ML18142B355: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18142B355
| number = ML18142B355
| issue date = 07/10/1978
| issue date = 07/10/1978
| title = R.E. Ginna - Forwards Monthly Operating Status Report for Month of June, 1978
| title = Forwards Monthly Operating Status Report for Month of June, 1978
| author name = Lang L
| author name = Lang L
| author affiliation = Rochester Gas & Electric Corp
| author affiliation = Rochester Gas & Electric Corp
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:(~(~0 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)DI TRIBUTIQN FOR INCOMING MATERIAL 50-244 REC: NRC QRG: LANG L S ROCHESTER GAS 5 ELEC DOCTYPE: LETTER NOTARIZED:
{{#Wiki_filter:(~ (~0 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS )
NO  
DI TRIBUTIQN FOR INCOMING MATERIAL                           50-244 REC:                                 QRG: LANG L S                     DOCDATE: 07/10f 78 NRC                                    ROCHESTER GAS 5 ELEC           DATE RCVD: 07/$  //78 DOCTYPE: LETTER         NOTARIZED: NO                                       COPIES RECEIVED


==SUBJECT:==
==SUBJECT:==
MONTHLY OPERATING STATUS REPORT FOR THE MONTH OF JUNE 1978.DOCDATE: 07/10f 78 DATE RCVD: 07/$//78 COPIES RECEIVED LTR 1 ENCL 1 PLANT NAME: RE GINNA-UNIT 1 REVIEWER INITIAL: XRS DISTRIBUTOR INITIAL: 4H~++++4t+++~~4~++>HHI DISTRIBUTION QF THIS MATERIAL IS AS FOLLOWS ANNUAL 8c SEMI-ANNUAL OPERATING REPORTS (OL STAGE>.<DISTRIBUTION CODE A008)FOR ACTION: INTERNAL: EXTERNAL: BR CHIEF ORBN2 BC4t+W/6 ENCL EG FIL J/ENCL+4W/2 ENCL HANAUER44 Wf ENCL AD FOR SYS 8c PROJ++W/ENCL REACTOR SAFETY BR++W/ENCL ,EEB++W/ENCL
LTR 1    ENCL 1 MONTHLY OPERATING STATUS REPORT FOR THE MONTH OF JUNE 1978.
.EFFLUENT TREAT SYS+4W/ENCL LPDR S ROCHESTER'Y++W/ENCL NATI LAB ORNL4+Wf ENCL TERA++W/ENCL NS I C+4fW/ENCL ACRS CAT B++W/15 ENCL I NRC PDR44W/ENCL MIPC<4W/2 ENCL DIRECTOR DOR+4W/ENCL ENGINEERING BR++W/ENCL PLANT SYSTEMS BR~<W/ENCL CORE PERFORMANCE BR>+W/ENCL DISTRIBUTION:
PLANT NAME: RE GINNA UNIT         1                           REVIEWER INITIAL: XRS DISTRIBUTOR INITIAL:
LTR 41 ENCL 41 SIZE: iP+5P THE END CONTROL NBR: 782000110 I~jt I'II'I I t II II I H I I I  
4H~++++4t+++~~4~++>HHI DISTRIBUTION QF THIS MATERIAL IS AS FOLLOWS ANNUAL   8c SEMI-ANNUAL OPERATING REPORTS       (OL STAGE>.
//////////
    < DISTRIBUTION CODE A008)
j//I/////////
FOR ACTION:         BR CHIEF ORBN2 BC4t+W/6 ENCL I
/z//////Pl/Ill/Ill//
INTERNAL:            EG   FIL     J/ENCL                 NRC PDR44W/ENCL
/I////////
                                +4W/2 ENCL                    MIPC<4W/2 ENCL HANAUER44 WfENCL                    DIRECTOR DOR+4W/ ENCL AD FOR SYS 8c PROJ++W/ENCL          ENGINEERING BR++W/ENCL REACTOR SAFETY BR++W/ENCL           PLANT SYSTEMS BR~<W/ENCL
!/////I//////
                        ,EEB++W/ENCL     .                   CORE PERFORMANCE BR>+W/ENCL EFFLUENT TREAT SYS+4W/ENCL EXTERNAL:            LPDR S ROCHESTER'Y++W/ENCL NATI LAB ORNL4+WfENCL TERA++W/ENCL NS I C+4fW/ENCL ACRS     CAT B++W/15 ENCL DISTRIBUTION:       LTR 41       ENCL 41                       CONTROL NBR:    782000110 SIZE: iP+5P THE END
ZP.'%OAT ROCHESTER GAS AND ELECTRIC CORPORATION
 
