MSSV in mitigating the consequences of an accident.For the events analyzed, all applicable acceptance criteria were satisfied, and there was no increase in the doses over those previously generated.
Relaxation of the MSSV setpoint tolerance from +1% to J3% does not increase the probability or consequences   of an accident previously evaluated.     Component and system performance will not be adversely affected since equipment and system design criteria continue to be met. The MSSVs do not initiate any accident not already discussed in the UFSAR. Neither the mass and energy release to the containment following a postulated loss of coolant accident (LOCA), nor the containment response following the LOCA analysis, credit the MSSV in mitigating the consequences                     of an accident. For the events analyzed, all applicable acceptance criteria were satisfied, and there was no increase in the doses over those previously generated.           As a result, the conclusions presented in the Donald C. Cook UFSAR are unaffected by the proposed change. Therefore, changing the MSSV lift setpoint tolerances would have no impact on the consequences           of an accident.
As a result, the conclusions presented in the Donald C.Cook UFSAR are unaffected by the proposed change.Therefore, changing the MSSV lift setpoint tolerances would have no impact on the consequences of an accident.2.Create the possibility of a new or different kind of accident from any accident previously evaluated.
: 2. Create the possibility   of a new or different kind of accident from any accident previously evaluated.
The possibility for an accident or malfunction of a different type than evaluated previously in the safety analysis report is not created.Increasing the lift setpoint tolerance on the MSSVs does not introduce a new accident initiator mechanism.
The possibility for an accident or malfunction         of a different type   than evaluated previously in the safety analysis report is not created.       Increasing the lift setpoint tolerance on the MSSVs does not introduce a new accident initiator mechanism.           No new failure modes have been defined for any system or component important to safety nor has any new limiting single failure been identified. No accident willbe  created that will increase the challenge to the MSSVs or result in increased actuation of the valves. Therefore, the possibility of an accident different than previously             evaluated is not created.
No new failure modes have been defined for any system or component important to safety nor has any new limiting single failure been identified.
: 3. Involve a significant reduction in     a margin of safety.
No accident will be created that will increase the challenge to the MSSVs or result in increased actuation of the valves.Therefore, the possibility of an accident different than previously evaluated is not created.3.Involve a significant reduction in a margin of safety.The margin of safety as defined in the basis of the Technical Specifications is not reduced by the change in the MSSV lift setpoint tolerance.
The margin     of safety as defined in the basis   of the Technical Specifications     is not reduced by the change in the MSSV         lift setpoint tolerance. The proposed Increase in the as-found MSSV           lift P
The proposed Increase in the as-found MSSV lift P A-3 setpoint tolerance will not Invalidate the LOCA or non-LOCA conclusions presented in the UFSAR accident analyses.The new loss of load/turbine trip analysis concluded that all applicable acceptance criteria are still satisfied.
A-3
For all the UFSAR non-LOCA transients, the DNB design basis, primary and secondary pressure limits, and dose limits continue to be met.Peak cladding temperatures remain below the limits specified in 10CFR50.46.
 
The calculated doses resulting from a steam generator tube rupture event remain within a small fraction of the 10CFR100 permissible releases.Thus, there is no reduction in the margin to safety.Note, however, in order to implement the proposed change, the Technical Specifications will have to be changed.
setpoint tolerance will not Invalidate the LOCA or non-LOCA conclusions presented in the UFSAR accident analyses. The new loss     of load/turbine trip analysis concluded that all applicable acceptance criteria are still satisfied. For all the UFSAR non-LOCA transients, the DNB design basis, primary and secondary pressure limits, and dose limits continue to be met.             Peak cladding temperatures remain below the limits specified in 10CFR50.46.           The calculated doses resulting from a steam generator tube rupture event remain within a small fraction       of the 10CFR100 permissible releases.
3.7.1.1 All aain stoma line coda safety valvea aasocLaeed vieh each sees.generator shall bo OPEkASLE.I IIC4HLBX: thCGM: ao b.VLeh 4 reactor coolant loopa and aaaociatad seaaa generacot..s Ln operation'assd vieh ona or aora aain ateaa lima code sefecy valvoa Lnoyorabla, operation Ln NOES 1, R and 3 aay proceed yrovidad, that within 4 houra, either eho Lnoparabla valve Ls raatorad to OPXMLI atatua or eha hwer 4nge Neutron fLux High Satpoint triy ia reduced yor Table 3.1-1.;othe~a, io Ln at laaat NT STARlT viehin eha naxt C houra and Ln Cog SMVTKNN vithin eho following 30 boura.>t e VLeh 3 raactor coolant looya an4 aaaociatad staaa gaaeraeogs Ln oyoratioss an4 vieh one or mra aain ataaa lina code safeey valvea aaaociatad vieh an operatic loop Lnoporabla, operaeLon Ln NRC 3 aalu proceed providad, that&thin 4 houri, either the Lnoporablo valve La raatorad to OHRALLC aeatua or che reactor trip breakers are opane4;othariiao, bo in COLO SRUTEOQN vtthin eha next 30 bours.C~The proviaiona of Spocificatioo 3.0.4 are not apylicable.
Thus, there is no reduction in the margin to safety.         Note, however, in order to implement the proposed change, the Technical Specifications       will have to be   changed.
4.7.1.1 Each aain a~liao code aafaey valve ahaG bo 4eeonaeraeed OPEMlJ, rich life aottiags and orifice aixaa aa ebs Ln Table 4,7 1, Ln accordance etch, Soetioss ZI of eho AQC loilar and Praaaura Vaaaal Coda, 1914 gee.D.C.COCC~URXZ 1 3/4 7-1 agama NO.ig0 TABLE 3.7-l HNIINN ALLONkE ONER RAHGK lKUTRON fLUN HIGH SETPOINT MITU INOPERhBLE STEAN lEFWlKflll
 
~~e C Naxtam Naker of feeyorable Safety Valves oa la ati Steaa Caaarator Hexf~Al)owable Power Range Neutron flux High Setpoint Percent of RATKD TERNAL PSKR 13.6  
3.7.1.1   All aain stoma line coda safety valvea aasocLaeed vieh each   sees.
generator shall bo OPEkASLE.
I IIC4HLBX:
thCGM:
ao   VLeh 4 reactor coolant loopa and aaaociatad seaaa generacot..s Ln operation'assd vieh ona or aora aain ateaa lima code sefecy valvoa Lnoyorabla, operation Ln NOES 1, R and 3 aay proceed yrovidad, that within 4 houra, either eho Lnoparabla valve Ls raatorad to OPXMLI atatua or eha hwer 4nge Neutron fLux High Satpoint   triy ia reduced yor Table 3.1-1.; othe~a, io Ln at laaat NT STARlT viehin eha naxt C houra and Ln Cog SMVTKNN vithin eho following 30 boura.                     >t e
: b. VLeh 3 raactor coolant looya an4 aaaociatad staaa gaaeraeogs Ln oyoratioss an4 vieh one or mra aain ataaa lina code safeey valvea aaaociatad vieh an operatic loop Lnoporabla, operaeLon Ln NRC 3 aalu proceed providad, that &thin 4 houri, either the Lnoporablo valve La raatorad to OHRALLC aeatua or che reactor trip breakers are opane4; othariiao, bo in COLO SRUTEOQN vtthin eha next 30 bours.
C~   The proviaiona of Spocificatioo 3.0.4 are not apylicable.
4.7.1.1 Each aain   a~     liao code aafaey valve ahaG bo 4eeonaeraeed OPEMlJ, rich life aottiags and orifice aixaa aa ebs Ln Table 4,7 1,           Ln accordance etch, Soetioss ZI of eho AQC loilar and Praaaura Vaaaal Coda, 1914 gee.
D. C. COCC ~ URXZ 1                 3/4 7-1                 agama   NO.ig0
 
TABLE 3.7-l HNIINN ALLONkE ONER RAHGK lKUTRON fLUN HIGH SETPOINT MITU INOPERhBLE STEAN lEFWlKflll
        ~   e
          ~
C Hexf~ Al)owable    Power Range Naxtam Naker of feeyorable Safety                         Neutron flux High Setpoint Valves oa la         ati Steaa Caaarator                 Percent of RATKD TERNAL PSKR 13.6
 
n 5%
oo  Nl                                $ 0CS yeiy                            1C  in.
h    N1                            'I
                                          $ 045 I
peiy                            LC  in oo  N-3                                5075 peig                              1C  ln I
4e  NR                                $ 07I yeiy W
1C  in.
  ~o  N3                                k$ peiy                                1C in.
I A
  +fho l tt catt    praaaaro aball oorroayqn4 aoaiaal oporatiay taeperatura ae1 proeeur' to aabieat aedltlone ot the yalya at.
 
Tho OPERAITLI.Y    of eha aain seoaa line coda safoey valvoo anagram Iocondaty Iyo coo proasuro vil1 bo Liiieo4 eo vi chin i ea do s '.gn pzoaguro of 10f5 paid durinj the oooe sovoro aneicipaeod syseoN opera.
eional eranaionc. The aux~'oliovini capaeiey i4 aaoociaeid vi h I eutbino erip froa 100% RATS THERMAL t5CL coincident vieh an aaavuaod .':
of eondonsot hoac sinJa (i.o.. no seaaa byyaaa eo eho condonaot).
The  Ipooifiod valve      life coceinla an@ rolioving capaeieioo are in aocozdaneo    viA eho    zoquiroaenea of 5occion ZTZ of eho QlC Soklor and prooquto Code L97L Cdi cion. The cecal rolioving cayao icy for al L valvo on a    o        g coaa    noo o L7 L53 . lOO Lba/ht vhieh ia apyroaiaaco ly LR
                                      ~
pot'cone of cho eoeal secondary acorn Gee of LL.L20,000 LboAg ae atagg. tOQXR. A        aint'f      2 OPCRAILC aafoey valvoo per oporabl ~
gcaaa gonotaeor onouroo ehac ouffioione rolieCag capacity ia evai
[00'ATZy lo for eho allowable ZHQ8AL PNC toactiot&a Ln Table 3.7 ~ L.
STARTUt and/or tQCL OPERATION          ii allerahlo vieh aafocy val inoyorablo +%chan cho Liiicaciona of the iCZZM r~iroaoncs on eho bao'.
of eho reduction. in secondary oyseee ae~ fZov aad TRLLCQ. tOMER zoq .
by eho rodueod reactor etiy ooccinga ~ f cho lover Range Noueron Flax channela. The reactor erfy aocyoint ro4aciona are darivo4 on eho foLLoving baooo:
For  4 Looy oporaeion a (L0%)
      %hero:
5P ~  N4acod toaccot eriy ooeyoint ia potcone of        RATtD THELVL 8%lLL V ~ eaaSaa    nuabet  ot inoyotailo aafocy valvoo por    scoaa 1ino L.,2  or 3.
X ~  Toeal rolkoving cayaaity ot      all oafoey valve! por aeoca Line ~ 4.off,454 Lbo/beut.
Y ~  Nacilua  roliovinl eayacicy ot    any one cato'ey valve
                    ~ f57,C94 Lbo/hour, (109) ~ Rover    Rancho  Neutron Ficta-High  Ttiy  Soepoine fot 4  loop oyoracion.
O..C. CXC      ~ UNION  1                  ) 3/i  $ L              AN~tKNT NO.
 
3,7,1.1  hL1 matn%Egal seaaa leone coda sa.aey valves assoc'.acid viA each stean jenaraeor sha11 be OPELQQ v'. 5 Life seer'gs as speci'f ed '.n TabLe 3: I -'a.
2      i ~
ao  Vkeh 4  reactor coolane Loops and associated seeaa generaeo s Ln cyerae'on and vieh one or mora Iakn seeaa LW coda.sa eey valves
              ~ rable, eparaeton La CNS 1, 2 and S may proceed yrovided, chat vtdgn 4 bees, etcher ehe inoperable valve ts reseored eo vichin eho neat C    ~s                                        ~~
OPQhlLX jeacQ$ Qr ehe ?4%%r iange &#xc3;oLeron F11% Ekgh Trip Sec[oint.
ia reduced year Table S.l-l: otherwise, be in at Lease Bet ca@ La COTE 51CTtRKNN vtehfa ehe follm4ag 30 heats.                                                          i
: b. VSch 3  reaotor coolant looya aaL associated steam generators bi operation aa4 etch one or sere aaSa steam Lhse code sa"oey valves aaaoetato4 &th an ~racial 3eoy taeporable, eyeraef.on ta MDL 3 may yrocoo4 ytevtdad, chat vtthta    l beati, eiehet the i.noyerable valve Sa reaeored te OZQQLX status er ehe reactor trLy brewers are eyeaed; etheaCae, be Qx COLO SRUTI% withe ehe next 30 hexa.
          'The yxevta5.oaa  of SpoctNcaeton 3.0.I are not ayylfcable, 4.?.L.L Io  e44LCLeaai SerretlLcaee    teqCr~ta    eehez than chose ~red    by 4.t.$ .
S/a 7~1              Ajg&#xc3;KICRT 50. 82


n 5%1C in.LC in 1C ln 1C in.1C in.oo N l$0CS yeiy h N 1$045 peiy'I I oo N-3 5075 peig I 4e NR$07I yeiy W~o N 3 k$peiy I A+fho l tt catt praaaaro aball oorroayqn4 to aabieat aedltlone ot the yalya at.aoaiaal oporatiay taeperatura ae1 proeeur'
TABLE 3. l-l INXINll ALL@NB.K PSKR  RANGE NK~U~F            SETPOIIIT  lIITII INOPERABLE STEAH Nax)mm h))mab)e Poser Range Saxi~ Nuwber  of        le Safety                      NeNtroa Flux lllgh Setpoiat Va ves oa                          or                Cerement of  RATEO  TIIENHL PONER 87.2


Tho OPERAITLI.Y of eha aain seoaa line coda safoey valvoo anagram Iocondaty Iyo coo proasuro vil 1 bo Liiieo4 eo vi chin i ea do s'.gn pzoaguro of 10f5 paid durinj the oooe sovoro aneicipaeod syseoN opera.eional eranaionc.
ZAlkf 3.7-h STEIN Ltd  SQ'HY VALVfS ffN lOOP 81+
The aux~'oliovini capaeiey i4 aaoociaeid vi h I eutbino erip froa 100%RATS THERMAL t5CL coincident vieh an aaavuaod.': of eondonsot hoac sinJa (i.o..no seaaa byyaaa eo eho condonaot).
VM                                                llfT SEHl                    ORIFlCE SIZE
The Ipooifiod valve life coceinla an@rolioving capaeieioo are in aocozdaneo viA eho zoquiroaenea of 5occion ZTZ of eho QlC Soklor and prooquto Code L97L Cdi cion.The cecal rolioving cayao icy for al L valvo on a o g coaa noo o L7~L53.lOO Lba/ht vhieh ia apyroaiaaco ly LR pot'cone of cho eoeal secondary acorn Gee of LL.L20,000 LboAg ae[00'ATZy atagg.tOQXR.A aint'f 2 OPCRAILC aafoey valvoo per oporabl~gcaaa gonotaeor onouroo ehac ouffioione rolieCag capacity ia evai lo for eho allowable ZHQ8AL PNC toactiot&a Ln Table 3.7~L.STARTUt and/or tQCL OPERATION inoyorablo
: a. SV-l                                                l065 psig                      l6 i li. SV-l                                                )065 psig                      16 in.~
+%chan cho Liiicaciona of of eho reduction.
: c. SV-2                                               l075 psig                      )6 in.~
in secondary oyseee by eho rodueod reactor etiy ooccinga channela.The reactor erfy aocyoint foLLoving baooo: For 4 Looy oporaeion ii allerahlo vieh aafocy val the iCZZM r~iroaoncs on eho bao'.ae~fZov aad TRLLCQ.tOMER zoq.~f cho lover Range Noueron Flax ro4aciona are darivo4 on eho a (L0%)%hero: 5P~N4acod toaccot eriy ooeyoint ia potcone of RATtD THELVL 8%lLL V~eaaSaa nuabet ot inoyotailo aafocy valvoo por scoaa 1ino L.,2 or 3.X~Toeal rolkoving cayaaity ot all oafoey valve!por aeoca Line~4.off,454 Lbo/beut.Y~Nacilua roliovinl eayacicy ot any one cato'ey valve~f57,C94 Lbo/hour, (109)~Rover Rancho Neutron Ficta-High Ttiy Soepoine fot 4 loop oyoracion.
: 1. SV-2,                                              l075 prig                    l6 in.2
O..C.CXC~UNION 1)3/i$L AN~tKNT NO.  
: e. SV-3                                                )NS ysiS                      l6 in.~
l% mme XI'ressure slull cerrespoal        to oehieat coa4itioas of Qe valve at eewiaal oyeratiay teayerebee.aal yra5ssre.


