ML18047A333: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:*
{{#Wiki_filter:*
* consumers Power company General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 May 20, 1982 Dennis M Crutchfield, Chief Operating Reactors Branch No 5 Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 -LICENSE DPR-20 -PALISADES PLANT -INSERVICE PUMP TESTING PROCEDURES As per letter dated October 27, 1981, the Consumers Power Palisades Plant is updating its inservice pump testing program to comply with requirements of the ASME B&PV Code Section XI, 1977 edition with Addenda through Summer 1979. This is done in accordance with 10 CFR 50.55a. A telephone conversation with the NRC brought to the attention of Consumers Power Company that al though relief requests from certain code i terns relating to pump testing had been submitted; a complete description of the procedures for inservice testing of selected safety-related pumps had not. An updated
consumers Power company General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 May 20, 1982 Dennis M Crutchfield, Chief Operating Reactors Branch No 5 Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC             20555 DOCKET 50-255 - LICENSE DPR   PALISADES PLANT - INSERVICE PUMP TESTING PROCEDURES As per letter dated October 27, 1981, the Consumers Power Palisades Plant is updating its inservice pump testing program to comply with requirements of the ASME B&PV Code Section XI, 1977 edition with Addenda through Summer 1979. This is done in accordance with 10 CFR 50.55a.
A telephone conversation with the NRC brought to the attention of Consumers Power Company that al though relief requests from certain code i terns relating to pump testing had been submitted; a complete description of the procedures for inservice testing of selected safety-related pumps had not. An updated
* copy of these procedures, EM-09-04, is enclosed.
* copy of these procedures, EM-09-04, is enclosed.
Brian D Johnson Senior Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector  
Brian D Johnson Senior Licensing Engineer CC   Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment - 11 pages
-Palisades Attachment  
          --     -- - --~20 0 8..,05 8 2os2so     2cg 0500 0255 PDR AD0 ~                    PDR p}}
-11 pages  
-----0 8..,05 8 2os2so 0 2cg 0500 0255 PDR AD PDR p}}

Latest revision as of 12:52, 3 February 2020

Forwards Revision 5 to EM-09-04, Inservice Testing of Selected Safety-Related Pumps, Per 811027 Ltr
ML18047A333
Person / Time
Site: Palisades Entergy icon.png
Issue date: 05/20/1982
From: Johnson B
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To: Crutchfield D
Office of Nuclear Reactor Regulation
Shared Package
ML18047A334 List:
References
NUDOCS 8205250200
Download: ML18047A333 (1)


Text

consumers Power company General Offices: 1945 West Parnell Road, Jackson, Ml 49201 * (517) 788-0550 May 20, 1982 Dennis M Crutchfield, Chief Operating Reactors Branch No 5 Nuclear Reactor Regulation US Nuclear Regulatory Commission Washington, DC 20555 DOCKET 50-255 - LICENSE DPR PALISADES PLANT - INSERVICE PUMP TESTING PROCEDURES As per letter dated October 27, 1981, the Consumers Power Palisades Plant is updating its inservice pump testing program to comply with requirements of the ASME B&PV Code Section XI, 1977 edition with Addenda through Summer 1979. This is done in accordance with 10 CFR 50.55a.

A telephone conversation with the NRC brought to the attention of Consumers Power Company that al though relief requests from certain code i terns relating to pump testing had been submitted; a complete description of the procedures for inservice testing of selected safety-related pumps had not. An updated

  • copy of these procedures, EM-09-04, is enclosed.

Brian D Johnson Senior Licensing Engineer CC Administrator, Region III, USNRC NRC Resident Inspector - Palisades Attachment - 11 pages

-- -- - --~20 0 8..,05 8 2os2so 2cg 0500 0255 PDR AD0 ~ PDR p