~89 EAST AVENUE, ROCHESTER, N.Y.14649 TELEPHONE AREA CODE 7ld 546.2700 Ginna Station July'0, 1078 Director, Office of Management Information and Program Control U.S.NUCLEAR REGULATORY COMMISSION Washington, D.C.20555  
I
                      'I II t
~ jt   I' I
II II I
H I
I I
 
                //////////   j//I/////////
ZP.
                                                                                                                      '%OAT
          /z///     /// Pl/Ill/Ill//
    /I////////         !/////I//////
ROCHESTER GAS AND ELECTRIC CORPORATION                       ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA CODE 7ld   546.2700 Ginna Station July'0,       1078 Director, Office of                       Management Information and Program Control U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555


==Subject:==
==Subject:==
Monthly Report for June, 1978 Operating Status Information R.E.Ginna Nuclear Power Plant Unit No.1 Docket No.50-244  
Monthly Report for June, 1978 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244
 
==Dear  Sir:==


==Dear Sir:==
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1978.
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1978.Attachments Lee S.Lang Superintendent
Lee S. Lang Superintendent Attachments
~@~I/tjljlggP(i j P P RP(j Pntjj l782000iio I'
                                                                            ~@~I/ tjljlggP(i       j PP  RP(j Pntjj l782000iio
OPERATING DATA REPORT, DOCKET NO.50 244 DATE COMPLETED BY 777 Andrew E.McNamara, Operations ide~OPERATING STATUS 1.Unit Name: GINNA STATION UN 2.Reporting Period: June 1978 3.Licensed Thermal Power (MWt): 4.Nameplate Rating (Gross hfWe): 490 5.Design Electrical Rating (Net hfWe): 6.hfaximum Dependable Capacity (Gross hfWe): 7.hfaximum Dependable Capacity (Net hfWe): 8.If Changes Occur in Capacity Ratings (Items 490 70 TELEPHONE--6-2700 Ext.291-205, at Ginna Notes The Reactor Power Level averaged 100%for the Report onth.Exception:
 
