{{#Wiki_filter:REACTORCOOLANT,SYSTEM3/4.4.6REACTORCOOLANTSYSTEMLEAKAGELEAKAGEDETECTION SYSTEMSLIMITINGCONDITION FOROPERATION 3.4.6.1Thefollowing ReactorCoolantSystemleakagedetection systemsshallbeOPERABLE:
{{#Wiki_filter:REACTOR COOLANT, SYSTEM 3/4.4.6    REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION      FOR OPERATION 3.4.6.1 The      following Reactor Coolant    System leakage  detection systems shall be OPERABLE:
'a~Oneofthecontainment atmosphere particulate radioactivity monitoring channels(ERS-1301 orERS-1401),
      'a ~   One  of the containment atmosphere particulate radioactivity monitoring channels     (ERS-1301 or ERS-1401),
b.Thecontainment, sumpflowmonitoring system,andc~Eitherthecontainment humiditymonitoro"oneofthecontainment atmosphere gaseousradioactivity monitoring channels(ERS-1305 orERS-1405)
: b. The containment,   sump  flow monitoring system,   and c~     Either the containment humidity monitor o"       one  of the containment atmosphere   gaseous  radioactivity monitoring   channels   (ERS-1305 or ERS-1405) .
.APPLICABILITY:
APPLICABILITY:       MODES  1, 2, 3  and 4.
MODES1,2,3and4.ACTION:Withonlytwooftheaboverequiredleakagedetection systemsOPERABLE, operation maycontinueforupto30daysprovidedgrabsamplesofthecontainment atmosphere areobtainedandanalyzedatleastonceper24hourswhentherecuiredgaseousand/crparticulate radioactivity monitoring channelsareinoperable; otherwise, beinatleastHOTSTANDBYwithinthene'xt6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.SURVEILLANCE REUIREMENTS 4.4.6.1Theleakagedetection systemsshallbedemonstrated OPERABLEby:'a~Containment atmosphere particulate andgaseous(ifbeingused)monitoring system-performance ofCHANNELCHECK,CHANNELCALIBRATION andCHANNELFUNCTIONAL TESTatthefrequencies specified inTable4.3-3,b.Containment sumpflowmonitoring system-performance ofCHANNELCALIBRATION atleastonceper18months,c~Containment humiditymonitor(ifbeingused)-performance ofCHANNELCALIBRATION atleastonceper18months.D.C.COOK-UNIT13/44-14~Amendment No.
ACTION:
ICl1 REACTORCOOLANTSYSTEMThispageintenzicnally leftblank.D.C.'OOK-UNIT13/44-15Amendment No.
With only two of the above required leakage detection systems OPERABLE, operation may continue for up to 30 days provided grab samples of the containment atmosphere are obtained and analyzed at least once per 24 hours when the recuired gaseous and/cr particulate radioactivity monitoring channels are inoperable; otherwise, be in at least HOT STANDBY within the ne'xt 6 hours and in COLD SHUTDOWN within the following 30 hours.
ADMINISTRATIVE CONTROLSSPECIALREPORTS6.9.2Specialreportsshallbesubmitted totheRegionalAdministrator withinthetimeperiodspecified foreachreport.Thesereportsshallbesubmitted coveringtheactivities identified belowpursuanttotherequirements oftheapplicable reference Specifications:
SURVEILLANCE RE UIREMENTS 4.4.6.1    The leakage    detection systems shall    be demonstrated  OPERABLE  by:
a~b.c~Inservice Inspection ProgramReview,Specification 4.4.10.ECCSActuation, Specifications 3.5.2and3.5.3.Inoperable SeismicMonitoring Instrumentation, Specification 3.3.3.3.d.Inoperable Meteorological Monitoring Instrumentation, Specification 3.3.3.4.e.Seismiceventanalysis, Specification 4.3.3.3.2.
            'a ~   Containment atmosphere   particulate and gaseous    (if being  used) monitoring system-performance     of CHANNEL CHECK,   CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST      at the frequencies specified in Table 4.3-3,
f.SealedSourceleakageinexcessoflimits,Specification 4.7.7.1.3.
: b. Containment sump flow monitoring system-performance         of CHANNEL CALIBRATION at least once per 18 months, c ~   Containment humidity monitor      (if being used) performance     of CHANNEL CALIBRATION    at least  once per 18 months.
g.FireDetection Instrumentation, Specification 3.3.3.7.h.FireSuppression Systems,Specifications 3.7.9.1,3.7.9.2,3.7.9.3and3.7.9.4.i.Containment SumpLevelinstrumentation, Table3.3-11.D.C.COOK-UNIT16-19Amendment No.
D. C. COOK UNIT 1                            3/4 4-14 ~               Amendment No.
INSTRUMENTATION BASES3/4.3.3.7 FIREDETECTION INSTRUMENTATION OPERABILITY ofthef'redetection instrumentation ensuresthatadequatewarningcapability isavailable forthepromptdetection offires.Thiscapability isrequiredinordertodetectandlocatefiresintheirearlystages.Promptdetection offireswillreducethepotential fordamagetosafetyrelatedequipment andisanintegralelementintheoverallfacilityfireprotection program.Intheeventthataportionofthefiredetection instrumentation isinoperable, theestablishment o'ffrequentfirepatrolsintheaffectedareasisrequiredtoprovidedetection capability untiltheinoperable instrumentation isrestoredtoOPERABILITY.
 
Useofcontainment temperature monitoring isallowedonceperhourifccntainment firedetection isinoperable.
I l 1 C
3/4.3.3.8POST-ACCiDENT INSTRUMENTATION TheOPERABILITY ofthepost-accident instrumentation ensuresthatsufficient information isavailable onselectedplantparameters tomonitorandassessthesevariables duringandfollowing anaccident.
 
Thecontainment waterlevelCHANNELCHECKisavisualinspection ofparallelchannelswhichshouldindicatewithinacceptable instrument driftthatthewaterlevelisbelowtherangeoftheccntainment waterlevelinstrumentation.
REACTOR COOLANT SYSTEM This page intenzicnally left blank.
Acceptable instrument driftforccntainment waterlevelinstrumentation ispresently considered 25%offullscale.Thecontainment sumplevelchannelsshouldindicatethesamelevelonbothchannelswithinacceptable instrument drift,whichispresently considered a25%offullscaledifference betweenthetwoparallelchannels.
D. C.'OOK   UNIT 1                3/4 4-15        Amendment No.
Ifthechannelsdonotindicatethesamelevel,thecontainment sumppumpactuation andshut-offcanbeusedtoindicateifeitherchanneliscorrect.Thedriftforbothinstrumentation systemsisattributed toairaccumulation inthecapillaries.
 
Providedthatthedriftislessthan25%,itshouldnotpreventtheinstrument frcmtrackingchangesinlevel.Equipment changesmaychangetheacceptable drift.Suchachangewillnotconstitute violation ofthisT/S,providedappropriate evidenc'e existstojustifythechange.D.C.COOK-UNIT1B3/43-4Amendment No.
ADMINISTRATIVE CONTROLS SPECIAL REPORTS 6.9.2      Special reports shall be submitted to the Regional Administrator within the time period specified for each report. These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable reference Specifications:
POS-CCIDENTISTRUMENTATION LIMITINGCONDITION FOROPERATION 3.3.3.8Thepost-accident monitoring instrumentation channelsshowninTable3.3-11shallbeOPERABLE.
a~     Inservice Inspection Program Review, Specification 4.4.10.
APPLICABILITY:
: b.      ECCS  Actuation, Specifications 3.5.2  and 3.5.3.
MODES1,2,and3.ACTION:WiththenumberofOPERABLEpost-accident monitoring channelslessthanrequiredbyTable3.3-11,eitherrestoretheinoperable channeltoOPERABLEstatuswithin30days,orbeinHOTSHUTDOWNwithinthenext12hoursexceptwherenotedinTable3.3-11.b.Theprovisions ofSpecifications 3.0.4arenotapplicable.
c  ~    Inoperable Seismic Monitoring Instrumentation, Specification 3.3.3.3.
SURVEILLANCE REUIREMENTS 4.3.3.8Eachpost-accident monitoring instrumentation channelshallbedemonstrated OPERABLEbyperformance oftheCHANNELCHECKandCHANNELCALIBRATION operations atthefrequencies showninTable4.3-7.D.C.COOK-UNIT13/43-54Amendment No.
: d.     Inoperable Meteorological Monitoring Instrumentation, Specification 3.3.3.4.
TABLE3.3-llPOST-ACCIDENT MONITORING INSTRUMENTATION INSTRUMENT HINIHUHCHANNELSOPERABLE1.Containment Pressure2.3.4.ReactorCoolantOutletTemperature
: e. Seismic event analysis, Specification 4.3.3.3.2.
-T(WideRange)HOTReactorCoolantInletTemperature
: f. Sealed Source leakage    in excess of limits, Specification 4.7.7.1.3.
-T(WideRange)COLDReactorCoolantPressure-WideRange5.Pressurizer WaterLevel6.SteamLinePressure7.SteamGenerator WaterIevel-Na'rrowRange8.Refueling WaterStorageTankWaterLevel9.BoricAcidTankSolutionLevel10.AuxiliarFeedwater FlowRateYll.ReactorCoolantSystemSubcooling HarginMonitor12.PORVPositionIndicator
: g. Fire Detection Instrumentation, Specification 3.3.3.7.
-LimitSwitches***
: h. Fire Suppression Systems, Specifications 3.7.9.1, 3.7.9.2, 3.7.9.3 and  3.7.9.4.
13.PORVBlockValvePositionIndicator
: i. Containment   Sump Level instrumentation, Table 3.3-11.
-LimitSwitches14.SafetyValvePositionIndicator
D. C. COOK     - UNIT  1                      6-19                    Amendment No.
-AcousticMonitor15.Containment SumpLevel16.Containment WaterLevel2/SteamGenerator 1/SteamGenerator 1/SteamGenerator*
 
1**1/Valve1/Valve1/Valve1¹SteamGenerator WaterLevelChannelscanbeusedasasubstitute forthecorresponding auxiliary feedwater flowratechannelinstrument.
INSTRUMENTATION BASES 3/4.3.3.7     FIRE DETECTION INSTRUMENTATION OPERABILITY   of the f're detection instrumentation ensures that adequate warning  capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early stages. Prompt detection of fires will reduce the potential for damage to safety related equipment and is an integral element in the overall facility fire protection program.
PRODAC250subcooling marginreadoutcanbeusedasasubstitute forthesubcooling monitorinstrument.
In the event that a portion of the fire detection instrumentation is inoperable, the establishment o'f frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored to OPERABILITY. Use of containment temperature monitoring is allowed once per hour      if ccntainment fire detection is inoperable.
***Acousticmonitoring ofPORVposition(1channelperthreeval'ves-headereddischarge) canbeusedasasubstitute forthePORVPositionIndicator
3/4. 3. 3. 8  POST-ACCiDENT INSTRUMENTATION The OPERABILITY  of the post-accident instrumentation ensures that sufficient information is available      on selected plant parameters to monitor  and assess these variables during and following an accident.
-LimitSwitchesinstruments.
The containment water level CHANNEL CHECK is a visual inspection of parallel channels which should indicate within acceptable instrument drift that the water level is below the range of the ccntainment water level instrumentation. Acceptable instrument drift for ccntainment water level instrumentation is presently considered 25% of full scale.
¹WithlessthantheminimumnumberofchannelsOpERABLErestorethesystemtoOPERABLEstatuswithin30daysorprepareandsubmitaSpecialReporttotheCommission pursuanttoSpecification 6.9.2withinthenext14daysoutlining available backupequipment, thecauseoftheinoperability andtheplansandscheduleforrestoring
The containment sump level channels should indicate the same level on both channels within acceptable instrument drift, which is presently considered a 25% of full scale difference between the two parallel channels.
..thesystemtoOPERABLEstatus.
If  the channels do not indicate the same level, the containment sump pump actuation and shut-off can be used to indicate      if either channel is correct.
TABLE4.3-7POST-ACCIDENT MONITORING INSTRUHENTATION SURVEILLANCE REUIREHENTS INSTRUMENT CHANNELCHECKCHANNELCALIBRATION 1.Containment Pressure2.ReactorCoolantOutletTemperature
The drift for both instrumentation systems is attributed to air accumulation in the capillaries. Provided that the drift is less than 25%,
-T(WideRange)HOT3.,ReactorCoolantInletTemperature
should not prevent the instrument frcm tracking changes in level. Equipment it changes may change the acceptable drift. Such a change will not constitute violation of this T/S, provided appropriate evidenc'e exists to justify the change.
-T(WideRange)COLD4.ReactorCoolantPressure-WideRange5.Pressurizer WaterLevel6.SteamLinePressure7.SteamGenerator WaterLevel-NarrowRange8.RWSTWaterLevel9.BoricAcidTankSolutionLevel10.Auxiliary Feedwater FlowRate11.ReactorCoolantSystemSubcooling MarginMonitor12.PORVPositionIndicator
D. C. COOK UNIT 1                        B 3/4 3-4              Amendment No.
-LimitSwitches13.PORVBlockValvePositionIndicator
 
-LimitSwitches14.SafetyValvePositionIndicator
POS - CCIDENT  I STRUMENTATION LIMITING CONDITION    FOR OPERATION 3.3.3.8 The post-accident monitoring instrumentation channels shown in Table 3.3-11 shall be OPERABLE.
-AcousticMonitor15.Containment SumpLevel16.Containment WaterLevel INSE0POST-CCIDENTINSTRUMENTATION LIMITIGCODITIONFOROPERATON3.3.3,6Thepost-accident monitoring instrumentation channelsshowninTable3.3-10shallbeOPERABLE.
APPLICABILITY:     MODES  1, 2, and 3.
APPLICABILITY:
ACTION:
MODES1,2,and3.~ACTON:WiththenumberofOPERABLEpost-accident monitoring channelslessthanrequiredbyTable3.3-10,eitherrestoretheinoperable channeltoOPERABLEstatuswithin30days,orbeinHOTSHUTDOWNwithinthenext12hoursexceptwherenotedinTable3.3-10'.Theprovisions ofSpecifications 3.0.4arenotapplicable.
With the number of OPERABLE post-accident monitoring channels less than required by Table 3.3-11, either restore the inoperable channel to OPERABLE status within 30 days, or be in HOT SHUTDOWN within the next 12 hours except where noted in Table 3.3-11.
SURVEILLANCE REUIREMETS4.3.3.6Eachpost-accident monitoring instrumentation channelshallbedemonstrated OPERABLEbyperformance oftheCHANNELCHECKandCHANNELCALIBRATION operations atthefrequencies showninTable4.3-10.D.C.COOK-UNIT23t43-45Amendment No.
: b. The  provisions of Specifications 3.0.4 are not applicable.
TABLE3.3-10POST-ACCIDENT MONITORING INSTRUMENTATION INSTRUMENT MINIMUMCHANNELSOPERABLE1.Containment Pressure2.3.45.ReactorCoolantOutletTemperature
SURVEILLANCE RE UIREMENTS 4.3.3.8  Each  post-accident monitoring instrumentation channel shall  be demonstrated    OPERABLE  by performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3-7.
-T(WideRange)ReactorCoolantInletTemperature
D. C. COOK - UNIT 1                    3/4 3-54                  Amendment No.
-T(WideRange)ReactorCoolantPressure-WideRangePressurizer WaterLevel'.SteamLinePressure7.SteamGenerator WaterLevel-NarrowRange8.Refueling WaterStorageTankWaterLevel9.BoricAcidTankSolutionLevel10.Auxiliary Feedwater FlowRate11.ReactorCoolantSystemSubcooling MarginMonitor12.PORVPositionIndicator
 
