Line 3: Line 3:
| issue date = 03/19/1997
| issue date = 03/19/1997
| title = Part 21 Rept Re Missing Spacers from Standard SMB-00 Torque Switch Assemblies.Caused by Defective Lot Received from Limitorque Facility.Replaced or Repaired Defective Assemblies by Addition of Spacer
| title = Part 21 Rept Re Missing Spacers from Standard SMB-00 Torque Switch Assemblies.Caused by Defective Lot Received from Limitorque Facility.Replaced or Repaired Defective Assemblies by Addition of Spacer
| author name = DEPUYDT M B
| author name = Depuydt M
| author affiliation = AMERICAN ELECTRIC POWER CO., INC.
| author affiliation = AMERICAN ELECTRIC POWER CO., INC.
| addressee name =  
| addressee name =  
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:CATEGORY REGULATO INFORMATION DISTRIBUTION TEM (RIDS)ACCESSION NBR:9703210143 DOC.DATE: 97/03/19 NOTARIZED:
{{#Wiki_filter:CATEGORY REGULATO       INFORMATION DISTRIBUTION           TEM (RIDS)
NO DOCKET¹FACIL;50-~15 Donald C.Cook Nuclear Power Plant, Unit 1, Indiana M 05000315"50-316 Donald C.Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH.NAME AUTHOR AFFILIATION DEPUYDT,M.B.
ACCESSION NBR:9703210143           DOC.DATE: 97/03/19       NOTARIZED: NO           DOCKET ¹ FACIL;50-~15 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana                 M 05000315 "50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana               M 05000316 AUTH. NAME           AUTHOR AFFILIATION DEPUYDT,M.B.         American Electric Power Co., Inc.
American Electric Power Co., Inc.RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
RECIP.NAME           RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)