On 6/25, the Power Level was reduced to 46%, for a short period, to perform T-188, Turbine Main Steam Stop Valves Test.Number 3 Through 7)Since Last Report, Give Reasons: 9.Power Level to Which Restricted, If Any (Net hfWe)t 10.Reasons For Restrictions, If Any: This hfonth Yr:to.Date Cumulative 4,343 ll.Hours In Reporting Period 720 12.Number of Hours Reactor Was Critical 720 13.Reactor Reserve Shutdown Hours 0 14.Hours Generator On-Line 720 15.Unit Reserve Shutdown Hours 0 16.Gross Thermal Energy Generated (MWH)1 082 184 363,782 2,780.72 39.7 2,693.25 3 958 728 1,205,181 1 1 2 0 62%62%56%56%17.Gross Electrtcal Energy Generated (MWH)19.Unit Service Factor 100%20.Unit Availability Factor 100%21.Unit Capacity Factor (Using MDC Net)22.Unit Capacity Factor (Using.DRR Net)103%y I 23.Unit Forced Outage Rate 24.Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each): 75 335 56,819.34 55,211.63 8.5*72,395,770 23,393,041 22 125 034 73%73%65.25.If Shut Down At End Of Report.Period, Estimated Date of Startup: I 26.Units In Test Status (Prior to Commercial Operation):
I' OPERATING DATA REPORT, DOCKET NO. 50 244 DATE COMPLETED BY                       777 Andrew E. McNamara,       Operations     ide TELEPHONE                6-2700
INITIAL CRITICALITY INITIAL ELECTRICITY COhfhf ERCIAL OPERATION Forecast Achieved*Cumulative Data commencing January 1, 1975 49$8 (Rcv 1/7d) 0 h\ MONTH June, 1978 DAY AVERAGE DAILY POWER LEVEL (M We-N et)482 DOCKET NO..50 244 UNIT III@irma Statio DATE COMPLETED BY Andrew E.McNamara, Operations Aide TELEPHON E 1-716-546-2700 xt.-,at nna DAY, AVERAGE DAlLY POWER LEVEL (MWe-Net)486 10 12 13 14 15 16 485 484 486 486 485 485 485 485 484 484 483 484 487 486 485 17 18 19 20.21-22 23 24 25 26 21 28 29 30 31 486 483 482 484 484 482 482 428 484 483 480 481 481 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.'ompute to the nearest whole megawatt.40~87{REV 1/78) 1~I'8 DOCKI:.T NO.Nl Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS t)A I I'-COMPLETED I3Y C4as4~Andrew E.HcNamara, Operat ons Aide REPORT MONTH TELEPHONE 1-716-546-2700 Ext.291-205, at Ginna No.Date 0 0.-I-C 0 I 0~0 0 Z Cl~P4 C 0 0 C u o 0IA C 0 O licensee Event Report il Ew-0 0 Vl D 0\A C 0 Lo C 0 E 0 U Cause gL Corrective Action to Prevent Recurrence No outages or power reductions to report.3 F: Forced St Scheduled 88-88 (RCV 1/r8)Reason: A-Equipmcnt Failure (Explain)B-maintenance or Test C-Rcfucling D-Regulatory Restriction
          ~
'-Operator Training&Liccnsc Examination F-Administrative G-Operational Error (Explain)H-Other (Explain)3 Method: I-Manual 2-Manual Scram.3-Automatic Scram.4-Other (Explain)Exhibit G-Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER)File (NUREG-0161)'5 Exhibit 1-Same Source l Iy 4 NARRATIVE  
OPERATING STATUS                                                                 Ext. 291-205,    at Ginna
: 1. Unit Name:       GINNA STATION UN                                 Notes    The Reactor Power      Level
: 2. Reporting Period: June       1978                                 averaged 100%      for the Report
: 3. Licensed Thermal Power (MWt):                                      onth. Exception: On 6/25,
: 4. Nameplate Rating (Gross hfWe):
490                         the Power Level was reduced to
: 5. Design Electrical Rating (Net hfWe):
46%,    for a  short period, to perform T-188, Turbine Main
: 6. hfaximum Dependable Capacity (Gross hfWe): 490 70                Steam Stop Valves Test.
: 7. hfaximum Dependable Capacity (Net hfWe):
: 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7)   Since Last Report, Give Reasons:
: 9. Power Level to Which Restricted, If Any (Net hfWe)t
: 10. Reasons For Restrictions, If Any:
This hfonth             Yr:to.Date         Cumulative ll. Hours In Reporting   Period                         720                 4,343              75 335
: 12. Number of Hours Reactor Was Critical                 720                 2,780. 72          56,819.34
: 13. Reactor Reserve Shutdown Hours                         0                     39. 7
: 14. Hours Generator On-Line                               720                 2,693.25            55,211.63
: 15. Unit Reserve Shutdown Hours 0                                             8.5 *
: 16. Gross Thermal Energy Generated (MWH)         1 082 184             3 958 728             72,395,770
: 17. Gross Electrtcal Energy Generated (MWH)       363,782            1,205,181            23,393,041 1 1 2      0        22 125 034
: 19. Unit Service Factor                               100%                     62%                  73%
: 20. Unit Availability Factor                           100%                     62%                  73%
: 21. Unit Capacity Factor (Using MDC Net)                                       56%                  65.
103%                    56%
: 22. Unit Capacity Factor (Using.DRR Net) y             I
: 23. Unit Forced Outage Rate
: 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
: 25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
I
: 26. Units In Test Status (Prior to Commercial Operation):                   Forecast            Achieved INITIALCRITICALITY INITIALELECTRICITY COhfhf ERCIAL OPERATION
* Cumulative Data       commencing January 1, 1975                                                   49 $ 8 (Rcv 1/7d)
 