-LimitSwitches"-**
TABLE 3.3-ll POST-ACCIDENT MONITORING INSTRUMENTATION INSTRUMENT                                                               HINIHUH CHANNELS OPERABLE
13.PORVBlockValvePositionIndicator
: 1. Containment Pressure
-LimitSwitches14.SafetyValvePositionIndicator
: 2. Reactor Coolant Outlet Temperature  THOT (Wide Range)
-AcousticMonitor15.Containment SumpLevel16.Containment WaterLevel2/SteamGenerator 1/SteamGenerator 1/SteamGenerator*
: 3. Reactor Coolant Inlet Temperature  TCOLD (Wide Range)
1/Valve1/Valve1/Valve*SteamGenerator WaterLevelChannelscanbeusedasasubstitute forthecorresponding auxiliary feedwater flowratechannelinstrument.
: 4. Reactor Coolant Pressure - Wide Range
.**pRODAC250subcooling marginreadoutcanbeusedasasubstitute forthesubcooling monitorinstrument.
: 5. Pressurizer Water Level
***Acousticmonitoring ofPORVposition(1channelperthreevalves-headereddischarge) canbeusedasasubstitute forthePORVPositionIndicator
: 6. Steam Line Pressure                                                        2/Steam Generator
-LimitSwitchesinstruments.
: 7. Steam Generator Water Ievel  Na'rrow Range                                1/Steam Generator
WithlessthantheminimumnumberofchannelsOPERABLErestorethesystemtoOPERABLEstatuswithin30daysorprepareandsubmitaSpecialReporttotheCommission pursuanttoSpecification 6.9.2withinthenext14daysoutlining available backupequipment, thecauseoftheinoperability andtheplansandscheduleforrestoring thesystemtoOPERABLEstatus.
: 8. Refueling Water Storage Tank Water Level
TABLE4.3-10POST-ACCIDENT HONITORING INSTRUMENTATION SURVEILLANCE REUIREHENTS INSTRUMENT CHANNELCHECKCHANNELCALIBRATION 1.Containment Pressure2.3.5."ReactorCoolantOutletTemperature
: 9. Boric Acid Tank Solution Level
-T(WideRange)HOTReactorCoolantInletTemperature
: 10. AuxiliarY Feedwater Flow Rate                                              1/Steam Generator*
-T(WideRange)COLDReactorCoolantPressure-WideRangePressurizer WaterLevelR6.SteamLinePressure7.SteamGenerator WaterLevel-NarrowRange0.RWSTWaterLevel9.BoricAcidTankSolutionLevel10.Auxzlzary Feedwater FlowRatell.ReactorCoolantSystemSubcooling MarginMonitor12.PORVPositionIndicator
ll. Reactor Coolant System Subcooling Hargin Monitor                          1**
-LimitSwitches13.PORVBlockValve-Position Indicator
: 12. PORV Position Indicator - Limit Switches***                               1/Valve
-LimitSwitches" 14.SafetyValvePositionIndicator
: 13. PORV  Block Valve Position Indicator  Limit Switches                      1/Valve
-AcousticMonitor15.Containment SumpLevel16.Containment WaterLevel*Theprovisions ofSpecification 4.0.6areapplicable.
: 14. Safety Valve Position Indicator - Acoustic Monitor                        1/Valve
REACTORCOOLANTSYSTEM3/4.4.6REACTORCOOLANTSYSTEMLEAKAGELEAKAGEDETECTION SYSTEMSLIMITINGCONDITION FOROPERATION 3.4.6.1"Thefollowing FeactorCoolantSystemleakagedetection systemsshallbeOPERABLE:
: 15. Containment Sump Level                                                    1¹
a.Oneofthecontainment atmosphere particulate radioactivity monitoring channels(ERS-2301 orERS-2401),
: 16. Containment Water Level Steam Generator Water Level Channels    can be used as a  substitute for the corresponding auxiliary feedwater flow rate channel instrument.
b.Thecontainment sumpflowmonitoring system,andc.Eitherthecontainment humiditymonitororoneofthecontainment atmosphere gaseousradioactivity monitoring channels~(ERS-2305 orERS-2405).
PRODAC 250  subcooling margin readout can be used as a substitute    for the subcooling monitor instrument.
APPLICABILITY:
*** Acoustic monitoring of PORV position (1 channel per three val'ves headered discharge)       can be used as a substitute for the PORV Position Indicator  Limit Switches instruments.
MODES1,2,3and4.ACTXON:Withonlytwooftheabcverecuiredleakagedetection systemsOPERABLE, operation maycontinueforuptc30daysprovidedcrabsamplesofthecontainment atmosphere aeobtainedandanalyzedatleastonceper24hourswhentherequiredgasecusand/crparticulate radioactivity monitoring channelsareinoperable; otherwise, beinatleastHOTSTANDBYwithinthenext6hoursandinCOLDSHUTDOWNwithinthefollowing 30hours.SURVEILLANCE REUIREMENTS 4.4.6.1Theleakagedetection systemsshallbedemonstrated OPERABLEby:a~Containment atmosphere particulate andgaseous(ifbeingused)monitoring system-performance ofCHANNELCHECK,CHANNELCALIBRATION andCHANNELFUNCTIONAL TESTatthefrequencies specified inTable4.3-3,b.Containment sumpflowmonitoring system-performance ofCHANNELCALIBRATION atleastonceper18months,*C~Containment humiditymonitor(ifbeingused)-performance ofCHANNELCALIBRATION atleastonceper18months.*Theprovisions ofSpecification 4.0.6areapplicable.
¹   With less than the minimum number of channels OpERABLE restore the system to OPERABLE status within 30 days or prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 14 days outlining available backup equipment, the cause of the inoperability and the plans and schedule for restoring ..the system to OPERABLE status.
D.C.COOK-UNIT23/44-14Amendment No.
 
ADMINISTRATIVE CONTROLSSPECIALREPORTS6.9.2Specialreportsshallbesubmitted totheRegionalAdministrator withinthetimeperiodspecified foreachreport.Thesereportsshallbesubmitted coveringtheactivities identified belowpursuanttotherequirements oftheapplicable reference specification:
TABLE 4.3-7 POST-ACCIDENT MONITORING INSTRUHENTATION SURVEILLANCE RE UIREHENTS CHANNEL          CHANNEL INSTRUMENT                                                               CHECK        CALIBRATION
a0ECCSActuation, Specifications 3.5.2and3,5.3.b.Inoperable SeismicMonitoring Instrumentation, UnitNo.1,Specification 3.3.3.3.c~Inoperable Meteorological Monitoring Instrumentation, UnitNo.1,Specification 3.3.3.4.d.FireDetection Instrumentation, Specification 3.3.3.8.e.FireSuppression Systems,Specifications, 3.7.9.1,3.7.9.2,3.7.9.3and3.7.9.4.SeismicEventAnalysis, Specification 4.3.3.3.2.
: 1. Containment Pressure
g.SealedSourceleakageinexcessoflimits,Specification 4.7.8.1.3.
: 2. Reactor Coolant Outlet Temperature  T     (Wide Range)
h.Containment SumpLevelinstrumentation, Table3.3-10.D.C.COOK-UNIT26-19Amendment No.
HOT 3., Reactor Coolant Inlet Temperature  T COLD (Wide Range)
13/4~3INSTRUMENTATZ BASES3/4.3>3~2MOVABLEZNCOREDETECTORS TheOPERABILITY ofthemovableincoredetectors withthespecified minimumcomplement ofequipment ensuresthatthemeasurements obtainedforuseofthissystemaccurately represent thespatialneutronfluxdistribution ofthereactorcore.TheOPERABILITY ofthissystemisdemonstrated byirradiating eachdetectorusedandnormalizing itsrespective output.3/4.3.3.3 SEISMICINSTRUMENTATION TheOPERABILITY oftheseismicinstrumentation ensuresthatsufficient capability isavailable topromptlydetermine themagnitude ofaseismicevent,andevaluatetheresponseofthosefeaturesimportant tosafety.Thiscapability isrequiredtopermitcomparison ofthemeasuredresponsetothatusedinthedesignbasisforthefacility.
: 4. Reactor Coolant Pressure - Wide Range
3/4.3.3.4 METEOROLOGICAL INSTRUMENTATION TheOPERABILITY ofthemeteorological instrumentation ensuresthatsufficient meteorological dataisavailable forestimating potential radiation dosestothepublicasaresultofroutineoraccidental releaseofradioactive materials totheatmosphere.
: 5. Pressurizer Water Level
Thiscapability isrequiredtoevaluatetheneedforinitiating protective measurestoprotectthehealthandsafetyofthepublic.3/4.3.3.5 REMOTESHUTDOWNINSTRUMENTATZON TheOPERABILITY oftheremote'hutdown instrumentation ensuresthatsufficient capability isavailable topermitshutdownandmaintenance ofHOTSTANDBYofthefacilityfromlocations outsideofthecontrolroom.Thiscapability isrequiredintheeventcontrolroomhabitability islostandisconsistent withGeneralDesignCriteria19of10CFR50.3/4.3.3.6 POST-ACCIDENT INSTRUMENTATION TheOPERABILITY ofthepost-accident instrumentation ensuresthatsufficient information isavailable onselectedplantparameters tomonitorandassessthesevariables duringandfollowing anaccident.
: 6. Steam Line Pressure
Thecontainment waterlevelCHANNELCHECKisavisualinspection ofparallelchannelswhichshouldindicatewithinacceptable instrument driftthatthewaterlevelisbelowtherangeofthecontainment waterlevelinstrumentation.
: 7. Steam Generator Water Level  Narrow Range
Acceptable instrument driftforcontainment waterlevelinstrumentation ispresently considered 25%offullscale.Thecontainment sumplevelchannelsshouldindicatethesamelevelonbothchannelswithinacceptable instrument drift,whichispresently considered a25%offullscaledifference betweenthetwoparallelchannels.
: 8. RWST Water Level
Ifthechannelsdonotindicatethesamelevel,thecontainment sumppumpactuation andshut-offcanbeusedtoindicateifeitherchanneliscorrect.D.C.COOK-UNIT2B3/43-2Amendment No.
: 9. Boric Acid Tank Solution Level
3/4.3INSTRUMENTATION BASESThedriftforbothinstrumentation systemsisattributed toairaccumulation inthecapillaries.
: 10. Auxiliary Feedwater Flow Rate
Providedthatthedriftislessthan25%,itshouldnotpreventtheinstumentromtrackingchangesinlevel.Equipment changesmaychangetheacceptable drift.Suchachangewillnotconstitute aviolation ofthisT/S,prov'dedappropriate evidenceexiststojustifythechange.3/4.3.3.7AXIALPOWERDISTRIBUTION MONITORING SYSTEM(APDMS)OPERABILITY oftheAPDMSensuesthatsufficient capability isavailable forthemeasurement oftheneutronfluxspatialdistribution withinthereactorcore.Thiscapability isrequiredto1)monitorthecorefluxpatternsthatarerepresentative ofthepeakcorepowerdensityand2)limitthecoreaverageaxialpowerprofilesuchthat~thetotalpowerpeakingfactorFismaintained withinacceptable limits.3/4.3.3.8 FIREDETECTION ZNSTRUMENTATZON OPERABILITY ofthefiredetection instrumentation ensuresthatadequatewarningcapability isavailable forthepromptdetection offires.Thiscapability isrequiredinordertodetectandlocatefiresintheirearlystages.Promptdetection off'reswillreducethepotential fordamagetosafety-related equipment andisanintegralelementintheoverallfacilityfireprotection program.Zntheeventthataportionofthefiredetection instrumentation isinoperable, theestablishment offrequentfirepatrolsintheaffectedareasisrequiredtoprovidedetection capability untiltheinoperable instrumentation isrestoredtcOPERABILITY.
: 11. Reactor Coolant System Subcooling Margin Monitor
Useofcontainment temperature monitoring isallowedonceperhourifcontainment firedetection isinoperable.
: 12. PORV Position Indicator  Limit Switches
3/4.3.3.9PADIOACTIVE LZUZDEFFLUENTINSTRUMENTATION Theradioactive liquideffluentinstrumentation isprovidedtomonitorandcontrol,asapplicable, thereleasesofradioactive materials inliquideffluents duringactualorpotential releases.
: 13. PORV  Block Valve Position Indicator  Limit Switches
Thealarm/trip setpoints fortheseinstruments shallbecalculated inaccordance withNRCapprovedmethodsintheODCMtoensurethatthealarm/trip willoccurpriortoexceeding thelimitsof10CFRPart20.TheOPERABILITY anduseofthisinstrumentation isconsistent withtherequirements ofGeneralDesignCriteriaspecified inSection11.3oftheFinalSafetyAnalysisReportfortheDonaldC.CookNuclearPlant.3/4.3.3.10 RADIOACTIVE GASEOUSEFFLUENTINSTRUMENTATION Theradioactive gaseouseffluentinstrumentation isprovidedtomonitorandcontrol,asapplicable, thereleasesofradioactive materials ingaseouseffluents duringactualorpotential releases.
: 14. Safety Valve Position Indicator  Acoustic Monitor
Thealarm/trip setpoints fortheseinstruments shallbecalculated inaccordance withNRCapprovedmethodsD.C.COOK-UNIT2B3/43-3Amendment No.
: 15. Containment Sump Level
1I~~~~3/4.3INSTRUMENTATION BASESintheODCMtoensurethatthealarm/trip willoccurpriortoexceeding thelimitsof10CFRPart20.Thisinstrumentation alsoincludesprovisions formonitoring theconcentrations ofpotentially explosive gasmixturesinthewastegasholdupsystem.TheOPERABILITY anduseofthisinstrumentation isconsistent withtherequirements ofGeneralDesignCriteriaspecified in'ection11.3ofthe'Final SafetyAnalysisReportfortheDonaldC.CookNuclearPlant.3/4.3.4TURBINEOVERSPEED PROTECTION Thisspecification isprovidedtoensurethattheturbineoverspeed protection instrumentation andtheturbinespeedcontrolvalvesareOPERABLEandwillprotecttheturbineromexcessive overspeed.
: 16. Containment Water Level
Protection fromturbineexcessive overspeed isrequiredsinceexcessive overspeed oftheturbinecouldgeneratepotentially damagingmissileswhichcouldimpactanddamagesafetyrelatedcomponents, equipment orstructures.
 
D.C.COOK-Unit2B3/43-4Amendment No.
INS      E      0 POST- CCIDENT INSTRUMENTATION LIMITI G    CO  DITION  FOR OPERAT ON 3.3.3,6    The  post-accident monitoring instrumentation channels  shown  in Table 3.3-10 shall be    OPERABLE.
u~~(3~QorloinystlllfDIANA
APPLICABILITY:       MODES  1, 2, and 3.
&NICH~GAIV ElECTBICCOFORTWAYNE,INDIANAAMOUNTcHEcKNo.083~0273DATE03248bSl50.004~lnfullseNIement ofstatement accompenytng thischeUSNUCLEARREGULATORY COMMISSIONTotheWASHINGTON DC20555Orderof25b43024DISBURSEMENT ACCOUNTLINCOLNNATIONALBANKANDTRUSTCOMPANY,FORTWAYNE,INDIANAII'029LI3II''.07t900275I:I3S75205ll'EMITTANCE ADVICE-DETACHBEFOREDEPOSITING INDIANALMICHIGANELECTRICCO.P.O.BOX60FORTWAYNE,INDIANA46801cHEGKNo.0630273OURREFERENCE DATE036030'I602-2b-86DATE03248bVENDORSREFERENCE
~ACT ON:
,AEPNRCor5'I2pfAMOUNTGROSS15000$15000DEDUCTTRY32REV.I86EXPLANATION CD-CASHDISCOUNTRT-RETAINEDPRPRIORPAYMENTOFDEDUCTIONS TR-TRANSPORTATION TXTAXWITHHELDAJADJUSTMENT Attachment 3toAEP:NRC:0856T Regulatory Guide1.97,Rev.3,Pertinent Sections  
With the number of OPERABLE post-accident monitoring channels less than required by Table 3.3-10, either restore the inoperable channel to OPERABLE status within 30 days, or be in HOT SHUTDOWN within the next 12 hours except where noted in Table 3.3-10 The  provisions of Specifications 3.0.4 are not applicable.
~O'">>U.S.NUCLIRREGULATORY COMMI88lot
SURVEILLANCE RE UIREME TS 4.3.3.6    Each  post-accident monitoring instrumentation channel shall    be demonstrated    OPERABLE  by performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3-10.
!RELATRY0FRCEOFNUCLEARREGULATORY RESEARCHResea~aa'D-REGULATORY GUIDE'l.97INSTRUMENTATION FORLIGHT-WATEROOLED NUCLEARPOWERPLANTSTOASSESSPLANTANDENVIRONSCONDITIONS DURINGANDFOLLOWING ANACCIDENTA.INTROOUCTION B.OISCUSSION Criterion 13,"Instrumentation andControl,"
D. C. COOK - UNIT 2                      3t4 3-45                  Amendment No.
ofAppen-dixA,"GeneralDesignCriteriaforNuclearPowerPlants,"to10CFRPart50,"Domestic Licensing ofProduction andUtilization Facilities,"
 