==SUBJECT:==
==SUBJECT:==
Part 21 rept re missing spacers from standard SMB-00 torque switch assemblies.
Part 21 rept re missing spacers from standard SMB-00 torque switch assemblies. Caused by defective lot received from Limitorque facility.Replaced or repaired defective assemblies by addition of spacer.
Caused by defective lot received from Limitorque facility.Replaced or repaired defective assemblies by addition of spacer.DISTRIBUTION CODE: IE19D COPIES RECEIVED:LTR ENCL SIZE: TITLE: Part 21 Rept (50 DKT)NOTES: RECIPIENT ID CODE/NAME PD3-3 PD INTERNAL: LE R E%7I%,"C RES/DET/EIB RGN2 RGN4 EXTERNAL: INPO RECORD CTR NRC PDR COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1'RECIPIENT ID CODE/NAME HICKMAN,J NRR/DISP/PSIB/B PDR WARDS M.RGNl RGN3 NOAC SILVER,E NUDOCS FULL TXT COPIES LTTR ENCL 1 1 1 1 1 1 1 1 1 1 1 1 1 1 NOTE TO ALL"RIDS" RECIPIENTS:
DISTRIBUTION CODE: IE19D COPIES RECEIVED:LTR                 ENCL     SIZE:
PLEASE HELP US TO REDUCE WASTE!CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT.415-2083)TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15 e
TITLE: Part 21 Rept (50 DKT)
616K.-!9'97(19EOI 09:19 COOK-E TEE:616906 I Donald C.Cook Plant, Units 1 and 2 Docket Numbers 50-315 and 50-316 Operating Licenses DPR-58 and DPR-74 This fax serves as a report of a 10 CFR Part 21 defect, reported under 10 CFR 21.21.d.3.i.
NOTES:
Q ri i f n On January 8, 1997, while installing a new torque switch assembly for motor operated valve 2-IVlN10-421, it was noted that a spacer appeared to be missing from the torque switch.An inspection of all the standard SMB-00 torque switches assemblies remaining in stock determined that they were all missing a spacer.These torque switch assemblies were part of a group of 7 received from Limitorque for general use at DC Cook under ASP 18787.A condition report was written to investigate if this was a new design.On January 12, 1997, 2-WMO-728, West Essential Service Water (ESN/)Supply to the 2CD Emergency Diesel Generator (EDG)Heat Exchanger Shutoff Valve, failed to fully close during performance of routine surveillance
RECIPIENT           COPIES            'RECIPIENT          COPIES ID CODE/NAME         LTTR ENCL        ID CODE/NAME        LTTR ENCL PD3-3 PD                 1    1      HICKMAN,J                1  1 INTERNAL:     LE       R           1    1      NRR/DISP/PSIB/B          1    1 E%7I%,"C           1    1      PDR WARDS M.              1    1 RES/DET/EIB               1     1     RGNl                      1   1 RGN2                      1     1     RGN3                      1   1 RGN4                      1     1 EXTERNAL: INPO RECORD CTR            1     1     NOAC SILVER,E             1   1 NRC PDR                  1     1     NUDOCS FULL TXT          1   1 NOTE TO ALL "RIDS" RECIPIENTS:
" 2 OHP 4030.STP.027CD,"CD Diesel Generator Operability Test".investigation of the failure on January 14, 1997 discovered that the torque switch assembly installed on the valve was also missing a spacer.The valve was declared inoperable, however the valve was still capable of performing its design basis function of opening, therefore, the operability of the 2CD Diesel Generator was not affected.On January 14,1997, in evaluating the failure of 2-WIVIO-728 and the effects of the missing spacer on the torque switch assembly, it was determined that the lack of the spacer allows the torque switch shaft to rotate slightly along the shaft length.This shaft rotation allowed the torque switch contacts to open.With the closed torque switch contacts open, the actuator control circuit will not allow the actuator to run in the closed direction and therefore will not allow the valve to fully close.The actuator control circuit uses only the closed set of contacts and therefore the open operation is not affected.In the investigation, it was determined that Z-CMO-415, the Component Cooling Water (CCW)to Miscellaneous Header Shutoff Valve for Train A, had received one of the torque switch assemblies from the lot of 7 which E'9703210i'43 9703i9 PDR ADQCK 050003i 5 S PDR'lltIIIIRllliIBtlIillIItflllIIItMlflltll 61AK.-19'7 1IYEDI 09: 20 COOK-K TEL:616906 1 Part 21 Report DC Cook Plant Page 2 were missing the spacer.Because the operability of the valve could not be assured, it was declared inoperable.
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS   FOR DOCUMENTS YOU DON'T NEED!
As the defective assembly had been installed in September of 1996, it was determined that a 10CFR50.72(b)(1)(ii)(B)
TOTAL NUMBER OF COPIES REQUIRED: LTTR             15   ENCL     15
ENS call for a condition outside the design basis was appropriate.
The ENS call was made on January 14, 1997 at 1650 hours.The fourth defective torque switch assembly was found to have been installed in 1-VVMO-754.
With the exception of the 2-CMO-415, all the valves in which the defective assemblies had been installed had either an"open" safety function (2-WMO-728 and 1-VVNlO-724) or were a BOP valve (2 MNt0-421), and thus their operability was not in question.During the investigation of this event, an operability evaluation was performed for 2-CMO-415.
The valve was found to have been successfully tested under dynamic conditions during the September 1996 to January 1997 interval and that the defective torque switch assembly would not have kept the valve from performing its design basis function of closing.Therefore, the valve had never been inoperable.
The ENS notification was retracted on February 22, 1997.f n The defective lot of 7 received from Limitorque apparently resulted from a manufacturing/assembly error at the Limitorque facility.Eff F il nPI r'n The double pole torque switch is a standard configuration for American Electric power and is used extensively at the DC Cook Plant in SMB-00 actuators.
The 7 assemblies supplied under ASP 18787 were placed in open stock for use in the next valve requiring one, Therefore, the 3 torque 61AR.-19'7(%OI 09:20 GOOK-K TEL:616906
\part 21 Report DC Cook Plant Page 3 switch assemblies in open stock could have been used in any number of safety related applications with unknown results.The failures in the 4 valves in which they were installed did not result in any safety impact, however, this could not be guaranteed for all other SMB-00 valve actuators in the plant due to the large variety of applications for the assembly.Because it is not possible to definitively evaluate all possible applications for significant safety hazard, it was conservatively decided to submit this event as a Part 21.i A n All 4 of the defective assemblies which were installed have been either replaced, or repaired by addition of a spacer.All 7 assemblies were returned to Limitorque for evaluation on March 10, 1997.Limitorque has not been able to predict when their evaluation might be complete.
II(>F,.-10'Ji ()ION)12:>6 COOK-NSQ C I 6~TEL:6)64'~P.001 Date: Fax Cover Sh, t March1997 To: NRC Operations Center 301/816-0550 Fax: 301/816-5151 From: Mary Beth Depuydt 616/465-5901, x1589~FAX: 616/466-'2905 Total 0 of Pages: 4, including cover p.",.e pz/97>qo POWER REACTOR EVENT NUMBER: 31922 FACILITY: COOK UNIT:[1][2][]RX TYPE:[1]W-4-LP,[2]
W-4-LP NRC NOTIFIED BY: MARY BETH DEPUYDT HQ, OPS OFFICER: JOHN MacKINNON REGION: 3 STATE: MI NOTIFICATION DATE: NOTIFICATION TXME: EVENT DATE: EVENT TIME: LAST UPDATE DATE: 03/10/97 11:2S'ET]03/10/97 00:00[EST]
03/10/97 EMERGENCY CLASS: NOT APPLICABLE 10 CFR SECTION: CDEG 21.21(c)(3)(i)DEFECTS/NONCOMPLIANCE NOTIFICATIONS VERN HODGE, RVIB n NRR SCRAM CODE RX CRIT XNIT PWR'NIT RX MODE CURR PWR CURR RX MODE N N 0 100 REFUELING POWER OPERATION 0 REFUELING 100 POWER OPERATION EVENT TEXT STANDARD SMB-00 TORQUE SWITCHES ASSEMBLIES REMAINING IN STOCK DETERMINED THAT THEY WERE ALL MXSSING A SPACER.ON JANUARY 8, 1997, WHILE INSTALLING A NEW TORQUE SWXTCH ASSEMBLY FOR MOTOR OPERATED VALVE 2-MMO-421, IT WAS NOTED THAT A SPACER APPEARED TO BE MISSING FROM THE TORQUE SWITCH.AN XNSPECTION OF ALL THE STANDARD SMB-00 TORQUES SWXTCHES ASSEMBLIES REMAINING IN STOCK DETERMINED THAT THEY WERE ALL MXSSING A SPACER.THESE TORQUE SWITCH ASSEMBLIES WERE PART OF A GROUP OF 7 RECEXVED FROM LIMITORQUE FOR GENERAL USE AT DC COOK UNDER ASP 18787.A CONDXTION REPORT WAS WRITTEN TO INVESTIGATE IF THIS WAS A NEW DESIGN.THE DEFECTIVE LOT OF 7 RECEIVED FROM LIMITORQUE APPARENTLY RESULTED FROM A MANUFACTURING ASSEMBLY ERROR AT THE LIMITORQUE FACILITY.THE DOUBLE POLE TORQUE SWITCH IS A STANDARD CONFIGURATION FOR AMERICAN ELECTRIC'POWER AND IS USED EXTENSIVELY AT THE DC COOK PLANT IN SMB-00 ACTUATORS.
THE 7 ASSEMBLIES SUPPLIED UNDER ASP 18787 WERE PLACED XN OPEN STOCK FOR USE IN THE NEXT VALVE REQUXRING ONE.THEREFORE, THE.3 TORQUE SWITCH ASSEMBLXES IN OPEN STOCK COULD HAVE BEEN USED IN ANY NUMBER OF SAFETY RELATED APPLICATIONS WITH UNKNOWN RESULTS.THE FAILURES XN THE 4 VALVES IN WHICH THEY WERE INSTALLED DID NOT RESULT IN ANY SAFETY IMPACT~HOWEVERS THIS COULD NOT BE GUARANTEED FOR ALL OTHER SMB 00 VALVE ACTUATORS IN THE PLANT DUE TO THE LARGE VARIETY OF APPLICATIONS FOR THE ASSEMBLY.BECAUSE IT IS NOT POSSIBLE TO DEFINITIVELY EVALUATE ALL POSSXBLE APPLXCATIGNS FOR SIGNIFICANT SAFETY HAZARD, IT WAS CONSERVATIVELY DECIDED TO SUBMIT THIS EVENT AS A PART 21.(Continued on next page)