0 h
\
 
DOCKET NO.. 50 244 UNIT III @irma Statio DATE COMPLETED BY Andrew E. McNamara, Operations Aide 1-716-546-2700 TELEPHON E xt.     ,at           nna MONTH        June, 1978 DAY AVERAGE DAILYPOWER LEVEL                        DAY, AVERAGE DAlLY POWER         LEVEL (MWe-N et)                                        (MWe-Net) 482                                              486 17 485                               18 486 484                                               483 19 486                                               482 20.
486                                              484 21-485                                              484 22 485                                              482 23 485                                              482 24 485                                              428 25 484                                               484 10                                                  26 484                                             483 21 483                                              480 12                                                  28 484                                              481 13                                                  29 14                  487                                              481 30 486 15                                                  31 485 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
to the nearest whole megawatt.                                                                   'ompute 40 ~ 87 {REV 1/78)
 
1
      ~
I
  '8
 
DOCKI:.T NO.
Nl Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS                             t)A I I'-
COMPLETED I3Y                         C4as4~
Andrew E. HcNamara, Operat ons Aide REPORT MONTH                           TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna P4                  0                                C C                                                            0 Lo 0        C              C u    licensee        Ew-        C                Cause    gL Corrective 0        I      0                o                    0 No.         Date     0. 0 0                                Event          Vl 0
D      0                         Action to E 0
                                ~
I-    0 Z                                                  0 Cl ~               0IA       C   Report il       \A U
Prevent Recurrence 0
O No outages or power reductions to report.
3 3
F: Forced         Reason:                                                Method:                          Exhibit G - Instructions St Scheduled     A-Equipmcnt Failure (Explain)                         I-Manual                          for Preparation of Data B-maintenance or Test                                 2-Manual Scram.                  Entry Sheets for Licensee C-Rcfucling                                           3-Automatic Scram.                Event Report (LER) File (NUREG-D-Regulatory Restriction                               4-Other (Explain)                0161)
Training & Liccnsc Examination
                                              '-Operator F-Administrative G-Operational Error (Explain)
                                                                                                          '5 88-88 (RCV 1/r8)     H-Other (Explain)                                                                       Exhibit   1 - Same Source
 
l Iy
 
4 NARRATIVE  


==SUMMARY==
==SUMMARY==
OF OPERATING EXPERIENCE DOCKET NO.0-2 UNIT II1, Ginna Station DATE July 10,,1978 COMPLETED BY Andrew E.McNamara, Operations Aide MONTH June 1978 TELEpHONE 1-716-546-2700 Ext.291-05, at nna The Reactor Power Level was gradually increased to 100%on 6/1, to complete power ascension phase after the annual refueling and maintenance shutdown.The Reactor Power Level averaged 100%for the remainder of the Report Month, with the following exception:
OF OPERATING EXPERIENCE DOCKET NO.       0-2 UNIT   II1, Ginna Station DATE   July 10,,1978 COMPLETED BY Andrew E. McNamara, Operations Aide TELEpHONE   1-716-546-2700 Ext. 291- 05, at     nna MONTH  June  1978 The Reactor Power Level was gradually increased to   100% on 6/1, to complete power ascension phase after the annual refueling and maintenance shutdown.
On 6/25, the power level was reduced to~46%for a short period to perform T-18B, Turbine Main Steam Stop Ualves Test.The power level was restored to 100%upon completion of the test.49 123 u/Td) 1 I''bl J~I' Narrative Summa of Safet Related Maintenance June, 1978 No major safety related maintenance occurred during the anth of June, 1978.
The Reactor Power Level averaged 100% for the remainder of the Report   Month, with the following exception:
On 6/25, the power level was reduced to ~ 46% for a short period to perform T-18B, Turbine Main Steam Stop Ualves Test. The power level was restored to 100% upon completion of the test.
49 123 u/Td)
 
1 I''bl J I'
        ~
 
Narrative Summa   of Safet Related   Maintenance June, 1978 No major safety related maintenance occurred during the anth of June, 1978.
 