includesarequirement thatinstru-mentation beprovidedtomonitorvariables andsystemsovertheiranticipated rangesforaccidentconditions asappropriate toensureadequatesafety.Criterion 19,"ControlRoofn,"ofAppendixAto10CFRPart50includesarequirement thatacontrolroombepro-,videdfromwhichactionscanbetakentomaintainthenuclearpowerunitinasafecondition underaccidentconditions, including losswfwoolant accidents, andthatequipment, including thenecessary instrumentation, atappropri'ate locations outsidethecontrolroombe.providedwithadesigncapability forprompthotshutdownofthereactor.Criterion 64,"Monitoring Radioactivity Releases,"
TABLE 3.3-10 POST-ACCIDENT MONITORING INSTRUMENTATION INSTRUMENT                                                                       MINIMUM CHANNELS OPERABLE
ofAppendixAto10CFRPart50includesarequirement thatmeansbeprovidedformonitoring thereactorcontainment atmosphere, spacescontaining components forrecirculation oflo~fwoolant accidentfluid,effluentdischarge paths,andtheplantenvironsforradioactivity thatmaybereleasedfrompostulated accidents.
: 1. Containment Pressure
Indications ofplantvariables arerequiredbythecontrolroomoperating personnel duringaccidentsituations to(1)provideinformation requiredtopermittheoperatortotakepreplanned manualactionstoaccomplish safeplantshut-down;(2)determine whetherthereactortrip,engineered-safety-feature systems,andmanuallyinitiated safetysystemsandothersystemsimportant tosafetyareperforming theirintendedfunctions (i.ereactivity control,core.cooling,maintaining reactorcoolantsystemintegrity, andmaintaining containment integrity);
: 2. Reactor Coolant Outlet Temperature        T       (Wide Range)
and(3)provideinforma-tiontotheoperators thatwillenablethemtodetermine thepotential forcausingagrossbreachofthebarrierstoradioactivity release(i.e.,fuelchdding,reactorcoohntpressureboundary, andcontainment) andtodetermine ifagrossbreachofabarrierhasoccurred.
: 3. Reactor Coolant Inlet Temperature        T       (Wide Range) 4    Reactor Coolant Pressure          Wide Range
Inadditiontotheabove,indications ofplantvariables thatprovideinforma-tiononoperation ofplantsafetysystemsandothersystemsimportant tosafetyarerequiredbythecontrolroomoperating personnel duringanaccidentto(I)furnishdataregarding theoperation ofplantsystemsinorderthattheoperatorcanmakeappropriate decisions astotheiruseand(2)provideinformation regarding thereleaseofradioactive materials toallowforearlyindication oftheneedtoinitiateactionnecessary toprotectthepublicandforanestimateofthemagnitude ofanyimpending threat.Thisguidedescribes amethodacceptable totheNRCstaffforcomplying withtheCommission's regulations toprovideinstrumentation tomonitorplantvariables andsystemsduringandfollowing anaccidentinalight-water-coolednuclearpowerplant.'IheAdvisoryCommittee onReactorSafeguards hasbeenconsulted concerning thisguideandhasconcurred intheregulatory position.
: 5. Pressurizer Water  Level'.
Anyguidanceinthisdocumentrelatedtoinformation collection activities hasbeenclearedunderOMBClearance No.31504011.
Steam Line Pressure                                                              2/Steam Generator
Atthestartofanaccident, itmaybedifficult fortheoperatortodetermine immediately whataccidenthasoccurredorisoccurring andtherefore todetermine theappropriate
: 7. Steam Generator Water Level  Narrow Range                                        1/Steam Generator
: response, Forthisreason,reactortripandcertainothersafetyactions(e.g.,emergency corecoolingactuation, containment isolation, ordepressurization) havebeendesignedtobeperformed automatically duringtheinitialstagesofanaccident.
: 8. Refueling Water Storage Tank Water Level
Instrumentation isalsoprovidedtoindicateinformation aboutphntvariables requiredtoenabletheoperation ofmanuallyinitiated safetysystemsandotherappropriate operatoractionsinvolving systemsimportant tosafety.USNRCREGULATORY GUIDESRagulatary GuidesaceIssuedtodescribeandmakeavailable tothepubliccnethodsacceptable totheNRcstaffofImplementing speclflcpartsoftheCommlsslon's regulations, todelineate tach-nlouasusedbythestaffInevaluating speclflcproblemsorpostu-latedaccidents, ortoprovideguidancetoapplicants.
: 9. Boric Acid Tank Solution Level
Regulatory Guidessrenocsubstitutes forregulations, andcompliance withthemIsnotrequired.
: 10. Auxiliary Feedwater         Flow Rate                                            1/Steam Generator*
Methodsandsolutions different fromthosesatoutIntheguideswillbeacceptable Iftheyprovideabasisforthaflndlngsraaulslte tothoIssuanceorcontinuance ofapermitorlicensebytheCommlsslon.
: 11. Reactor Coolant System Subcooling Margin Monitor
ThisguidewasIssuedafterconslderatlon ofcommentsreceivedfcomthepublic.Cocnments sndsuggestions forImprovements Intheseguidesare'ncouraged atalltimes,andguideswillberevised,asappropriate, toaccommodate commentsandtoreflectnewInforma-tionoreccpecloncs.
: 12. PORV Position Indicator  Limit Switches"-**                                     1/Valve
CommentsshouldbesenttotheSecretary ofthsCommlsslor.
: 13. PORV  Block Valve Position Indicator  Limit Switches                            1/Valve
U.S.NuclearRegulatory Commlsslonh Washington, O.C.20555,,Attantlonc Docketing andServiceBranch.TheguidessraIssuedinthefollowing tenbroaddlvlslonsc 1.PowerReactors6.Products2,ResearchandTestReactors7.Transportation 3.FuelssndMaterials Facllltles 8.Occupational Health4.Environmental andSltlngg.Antitrust andFlnanclal Review5.Materials andPlantProtection 10.GeneralCopiesofIssuedguidesmaybopurchased stthecurrentGovernment pclntlngofficeprice.Asubscctptlon serviceforfuturoguidesInspo.elflcdlvlslons Isavallabls throughthoGovernment prlntlngOffice.Information onthesubscrlptlan socvlceandcurrentGpopricesmaybeobtainedbywrltlngthoU.s.NuclearRegulatory commlsslon, washington, D.c.20555,Attontlonc publlcatlons salesManager.
: 14. Safety Valve Position Indicator - Acoustic Monitor                                1/Valve
I~in1II+I TABLE1DESIGNANDQUALIFICATION CRlTERlAFORINSTRUNIENTATION Category1l.Equipment Qualification Theinstrumentation shouldbequaliTied inaccordance withRegulatory Guide1.89,"Qualification ofClasslEEquipment forNuclearPowerPlants,"andthemethod-ologydescribed inNUREG4588, "InterimStaffPosi-tiononEnvironmental Qualification ofSafety-Related Electrical Equipment."
: 15. Containment Sump Level
Category21.Equipment Qualification SameasCategory1Category3l.Equipment Qualification Nospecificprovision Instrumentation whoserangesarerequiredtoextendbeyondthoserangescalculated inthemostseveredesign.basisaccidenteventforagivenvariableshouldbequali-fiedusingtheguidanceprovidedinparagraph 6.3.6ofANSI'.5.SameasCat<<g>>ry1Nosp<<<<ilicpn)vis')on Qualification appliestothecompleteinstrumentation channelfromsensortodisplaywherethedisplayisadirect-indicating meterorrecording device.Iftheinstru-mentation channelsignalistobeusedinacomputer-baseddisplay,recording, ordiagnostic program,qualifi-cationappliesfromthesensoruptoandincluding thechannelisolation device.SameasCategory1Nospccifi<<provision Theseismicportionofqualification shouldbeinaccor-dancewithRegulatory Guide1.100,"SeismicQualifica-tionofElectricEquipment forNuclearPowerPlants."Instrumentation shouldcontinuetoreadwithintherequiredaccuracyfollowing, butnotnecessarily during,asafeshutdownearthquake.
: 16. Containment Water Level
Nospecil'i<<provisi>>n Nospecilicprovision 2.Redundancy Nosinglefailurewithineithertheaccident-monitoring instrumentation, itsauxiliary supporting
* Steam Generator Water Level Channels        can be used as a  substitute for the corresponding auxiliary feedwater flow rate channel instrument.
: features, oritspowersourcesconcurrent withthefailuresthatare2.Redundancy Nospecificprovision 2.Redundancy Nospecificprovision 4Coploaaroavallabla fromtheNRC/GPOSataaProgram,US.NuclearRegulatory Commlraion, Waahlnaton, D.C.20555.
. **   pRODAC 250  subcooling margin readout can be used as a substitute          for the subcooling monitor instrument.
2.(Continued)
  *** Acoustic monitoring of PORV position (1 channel per three valves  headered discharge)             can be used as a substitute for the PORV Position Indicator  Limit Switches instruments.
Category1TABLE1(Continued)
With less than the minimum number of channels OPERABLE restore the system to OPERABLE status within 30 days or prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 14 days outlining available backup equipment, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.
Category2Category3acondition orresultofaspeciTicaccidentshouldpreventtheoperators frombeingpresented theinforma-tionnecessary forthemtodetermine thesafetystatusoftheplantandtobringtheplanttoandmaintainitinasafecondition following thataccident.
 
Wherefailureofoneaccident-monitoring channelresultsininforma-tionambiguity (thatis,theredundant displaysdisagree) thatcouldleadoperators todefeatorfailtoaccomplish arequiredsafetyfunction, additional information shouldbeprovidedtoallowtheoperators todeducetheactualconditions intheplant.Thismaybcaccomplished byproviding additional independent clrannels ofinformation ofthesamevariable(addition ofanidentical channel)orbyproviding anindependent channeltomonitoradifferent variablethatbearsaknownrelationship tothemultiplechannels(addition ofadiversechannel).
TABLE 4.3-10 POST-ACCIDENT HONITORING INSTRUMENTATION SURVEILLANCE RE UIREHENTS CHANNEL          CHANNEL INSTRUMENT                                                               CHECK        CALIBRATION
Redun-dantordiversechannelsshouldbeelectrically independ-entandphysicaHy separated fromeachotherandfromequipment notclassified important tosafetyinaccor-dancewithRegulatory Guide1.75,"Ph'ysical Independ-enceofElectricSystems,"
: 1. Containment Pressure
uptoand'including anyisola-!tiondevice.Withineachredundant divisionofasafetysysteni,redundant monitoring channelsarenotneededexceptforsteamgenerator levelinstrumentation intwo-loopplants.3.PowerSource3.PowerSource3.PowerSourceTheinstrumentation shouldbeenergized fromstationstandbypowersourcesasprovidedinRegulatory Guide1.32,"Criteria forSafety-Related ElectricPowerSystemsforNuclearPowerPlants,"andshouldbebackedupbybatteries wheremomentary interruption isnottolerable.
: 2. Reactor Coolant Outlet Temperature  T     (Wide Range)
Theinstrumentation shouldbeenergized fromahigh-reliability powersource,notnecessarily standbypower,andshouldbebackedupbybatterieswheremomentary interruption isnottolerable.
HOT
Nospecificprovision Category1TABLE1(Continued)
: 3. Reactor Coolant  Inlet Temperature T COLD (Wide Range)
Category2Category34.ChannelAvailability Theinstrumentation channelshouldbeavailable priorto!anaccidentexceptasprovidedinparagraph 4.11,"Excep-tion,"asdefinedinIEEEStd279-1971, "Criteria forPro-tectionSystemsforNuclearPowerGenerating Stations,"
Reactor Coolant Pressure  Wide Range                                                  R 5."  Pressurizer Water Level
orasspecified inthetechnical specifications.
: 6. Steam Line Pressure
4.ChannelAvailability Theout-of-service intervalshouldbebasedonnormaltechnical specification requirements onoutofserviceforthesystemitserveswhereapplicable orwherespecified byotherrequirements.
: 7. Steam Generator Water Level - Narrow Range
4.ChannelAvailability Nospecificprovision 5.QualityAssurance Regulatory Guide1.28"QualityAssurance PrograinRequirements (DesignandConstruction)"
: 0. RWST Water Level
Regulatory Guide1.30(SafetyGuide30)"QualityAssurance Require-mentsfortheinstallation, Inspection, andTestingofInstrumentation andElectricEquipment" Therecommendations ofthefollowing regulatory guidespertaining toqualityassurance shouldbefoUowed:5.QualityAssurance SameasCategorylas>>>odili<<d byth<<following:
: 9. Boric Acid Tank Solution Level 1 0. Auxzlzary Feedwater Flow Rate ll. Reactor Coolant System Subcooling Margin Monitor
Sincesomeinstru>nentatio<<
: 12. PORV Position Indicator  Limit Switches
islessii>>purta>>t tosafetythanotherinstrumentation, itmaynotbenecessary toapplythesamequalityassurance measurestoallinstrumentation.
: 13. PORV Block Valve -Position Indicator - Limit Switches"
Thequalityassur-ancerequirements thatareimplemented shouldprovidecontroloveractivities affecting qualitytoanextentconsistent withtheimportance tosafetyoftheinstrumentation.
: 14. Safety Valve Position Indicator - Acoustic Monitor
Theserequirements shouldbedetermined anddocumented bypersonnel knowl-edgeableintheenduseoftheinstrumentation.
: 15. Containment Sump Level
5.QualityAssurance l1>ei>>stru>>>e>>Iationeliou1dbeoflugh-quality co>>>>>i<<rcial gra>leandshouldbeselectedtowithsta>>d thest>ecitied serviceenvironment.
: 16. Containment Water Level
Regulatory Guide1.38"QualityAssurance Require-mentsforPackaging,
*The provisions of Specification 4.0.6 are applicable.
: Shipping, Receiving, Storage,andHan-dlingofItemsforWater-Cooled NuclearPowerPlants"Regulatory Guide1.58"Qualification ofNuclearPowerPlantInspection, Examination, andTestingPersonnel" Regulatory Guide1.64"QualityAssurance Require-mentsfortheDesignofNuclearPowerPlants"Regulatory Guide1.74"QualityAssurance TermsandDefinitions" 5.(Continued)
 
Category1TABLE1(Continued)
REACTOR COOLANT SYSTEM 3/4.4.6  REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION      FOR OPERATION 3.4.6.1   "The  following Feactor Coolant      System leakage  detection systems shall be OPERABLE:
Category2Category3Regulatory Guide1.88"Collection, Storage,andhfain-tenanceofNuclearPowerPlantQualityAssurance Records"Regulatory Guide1.123"QualityAssurance Require-mentsforControlofProcure-mentofItemsandServicesforNuclearPowerPlants"Regulatory Guide1.144"Auditing ofQualityAssurance ProgramsforNuclearPowerPlants"IOORegulatory Guide1.146"Qualification ofQualityAssur-anceProgramAuditPersonnel forNuclearPowerPlants"Reference totheaboveregulatory guides(exceptRegula-toryGuides1.30and1.38)isbeingmadependingissuanceofarevisiontoRegulatory Guide1.28thatisunderdevel-opment(TaskRS002-5)andthatwillendorseANSI/AShIE NQA-I-1979,"QualityAssurance ProgramRequirements forNudearPowerPlants."6.DisplayandRecording Continuous real-time displayshouldbeprovided.
: a.     One of the containment    atmosphere   particulate radioactivity monitoring channels   (ERS-2301     or ERS-2401),
Theindication maybeonadial,digitaldisplay,CRT,orstripchart recorder.
: b.     The containment sump    flow monitoring system, and
Recording ofinstrumentation readoutinformation shouldbeprovidedforatleastoneredundant channel.6.DisplayandRecording Theinstrumentation signalmaybedisplayed onanindividual instrument oritmaybeprocessed fordisplayondemand.Signalsfromeffluentradioactivity monitorsandareamonitorsshouldberecorded.
: c.     Either the containment humidity monitor or        one of the containment atmosphere     gaseous  radioactivity monitoring channels
6.DisplayandRecording SameasCategory2Signalsfromeffluentradioactivity
                  ~
: monitors, areamonitors, andmeteorology monitorsshouldberecorded.
(ERS-2305 or ERS-2405).
5QopteamayheobtainedfromtheAmericanSocietyofMechanical Engineers, 345East47thStreet,NewYork,NewYo<<teet7.
APPLICABILITY:       MODES  1, 2, 3 and 4.
TABLE1(Continued)
ACTXON:
Category2Category36.(Continued)
With only two of the abcve recuired leakage detection systems OPERABLE, operation may continue for up tc 30 days provided crab samples of the containment atmosphere a e obtained and analyzed at least once per 24 hours when the required gasecus and/cr particulate radioactivity monitoring channels are inoperable; otherwise, be in at least HOT STANDBY within the next 6 hours and in COLD SHUTDOWN within the following 30 hours.
Ifdirectandimmediate trendortransient information isessential foroperatorinformation oraction,therecording shouldbecontinuously avaBableonredun-dantdedicated recorders.
SURVEILLANCE RE UIREMENTS 4.4.6.1  The leakage    detection systems shall      be demonstrated  OPERABLE by:
Otherwise, itmaybecon-tinuously updated,storedincomputermemory,anddisplayed ondemand.Intermittent displayssuchasdataloggersandscanningrecorders maybeusedifnosignificant transient responseinformation islikelytobelostbysuchdevices.SameasCategory1SameasCategory17.RangeIftwoormoreinstruments areneededtocoveraparticular range,overlapping ofinstrument spanshouldbeprovided.
a ~   Containment atmosphere particulate and gaseous        (if being used) monitoring system-performance of CHANNEL CHECK,         CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST        at the frequencies specified in Table 4.3-3,
Iftherequiredrangeofmoni-toringinstrumentation resultsinalossofinstru-mentation sensitivity inthenormaloperating range,separateinstruments shouldbeused.7.RangeSalileasCategoryl7.ltaugeSeineasCategory18.Equipment Identification TypesA,B,andCinstruments designated asCate-gories1and2shouldbespecifically identified withacommondesignation onthecontrolpanelssothattheoperatorcaneasilydiscernthattheyareintendedforuseunderaccidentconditions.
: b.     Containment sump flow monitoring system-performance         of CHANNEL CALIBRATION at least once per 18 months,*
8.Equipment Identification SameasCategory18.Equipment Identification Nospecificprovision 9.Interfaces Thetransmission ofsignalsforotheruseshouldbethroughisolation devicesthataredesignated aspartofthemonitoring instrumentation andthatmeettheprovisions ofthisdocument.
C ~   Containment humidity monitor      (if being  used) - performance of CHANNEL CALIBRATION  at least    once per 18 months.
10.Servicing, Testing,andCalibration Servicing, testing,andcalibration programsshouldbespecified tomaintainthecapability ofthemonitoring instrumentation.
*The  provisions of Specification 4.0.6 are applicable.
Iftherequiredintervalbetween9.Interfaces SameasCategoryI10.Servicing, Testing,andCalibration SameasCategory19.Interfaces Nospecificprovision 10.Servicing, Testing,andCalibration SameasCategoryI 10.(Continued)
D. C. COOK UNIT 2                            3/4 4-14                Amendment No.
Category1TABLE1(Continued)
 
Category2testingislessthanthenormaltimeintervalbetweenplantshutdowns, acapability fortestingduringpoweroperation shouldbeprovided.
ADMINISTRATIVE CONTROLS SPECIAL REPORTS 6.9.2    Special reports shall be submitted to the Regional Administrator within the time period specified for each report. These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable reference specification:
Whenevermeansforremovingchannelsfromserviceareincludedinthedesign,thedesignshouldfacilitate administrative controloftheaccesstosuchremovalmeans.SameasCategory1SameasCategory1Thedesignshouldfacilitate administrative controloftheaccesstoallsetpointadjustments, modulecalibra-tionadjustments, andtestpoints.SameasCategory1SallleasCategory1Periodicchecking, testing,calibration, andcalibration verification shouldbeinaccordance withtheapplicable portionsofRegulatory Guide1.118,"Periodic TestingofElectricPowerandProtection Systems,"
a 0    ECCS  Actuation, Specifications 3.5.2 and 3,5.3.
pertaining totestingofinstrument channels.
: b. Inoperable Seismic Monitoring Instrumentation, Unit No. 1, Specification 3.3.3.3.
(Note:Responsetimetestingnotusuallyneeded.)SameasCategoryISameasCategory1Thelocationoftheisolation deviceshouldbesuchthatitwouldbeaccessible formaintenance duringaccidentconditions.
c~     Inoperable Meteorological Monitoring Instrumentation, Unit No. 1, Specification 3.3.3.4.
SameasCategory1Nospecificprovision 11.HumanFactorsTheinstrumentation shouldbedesignedtofacilitate therecognition,
: d. Fire Detection Instrumentation, Specification 3.3.3.8.
: location, replacement, repair,oradjustment ofmalfunctioning components ormodules.11.HumanFactorsSameasCategory111.HumanFactorsSameasCategory1Themonitoring instrumentation designshouldminimizethedevelopment ofconditions thatwouldcausemeters,annunciators, recorders, alarms,etc.,togiveanomalous indications potentially confusing totheoperator.
: e. Fire Suppression Systems, Specifications, 3.7.9.1, 3.7.9.2, 3.7.9.3 and 3.7.9.4.
Humanfactorsanalysisshouldbeusedindetermining typeandlocationofdisplays.
Seismic Event Analysis, Specification 4.3.3.3.2.
SameasCategory1SameasCategory1 11.(Continued)
: g. Sealed Source leakage  in  excess  of limits, Specification 4.7.8.1.3.
Category1TABLE1(Continued)
: h. Containment Sump Level instrumentation, Table 3.3-10.
Category2Category3'ITotheextentpracticable, thesameinstruments shouldbeusedforaccidentmonitoring asareusedforthenormaloperations oftheplanttoenabletheoperators touse,duringaccidentsituations, instruments withwhichtheyaremostfamiliar.
D. C. COOK UNIT 2                          6-19                Amendment No.
SameasCategoryISameasCategory112.DirectMeasurement Totheextentpracticable, monitoring instrumentation inputsshouldbefromsensorsthatdirectlymeasurethedesiredvariables.
 
