| 1/~ f '5____ | | 1/~ f '5____ |
|
| |
|
| FORM OAR-1 OWNER'S ACTIVITY REPORT TABLES Report Number BFNU1R12 | | FORM OAR-1 OWNER'S ACTIVITY REPORT TABLES Report Number BFNU1R12 PI ant Browns Ferry Unit No. 1 Commercial service date 08/01/1974 Refueling outage no. - 12- - - |
| - - - - - - - - - - - - - - - - -- - - - -- - - - - - - - -
| | Current inspection interval 3rd Current inspection period -1st TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATIONS FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description Variable spring as-found (Acceptance by Evaluation) |
| PI ant Browns Ferry Unit No. 1 Commercial service date 08/01/1974 Refueling outage no. - 12- - - | |
| Current inspection interval 3rd | |
| -----
| |
| Current inspection period -1st | |
| -- - - - -
| |
| TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATIONS FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description Variable spring as-found (Acceptance by Evaluation) | |
| F-A, Item F1 .20C setting found out of range . The condition was evaluated in accordance Acceptance range is 2078 with IWF-3122.3. Since the spring support was lbs, +/- 54 (2024 lbs to determined to still be able to perform its design 2132 lbs). As-found function , corrective measures were performed setting 2350 lbs. [NOi to restore the support to its orig ina l design U1R12-001) condition per IWF-3122.3 (b). WO 11 9973691 reset the load setting of the spring to the design range specifications. Therefore, no add itional or preservice exams are applicable. The spring support was then reinspected to ve rify th e settings. | | F-A, Item F1 .20C setting found out of range . The condition was evaluated in accordance Acceptance range is 2078 with IWF-3122.3. Since the spring support was lbs, +/- 54 (2024 lbs to determined to still be able to perform its design 2132 lbs). As-found function , corrective measures were performed setting 2350 lbs. [NOi to restore the support to its orig ina l design U1R12-001) condition per IWF-3122.3 (b). WO 11 9973691 reset the load setting of the spring to the design range specifications. Therefore, no add itional or preservice exams are applicable. The spring support was then reinspected to ve rify th e settings. |
| E-A, Item E1 .11 Gouge in Drywell liner. EVALUATED ACCEPTABLE | | E-A, Item E1 .11 Gouge in Drywell liner. EVALUATED ACCEPTABLE |
Line 61: |
Line 55: |
| The wall thickness was below the acceptance criteria without Civil Design Eng ineeri ng evaluation of 0.75". Civil Engineering determined that the remaining th ickness of 0.73" is greater than the allowed 10% reduction of wall thickness (0.675"), thus it is acceptable for continued operation . Per IWE-3122.3 (b) the area will be reexamined in accordance with IWE-2420. | | The wall thickness was below the acceptance criteria without Civil Design Eng ineeri ng evaluation of 0.75". Civil Engineering determined that the remaining th ickness of 0.73" is greater than the allowed 10% reduction of wall thickness (0.675"), thus it is acceptable for continued operation . Per IWE-3122.3 (b) the area will be reexamined in accordance with IWE-2420. |
|
| |
|
| FORM OAR-1 OWNER'S ACTIVITY REPORT TABLES Report Number BFNU1R12 | | FORM OAR-1 OWNER'S ACTIVITY REPORT TABLES Report Number BFNU1R12 PI ant Browns Ferry Unit No. 1 Commercial service date 08/01/1974 Refueling outage no. - - |
| -----------------------------
| | Current inspection interval 3rd Current inspection period -1st TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Description of Date Repair/Replacement Item Description Class Work I Completed Plan Number I |
| PI ant Browns Ferry Unit No. 1 Commercial service date 08/01/1974 Refueling outage no. - - | |
| Current inspection interval 3rd | |
| -----
| |
| Current inspection period -1st | |
| -----
| |
| TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Description of Date Repair/Replacement Item Description Class Work I Completed Plan Number I | |
| NONE NONE | | NONE NONE |
|
| |
|
| FORM OAR-1 OWNER'S ACTIVITY REPORT TABLES Report Number BFNU1R12 | | FORM OAR-1 OWNER'S ACTIVITY REPORT TABLES Report Number BFNU1R12 PI ant Browns Ferry Unit No. 1 Commercial service date 08/01/1974 Refueling outage no. -12 ---- |
| -----------------------------------
| |
| PI ant Browns Ferry Unit No. 1 Commercial service date 08/01/1974 Refueling outage no. -12 ---- | |
| Current inspection interval 3rd | | Current inspection interval 3rd |
| ------ Current inspection period 1st | | ------ Current inspection period 1st Summary of IWE Indications for U1R12 The summary table below is provided in accordance with the requirements of 10 CFR 50.55a(b )(2)(ix)(A) . |
| --------
| |
| Summary of IWE Indications for U1R12 The summary table below is provided in accordance with the requirements of 10 CFR 50.55a(b )(2)(ix)(A) . | |
