REGULATORY GUIDE 1.74 QUALITY ASSURANCE TERMS AND DEFINITIONS

A. INTRODUCTION

Although Section 1.1, "Scope," of ANSI

N45.2.10-1973 states that the standard contains terms Appendix B, "Quality Assurance Criteria for and their definitions that are important to the Nuclear Power Plants and Fuel Reprocessing Plants,"of understanding of the intent of required quality assurance

10 CFR Part 50, "Licensing of Production and practices for the construction of nuclear power plants, Utilization Facilities,"' establishes quality assurance these same terms are applicable to other phases of plant requirements for the design, construction, and operation life. including design, preoperational and startup testing, of nuclear power plant structures, systems, and and the operational phase.

components. This guide identifies quality assurance terms and acceptable definitions that are important to the understanding of these quality assurance requirements for the design, construction, and operation

C. REGULATORY POSITION

of nuclear power plant structures, systems, and components. This guide applies to all types of nuclear The quality assurance terms and definitions power plants. The Advisory Committee on Reactor contained in ANSI N45.2.10-1973 1 are generally Safeguards has been consulted concerning this guide and acceptable for use in describing and implementing has concurred in the regulatory position. quality assurance programs for the design, construction, and operation of nuclear power plant structures,

B. DISCUSSION

systems, and components subject to the following:

Working Group N45-2.10 of the American National Standards Institute Standards Committee N45, Reactor Plants and Their Maintenance, has prepared a standard The definition of "procurement documents" should be considered to include such documents as contracts, that contains certain terms and their definitions that are letters of intent, work orders, purchase orders, or important to the understanding of the intent of required proposals and their acceptances which authorize the quality assurance practices for the construction of seller to perform services or supply equipment, material, nuclear power plants. This standard was approved by or facilities on behalf of the purchaser.

subcommittee N45-2, Nuclear Quality Assurance Standards, of the American National Standards Institute Standards Committee N45 and the full committee and its Secretariat. It was subsequently approved and ANSI N45.2.10-1973, "Quality Asgurance Terms and Definitions," may be obtained from the American Society of designated N45.2.10-1973 by the American National Mechanical Engineers, 345 East 47th Street, New York, New Standards Institute on May 31, 1973. York 10017.

USAEC REGULATORY GUIDES Copies of published guides may be obtained by request indicating the divisions desired to the US. Atomic Energy Commission, Washington, D.C. 20545, Regulatory Guides are issued to describe and make available to the public Attention: Director of Regulatory Standards. Comments and suggestions for methods acceptable to the AEC Regulator, staff of implementing specific parts of improvements in these guides are encouraged and should be sent to the Secretary the Commission's regulations, to delineate techniques used by the staff in of the Commission, U.S. Atomic Energy Commission, Washington, D.C. 20545, evaluating specific problems or postulated accidents, or to provide guidance to Attention: Chief, Public Proceedings Staff.

applicants. Regulatory Guides are not substitutes for regulations and compliance with them is not required. Methods and solutions different from those set out in The guides are issued in the following ten broad divisions:

the guides will be acceptable if they proviee a basis for the findings requisite to the issuance or continuance 9f a permit or license by the Commission. 1. Power Reactors

6. Products

2. Research and Test Reactors

7. Transportation

3. Fuels and Materials Facilities 8. Occupational Health Published guides will be revised periodictly, as appropriate, to accommodate 4. Environmental and Siting 9. Antitrust Review comments and to reflect new information or experience. 5. Materials and Plant Protection 10. General