0 FACILITY: COOK PAGE g 2 OF EVENT NUMBER: 31922 ALL 4 OF THE DEFECTIVE ASSEMBLIES WHICH WERE INSTALLED HAVE BEEN EITHER REPLACED, OR REPAIRED BY ADDITION OF A SPACER.ALL 7 ASSEMBLIES WERE RETURNED TO LIMITORQUE FOR EVALUATION ON MARCH 10'997 LIMITORQUE HAS NOT BEEN ABLE TO PREDICT WHEN THEIR EVALUATION MIGHT BECOMPLETE.
e 616K.-!9'97(19EOI 09:19    COOK-E                            TEE:616906 I
COPY OF PART 21 SENT TO VERN HODGE.  
Donald C. Cook Plant, Units 1 and 2 Docket Numbers 50-315 and 50-316 Operating Licenses DPR-58 and DPR-74 This fax serves as a report of a 10 CFR Part 21 defect, reported under 10 CFR 21.21.d.3.i.
.~Wb.I p'i}}
Q    ri  i    f    n On January 8, 1997, while installing a new torque switch assembly for motor operated valve 2-IVlN10-421, it was noted that a spacer appeared to be missing from the torque switch. An inspection of all the standard SMB-00 torque switches assemblies remaining in stock determined that they were all missing a spacer. These torque switch assemblies were part of a group of 7 received from Limitorque for general use at DC Cook under ASP 18787. A condition report was written to investigate if this was a new design.
On January 12, 1997, 2-WMO-728, West Essential Service Water (ESN/)
Supply to the 2CD Emergency Diesel Generator (EDG) Heat Exchanger Shutoff Valve, failed to fully close during performance of routine surveillance
            " 2 OHP 4030.STP.027CD, "CD Diesel Generator Operability Test".
investigation of the failure on January 14, 1997 discovered that the torque switch assembly installed on the valve was also missing a spacer. The valve was declared inoperable, however the valve was still capable of performing its design basis function of opening, therefore, the operability of the 2CD Diesel Generator was not affected.
On January 14,1997, in evaluating the failure of 2-WIVIO-728 and the effects of the missing spacer on the torque switch assembly, it was determined that the lack of the spacer allows the torque switch shaft to rotate slightly along the shaft length. This shaft rotation allowed the torque switch contacts to open. With the closed torque switch contacts open, the actuator control circuit will not allow the actuator to run in the closed direction and therefore will not allow the valve to fully close. The actuator control circuit uses only the closed set of contacts and therefore the open operation is not affected.
In the investigation, it was determined that Z-CMO-415, the Component Cooling Water (CCW) to Miscellaneous Header Shutoff Valve for Train A, had received one of the torque switch assemblies from the lot of 7 which
      '9703210i'43 9703i9 PDR    ADQCK 050003i 5 S                    PDR                              'lltIIIIRllliIBtlIillIItflllIIItMlflltll E
 