Anindirectmeasurement shouldbemadeonlywhenitcanbeshownbyanalysistoprovideunambiguous information.
1 3/4 ~ 3    INSTRUMENTATZ BASES 3/4. 3 > 3~2  MOVABLE ZNCORE DETECTORS The OPERABILITY of the movable incore detectors with the specified minimum complement of equipment ensures that the measurements obtained for use of this system accurately represent the spatial neutron flux distribution of the reactor core. The OPERABILITY of this system is demonstrated by irradiating each detector used and normalizing its respective output.
12.DirectMeasurement SameasCategoryl12.DirectMeasurement SameasCaltcgofy l
3/4.3.3.3       SEISMIC INSTRUMENTATION The OPERABILITY of the seismic instrumentation ensures that sufficient capability is available to promptly determine the magnitude of a seismic event, and evaluate the response of those features important to safety. This capability is required to permit comparison of the measured response to that used in the design basis for the facility.
TABLE3PWRVARIABLES TYPEAVariables:
3/4.3.3.4       METEOROLOGICAL INSTRUMENTATION The OPERABILITY    of the meteorological instrumentation ensures that sufficient meteorological data is available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere. This capability is required to evaluate the need for initiating protective       measures to protect the health and safety of the public.
thosevariables tobemonitored thatprovidetheprimaryinformation requiredtopermitthecontrolroomoperatortotakespecificmanuallycontrolled actionsforwhichnoautomatic controlisprovidedandthatarerequiredforsafetysystemstoaccomplish theirsafetyfunctions fordesignbasisaccidentevents.Primaryinformation isinforma-tionthatisessential forthedirectaccomplishment ofthespecified safetyfunctions; itdoesnotincludethosevariables thatareassociated withcontingency actionsthatmayalsobeidentified inwrittenprocedures.
3/4.3.3.5       REMOTE SHUTDOWN INSTRUMENTATZON The OPERABILITY    of the remote'hutdown instrumentation ensures that sufficient capability is available to permit shutdown and maintenance of HOT STANDBY of the facility from locations outside of the control room.         This capability is required in the event control room habitability is lost and is consistent with General Design Criteria 19 of 10 CFR 50.
AvariableincludedasTypeAdoesnotprecludeitfrombeingincludedasTypeB,C,D,orEorviceversa.VariablePlantspecificRangePlantspecificCategory(seeRegulatory Position1.4andTable1)Information requiredforoperatoractionTYPEBVariables:
3/4.3.3.6       POST-ACCIDENT INSTRUMENTATION The OPERABILITY of the post-accident instrumentation ensures that sufficient information is available on selected plant parameters to monitor          and assess      these variables during and following an accident.
thosevariables thatprovideinformation toindicatewhetherplantsafetyfunctions arebeingaccomplished.
The    containment water level CHANNEL CHECK is a visual inspection of parallel      channels which should indicate within acceptable instrument drift that the water level is below the range of the containment water level instrumentation. Acceptable instrument drift for containment water level instrumentation is presently considered 25% of full scale.
Plantsafetyfunctions are(I)reactivity control,(2)corecooling,(3)maintaining reactorcoolantsystemintegrity, and(4)maintaining containment integrity (including radioactive effluentcontrol).
The containment sump level channels should indicate the same level on both channels within acceptable instrument drift, which is presently considered a 25% of full scale difference between the two parallel channels.
Variables arelistedwithdesignated rangesandcategoryfordesignandqualification requirements.
If  the channels do not indicate the same level, the containment sump pump actuation      and  shut-off can be used to indicate  if either channel is correct.
Keyvariables areindicated bydesignandqualiTication Categoryl.Reactivity ControlNeutronFlux10%to1007ofullpowerFunctiondetection; accomplishment ofmitigation ControlRodPositionRCSSolubleBoronConcen-trationFullinornotfullin0to6000ppmVerification Verification RCSColdLegWaterTemper-ature50Fto400FVeriTication CoreCoolingRCSHotLegWaterTemper-ature50Fto700FFunctiondetection; accomplishment ofmitigation; verification; long-term surveillance RCPColdLegWaterTemper-50Fto700FaturerFunctiondetection; accomplishment ofmitigation; veriTication; long-term surveillance RCSPressure0to3000psig(4000psigforCEplants)200Fto2300F1233Functiondetection; accomplishment ofmitigation; veriTication; long-term surveillance VeriTication IWhereavariabioislistedformorathanonepurpose,theinstrumentation raqulrarnants mayboIntegrated andonlyonomaasuramont provided.
D. C. COOK   - UNIT 2                B  3/4 3-2              Amendment No.
2ThemaxhnumvaluemayberavisadupwardtosatisfyATWSroquiramants.
 
3Instrumentation thatIsapartofthellnalICCdatactlon systomshouldmeetthedesignroqulramonts spadflodlnItamILF.2 ofNUREG<737.
3/4.3    INSTRUMENTATION BASES drift for    both instrumentation systems is attributed to air The accumulation in the capillaries. Provided that the drift is less than 25%,         it should not prevent the inst ument rom tracking changes in level. Equipment changes may change the acceptable drift. Such a change will not constitute a violation of this T/S, prov'ded appropriate evidence exists to justify the change.
(NthanTypoKtharmocouptas bacomopartofthosystam,thayaroconsidarad tomoottheraqulromants.
3/4. 3. 3. 7 AXIAL POWER    DISTRIBUTION MONITORING SYSTEM (APDMS)
Howovar,thoromaindar ofthodataction systemthatisoutsidothereactorvassalshouldmootthoraqulromants spadflod.)
OPERABILITY     of the APDMS ensu es that sufficient capability is available for the    measurement    of the neutron flux spatial distribution within the reactor core. This capability is required to 1) monitor the core flux patterns that are representative of the peak core power density and 2) limit the core average axial power profile such that the total power peaking factor F is maintained
1.97-22 TABLE3(Continued)
                                    ~
RangeCategory(seeRegulatory Position1.4andTable1)TYPEC(Continued)
within acceptable limits.
FuelCladding(Continued)
3/4.3.3.8     FIRE DETECTION ZNSTRUMENTATZON OPERABILITY     of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early stages.     Prompt detection of f'res will reduce the potential for damage to safety-related equipment and is an integral element in the overall facility fire protection program.
Radioactivity Concentration orRadiation LevelinCirculating PrimaryCoolantAnalysisofPrimaryCoohnt(GammaSpectrum) 1/2TechSpeclimitio100timesTechSpeclimit10pCi/mlto10Ci/mlorTID-14844 sourcetermincoolantvolume36Detection ofbreachDetailanalysis; accomplishment ofmitigation; veriTication; long-term surveillance ReactorCoolantPressureBoundaryRCSPressureIContainment Pressurel 0to3000psig(4000psigforCEplants)-5psigtodesignpressure4(-10psigforsubatmospheric containments) 12Detection ofpotential fororactualbreach;accomplishment ofmitiga-tion;long-term surveillance Detection ofbreach;accomplishment ofmitigation; verification; long<ermsurveillance Containment SumpWaterLeveliNarrowrangetoptobottom(sump),widerange(plantspecific)
Zn  the event that a portion of the fire detection instrumentation is inoperable, the establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored tc OPERABILITY. Use of containment temperature monitoring is allowed once per hour        if containment fire detection is inoperable.
Detection ofbreach;accomplishment ofmitigation; verification; long-term surveillance EffluentRadioactivity
3/4. 3. 3. 9    PADIOACTIVE LZ UZD EFFLUENT INSTRUMENTATION The    radioactive liquid effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in liquid effluents during actual or potential releases. The alarm/trip setpoints for these instruments shall be calculated in accordance with NRC approved methods in the ODCM to ensure that the alarm/trip will occur prior to exceeding the limits of 10 CFR Part 20. The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria specified in Section 11.3 of the Final Safety Analysis Report for the Donald C. Cook Nuclear Plant.
-NobleGasEffluentfromCondenser AirRemovalSystemExhaust10pCi%cto10pCi%cContainment AreaRadiation 1R/hrto10R/hr37,839Detection ofbreach;verification Detection ofbreach;verification Containment RCSPressureI0to3000psig(4000psigforCEplants)Detection ofpotential forbreach;accomplishment ofmitigation SampUngormonitoring ofradioactive Uquidsandgasesshouldbeperformed inamannerthatensuresptocutement oftepesentative samoles.ForeasesthecriteriaofANSIN13.1.1969, "G>>udetoSamplingAitbotnoRadioactive Materials inNuclearFacUiiies>'hould beappQed.Forllquih,provisions shouldbemadeforsamplingfromwell.mixedturbulent zones,andsamplinglinesshouldbede>>dgnedtomlnl-nJoplateoutordeposition.
3/4.3.3.10       RADIOACTIVE GASEOUS EFFLUENT INSTRUMENTATION The    radioactive gaseous effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases. The alarm/trip setpoints for these instruments shall be calculated in accordance with NRC approved methods D. C. COOK   - UNIT 2                    B 3/4 3-3                Amendment No.
Forsafeandconvenient sampgng,theprovisions shouldindude:a.Shielding tomaintainradiation dosesALARA,b.Samplecontainers withcontalnetmmpUng portconneciot compatibility, c.Capabigiy ofsamplingunderprimarysystempressureandnegativepressures, d.HandUngandtransport capability, ande.Prearrangement foranalysisandmietpteiailon.
 
7Mlnhnumofiwomonitorsatwidelyseparated locations.
1 I ~ ~
8Detectors shouldrespondiogammaradiation phoionswithinanyenergyrangeftom60koVto3MoVwithadosetatoresponseaccuracywithinafactorof2overtheeniitorange.9Monitorsshouldbecapableofdetecdngandmeasuring gaseouseffluentradioactivity withcompositions tanyngfromfreshequlUbtlutn noblegasladonProductmixturesioiordayrold
~ ~
: mixtures, withoverallsystemaccuracies,within afactorof2.Effluentradioactivity maybo<<p<<ssodlntermsofconcentrations ofXe-133equivalents, intermsofconcentrations ofanynoblegasnucUdes,orintermsofintegrated naMeVpetunItthno.Itisnotexpectediha!asinglemonitoring devicewillhavesuNcienttangotoencompass theoafltetangoprovidedthisregulatory guideandthatmulilolocomponents orsystemswillbeneeded.Existingequlpmoat maybeusedtomonitoranyportionofihstatedtangowitidntheequipment designrating.r1.97-24 Attachment 4toAEP:NRC:0856T Reasonsand10CFR50.92AnalysisforChangetotheDonaldC..CookNuclearPlantUnitNos.1and2Technical Specifications Illr~~\Attachment 4toA:NRC:0856T Page1Containment WaterLevelMonitorIIF1.5TheguidancegiveninGenericLetterNo.83-37statesthat:~"Acontinuous indication ofcontainment waterlevelshouldbeprovidedinthecontrolroomofeachreactorduringPowerOperation, StartupandHotStandbymodesofoperation.
3/4.3  INSTRUMENTATION BASES in the  ODCM  to ensure that the alarm/trip will occur prior to exceeding the limits of  10 CFR  Part 20. This instrumentation also includes provisions for monitoring  the  concentrations  of potentially explosive gas mixtures in the waste gas  holdup  system. The OPERABILITY and use of this instrumentation is consistent  with  the  requirements  of General Design Criteria specified in
Atleastonechannelfornarrowrangeandtwochannelsforwiderangeinstruments shouldbeoperableatalltimeswhenthereactorisoperating inanyoftheabovemodes.Narrowrangeinstruments shouldcovertherangefrombottomtothetopofthecontainment sump.Widerangeinstruments shouldcovertherangefromthebottomofthecontainment totheelevation equivalent toa600,000gallon(orlessifjustified) capacity.
          'ection 11.3 of the'Final Safety Analysis Report for the Donald C. Cook Nuclear Plant.
"Technical Specifications forcontainment waterlevelmonitorsshouldbeincludedwithotheraccidentmonitoring instrumentation inthepresentTechnical Specifications.
3/4.3.4  TURBINE OVERSPEED PROTECTION This specification is provided to ensure that the turbine overspeed protection instrumentation and the turbine speed control valves are OPERABLE and will protect the turbine rom excessive overspeed.       Protection from turbine excessive overspeed is required since excessive overspeed of the turbine could generate potentially damaging missiles which could impact and damage  safety related components, equipment or structures.
LCOs(including therequiredActions)forwiderangemonitorsshouldincludetherequirement thattheinoperable channelwillberestoredtooperablestatuswithin30daysortheplantwillbebroughttoHotShutdowncondition asrequiredforotheraccidentmonitoring instrumentation.
D. C. COOK Unit  2                    B 3/4 3-4                  Amendment No.
Typicalacceptable LCOandsurveillance requirements foraccidentmonitoring instrumentation areincludedinEnclosure 3."kWeareproposing thatT/STables3.3-11and3.3-10forUnits1and2,respectively, berevisedtoincludetherequirement thatatleasttwocontainment waterlevelchannelsandonecontainment sumplevelchannelbeoperableduringModes1,2,and3.Inaddition, weareproposing thatT/STables4.3-7and4.3-10forUnits1and2,respectively, berevisedtoincludethesurveillance requirements forthesechannels.
 
Inordertofollowtheaboveguidance, andmaintaininternalconsistency withourcurrentTechnical Specifications, the30-dayactionstatement inT/S3.3'.8forUnit1and3.3'.6forUnit2isproposedforthecontainment waterlevelandcontainment sumplevelinstrumentation.
u
TheformatofT/STables3.3-11and3.3-10forUnits1and2variesfromtheGenericLetterexamplebecauseourpresentT/Ssincludeonlyonecolumnlisting"MinimumChannelsOperable."
~ ~   (3 ~
Inordertokeeptheformatsimilartootheraccidentmonitoring instrumentation includedinthepresentT/Ss,thecolumnlistingthe"Required No.ofChannels" isnotincluded.
Q orloin yst      lllfDIANA& NICH~GAIV ElECTBIC CO FORT WAYNE, INDIANA AMOUNT cHEcK No.       08 3~0273                          DATE 03 24 8b                                                    S l 50. 004 ~
Per10CFR50.92,aproposedamendment willnotinvolveasignificant hazArdsconsideration iftheproposedamendment doesnot:(1)involve'significant increaseintheprobability orconsequences ofanaccidentpreviously evaluated, (2)createthepossibility ofanewordifferent kindofaccidentfromanyaccidentpreviously analyzedorevaluated, or(3)involveasignificant reduction inamarginofsafety.
ln full seNIement of statement accompenytng this che U  S    NUCLEAR REGULATORY                            25b43024 COMM I S S ION                                                                    DISBURSEMENT ACCOUNT Tothe        WASHINGTON                    DC  20555 Order of LINCOLN NATIONAL BANK AND TRUST COMPANY
lN~P7Attachment 4toA..NRC:0856T Criterion Thesechangeswillexpandthelicenserequirements forpost-accident monitoring instrumentation andassisttheoperatorinrecovering fromanaccident.
                              , FORT WAYN E, INDIANA II'0 29      LI  3II''.0 7 t 900    2 7 5I:  I  3S 7  5 20 ADVICE -               5ll'EMITTANCE DETACH BEFORE DEPOSITING INDIANA L MICHIGAN ELECTRIC CO.               P.O. BOX 60                  FORT WAYNE, INDIANA 46801 cHEGK No.     06 3 0273                          DATE 03  24  8b                          AMOUNT                $ 150 00 OUR REFERENCE                DATE                VENDORS REFERENCE                              GROSS                    DEDUCT 036 030'I6              02-2b-86        ,AEP NRC                                                  150 00 or5'I 2 pf EXPLANATION      CD CASH DISCOUNT    RT RETAINED                  PR    PRIOR PAYMENT TRY 32 REV. I 86          OF DEDUCTIONS    TR TRANSPORTATION   TX  TAX WITHHELD              AJ    ADJUSTMENT
Thechangeswillnotinvolveasignificant increaseintheprobability orconsequences ofanypreviously evaluated accident.
 
Criterion 2Thechangesdonotaffectnormaloraccidentplantoperation.
Attachment   3 to AEP:NRC:0856T Regulatory Guide 1.97, Rev. 3, Pertinent Sections
Inanaccidenttheywillservetoprovidedatatotheoperator; therefore, thechangeswillnotcreatethepossibility ofanewordifferent kindofaccidentfromanypreviously analyzedorevaluated.
 