0}}
0}}

Latest revision as of 00:33, 3 February 2020

Forwards Monthly Operating Status Report for Month of June, 1978
ML18142B355
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/10/1978
From: Lang L
Rochester Gas & Electric Corp
To:
Office of Nuclear Reactor Regulation
References
Download: ML18142B355 (14)


Text

(~ (~0 REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS )

DI TRIBUTIQN FOR INCOMING MATERIAL 50-244 REC: QRG: LANG L S DOCDATE: 07/10f 78 NRC ROCHESTER GAS 5 ELEC DATE RCVD: 07/$ //78 DOCTYPE: LETTER NOTARIZED: NO COPIES RECEIVED

SUBJECT:

LTR 1 ENCL 1 MONTHLY OPERATING STATUS REPORT FOR THE MONTH OF JUNE 1978.

PLANT NAME: RE GINNA UNIT 1 REVIEWER INITIAL: XRS DISTRIBUTOR INITIAL:

4H~++++4t+++~~4~++>HHI DISTRIBUTION QF THIS MATERIAL IS AS FOLLOWS ANNUAL 8c SEMI-ANNUAL OPERATING REPORTS (OL STAGE>.

< DISTRIBUTION CODE A008)

FOR ACTION: BR CHIEF ORBN2 BC4t+W/6 ENCL I

INTERNAL: EG FIL J/ENCL NRC PDR44W/ENCL

+4W/2 ENCL MIPC<4W/2 ENCL HANAUER44 WfENCL DIRECTOR DOR+4W/ ENCL AD FOR SYS 8c PROJ++W/ENCL ENGINEERING BR++W/ENCL REACTOR SAFETY BR++W/ENCL PLANT SYSTEMS BR~<W/ENCL

,EEB++W/ENCL . CORE PERFORMANCE BR>+W/ENCL EFFLUENT TREAT SYS+4W/ENCL EXTERNAL: LPDR S ROCHESTER'Y++W/ENCL NATI LAB ORNL4+WfENCL TERA++W/ENCL NS I C+4fW/ENCL ACRS CAT B++W/15 ENCL DISTRIBUTION: LTR 41 ENCL 41 CONTROL NBR: 782000110 SIZE: iP+5P THE END

I

'I II t

~ jt I' I

II II I

H I

I I

////////// j//I/////////

ZP.

'%OAT

/z/// /// Pl/Ill/Ill//

/I////////  !/////I//////

ROCHESTER GAS AND ELECTRIC CORPORATION ~ 89 EAST AVENUE, ROCHESTER, N.Y. 14649 TELEPHONE AREA CODE 7ld 546.2700 Ginna Station July'0, 1078 Director, Office of Management Information and Program Control U. S. NUCLEAR REGULATORY COMMISSION Washington, D. C. 20555

Subject:

Monthly Report for June, 1978 Operating Status Information R. E. Ginna Nuclear Power Plant Unit No. 1 Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of June, 1978.

Lee S. Lang Superintendent Attachments

~@~I/ tjljlggP(i j PP RP(j Pntjj l782000iio

I' OPERATING DATA REPORT, DOCKET NO. 50 244 DATE COMPLETED BY 777 Andrew E. McNamara, Operations ide TELEPHONE 6-2700

~

OPERATING STATUS Ext. 291-205, at Ginna

1. Unit Name: GINNA STATION UN Notes The Reactor Power Level
2. Reporting Period: June 1978 averaged 100% for the Report
3. Licensed Thermal Power (MWt): onth. Exception: On 6/25,
4. Nameplate Rating (Gross hfWe):