| Examination Component Indication Acceptability/Corrective Action Inaccessible Additional Category and Identifier Description Area Samples Item Number (Location and Evaluation) | | Examination Component Indication Acceptability/Corrective Action Inaccessible Additional Category and Identifier Description Area Samples Item Number (Location and Evaluation) |
| E-A, Item E1 .30 Moisture Seal Areas of EVALUATED ACCEPTABLE None None Barrier Separation . None of the areas penetrated the full MSB-1-1 [NOi U1R12- depth of the seal , seal adhesion was 003] good in all locations, and there was no seal failure . The affected portions of the seal identified for repair were excavated and drywell liner below the seal was VT-1 examined . No evidence of moisture intrusion or damage to the liner indicative of moisture intrusion was observed demonstrating no seal failure occurred . The MSB was then re-poured in these areas and re-examined .}} | | E-A, Item E1 .30 Moisture Seal Areas of EVALUATED ACCEPTABLE None None Barrier Separation . None of the areas penetrated the full MSB-1-1 [NOi U1R12- depth of the seal , seal adhesion was 003] good in all locations, and there was no seal failure . The affected portions of the seal identified for repair were excavated and drywell liner below the seal was VT-1 examined . No evidence of moisture intrusion or damage to the liner indicative of moisture intrusion was observed demonstrating no seal failure occurred . The MSB was then re-poured in these areas and re-examined .}} |
|
---|
Category:Inservice/Preservice Inspection and Test Report
MONTHYEARCNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan CNL-23-025, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472023-07-0303 July 2023 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML23171A9132023-06-20020 June 2023 Amse, Section XI, Fifth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owners Activity Report ML23171A9572023-06-20020 June 2023 Replacement Steam Dryer Visual Inspection Results (U2R22) ML23025A0752023-01-25025 January 2023 American Society of Mechanical Engineers, Section XI, Third 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owners Activity Report Cycle . ML23024A1632023-01-24024 January 2023 Replacement Steam Dryer Visual Inspection Results (U1R14) ML22182A1632022-07-0101 July 2022 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner'S Activity Report for Browns ML21202A2422021-07-21021 July 2021 American Society of Mechanical Engineers, Section XI, Fifth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner'S Activity Report for Browns Ferry Nucle ML21201A3112021-07-20020 July 2021 Replacement Steam Dryer Visual Inspection Results ML21036A1532021-02-0505 February 2021 Owner'S Activity Report for Cycle 13 Operation ML21032A1302021-02-0101 February 2021 Replacement Steam Dryer Visual Inspection Results (U1R13) ML20176A3652020-06-24024 June 2020 American Society of Mechanical Engineers, Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner'S Activity Report for Browns Ferry Nucl CNL-20-019, American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Request for Alternative 0-ISI-472020-02-28028 February 2020 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection and Augmented Program Interval Request for Alternative 0-ISI-47 ML19190A0722019-07-0909 July 2019 American Society of Mechanical Engineers, Section XI, Fifth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner'S Activity Report for Browns Ferry Nucle ML19051A0182019-02-20020 February 2019 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report Cycle 12 Operation CNL-18-123, Re-Submittal of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program and Augmented Program, Second Ten Year Interval Request for Relief 1-ISI-272018-12-27027 December 2018 Re-Submittal of American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program and Augmented Program, Second Ten Year Interval Request for Relief 1-ISI-27 ML18186A6042018-07-0505 July 2018 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Browns Ferry Nuclear Plant, Unit 3, Cycle 1 CNL-18-080, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 1 Second Ten-Year Interval Request for Relief for 1-ISI-28 and 1-ISI-292018-05-31031 May 2018 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 1 Second Ten-Year Interval Request for Relief for 1-ISI-28 and 1-ISI-29 ML17180A3862017-06-29029 June 2017 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Browns Ferry Nuclear Plant, Unit 2, Cycle 1 CNL-17-013, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 3 Third Ten Year Interval Request for Relief for 3-ISI-28 and 3-ISI-292017-01-31031 January 2017 American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection (ISI) Program, Unit 3 Third Ten Year Interval Request for Relief for 3-ISI-28 and 3-ISI-29 ML16176A2842016-06-24024 June 2016 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 17 Operation ML15190A3302015-07-0909 July 2015 ASME Section XI, Lnservice