3,7,1.1 hL1 matn seaaa leone coda sa.aey valves assoc'.acid viA each stean jenaraeor sha11 be OPELQQ v'.5 Life seer'gs as speci'f ed'.n TabLe 3: I-'a.%Egal 2 i~ao b.Vkeh 4 reactor coolane Loops and associated seeaa generaeo s Ln cyerae'on and vieh one or mora Iakn seeaa LW coda.sa eey valves~rable, eparaeton La CNS 1, 2 and S may proceed yrovided, chat vtdgn 4 bees, etcher ehe inoperable valve ts reseored eo OPQhlLX jeacQ$Qr ehe?4%%r iange&#xc3;oLeron F11%Ekgh Trip Sec[oint.ia reduced year Table S.l-l: otherwise, be in at Lease Bet~~vichin eho neat C~s ca@La COTE 51CTtRKNN vtehfa ehe follm4ag 30 heats.i VSch 3 reaotor coolant looya aaL associated steam generators bi operation aa4 etch one or sere aaSa steam Lhse code sa"oey valves aaaoetato4
Tho   OHRQIUTT of cho cata sceaa ltno                 eo4a aafecy   ~aires eaaeea
&th an~racial 3eoy taeporable, eyeraef.on ta MDL 3 may yrocoo4 ytevtdad, chat vtthta l beati, eiehet the i.noyerable valve Sa reaeored te OZQQLX status er ehe reactor trLy brewers are eyeaed;etheaCae, be Qx COLO SRUTI%withe ehe next 30 hexa.'The yxevta5.oaa of SpoctNcaeton 3.0.I are not ayylfcable, 4.?.L.L Io e44LCLeaai SerretlLcaee teqCr~ta eehez than chose~red by 4.t.$.S/a 7~1 Ajg&#xc3;KICRT 50.82 TABLE 3.l-l INX INll ALL@NB.K PSKR RANGE NK~U~F SETPOIIIT lIITII INOPERABLE STEAH Saxi~Nuwber of Va ves oa le Safety or Nax)mm h))mab)e Poser Range NeNtroa Flux lllgh Setpoiat Cerement of RATEO TIIENHL PONER 87.2 VM a.SV-l li.SV-l c.SV-2 1.SV-2, e.SV-3 ZAlkf 3.7-h STEIN Ltd SQ'HY VALVfS ffN lOOP 81+llfT SEHl l065 psig)065 psig l075 psig l075 prig)NS ysiS ORIFlCE SIZE l6 i 16 in.~)6 in.~l6 in.2 l6 in.~l%mme XI'ressure slull cerrespoal to oehieat coa4itioas of Qe valve at eewiaal oyeratiay teayerebee.aal yra5ssre.
        ~c   ee seceataxy Iystaa )casanova <11 Q ltatca4 ce WN,a ll0o of tcs oazbtne                104i of aen4ensor beaC sink (L,e., M
Tho OHRQIUTT of cho cata sceaa ltno eo4a aafecy~aires eaaeea~c ee seceataxy Iystaa)casanova<11 Q ltatca4 ce WN,a ll0o of tcs 4ast~yciseure of 104$Pstg 4ctag Cho aesC severs anctctpace4 eyscaa oPoractana1 transient.
                                      ~
The aaxtaa ralteCag ceyaaicy ts assoctaca4 vSch a oazbtne crt'~104i~TRENT 8$ZR aotnatdanc rich an ass~4 1ois of aen4ensor beaC sink (L,e., M s~l+ass ce che aon4ansaz).
4ast~ yciseure of 104$ Pstg 4ctag Cho aesC severs anctctpace4 eyscaa oPoractana1 transient. The aaxtaa ralteCag ceyaaicy ts assoctaca4 vSch a crt'~                       TRENT 8$ ZR aotnatdanc rich an ass~4 1ois s~     l+ass ce che aon4ansaz).
Tbe syoetfto4 Mw 1SA sottSILgs an4 reltovtag ecyacittas are tn aeeor4anae etch cho reqatr~cs of Soertoa III of cho A58R&tier an4~gggg~p Pros~e Co4e, 1071 Mic oe Tbe cecal toit~ecyactcy of a11 aafocy v res oa e s~linea La lT,U$,000 lhsiht~ah ta ac lease 10f~tcanc of che 84%~soaon~sc440 AM race ae 100'ATZO~g, 5ggR.i Ntsga%of!OMAlLS aafecy M&s Por s~gonatacar toglkgos chas eatttatane reit~aayaetry ta~ladle fer Ihe alletahlo tRQNAL?OCR toscrta!Soi ta Taile 3.7 l.STIRXQP ea4/ot 8$CL OPmliTKON te allowable etch safely~tseyerailo withe che 1$akcactoes ot the AC?TM~reeencs oa the hasta of che re4sacioo ta soaea4axy aye~s~flee sni Thtlsg.8&#xc3;CR-r~atxe4 iy Che te4aae4 reaecer.eriy eeeeSNge ef Ae Peat Range'1~chIRhllso The reeccer~ee~tkc f04Nrtooe are 4ert~eO che fellatio bases: ga l 1eey eyeracQe a (i')Aero: St a re~reeecee arty eeeyeLae La Poreene of lCCl TIRlh 8%&1 a aml~aeAer ef Saeyetahle safeey Weel Per seem@as Y=-&#x17d;10'Ieiil relS~eoyoetry of all safoey valves Per stable~SB Qe./bees e 4,Q!,4S~~rolteviag eayac&y ef~one safoey va1ve Sa O~.Pe+&#x17d;aSt, See teat Osage See~Plm~ltd Seeyets!fer 1 leep~ye ra@tee~WCLCaa tLaa mt a 1$/4 liL sammy Io.$2.  
Tbe   syoetfto4     Mw 1SA       sottSILgs an4     reltovtag ecyacittas are tn aeeor4anae   etch cho     reqatr~cs of         Soertoa   III of cho                 &tier
~gggg~p Pros~e v res Co4e, 1071     Mic oe s~          Tbe cecal linea toit~             A58R ecyactcy of lT,U$ ,000 lhsiht ~ah ta a11 an4 aafocy 100'ATZO ~g, oa      e                        La                                            ac lease 10f
        ~tcanc of           84%~ soaon~ sc440 AM race 5ggR. i Ntsga% of ! OMAlLS aafecy M&s Por s~ gonatacar che                                                ae chas eatttatane reit~ aayaetry ta ~ladle fer Ihe alletahlo tRQNAL toglkgos
        ?OCR   toscrta!Soi ta Taile 3.7         l.
STIRXQP tseyerailo withe ea4/ot   8$ CL OPmliTKON te allowable etch safely che 1$ akcactoes ot the AC?TM ~reeencs oa the
                                                                                                ~
hasta of che re4sacioo ta soaea4axy aye~                 s~     flee sni Thtlsg.           8&#xc3;CR-chIRhllso fellatio    bases:
The  reeccer    ~ ee~tkc r~atxe4 iy Che te4aae4 reaecer.eriy eeeeSNge ef Ae Peat f04Nrtooe are      4ert~
Range'1~
eO che ga   l 1eey eyeracQe a (i')
Aero:
St a   re~ reeecee TIRlh 8%&
arty   eeeyeLae La Poreene     of lCCl 1a    aml~       aeAer ef Saeyetahle safeey Weel Per seem
                            @as Y=-
                      '~    Ieiil relS~ eoyoetry SB Qe. /bees e 4,Q!,4S of all safoey valves              Per stable
                            ~~.Pe+'aSt, Sa  O~
rolteviag eayac&y ef See
                                                                      ~   one safoey va1ve 10'    teat     Osage
                            ~ ye ra@tee See~       Plm   ~ ltd         Seeyets!         fer 1 leep
        ~   WCLCaa     tLaa       mt a                     1 $ /4 liL                     sammy Io. $ 2.


INNT A he safety nl>e)s OPERABLE~)th a 1)ft setting of'W about the nmfnal value.H~r, the safety valve shall be reset to the noa)nal value+]%whenever f~outs1de the+1%tolerance.}}
INNT A he safety nl>e )s OPERABLE ~)th a 1 )ft setting of'W value. H~r,                                         about the safety valve shall be reset to the noa)nalthe nmfnal whenever f~ outs1de the +1% tolerance.                       value +]%}}

Latest revision as of 01:28, 4 February 2020

DC Cook Units 1 & 2 Main Steam Safety Valve Lift Setpoint Tolerance Relaxation.
ML17331B133
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 12/31/1993
From:
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To:
Shared Package
ML17331B132 List:
References
SECL-91-429, SECL-91-429-R02, SECL-91-429-R2, NUDOCS 9312230047
Download: ML17331B133 (157)


Text

DONALD C. COOK UNITS 1 R 2 MIJN STEAM SAHHY VALVE LIFI'ETPOINT TOLERANCE RELAXATION Nuclear and Advanced Technology Division Westinghouse Electric Corporation December 1993 e1993 Westinghouse Electric Corporation All Rights Reserved 9312230047 931217 PDR ADOCK 05000315

. P PDR

SECL-91<29, Revision 2 TABLE OF CONTENTS

~SE I~N PA E List of Tables List of Figures nI Safety Evaluation Check List VI Introduction Licensing Basis Evaluations Non-LOCA 5 LOCA 17 Containment Integrity 24 Steam Generator Tube Rupture 24 Component Performance 25 Systems Evaluation 26 Radiological Evaluation 26 Plant Risk Analysis /PE) 26 Plant Risk Analysis (non-IPE) 26 I&C Systems 27 Technical Specifications 27 Assessment of No Unreviewed Safety Question 28 Conclusion 31 References 32 Appendix A: Significant Hazards Evaluation Appendix B: Recommended Technical Specification Marked-Ups 91429R2.wpf

LIST OF TABLES TABLE PA E Table 1: Main Steam Safety Valve LiftSetpoints Table 2: DNB Design Basis Transients Not Affected by MSSV LiftSetpoint Tolerance Increase Table 3: Unit 1 Turbine Trip Sequence of Events 33 Table 4: Unit 2 Turbine Trip Sequence of Events 35 Table 5: Current Licensing Basis Steam Line Safety Valves per Loop 37 Table 6: MSSV Setpoint Increase Steam Line Safety Valves per Loop 38 Table 7: Unit 1 Low Pressure Low Temperature Input Parameters 39 Table 7a: Unit 1 Initial Input Parameters for the Small Break LOCA Analysis Table 8: Unit 1 Low Pressure High Temperature Input Parameters 41 Table 9: Unit 2 Low Pressure High Temperature Input Parameters 42 Table 10: Unit 1 Small Break LOCA Evaluation Time Sequence of Events 43 Table 10a: Unit 1 Small Break LOCA Analysis Time Sequence of Events Table 11: Unit 1 Small Break LOCA Evaluation Summary of Results 45 Table 11a: Unit 1 Small Break LOCA Analysis Summary of Results Table 12: Unit.2 Small Break LOCA Evaluation 46 Time Sequence of Events 47 Table 13: Unit 2 Small Break LOCA Evaluation Summary of Results 48 ubxxx.wpf: Id-121393

SECI 91<29, Revision 2 LIST OF FIGURES

~IGURB Figure la: Illustration of Overtemperature and Overpower hT Protection for Unit 1 Figure 1b-c: Illustration of Overtemperature and Overpower hT Protection for Unit 2 (mixed and full V-SH cores)

Figure 2: Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 3: Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Nuclear Power and DNBR Figure 4: Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 5: Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback; Steam Generator Pressure and MSSV Relief Rate Figure 6: Unit 1 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Pressurizer Relief Rate Figure 7: Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 8: Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Nuclear Power and DNBR Figure 9: 'nit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 10: Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 11: Unit 1 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Pressurizer Relief Rate Figure 12: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 13: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Nuclear Power and DNBR Figure 14: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Core Average Temperature and Loop Temperature f '1429R2.wp

SECL-91<29, Revision 2 LIST OF FIGURES (Continued)

~FI @RE Figure 15: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 16: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Pressurizer Relief Rate Figure 17: Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 18: Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Nuclear Power and DNBR Figure 19: Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 20: Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 21: Unit 1 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Pressurizer Relief Rate Figure 22a-b: Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 23a-b: Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Nuclear Power and DNBR Figure 24a-b: Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 25a-b: Unit 2 Turbine Trip Event Without OPressure Control, Minimum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 26a-b: Unit 2 Turbine Trip Event Without Pressure Control, Minimum Reactivity Feedback: Pressurizer Relief Rate Figure 27a-b: Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 28a-b: Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Nuclear Power and DNBR 91429Rz.wpf 1v

SECI 91-429, Revision 2 LIST OF FIGURES (Continued)

FI URE Figure 29a-b: Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 30a-b: Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 31a-b: Unit 2 Turbine Trip Event Without Pressure Control, Maximum Reactivity Feedback: Pressurizer Relief Rate Figure 32a-b: Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 33a-b: Unit 1 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Nuclear Power and DNBR Figure 34a-b: Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 35a-b: Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 36a-b: Unit 2 Turbine Trip Event With Pressure Control, Maximum Reactivity Feedback: Pressurizer Relief Rate Figure 37a-b: Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Pressurizer Pressure and Water Volume Figure 38a-b: Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Nuclear Power and DNBR Figure 39a-b: Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Core Average Temperature and Loop Temperature Figure 40a-b: Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Steam Generator Pressure and MSSV Relief Rate Figure 41a-b: Unit 2 Turbine Trip Event With Pressure Control, Minimum Reactivity Feedback: Pressurizer Relief Rate 9 1 429R2.wp f v

SECI 91-429, Revision 2 Customer Reference No(s).

PO: 04877-040-IN Westinghouse Reference No(s).

WESTINGHOUSE NUCLEAR SAFETY SAFETY EVALUATIONCHECK LIST

1) NUCLEAR PLANT(S): DONALD'C COOK NITS 1 AND 2
2) SUBJECT (TITLE): RELAXATI N F MSSV SETPOINT TOLERANCE TO +/-  %
3) The written safety evaluation of the revised procedure, design change or modification required by 10CFR50.59 (b) has been prepared to the extent required and is attached. If a safety evaluation is not required or is incomplete for any reason, explain on Page 2.

Parts A and B of this Safety Evaluation Check List are to be completed only on the basis of the safety evaluation performed.

CHECK LIST - PART A 10CFR50.59(a)(1)

(3.1) Yes X No A change to the plant as described in the UFSAR?

(3.2) Yes No X,,A change to procedures as described in the UFSAR?

(3.3) Yes No X A test or experiment not described in the UFSAR?

(3.4) Yes X No A change to the plant technical specifications?

(See note on Page 2.)

4) CHECK LIST - Part B 10CFR50.59(a)(2) (Justification for Part B answers must be included on Page 2.)

(4.1) Yes No X Will the probability of an accident previously evaluated in the UFSAR be increased?

(4.2) Yes No X Will the consequences of an accident previously evaluated in the UFSAR be increased?

(4.3) Yes No X May the possibility of an accident which is different than any already evaluated in the UFSAR be created?

(4.4) Yes No X Will the probability of a malfunction of equipment important to safety previously evaluated in the UFSAR be increased?

(4.5) Yes No X Will the consequences of a malfunction of equipment important to safety previously evaluated in the UFSAR be increased?

(4.6) Yes No X May the possibility of a malfunction of equipment important to safety different than any already evaluated in the UFSAR be created?

(4.7) Yes No X Will the margin'of safety as defined in the bases to any technical specifications be reduced?

91429R2.wpf vi

SECL-91-429, Revision 2 NOTES:

If the answers to any of the above questions are unknown, indicate under 5) REMARKS and explain below.

If the answers to any of the above questions in Part A 3.4 or Part B cannot be answered in the negative, based on the written safety evaluation, the change review would require an application for license amendment as required by 10CFR50.59(c) and submitted to the NRC pursuant to 10CFR50.90.

5) REMARKS:

The attached safety evaluation summarizes the justification for answers given in Part A 3.4 and Part B of this safety evaluation check list:

'Reference to documents containing written safety evaluation:

F R UF AR PDATE Pages: Tables: Figures:

Reason for/Description of Change:

UFSAR Mark-u s e rovided b se arate transmittal

6) SAFETY EVALUATIONAPPROVAL LADDER:

1 6.1) Prepared by (Nuclear Safety):

6.2) Reviewed by (Nuclear Safety):

dccook.wp f-121093 vn

SECI 91<29, Revision 2 DONALD C. COOK UNITS 1 &2 INCREASED IVORYÃ ST1MH SAFRXY VALVESEIPOINT TOLERANCE SAFEIY EVALUATION I. INTRODUCTI N American Electric Power Service Corporation (AEPSC) has found that over an operating cycle the setpoint of the Main Steam Safety Valves (MSSVs) can change by more than 1% from the original set-pressure. AEPSC has requested that Westinghouse perform an evaluation to increase the lift setpoint tolerance on the MSSVs at Donald C. Cook Units 1 & 2. The following safety evaluation is provided to support changing the as-found liftsetpoint tolerance as stated by the Technical Specifications from J1% to +3%.

During normal surveillance, if the valves are found to be within +3%, they will be within the bases of the accident analyses, however, the valves will be reset to J1% to account for future accumulation of drift. Thus, this evaluation permits a J3% setpoint tolerance to address as-found conditions.

The MSSVs are located outside containment upstream of the Main Steam Isolation Valves. The purpose of the valves is to prevent overpressurization of the steam generators. In order to accomplish this, a bank of five valves is located on each of the four steam generators, and the relief capacity is designed such that the total steam flow from the 20 valves will bound that produced by the limiting licensing-basis analysis. For Donald C. Cook, the total relief capacity of the 20 valves is

17. 153 E6 ibm/hr at 1186.5 psia (1171.5 psig).

The lift setpoints of the individual valves on each steamline are staggered at different pressures to minimize chattering once the valves are actuated. Staggering the valves also minimizes the total number of valves actuated during those transients where less than the maximum relief capacity is required thereby reducing maintenance requirements on the valves. The actual setpoints are provided in Table 1 and are documented in Tables 4.7-1 and 3.7-4 of the Units 1 and 2 Technical Specifications, respectively (Reference 1).

91429Rz.wpf

SECL-91<29, Revision 2 The operation of the Class 2 main steam safety valves (MSSVs) is governed by the ASME Code (Reference 2). AEPSC will maintain the design basis of the MSSVs by ensuring that the valves, if outside the J1% tolerance, will be recalibrated to within J1%. The purpose of this evaluation is to provide a quantification of the effects of a higher as-found liftsetpoint tolerance. This safety evaluation will address the effects of the J3% as-found tolerance on UFSAR accident analyses (non-LOCA, LOCA, SGTR) and will document how the effects are accounted for within the accident analyses and the acceptability of the increase in the liftsetpoint tolerance.

91<29R2.wpf

SECI 91-429, Revision 2 TABLE 1 MAINSTEAM SATINY VALVELIFI'ETPOINT Value Number .Lift Se oint 1 SV-1 1065 psig (1080 psia)

SV-1 1065 psig (1080 psia)

SV-2 1075 psig (1090 psia)

SV-2 1075 psig (1090 psia)

SV-3 1085 psig (1100 psia)

References:

Table 4.7-1 of the Unit 1 Technical Specifications and Table 3.7-4 of the Unit 2 Technical Specifications 91429R2.wpf

SECL-91<29, Revision 2 II. LICENSING BASIS Title 10 of the Code of Federal Regulations, Section 50.59 (10CFR50.59) allows the holder of a license authorizing operation of a nuclear power facility the capacity to initiate certain changes, tests and experiments not described in the Updated Final Safety Analysis Report (UFSAR). Prior Nuclear Regulatory Commission (NRC) approval is not required to implement the modification provided that the proposed change, test or experiment does not involve an unreviewed safety question or result in a change to the plant technical specifications incorporated in the license. While the proposed change to the MSSV liftsetpoint tolerances involves a change to the Donald C. Cook Technical Specifications and requires a licensing amendment request, this evaluation will be performed using the method outlined under 10CFR50.59 to provide the bases for the determination that the proposed change does not involve an unreviewed safety question. In addition, an evaluation will demonstrate that the proposed change does not represent a significant hazards consideration, as required by 10CFR50.91 (a) (1) and will address the three test factors required by 10CFR50.92 (c).

The non-LOCA safety analyses will be examined to determine the impact of the MSSV liftsetpoint tolerance relaxation on the DNB design basis as well as the applicable primary and secondary system pressure limits. The long-term core cooling capability of the secondary side will also be considered.

The LOCA evaluation will investigate the effects on the licensing basis small break analysis in terms of peak clad temperature, and any adverse effects on the steam generator tube rupture event and subsequent dose release calculations will also be determined.

91429R2.wpf

SECI 91<29, Revision 2 III. EVALUATIONS The results of the various evaluations from the Nuclear Safety related disciplines within Westinghouse scope are discussed in the following sections.