490 the Power Level was reduced to

5. Design Electrical Rating (Net hfWe):

46%, for a short period, to perform T-188, Turbine Main

6. hfaximum Dependable Capacity (Gross hfWe): 490 70 Steam Stop Valves Test.
7. hfaximum Dependable Capacity (Net hfWe):
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net hfWe)t
10. Reasons For Restrictions, If Any:

This hfonth Yr:to.Date Cumulative ll. Hours In Reporting Period 720 4,343 75 335

12. Number of Hours Reactor Was Critical 720 2,780. 72 56,819.34
13. Reactor Reserve Shutdown Hours 0 39. 7
14. Hours Generator On-Line 720 2,693.25 55,211.63
15. Unit Reserve Shutdown Hours 0 8.5 *
16. Gross Thermal Energy Generated (MWH) 1 082 184 3 958 728 72,395,770
17. Gross Electrtcal Energy Generated (MWH) 363,782 1,205,181 23,393,041 1 1 2 0 22 125 034
19. Unit Service Factor 100% 62% 73%
20. Unit Availability Factor 100% 62% 73%
21. Unit Capacity Factor (Using MDC Net) 56% 65.

103% 56%

22. Unit Capacity Factor (Using.DRR Net) y I
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
25. If Shut Down At End Of Report. Period, Estimated Date of Startup:

I

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhfhf ERCIAL OPERATION
  • Cumulative Data commencing January 1, 1975 49 $ 8 (Rcv 1/7d)

0 h

\

DOCKET NO.. 50 244 UNIT III @irma Statio DATE COMPLETED BY Andrew E. McNamara, Operations Aide 1-716-546-2700 TELEPHON E xt. ,at nna MONTH June, 1978 DAY AVERAGE DAILYPOWER LEVEL DAY, AVERAGE DAlLY POWER LEVEL (MWe-N et) (MWe-Net) 482 486 17 485 18 486 484 483 19 486 482 20.

486 484 21-485 484 22 485 482 23 485 482 24 485 428 25 484 484 10 26 484 483 21 483 480 12 28 484 481 13 29 14 487 481 30 486 15 31 485 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

to the nearest whole megawatt. 'ompute 40 ~ 87 {REV 1/78)

1

~

I

'8

DOCKI:.T NO.

Nl Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS t)A I I'-

COMPLETED I3Y C4as4~

Andrew E. HcNamara, Operat ons Aide REPORT MONTH TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna P4 0 C C 0 Lo 0 C C u licensee Ew- C Cause gL Corrective 0 I 0 o 0 No. Date 0. 0 0 Event Vl 0

D 0 Action to E 0

~

I- 0 Z 0 Cl ~ 0IA C Report il \A U

Prevent Recurrence 0

O No outages or power reductions to report.

3 3

F: Forced Reason: Method: Exhibit G - Instructions St Scheduled A-Equipmcnt Failure (Explain) I-Manual for Preparation of Data B-maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Rcfucling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

Training & Liccnsc Examination

'-Operator F-Administrative G-Operational Error (Explain)

'5 88-88 (RCV 1/r8) H-Other (Explain) Exhibit 1 - Same Source

l Iy

4 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 0-2 UNIT II1, Ginna Station DATE July 10,,1978 COMPLETED BY Andrew E. McNamara, Operations Aide TELEpHONE 1-716-546-2700 Ext. 291- 05, at nna MONTH June 1978 The Reactor Power Level was gradually increased to 100% on 6/1, to complete power ascension phase after the annual refueling and maintenance shutdown.

The Reactor Power Level averaged 100% for the remainder of the Report Month, with the following exception:

On 6/25, the power level was reduced to ~ 46% for a short period to perform T-18B, Turbine Main Steam Stop Ualves Test. The power level was restored to 100% upon completion of the test.

49 123 u/Td)

1 Ibl J I'

~

Narrative Summa of Safet Related Maintenance June, 1978 No major safety related maintenance occurred during the anth of June, 1978.

0