Criterion 3Thechangesdonotinvolveasignificant reduction inthemarginofsafety,sincetheywillonlyrequirethatadditional databeavailable totheoperator.
      ~O
TheCommission hasprovidedguidanceconcerning thedetermination ofsi.gnificant hazardsbyproviding certainexamples(48FR14870)ofamendments considered notlikelytoinvolvesignificant hazardsconsideration.
                '">>         U.S. NUCLIR REGULATORY COMMI88lot                                                                     Resea~aa'D-
Thesecondoftheseexamplesreferstochangesthatimposeadditional limitations, restrictions, orcontrolsnotpresently includedintheT/Ss.Sincetherequirement forsumpandcontainment waterlevelmonitorsconstitute arestriction whichthecurrentT/Ssdonothave,webelievethisexampleisapplicable andthatthechangesinvolvenosignificant hazardsconsideration.
                      !  RE                              LAT RY 0FRCE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 'l.97 INSTRUMENTATION FOR LIGHT-WATEROOLED NUCLEAR POWER PLANTS TO ASSESS PLANT AND ENVIRONS CONDITIONS DURING AND FOLLOWING AN ACCIDENT A. INTROOUCTION                                                             B. OISCUSSION Criterion 13, "Instrumentation and Control," of Appen-                 Indications of plant variables are required by the control dix A, "General Design Criteria for Nuclear Power Plants,"             room operating personnel during accident situations to (1) to 10 CFR Part 50, "Domestic Licensing of Production and              provide information required to permit the operator to take Utilization Facilities," includes a requirement that instru-          preplanned manual actions to accomplish safe plant shut-mentation be provided to monitor variables and systems                down; (2) determine whether the reactor trip, engineered-over their anticipated ranges for accident conditions as              safety-feature systems, and manually initiated safety appropriate to ensure adequate safety.                                systems and other systems important to safety are performing their intended functions (i.ereactivity control, core                .
TheaboveT/Schangesconstitute additional restrictions tothepresentT/Ss.Therefore, webelievethatthesechangesdonotinvolveasignificant hazardsconsideration asdefinedin10CFR50.92.ItisnotedthatAEP:NRC:0856I alsoproposedchangesfortheaxialpowerdistribution monitoring systemandseveraladministrative changes.Wearelimitingthissubmittal tochangesforthecontainment waterlevelandcontainment sumplevelinstrumentation.
Criterion 19, "Control Roofn," of Appendix A to 10 CFR            cooling, maintaining reactor coolant system integrity, and Part 50 includes a requirement that a control room be pro-            maintaining containment integrity); and (3) provide informa-vided from which actions can be taken to maintain the nuclear          tion to the operators that will enable them to determine the power unit in a safe condition under accident conditions,             potential for causing a gross breach of the barriers to including losswfwoolant accidents, and that equipment,                 radioactivity release (i.e., fuel chdding, reactor coohnt including the necessary instrumentation, at appropri'ate              pressure boundary, and containment) and to determine if a locations outside the control room be. provided with a                gross breach of a barrier has occurred. In addition to the design capability for prompt hot shutdown of the reactor.             above, indications of plant variables that provide informa-tion on operation of plant safety systems and other systems Criterion 64, "Monitoring Radioactivity Releases," of              important to safety are required by the control room Appendix A to 10 CFR Part 50 includes a requirement that              operating personnel during an accident to (I) furnish data means be provided for monitoring the reactor containment              regarding the operation of plant systems in order that the atmosphere, spaces containing components for recirculation            operator can make appropriate decisions as to their use and of lo~fwoolant accident fluid, effluent discharge paths,               (2) provide information regarding the release of radioactive and the plant environs for radioactivity that may be released          materials to allow for early indication of the need to from postulated accidents.                                           initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat.
Werequestthatyourstaffcontinuetoreviewthechangesregarding theaxialpowerdistribution systemandtheadministrative changesassubmitted inAEP:NRC:0856I.
This guide describes a method acceptable to the NRC                    At the start of an accident, it may be difficult for the staff for complying with the Commission's regulations to              operator to determine immediately what accident has provide instrumentation to monitor plant variables and                occurred or is occurring and therefore to determine the systems during and following an accident in a light-water-            appropriate response, For this reason, reactor trip and cooled nuclear power plant. 'Ihe Advisory Committee on                certain other safety actions (e.g., emergency core cooling Reactor Safeguards has been consulted concerning this                actuation, containment isolation, or depressurization) have guide and has concurred in the regulatory position.                   been designed to be performed automatically during the initial stages of an accident. Instrumentation is also provided to indicate information about phnt variables required to Any guidance in this document related to information              enable the operation of manually initiated safety systems collection activities has been cleared under OMB Clearance            and other appropriate operator actions involving systems No. 31504011.                                                         important to safety.
~~tt!}}
USNRC REGULATORY GUIDES                              Comments should be sent to the Secretary of ths Commlsslor.
Ragulatary Guides ace Issued to describe and make available to the      U.S. Nuclear Regulatory Commlsslonh Washington, O.C. 20555,,
public cnethods acceptable to the NRc staff of Implementing            Attantlonc Docketing and Service Branch.
speclflc parts of the Commlsslon's regulations,    to delineate tach-  The guides sra Issued in the following ten broad dlvlslonsc nlouas used by the staff In evaluating speclflc problems    or postu-lated accidents, or to provide guidance to applicants. Regulatory      1. Power Reactors                    6. Products Guides sre noc substitutes for regulations, and compliance with        2, Research and Test Reactors        7. Transportation them Is not required. Methods and solutions different from those sat    3. Fuels snd Materials Facllltles 8. Occupational Health out In the guides will be acceptable flndlngs raaulslte to tho Issuance orIf continuance they provide a basis for tha of a permit or
: 4. Environmental and Sltlng          g. Antitrust and Flnanclal Review
: 5. Materials and Plant Protection 10. General license by the Commlsslon.
This guide was Issued after conslderatlon of comments received fcom      Copies of Issued guides may bo purchased st the current Government the public. Cocnments snd suggestions for Improvements In these          pclntlng office price. A subscctptlon service for futuro guides In spo.
guides are'ncouraged at all times, and guides will                      elf lc dlvlslons Is avallabls through tho Government prlntlng Office.
appropriate, to accommodate comments and to reflect be      revised, as  Information on the subscrlptlan socvlce and current Gpo prices may tion or eccpecloncs.                                     new Informa-    be obtained by wrltlng tho U.s. Nuclear Regulatory commlsslon, washington, D.c. 20555, Attontlonc publlcatlons sales Manager.
 
I ~
i n
1I I + I
 
TABLE 1 DESIGN AND QUALIFICATIONCRlTERlA FOR INSTRUNIENTATION Category  1                                                      Category 2                                    Category 3
: l. Equipment Qualification                                              1. Equipment Qualification                    l. Equipment Qualification The instrumentation should be qualiTied in accordance                    Same as Category  1                          No specific provision with Regulatory Guide 1.89, "Qualification of Class lE Equipment for Nuclear Power Plants," and the method-ology described in NUREG4588, "Interim Staff Posi-tion on Environmental Qualification of Safety-Related Electrical Equipment."
Instrumentation whose ranges are required to extend                      Same as Cat<<g>>ry  1                          No sp<<<<ilic pn)vis')on ANSI'.5.
beyond those ranges calculated in the most severe design.
basis accident event for a given variable should be quali-fied using the guidance provided in paragraph 6.3.6 of Qualification applies to the complete instrumentation                    Same as Category  1                          No spccifi<<provision channel from sensor to display where the display is a direct-indicating meter or recording device. If the instru-mentation channel signal is to be used in a computer-based display, recording, or diagnostic program, qualifi-cation applies from the sensor up to and including the channel isolation device.
The seismic portion of qualification should be in accor-                No specil'i<<provisi>>n                        No specilic provision dance with Regulatory Guide 1.100, "Seismic Qualifica-tion of Electric Equipment for Nuclear Power Plants."
Instrumentation should continue to read within the required accuracy following, but not necessarily during, a safe shutdown earthquake.
: 2. Redundancy                                                            2. Redundancy                                2. Redundancy No single failure within either the accident-monitoring                  No specific provision                        No specific provision instrumentation, its auxiliary supporting features, or its power sources concurrent with the failures that are 4
Coploa aro avallabla from the NRC/GPO Sataa Program, U S. Nuclear Regulatory Commlraion, Waahlnaton, D.C. 20555.
 
TABLE 1 (Continued)
Category  1                                          Category 2                                    Category 3
: 2. (Continued) a  condition or result of a speciTic accident should prevent the operators from being presented the informa-tion necessary for them to determine the safety status of the plant and to bring the plant to and maintain it in a safe condition following that accident. Where failure of one accident-monitoring channel results in informa-tion ambiguity (that is, the redundant displays disagree) that could lead operators to defeat or fail to accomplish a required safety function, additional information should be provided to allow the operators to deduce the actual conditions in the plant. This may bc accomplished by providing additional independent clrannels of information of the same variable (addition of an identical channel) or by providing an independent channel to monitor a different variable that bears a known relationship to the multiple channels (addition of a diverse channel). Redun-dant or diverse channels should be electrically independ-ent and physicaHy separated from each other and from equipment not classified important to safety in accor-dance with Regulatory Guide 1.75, "Ph'ysical Independ-ence of Electric Systems," up to and'including any isola-tion device. Within each redundant division of a safety
! systeni, redundant monitoring channels are not needed except for steam generator level instrumentation in two-loop plants.
: 3. Power Source                                          3. Power Source                                3. Power Source The instrumentation should be energized from station      The instrumentation should be energized from a No specific provision standby power sources as provided in Regulatory Guide    high-reliability power source, not necessarily 1.32, "Criteria for Safety-Related Electric Power Systems standby power, and should be backed up by for Nuclear Power Plants," and should be backed up by    bat teries where momentary interruption is not batteries where momentary interruption is not tolerable. tolerable.
 
TABLE 1 (Continued)
Category  1                                            Category 2                                                  Category 3
: 4. Channel Availability                                    4. Channel Availability                                4. Channel Availability The instrumentation channel should be available prior to    The out-of-service interval should be based on normal  No specific provision an accident except as provided in paragraph 4.11, "Excep-  technical specification requirements on out of service
! tion," as defined in IEEE Std 279-1971, "Criteria for Pro-  for the system it serves where applicable or where tection Systems for Nuclear Power Generating Stations,"    specified by other requirements.
or as specified in the technical specifications.
: 5. Quality Assurance                                        5. Quality Assurance                                  5. Quality Assurance The recommendations of the following regulatory guides      Same as Category l as>>>odili<<d by th<<    following:    l1>e i>>st ru>>>e>> I ation eliou1 d be of lugh-quality pertaining to quality assurance should be foUowed:                                                                 co>>>>>i<<rcial gra>le and should be selected to Since some instru>nentatio<< is less ii>>purta>>t to      withsta>>d the st>ecitied service environment.
Regulatory Guide 1.28      "Quality Assurance Prograin      safety than other instrumentation, it may not be Requirements (Design and        necessary to apply the same quality assurance Construction)"                  measures to all instrumentation. The quality assur-ance requirements that are implemented should Regulatory Guide 1.30      "Quality Assurance Require-      provide control over activities affecting quality to an (Safety Guide 30)          ments for the installation,     extent consistent with the importance to safety of Inspection, and Testing of      the instrumentation. These requirements should be Instrumentation and Electric    determined and documented by personnel knowl-Equipment"                      edgeable in the end use of the instrumentation.
Regulatory Guide 1.38      "Quality Assurance Require-ments for Packaging, Shipping, Receiving, Storage, and Han-dling of Items for Water-Cooled Nuclear Power Plants" Regulatory Guide 1.58      "Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel" Regulatory Guide 1.64      "Quality Assurance Require-ments for the Design of Nuclear Power Plants" Regulatory Guide 1.74      "Quality Assurance Terms and Definitions"
 
TABLE 1 (Continued)
Category  1                                                        Category 2                                         Category 3
: 5. (Continued)
Regulatory Guide 1.88      "Collection, Storage, and hfain-tenance  of Nuclear Power Plant Quality Assurance Records" Regulatory Guide 1.123      "Quality Assurance Require-ments for Control of Procure-ment of Items and Services for Nuclear Power Plants" Regulatory Guide 1.144      "Auditing of Quality Assurance Programs for Nuclear Power Plants" Regulatory Guide 1.146      "Qualification of Quality Assur-ance Program Audit Personnel I                                for Nuclear Power Plants" OO  Reference to the above regulatory guides (except Regula-tory Guides 1.30 and 1.38) is being made pending issuance of a revision to Regulatory Guide 1.28 that is under devel-opment (Task RS 002-5) and that will endorse ANSI/AShIE NQA-I-1979, "Quality Assurance Program Requirements for Nudear Power Plants."
: 6. Display and Recording                                                6. Display and Recording                              6. Display and Recording Continuous real-time display should be provided. The                    The instrumentation signal may be displayed on an      Same as Category 2 indication may be on a dial, digital display, CRT, or                  individual instrument or it may be processed for stripchart recorder.                                                    display on demand.
Recording of instrumentation readout information                        Signals from effluent radioactivity monitors and      Signals from effluent radioactivity monitors, should be provided for at least one redundant channel.                  area monitors should be recorded.                      area monitors, and meteorology monitors should be recorded.
5 Qoptea may he obtained from the American Society of Mechanical Engineers, 345 East 47th Street, New York, New Yo<< teet7.
 
TABLE 1 (Continued)
Category 2                              Category 3
: 6. (Continued)
If direct and immediate trend or transient information    Same as Category  1                    Same as Category  1 is essential for operator information or action, the recording should be continuously avaBable on redun-dant dedicated recorders. Otherwise, it may be con-tinuously updated, stored in computer memory, and displayed on demand. Intermittent displays such as data loggers and scanning recorders may be used    if no significant transient response information is likely to be lost by such devices.
: 7. Range                                                  7. Range                                7. ltauge If two or more instruments are needed to cover a          Salile as Category l                    Seine as Category  1 particular range, overlapping of instrument span should be provided. If the required range of moni-toring instrumentation results in a loss of instru-mentation sensitivity in the normal operating range, separate instruments should be used.
: 8. Equipment Identification                              8. Equipment    Identification          8. Equipment    Identification Types A, B, and C instruments designated as Cate-        Same as Category  1                    No specific provision gories 1 and 2 should be specifically identified with a common designation on the control panels so that the operator can easily discern that they are intended for use under accident conditions.
: 9. Interfaces                                            9. Interfaces                            9. Interfaces The transmission of signals for other use should be      Same as Category  I                    No specific provision through isolation devices that are designated as part of the monitoring instrumentation and that meet the provisions of this document.
: 10. Servicing, Testing, and Calibration                  10. Servicing, Testing, and Calibration  10. Servicing, Testing, and Calibration Servicing, testing, and calibration programs should be  Same as Category  1                    Same as Category    I specified to maintain the capability of the monitoring instrumentation. If the required interval between
 
TABLE 1 (Continued)
Category 1                                        Category 2
: 10. (Continued) testing is less than the normal time interval between plant shutdowns, a capability for testing during power operation should be provided.
Whenever means for removing channels from service        Same as Category 1          Same as Category  1 are included in the design, the design should facilitate administrative control of the access to such removal means.
The design should facilitate administrative control of  Same as Category 1          Sallle as Category 1 the access to all setpoint adjustments, module calibra-tion adjustments, and test points.
Periodic checking, testing, calibration, and calibration Same as Category I          Same as Category  1 verification should be in accordance with the applicable portions of Regulatory Guide 1.118, "Periodic Testing of Electric Power and Protection Systems," pertaining to testing of instrument channels. (Note: Response time testing not usually needed.)
The location of the isolation device should be such      Same as Category 1          No specific provision that it would be accessible for maintenance during accident conditions.
: 11. Human Factors                                      11. Human Factors          11. Human Factors The instrumentation should be designed to facilitate    Same as Category 1          Same as Category  1 the recognition, location, replacement, repair, or adjustment of malfunctioning components or modules.
The monitoring instrumentation design should minimize    Same as Category 1          Same as Category  1 the development of conditions that would cause meters, annunciators, recorders, alarms, etc., to give anomalous indications potentially confusing to the operator. Human factors analysis should be used in determining type and location of displays.
 
TABLE 1 (Continued)
Category  1                                      Category 2                  Category 3
                                                                                                      'I
: 11. (Continued)
To the extent practicable, the same instruments should Same as Category I          Same as Category  1 be used for accident monitoring as are used for the normal operations of the plant to enable the operators to use, during accident situations, instruments with which they are most familiar.
: 12. Direct Measurement                                12. Direct Measurement      12. Direct Measurement To the extent practicable, monitoring instrumentation  Same as Category l          Same as Caltcgofy l inputs should be from sensors that directly measure the desired variables. An indirect measurement should be made only when it can be shown by analysis to provide unambiguous information.
 