61AK. -19'7 1IYEDI 09: 20  COOK-K                        TEL:616906 1
Part 21 Report DC Cook Plant Page 2 were missing the spacer. Because the operability of the valve could not be assured, it was declared inoperable. As the defective assembly had been installed in September of 1996, it was determined that a 10CFR50.72(b)(1)(ii)(B) ENS call for a condition outside the design basis was appropriate. The ENS call was made on January 14, 1997 at 1650 hours.
The fourth defective torque switch assembly was found to have been installed in 1-VVMO-754. With the exception of the 2-CMO-415, all the valves in which the defective assemblies had been installed had either an "open" safety function (2-WMO-728 and 1-VVNlO-724) or were a BOP valve (2 MNt0-421), and thus their operability was not in question.
During the investigation of this event, an operability evaluation was performed for 2-CMO-415. The valve was found to have been successfully tested under dynamic conditions during the September 1996 to January 1997 interval and that the defective torque switch assembly would not have kept the valve from performing its design basis function of closing.
Therefore, the valve had never been inoperable. The ENS notification was retracted on February 22, 1997.
f      n The defective lot of 7 received from Limitorque apparently resulted from a manufacturing/assembly error at the Limitorque facility.
Eff        F il      nPI        r 'n The double pole torque switch is a standard configuration for American Electric power and is used extensively at the DC Cook Plant in SMB-00 actuators. The 7 assemblies supplied under ASP 18787 were placed in open stock for use in the next valve requiring one, Therefore, the 3 torque
 