Inspection, System Pressure Test, Containment Lnservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 18 Operation ML15028A4032015-01-27027 January 2015 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 10 Operation ML14260A3652014-09-12012 September 2014 3 - ASME, Code Section XI-Inservice Inspection Program for the Unit 1 Second Ten-Year Inspection Interval, Unit 2 Fourth Ten-Year Inspection Interval and Unit 3 Third Ten-Year Inspection Interval, Request for an Alternative. ML14169A4042014-06-16016 June 2014 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Browns Ferry Plant, Unit 3, Cycle 16 Operat ML14056A2682014-02-11011 February 2014 ASME, Section XI Code, Inservice Inspection Program for Unit I Second Ten-Year Inspection Interval, Unit 2 Fourth Ten-Year Inspection Interval, and Unit 3 Third Ten-Year Inspection Interval, Request for Relief ISI-44 ML13291A3842013-10-0202 October 2013 Inservice Testing Program for the Fourth Ten Year Interval ML13256A1012013-09-11011 September 2013 CFR 72.48 Changes, Tests, and Experiments, Biennial Summary Report Associated with the Independent Spent Fuel Storage Installation ML13253A1392013-08-0202 August 2013 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 17 Operation ML13119A3862013-04-29029 April 2013 Ti 182 RFI 2013003_AS Doc ML13067A4012013-03-0101 March 2013 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection and Repair and Replacement Programs - Owner'S Activity Report for Cycle 9 Operation ML12240A1052012-08-24024 August 2012 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 15 Operation ML12150A3672012-05-24024 May 2012 American Society of Mechanical Engineers, Section Xl Code, Inservice Inspection Program for the Unit 2 Third Ten-Year Inspection Interval, Request for Relief 2-ISI-28 ML11189A1122011-07-0606 July 2011 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs - Owner'S Activity Report for Cycle 16 Operation ML1108300372011-03-21021 March 2011 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, Inservice Inspection Program, Third Ten-Year Inspection Interval, Request for Relief 3-ISI-26 ML1102603952011-01-21021 January 2011 American Society of Mechanical Engineers, Section XI Inservice Inspection Program for the Unit 3 Third Ten-Year Inspection Interval, Request for Relief 3-ISI-25 ML1018705992010-07-0101 July 2010 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, Inservice Inspection Program, Request to Use Subsequent Edition of ASME Section Xl Code for Repair and Replacement Activities ML1014700692010-05-24024 May 2010 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI, System Pressure Test Program for the Fourth 10-Year Inspection Interval ML1009205422010-03-31031 March 2010 American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section Xl, Inservice Inspection Program for the Fourth Ten-Year Inspection Interval ML1005704132010-02-24024 February 2010 American Society of Mechanical Engineers, Section Xl, Inservice Inspection Program for the Unit 2 Third Ten-Year Inspection Interval, Request for Relief 2-1S1-18, Revision 2 ML1004801252010-02-11011 February 2010 American Society of Mechanical Engineers, Section XI Inservice Inspection Program for Unit 1 Second Ten-Year Inspection Interval, Request for Relief 1-ISI-26, Risk-Informed Inservice Inspection Program ML1001917972010-01-15015 January 2010 American Society of Mechanical Engineers, Section XI Inservice Inspection Program for Browns Ferry Unit 1 Second Ten-Year Inspection Interval and Units 2 & 3 Third Ten-Year Inspection Interval, Request for Relief ISI-23 ML0928005122009-10-0505 October 2009 Comments Regarding NRC Letter and Associated Safety Evaluation for the Browns Ferry Nuclear Plant, Unit 2, Inservice Inspection Program Related to Examination of Piping Weld Overlays ML0926606142009-09-21021 September 2009 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs - Summary Report for Cycle 15 Operation ML0928707662009-09-17017 September 2009 Response to NRC Request for Additional Information for Third 10-Year Interval Inservice Inspection Program Plan, Relief Request 2-ISI-19, Revision 1 ML1019002472009-07-0707 July 2009 American Society of Mechanical Engineers Section Xl, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs - Summary Report for Cycle 14 Operation ML0914702082009-05-22022 May 2009 American Society of Mechanical Engineers (ASME) Section Xl, Inservice Inspection Program for the Third Ten-Year Inspection Interval - Request for Relief 2-1Sl-21, Revision 1 - Resubmittal ML0913906422009-05-18018 May 2009 American Society of Mechanical Engineers Section XI, Inservice Inspection Program - Request for Relief 2-ISI-21, Revision 1 - Examination of Piping Weld Overlays ML0907808612009-03-0202 March 2009 American Society of Mechanical Engineers (ASME) Section XI, Inservice Inspection Program for the Third Ten-year Inspection Interval - Request for Relief 2-ISI-19, Revision 1 ML0906304232009-03-0202 March 2009 American Society of Mechanical Engineers Section XI, Inservice Inspection, System Pressure Test, Containment Inspection (IWE, and Repair and Replacement Programs - Summary Reports for Cycle 7 Operation 2023-07-03
