{{#Wiki_filter:{7-771
{{#Wiki_filter:{7-771 NRC FORM 366 UPDATE REPORT e                                                            U.aCLEAR REGULATORY COMMISSION PREVIOUS REPORT DATE 04/24/80 LICENSEE EVENT REPORT CONTROL BL.OCK:            I~1--------------.6I\.!..I            I';\                (PLEASE PRfNT OR TYPE ALL REQUIRED INFORMATION)
* NRC FORM 366 UPDATE REPORT e                                                            U.aCLEAR REGULATORY COMMISSION PREVIOUS REPORT DATE 04/24/80 LICENSEE EVENT REPORT CONTROL BL.OCK:            I~1--------------.6I\.!..I            I';\                (PLEASE PRfNT OR TYPE ALL REQUIRED INFORMATION)
~ I V ! Al SI Pl SI 1 101 ° 7      8    9        l.lCENSEE CODE              14      1S 1° I-      I O I O I O I O I O l-l.lCENSE NUMBEl'i I O I O 101 4 11 11 11 11 101 25    26      l.lCENSE TYPE      ;JO I
~ I V ! Al SI Pl SI 1 101 ° 7      8    9        l.lCENSEE CODE              14      1S 1° I-      I O I O I O I O I O l-l.lCENSE NUMBEl'i I O I O 101 4 11 11 11 11 101 25    26      l.lCENSE TYPE      ;JO I
57 CAT ss*
57 CAT ss*

Revision as of 01:11, 3 February 2020

Updated LER 80-022/03X-1:on 800327,snubbers 1-RC-HSS-116 & 1-RC-HSS-117 Found Out of Position During Inaccessible Snubbers Visual Insp 1-PT-39B-1.Caused by Improper Installation Due to Design Change Deficiency
ML18139B216
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/27/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML18139B212 List:
References
IEB-79-14, LER-80-022-03X, LER-80-22-3X, NUDOCS 8104020648
Download: ML18139B216 (2)


Text

{{#Wiki_filter:{7-771 NRC FORM 366 UPDATE REPORT e U.aCLEAR REGULATORY COMMISSION PREVIOUS REPORT DATE 04/24/80 LICENSEE EVENT REPORT CONTROL BL.OCK: I~1--------------.6I\.!..I I';\ (PLEASE PRfNT OR TYPE ALL REQUIRED INFORMATION) ~ I V ! Al SI Pl SI 1 101 ° 7 8 9 l.lCENSEE CODE 14 1S 1° I- I O I O I O I O I O l-l.lCENSE NUMBEl'i I O I O 101 4 11 11 11 11 101 25 26 l.lCENSE TYPE ;JO I 57 CAT ss* I© CON'T [iliJ '. 8

                  ~~~~~        ~©Io 15 1o I o I o 1 2 60             61               DOCKET NUMBER 1 8 1o 101 6S      69 o 13 I 2 I 7 I 8 I o I© I oI 3 I EVENT CATE             74       75 21 REPORT CATE 11    8I 1I SO 0

EVENT DESCRIPTION AND PROBABLE CONSEQUENCES@)

            /During the performance of l-PT-39B-l, Inaccessible Snubbers Visual Inspection, snub-

[[II] lbers l-RC-HSS-116 and l-RC-HSS-117 were discovered installed improperly, i.e. 90° out! [[II] jof position. The snubbers were declared inoperable. .This event is reportable in CI:I]J 1accordance with Tech. Spec. 6.6.2.b.(2). Since no seismic disturbances were experi- []J:[) lenced while the unit was at power, the health and safety of the public were not [[]I) affected [IT[] 7 8 g 80 SYSTEM CAUSE CAUSE COMP. VAi.VE cooE cooe suecooe COMPONENT cooe suecooE SUBCOOE [ill] 7 8 le 9 IB 10 I@ LLJ@ Ll.J@) 12 js ju IP !o !R !T I@ 13 18 lE...J@) l!.J@ 19 20 11 SEQUENTIAi. OCCURRENCE REPORT REVISION I.ER/RO CVENT YEAR REPORT NO. COOE TYPE NO.