61AR. -19'7(%OI 09:20      GOOK-K                          TEL:616906
                \
part 21 Report DC Cook Plant Page 3 switch assemblies in open stock could have been used in any number of safety related applications with unknown results. The failures in the 4 valves in which they were installed did not result in any safety impact, however, this could not be guaranteed for all other SMB-00 valve actuators in the plant due to the large variety of applications for the assembly.
Because it is not possible to definitively evaluate all possible applications for significant safety hazard, it was conservatively decided to submit this event as a Part 21.
i A    n All 4 of the defective assemblies which were installed have been either replaced, or repaired by addition of a spacer. All 7 assemblies were returned to Limitorque for evaluation on March 10, 1997. Limitorque has not been able to predict when their evaluation might be complete.
 
II(>F,.
I
        -10'Ji 6 ~
C
()ION) 12: >6  COOK-NSQ                      TEL:6)64 '~ P. 001 Fax Cover Sh,      t Date:          March      1997 To:              NRC Operations Center 301/816-0550 Fax: 301/816-5151 From:          Mary Beth Depuydt 616/465-5901, x1589
                        ~
FAX: 616/466-'2905 Total 0 of Pages:        4, including cover p.", .e
 
pz/ 97>qo POWER REACTOR                                          EVENT NUMBER:  31922 FACILITY: COOK                            REGION: 3  NOTIFICATION DATE: 03/10/97 UNIT:      [1] [2]  [ ]                  STATE: MI  NOTIFICATION TXME: 11:2S'ET]
RX TYPE:  [1] W-4-LP,[2] W-4-LP                      EVENT DATE:          03/10/97 EVENT TIME:          00:00[EST]
NRC NOTIFIED BY: MARY BETH DEPUYDT                    LAST UPDATE DATE:    03/10/97 HQ, OPS OFFICER:    JOHN MacKINNON NOTIFICATIONS EMERGENCY CLASS: NOT APPLICABLE 10 CFR SECTION:
CDEG 21.21(c)(3)  (i)      DEFECTS/NONCOMPLIANCE VERN HODGE, RVIB        NRR n
SCRAM CODE RX    CRIT XNIT  PWR  'NIT RX  MODE    CURR PWR    CURR RX MODE N                      0      REFUELING              0    REFUELING N                    100      POWER OPERATION      100    POWER OPERATION EVENT TEXT STANDARD SMB-00 TORQUE SWITCHES ASSEMBLIES REMAINING      IN STOCK DETERMINED THAT THEY WERE ALL MXSSING A SPACER.
ON JANUARY  8, 1997, WHILE INSTALLING A NEW TORQUE SWXTCH ASSEMBLY FOR MOTOR OPERATED VALVE 2-MMO-421, IT WAS NOTED THAT A SPACER APPEARED TO BE MISSING FROM THE TORQUE SWITCH. AN XNSPECTION OF ALL THE STANDARD SMB-00 TORQUES SWXTCHES ASSEMBLIES REMAINING IN STOCK DETERMINED THAT THEY WERE ALL MXSSING A SPACER. THESE TORQUE SWITCH ASSEMBLIES WERE PART OF A GROUP OF 7 RECEXVED FROM LIMITORQUE FOR GENERAL USE AT DC COOK UNDER ASP 18787. A CONDXTION REPORT WAS WRITTEN TO INVESTIGATE IF THIS WAS A NEW DESIGN.
THE DEFECTIVE LOT OF 7 RECEIVED FROM LIMITORQUE APPARENTLY RESULTED FROM A MANUFACTURING ASSEMBLY ERROR AT THE LIMITORQUE FACILITY.
THE DOUBLE POLE TORQUE SWITCH IS A STANDARD CONFIGURATION FOR AMERICAN ELECTRIC 'POWER AND IS USED EXTENSIVELY AT THE DC COOK PLANT IN SMB-00 ACTUATORS. THE 7 ASSEMBLIES SUPPLIED UNDER ASP 18787 WERE PLACED XN OPEN STOCK FOR USE IN THE NEXT VALVE REQUXRING ONE. THEREFORE, THE.3 TORQUE SWITCH ASSEMBLXES IN OPEN STOCK COULD HAVE BEEN USED IN ANY NUMBER OF SAFETY RELATED APPLICATIONS WITH UNKNOWN RESULTS. THE FAILURES XN THE 4 VALVES IN WHICH THEY WERE INSTALLED DID NOT RESULT IN ANY SAFETY IMPACT~
HOWEVERS THIS COULD NOT BE GUARANTEED FOR ALL OTHER SMB 00 VALVE ACTUATORS IN THE PLANT DUE TO THE LARGE VARIETY OF APPLICATIONS FOR THE ASSEMBLY.
BECAUSE IT IS NOT POSSIBLE TO DEFINITIVELY EVALUATE ALL POSSXBLE APPLXCATIGNS FOR SIGNIFICANT SAFETY HAZARD, IT WAS CONSERVATIVELY DECIDED TO SUBMIT THIS EVENT AS A PART 21.
(Continued on next page)
 