TABLE 3 PWR    VARIABLES TYPE A Variables: those variables to be monitored that provide the primary information required to permit the control automatic  control    provided  and that are required room operator to take specific manually controlled actions for which no                                      is for safety systems to accomplish their safety functions for design basis accident events. Primary information is informa-tion that is essential for the direct accomplishment of the specified safety functions; it does not include those variables that are associated with contingency          actions that  may  also  be identified in written procedures.
A variable included      as Type A does not preclude      it from being included    as Type B, C, D, or E or vice versa.
Category (see Regulatory Position 1.4 Variable                                  Range                      and Table 1)
Plant specific                              Plant specific                                            Information required for operator action TYPE B Variables: those variables that provide information to indicate whether plant safety functions are being accomplished.
Plant safety functions are (I) reactivity control, (2) core cooling, (3) maintaining reactor coolant system integrity, and (4) maintaining containment integrity (including radioactive effluent control). Variables are listed with designated ranges and category for design and qualification requirements. Key variables are indicated by design and qualiTication Category l.
Reactivity Control Neutron Flux                              10  % to 1007o    full power                              Function detection; accomplishment of mitigation Control Rod Position                      Full in or not full in                                    Verification RCS Soluble Boron Concen-                  0 to 6000 ppm                                              Verification tration RCS Cold Leg Water Temper-                50  Fto 400    F                                          VeriTication ature Core Cooling RCS Hot Leg Water Temper-                50 F to 700 F                                              Function detection; accomplishment ature                                                                                                of mitigation; verification; long-term surveillance RCP Cold Leg Water Temper-                50 F to 700 F                                              Function detection; accomplishment ature                                                                                                of mitigation; veriTication; long-term r                                                                                        surveillance RCS Pressure                              0 to 3000 psig (4000 psig for                  12          Function detection; accomplishment CE plants)                                                of mitigation; veriTication; long-term surveillance 200 F to 2300 F                                33          VeriTication IWhere    a variabio is listed for mora than one purpose, the instrumentation raqulrarnants may    bo Integrated and only ono maasuramont provided.
2 The maxhnum value may be ravisad upward to satisfy ATWS roquiramants.
3 Instrumentation that Is a part of the llnal ICC datactlon systom should meet the design roqulramonts spadflod ln ItamILF.2 of NUREG<737. (Nthan Typo K tharmocouptas bacomo part of tho systam, thay aro considarad to moot the raqulromants. Howovar, tho romaindar of tho dataction system that is outsido the reactor vassal should moot tho raqulromants spadflod.)
1.97-22
 
TABLE 3 (Continued)
Category (see Regulatory Position 1.4 Range                    and Table 1)
TYPE C (Continued)
Fuel Cladding (Continued) 1/2 Tech Spec limit io 100 times                        Detection of breach Radioactivity Concentration or Radiation Level in Circulating          Tech Spec limit Primary Coolant Analysis of Primary Coohnt              10  pCi/ml to 10 Ci/ml or                  36          Detail analysis; accomplishment of (Gamma Spectrum)                        TID-14844 source term in                                mitigation; veriTication; long-term coolant volume                                          surveillance Reactor Coolant Pressure Boundary RCS Pressure I                          0 to 3000 psig (4000 psig    for CE        12          Detection of potential for or actual plants)                                                  breach; accomplishment of mitiga-tion; long-term surveillance 4                            Detection of breach; accomplishment Containment Pressurel                    -5 psig to design pressure
(-10 psig for subatmospheric                            of mitigation; verification; long<erm containments)                                            surveillance Containment Sump Water                  Narrow range top to                                      Detection of breach; accomplishment Leveli                                  bottom (sump), wide                                      of mitigation; verification; long-term range (plant specific)                                  surveillance R/hr to 10    R/hr                      37,8          Detection of breach; verification Containment Area Radiation                1 Effluent Radioactivity - Noble            10  pCi%c to 10    pCi%c                39            Detection of breach; verification Gas Effluent from Condenser Air Removal System Exhaust Containment RCS Pressure I                      0 to 3000 psig (4000 psig for                            Detection of potential for breach; CE plants)                                              accomplishment of mitigation SampUng or monitoring of radioactive Uquids and gases should be performed in a manner that ensures ptocutement of tepesentative samoles. For eases the criteria of ANSI N13.1.1969, "G>>ude to Sampling Aitbotno Radioactive Materials in Nuclear          FacUiiies>'hould be appQed. For llquih, provisions should be made for sampling from well.mixed turbulent zones, and sampling      lines should be de>>dgned to mlnl-nJo plateout or deposition. For safe and convenient sampgng, the provisions should indude:
: a. Shielding to maintain radiation doses ALARA,
: b. Sample containers with contalnetmmpUng port conneciot compatibility,
: c. Capabigiy of sampling under primary system pressure and negative pressures,
: d. HandUng and transport capability, and
: e. Prearrangement for analysis and mietpteiailon.
7 Mlnhnum of iwo monitors at widely separated locations.
8 Detectors should respond io gamma radiation phoions within any energy range ftom 60 koV to 3 MoV with a dose tato response accuracy within a factor of 2 over the eniito range.
9 Monitors should be capable of detecdng and measuring gaseous effluent radioactivity with compositions tanyng from fresh equlUbtlutn noble gas ladon Product mixtures io iordayrold mixtures, with overall system accuracies,within a factor of 2. Effluent radioactivity may bo
<<p<<ssod ln terms of concentrations of Xe-133 equivalents, in terms of concentrations of any noble gas nucUdes, or in terms of integrated na MeV pet unIt thno. It is not expected iha! a single monitoring device will have suNcient tango to encompass the oaflte tango provided this regulatory guide and that mulilolo components or systems will be needed. Existing equlpmoat may be used to monitor any portion of ih stated tango witidn the equipment design rating.
r 1.97-24
 
Attachment 4 to AEP:NRC:0856T Reasons  and 10 CFR 50.92  Analysis for Change to the Donald C..Cook Nuclear Plant Unit Nos. 1 and  2 Technical Specifications
 
Ill    r
    ~ ~
        \
Attachment 4 to    A  :NRC:0856T                              Page 1 Containment Water Level Monitor        II F  1.5 The guidance    given in Generic Letter No. 83-37 states that:
              ~ "A continuous    indication of containment water level should be provided in the control room of each reactor during Power Operation, Startup and Hot Standby modes of operation. At least one channel    for narrow  range and two channels  for wide range instruments should be operable at all times when the reactor is operating in any of the above modes. Narrow range instruments should cover the range from bottom to the top of the containment sump. Wide range instruments should cover the range from the bottom of the containment to the elevation equivalent to a 600,000 gallon (or less    if justified) capacity.
                "Technical Specifications for containment water level monitors should be included with other accident monitoring instrumentation in the present Technical Specifications. LCOs (including the required Actions) for wide range monitors should include the requirement that the inoperable channel will be restored to operable status within 30 days or the plant will be brought to Hot Shutdown  condition as required for other accident monitoring instrumentation. Typical acceptable LCO and surveillance requirements for accident monitoring instrumentation are included in Enclosure 3."
k We  are proposing that T/S Tables 3.3-11 and 3.3-10 for Units 1 and 2, respectively, be revised to include the requirement that at least two containment water level channels and one containment sump level channel be operable during Modes 1, 2, and 3. In addition, we are proposing that T/S Tables 4.3-7 and 4.3-10 for Units 1 and 2, respectively, be revised to include the surveillance requirements for these channels.
In order to follow the above guidance, and maintain internal consistency with our current Technical Specifications, the 30-day action statement in T/S 3.3 '.8 for Unit 1 and 3.3 '.6 for Unit 2 is proposed for the containment water level and containment sump level instrumentation.
The  format of T/S Tables 3.3-11 and 3.3-10 for Units 1 and 2 varies from the Generic Letter example because our present T/Ss include only one column listing "Minimum Channels Operable."        In order to keep the format similar to other accident monitoring instrumentation included in the present T/Ss, the column listing the "Required No. of Channels" is not included.
Per 10 CFR 50.92, a proposed amendment will not involve a        significant hazArds consideration      if  the proposed amendment does not:
(1)  involve'    significant increase in the probability or consequences  of an accident previously evaluated, (2)  create the possibility of a new or different kind of accident from any accident previously analyzed or evaluated, or (3)  involve a significant reduction in a margin of safety.
 
lN ~
P 7
Attachment 4 to    A ..NRC:0856T Criterion These changes    will expand the license requirements for post-accident monitoring instrumentation and assist the operator in recovering from      an accident. The changes will not involve a significant increase in the probability or consequences of any previously evaluated accident.
Criterion  2 The changes  do not affect normal or accident plant operation. In an accident they    will serve  to provide data to the operator; therefore, the changes will not create the possibility of a new or different kind of accident from any previously analyzed or evaluated.
Criterion  3 The changes  do not involve a significant reduction in the margin of safety, since they will only require that additional data be available to the operator.
The Commission has    provided guidance concerning the determination of si.gnificant hazards by providing certain    examples  (48 FR  14870) of amendments  considered not    likely to involve significant  hazards consideration. The second of these examples refers to changes that impose  additional limitations, restrictions, or controls not presently included in the T/Ss. Since the requirement for sump and containment water level monitors constitute a restriction which the current T/Ss do not have, we believe this example is applicable and that the changes involve no significant hazards consideration.
The above T/S changes    constitute additional restrictions to the present T/Ss. Therefore,  we  believe that these changes  do not involve a significant hazards consideration as defined in      10 CFR 50.92.
It is noted that AEP:NRC:0856I also proposed changes for the axial power distribution monitoring system and several administrative changes. We are limiting this submittal to changes for the containment water level and containment sump level instrumentation.      We request that your staff continue to review the changes regarding the axial power distribution system and the administrative changes as submitted in AEP:NRC:0856I.
 
~ ~ t t
  !}}

Latest revision as of 00:54, 4 February 2020

Proposed Tech Spec Changes Re Containment Level Monitor,In Response to Generic Ltr 83-37
ML17334A963
Person / Time
Site: Cook  American Electric Power icon.png
Issue date: 05/19/1986
From:
INDIANA MICHIGAN POWER CO. (FORMERLY INDIANA & MICHIG
To:
Shared Package
ML17334A962 List:
References
GL-83-37, NUDOCS 8605230211
Download: ML17334A963 (33)


Text

REACTOR COOLANT, SYSTEM 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.6.1 The following Reactor Coolant System leakage detection systems shall be OPERABLE:

'a ~ One of the containment atmosphere particulate radioactivity monitoring channels (ERS-1301 or ERS-1401),

b. The containment, sump flow monitoring system, and c~ Either the containment humidity monitor o" one of the containment atmosphere gaseous radioactivity monitoring channels (ERS-1305 or ERS-1405) .

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

With only two of the above required leakage detection systems OPERABLE, operation may continue for up to 30 days provided grab samples of the containment atmosphere are obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the recuired gaseous and/cr particulate radioactivity monitoring channels are inoperable; otherwise, be in at least HOT STANDBY within the ne'xt 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.4.6.1 The leakage detection systems shall be demonstrated OPERABLE by:

'a ~ Containment atmosphere particulate and gaseous (if being used) monitoring system-performance of CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST at the frequencies specified in Table 4.3-3,

b. Containment sump flow monitoring system-performance of CHANNEL CALIBRATION at least once per 18 months, c ~ Containment humidity monitor (if being used) performance of CHANNEL CALIBRATION at least once per 18 months.

D. C. COOK UNIT 1 3/4 4-14 ~ Amendment No.

I l 1 C

REACTOR COOLANT SYSTEM This page intenzicnally left blank.

D. C.'OOK UNIT 1 3/4 4-15 Amendment No.

ADMINISTRATIVE CONTROLS SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the Regional Administrator within the time period specified for each report. These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable reference Specifications:

a~ Inservice Inspection Program Review, Specification 4.4.10.

b. ECCS Actuation, Specifications 3.5.2 and 3.5.3.

c ~ Inoperable Seismic Monitoring Instrumentation, Specification 3.3.3.3.

d. Inoperable Meteorological Monitoring Instrumentation, Specification 3.3.3.4.
e. Seismic event analysis, Specification 4.3.3.3.2.
f. Sealed Source leakage in excess of limits, Specification 4.7.7.1.3.
g. Fire Detection Instrumentation, Specification 3.3.3.7.
h. Fire Suppression Systems, Specifications 3.7.9.1, 3.7.9.2, 3.7.9.3 and 3.7.9.4.
i. Containment Sump Level instrumentation, Table 3.3-11.

D. C. COOK - UNIT 1 6-19 Amendment No.

INSTRUMENTATION BASES 3/4.3.3.7 FIRE DETECTION INSTRUMENTATION OPERABILITY of the f're detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early stages. Prompt detection of fires will reduce the potential for damage to safety related equipment and is an integral element in the overall facility fire protection program.

In the event that a portion of the fire detection instrumentation is inoperable, the establishment o'f frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored to OPERABILITY. Use of containment temperature monitoring is allowed once per hour if ccntainment fire detection is inoperable.

3/4. 3. 3. 8 POST-ACCiDENT INSTRUMENTATION The OPERABILITY of the post-accident instrumentation ensures that sufficient information is available on selected plant parameters to monitor and assess these variables during and following an accident.

The containment water level CHANNEL CHECK is a visual inspection of parallel channels which should indicate within acceptable instrument drift that the water level is below the range of the ccntainment water level instrumentation. Acceptable instrument drift for ccntainment water level instrumentation is presently considered 25% of full scale.

The containment sump level channels should indicate the same level on both channels within acceptable instrument drift, which is presently considered a 25% of full scale difference between the two parallel channels.

If the channels do not indicate the same level, the containment sump pump actuation and shut-off can be used to indicate if either channel is correct.

The drift for both instrumentation systems is attributed to air accumulation in the capillaries. Provided that the drift is less than 25%,

should not prevent the instrument frcm tracking changes in level. Equipment it changes may change the acceptable drift. Such a change will not constitute violation of this T/S, provided appropriate evidenc'e exists to justify the change.

D. C. COOK UNIT 1 B 3/4 3-4 Amendment No.

POS - CCIDENT I STRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.8 The post-accident monitoring instrumentation channels shown in Table 3.3-11 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

ACTION:

With the number of OPERABLE post-accident monitoring channels less than required by Table 3.3-11, either restore the inoperable channel to OPERABLE status within 30 days, or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except where noted in Table 3.3-11.

b. The provisions of Specifications 3.0.4 are not applicable.

SURVEILLANCE RE UIREMENTS 4.3.3.8 Each post-accident monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3-7.

D. C. COOK - UNIT 1 3/4 3-54 Amendment No.

TABLE 3.3-ll POST-ACCIDENT MONITORING INSTRUMENTATION INSTRUMENT HINIHUH CHANNELS OPERABLE

1. Containment Pressure
2. Reactor Coolant Outlet Temperature THOT (Wide Range)
3. Reactor Coolant Inlet Temperature TCOLD (Wide Range)
4. Reactor Coolant Pressure - Wide Range
5. Pressurizer Water Level
6. Steam Line Pressure 2/Steam Generator
7. Steam Generator Water Ievel Na'rrow Range 1/Steam Generator
8. Refueling Water Storage Tank Water Level
9. Boric Acid Tank Solution Level
10. AuxiliarY Feedwater Flow Rate 1/Steam Generator*

ll. Reactor Coolant System Subcooling Hargin Monitor 1**

12. PORV Position Indicator - Limit Switches*** 1/Valve
13. PORV Block Valve Position Indicator Limit Switches 1/Valve
14. Safety Valve Position Indicator - Acoustic Monitor 1/Valve
15. Containment Sump Level 1¹
16. Containment Water Level Steam Generator Water Level Channels can be used as a substitute for the corresponding auxiliary feedwater flow rate channel instrument.

PRODAC 250 subcooling margin readout can be used as a substitute for the subcooling monitor instrument.

      • Acoustic monitoring of PORV position (1 channel per three val'ves headered discharge) can be used as a substitute for the PORV Position Indicator Limit Switches instruments.

¹ With less than the minimum number of channels OpERABLE restore the system to OPERABLE status within 30 days or prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 14 days outlining available backup equipment, the cause of the inoperability and the plans and schedule for restoring ..the system to OPERABLE status.

TABLE 4.3-7 POST-ACCIDENT MONITORING INSTRUHENTATION SURVEILLANCE RE UIREHENTS CHANNEL CHANNEL INSTRUMENT CHECK CALIBRATION

1. Containment Pressure
2. Reactor Coolant Outlet Temperature T (Wide Range)

HOT 3., Reactor Coolant Inlet Temperature T COLD (Wide Range)

4. Reactor Coolant Pressure - Wide Range
5. Pressurizer Water Level
6. Steam Line Pressure
7. Steam Generator Water Level Narrow Range
8. RWST Water Level
9. Boric Acid Tank Solution Level
10. Auxiliary Feedwater Flow Rate
11. Reactor Coolant System Subcooling Margin Monitor
12. PORV Position Indicator Limit Switches
13. PORV Block Valve Position Indicator Limit Switches
14. Safety Valve Position Indicator Acoustic Monitor
15. Containment Sump Level
16. Containment Water Level

INS E 0 POST- CCIDENT INSTRUMENTATION LIMITI G CO DITION FOR OPERAT ON 3.3.3,6 The post-accident monitoring instrumentation channels shown in Table 3.3-10 shall be OPERABLE.

APPLICABILITY: MODES 1, 2, and 3.

~ACT ON:

With the number of OPERABLE post-accident monitoring channels less than required by Table 3.3-10, either restore the inoperable channel to OPERABLE status within 30 days, or be in HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> except where noted in Table 3.3-10 The provisions of Specifications 3.0.4 are not applicable.

SURVEILLANCE RE UIREME TS 4.3.3.6 Each post-accident monitoring instrumentation channel shall be demonstrated OPERABLE by performance of the CHANNEL CHECK and CHANNEL CALIBRATION operations at the frequencies shown in Table 4.3-10.

D. C. COOK - UNIT 2 3t4 3-45 Amendment No.

TABLE 3.3-10 POST-ACCIDENT MONITORING INSTRUMENTATION INSTRUMENT MINIMUM CHANNELS OPERABLE

1. Containment Pressure
2. Reactor Coolant Outlet Temperature T (Wide Range)
3. Reactor Coolant Inlet Temperature T (Wide Range) 4 Reactor Coolant Pressure Wide Range
5. Pressurizer Water Level'.

