ML18139B212

From kanterella
Jump to navigation Jump to search
Forwards Updated LERs 80-010/01X-1,80-013/03X-1,80-020/01X-1 & 80-022/03X-1
Date released: 12/10/2018 Download: ML18139B212


Updated LER 80-022/03X-1:on 800327,snubbers 1-RC-HSS-116 & 1-RC-HSS-117 Found Out of Position During Inaccessible Snubbers Visual Insp 1-PT-39B-1.Caused by Improper Installation Due to Design Change Deficiency
ML18139B216
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/27/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B216 (2)
Updated LER 80-020/01X-1:on 800310,heat Tracing Circuits 24A,B & C for Unit Boric Acid Filter Sys Found Tagged Out of Svc Since 800211,during Review of Penetrant Test 27B.Caused by Error During Maint on Unit 1 Drain Line
ML18139B215
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/27/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B215 (2)
Updated LER 80-013/03X-1:on 800206,valve HCV-1852A to Tank 1-SI-TK-1A Delayed Closing 30-50 Secs,Resulting in Tank Draining Below Tech Spec Level.Caused by Moisture in Air Lines Feeding Valve Operator.Tank Filled to Tech Spec Level
ML18139B214
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/27/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B214 (2)
Updated LER 80-010/01X-1:on 800131,overstress on 18-inch Line CC-9-121,unit 2 Supply to RHR Exchanger,Found During Pipe Stress Reanalysis on Show Cause Lines.Caused by Supports Installed to Prevent Overstress During DBE
ML18139B213
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/27/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B213 (2)
Forwards Updated LERs 80-010/01X-1,80-013/03X-1,80-020/01X-1 & 80-022/03X-1
ML18139B211
Person / Time
Site: Surry Dominion icon.png
Issue date: 03/27/1981
From: Joshua Wilson
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML18139B211 (1)