0 FACILITY: COOK                                 PAGE g 2 OF EVENT NUMBER: 31922 ALL 4 OF THE DEFECTIVE ASSEMBLIES WHICH WERE INSTALLED HAVE BEEN EITHER REPLACED, OR REPAIRED BY ADDITION OF A SPACER. ALL 7 ASSEMBLIES WERE RETURNED TO LIMITORQUE FOR EVALUATION ON MARCH 10'997   LIMITORQUE HAS NOT BEEN ABLE TO PREDICT WHEN THEIR EVALUATION MIGHT BECOMPLETE.
COPY OF PART 21 SENT TO VERN HODGE.
 
        ~ Wb.
I p'i}}

Latest revision as of 00:10, 4 February 2020

Part 21 Rept Re Missing Spacers from Standard SMB-00 Torque Switch Assemblies.Caused by Defective Lot Received from Limitorque Facility.Replaced or Repaired Defective Assemblies by Addition of Spacer
ML17333A816
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 03/19/1997
From: Depuydt M
AMERICAN ELECTRIC POWER CO., INC.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
REF-PT21-97 NUDOCS 9703210143
Download: ML17333A816 (10)


Text

CATEGORY REGULATO INFORMATION DISTRIBUTION TEM (RIDS)

ACCESSION NBR:9703210143 DOC.DATE: 97/03/19 NOTARIZED: NO DOCKET ¹ FACIL;50-~15 Donald C. Cook Nuclear Power Plant, Unit 1, Indiana M 05000315 "50-316 Donald C. Cook Nuclear Power Plant, Unit 2, Indiana M 05000316 AUTH. NAME AUTHOR AFFILIATION DEPUYDT,M.B. American Electric Power Co., Inc.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Part 21 rept re missing spacers from standard SMB-00 torque switch assemblies. Caused by defective lot received from Limitorque facility.Replaced or repaired defective assemblies by addition of spacer.

DISTRIBUTION CODE: IE19D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Part 21 Rept (50 DKT)

NOTES:

RECIPIENT COPIES 'RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD3-3 PD 1 1 HICKMAN,J 1 1 INTERNAL: LE R 1 1 NRR/DISP/PSIB/B 1 1 E%7I%,"C 1 1 PDR WARDS M. 1 1 RES/DET/EIB 1 1 RGNl 1 1 RGN2 1 1 RGN3 1 1 RGN4 1 1 EXTERNAL: INPO RECORD CTR 1 1 NOAC SILVER,E 1 1 NRC PDR 1 1 NUDOCS FULL TXT 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM OWFN 5D-5(EXT. 415-2083) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 15 ENCL 15

e 616K.-!9'97(19EOI 09:19 COOK-E TEE:616906 I

Donald C. Cook Plant, Units 1 and 2 Docket Numbers 50-315 and 50-316 Operating Licenses DPR-58 and DPR-74 This fax serves as a report of a 10 CFR Part 21 defect, reported under 10 CFR 21.21.d.3.i.

Q ri i f n On January 8, 1997, while installing a new torque switch assembly for motor operated valve 2-IVlN10-421, it was noted that a spacer appeared to be missing from the torque switch. An inspection of all the standard SMB-00 torque switches assemblies remaining in stock determined that they were all missing a spacer. These torque switch assemblies were part of a group of 7 received from Limitorque for general use at DC Cook under ASP 18787. A condition report was written to investigate if this was a new design.