1. Non-LOCA Evaluation The non-LOCA accident analyses that are currently presented in the UFSAR modelled the MSSVs as a'ank of five valves, all of which having a lift setpoint equal to that of the highest set valve (1100 psia) plus 3% to account for accumulation. All of the analyses and evaluations performed for this report modelled the staggered behavior of the MSSVs. Specifically, each valve was assumed to operate individually. Moreover, the analyses/evaluations of this report modelled the flow rate of each valve to ramp linearly from no flow at its lift setpoint (nominal Technical Specification setpoint plus or minus the 3% tolerance value) to full open flow at its full open point (3% above the pressure at which the valves were assumed to pop open - i.e., accumulation effect).

For the purposes of this evaluation, all 20 MSSVs are assumed to lift3% above the Technical Specification lift setpoint and achieve full rated flow (normally at 3% abov:: the setpoint) 6% above the setpoint.

hT Protection The increase in the MSSV liftsetpoint tolerance has the potential to impact the Overtemperature hT and Overpower hT setpoint equations. Referring to Figure la for Unit 1 and Figures 1b and 1c (which are the most limiting case for each unit/core type), increasing the point at which the MSSVs lift will lower the steam generator safety valve line.

If the current OTAT setpoint coefficients (K1 through K3) result in protection lines that just bound the thermal core limits, it is possible that by lowering the SG safety valve line to the right, a portion of the core limits will be uncovered.

'1429R2.wpf

SECI 91<29, Revision 2, In order to evaluate the effects of the increase in the setpoint tolerance, the Overtemperature hT and Overpower dT setpoint equations (K1 through K6) were examined to determine if the equations remained valid assuming that all 20 MSSVs opened with a +3% tolerance. The results of that evaluation showed that there was sufficient margin in the generation of the current setpoint equations to offset the lowering of the SG safety valve line. Thus, changes to the Overtemperature and Overpower Technical Specifications are not needed. The results of this evaluation are presented as Figures la, lb, and 1c.

~DNB Even The transients identified in Table 2 are analyzed in the D. C. Cook UFSAR to demonstrate that the DNB design basis is satisfied. With one exception, these events are a) of such a short duration that they do not result in the actuation of the MSSVs, b) core-related analyses that focus on the active fuel region only (i.e., only the core is modelled), or c) cooldown events which result in a decrease in secondary steam pressure. The single exception is the loss of external load/turbine trip event which is addressed explicitly in the ANALYSIS section of this safety evaluation. Thus, based on the above, these yon-LOCA DNB transients are not adversely impacted by the proposed change, and the results and conclusions presented in the UFSAR remain valid, Boron Dilution Event The boron dilution event (14.1.5) is analyzed to demonstrate that the operators (or the automatic mitigation circuitry) have sufficient time to respond prior to reactor criticality. The secondary system is not modeled in the analysis of this event, and thus, changes to the MSSVs have no impact on this event. Therefore, the results and conclusions presented in the UFSAR remain valid.

Steamline Break Mass &: Ene Releases For the steamline break mass and energy releases, the'steam release calculations are insensitive to the changes in the MSSV liftsetpoints since the vast majority of these calculations result in depressurizations of the secondary side such that the MSSVs are not actuated. For the 91429Rz.wpf

SECI 91-429, Revision 2 TABLE 2 DNB DESIGN BASIS TRANSIENTS NOT AFFECTED BY MSSV LIFI'ETPOINT TOLERANCE INCREASE"'vent UFSAR Section Excessive Heat Removal Due to 14.1.10 Feedwater System Malfunction Excessive Load Increase Incident 14.1.11 Rupture of a Steam Pipe (Steamline 14.2.5 Break - Core Response)

Loss of Reactor Coolant Flow 14.1.6 includes Locked Rotor Analysis)

Uncontrolled RCCA Bank Withdrawal 14.1.1 From a Subcritical Condition Uncontrolled RCCA Bank Withdrawal 14.1.2 at Power RCCA Misalignment 14.1.3 91429R2.wpf

SECI 91-429, Revision 2 smaller break cases that might result in a heatup, one MSSV per steam generator is sufficient (based on the existing analyses) to provide any required heat removal following reactor trip. The secondary pressures will be no greater than those presently calculated. Thus the existing steamline break mass and energy release calculations remain valid.

Event UFSAR Sectio Steamline Rupture Mass & Energy Releases WCAP-11902 Inside Containment Supplement 1

'teamline Rupture Mass & Energy Releases WCAP-10961 Rev 1 Outside Containment for (current)

Equipment Environmental Qualification Submittal AEP:NRC:1140*

(approved 11/20/9 1)

Submittal AEP:NRC:1140 "Technical Specification Change Request, BIT Boron Concentration Reduction," March 26, 1991.

(included in WCAP-11902, Supplement 1)

Lon -Term Heat Removal Events The only non-LOCA transients remaining are the long-term heatup events. The long-term heat removal events are analyzed to determine if the auxiliary feedwater (AFW) heat removal capability is sufficient to ensure that the peak RCS and secondary pressures do not exceed allowable limits, the pressurizer does not fill (LONF/LOOP), and the core remains covered and in a eoolable geometry (FLB). These transients are listed below.

Event Loss of All AC Power to the Plant 14.1.12 Auxiliaries (Loss of Offsite Power - LOOP)

Loss of Normal Feedwater (LONF) 14.1.9 Feedwater System Pipe Break (FLB)* 14.1.8 C

  • The Feedwater System Pipe Break event is not part of the Unit 1 licensing basis and is presented in the Unit 1 UFSAR for information purposes only.

These transients are impacted by the increase in the MSSV lift setpoint tolerance because the calculations determining the amount of AFW flow available must assume a maximum given steam generator backpressure in order to determine the amount of AFW that can be delivered. As the steam 4

91429Rz.wp f

SECL-91<29, Revision 2 generator back pressure increases, the amount of AFW delivered will be reduced. For the loss of normal feedwater and the loss of all AC power to the Plant Auxiliaries events, evaluations were performed in which the staggered actuation of the MSSVs was taken into account.

The safety analysis presented in the current UFSAR assumed an AFW flow rate of 450 gpm, split evenly to all four steam generators. The evaluations done for this report concerning loss of normal feedwater (LONF) for Units 1 and 2, as well as loss of all AC power to the plant auxiliaries (LOOP) for Unit 1, demonstrated that the secondary side pressures will not exceed 1123 psia during the time AFW is delivered to the steam generators. Based on Reference 10, the AFW assumptions modeled in the safety analysis remain valid for steam generator backpressures up to 1123 psia. Since the evaluation, in which a +3% MSSV setpoint tolerance was assumed, showed that the secondary side pressure transient will not preclude the AFW flow rates assumed in the analysis from being supplied to the steam generators, the existing analyses remain valid for Unit 1 LONF/LOOP and Unit 2 LONF.

The Loss of Offsite Power event (LOOP) for Unit 2 was also evaluated for this-report. The LOOP safety analysis presented in the current UFSAR for Unit 2 assumed an AFW flow rate of 430 gpm split evenly to all four steam generators. The recent'evaluation done for this report took credit for the staggered actuation of the MSSVs as well as a +3% setpoint tolerance, as discussed earlier. The evaluation yielded results similar to those discussed above for Unit 1. The secondary side pressure for this Unit 2 evaluation was demonstrated not to exceed 1133 psia during the period AFW is supplied. Based on Reference 10, the secondary side pressure transient was found not to preclude the AFW flow rates assumed in the analysis from being delivered to the steam generators. Therefore, the existing Loss of Offsite Power analysis for Unit 2 remain valid.

The evaluations for the LONF/LOOP events for both Unit 1 and Unit 2, as discussed above, demonstrate that the respective analyses are still applicable even if a MSSV liftsetpoint tolerance of

+3% is assumed. Therefore the results and conclusions presented in the Donald C. Cook Unit 1 &2 UFSAR remain valid.

The evaluation done for this report for the Unit 2 Feedline Break event demonstrated that, the secondary side pressure will not exceed 1133 psia during the period when AFW is being delivered.

91429R2.wpf

SECL-91<29, Revision 2 At 1133 psia, an AFW flow rate of 685 gpm with asymmetric flow splits to the three intact steam generators could be supplied based on information contained in Reference,10. The current analysis for this event assumed a total AFW flow rate of 600 gpm with an even split of 200 gpm to the three intact steam generators. Since the total AFW flow rate is more than sufficient to accommodate AFW flow split deviations of as much as 25 gpm per loop, the current Feedline Break analysis continue to be applicable and remain bounding for this evaluation. Therefore, the results and conclusions presented in the Unit 2 UFSAR (14.2.8) remain valid.

-3% Tolerance:

The secondary steam releases generated for the locked rotor offsite dose calculations for Unit 2 could be potentially affected by an increase in the MSSV setpoint tolerance from -1% to -3%. Reference 9 transmitted the most recent locked rotor dose analysis. Given that the radiological assumptions used in the Reference 9 analysis do not change with an increase in MSSV setpoint tolerance (i.e.,

rods-in-DNB and primary to secondary leakage remain at 11% and 1 gpm respectively) the only effect the tolerance increase would have would be on the mass release values. The methodology used to calculate these masses is based on determining the amount of secondary side inventory required to cool down the RCS. During the first two hours (0-2 hours), the operators are assumed to lower the RCS average temperature to no-load conditions (547'F) by bleeding steam. Over the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> (2-8 hours), the operators will cool the plant down such that Mode 4 operation (hot shutdown) can be entered.

The existing steam release calculations for the 0-2 hour period used enthalpies corresponding to saturated conditions at both the nominal full power RCS average temperature and the no-load temperature (581.3'F and 547'F, respectively). Thus, as long as the increased liftsetpoint tolerance

(-3%) does not result in the MSSVs remaining open at a saturation temperature outside of the range identified above, the existing mass releases remain valid (Reference 9),

The existing mass release calculations were performed using the temperatures previously identified (581.3'F and 547'F). Per the Donald C. Cook Technical Specifications, the lowest set MSSV on each steam generator will open at 1080 psia (1065 psig) not including any tolerance. Based on the ASME Steam Tables (Reference 6) at saturated conditions, 547'F corresponds to 1020.1 psia and 9 l-429R2.wp f 10

SECL-91-429, Revision 2 represents the lowest steam pressure considered in the mass calculations. Thus, the existing releases include a reseat pressure approximately 5.5% below the lowest Technical Specification lift setpoint.

As long as the valves continue to reseat within this. pressure range, the current mass releases remain valid.

The operating windows that are applicable for Unit 1 operation are bounded by the Unit 2 dose analysis. Therefore, the mass releases for Unit 2, as found in Reference 9, are applicable to Unit 1.

Evaluation Summa Thus, based on the discussions presented above, only one UFSAR non-LOCA transient is impacted

'uch that a new analysis must be performed in order to address the effects of the MSSV lift setpoint tolerance increase from J1% to J3%. This event is the loss of external load/turbine trip accident.

For the other transients, the results and conclusions presented in the Donald C. Cook Unit 1 &2 UFSAR remain valid.

Loss of External Load/Turbine Tri The loss of external load/turbine trip event is presented in Section 14.1.8 of the Donald C. Cook UFSAR. This transient is caused by a turbine-generator trip which results in the immediate termination of steam flow. Since no credit is taken for a direct reactor trip on turbine trip, primary and secondary pressure and temperature will begin to increase, actuating the pressurizer and steam generator safety valves. The reactor will eventually be tripped by one of the other reactor protection system (RPS) functions; specifically, overtemperature hT, high pressurizer pressure, or low-low steam generator water level.

The turbine trip event is the limiting non-LOCA event for potential overpressurization, i.e., this transient forms the design basis for the primary and secondary safety valves. Since the MSSVs will now potentially be opening at a higher pressure due to the increase in the lift setpoint tolerance, it is necessary to analyze this transient in order to demonstrate that all the applicable acceptance criteria 91429R2.wpf

SECL-91<29, Revision 2 are satisfied. A turbine trip is classified as an ANS condition II event, a fault of moderate frequency.

As such, the appropriate acceptance criteria are DNBR, peak primary pressure, and peak secondary pressure. The transient is described in greater detail in the UFSAR.

The turbine trip event is analyzed using a modified version of the LOFTRAN digital computer code (Reference 6). This modified version of LOFTRAN only differs from the standard code version in the way the MSSVs are modelled. The program simulates neutron kinetics, reactor coolant system, pressurizer, pressurizer relief and safety valves, pressurizer spray, steam generators, and main steam safety valves. With the modified code, the MSSVs are explicitly modeled as a bank of 5 valves on each steam generator with staggered lift setpoints. Whereas the standard LOFTRAN version program conservatively models the MSSVs as a bank of five valves, all having one common liftsetpoint. By modelling the staggered behavior of the MSSVs, a more accurate simulation of how the valves actually behave is achieved. Since higher steam pressures are conservative for this event, no blowdown or hysteresis behavior was assumed.

Consistent with the existing UFSAR analysis, all assumptions were the same as previously used unless specifically noted. The following assumptions were used in this analysis:

a. Initial power, temperature, and pressure were at their nominal values consistent with:
1) ITDP methodology (WCAP-8567) for Unit 1, with the exception that a 2%

conservatism on initial core power was assumed.

2) RTDP methodology (WCAP-11397) for Unit 2, with no exceptions.
b. Turbine trip was analyzed with both minimum and maximum reactivity feedback.

C. Turbine trip was analyzed both with and without pressurizer pressure control. The PORVs and sprays were assumed operable in the'cases with pressure control. The cases with pressure control minimize the increase in primary pressure which is conservative for the DNBR transient. The cases without pressure control maximize the increase in pressure which is conservative for the RCS overpressurization criterion.

91429R2.wpf . 12

SECI 91<29, Revision 2

d. The steam generator PORV and steam dump valves were not assumed operable. This assumption maximizes secondary pressure which in turn maximizes the primary temperature for DNBR and primary pressure for pressure cases.
e. Main feedwater flow was assumed to be lost coincident with the turbine trip. This assumption maximizes the heatup effects.
f. Only the overtemperature dT, high pressurizer pressure, and low-low steam generator water level reactor trips were assumed operable for the purposes of this analysis.
g. The flow rate for each MSSV was modelled to ramp linearly from no flow at its lift setpoint (3% above the nominal Technical Specification setpoint) to full open flow at its full open point (6% above the nominal setpoint), The full open flow rate is based on a reference full flow capacity of 238 ibm/sec at 1186.5 psia (based on the ASME rated flow for these valves). For secondary side pressures between the initial full open point for each valve and 1186.5 psia, the full open flow rate was modelled to vary proportionally with pressure. This assumption maximizes secondary pressure which in turn maximizes the primary temperature for DNBR and primary pressure for pressure cases.

R~esul Four cases for each unit/core type (i.e. Unit 1, Unit 2 mixed core,and Unit 2 full V5 core) were analyzed: a) minimum feedback without pressure control, b) maximum feedback without pressure control, c) maximum feedback with pressure control, and d) minimum feedback with pressure control.

The most limiting cases in the current UFSAR continue to be the most limiting cases. The calculated sequence of events for the four cases for each unit are presented in Tables 3 and 4.

9l429R2.wp f 13

SECI 91<29, Revision 2 Case A:

Figures 2 through 6 show the transient response for the turbine trip event under minimum reactivity feedback conditions without pressure control. The reactor is tripped on high pressurizer pressure.

The neutron flux remains essentially constant at full power until the reactor is tripped, and the DNBR remains above the initial value for the duration of the transient. The pressurizer safety valves are actuated and maintain primary pressure below 110% of the design value. The main steam safety valves are also actuated and maintain secondary pressure below 110% of the design value.

Case B:

Figures 7 through 11 show the transient response for the turbine trip event under rnaxirnum reactivity feedback conditions without pressure control. The core power is observed to undergo a momentary increase. This is due to positive reactivity being inserted as a result of the increase in coolant density caused by the increase in primary pressure. This affect is quickly countered by the subsequent temperature rise brought on by the abrupt loss of the heat sink. The reactor is tripped on high pressurizer pressure. The DNBR increases throughout the transient and never drops below the initial value. The pressurizer safety valves are actuated and maintain primary pressure below 110% of the design value. The main steam safety valves are also actuated and maintain secondary pressure below 110% of the design value.

Case C:

Figures 12 through 16 show the transient response for the turbine trip event under maximum reactivity feedback conditions with pressure control ~ The core power is observed to undergo a momentary increase. This is due to positive reactivity being inserted as a result of the increase in coolant density caused by the rapid increase in primary pressure. This affect is quickly countered by the subsequent temperature

\

rise brought on by the abrupt loss of the heat sink. The reactor is tripped on low-low steam generator water level. The DNBR increases throughout the transient and never drops below the initial value, The pressurizer relief valves.and sprays maintain primary pressure 91429R2.wpf 14

SECI 91-429, Revision 2 below 110% of the design value. The main steam safety valves are also actuated and maintain secondary pressure below 110% of the design value.

Case D:

Figures 17 through 21 show the transient response for the turbine trip event under minimum reactivity feedback conditions with pressure control. The reactor is tripped on high pressurizer pressure.

Although the DNBR value decreases below the initial value, it remains well above the limit throughout the entire transient. The pressurizer relief valves and sprays maintain primary pressure below 110% of the design value. The main steam safety valves are also actuated and maintain secondary pressure below 110% of the design value.

Anal i Concl ion nit 1 Based on the results of these Unit 1 turbine trip analyses with a +3% tolerance on the MSSV lift setpoints, all of the applicable acceptance criteria are met. The minimum DNBR for each case is greater than the limit value. The peak primary and secondary pressures remain below 110% of design at all times.

UNIT 2: a mixed and b full V-5 cores Case A:

Figures 22a through 26b ("a" designates mixed core figures and "b" denotes full V-5 core figures) show the transient response for the turbine trip event under minimum reactivity feedback conditions without pressure control for both core types. The reactor is tripped on high pressurizer pressure.,

The neutron flux remains essentially constant at full power until the reactor is tripped, and the DNBR remains above the initial value for the duration of the transient. The pressurizer safety valves are actuated and maintain primary pressure below 110% of the design value. The main steam safety valves are also actuated and maintain secondary pressure below 110% of the design value.

91429R2.wpf 15

SECL-91<29, Revision 2 Case B:

Figures 27a through 31b show the transient response for the turbine trip event under maximum reactivity feedback conditions without pressure control for both mixed and full V-5 core types. The core power is observed to undergo a momentary increase, This is due to positive reactivity being inserted as a result of the increase in coolant density caused by the rapid increase in primary pressure.

This affect is quickly countered by the subsequent temperature rise brought on by the abrupt loss of the heat sink. The reactor is tripped on high pressurizer pressure. The DNBR increases throughout the transient and never drops below the initial value. The pressurizer safety valves are actuated and maintain primary pressure below 110% of the design value. The main steam safety valves are also actuated and maintain secondary pressure below 110% of the design value.