Steam Line Pressure 2/Steam Generator

7. Steam Generator Water Level Narrow Range 1/Steam Generator
8. Refueling Water Storage Tank Water Level
9. Boric Acid Tank Solution Level
10. Auxiliary Feedwater Flow Rate 1/Steam Generator*
11. Reactor Coolant System Subcooling Margin Monitor
12. PORV Position Indicator Limit Switches"-** 1/Valve
13. PORV Block Valve Position Indicator Limit Switches 1/Valve
14. Safety Valve Position Indicator - Acoustic Monitor 1/Valve
15. Containment Sump Level
16. Containment Water Level

. ** pRODAC 250 subcooling margin readout can be used as a substitute for the subcooling monitor instrument.

      • Acoustic monitoring of PORV position (1 channel per three valves headered discharge) can be used as a substitute for the PORV Position Indicator Limit Switches instruments.

With less than the minimum number of channels OPERABLE restore the system to OPERABLE status within 30 days or prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 14 days outlining available backup equipment, the cause of the inoperability and the plans and schedule for restoring the system to OPERABLE status.

TABLE 4.3-10 POST-ACCIDENT HONITORING INSTRUMENTATION SURVEILLANCE RE UIREHENTS CHANNEL CHANNEL INSTRUMENT CHECK CALIBRATION

1. Containment Pressure
2. Reactor Coolant Outlet Temperature T (Wide Range)

HOT

3. Reactor Coolant Inlet Temperature T COLD (Wide Range)

Reactor Coolant Pressure Wide Range R 5." Pressurizer Water Level

6. Steam Line Pressure
7. Steam Generator Water Level - Narrow Range
0. RWST Water Level
9. Boric Acid Tank Solution Level 1 0. Auxzlzary Feedwater Flow Rate ll. Reactor Coolant System Subcooling Margin Monitor
12. PORV Position Indicator Limit Switches
13. PORV Block Valve -Position Indicator - Limit Switches"
14. Safety Valve Position Indicator - Acoustic Monitor
15. Containment Sump Level
16. Containment Water Level
  • The provisions of Specification 4.0.6 are applicable.

REACTOR COOLANT SYSTEM 3/4.4.6 REACTOR COOLANT SYSTEM LEAKAGE LEAKAGE DETECTION SYSTEMS LIMITING CONDITION FOR OPERATION 3.4.6.1 "The following Feactor Coolant System leakage detection systems shall be OPERABLE:

a. One of the containment atmosphere particulate radioactivity monitoring channels (ERS-2301 or ERS-2401),
b. The containment sump flow monitoring system, and
c. Either the containment humidity monitor or one of the containment atmosphere gaseous radioactivity monitoring channels

~

(ERS-2305 or ERS-2405).

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTXON:

With only two of the abcve recuired leakage detection systems OPERABLE, operation may continue for up tc 30 days provided crab samples of the containment atmosphere a e obtained and analyzed at least once per 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> when the required gasecus and/cr particulate radioactivity monitoring channels are inoperable; otherwise, be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

SURVEILLANCE RE UIREMENTS 4.4.6.1 The leakage detection systems shall be demonstrated OPERABLE by:

a ~ Containment atmosphere particulate and gaseous (if being used) monitoring system-performance of CHANNEL CHECK, CHANNEL CALIBRATION and CHANNEL FUNCTIONAL TEST at the frequencies specified in Table 4.3-3,

b. Containment sump flow monitoring system-performance of CHANNEL CALIBRATION at least once per 18 months,*

C ~ Containment humidity monitor (if being used) - performance of CHANNEL CALIBRATION at least once per 18 months.

  • The provisions of Specification 4.0.6 are applicable.

D. C. COOK UNIT 2 3/4 4-14 Amendment No.

ADMINISTRATIVE CONTROLS SPECIAL REPORTS 6.9.2 Special reports shall be submitted to the Regional Administrator within the time period specified for each report. These reports shall be submitted covering the activities identified below pursuant to the requirements of the applicable reference specification:

a 0 ECCS Actuation, Specifications 3.5.2 and 3,5.3.

b. Inoperable Seismic Monitoring Instrumentation, Unit No. 1, Specification 3.3.3.3.

c~ Inoperable Meteorological Monitoring Instrumentation, Unit No. 1, Specification 3.3.3.4.

d. Fire Detection Instrumentation, Specification 3.3.3.8.
e. Fire Suppression Systems, Specifications, 3.7.9.1, 3.7.9.2, 3.7.9.3 and 3.7.9.4.

Seismic Event Analysis, Specification 4.3.3.3.2.

g. Sealed Source leakage in excess of limits, Specification 4.7.8.1.3.
h. Containment Sump Level instrumentation, Table 3.3-10.

D. C. COOK UNIT 2 6-19 Amendment No.

1 3/4 ~ 3 INSTRUMENTATZ BASES 3/4. 3 > 3~2 MOVABLE ZNCORE DETECTORS The OPERABILITY of the movable incore detectors with the specified minimum complement of equipment ensures that the measurements obtained for use of this system accurately represent the spatial neutron flux distribution of the reactor core. The OPERABILITY of this system is demonstrated by irradiating each detector used and normalizing its respective output.

3/4.3.3.3 SEISMIC INSTRUMENTATION The OPERABILITY of the seismic instrumentation ensures that sufficient capability is available to promptly determine the magnitude of a seismic event, and evaluate the response of those features important to safety. This capability is required to permit comparison of the measured response to that used in the design basis for the facility.

3/4.3.3.4 METEOROLOGICAL INSTRUMENTATION The OPERABILITY of the meteorological instrumentation ensures that sufficient meteorological data is available for estimating potential radiation doses to the public as a result of routine or accidental release of radioactive materials to the atmosphere. This capability is required to evaluate the need for initiating protective measures to protect the health and safety of the public.

3/4.3.3.5 REMOTE SHUTDOWN INSTRUMENTATZON The OPERABILITY of the remote'hutdown instrumentation ensures that sufficient capability is available to permit shutdown and maintenance of HOT STANDBY of the facility from locations outside of the control room. This capability is required in the event control room habitability is lost and is consistent with General Design Criteria 19 of 10 CFR 50.

3/4.3.3.6 POST-ACCIDENT INSTRUMENTATION The OPERABILITY of the post-accident instrumentation ensures that sufficient information is available on selected plant parameters to monitor and assess these variables during and following an accident.

The containment water level CHANNEL CHECK is a visual inspection of parallel channels which should indicate within acceptable instrument drift that the water level is below the range of the containment water level instrumentation. Acceptable instrument drift for containment water level instrumentation is presently considered 25% of full scale.

The containment sump level channels should indicate the same level on both channels within acceptable instrument drift, which is presently considered a 25% of full scale difference between the two parallel channels.

If the channels do not indicate the same level, the containment sump pump actuation and shut-off can be used to indicate if either channel is correct.

D. C. COOK - UNIT 2 B 3/4 3-2 Amendment No.

3/4.3 INSTRUMENTATION BASES drift for both instrumentation systems is attributed to air The accumulation in the capillaries. Provided that the drift is less than 25%, it should not prevent the inst ument rom tracking changes in level. Equipment changes may change the acceptable drift. Such a change will not constitute a violation of this T/S, prov'ded appropriate evidence exists to justify the change.

3/4. 3. 3. 7 AXIAL POWER DISTRIBUTION MONITORING SYSTEM (APDMS)

OPERABILITY of the APDMS ensu es that sufficient capability is available for the measurement of the neutron flux spatial distribution within the reactor core. This capability is required to 1) monitor the core flux patterns that are representative of the peak core power density and 2) limit the core average axial power profile such that the total power peaking factor F is maintained

~

within acceptable limits.

3/4.3.3.8 FIRE DETECTION ZNSTRUMENTATZON OPERABILITY of the fire detection instrumentation ensures that adequate warning capability is available for the prompt detection of fires. This capability is required in order to detect and locate fires in their early stages. Prompt detection of f'res will reduce the potential for damage to safety-related equipment and is an integral element in the overall facility fire protection program.

Zn the event that a portion of the fire detection instrumentation is inoperable, the establishment of frequent fire patrols in the affected areas is required to provide detection capability until the inoperable instrumentation is restored tc OPERABILITY. Use of containment temperature monitoring is allowed once per hour if containment fire detection is inoperable.

3/4. 3. 3. 9 PADIOACTIVE LZ UZD EFFLUENT INSTRUMENTATION The radioactive liquid effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in liquid effluents during actual or potential releases. The alarm/trip setpoints for these instruments shall be calculated in accordance with NRC approved methods in the ODCM to ensure that the alarm/trip will occur prior to exceeding the limits of 10 CFR Part 20. The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria specified in Section 11.3 of the Final Safety Analysis Report for the Donald C. Cook Nuclear Plant.

3/4.3.3.10 RADIOACTIVE GASEOUS EFFLUENT INSTRUMENTATION The radioactive gaseous effluent instrumentation is provided to monitor and control, as applicable, the releases of radioactive materials in gaseous effluents during actual or potential releases. The alarm/trip setpoints for these instruments shall be calculated in accordance with NRC approved methods D. C. COOK - UNIT 2 B 3/4 3-3 Amendment No.

1 I ~ ~

~ ~

3/4.3 INSTRUMENTATION BASES in the ODCM to ensure that the alarm/trip will occur prior to exceeding the limits of 10 CFR Part 20. This instrumentation also includes provisions for monitoring the concentrations of potentially explosive gas mixtures in the waste gas holdup system. The OPERABILITY and use of this instrumentation is consistent with the requirements of General Design Criteria specified in

'ection 11.3 of the'Final Safety Analysis Report for the Donald C. Cook Nuclear Plant.

3/4.3.4 TURBINE OVERSPEED PROTECTION This specification is provided to ensure that the turbine overspeed protection instrumentation and the turbine speed control valves are OPERABLE and will protect the turbine rom excessive overspeed. Protection from turbine excessive overspeed is required since excessive overspeed of the turbine could generate potentially damaging missiles which could impact and damage safety related components, equipment or structures.

D. C. COOK Unit 2 B 3/4 3-4 Amendment No.

u

~ ~ (3 ~

Q orloin yst lllfDIANA& NICH~GAIV ElECTBIC CO FORT WAYNE, INDIANA AMOUNT cHEcK No. 08 3~0273 DATE 03 24 8b S l 50. 004 ~

ln full seNIement of statement accompenytng this che U S NUCLEAR REGULATORY 25b43024 COMM I S S ION DISBURSEMENT ACCOUNT Tothe WASHINGTON DC 20555 Order of LINCOLN NATIONAL BANK AND TRUST COMPANY

, FORT WAYN E, INDIANA II'0 29 LI 3II.0 7 t 900 2 7 5I: I 3S 7 5 20 ADVICE - 5ll'EMITTANCE DETACH BEFORE DEPOSITING INDIANA L MICHIGAN ELECTRIC CO. P.O. BOX 60 FORT WAYNE, INDIANA 46801 cHEGK No. 06 3 0273 DATE 03 24 8b AMOUNT $ 150 00 OUR REFERENCE DATE VENDORS REFERENCE GROSS DEDUCT 036 030'I6 02-2b-86 ,AEP NRC 150 00 or5'I 2 pf EXPLANATION CD CASH DISCOUNT RT RETAINED PR PRIOR PAYMENT TRY 32 REV. I 86 OF DEDUCTIONS TR TRANSPORTATION TX TAX WITHHELD AJ ADJUSTMENT

Attachment 3 to AEP:NRC:0856T Regulatory Guide 1.97, Rev. 3, Pertinent Sections

~O

'">> U.S. NUCLIR REGULATORY COMMI88lot Resea~aa'D-

! RE LAT RY 0FRCE OF NUCLEAR REGULATORY RESEARCH REGULATORY GUIDE 'l.97 INSTRUMENTATION FOR LIGHT-WATEROOLED NUCLEAR POWER PLANTS TO ASSESS PLANT AND ENVIRONS CONDITIONS DURING AND FOLLOWING AN ACCIDENT A. INTROOUCTION B. OISCUSSION Criterion 13, "Instrumentation and Control," of Appen- Indications of plant variables are required by the control dix A, "General Design Criteria for Nuclear Power Plants," room operating personnel during accident situations to (1) to 10 CFR Part 50, "Domestic Licensing of Production and provide information required to permit the operator to take Utilization Facilities," includes a requirement that instru- preplanned manual actions to accomplish safe plant shut-mentation be provided to monitor variables and systems down; (2) determine whether the reactor trip, engineered-over their anticipated ranges for accident conditions as safety-feature systems, and manually initiated safety appropriate to ensure adequate safety. systems and other systems important to safety are performing their intended functions (i.ereactivity control, core .

Criterion 19, "Control Roofn," of Appendix A to 10 CFR cooling, maintaining reactor coolant system integrity, and Part 50 includes a requirement that a control room be pro- maintaining containment integrity); and (3) provide informa-vided from which actions can be taken to maintain the nuclear tion to the operators that will enable them to determine the power unit in a safe condition under accident conditions, potential for causing a gross breach of the barriers to including losswfwoolant accidents, and that equipment, radioactivity release (i.e., fuel chdding, reactor coohnt including the necessary instrumentation, at appropri'ate pressure boundary, and containment) and to determine if a locations outside the control room be. provided with a gross breach of a barrier has occurred. In addition to the design capability for prompt hot shutdown of the reactor. above, indications of plant variables that provide informa-tion on operation of plant safety systems and other systems Criterion 64, "Monitoring Radioactivity Releases," of important to safety are required by the control room Appendix A to 10 CFR Part 50 includes a requirement that operating personnel during an accident to (I) furnish data means be provided for monitoring the reactor containment regarding the operation of plant systems in order that the atmosphere, spaces containing components for recirculation operator can make appropriate decisions as to their use and of lo~fwoolant accident fluid, effluent discharge paths, (2) provide information regarding the release of radioactive and the plant environs for radioactivity that may be released materials to allow for early indication of the need to from postulated accidents. initiate action necessary to protect the public and for an estimate of the magnitude of any impending threat.

This guide describes a method acceptable to the NRC At the start of an accident, it may be difficult for the staff for complying with the Commission's regulations to operator to determine immediately what accident has provide instrumentation to monitor plant variables and occurred or is occurring and therefore to determine the systems during and following an accident in a light-water- appropriate response, For this reason, reactor trip and cooled nuclear power plant. 'Ihe Advisory Committee on certain other safety actions (e.g., emergency core cooling Reactor Safeguards has been consulted concerning this actuation, containment isolation, or depressurization) have guide and has concurred in the regulatory position. been designed to be performed automatically during the initial stages of an accident. Instrumentation is also provided to indicate information about phnt variables required to Any guidance in this document related to information enable the operation of manually initiated safety systems collection activities has been cleared under OMB Clearance and other appropriate operator actions involving systems No. 31504011. important to safety.

USNRC REGULATORY GUIDES Comments should be sent to the Secretary of ths Commlsslor.

Ragulatary Guides ace Issued to describe and make available to the U.S. Nuclear Regulatory Commlsslonh Washington, O.C. 20555,,

public cnethods acceptable to the NRc staff of Implementing Attantlonc Docketing and Service Branch.

speclflc parts of the Commlsslon's regulations, to delineate tach- The guides sra Issued in the following ten broad dlvlslonsc nlouas used by the staff In evaluating speclflc problems or postu-lated accidents, or to provide guidance to applicants. Regulatory 1. Power Reactors 6. Products Guides sre noc substitutes for regulations, and compliance with 2, Research and Test Reactors 7. Transportation them Is not required. Methods and solutions different from those sat 3. Fuels snd Materials Facllltles 8. Occupational Health out In the guides will be acceptable flndlngs raaulslte to tho Issuance orIf continuance they provide a basis for tha of a permit or

4. Environmental and Sltlng g. Antitrust and Flnanclal Review
5. Materials and Plant Protection 10. General license by the Commlsslon.

This guide was Issued after conslderatlon of comments received fcom Copies of Issued guides may bo purchased st the current Government the public. Cocnments snd suggestions for Improvements In these pclntlng office price. A subscctptlon service for futuro guides In spo.

guides are'ncouraged at all times, and guides will elf lc dlvlslons Is avallabls through tho Government prlntlng Office.

appropriate, to accommodate comments and to reflect be revised, as Information on the subscrlptlan socvlce and current Gpo prices may tion or eccpecloncs. new Informa- be obtained by wrltlng tho U.s. Nuclear Regulatory commlsslon, washington, D.c. 20555, Attontlonc publlcatlons sales Manager.

I ~

i n

1I I + I

TABLE 1 DESIGN AND QUALIFICATIONCRlTERlA FOR INSTRUNIENTATION Category 1 Category 2 Category 3

l. Equipment Qualification 1. Equipment Qualification l. Equipment Qualification The instrumentation should be qualiTied in accordance Same as Category 1 No specific provision with Regulatory Guide 1.89, "Qualification of Class lE Equipment for Nuclear Power Plants," and the method-ology described in NUREG4588, "Interim Staff Posi-tion on Environmental Qualification of Safety-Related Electrical Equipment."

Instrumentation whose ranges are required to extend Same as Cat<<g>>ry 1 No sp<<<<ilic pn)vis')on ANSI'.5.

beyond those ranges calculated in the most severe design.

basis accident event for a given variable should be quali-fied using the guidance provided in paragraph 6.3.6 of Qualification applies to the complete instrumentation Same as Category 1 No spccifi<<provision channel from sensor to display where the display is a direct-indicating meter or recording device. If the instru-mentation channel signal is to be used in a computer-based display, recording, or diagnostic program, qualifi-cation applies from the sensor up to and including the channel isolation device.

The seismic portion of qualification should be in accor- No specil'i<<provisi>>n No specilic provision dance with Regulatory Guide 1.100, "Seismic Qualifica-tion of Electric Equipment for Nuclear Power Plants."

Instrumentation should continue to read within the required accuracy following, but not necessarily during, a safe shutdown earthquake.