On January 12, 1997, 2-WMO-728, West Essential Service Water (ESN/)

Supply to the 2CD Emergency Diesel Generator (EDG) Heat Exchanger Shutoff Valve, failed to fully close during performance of routine surveillance

" 2 OHP 4030.STP.027CD, "CD Diesel Generator Operability Test".

investigation of the failure on January 14, 1997 discovered that the torque switch assembly installed on the valve was also missing a spacer. The valve was declared inoperable, however the valve was still capable of performing its design basis function of opening, therefore, the operability of the 2CD Diesel Generator was not affected.

On January 14,1997, in evaluating the failure of 2-WIVIO-728 and the effects of the missing spacer on the torque switch assembly, it was determined that the lack of the spacer allows the torque switch shaft to rotate slightly along the shaft length. This shaft rotation allowed the torque switch contacts to open. With the closed torque switch contacts open, the actuator control circuit will not allow the actuator to run in the closed direction and therefore will not allow the valve to fully close. The actuator control circuit uses only the closed set of contacts and therefore the open operation is not affected.

In the investigation, it was determined that Z-CMO-415, the Component Cooling Water (CCW) to Miscellaneous Header Shutoff Valve for Train A, had received one of the torque switch assemblies from the lot of 7 which

'9703210i'43 9703i9 PDR ADQCK 050003i 5 S PDR 'lltIIIIRllliIBtlIillIItflllIIItMlflltll E

61AK. -19'7 1IYEDI 09: 20 COOK-K TEL:616906 1

Part 21 Report DC Cook Plant Page 2 were missing the spacer. Because the operability of the valve could not be assured, it was declared inoperable. As the defective assembly had been installed in September of 1996, it was determined that a 10CFR50.72(b)(1)(ii)(B) ENS call for a condition outside the design basis was appropriate. The ENS call was made on January 14, 1997 at 1650 hours0.0191 days <br />0.458 hours <br />0.00273 weeks <br />6.27825e-4 months <br />.

The fourth defective torque switch assembly was found to have been installed in 1-VVMO-754. With the exception of the 2-CMO-415, all the valves in which the defective assemblies had been installed had either an "open" safety function (2-WMO-728 and 1-VVNlO-724) or were a BOP valve (2 MNt0-421), and thus their operability was not in question.

During the investigation of this event, an operability evaluation was performed for 2-CMO-415. The valve was found to have been successfully tested under dynamic conditions during the September 1996 to January 1997 interval and that the defective torque switch assembly would not have kept the valve from performing its design basis function of closing.

Therefore, the valve had never been inoperable. The ENS notification was retracted on February 22, 1997.

f n The defective lot of 7 received from Limitorque apparently resulted from a manufacturing/assembly error at the Limitorque facility.

Eff F il nPI r 'n The double pole torque switch is a standard configuration for American Electric power and is used extensively at the DC Cook Plant in SMB-00 actuators. The 7 assemblies supplied under ASP 18787 were placed in open stock for use in the next valve requiring one, Therefore, the 3 torque

61AR. -19'7(%OI 09:20 GOOK-K TEL:616906

\

part 21 Report DC Cook Plant Page 3 switch assemblies in open stock could have been used in any number of safety related applications with unknown results. The failures in the 4 valves in which they were installed did not result in any safety impact, however, this could not be guaranteed for all other SMB-00 valve actuators in the plant due to the large variety of applications for the assembly.

Because it is not possible to definitively evaluate all possible applications for significant safety hazard, it was conservatively decided to submit this event as a Part 21.

i A n All 4 of the defective assemblies which were installed have been either replaced, or repaired by addition of a spacer. All 7 assemblies were returned to Limitorque for evaluation on March 10, 1997. Limitorque has not been able to predict when their evaluation might be complete.

II(>F,.