Case C:

Figures 32a through 36b show the transient response for the turbine trip event under maximum reactivity feedback conditions with pressure control for the two applicable Unit 2 core types. The core power is observed to undergo a momentary increase. This is due to positive reactivity being inserted as a result of the increase in coolant density caused by the rapid increase in primary pressure.

This affect is quickly countered by the subsequent temperature rise brought on by the abrupt loss of the heat sink. The reactor is tripped on low-low steam generator water level ~ The DNBR increases throughout the transient and never drops below the initial value.. The pressurizer relief valves and sprays maintain primary pressure below 110% of the design value. The main steam safety valves are also actuated and maintain secondary pressure below 110% of the design value.

Case D:

Figures 37a through 41b show the transient response for the turbine trip event under minimum reactivity feedback conditions with pressure control for both the mixed and full V-5 cores. The reactor is tripPed on high pressurizer pressure. Although the DNBR value decreases below the initial value, it remains well above the limit throughout the entire transient. The pressurizer relief valves and sprays maintain primary pressure below 110% of the design value. The 91429R2.wpf 16

SECL-91<29, Revision 2 main steam safety valves are also actuated and maintain secondary pressure below 110% of the design value.

Anal is Conclusion nit 2 Based on the results of these Unit 2 mixed and full core turbine trip analyses with a +3% tolerance on the MSSV lift setpoints, all of the applicable acceptance criteria are met. The minimum DNBR for each case is greater than the limit value. The peak primary and secondary pressures remain below 110% of design at all times.

N n- A Conclusio The effects of increasing the as-found lift setpoint tolerance on the main steam safety valves have been examined, and it has been determined that, with one exception, the current accident analyses as presented in the UFSAR remain valid. The loss of load/turbine trip event was analyzed in order to quantify the impact of the setpoint tolerance relaxation. As previously demonstrated in this safety evaluation, all applicable acceptance criteria for this event have been satisfied and the conclusions presented in the UFSAR are s'till valid. Thus, with respect to the non-LOCA transients, the proposed Technical Specification change does not constitute an unreviewed safety question, and the non-LOCA accident analyses, as presented in the report, support the proposed change,

2. CA and A Related Evaluations La e Break CA The current large break LOCA analyses for Donald C. Cook Units 1 and 2 were performed with the NRC approved 1981 Evaluation Model plus BASH. After a postulated large break LOCA occurs, the heat transfer between the reactor coolant system (RCS) and the secondary system may be in either direction, depending on the relative temperatures. In the case of continued heat addition to the secondary system, the secondary system pressure increases and the MSSVs may actuate to limit the pressure. However, this does not occur in the large break evaluation model since no credit is taken for auxiliary feedwater actuation. Consequently, the secondary system acts as a heat source. in the 91429R2.wpf 17

SECL-91<29, Revision 2 l

postulated large break LOCA transient and the secondary pressure does not increase. Since the secondary system pressure does not increase, it is not necessary to model the MSSV setpoint in the large break evaluation model. Therefore, an increase in the allowable MSSV setpoint tolerance for Donald C. Cook Units 1 and 2 will not impact the current UFSAR large break LOCA analyses.

mall Break CA The small break LOCA analyses for Donald C. Cook Units 1 and 2 were performed with the NRC approved Evaluation Model using the NOTRUMP code. After a postulated small break LOCA occurs, the heat transfer between the RCS and the secondary system may be in either direction depending on the relative temperatures. In the case of continued heat addition to the secondary system, the secondary system pressure increases which leads to steam relief via the MSSVs. In the small break LOCA, the secondary flow aids in the reduction of RCS pressure. Subsequently, Donald C. Cook Units 1 and 2 were reanalyzed to determine the impact of an increased MSSV setpoint tolerance of 3%.

The licensing basis small break LOCA analysis for Donald C. Cook Unit 1 included a safety evaluation to address a 25 gpm charging pump flow imbalance and operation with the high head safety injection cross tie valve closed at 3250 MWt core power level. Also, a safety evaluation had been performed which modeled an increased auxiliary feedwater enthalpy delay time. These assumptions were incorporated in the increased MSSV setpoint tolerance NOTRUMP analysis of the limiting 3 inch break for Unit 1. However, in order to obtain a direct sensitivity for the increased MSSV setpoint tolerance, a NOTRUMP analysis was also performed incorporating these assumptions but modelling the original MSSV setpoints.

In addition, a 3 inch NOTRUMP analysis was performed for the low pressure, high temperature operating condition for Unit 1 since a safety evaluation had been originally performed as part of the licensing basis analysis. The increased MSSV setpoint tolerance, a core power level of 3250 MWt

.with the. high head cross tie valve closed, and a 25 gpm charging pump flow imbalance were assumed for the analysis of the low pressure, high temperature case.

91429Rz.wp f 18

SECL-91-429, Revision 2 Donald C. Cook Unit 2 was reanalyzed for the limiting 3 inch break, low pressure and high temperature operating condition with the high head cross tie valve closed. The power shape axial offset was reduced from the licensing basis analysis of +30% to +13% for the MSSV increase analysis. An axial offset of +13% is equal to the value assumed in the licensing basis large break LOCA analysis. In addition, the licensing basis analysis conservatively assumed a maximum" assembly average power (P+ of 1.519. The 3% increased MSSV setpoint tolerance analysis assumed a P~ which was reduced to 1.46. In order to obtain a direct sensitivity for the increased MSSV setpoint tolerance, a NOTRUMP analysis was performed incorporating these assumptions but modelling the original MSSV setpoints.

Tables 5 and 6 summarize the MSSV setpoints used in the Donald C. Cook Units 1 and 2 current licensing basis small break LOCA analyses and the increased MSSV setpoint tolerance analyses, respectively. Tables 7 and 8 summarize the initial input assumptions used in the Unit 1 analysis.

The Unit 2 initial input assumptions are summarized in Table 9, The time sequence of events and results of the Unit 1 analysis are summarized in Tables 10 and 11, respectively. The limiting peak clad temperature calculated is 1879'F, including a 25'F burst and blockage penalty, for the 3% increased MSSV setpoint tolerance case at 3250 MWt and the low pressure, low temperature operating conditions'. This value is less than the acceptance criteria limit of 2200'F. The maximum local metal-water reaction is 3A7%, which is well below the embrittlement limit of 17% as required by 10CFR50.46. The total core metal-water reaction is less than 1.0%, corresponding to less than 1.0 percent hydrogen generation, as compared to the 1%

criterion of 10CFR50.46.

The time sequence of events and results of the Unit 2 analysis are summarized in Tables 12 and 13, respectively. 'Ihe limiting peak clad temperature calculated is 2125'F, including a 12'F artificial leak-by penalty and 157'F burst and blockage penalty, for the 3% increased MSSV setpoint tolerance case at 3250 MWt and low pressure, high temperature operating condition. This value is less than the acceptance criteria limit of 2200'F. The maximum local metal-water reaction is 4.26%, which is These results are from calculations using a nominal auxiliary fcedwater flow. A subsequent analysis using a morc conservative minimum auxiliary feedwater flow rate is presented in thc next section.

91429R2.wpf 19

SECI 91<29, Revision 2 well below the embrittlement limit of 17% as required by 10CFR50.46. The total core metal-water reaction is less than 1.0%, corresponding to less than 1.0 percent hydrogen generation, as compared to the 1% criterion of 10CFR50.46.

Additional Small Break CA Anal ses The small break LOCA analysis for Cook Unit 1, previously discussed, used nominal Auxiliary Feedwater (AFW) flow rates (1258 gpm total delivery), whereas minimum AFW flow rates were used for Cook Unit 2, Since minimum AFW flow rates are more limiting, the small break LOCA for Cook Unit 1 for +3% MMSV setpoint tolerance was reanalyzed using lower auxiliary feedwater flow rates (750 gpm total delivery). The following presents the results of the revised small break LOCA analyses performed for Donald C. Cook Unit 1.

Based on the Cook Unit 1 analyses presented in the previous section, two additional small break LOCA cases were run to address a relaxation to +3% for the MSSV setpoint tolerance. First, the original LPLT (Low Pressure, Low Temperature) case presented above, the results of which are shown in Tables 10 and 11, was rerun modeling 750 gpm total AFW system flow rate. As was demonstrated in References 11 and 12, the LPLT case is the limiting case for the pressure/temperature operating window for Cook Unit 1, and that will not change due to the reduction in AFW flow. In addition, since only the limiting break size (3 inch) was previously analyzed, a 2 inch break was also analyzed for the 750 gpm AFW flow rate to provide further assurance that the limiting break size has not shifted to a smaller break size due to the reduction in the AFW flow rate.

Note that since both the reduction in AFW delivered flow and the increase in the setpoint tolerance to

>3% tend to shift the limiting break size to a smaller break, it is not necessary to consider that the limiting break could be larger than was presented in the current licensing basis analysis which demonstrated that the 3 inch break is limiting.

The MSSV performance assumed in these new cases is shown in Table 6. The initial input parameters assumed for these new cases are shown in Table 7a, and are compared with the original licensing basis in Reference 11. If the new analysis values from Table 7a are compared with the original evaluation cases shown in Table 7, very few differences are evident. Except for the auxiliary feedwater flow rate an'd a slight increase in the accumulator water temperature, the initial RCS 91429R2.wpf 20

SECL-91<29, Revision 2 pressure was lowered to cover a safety evaluation that was performed for pressurizer pressure uncertainty. Incorporating this new RCS pressure had a negligible effect on the vessel inlet and outlet temperatures and the steam pressure assumed for reactor steady-state operation (prior to initiation of the transient). One final additional change is in the AFW enthalpy delay. The lower AFW flow rate would result in a longer delay. The current NOTRUMP model has been improved to model the volume of hot main feedwater that must be purged from the piping prior to cold AFW being delivered to the steam generator, and the delay is calculated by the model. Other than these minor differences, and the intended change (i.e., reduce AFW flow rate and increase accumulator water temperature),

the initial conditions assumed for the additional runs are identical to the runs performed for the previous section.

The time sequence of events and results of the Unit 1 analyses are summarized in Tables 10a and 11a, respectively. The limiting Peak Clad Temperature (P~ calculated is 2068'F, including a 117'F burst and blockage penalty, for the +3% increased MSSV setpoint tolerance case at 3250 MWt and low pressure, low temperature operating condition. This value is less than the acceptance criteria limit of 2200'F, and is almost the same computed result that is seen for D.'. Cook Unit 2 (the pre-burst/blockage PCT of 1951'F versus 1956'F). The maximum local metal-water reaction is 5.06%,

which is well below the embrittlement limit of 17% as required by 10 CFR 50.46. The total core metal-water reaction is less than 1.0%, corresponding to less than 1.0 percent hydrogen generation, as compared to the 1% criterion of 10 CFR 50.46.

The >3% increased MSSV setpoint tolerance has been analyzed for the Donald C. Cook Nuclear Plant Unit 1 for the small break LOCA analyses performed by Westinghouse. The potential effect of this change on the FSAR analysis results for the small break LOCA analysis was examined via reanalysis and although the results are more limiting than previous analysis cases, it was shown that the effect of the increased MSSV setpoint tolerance did not result in exceeding any of the following design or regulatory limits:

1. The calculated peak fuel element cladding temperature is below the requirements of 2200'F.
2. The amount of fuel element cladding that reacts chemically with water or steam does not exceed 1 percent of the total amount of Zircaloy in the reactor.

91429Rz.wpf 21

SECI 91-429, Revision 2

3. The cladding temperature transient is terminated at a time when the core geometry is still amenable to cooling. The localized cladding oxidation limit of 17 percent is not exceeded during or after quenching.
4. The core remains amenable to cooling during and after the break.
5. The core temperature is reduced and decay heat is removed for an extended period of time, as required by the long-lived radioactivity remaining in the core.

Therefore, it is concluded that a relaxation to J3% for the MSSV setpoint tolerance is acceptable from the standpoint of the small break LOCA FSAR accident analyses discussed in this safety evaluation.

Post-LOCA Lon Term Core Coolin The Westinghouse licensing position for satisfying the requirements of 10CFR50.46 Paragraph (b),

Item (5), "Long Term Cooling," concludes that the reactor will remain shut down by borated ECCS water residing in the RCS/sump after a LOCA. Since credit for the control rods. is not taken for a large break LOCA, the borated ECCS water provided by the accumulators and the RWST must have a boron concentration that', when mixed with other water sources, will result in the reactor core remaining subcritical assuming all control rods out. The calculation is based upon the reactor steady state conditions at the initiation of a LOCA and considers sources of both borated and unborated fluid in the post-LOCA containment sump. The steady state conditions are obtained from the large break LOCA analysis which, as stated above, does not take credit for MSSV actuation. Thus the post-LOCA long-term core cooling evaluation is independent of the MSSV setpoint tolerance, and there will be no change in the calculated RCS/sump boron concentration after a postulated LOCA for Donald C. Cook Units 1 and 2.

Hot Switchover to Prevent Potential Boron Preci itation Post-LOCA hot leg recirculation time is determined for inclusion in emergency operating procedures to ensure no boron precipitation in the reactor vessel following boiling in the core. This time is 91429R2.wpf 22

SECL-91<29, Revision 2 dependent on power level and the RCS, RWST, and accumulator water volumes and with their associated boron concentrations. The proposed MSSV setpoint tolerance increase to 3% does not affect the power level or the boron concentrations assumed for the RCS, RWST, and accumulator in the hot leg switchover calculation for Unit 1. The proposed MSSV setpoint tolerance increase to 3%'oes not affect the boron concentrations assumed for the RCS, RWST, and accumulator in the hot leg switchover calculation for Unit 2. The current licensing basis hot leg.switchover calculation for Unit 2 is at full power, 3413 MWt, with cross tie valve at closed position. With MSSV setpoint tolerance increased to 3%, Unit 2 LOCA analyses assumed a reduced core power, 3250 MWt, with cross tie valve at closed position. A reduction in power reduces the boil-off rate in the hot leg switchover calculation. A reduction in the boilwffrate results in the rate of boron build up also being reduced.

Therefore, the licensing basis hot leg switchover calculation for the Donald C. Cook Units 1 and 2 remains bounding.

LOCA H draulic Forci Functions The peak hydraulic forcing functions on the reactor vessel and internals occur very early in the large break LOCA transient. Typically, the peak forcing functions occur between 10 and 50 milliseconds (0.01 and 0.05 seconds) and have subsided well before 500 milliseconds (0.50 seconds). Any change in time associated with an increased MSSV setpoint tolerance would occur several seconds into the transient. Since the LOCA hydraulic forcing functions have peaked and subsided before the time at which the MSSV may actuate, the increase in the MSSV setpoint tolerance to 3% will not impact the LOCA hydraulic forcing functions calculation for Donald C. Cook Units 1 and 2.

LOCA Conclusio The effect of increasing the MSSV setpoint tolerance to 3% for Donald C. Cook Units 1 and 2 has been evaluated for each of the LOCA related analyses addressed in the UFSAR. For currently analyzed conditions, or for Unit 2 operation at a reduced power level of 3250 MWt when the high head cross tie valves are closed, it was shown that the 3% MSSV setpoint tolerance does not result in any design or Regulatory limit being exceeded. Therefore, with respect to the LOCA analyses, it can be concluded that increasing the MSSV setpoint tolerance to 3% for Donald C. Cook Units 1 and 2 will be acceptable from. the standpoint of the UFSAR accident analyses discussed in the safety

'valuation.

91429Rz.wp f 23

SECI 91429, Revision 2 3.~

~

Containment Tnt ri Evaluation Relaxation of the Donald C. Cook Units 1 & 2 Technical Specification Main Steam Safety Valve setpoint tolerances from +1% to +3% do not adversely affect the short term or long term LOCA mass and energy releases and, subsequently, the related containment analyses. Since there is no impact on the main steaml inc break mass and energy release calculations, there is also no impact on that associated containment response analysis. The proposed change does not affect the normal plant operating parameters, system actuations, accident mitigating capabilities or assumptions important to the mass and energy release and containment analyses, or create more limiting conditions than those already assumed in the current analyses. Therefore, the conclusions presented in the Donald C, Cook UFSAR remain valid with respect to containment.

4. Steam Generator Tube Ru ture To demonstrate that an unreviewed safety question does not exist for the steam generator tube rupture (SGTR) event, the increased MSSV setpoint tolerance was evaluated for Donald C. Cook Units 1 and 2. The analysis for uprating to 3600 MWT considered up to 15% steam generator tube plugging for both Units 1 and 2. The limiting cases from this analysis were reevaluated for the increased MSSV setpoint tolerance. An increased steam generator tube plugging level of 20% was also considered at power levels of 3262 MWT for Unit 1 and 3425 MWT for Unit 2. The criteria stated in the UFSAR analysis for Donald C. Cook were used in establishing the continued applicability of the SGTR licensing basis safety analysis by demonstrating that the conclusions for SGTR UFSAR analysis remain valid.

An evaluation has been performed to determine the impact on the Donald C. Cook Units'GTR analysis of record for increased MSSV setpoint tolerance for all the cases with different steam generator tube plugging and power levels stated above. The primary thermal hydraulic parameters which affect the calculation of offsite radiation doses for a SGTR are the amount of radioactivity assumed to be present in the reactor coolant, the aniount of reactor coolant transferred to the secondary side of the ruptured steam generator through the ruptured tube, and the amount of steam released from the ruptured steam generator to the atmosphere. Thus, the calculated offsite radiation doses for an SGTR'for Donald C. Cook are dependent on these three factors.

91429R2.wpf 24

SECI 91<29, Revision 2 For the UFSAR SGTR analysis, the activity in the reactor coolant is based on an assumption of 1%

defective fuel, and this assumption will not be affected by the increased MSSV setpoint tolerance.

The two remaining factors are affected by the increased MSSV setpoint tolerance, and the evaluation was performed to quantify this effect.

To evaluate the effect of the increased MSSV setpoint tolerance on the Donald C. Cook SGTR analysis, the revised SG safety valve set pressure was lowered by 3% from 1080 psia to 1047.6 psia.

This resulted in a slightly higher equilibrium primary-to-secondary break flow (approximately 0.5%),

since there was an increase in the pressure differential between the RCS and secondary side assumed in the analysis. The steam released to the atmosphere subsequently increased (by approximately 0.2%) because of the lower pressure assumed for the main steam safety valves. The limiting cases, for all power levels and steam generator tube plugging levels considered, were at 3600 MVft.

The thyroid and whole body doses estimated for Units 1 and 2, based on the analyses described above, are bounded by those previously determined for the rerating program. The actual estimated dose factors (compared to the results of the rerating calculation) are as follows:

Unit f: thyroid 0.7, whole body 1.005 Unit 2: thyroid 0.99, whole body 0.98 Although the Unit 1 whole body dose exceeds the previous value by approximately 0.5%, this increase is well within the acceptable limit. Thus, the results and conclusion in the Donald C. Cook UFSAR that the offsite doses for an SGTR event would be within a small fraction of the 10CFR100 guidelines remains valid.