            @      REPORT NUMBER j  8 O i i               I23 I          1° I 2 1 2261 I27.,..I                  10 I 329I            l!_J            l=J            l2J 21          22                          24                                      2S                    30             31             32
  • ACTION FUTURE EFFl:C"T' SHUTt>OWN
  • t.:::\ A'iiACHMENT NPRD-4 PRIME COMP. COMPONENT TAKEN ACTION ON Pl.ANT METHOD HOURS ~22 SUBMl'iiEO FORM:;ue. SUPPi.i ER MANUFACTURER LI@W@

3:3 34 UJ@ 3S L!.1 I 01 01 01 01 36 37 40 l!.J@. 41 l..!..J@) 42 W@) 43 I GI 2 15 I 5 1 44 47 CAUSE DESCRIPTION AND CORRECTIVE ACTIONS @ DJ]] JThe snubbers were installed improperly due to deficiency of the design change utilizeq CIIlJ Ito correct pipe support deficiencies discovered under IE Bulletin 79-14. The snubber§ o:::uJ 1will be purged and installed properly prior to unit start-up. D:u]I..._________________________________________ CIEJ8 7 9 80

                                                                                    ~

AA~LITY STATUS  % POWER OTHEi'I STATUS \::::;/ METI-IOD OF DISCOVERY DISCOVERY DESCRIPTION *@ tITIJ lQJ@) ! 0 I O I O lI...._N__/A_.- - - - l!J@1* 7 8 9 10 12 1'3 44 45 Personnel observation 80 46 ACTIVITY CONTENT /.:';\ REl.EASeo OF RELEASE . AMOUNT OF ACTIVITY _LOCATION OF RELEASE @ l2liJ ~ @ Li@)_I___N_/A_ _ _ __ N/A 1

  • a 9 10 11 44 45 80 PERSONNEL EXPOSURES Q.

NUMBER /;;":;\TYPE(.;;;\ DESCRIPTION [QI] 10 IO IO '~~.....__N_/A_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _____, 1 a g 11 12 13 PERSONNEL INJURIES ~ [iliJ 10 t OI Ol@~___I_A_._ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ___,...____ NUMBER DESCRIPTION 41 7 8 9 11 12 so LOSS OF OR OAMAGE TO l"ACILJTY TYPE DESCRIPTION

                                                         '43\

I;::) DJ1) ~@. *

  • N/A 7 8 9 10 so PUBLICITY C,.. R 5- 0 ISSUEOt,;:;\ DESCRIPTION~ N C U c: NL y .,

IIli] Ui..J~--*-*--**_.:;.;N.....A...___ _ _ _ _ _ _ _ _ _ _ _ _ ____. I j I II I I II I II I ! 7 8 9 10 68 69 80 ; J. L. W:Hson (804) 357-3184 o NAME OF P C > E P A R E ; ; - - - - - - - - - - - - - - - - - PUQNE: 8104020648

e SURRY POWER STATION UNIT NO. 1 DOCKET NO: 50-280 REPORT NO: 80-022/03X-l EVENT DATE: 03-27-80 TITLE OF EVENT: SNUBBERS l-HSS-RC-115/116 IMPROPERLY INSTALLED

1. DESCRIPTION OF EVENT:

During the performance of l-PT-39B-l, Inaccessible Snubbers Visual Inspection, snubbers l-RC-HSS-116 and l-RC-HSS-117 were discovered installed improperly, i.e. 90° out of proper position. The snubbers were declared inoperable. This event is reportable in accordance with Tech. Spec. 6.6.2.b,2.

2. PROBABLE CONSEQUENCES:

The snubbers were installed with the reservoir below the valve block. This could have caused air intro~uction into the valve block or cylinder thus preventing the snubbers from performing their intended function. However, since no seismic disturbances were encountered while the Unit was at power, the health and safety of the public were not affected.

3. CAUSE OF EVENT:

The snubbers were ins~alled improperly due to a dificiency of the design change utilized to correct pipe support deficiencies discovered under IE Bulletin 79-14.

4. IMMEDIATE CORRECTIVE ACTIONS:

The snubbers were declared inoperable.

5. SUBSEQUENT CORRECTIVE ACTIONS:

The snubber end mounting bracket will be removed, rotated 90° and reinstalled. The snubber will be purged and reinstalled in the proper orientation pr,ior to Unit Startup.

6. ACTION TAKEN TO PREVENT RECURRENCE:

Design personnel have been apprised of the importance of proper snubber orientation. 7, GENERIC IMPLICATIONS: The Visual Inspection performed at Unit shutdown covers all snubber installations. Since no other snubbers were discovered installed improperly, this event possesses no generic implications.}}