I

-10'Ji 6 ~

C

()ION) 12: >6 COOK-NSQ TEL:6)64 '~ P. 001 Fax Cover Sh, t Date: March 1997 To: NRC Operations Center 301/816-0550 Fax: 301/816-5151 From: Mary Beth Depuydt 616/465-5901, x1589

~

FAX: 616/466-'2905 Total 0 of Pages: 4, including cover p.", .e

pz/ 97>qo POWER REACTOR EVENT NUMBER: 31922 FACILITY: COOK REGION: 3 NOTIFICATION DATE: 03/10/97 UNIT: [1] [2] [ ] STATE: MI NOTIFICATION TXME: 11:2S'ET]

RX TYPE: [1] W-4-LP,[2] W-4-LP EVENT DATE: 03/10/97 EVENT TIME: 00:00[EST]

NRC NOTIFIED BY: MARY BETH DEPUYDT LAST UPDATE DATE: 03/10/97 HQ, OPS OFFICER: JOHN MacKINNON NOTIFICATIONS EMERGENCY CLASS: NOT APPLICABLE 10 CFR SECTION:

CDEG 21.21(c)(3) (i) DEFECTS/NONCOMPLIANCE VERN HODGE, RVIB NRR n

SCRAM CODE RX CRIT XNIT PWR 'NIT RX MODE CURR PWR CURR RX MODE N 0 REFUELING 0 REFUELING N 100 POWER OPERATION 100 POWER OPERATION EVENT TEXT STANDARD SMB-00 TORQUE SWITCHES ASSEMBLIES REMAINING IN STOCK DETERMINED THAT THEY WERE ALL MXSSING A SPACER.

ON JANUARY 8, 1997, WHILE INSTALLING A NEW TORQUE SWXTCH ASSEMBLY FOR MOTOR OPERATED VALVE 2-MMO-421, IT WAS NOTED THAT A SPACER APPEARED TO BE MISSING FROM THE TORQUE SWITCH. AN XNSPECTION OF ALL THE STANDARD SMB-00 TORQUES SWXTCHES ASSEMBLIES REMAINING IN STOCK DETERMINED THAT THEY WERE ALL MXSSING A SPACER. THESE TORQUE SWITCH ASSEMBLIES WERE PART OF A GROUP OF 7 RECEXVED FROM LIMITORQUE FOR GENERAL USE AT DC COOK UNDER ASP 18787. A CONDXTION REPORT WAS WRITTEN TO INVESTIGATE IF THIS WAS A NEW DESIGN.

THE DEFECTIVE LOT OF 7 RECEIVED FROM LIMITORQUE APPARENTLY RESULTED FROM A MANUFACTURING ASSEMBLY ERROR AT THE LIMITORQUE FACILITY.

THE DOUBLE POLE TORQUE SWITCH IS A STANDARD CONFIGURATION FOR AMERICAN ELECTRIC 'POWER AND IS USED EXTENSIVELY AT THE DC COOK PLANT IN SMB-00 ACTUATORS. THE 7 ASSEMBLIES SUPPLIED UNDER ASP 18787 WERE PLACED XN OPEN STOCK FOR USE IN THE NEXT VALVE REQUXRING ONE. THEREFORE, THE.3 TORQUE SWITCH ASSEMBLXES IN OPEN STOCK COULD HAVE BEEN USED IN ANY NUMBER OF SAFETY RELATED APPLICATIONS WITH UNKNOWN RESULTS. THE FAILURES XN THE 4 VALVES IN WHICH THEY WERE INSTALLED DID NOT RESULT IN ANY SAFETY IMPACT~

HOWEVERS THIS COULD NOT BE GUARANTEED FOR ALL OTHER SMB 00 VALVE ACTUATORS IN THE PLANT DUE TO THE LARGE VARIETY OF APPLICATIONS FOR THE ASSEMBLY.

BECAUSE IT IS NOT POSSIBLE TO DEFINITIVELY EVALUATE ALL POSSXBLE APPLXCATIGNS FOR SIGNIFICANT SAFETY HAZARD, IT WAS CONSERVATIVELY DECIDED TO SUBMIT THIS EVENT AS A PART 21.

(Continued on next page)

0 FACILITY: COOK PAGE g 2 OF EVENT NUMBER: 31922 ALL 4 OF THE DEFECTIVE ASSEMBLIES WHICH WERE INSTALLED HAVE BEEN EITHER REPLACED, OR REPAIRED BY ADDITION OF A SPACER. ALL 7 ASSEMBLIES WERE RETURNED TO LIMITORQUE FOR EVALUATION ON MARCH 10'997 LIMITORQUE HAS NOT BEEN ABLE TO PREDICT WHEN THEIR EVALUATION MIGHT BECOMPLETE.

COPY OF PART 21 SENT TO VERN HODGE.