2. Redundancy 2. Redundancy 2. Redundancy No single failure within either the accident-monitoring No specific provision No specific provision instrumentation, its auxiliary supporting features, or its power sources concurrent with the failures that are 4

Coploa aro avallabla from the NRC/GPO Sataa Program, U S. Nuclear Regulatory Commlraion, Waahlnaton, D.C. 20555.

TABLE 1 (Continued)

Category 1 Category 2 Category 3

2. (Continued) a condition or result of a speciTic accident should prevent the operators from being presented the informa-tion necessary for them to determine the safety status of the plant and to bring the plant to and maintain it in a safe condition following that accident. Where failure of one accident-monitoring channel results in informa-tion ambiguity (that is, the redundant displays disagree) that could lead operators to defeat or fail to accomplish a required safety function, additional information should be provided to allow the operators to deduce the actual conditions in the plant. This may bc accomplished by providing additional independent clrannels of information of the same variable (addition of an identical channel) or by providing an independent channel to monitor a different variable that bears a known relationship to the multiple channels (addition of a diverse channel). Redun-dant or diverse channels should be electrically independ-ent and physicaHy separated from each other and from equipment not classified important to safety in accor-dance with Regulatory Guide 1.75, "Ph'ysical Independ-ence of Electric Systems," up to and'including any isola-tion device. Within each redundant division of a safety

! systeni, redundant monitoring channels are not needed except for steam generator level instrumentation in two-loop plants.

3. Power Source 3. Power Source 3. Power Source The instrumentation should be energized from station The instrumentation should be energized from a No specific provision standby power sources as provided in Regulatory Guide high-reliability power source, not necessarily 1.32, "Criteria for Safety-Related Electric Power Systems standby power, and should be backed up by for Nuclear Power Plants," and should be backed up by bat teries where momentary interruption is not batteries where momentary interruption is not tolerable. tolerable.

TABLE 1 (Continued)

Category 1 Category 2 Category 3

4. Channel Availability 4. Channel Availability 4. Channel Availability The instrumentation channel should be available prior to The out-of-service interval should be based on normal No specific provision an accident except as provided in paragraph 4.11, "Excep- technical specification requirements on out of service

! tion," as defined in IEEE Std 279-1971, "Criteria for Pro- for the system it serves where applicable or where tection Systems for Nuclear Power Generating Stations," specified by other requirements.

or as specified in the technical specifications.

5. Quality Assurance 5. Quality Assurance 5. Quality Assurance The recommendations of the following regulatory guides Same as Category l as>>>odili<<d by th<< following: l1>e i>>st ru>>>e>> I ation eliou1 d be of lugh-quality pertaining to quality assurance should be foUowed: co>>>>>i<<rcial gra>le and should be selected to Since some instru>nentatio<< is less ii>>purta>>t to withsta>>d the st>ecitied service environment.

Regulatory Guide 1.28 "Quality Assurance Prograin safety than other instrumentation, it may not be Requirements (Design and necessary to apply the same quality assurance Construction)" measures to all instrumentation. The quality assur-ance requirements that are implemented should Regulatory Guide 1.30 "Quality Assurance Require- provide control over activities affecting quality to an (Safety Guide 30) ments for the installation, extent consistent with the importance to safety of Inspection, and Testing of the instrumentation. These requirements should be Instrumentation and Electric determined and documented by personnel knowl-Equipment" edgeable in the end use of the instrumentation.

Regulatory Guide 1.38 "Quality Assurance Require-ments for Packaging, Shipping, Receiving, Storage, and Han-dling of Items for Water-Cooled Nuclear Power Plants" Regulatory Guide 1.58 "Qualification of Nuclear Power Plant Inspection, Examination, and Testing Personnel" Regulatory Guide 1.64 "Quality Assurance Require-ments for the Design of Nuclear Power Plants" Regulatory Guide 1.74 "Quality Assurance Terms and Definitions"

TABLE 1 (Continued)

Category 1 Category 2 Category 3

5. (Continued)

Regulatory Guide 1.88 "Collection, Storage, and hfain-tenance of Nuclear Power Plant Quality Assurance Records" Regulatory Guide 1.123 "Quality Assurance Require-ments for Control of Procure-ment of Items and Services for Nuclear Power Plants" Regulatory Guide 1.144 "Auditing of Quality Assurance Programs for Nuclear Power Plants" Regulatory Guide 1.146 "Qualification of Quality Assur-ance Program Audit Personnel I for Nuclear Power Plants" OO Reference to the above regulatory guides (except Regula-tory Guides 1.30 and 1.38) is being made pending issuance of a revision to Regulatory Guide 1.28 that is under devel-opment (Task RS 002-5) and that will endorse ANSI/AShIE NQA-I-1979, "Quality Assurance Program Requirements for Nudear Power Plants."

6. Display and Recording 6. Display and Recording 6. Display and Recording Continuous real-time display should be provided. The The instrumentation signal may be displayed on an Same as Category 2 indication may be on a dial, digital display, CRT, or individual instrument or it may be processed for stripchart recorder. display on demand.

Recording of instrumentation readout information Signals from effluent radioactivity monitors and Signals from effluent radioactivity monitors, should be provided for at least one redundant channel. area monitors should be recorded. area monitors, and meteorology monitors should be recorded.

5 Qoptea may he obtained from the American Society of Mechanical Engineers, 345 East 47th Street, New York, New Yo<< teet7.

TABLE 1 (Continued)

Category 2 Category 3

6. (Continued)

If direct and immediate trend or transient information Same as Category 1 Same as Category 1 is essential for operator information or action, the recording should be continuously avaBable on redun-dant dedicated recorders. Otherwise, it may be con-tinuously updated, stored in computer memory, and displayed on demand. Intermittent displays such as data loggers and scanning recorders may be used if no significant transient response information is likely to be lost by such devices.

7. Range 7. Range 7. ltauge If two or more instruments are needed to cover a Salile as Category l Seine as Category 1 particular range, overlapping of instrument span should be provided. If the required range of moni-toring instrumentation results in a loss of instru-mentation sensitivity in the normal operating range, separate instruments should be used.
8. Equipment Identification 8. Equipment Identification 8. Equipment Identification Types A, B, and C instruments designated as Cate- Same as Category 1 No specific provision gories 1 and 2 should be specifically identified with a common designation on the control panels so that the operator can easily discern that they are intended for use under accident conditions.
9. Interfaces 9. Interfaces 9. Interfaces The transmission of signals for other use should be Same as Category I No specific provision through isolation devices that are designated as part of the monitoring instrumentation and that meet the provisions of this document.
10. Servicing, Testing, and Calibration 10. Servicing, Testing, and Calibration 10. Servicing, Testing, and Calibration Servicing, testing, and calibration programs should be Same as Category 1 Same as Category I specified to maintain the capability of the monitoring instrumentation. If the required interval between

TABLE 1 (Continued)

Category 1 Category 2

10. (Continued) testing is less than the normal time interval between plant shutdowns, a capability for testing during power operation should be provided.

Whenever means for removing channels from service Same as Category 1 Same as Category 1 are included in the design, the design should facilitate administrative control of the access to such removal means.

The design should facilitate administrative control of Same as Category 1 Sallle as Category 1 the access to all setpoint adjustments, module calibra-tion adjustments, and test points.

Periodic checking, testing, calibration, and calibration Same as Category I Same as Category 1 verification should be in accordance with the applicable portions of Regulatory Guide 1.118, "Periodic Testing of Electric Power and Protection Systems," pertaining to testing of instrument channels. (Note: Response time testing not usually needed.)

The location of the isolation device should be such Same as Category 1 No specific provision that it would be accessible for maintenance during accident conditions.

11. Human Factors 11. Human Factors 11. Human Factors The instrumentation should be designed to facilitate Same as Category 1 Same as Category 1 the recognition, location, replacement, repair, or adjustment of malfunctioning components or modules.

The monitoring instrumentation design should minimize Same as Category 1 Same as Category 1 the development of conditions that would cause meters, annunciators, recorders, alarms, etc., to give anomalous indications potentially confusing to the operator. Human factors analysis should be used in determining type and location of displays.

TABLE 1 (Continued)

Category 1 Category 2 Category 3

'I

11. (Continued)

To the extent practicable, the same instruments should Same as Category I Same as Category 1 be used for accident monitoring as are used for the normal operations of the plant to enable the operators to use, during accident situations, instruments with which they are most familiar.

12. Direct Measurement 12. Direct Measurement 12. Direct Measurement To the extent practicable, monitoring instrumentation Same as Category l Same as Caltcgofy l inputs should be from sensors that directly measure the desired variables. An indirect measurement should be made only when it can be shown by analysis to provide unambiguous information.

TABLE 3 PWR VARIABLES TYPE A Variables: those variables to be monitored that provide the primary information required to permit the control automatic control provided and that are required room operator to take specific manually controlled actions for which no is for safety systems to accomplish their safety functions for design basis accident events. Primary information is informa-tion that is essential for the direct accomplishment of the specified safety functions; it does not include those variables that are associated with contingency actions that may also be identified in written procedures.

A variable included as Type A does not preclude it from being included as Type B, C, D, or E or vice versa.

Category (see Regulatory Position 1.4 Variable Range and Table 1)

Plant specific Plant specific Information required for operator action TYPE B Variables: those variables that provide information to indicate whether plant safety functions are being accomplished.

Plant safety functions are (I) reactivity control, (2) core cooling, (3) maintaining reactor coolant system integrity, and (4) maintaining containment integrity (including radioactive effluent control). Variables are listed with designated ranges and category for design and qualification requirements. Key variables are indicated by design and qualiTication Category l.

Reactivity Control Neutron Flux 10  % to 1007o full power Function detection; accomplishment of mitigation Control Rod Position Full in or not full in Verification RCS Soluble Boron Concen- 0 to 6000 ppm Verification tration RCS Cold Leg Water Temper- 50 Fto 400 F VeriTication ature Core Cooling RCS Hot Leg Water Temper- 50 F to 700 F Function detection; accomplishment ature of mitigation; verification; long-term surveillance RCP Cold Leg Water Temper- 50 F to 700 F Function detection; accomplishment ature of mitigation; veriTication; long-term r surveillance RCS Pressure 0 to 3000 psig (4000 psig for 12 Function detection; accomplishment CE plants) of mitigation; veriTication; long-term surveillance 200 F to 2300 F 33 VeriTication IWhere a variabio is listed for mora than one purpose, the instrumentation raqulrarnants may bo Integrated and only ono maasuramont provided.

2 The maxhnum value may be ravisad upward to satisfy ATWS roquiramants.

3 Instrumentation that Is a part of the llnal ICC datactlon systom should meet the design roqulramonts spadflod ln ItamILF.2 of NUREG<737. (Nthan Typo K tharmocouptas bacomo part of tho systam, thay aro considarad to moot the raqulromants. Howovar, tho romaindar of tho dataction system that is outsido the reactor vassal should moot tho raqulromants spadflod.)

1.97-22

TABLE 3 (Continued)

Category (see Regulatory Position 1.4 Range and Table 1)

TYPE C (Continued)

Fuel Cladding (Continued) 1/2 Tech Spec limit io 100 times Detection of breach Radioactivity Concentration or Radiation Level in Circulating Tech Spec limit Primary Coolant Analysis of Primary Coohnt 10 pCi/ml to 10 Ci/ml or 36 Detail analysis; accomplishment of (Gamma Spectrum) TID-14844 source term in mitigation; veriTication; long-term coolant volume surveillance Reactor Coolant Pressure Boundary RCS Pressure I 0 to 3000 psig (4000 psig for CE 12 Detection of potential for or actual plants) breach; accomplishment of mitiga-tion; long-term surveillance 4 Detection of breach; accomplishment Containment Pressurel -5 psig to design pressure

(-10 psig for subatmospheric of mitigation; verification; long<erm containments) surveillance Containment Sump Water Narrow range top to Detection of breach; accomplishment Leveli bottom (sump), wide of mitigation; verification; long-term range (plant specific) surveillance R/hr to 10 R/hr 37,8 Detection of breach; verification Containment Area Radiation 1 Effluent Radioactivity - Noble 10 pCi%c to 10 pCi%c 39 Detection of breach; verification Gas Effluent from Condenser Air Removal System Exhaust Containment RCS Pressure I 0 to 3000 psig (4000 psig for Detection of potential for breach; CE plants) accomplishment of mitigation SampUng or monitoring of radioactive Uquids and gases should be performed in a manner that ensures ptocutement of tepesentative samoles. For eases the criteria of ANSI N13.1.1969, "G>>ude to Sampling Aitbotno Radioactive Materials in Nuclear FacUiiies>'hould be appQed. For llquih, provisions should be made for sampling from well.mixed turbulent zones, and sampling lines should be de>>dgned to mlnl-nJo plateout or deposition. For safe and convenient sampgng, the provisions should indude:

a. Shielding to maintain radiation doses ALARA,
b. Sample containers with contalnetmmpUng port conneciot compatibility,
c. Capabigiy of sampling under primary system pressure and negative pressures,
d. HandUng and transport capability, and
e. Prearrangement for analysis and mietpteiailon.

7 Mlnhnum of iwo monitors at widely separated locations.

8 Detectors should respond io gamma radiation phoions within any energy range ftom 60 koV to 3 MoV with a dose tato response accuracy within a factor of 2 over the eniito range.

9 Monitors should be capable of detecdng and measuring gaseous effluent radioactivity with compositions tanyng from fresh equlUbtlutn noble gas ladon Product mixtures io iordayrold mixtures, with overall system accuracies,within a factor of 2. Effluent radioactivity may bo

<<p<<ssod ln terms of concentrations of Xe-133 equivalents, in terms of concentrations of any noble gas nucUdes, or in terms of integrated na MeV pet unIt thno. It is not expected iha! a single monitoring device will have suNcient tango to encompass the oaflte tango provided this regulatory guide and that mulilolo components or systems will be needed. Existing equlpmoat may be used to monitor any portion of ih stated tango witidn the equipment design rating.

r 1.97-24

Attachment 4 to AEP:NRC:0856T Reasons and 10 CFR 50.92 Analysis for Change to the Donald C..Cook Nuclear Plant Unit Nos. 1 and 2 Technical Specifications

Ill r

~ ~

\

Attachment 4 to A :NRC:0856T Page 1 Containment Water Level Monitor II F 1.5 The guidance given in Generic Letter No. 83-37 states that:

~ "A continuous indication of containment water level should be provided in the control room of each reactor during Power Operation, Startup and Hot Standby modes of operation. At least one channel for narrow range and two channels for wide range instruments should be operable at all times when the reactor is operating in any of the above modes. Narrow range instruments should cover the range from bottom to the top of the containment sump. Wide range instruments should cover the range from the bottom of the containment to the elevation equivalent to a 600,000 gallon (or less if justified) capacity.

"Technical Specifications for containment water level monitors should be included with other accident monitoring instrumentation in the present Technical Specifications. LCOs (including the required Actions) for wide range monitors should include the requirement that the inoperable channel will be restored to operable status within 30 days or the plant will be brought to Hot Shutdown condition as required for other accident monitoring instrumentation. Typical acceptable LCO and surveillance requirements for accident monitoring instrumentation are included in Enclosure 3."

k We are proposing that T/S Tables 3.3-11 and 3.3-10 for Units 1 and 2, respectively, be revised to include the requirement that at least two containment water level channels and one containment sump level channel be operable during Modes 1, 2, and 3. In addition, we are proposing that T/S Tables 4.3-7 and 4.3-10 for Units 1 and 2, respectively, be revised to include the surveillance requirements for these channels.

In order to follow the above guidance, and maintain internal consistency with our current Technical Specifications, the 30-day action statement in T/S 3.3 '.8 for Unit 1 and 3.3 '.6 for Unit 2 is proposed for the containment water level and containment sump level instrumentation.

The format of T/S Tables 3.3-11 and 3.3-10 for Units 1 and 2 varies from the Generic Letter example because our present T/Ss include only one column listing "Minimum Channels Operable." In order to keep the format similar to other accident monitoring instrumentation included in the present T/Ss, the column listing the "Required No. of Channels" is not included.

Per 10 CFR 50.92, a proposed amendment will not involve a significant hazArds consideration if the proposed amendment does not:

(1) involve' significant increase in the probability or consequences of an accident previously evaluated, (2) create the possibility of a new or different kind of accident from any accident previously analyzed or evaluated, or (3) involve a significant reduction in a margin of safety.

lN ~

P 7

Attachment 4 to A ..NRC:0856T Criterion These changes will expand the license requirements for post-accident monitoring instrumentation and assist the operator in recovering from an accident. The changes will not involve a significant increase in the probability or consequences of any previously evaluated accident.

Criterion 2 The changes do not affect normal or accident plant operation. In an accident they will serve to provide data to the operator; therefore, the changes will not create the possibility of a new or different kind of accident from any previously analyzed or evaluated.

Criterion 3 The changes do not involve a significant reduction in the margin of safety, since they will only require that additional data be available to the operator.

The Commission has provided guidance concerning the determination of si.gnificant hazards by providing certain examples (48 FR 14870) of amendments considered not likely to involve significant hazards consideration. The second of these examples refers to changes that impose additional limitations, restrictions, or controls not presently included in the T/Ss. Since the requirement for sump and containment water level monitors constitute a restriction which the current T/Ss do not have, we believe this example is applicable and that the changes involve no significant hazards consideration.

The above T/S changes constitute additional restrictions to the present T/Ss. Therefore, we believe that these changes do not involve a significant hazards consideration as defined in 10 CFR 50.92.

It is noted that AEP:NRC:0856I also proposed changes for the axial power distribution monitoring system and several administrative changes. We are limiting this submittal to changes for the containment water level and containment sump level instrumentation. We request that your staff continue to review the changes regarding the axial power distribution system and the administrative changes as submitted in AEP:NRC:0856I.

~ ~ t t

!