5. Com nent Performance The relaxation of the lift setpoint tolerance for the MSSVs at Donald C. Cook does not directly or indirectly involve mechanical component hardware considerations. Direct effects as well as indirect effects on equipment important to safety (ITS) have been considered. Indirect effects include activities which involve non-safety related equipment which may affect ITS equipment. Component hardware considerations may include overall component integrity, sub-component integrity, and the 9 I 429R2.wpf 25

SECI 91<29, Revision 2 adequacy of component supports during all plant conditions. An evaluation is not required to determine whether the condition alters the design, material, construction standards, function or method of performing the function of any ITS equipment.

6. S ste Evaluation The relaxation of the liftsetpoint tolerance for the MSSVs at Donald C. Cook as described would not affect the integrity of a plant auxiliary fluid system or the ability of any auxiliary system to perform its intended safety function.
7. Radiolo ical Evaluation The relaxation of the lift setpoint tolerance for the MSSVs at Donald C. Cook as described do not affect radiological concerns other than those identified above in Section III.4 or post-LOCA hydrogen production. The evaluation in Sections III.1 and GI.3 concluded that the existing mass releases used in the remaining offsite dose calculations (i.e., steamline break, rod ejection, locked rotor, and short-term & long-term LOCA) are still applicable,
8. Plant Ri k Anal activities affecti IP The relaxation of the liftsetpoint tolerance for the MSSVs at Donald C. Cook does not adversely affect the Individual Plant Examination /PE) for the plant. This test does not affect the normal plant operating parameters, system actuations, accident mitigating capabilities, operating procedures or assumptions important to the IPE analyses, or create conditions that would significantly affect core damage or plant damage frequency or the frequency of core damage initiating events. Therefore, the conclusions presented in the IPE remain valid.
9. Plant Risk Anal es ch es other than IPF relat The relaxation of the liftsetpoint tolerance for the MSSVs does not result in an increase in the probability of occurrence of accidents previously evaluated in the UFSAR. This proposed change to the Technical Specifications does not result in, an increase in the probability of occurrence of a 91429R2.wpf 26

SECI 91<29, Revision 2 malfunction of equipment important to safety or of equipment that could indirectly affect equipment important to safety.

10.

The relaxation of the lift setpoint tolerance for the MSSVs does not directly or indirectly involve electrical systems, components, or instrumentation considerations. Direct effects as well as indirect effects on equipment important to safety have been considered. Indirect effects include conditions or activities which involve non-safety related electrical equipment which may affect Class 1E, post accident monitoring systems, or plant control electrical equipment. Consideration has been given to seismic and environmental qualification, design and performance criteria per IEEE standards, functional requirements, and plant technical specifications with respect to all plant conditions. An evaluation is not required to determine whether the MSSV setpoint tolerance relaxation alters the design, configuration, qualification, or performance of safety related electrical systems or components. The MSSV setpoint tolerance relaxation has no potential for impact to the identification 1

of an unresolved safety question as it would relate to the safety related function of electrical systems of components.

11. Technical S ficatio A review of the Donald C. Cook Unit 1 and Unit 2 Technical Specifications was performed to address a change in the liftsetpoint tolerance for the Main Steam Safety Valves. The Technical Specification review, inclusive of Amendments 157 and 141 for Units 1 and 2, respectively.

Proposed markups are attached to this evaluation for both Unit 1 and Unit 2, and reflect changes to Table 4.7-1 and 3.7-4, respectively. A change to the basis for both units is also proposed and discusses the relationship between the J1% and J3% tolerances.

91429R2.wpf 27

SECL-91-429, Revision 2 IV. ASSESSMENT OF NO SAI'KFV UPON The relaxation in the lift setpoint tolerance for the MSSVs at Donald C. Cook Units 1 and 2 has been evaluated consistent with the requirements of 10CFR50.59 and does not involve an unreviewed safety question on the basis of the following justifications:

Will the probability of an accident previously evaluated in the SAR be increased?

No. The +3% tolerance on the MSSV setpoint does not increase the probability of an accident previously evaluated in the UFSAR. There are no hardware modifications to the valves and, therefore, there is no increase in the probability of a spurious opening of a MSSV. The MSSVs are actuated to protect the secondary systems from overpressurization after an accident is initiated. Sufficient margin exists between the normal steam system operating pressure and the valve setpoints with the increased tolerance to preclude an increase in the probability of actuating the valves. Therefore, the probability of an accident previously evaluated in the UFSAR would not be increased as a result of increasing the MSSV lift setpoint tolerance by 3% above or below the current Technical Specification setpoint value.

2. Will the consequences of an accident previously evaluated in the SAR be increased?

No. Based on the'discussions presented within, all of the applicable LOCA and non-LOCA design basis acceptance criteria remain valid both for the transients evaluated and the single event analyzed. Additionally, no new limiting single failure is introduced by the proposed change. The DNBR and PCT values remain within the specified limits'of the licensing basis.

Although increasing the valve setpoint will increase the steam release from the ruptured steam generator above the UFSAR value by approximately 0.2%, the SGTR analysis indicates that

, the calculated doses are bounded by those determined for the rerating program which, in turn, are within a small fraction of the 10CFR100 dose guidelines. The evaluation also concluded that the existing mass releases used in the offsite dose calculations for the remaining transients (i.e., steamline break, rod ej ation) are still applicable. Therefore, based on the above, there is no increase in the dose consequences.

91429R2.wpf 28

SECL-91<29, Revision 2

3. May the possibility of an accident which is different than any already evaluated in the SAR be created?

No. As previously indicated in Section III.1, the Inadvertent Opening of a SG Relief or Safety Valve event is currently presented in the Donald C. Cook UFSAR (Section 14.2.5) and is bounded by the Steamline Break analysis. Increasing the as-found liftsetpoint tolerance on the MSSVs does not introduce a new accident initiator mechanism. No new failure modes have been defined for any system or component important to safety nor has any new limiting single failure been identified. No accident will be created that will increase the challenge to the MSSVs and result in increased actuation of the valves. Therefore, the possibility of an accident different than any already evaluated in the UFSAR is not created.

4. Will the probability of a malfunction of equipment important to safety previously evaluated in the SAR be increased?

No. Although the proposed change takes place in equipment utilized to prevent overpressurization on the secondary side and to provide an additional heat removal path, increasing the as-found liftsetpoint tolerance on the MSSVs will not adversely affect the operation of the reactor protection system, any of the protection setpoints, or any other device required for accident mitigation. Therefore, the probability of a malfunction of equipment important to safety previously evaluated in the UFSAR will not be increased.

5. Will the consequences of a malfunction of equipment important to safety previously evaluated in the SAR be increased?

No. As discussed in the response to Questions 2 and 4, there is no increase in the dose release consequences as a result of increasing the as-found liftsetpoint tolerance on the MSSVs as defined in the attached safety evaluation.

91429R2.wpf 29

SECI 91429, Revision 2

6. May the possibility of a malfunction of equipment important to safety different than any already evaluated in the SAR be created?

No. As discussed in Question 4, an increase in the as-found liftsetpoint tolerance on the MSSVs will not impact any other equipment important to safety. Therefore, the possibility of a malfunction of equipment important to safety different thari any already evaluated in the UFSAR will not be created.

7. Will the margin of safety as defined in the bases to any technical specification be reduced?

No. As discussed in the a~ched safety evaluation, the proposed increase in the as-found MSSV lift setpoint tolerance will not invalidate the LOCA or non-LOCA conclusions presented in the UFSAR accident analyses. The new loss of load/turbine trip analysis concluded that all applicable acceptance criteria are still satisfied. For all the UFSAR non-LOCA transients, the DNB design basis, primary and secondary pressure limits, and dose limits continue to be met. Peak cladding temperatures remain below the limits specified in 10CFR50.46. The calculated doses resulting from a steam generator tube rupture event remain within a small fraction of the 10CFR100 permissible releases. Thus, there is no reduction in the margin to safety. Note that, as identified earlier, changes will be required to the plant Technical Specifications in order to implement the proposed change.

9l429R2.wpf 30

SECL-91<29, Revision 2 SD The proposed change to main steam safety valve liftsetpoint tolerances from +1% to +3% has been evaluated by Westinghouse. The preceding analyses and evaluations have determined that operation with the MSSV setpoints within a J3% tolerance about the nominal values will have no adverse impact upon the licensing basis analyses, as well as the steamline break mass & energy release rates inside and outside of containment. In addition, it is concluded that the J3% tolerance on the MSSV setpoint does not adversely affect the overpower or overtemperature protection system. As a result, adequate protection to the core limit lines continues to exists. Therefore, all licensing basis criteria continue to be satisfied and the conclusions in the UFSAR remain valid.

Thus, based on the information presented above, it can be concluded that the proposed increase of main steam safety valve lift setpoint tolerances from J1% to J3% does not represent an unreviewed safety question per the definition and requirements defined in 10CFR50.59.

The recommended Technical Specification changes, along with a no significant hazards evaluation, are presented as appendices to this evaluation.

91429Rz.wp f 31

SECL-91-429, Revision 2 VI. REFERENCES

1) Donald C. Cook Units 1 & 2 Technical Specifications through Amendments 157 and 141, respectively, 10/1/91.
2) ANSI/ASME BPV-I11-1-NB, "ASME Boiler and Pressure Vessel Code - Section III Rules for Construction of Nuclear Power Plant Components," ASME, 1983.
3) ANSUASME OM-1-1981, "Requirements for Inservice Performance Testing of Nuclear Power Plant Pressure Relief Devices," ASME, 1981.
4) "Donald C. Cook Units 1 & 2 Updated Final Safety Analysis Report (UFSAR), dated through July 1991.
5) ASME Steam Tables, Fifth Edition, 1983.

6)'urnett, T.W.T., et al., "LOFTRAN Code Description," WCAP-7907-P-A, June 1972.

7) Chelemer, H. et al ~,"Improved Thermal Design Procedure," WCAP-8567-P-A, February 1989.
8) Butler, J.C. and D.S. Love,"Steamline Break Mass/Energy Releases for Equipment Environmental Qualification Outside Containment," WCAP-10961-P, October 1985.
9) 90AE*-G4126 W/AEP2-0098 Transmittal regarding "Locked Rotor Dose Analysis for Donald C. Cook Unit 2 Cycles 8 & 9," 7/19/90.
10) Letter regarding AFW flow rates from R. B. Bennett of American Electric Power to J. N.

Steinmetz of Westinghouse Electric, 9/24/91.

11) WCAP-10054-P-A (Proprietary), WCAP-10081 (Non-Proprietary), Lee, H., et al.,

Westinghouse Small Break ECCS Evaluation Model Using the NOTRUMP Code, August 1985.

12) WCAP-12135, Donald C. Cook Nuclear Plant Units 1 and 2 Rerating Engineering Report, Vol. 1, September 1989.

91429R2.wpf 32

SECL-91<29, Revision 2 TABLE 3 UNIT I TURBINE TRIP SEQUENCE Accident Time sec Without pressurizer control Turbine trip, loss of main 0.0 (minimum reactivity feedback) feedwater flow High pressurizer pressure 77 reactor trip setpoint reached Rods begin to drop 9.7 Peak pressurizer pressure 10.5 occurs Minimum DNBR occurs Without pressurizer control Turbine trip, loss of main 0.0 (maximum reactivity feedback) feedwater flow High pressurizer pressure 7.9 reactor trip setpoint reached Rods begin to drop 9.9 Peak pressurizer pressure 10.5 occurs Minimum DNBR occurs With pressurizer control Turbine trip, loss of main 0.0 (maximum reactivity feedback) feedwater flow feedback)'vent Peak pressurizer pressure 10.0 occurs Low-low steam generator 47.1 water level reactor trip setpoint reached Rods begin to drop 49.1 Minimum DNBR occurs With pressurizer control Turbine trip, loss of main 0.0 (minimum reactivity feedwater flow High-pressurizer pressure 12.4 reactor trip setpoint reached 91429Rz.wp f 33

SECL-91<29, Revision 2 TABLE 3 (continued)

UNIT I TURBINE TRIP SEQUENCE Accident Event T~ime sec Rods begin to drop 14.4 Peak pressurizer pressure 16.0 occurs Minimum DNBR occurs 15.5

  • DNBR does not decrease below its initial value.

91429R2.wpf 34

SECL-91<29, Revision 2 TABLE 4 UNIT 2 TURBINE TRIP SEQUENCE OF EVENTS T~ime eee Accident Event Inixed full core core Without pressurizer control Turbine trip, loss of main 0.0 0.0 (minimum reactivity feedback) feedwater flow High pressurizer pressure 5.5 7.5 reactor trip setpoint reached Rods begin to drop 7.5 9.5 Peak pressurizer pressure 9.5 11.0 occurs Minimum DNBR occurs Without pressurizer control Turbine trip, loss of main 0.0 0.0 (maximum reactivity feedback) feedwater flow High pressurizer pressure 5.5 7.6 reactor trip setpoint reached Rods begin to drop 7.5 9.6 Peak pressurizer pressure 9.0 10.0 occurs Minimum DNBR occurs

  • DNBR does not decrease below its initial value.

91429R2.wp f 35

SECL-91<29, Revision 2 TABLE 4 (continued)

UNIT 2 TURBINE TRIP SEQUENCE OF EVENTS Time ec Accident Event full core core With pressurizer control Turbine trip, loss of main 0.0 0.0 (maximum reactivity feedback) feedwater flow Peak pressurizer pressure 7.0 7.5 occurs Low-low steam generator 60.1 52.8 water level reactor trip setpoint reached Rods begin to drop 62.1 54.8 Minimum DNBR occurs With pressurizer control Turbine trip, loss of main 0.0 0.0 (minimum reactivity feedback) feedwater flow High pressurizer pressure 10.6 11.2 reactor trip setpoint reached Rods begin to drop 12.6 13.2 Peak pressurizer pressure 13.5 14.5 occurs Minimum DNBR occurs 14.5 15.0

  • DNBR does not decrease below its initial value.

91429R2.wp f 36

SECI 91-429, Revision 2 TABLE 5 CURREN'I'ICENSING BASIS STEAM LINE SAFETY VALVES PER LOOP Safety Setpoint Percent Accumulation Flowrate Acc .

Valve Accumulation 1A 1065 10.0 1171.5 857690 1B 1065 10.0 1171.5 857690 2A 1075 8.98 1171.5 857690 2B 1075 8.98, 1171.5 857690 1085 7.97 1171.5 857690 The rated valve capacity at full accumulation pressure was calculated as follows:

51.5 x A x K x P = Actual Flowrate where:

A = Valve orifice area = 16 in'

= Coefficient of discharge = 0.975 P = Pressure (psia) at accumulation pressure The above actual fiowrate is reduced by 0.9 to get the valve rated capacity.

91429R2.wpf 37

SECI 91<29, Revision 2 TABLE 6 MSSV SETPOINT INCREASE STEAM LINE SAFEIV VALVES PER LOOP Safety Setpoint Pressure Percent Accumulation Flowrate Acc Valve ccumulation 1A 1096.95 3.0 1129.86 827585.6 1B 1096.95 3.0 1129.86 827585.6 2A 1107.25 3.0 1140.47 835257.2 2B 1107.25 3.0 1140.47 835257.2 1117.55 3.0 1151.08 842928.9 The rated valve capacity at full accumulation pressure was calculated as follows:

51.5 x A x K x P'= Actual Flowrate where:

A = Valve orifice area = 16 in K = Coefficient of discharge = 0.975 P = Pressure (psia) at accumulation pressure The above actual flowrate is reduced by 0.9 to get the valve rated capacity.

91429R2.wpf 38

SECL-91-429, Revision?

PRESSURE, LOW TEMPERATURE Current MSSV Licensing Setpoint Basis Increase License Core Power'MWt) 3588'.32 3250 Total Peaking Factor, F< 2.32 Axial Offset (%) +30 +30 Hot Channel Enthalpy Rise Factor, F 1.55 1.55 Maximum Assembly Average Power, P~ 1.433 1.433 Fuel Assembly Array 15 15 OFA Accumulator Water Volume (ft') 946 946 Accumulator Tank Volume (ft') 1350 1350 Minimum Accumulator Gas Pressure, (psia) 600 600 Loop Flow (gpm) 354000 354000 Vessel Inlet Temperature (F) 509.89 513.23 Outlet Temperature 'essel 581.71 578.57 (F)'CS Pressure (psia) 2100 2100 Steam Pressure 564.36 596.48 (psia)'team Generator Tube Plugging Level (%) 15 15 Maximum Refueling Water Storage Tank Temperature (F) 120 120 Maximum Condensate Storage Tank Temperature (F) 120 120 Fuel Backfill Pressure (psig) 275 275 Reactor Trip Setpoint (psia) 1860 1860 Safety Injection Signal Setpoint (psia) 1715 1715 Safety Injection Delay Time (sec) 27 27 Safety Injection Pump Degradation (%) 10 10 Charging Pump Flow Imbalance (gpin) 10 25 HHSI Cross Tie Valve Position Closed Closed Signal Processing Delay and Rod Drop Time (sec) 2.0 4,4 Reactor Coolant Pump Delay Time (sec) 4,4 4,4 Main Feedwater Isolation Delay Time (sec) 0.0 0.0 Main Feedwater Valve Closure Time (sec) 8.0 8.0 Auxiliary Feedwater Enthalpy Delay Time (sec) 272 60'able Main Steam Safety Valve Setpoint (psia) 5 Table 6 Two percent is added to this power to account for calorimetric error.

A safety evaluation for 25 gpm charging flow imbalance limits operation with HHSI cross tie valve closed to 3250 MWt.

Value is based on 102% core power, main coolant pump heat neglected, and best estimate Tavg.

A safety evaluation was performed to account for a auxiliary feedwater enthalpy delay of 272 seconds.

9l429R2.wpf 39

SECI 91-429, Revision 2 TABLE 7a Initial Input Parameters for the Small Break LOCA Analysis Current MSSV Licensing Setpoint Increase License Core Power'MWt) ~Bas'588'.32 3250 Total Peaking Factor, F<. 2'.32 AxM Offset (%) +30 +30 Hot Channel Enthalpy Rise Factor, P~ 1.55 1.55 Maximum Assembly Average Power, P~ 1.433 1.433 Fuel Assembly Array 15 X 15 0 FA Accumulator Water Volume (ft') 946 946 Accumulator Tank Volume (ft ) 1350 1350 Mirumum Accumulator Gas Pressure, (psia) 600 600 Loop Flow (gpm) 354000 354000 Vessel Inlet Temperature 509.89 513.20 581.71 578.44

('F)'essel Outlet Temperature ('F)'CS Pressure (psia) 2100 2033 Steam Pressure 564.36 596.11 (psia)'team Generator Tube Plugging Level (%) 15 15 Maximum Refueling Water Storage Tank Temperature ('F) 120 120 Maximum Condensate Storage Tank Temperature ('F) 120 120 Fuel Backfill Pressure (psig) 275 275 Reactor Trip Setpoint (psia) 1860 1860 Safety Injection Signal Setpoint (psia) 1715 1715 Safety Injection Delay Time (sec) 27 27 Safety Injection Pump Degradation (%) 10 10 Charging Pump Flow Imbalance (gpm) 10 25 HHSI Cross Tie Valve Position Closed Closed Signal Processing Delay and Rod Drop Time (sec) 2.0 4.4 Reactor Coolant Pump Delay Time (sec) 4.4 4.4 Main Feedwater Isolation Delay Time (sec) 0.0 0.0 Main Feedwater Valve Closure Time (sec) 8.0 8.0 Auxiliary Feedwater Total Delivery (gpm) 1258 750 Auxiliary Feedwater Delivery Delay Time (sec) 60'able 60'able Main Steam Safety Valve Setpoint (psia) 1 2 Accumulator Temperature ('F) 120 130 Two percent is added to this power to account for calorimetric error.

A safety evaluation for 25 gpm charging fiow imbalance limits operation with HHSI cross tie valve closed to 3250 MWt.

Value is based on 102% core power, main coolant pump heat neglected, and best estimate TAvo.

. A safety evaluation was performed to account for an auxiliary feedwater enthalpy delay of 272 seconds.

Enthalpy delay computed internally based on AFW flow rate and 75 ft'urge volume.

40

SECI 91-429, Revision 2 TABLE 8 LOW PRESSURE, HIGH TEMPERATURE Current MSSV Licensing Setp oint Basis Increase License Core Power'MWt) NA 3250 Total Peaking Factor, F< NA 232 Axial Offset (%) NA +30 Hot Channel Enthalpy Rise Factor, F NA 1.55'.433 Maximum Assembly Average Power, Pu NA Fuel Assembly Array NA 15X15 OFA Accumulator Water Volume (ft') NA 946 Accumulator Tank Volume (ft') NA 1350 Minimum Accumulator Gas Pressure, (psia) NA 600 Loop Flow (gpm) NA 354000 Vessel Inlet Temperature (F) NA 543.63 Outlet Temperature (F)'CS

'essel NA 606.79 Pressure (psia) NA 2100 Steam Pressure (psia)'team NA 793.90 Generator Tube Plugging Level (%) NA 15 Maximum Refueling Water Storage Tank Temperature (F) NA 120 Maximum Condensate Storage Tank Temperature (F) NA 120 Fuel Backfill Pressure (psig) NA 275 Reactor Trip Setpoint (psia) NA 1860 Safety Injection Signal Setpoint ('psia) NA 1715 Safety Injection Delay Time (sec) NA 27 Safety Injection Pump Degradation (%) NA 10 Charging Pump Flow Imbalance (gpm) NA 25 HHSI Cross Tie Valve Position NA Closed Signal Processing Delay and Rod Drop Time (sec) NA 4.4 Reactor Coolant Pump Delay Time (sec) NA 4.4 Main Feedwater Isolation Delay Time (sec) NA 0.0 Main Feedwater Valve Closure Time (sec) NA 8.0 Auxiliary Feedwater Enthalpy Delay Time (sec) NA 272 Main Steam Safety Valve Setpoint (psia) NA Table 6 1 Two percent is added to this power to account for calorimetric error.

2 A safety evaluation for the low pressure, high temperature operating condition was performed in the licensing basis analysis.

3 Value is based. on 102% core power, main coolant pump heat neglected, and best estimate Tavg.

91429R2.wpf 41

SECL-91<29, Revision 2 TABLE 9 LOW PRESSURE, HIGH TEMPERATURE Current MSSV Licensing Setp oint Basis Increase License Core Power'MWt) 3413 3250 Total Peaking Factor, Fz 2.34 2.357 Axial Offset (%) +30 +13 Hot Channel Enthalpy Rise Factor, F 1.644 1.666 Maximum Assembly Averag e Power, Pn 1.519 1.46 Fuel Assembly Array 17 17V5 Accumulator Water Volume (fP) 946 946 Accumulator Tank Volume (ft') 1350 1350 Minimum Accumulator Gas Pressure, (psia) 600 600 Loop Flow (gpm) 354000 354000 Vessel Inlet Temperature (F) ~ 544.41 544.41 Vessel Outlet Temperature 610.19 610.19 (F)'CS Pressure Including Uncertainties (psia) 2100 2100 Steam Pressure (psia) 807.03 807.03 Generator Tube Plugging Level (%)

'team 15 15 Maximum Refueling Water Storage Tank Temperature (F) 120 120 Maximum Condensate Storage Tank Temperature (F) 120 120 Fuel Backfill Pressure (psig) 275 275 Reactor Trip Setpoint (psia) 1860 1860 Safety Injection Signal Setpoint (psia) 1715 1715 Safety Injection Delay Time (sec) 27 27 Safety Injection Pump Degradation (%) 10 10 Charging Pump Flow Imbalance (gpm) 25 25 HHSI Cross Tie Valve Position Closed Closed Signal Processing Delay and Rod Drop Time (sec) 4.7 4.7 Reactor Coolant Pump Delay Time (sec) 4.4 44 Main Feedwater Isolation Delay Time (sec) 0.0 2.0 Main Feedwater Valve Closure Time (sec) 8.0 6.0 Auxiliary Feedwater Enthalpy Delay Time (sec) 349 349 Main Steam Safety Valve Setpoint (psia) Table 5 Table 6 1 Two percent is added to this power to account for calorimetric error.

2 Value is based on 102% core power, main coolant pump heat neglected, and best estimate Tavg.

91<29R2.wpf

SECI 91<29, Revision 2 TABLE 10 TIME SEQUENCE OF EVENTS LPLT LPLT LPHT LPHT Event w/ MSSV w/o MSSV w/ MSSV w/o MSSV Break Occurs 0 0 0 0 Reactor trip signal 11.23 11.23 13.54 13.54 Safety injection signal 19.28 19.28 22.42 22.42 Start of safety injection signal 46.28 46.28 49.42 49.42 Loop seal venting 643.4 644.7 601.8 608.3 Loop seal core uncovery NA NA NA NA Loop seal core recovery NA NA NA NA Boil-offcore uncovery 1139.2 1077.3 1073.4 1057.8 Accumulator injection begins 1730.0 1751.0 1647.8 1695.8 Peak clad temperature occurs 1935.5 1831.4 1872.3 1824.7 Top of core covered NA NA NA NA SI flow rate exceeds break flow rate 1988 2024 2293 2284 LPLT is low pressure, low temperature operating condition.

LPHT is low pressure, high temperature operating condition.

W/ MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.

W/0 MSSV is licensing basis main steam safety valve setpoint tolerance case at 3250 MWt core power.

91429R2.wpf 43

SECL-91-429, Revision 2 TABLE 10a TIME SEQUENCE OF EVFATS Time (seconds)

LPLT LPLT w/MSSV w/MSSV Event 3 inch Break 2 inch Break Break Occurs 0.0 0.0 Reactor trip signal 8.64 19.03 Safety injection signal 17.13 37.11 Start of safety injection 44.13 64.11 Start of auxiliary feedwater delivery 68.6 79.1 Loop seal venting 592 1390 Loop seal core uncovery N/A N/A Loop seal core recovery N/A N/A Boil-offcore uncovery 984 2312 Accumulator injection begins 1680 N/A Peak clad temperature occurs'op 1890 4042 of core covered N/A N/A SI flow rate exceeds break flow rate 1890 4091 LPLT is low pressure, low temperature operating condition.

W/ MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.

SECL-91-429, Revision 2 TABLE 11 SUMMITRY OF RFSULTS LPLT LPLT LPHT LPHT w/ MSSV w/o MSSV w/ MSSV w/o MSSV NOTRUMP Peak Clad Temperature ('F) 1853.7 1772.9 1837.7 1710.3 Peak Clad Temperature Location (ft) 11.75 11.75 11.75 11.75 Peak Clad Temperature Time (sec) 1935.5 1831.4 1872.3 1824.7 Local Zr/H,O Reaction Maximum (%) 3.47 2.47 3.13 1.82 Local Zr/H,O Reaction Location (ft) 11.75 11.75 11.75 11.75 Total Zr/H,O Reaction (%) < 1.0 < 1.0 <1.0 <1.0 Rod Burst None None None None Burst and Blockage Penalty ('F) 25 15 16 15 Total Peak Clad Temperature ('F) 1878.7 1787.9 1853.7 1725.3 LPLT is low pressure, low temperature operating condition.

LPHT is low pressure, high temperature operating condition.

W/ MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.

W/0 MSSV is licensing basis main steam safety valve setpoint tolerance case at 3250 MWt core power.

91429R2.wpf 45

SECL-91-429, Revision 2 TABLE 11a

SUMMARY

OF RESULTS LPLT LPLT w/MSSV w/MSSV 3 inch Break 2 inch Break NOTRUMP Peak Clad Temperature ('F) 1951 1833 Peak Clad Temperature Location (ft) 12.0 12.0 Peak Clad Temperature Time (sec) 1890 4042 Local Zr/H,O Reaction Maximum (I) 5.06 3.75 Local Zr/H~O Reaction Location (ft) 12.0 12.0 Total Zr/H,O Reaction (%) 0.568 0.397 Rod Burst None None Burst and Blockage Penalty ('F) 117 15 Total Peak Clad Temperature ('F) 2068 1848 LPLT is low pressure, low temperature operating condition.

W/ MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.

46

SECI 91<29, Revision 2 TABLE 12 TIIKE SEQUENCE OF EVI<22lTS Time Event LPHT LPHT w/ MSSV ~w/0 MS V Break Occurs 0 0 Reactor trip signal 11.01 11.01 Safety injection signal 20.92 20.92 Start of safety injection signal 47.92 47.92 Loop seal venting 620.0 627.2 Loop seal core uncovery NA NA Loop seal core recovery NA NA Boil-offcore uncovery 620.0 627.2 Accumulator injection begins 1604.3 1631.7 Peak clad temperature occurs 1691.0 1720.6 Top of core covered NA NA SI flow rate exceeds break flow rate 1683.0 1984.0 LPHT is low pressure, high temperature operating condition.

W/ MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.

W/0 MSSV is licensing basis main steam safety valve setpoint tolerance case at 3413 MWt core power.

91429R2.wp f 47

SECI 91429, Revision 2 TABLE 13 SUlVPdARY OF RESULTS LPHT LPHT w/ MSSV w/o MSSV NOTRUMP Peak Clad Temperature ('F) 1955.9 1947.1 Peak Clad Temperature Location (ft) 11.75 11.75 Peak Clad Temperature Time (sec) 1691.0 1720.6 Local Zr/H,O Reaction Maximum (%) 4.26 4.83 Local Zr/H>0 Reaction Location (ft) 11.75 11.75 Total Zr/H,O Reaction (%) <1.0 <1.0 Rod Burst None None ArtificialLeak-By Penalty ('F) 12 12 Burst and Blockage Penalty ('F) 157 143 Total Peak Clad Temperature ('F) 2124.9 2102.1 LPHT is low pressure, high temperature operating condition.

W/ MSSV is main steam safety valve setpoint tolerance increase case at 3250 MWt core power.

W/0 MSSV is licensing basis main steam safety valve setpoint tolerance case at 3413 MWt core power.

91429R2.wpf 48

SECL-91<29, Revision 2 FIGU1H~5 91429R2.wpf 49

W QQ RSIA 24OO PSIA 68 1840

>SIA

'000 i PsaA 2100 x PSIA 45

~

~ gglgQTOl VA1.VES O'EN 578 575 598 .. 595 5" 8 'l5 688 685 613 615 628 625 638 avg ( P:

eaaaaa p+ Nominal Tave ~ 578.7'F Core Ltmits .'(ominal PI.assure ~ 2100 ps.'a OONALO C. COOK UNIT 1 FIGURE la ILLUSTRATION OF OVERTEHPERATURE ANO. OVERPOWER OELTA T PROTECTION i

'I

75 OPaT 1922 2250 PSIA PSIA 65 04 2000 PSIA 2400 PSlA

<5 STEAN GENERATOR SAPPY VALVES OPEN 568 56S 578 575 58B 585 5'%'tS 688 685 618 615 628 625 T eve leF')


OTaT Protectfon Lfnes Cars Thsrtasl Ssfsty Ltsfts Nominal Vessel Average Teaperature 576'F Noafnal Pressurfzer Pressure 2250 psfa DONALD C COOK UNIT 2 (MIXED CORE)

FIGURE 1b ILLUSTRATION OF OVERTEMPERATURE ANO OVERPOWER DELTA T PROTECTION

OPaT 1922 73~ PSIA 2400 '.

PSIA 2000 53 PSIA 2250 STGN GENERATOR PSIA SAFETY VALVES OPEN 575 S88 585 5 I8 S~S 688 685 618 6 I5 628 625 ai3 nvg (~F'!


OTaT Protect)on Lines Core Therssal Safety Lfeits Nominal Vessel Average Temperature 5S1.3'F Nominal Pressurizer Pressure 2100 psia.

DONALD C. COOK UNIT 2 (FULL V5 CORE)

FIGURE Ic ILLUSTRATION OF OVERTEHPERATURE AND OVERPOWER DELTA T PROTECTION

h

~ v VV I

CC

~ 4h V v p l

'v4 I

I A "lCC C

." 300.

l 900.

lo. 20. 30. 40. 50. 60. ~C, 80. 90.

T MK (SEC~

2300.

F800.

>600 1~00

'4 1200 Jl IQOO.

0. 10. 20. 30. 40.

T ME 50 '0.

(SEC)

70. 80. 90. >00.

DONALD C. COOK UNIT I FIGURE 2 TURBINE TRIP EVENT 'WITHOUT PRESSURE CONTROL, HINUHUH REACTIVITY FEEDBACK

~~

rD ~

z I

I I

I i

i I

4

~ ~

Z 10 20 ic 40 T ~E 53 60 (SEC) 70 80:C 4 5 5

1.5 10 20 30 40 50 60 70 80 9C 1'K (SEC'ONALD C. COOK UNIT I FIGURE 3 TURBINE TRIP. EVENT WITHOUT PRESSURE CONTROL, HINUHUM REACTIVITY FEEDBACK

560 5~0 520 i 530 56C 5'0 520 500 0 10 20 3C <0 50 60 70 80 iC lC T 0= (SEC)

EGG'80 560 5<0 52G 500 2

560 560 i 5<0 520 500 70 90 t"3 0 10 20 30 40 50 60 SG v=

(SEC,'ONALD C. COOK UNIT I FIGURE 4 I TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, MINUMUM REACTIVITY FEEDBACK .

I

~

CC 1

1

'JCO 9CC.;

9CG.;

700.

50C.

500

0. IO. 20. 30. 40. 50. 60. 70. 90. 90. lQQ.

T uE (SEC) 400 tQ 350 300 250 200 150 C',

100 50 0

-50 10 20 30 40 50 50 70 dO 90 'CO Ti & (SEC)

DONALD C. COOK UNIT I FIGURE 5 I I

TURSINE TRIP EVENT WITHOUT PRESSURE CONTROL, HININN REACTIVITY FEEDBACK

35 sp 25 20 15 OC tv ip 5Ul 0

-5

-10 0 , 10 20 30 40 50 50 70 80 90 tCO TlhtK (SEC)

OONALO C. COOK UNIT 1 FIGURE 6 TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, HININN REACTIVITY FEEDBACK

OC

<OC a hAQ V

n 1 i~]

V C

'30C t800. io. 50.

Io. 20. 30. 60. ~0. 50. 90. <OC.

T:~E (SEC)

"300.

1900

>500 ac cr i 400

>200.

Jl

>300.

0. 10. 20. JO. 40. 50. 60. 70. 60. 90. IOC.

ri~K (sEc)

OONALD C. COOK UNIT I FI6URE TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL,

NXINN REACTIVITY FEEOBACK

0.

10 20 30 +0 50 60 70 d0 90 lCQ T vK (SEC,'

2.5 1.5 1.

0 10 20 30 40 50 60 70 d0 90 tCQ TisK (SEC)

DONALD C. CMK UNIT I FIGURE 8 TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, HAXII%N REACTIVITY FEEDBACK

66G 620 ~

~ V

!30 560 dr.o 520 500 tO 20 SO iO 50 do Io 80 90 r vc (sac)

>oo 660 660 6<o 620 500 8

5do seo 5~0 520 500 to 20 30 40 50 do 70 80 90 too ritz (sec)

ONALO C. COOK UNIT I FISNE TURBINE TRIP EVENT ltITH0UT NESSVRE CONTROL,

'NXINN REACTIVITY FEEDBACK

~

nC 2C

'A '.

300 A

300 I

'J) 3CC,;

700.

500.

500

0. 10. 20. 30. 40. 50. 60. 70. 80. 90. 100.

TlMK (SEC) 400 350 300 250 200 150 100 50 0

-50 0 tQ 2Q 30 40 50 50 70 d0 90 100 TIME (SEC)

DNALD C. CXK UNIT I FIGURE 10 TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, NXINPl REACTIVITY FEEDBACK

25 20 tQ 15 10 ac QC A4 5

-5

-10 0 10 ~

20 30 40 50 60 , 70 SO 90 1CO TlsK (SEC) 0ONALP C. COOK UNIT 1 FIGURE 11 TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, NXINN REACTIVITY FEEDBACK

a o a 4ag ~

"500 n

50C 5 h j 40C

" 'CC I

"2OC n

'OC 2300 1900.

1800

0. 10. 20. 30. io. 50. do. 70. 40. 80 . iCC tivK (SKC) 2300.

isoo.

t doo.

c >400.

1200.

n n

t 000.

)0. io.

20, go.

T ill 50. (5CC)do. 70 ~ 80, 90. ~OC.

OQWLD C. COOK NIT 1 FIQNE 12 mam TaIe EVEN VITH PRESSVRE CNTROL ~

NXINN REACTIVITY FEEoMCK

8 5

2 0 10 20 30 <0 50 d0 10 80 90 T>MK (SEC) 4 5

. 3.5 2.5 10 20 30 40 50 60 10 80 9G Tlirt (5KC)

ONE C. COOK . NIT I FIGNE 13 TtWSINE TRIP EVENT 'KITH PRESSNE CONTROL, NXINN REACTIVITY FEEDBACK

580 560 520 cBS

~60 540 520 500 lO 20 30 +0 50 50 VO T'Mg (SKC) 700 560 5iQ 520 500 2

580 560 540 10 20 30 40 50 80 10 d0 9G tCS TIIC (SEC)

XNALD C. COOK UNIT 1

, FI6URE 14 TUNM TRIP EVBIT QlTH PRESSNE CONTROL, NX1NN REACTIV?TY FEEDBACK

I IQQ 1500.

300.

BOO.

700:

600.

500

0. 10. 20. 30. 40.. 50. 60. 70. 60.

TlhlK (SEC) 400 350 I

3OO 250 200 150 100 I

50 0

0 10 20 30 40 50 60 70 80 90 100 T1QK (SEC)

OelALD C. COOK UNIT 2 (FULL YS CORE)

FIGURE 15 TURBINE TRIP EVENT WITH PRESSURE CONTROL, NXINN REACTIYITY FEEOBACK

25 20 Ql 1 5 10 5

-10 0 10 20 30 40 50 50 70 d0 90 100 Ti~K (SEC)

ONALG C. COOK UNIT 2 (FULL VS CORE)

FIGURE 16 TURBINE TRIP EVENT WITH PRESSURE CONTROL, NXINtw REACTIVITY FEEOBACK

2500.

2400.

nn

"~"C'v

'n 2OOO.

l 800.

l d00,

0. l0 . 20. 30 . '0,T<~g 50 d0 (SKC) 70 g0. 90. laC.

2300.

l800.

1 d00.

1400.

I 200.

l 000, 800. 50, 70. So 90 lo lo 20 30. 40. 50.

(SEC)

OONLD C. COOK UNIT 1 FI6NE 17 TURSINE TRIP EVENT MITH PRESSURE CONTROL, NINNN REACTIVITY FEEOBACK

2 5

a 4

x 2 0 10 20 30 40 50 do 70 do )C" 1'iuK 9C (SKC) 5 2.5 2 ~

0 10 20 30 io 50 00 70 do M iOO TiitE (SEC)

ONNLD C. COOK UNIT I FI6NE 18 TNSINE TRIP EVENT 'WITH PRESQNE CONTlSL, NINNN REACTIVITY FEEDBACK

56C' 5@i 52" 5~0 5

560 s~c 520 500 10 20 30 40 50 60 TO 80 'C" 9C T'lK (SEC) 700 680 560 6<0 525 600 580 51 555 5<0 520 4 14 20 30 40 50 T 1 IC ~

(SEC)

DNQLD'C. CON NIT I FINRE- Ig TNSINE TRIP EVENT WITH PRESSVRE CONTROL, NINNN REACTIVITY FEEDBACK

1000.

900.

800.

700.

500.

500

0. lp, 20, 30. 40. 50. dp. 70. 80. 90. 100.

TiuK (SEC) 500 CJ 4J Vl

<00 4

300 200 l00 0

-100 0 10 20 30 40 50 dp 70 80 90 100 TiVK (SEC) 00NALO C. CON NIT I FIGURE 20 TURBINE TRIP EVENT WITH PRESSURE CONTROL, NININN REACTIVITY FEEDBACK

30 25 20

)5 10 QC 5

tA ac 0 CL

-t0 0 I 0 20 30 40 50 60 70 80 90 100 Ti& (SEC)

ONNLD C. CON UNIT I FI6URE 21 TURBINE TRIP EVENT WITH PRESSURE CONTROL, NININN REACTIVITY FEEDBACK

2500.

n 250C.

5

<OC

~CO x

'V

2QC.

2100.

" 00 F900.

1/00

0. t0. 20. 30. 40. 50. 50. 70. 50. 9Q, )GG t ~c (sac>

2000.

1800.

1d00.

x

[400.

1200.

1300.

0. 10. 20. 30. 40. 50. 80. 10. 80. 90. t00.

re% (5')

OINED C. COOK NIT 2 (NIXEO CORK)

FIQNK 22a TNSNE TRIP EVENT ltITHOUT PRESSNE CONTROL, NINNY REhCTIVITY FKEDBAC<

50C n

< c,PC

'CC I

~

\+

o e rV yA 43 tOC C

""OC

>90C.

1800 0 ~ le 20 '0 ~ <0 ~

~ MK

50. 60.

(SEC)

70. <0. g0. ~PC "30C tSOC.

l 500.

t 40C.

I 200.

1300.

0. t0. 20. 30. 40. 50. 60. 70. 50. 90. lOC (MC) tOMLD C. CON NIT 2 (fULL V5 CONK) fIQNK 22b TlNSINE TRIP EV9fT VITHOUT PRKSSlNK CONTROL, NINNN REKTIVITY FEEDSACK

C c 5 x 2 0

0 l0 20 30 ~0 50 50 >0 80 90 ~Co

'Tissu (SKC) 2.5 2.2 t.d l.2 <0 50 50 . 10 iCa 4 >0 20 30 50 .SO Tilg (SEC)

OOOO C. COOK NIT 2 (NIXEO CORE)

FICNE 23a TlNSINE TRIP EVBIT WITHOUT PRESQNK CSlTROf.,

NINNN REhCTIVITY FEEO84<<

tO ZO 3O .O a 6O (sec) to 20 30 40 50 60 70 80 K iCQ 7:~K (SEC) tONU) C; COOK UNIT 2 (FVLl, N CORE)

FINRE 23b TVRIINE TRIP EVENT itITHOUT PRESSURE @NIAL, NINNN REACTIVITY FEEDBACK

0 560 diQ 520 I

530 560 5cQ 520 500 Q l0 20 30 40 50 60 70 80 9Q

~

Ti~E (SEC) 700 680 660 6+0 620 600 9

MQ MO 5<0

]4 20 '0 40 Ti &

50 d0 (SEC)

>0 60 90 DONALD C. CNX NlT 2 (NlXED CORE)

FENRK 24a TNSlNE TRlP EVENT QlTHOUT PRESQNE CONTROL, MINN% REACT[VlTY FEEOBACK

53 I I

c60 5ao 5ZQ 5:c

.'30 c6 szo 500 O lO ZO SO 4O 50 . 6O rO ao aC .Cg r QK (SEC)

.00 Sao 560 5io 520 500 580 I 560 5co 520 0 ~0 20 30 iO 50 60 70 40 SO iCO r w (sKc)

ONED C. COOK NIT 2 (RKL V5 CORK)

FIQNE 24b TURSINE TRIP EVENT WITHOUT NESSNE COKTROL, NINNN REACTIVITY FEEDBACK

'20C 1000.

z 300.

BQO.

o 700.

600.

500.

0. Io. 20. 30. <0. 50. 60. 70. 60. 9Q. IQQ.

TIME (SEC) 400 350 zoo 250 200 150 100 50 0

0 t0 20 30 40 50 60 70 80 90 >00 7 i & (SEC)

DNALD C. COOK NIT 2 (MIXED CORE)

FIGURE 25a TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, MINN@ REACTIVITY FEEDBACK

oc P 11QQ.

100.

300.

BCQ.

700.

500.

500

0. 10. 20. 30. 40. 50. SO. 70. 80. 90. 1OO.

TIME (SEC) 400 rn 350 300 250 2OO 150 100 50 0

-50 10 20 30 <0 50 do 70 80 90 100 TiME (SEC) 00NLD C. 'COOK UNIT 2 (FULL VS CORE)

FIGURE 251 TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, NINNN REACTIVITY FEEOBACK

40 30 25 20 15 10 5Vl 0

-5

-10 0 10 20 30 40 50 d0 70 50 90 )QQ TivK (SEC)

DONALO C. COOK UNIT 2 (MIXED CORK)

FIGURE 264 TURBINE TRIP EVENT WITHOUT

'RESSURE CONTROL,

.NINLNN REACTIVITY FEEOBACK

40 35 30 25 20 15 (Y

10 5

0

-5

-10 0 10 20 30 40 50 50 70 d0 90 100 Ti~E (SEC)

DONALD C. COOK UNIT 2 (FULL VS CORE)

FIGURE 26b TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, MIHUNN REACTIVITY FEEDBACK

tV "50C n

"50C

=~OC i vs

~ 1hP aavlo n

2 lQC C

2300.

1300.

1500.'0.

10. 20. 30. 40. 50. 50 70. dO. 90. 100 Ti IE (SEC) 2'300.

1800.

le00.

ct 1400.

'V 1200.

'1 000 .

800.

0. 10. 20. JO. 40. $ 0. 60. 70. 80. 90. 100.

Ti~K fMC) 004lLD C. CON NIT 2 (MIXED CORE)

FIQURE 27a TURBINE TRIP'VENT M?THOUT PRESSURE CONTROL, NXINPI REACTIVITY FEEDBACK

OA A

~4 "5GC n

"504 C

I hc a%%

2 tQC "300

>900.

>500

0. t0. ZQ. 30. 44. 50. d0 94 >00

(~C)

4. 300 I/00.

i 500.

'00.

> 200.

I 300.

0. 10. 20. 30. 44, 50. d0. 70. 60. 90. F00 T sK (MC)

'ONAN C. COOK UNIT 2 (FULL V5 CORE)

FI6NE 27b TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, .

NXISN REACTIVITY FEEDBACK

0.

l0 20 30 40 50 50 70 d0 9Q T~vE (SKC) 2.d 2.6 2.4 j2, 10 20 30 40 50 d0 70 d0 90 lC" (sac)

OONLD C. COOK UNIT 2 (NIXEQ CORE)

FIQNE 28a TVRSINE TRIP EVENT WITHOUT PRESQNE CONTROL, NXINN REACTIVITY FEEDBACK

C IQ 2Q 30 +0 50 60 70 I50 9C 'CQ T: MK (SKC) 5 5 2 5

>.5

l. O tO 4O 6O ~O aO eC tCa 2O aO 5O T:VK (SEC)

OIWL9 C. COOK NIT 2 (RJLL VS CORE}

fNNf 28b TlJRSINE TRIP EVENT 'WITHOUT l%ESSVRE CONTROL, NXINN REACTIVITY FEED8ACK

g2h i 1.

~ '0 I

I 560 5<0 c2h 500 0 10 20 30 40 50 60 70 dO QQ r ME (sEC) 700 580 560 6<0 620 600 8

580 580 540 520 IO. 20 30 40 50 60 '10 dO 90 I CQ rim (sac)

ONlLD C. COOK LNIT 2 (MIXED CORE) '

I6URK 29a TNSINE TRIP EVENT WITHOUT PRESSURE CNTROL, NXINN REACTIVITY FEEDSACK,

60 540 520 500

>0 20 30 40 50 60 70 60 yp T vK (SEC)

%%0 5150 5ip 620 500 8

5ao 560 5iO 520 0 >0 20 SO ip 50 50 70 .80 SC iCO T'MK (SKC)

NNALD C. CON UNIT 2 (FULL VS CNE)

FIQNE 29b TNBINE TRIP EVENT MlTHGUT-PRESSURE CNTROL, NXINN REACTIVITY FEEDBACK

QC g 1~00 90C.

n HPC 700.

500.

500 0, 10. 20. 30. 40. 50, 60. 10. bp. 90. 100.

~ TIME (SEC),

300 250 200 150 w 100 CC 50 0

n 50 0 10 20 30 40 50 60 70 80 90 100 T1& (SEC)

DONALD C. COOK UNIT 2 (MIXED CORE)

FI6URE 30a TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, NXINN REACTIVITY FEEDBACK

300.

30C 700.

500.

500.

0. IO. 20. 30 <0 50 60 70 80. 90. IOC.

T ME (SKC) 400 350 300 250 200 l50 100 50 0

-50

]0 2Q 30 40 50 dQ 70 d0 90 1CO r uE (SEC)

Ot)NALO C. COOK UNIT 2 (FULL VS CORE)

FIGURE 30b TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, NXII%N REACTIVITY FEEDBACK

25 20 15 10 ac ac

'4 5 ac 0

ac

-5

-10 "

0 10 20 30 40 50 60 70 80 90 )CO TIME (SEC)

DONALD C. COOK'NIT 2 (MIXED CORE}

FIGURE 3la TURBINE TRIP EVENT WITHOUT PRESSURE CONTROL, MAXIHLN REACTIVITY FEEDBACK .

25 20 V)

IO 5

0

-5

-10 0 10 20 30 <0 50 d0 70 So eo .CO TIME (SEC)

DONALD C. COOK UNIT 2 (FULL V5 CORE}

FIGURE 31b TURBINE TRIP. EVENT WITHOUT PRESSURE CONTROL, HAXIHN REACTIVITY FEEOBACK

q %s a rv 25CC 500 leer

"<cc

~

~,v vv ltIA eevbr 2 'QC 300.

i90C.

I t800

10. 20. 30. 40. 50 50 T'LIE (ggg) 2300.

1300.

1500.

<z 14QQ .

'V 1 200.

'A t QQQ.

0. 10. 20. 30. io. 50. dO. ZO. 50. 90. tQC.

TiMK (SKC)

ONAu) C. COOK UNIT 2 (lIIXH) CORE)

FIGVRE 32a TURBINE TRIP EVENT MITH PRESSVRE CONTROL, NXINN REACTIVITY FEEDBACK

~ ~

%A%

V I

50C t

.cQC C

n

~<hF a VV C

'900

'800 30. <0. 50. 60. 70. 50. 90 :GC 20.

T vK (SEC) 2".00

>30C. .~:tlj~i ~

>500

>400

>200 n

t 300.

0. 10, 20. 30. 40. 50. d0. 10. 50. 90. iOC r ~C '(SCC)

'ONlD C. COOK UNIT 2 (FULL V5 CQRE)

FI6NE 321 TURBINE TRIP EVENT MITH PRESSURE CONTROL, NXINN REACTIVITY FEEDBACK

dt 4

Z 0.

10 20 30 <0 50 50 70 80 9C r vK (SKC) 2.6 3 ~.z

~ 2 0 10 20 30 40 50 50 70 d0 90 Tlat@ (SEC)

OOQLG C. COOK NIT 2 (MIXED CORE)

FI6NE 33a TURBINE TRIP .EVENT MITH PRESQNE CONTROL, NXINN REACTIVITY FEEOSACK

l0 20 30 40 50 50 10 80 90

~ vK (SKC) lO 20 30 40 50 dO 10 60 9C T ~K (SKC)

ONIALO C. COOK UNIT 2 (FULL VS CORE)

FISuaz 33b TlJRSINE TRIP EVBIT MITH PRESSURE CONTROL, NXINN REACTIVITY FEEDSACK

5~0 620 I

I r vS Car

<<V 560 5<0 520 500 0 !0 20 30 40 50 60 l0 80 9C r ~E'SEc) 700 580 560 640 520 500 8

580 560 g

5L0 520 0 l0 20 30 40 50 60 10 80 90 lC" TivK (SKC) 00NLD C. COOK UNIT 2 (NIXEQ CORE}

FI6URE 348 TURBINE TRIP EVENT KITH PRESSURE CONTROL, NXINN REACTIVITY FEEDBACK

550 t 54C e 520 500 '0 0 20 30 <0 50 60 70 80 T vK (SKC',

0 I

I I

530 5~0 620 50C 2

580 3 560 5c0 520 500 io 20 30 io 50 60 ~0 ao ec :CO T ilK (SEC)

ONALD C. COOK UNIT 2 (FULL V5 CORE)

FIeNE 34b TURSINE TRIP EVENT 'KITH PRESSURE CONTROL, NXINN REACTIVITY FEE08aCV.

c

?J7 .-QC.

z 30C.

BCC.

D 700.

500.

500.

p. 10 '0 '0. 40.

T MK

50. 60.

(SEC)

70. 80. 9p. 1pc 300 250 200 150 OC 10Q CZ 50 0

n

-50 '60 10 20 30 40 50 70 SO 90 1CP Tlute (SEC)

DONALD C. COOK UNIT 2 (HIXED CORE)

FIGURE 35a TURBINE TRIP EVENT WITH PRESSURE CONTROL, NXINN REACTIVITY FEEDBACK

P'00 9CC 600.

500.

10. 20. 30 '0.

T:ME

50. 60.

(SEC)

70. 80. 9p. Ipp 400 350 300 250 200 150 100 50 0

-50 10 20 30 40 50 60 70 80 90 ICO TIME (SEC)

DONALD C. COOK UNIT 2 (FULL V5 CORE)

FIGURE 35b TURBINE TRIP EVENT WITH PRESSURE CONTROL, AXING REACTIVITY FEEDBACK

25 20

'A )5

)0 QC ac 5

5 0

-5

)Q 20 30 40 50 50 70 80 90 )GO T)MK (SKC)

PONALD C. COOK UNIT 2 (HIXEO CORE)

- FIGURE 361 TURBINE TRIP FVENT MITH PRESSURE CONTROL, NX'INN REACTIVITY FEEOBACK

25 20 10 ac ac 5

0

-5

-10 0 t0 20 30 40 TIME 50 50 (SEC)

'0 80 90 ICO DONALD C. COOK UNIT 2 (FULL V5 CORE)

FIGURE 36b TURBINE TRIP EVENT MITH PRESSURE CONTROL, MAX!NN REACTIVITY FEEDBACK

5CC "5CC 1

n 2 ICC I

C

".QG.

900.

I800.

0. tp. 20. 30. iP. 50. 60. 70. 50. yp T uK (SKC) 300 t300.

'6QC ac

'<OC C

v

>200 n

n I QOC.

0. l0. 20. 30. 40. 50. 60. 70. 80, 90. IOO.

T5VK (SE'C)

DONALD C. COOK UNIT 2 (IIIXED CORE)

FIGURE 37a TURBINE TRIP EVENT QITH PRESSURE CONTROL, MINN@ REACTIVITY FEEOBACK

5QC n

w gAQ e v C

~

'n 2 ~00 V) 1600 40. 50. 50. 10. 80. 90.:OC.

) 0. 20. 30.

T: VK (SEC) 2'300 .

1800.

1600.

I 400.

"4 l200.

1000.

600.

0. ~0. 20. 30. i0. 50. 60. 10. d0. 90. ~OC.

7 ~ & (SEC)

OONLO C. COOK NIT 2 (FULL VS CORE)

FIQIRE 37b TURBINE TRIP EVENT 'MITH PRESSURE CONTROL, NINNN REACTIVITY FEE08ACK

10 20 50 <0 50 60 7Q 60 gC r vK (SgC) 2 8 6

"2 1 6 4 ~Q 20 30 40 '0 T1QK 64 (SEC) 70 60 g)

OONU) C. COOK UNIT 2 (llIXEO CORE) fI6NE 38'URSINE TRIP EVENT MITH PRESSURE CONTROL, NINNPl REACTIVITY FEEDBACK

Z

0. ic 40 50 10 20 30 d0 d0 90 T MK (SEC}

4 5 3 5 2.5 I.S

l. 0 30 . io 50 10 70 10 20 80 SO tCO Ti& (SEC)

OQNLD C; COOK UNIT 2 (FULL VS CORE)

FIQNE 38b TRIP EVENT NITH

'URSIHE PRESSURE CONTROL SINN@ REACTIVITY FEEDBACK

560 t

520 500 0 10 20 30 40 50 60 70 80 9C '"0 I MK (SEC) 680 560 5~0

~ 520 500 550 560 540 520 500 "

0 10 20 30 40 50 60 10 80 90 '00 TivK (SEC) 00NALD C. COOK UN?T 2 (NIXED CORE)

F lGURE 39a TURSlNE TRlP EVENT 'MlTH PRESSURE CONTROL, NlHUNN REACTLVITY FEEOBACK

4, I

I cog iI I

520 500 0 >0 20 30 <0 50 60 70 T vK (SEC) 30 I

68G 660 5<0

r. 2r.

630 580 560 3

5i0 520 500 'l0 20 30 40 50 60 70 80 90 iCQ TivK (SKC)

NXQLO'C. COOK UNIT 2 (FULL V5 CORE)

FIGURE 3Sb TURBINE TRIP EVENT QITH PRESSURE CONTROL, NINNN REACTIVITY FEEDBACK

n 13QC.

700.

500.

500.

10. 20. 30. 40. 50. 60. 70. 80. 9Q.  !QC.

T ME (SEC) 40Q s) 350 300 "50 200 150 100 50 0

50

0. 10 20 30 40 50 60 70 80 90 >00 TiMK (SEC)

DONALD C. COOK UNIT 2 (MIXED CORE)

FIGURE 40a TURBINE TRIP EVENT QITH PRESSURE CONTROL, MINIMUM REACTIVITY FEEDBACK

'00.

el 3PG.

MV 7PG.

500.

500 0 ~ 10 ' 20 30 '0'0 '0'0 T ME (SEC)

~ 80. 90. 'CC.

500 n

400 1 I

(

3OO <

I 200 i 100 J) 0 n

-100 0 10 20 30 40 50 60 70 do 90 iCO TlMK (SEC)

OONALO C. COOK UNIT 2 (FULL VS CORE)

FIGURE 40b.

TURBINE. TRIP EVENT WITH PRESSURE CONTROL, HININN REACTIYITY FEEOBACK

40 35 30 25 20 15 gA

'4 ]Q 5

-5

-10 0 10 20 30 40 50 60 lO 80 90 'C3 T'ME (SEC)

DONALD C. COOK UNIT 2 (MIXED CORE)

FIGURE 41 a TURBINE TRIP EVENT MITH PRESSURE CONTROL, HINIMN REACTIVITV FEEDBACK

30 41 2c 20 15 1Q Ag J7 0

-1Q 0 10 20 30 40 50 60 70 80 90 TIME (SEC)

DONALD C. COOK UNIT 2 (FULL V5 CORE)

FIGURE 41b TURBINE TRIP EVENT MITM PRESSURE CONTROL, MINIHUH REACTIVITY FEEOBACK

APPENDIX A SIGNIFICANT HAZARDS EVALUATION

>A SIGNIFICANT HAZARDS EVALUATION DONALD C. COOK UNITS 1 & 2 MSSV LIFT SETPOINT TOLERANCE TECHNICAL SPECIFICATION CHANGE INTRODUCTION:

Pursuant to 10CFR50.92, each application for amendment to an operating license must be reviewed to determine if the proposed change involves a significant hazards consideration. The Commission has provided standards for determining whether a significant hazards consideration exists (10CFR50.92(c)).

A proposed amendment to an operating license for a facility involves no significant hazards consideration ifoperation of the facility in accordance with the proposed amendment would not: 1) involve a significant increase in the probability or consequences of an accident previously evaluated, or 2) create the possibility of a new or different kind of accident from any accident previously evaluated, or 3) involve a significant reduction in a margin of safety.

DESCRIPTION Of AMENDMENTRE VEST:

The purpose of this amendment request is to revise Technical Specification Section 3/4.7 for both Donald C. Cook units in order to relax the main steam safety valve (MSSV) lift setpoint tolerance from <1%

to J3%. The currently specified tolerance of J1% of the liftsetpoint can be difficultto meet when the valves are tested due to setpoint drift over the duration of the operating cycle. This evaluation will provide margin for American Electric Power Service Corporation (AEPSC) when they perform their surveillance testing.

The ASME Code requires that the valves liftwithin 1% of the specified setpoint (NB-7512.2). The code also states that the valves must attain rated lift (i.e., full flow) within 3% of the specified setpoint (NB-7512. 1). This evaluation will form the basis for taking exception to the ASME Code with respect to the lift setpoint tolerances. As defined in NB-7512.2, exceptions can be made to the code providing the effects are accounted for in the accident analyses.

A-1

BASIS FOR NO SI NIFICANT HAZAIU)S DETERMINATION:

The effects of increasing the as-found lift setpoint tolerance on the main steam safety valve have been examined for the non-LOCA accidents, and it has been determined that, with one exception, the current accident analyses as presented in the UFSAR remain valid. The loss of load/turbine trip event was analyzed in order to quantify the impact of the setpoint tolerance relaxation. As previously demonstrated in this evaluation, all applicable acceptance criteria for this event have been satisfied and the conclusions presented in the UFSAR are still valid. Thus, the proposed Technical Specification change does not constitute an unreviewed safety question, and the non-LOCA accident analyses, as presented in the report, support the proposed change.

The effect of an increase in the allowable Main Steam Safety Valve set pressure tolerance from +1% to

+3% on the UFSAR LOCA analyses has been evaluated. In each case the applicable regulatory or design limitwas satisfied. Specific analyses were performed for small break LOCA assuming the current MSSV Technical Specification set pressures plus the proposed additional 3% uncertainty. The calculated peak cladding temperatures remained below the 10CFR50.46 2200'F limit.

The steam generator tube rupture event was also analyzed to determine the effects of the lift setpoint tolerance increase. The results of the analysis concluded that there was a very slight increase in the whole body dose release for Unit 1, but the magnitude of the increase was SECL-91%29, Revision 1 within the uncertainty associated with the calculation itself, and that the releases generated for the Donald C. Cook Rerating Program bound those calculated for this evaluation. The evaluation also determined that the current Unit 2 doses remain bounding. Thus, the conclusions presented in the Donald C. Cook UFSAR remain valid.

Neither the mass and energy release to the containment following a postulated loss of coolant accident (LOCA), nor the containment response following the LOCA analysis, credit the MSSV in mitigating the consequences of an accident. Therefore, changing the MSSV liftsetpoint tolerances willhave no impact on the containment integrity analysis. In addition, based on the conclusion of the transient analyses, the change to the MSSV tolerance will not affect the calculated steamline break mass and energy releases inside containment.

A-2

The proposed change has been evaluated in accordance with the Significant Hazards criteria of 10CFR50.92. The results of the evaluation demonstrate that the change does not involve any significant hazards as described below.

1. A significant increase in the probability or consequences of an accident previously evaluated.

Relaxation of the MSSV setpoint tolerance from +1% to J3% does not increase the probability or consequences of an accident previously evaluated. Component and system performance will not be adversely affected since equipment and system design criteria continue to be met. The MSSVs do not initiate any accident not already discussed in the UFSAR. Neither the mass and energy release to the containment following a postulated loss of coolant accident (LOCA), nor the containment response following the LOCA analysis, credit the MSSV in mitigating the consequences of an accident. For the events analyzed, all applicable acceptance criteria were satisfied, and there was no increase in the doses over those previously generated. As a result, the conclusions presented in the Donald C. Cook UFSAR are unaffected by the proposed change. Therefore, changing the MSSV lift setpoint tolerances would have no impact on the consequences of an accident.

2. Create the possibility of a new or different kind of accident from any accident previously evaluated.

The possibility for an accident or malfunction of a different type than evaluated previously in the safety analysis report is not created. Increasing the lift setpoint tolerance on the MSSVs does not introduce a new accident initiator mechanism. No new failure modes have been defined for any system or component important to safety nor has any new limiting single failure been identified. No accident willbe created that will increase the challenge to the MSSVs or result in increased actuation of the valves. Therefore, the possibility of an accident different than previously evaluated is not created.

3. Involve a significant reduction in a margin of safety.

The margin of safety as defined in the basis of the Technical Specifications is not reduced by the change in the MSSV lift setpoint tolerance. The proposed Increase in the as-found MSSV lift P

A-3

setpoint tolerance will not Invalidate the LOCA or non-LOCA conclusions presented in the UFSAR accident analyses. The new loss of load/turbine trip analysis concluded that all applicable acceptance criteria are still satisfied. For all the UFSAR non-LOCA transients, the DNB design basis, primary and secondary pressure limits, and dose limits continue to be met. Peak cladding temperatures remain below the limits specified in 10CFR50.46. The calculated doses resulting from a steam generator tube rupture event remain within a small fraction of the 10CFR100 permissible releases.

Thus, there is no reduction in the margin to safety. Note, however, in order to implement the proposed change, the Technical Specifications will have to be changed.

3.7.1.1 All aain stoma line coda safety valvea aasocLaeed vieh each sees.

generator shall bo OPEkASLE.

I IIC4HLBX:

thCGM:

ao VLeh 4 reactor coolant loopa and aaaociatad seaaa generacot..s Ln operation'assd vieh ona or aora aain ateaa lima code sefecy valvoa Lnoyorabla, operation Ln NOES 1, R and 3 aay proceed yrovidad, that within 4 houra, either eho Lnoparabla valve Ls raatorad to OPXMLI atatua or eha hwer 4nge Neutron fLux High Satpoint triy ia reduced yor Table 3.1-1.; othe~a, io Ln at laaat NT STARlT viehin eha naxt C houra and Ln Cog SMVTKNN vithin eho following 30 boura. >t e

b. VLeh 3 raactor coolant looya an4 aaaociatad staaa gaaeraeogs Ln oyoratioss an4 vieh one or mra aain ataaa lina code safeey valvea aaaociatad vieh an operatic loop Lnoporabla, operaeLon Ln NRC 3 aalu proceed providad, that &thin 4 houri, either the Lnoporablo valve La raatorad to OHRALLC aeatua or che reactor trip breakers are opane4; othariiao, bo in COLO SRUTEOQN vtthin eha next 30 bours.

C~ The proviaiona of Spocificatioo 3.0.4 are not apylicable.

4.7.1.1 Each aain a~ liao code aafaey valve ahaG bo 4eeonaeraeed OPEMlJ, rich life aottiags and orifice aixaa aa ebs Ln Table 4,7 1, Ln accordance etch, Soetioss ZI of eho AQC loilar and Praaaura Vaaaal Coda, 1914 gee.

D. C. COCC ~ URXZ 1 3/4 7-1 agama NO.ig0

TABLE 3.7-l HNIINN ALLONkE ONER RAHGK lKUTRON fLUN HIGH SETPOINT MITU INOPERhBLE STEAN lEFWlKflll

~ e

~

C Hexf~ Al)owable Power Range Naxtam Naker of feeyorable Safety Neutron flux High Setpoint Valves oa la ati Steaa Caaarator Percent of RATKD TERNAL PSKR 13.6

n 5%

oo Nl $ 0CS yeiy 1C in.

h N1 'I

$ 045 I

peiy LC in oo N-3 5075 peig 1C ln I

4e NR $ 07I yeiy W

1C in.

~o N3 k$ peiy 1C in.

I A

+fho l tt catt praaaaro aball oorroayqn4 aoaiaal oporatiay taeperatura ae1 proeeur' to aabieat aedltlone ot the yalya at.

Tho OPERAITLI.Y of eha aain seoaa line coda safoey valvoo anagram Iocondaty Iyo coo proasuro vil1 bo Liiieo4 eo vi chin i ea do s '.gn pzoaguro of 10f5 paid durinj the oooe sovoro aneicipaeod syseoN opera.

eional eranaionc. The aux~'oliovini capaeiey i4 aaoociaeid vi h I eutbino erip froa 100% RATS THERMAL t5CL coincident vieh an aaavuaod .':

of eondonsot hoac sinJa (i.o.. no seaaa byyaaa eo eho condonaot).

The Ipooifiod valve life coceinla an@ rolioving capaeieioo are in aocozdaneo viA eho zoquiroaenea of 5occion ZTZ of eho QlC Soklor and prooquto Code L97L Cdi cion. The cecal rolioving cayao icy for al L valvo on a o g coaa noo o L7 L53 . lOO Lba/ht vhieh ia apyroaiaaco ly LR

~

pot'cone of cho eoeal secondary acorn Gee of LL.L20,000 LboAg ae atagg. tOQXR. A aint'f 2 OPCRAILC aafoey valvoo per oporabl ~

gcaaa gonotaeor onouroo ehac ouffioione rolieCag capacity ia evai

[00'ATZy lo for eho allowable ZHQ8AL PNC toactiot&a Ln Table 3.7 ~ L.

STARTUt and/or tQCL OPERATION ii allerahlo vieh aafocy val inoyorablo +%chan cho Liiicaciona of the iCZZM r~iroaoncs on eho bao'.

of eho reduction. in secondary oyseee ae~ fZov aad TRLLCQ. tOMER zoq .

by eho rodueod reactor etiy ooccinga ~ f cho lover Range Noueron Flax channela. The reactor erfy aocyoint ro4aciona are darivo4 on eho foLLoving baooo:

For 4 Looy oporaeion a (L0%)

%hero:

5P ~ N4acod toaccot eriy ooeyoint ia potcone of RATtD THELVL 8%lLL V ~ eaaSaa nuabet ot inoyotailo aafocy valvoo por scoaa 1ino L.,2 or 3.

X ~ Toeal rolkoving cayaaity ot all oafoey valve! por aeoca Line ~ 4.off,454 Lbo/beut.

Y ~ Nacilua roliovinl eayacicy ot any one cato'ey valve

~ f57,C94 Lbo/hour, (109) ~ Rover Rancho Neutron Ficta-High Ttiy Soepoine fot 4 loop oyoracion.

O..C. CXC ~ UNION 1 ) 3/i $ L AN~tKNT NO.

3,7,1.1 hL1 matn%Egal seaaa leone coda sa.aey valves assoc'.acid viA each stean jenaraeor sha11 be OPELQQ v'. 5 Life seer'gs as speci'f ed '.n TabLe 3: I -'a.

2 i ~

ao Vkeh 4 reactor coolane Loops and associated seeaa generaeo s Ln cyerae'on and vieh one or mora Iakn seeaa LW coda.sa eey valves

~ rable, eparaeton La CNS 1, 2 and S may proceed yrovided, chat vtdgn 4 bees, etcher ehe inoperable valve ts reseored eo vichin eho neat C ~s ~~

OPQhlLX jeacQ$ Qr ehe ?4%%r iange ÃoLeron F11% Ekgh Trip Sec[oint.

ia reduced year Table S.l-l: otherwise, be in at Lease Bet ca@ La COTE 51CTtRKNN vtehfa ehe follm4ag 30 heats. i

b. VSch 3 reaotor coolant looya aaL associated steam generators bi operation aa4 etch one or sere aaSa steam Lhse code sa"oey valves aaaoetato4 &th an ~racial 3eoy taeporable, eyeraef.on ta MDL 3 may yrocoo4 ytevtdad, chat vtthta l beati, eiehet the i.noyerable valve Sa reaeored te OZQQLX status er ehe reactor trLy brewers are eyeaed; etheaCae, be Qx COLO SRUTI% withe ehe next 30 hexa.

'The yxevta5.oaa of SpoctNcaeton 3.0.I are not ayylfcable, 4.?.L.L Io e44LCLeaai SerretlLcaee teqCr~ta eehez than chose ~red by 4.t.$ .

S/a 7~1 AjgÃKICRT 50. 82

TABLE 3. l-l INXINll ALL@NB.K PSKR RANGE NK~U~F SETPOIIIT lIITII INOPERABLE STEAH Nax)mm h))mab)e Poser Range Saxi~ Nuwber of le Safety NeNtroa Flux lllgh Setpoiat Va ves oa or Cerement of RATEO TIIENHL PONER 87.2

ZAlkf 3.7-h STEIN Ltd SQ'HY VALVfS ffN lOOP 81+

VM llfT SEHl ORIFlCE SIZE

a. SV-l l065 psig l6 i li. SV-l )065 psig 16 in.~
c. SV-2 l075 psig )6 in.~
1. SV-2, l075 prig l6 in.2
e. SV-3 )NS ysiS l6 in.~

l% mme XI'ressure slull cerrespoal to oehieat coa4itioas of Qe valve at eewiaal oyeratiay teayerebee.aal yra5ssre.

Tho OHRQIUTT of cho cata sceaa ltno eo4a aafecy ~aires eaaeea

~c ee seceataxy Iystaa )casanova <11 Q ltatca4 ce WN,a ll0o of tcs oazbtne 104i of aen4ensor beaC sink (L,e., M

~

4ast~ yciseure of 104$ Pstg 4ctag Cho aesC severs anctctpace4 eyscaa oPoractana1 transient. The aaxtaa ralteCag ceyaaicy ts assoctaca4 vSch a crt'~ TRENT 8$ ZR aotnatdanc rich an ass~4 1ois s~ l+ass ce che aon4ansaz).

Tbe syoetfto4 Mw 1SA sottSILgs an4 reltovtag ecyacittas are tn aeeor4anae etch cho reqatr~cs of Soertoa III of cho &tier

~gggg~p Pros~e v res Co4e, 1071 Mic oe s~ Tbe cecal linea toit~ A58R ecyactcy of lT,U$ ,000 lhsiht ~ah ta a11 an4 aafocy 100'ATZO ~g, oa e La ac lease 10f

~tcanc of 84%~ soaon~ sc440 AM race 5ggR. i Ntsga% of ! OMAlLS aafecy M&s Por s~ gonatacar che ae chas eatttatane reit~ aayaetry ta ~ladle fer Ihe alletahlo tRQNAL toglkgos

?OCR toscrta!Soi ta Taile 3.7 l.

STIRXQP tseyerailo withe ea4/ot 8$ CL OPmliTKON te allowable etch safely che 1$ akcactoes ot the AC?TM ~reeencs oa the

~

hasta of che re4sacioo ta soaea4axy aye~ s~ flee sni Thtlsg. 8ÃCR-chIRhllso fellatio bases:

The reeccer ~ ee~tkc r~atxe4 iy Che te4aae4 reaecer.eriy eeeeSNge ef Ae Peat f04Nrtooe are 4ert~

Range'1~

eO che ga l 1eey eyeracQe a (i')

Aero:

St a re~ reeecee TIRlh 8%&

arty eeeyeLae La Poreene of lCCl 1a aml~ aeAer ef Saeyetahle safeey Weel Per seem

@as Y=-

'~ Ieiil relS~ eoyoetry SB Qe. /bees e 4,Q!,4S of all safoey valves Per stable

~~.Pe+'aSt, Sa O~

rolteviag eayac&y ef See

~ one safoey va1ve 10' teat Osage

~ ye ra@tee See~ Plm ~ ltd Seeyets! fer 1 leep

~ WCLCaa tLaa mt a 1 $ /4 liL sammy Io. $ 2.

INNT A he safety nl>e )s OPERABLE ~)th a 1 )ft setting of'W value. H~r, about the safety valve shall be reset to the noa)nalthe nmfnal whenever f~ outs1de the +1% tolerance. value +]%