[Table view] Category:Letter
MONTHYEARML24032A4762024-02-0101 February 2024 Final Report of a Part 21 Evaluation Associated with Starter Contactors for the BFN Unit 1 High Pressure Coolant Injection Suppression Pool Inboard Suction Valve ML24023A2802024-01-23023 January 2024 Final Report of a Deviation or Failure to Comply Associated with a Relay in the Reactor Core Isolation Cooling Condensate Pump CNL-24-017, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions2024-01-17017 January 2024 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure and Emergency Preparedness Department Procedure Revisions ML24016A3042024-01-16016 January 2024 Final Report of a Part 21 Evaluation Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump CNL-23-071, Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-472024-01-11011 January 2024 Response to Request for Additional Information Regarding Browns Ferry Nuclear Plant, Units 1, 2, and 3, Inservice Inspection and Augmented Program Interval Revised Request for Alternative 0-ISI-47 ML24022A1732024-01-0303 January 2024 Receipt and Availability of the Subsequent License Renewal Application ML23319A1992024-01-0303 January 2024 Issuance of Amendment Nos. 333, 356, and 316 Regarding the Technical Specification Surveillance Requirements 3.4.3.2 and 3.5.1.11 Regarding Safety Relief Valves ML23355A2062023-12-21021 December 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation ML23348A3942023-12-14014 December 2023 Interim Part 21 Report of a Potential Deviation or Failure to Comply Associated with Starter Contactors for the High Pressure Coolant Injection Suppression Pool Inboard Suction Valve IR 05000259/20230102023-12-11011 December 2023 Commercial Grade Dedication Inspection Report 05000259/2023010 and 05000260/2023010 and 05000296/2023010 ML23335A0722023-12-0101 December 2023 Interim Report of a Deviation or Failure to Comply Associated with a Relay in the Unit 2 Reactor Core Isolation Cooling Condensate Pump ML23334A2492023-11-30030 November 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-070, Submittal of Fifth 10-Year Interval Inservice Testing Program Plan2023-11-29029 November 2023 Submittal of Fifth 10-Year Interval Inservice Testing Program Plan ML23331A2532023-11-27027 November 2023 Summary Report for 10 CFR 50.9 Evaluations, Technical Specifications Bases Changes, Technical Requirement Manual Changes, and NRC Commitment Revisions CNL-23-067, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions2023-11-27027 November 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions ML23325A1102023-11-21021 November 2023 Anchor Darling Double Disc Gate Valve Commitment Revision ML23320A2542023-11-16016 November 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump IR 05000259/20230032023-11-13013 November 2023 Integrated Inspection Report 05000259/2023003, 05000260/2023003 and 05000296/2023003 IR 05000259/20230402023-11-0202 November 2023 Supplemental Inspection Supplemental Report 05000259 2023040 and Follow-Up Assessment Letter ML23292A2532023-10-18018 October 2023 BFN 2024-301, Corporate Notification Letter (210-day Ltr) ML23282A0022023-10-0606 October 2023 Interim Part 21 Report of a Deviation or Failure to Comply Associated with Check Valve 0-CKV-023-0565 for D1 Residual Heat Removal Service Water Pump ML23278A0122023-10-0505 October 2023 Updated Final Safety Analysis Report, Amendment 30 ML23271A1702023-09-28028 September 2023 Site Emergency Plan Implementing Procedure Revision ML23270A0702023-09-26026 September 2023 SLRA Pre-Application Meeting Summary 09-13-2023 ML23257A1232023-09-22022 September 2023 Administrative Changes to Technical Specification Pages Issued for License Amendment Nos. 332, 355, and 315 CNL-23-061, Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision2023-09-20020 September 2023 Tennessee Valley Authority - Central Emergency Control Center Emergency Plan Implementing Procedure Revision ML23263B1042023-09-20020 September 2023 Special Report 260/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation ML23205A2132023-09-0808 September 2023 Issuance of Amendment Nos. 332, 355, and 315 Regarding the Revision of Technical Specifications to Adopt TSTF-566-A and TSTF-580-A, Rev. 1 CNL-23-057, Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 642023-09-0505 September 2023 Central Emergency Control Center Emergency Plan Implementing Procedure Revisions. Includes CECC-EPIP-1, Revision 76 and CECC-EPIP-9, Revision 64 IR 05000259/20230052023-08-29029 August 2023 Updated Inspection Plan for Browns Ferry Nuclear Plant, Units 1, 2 and 3 - Report 05000259/2023005, 05000260/2023005 and 05000296/2023005 ML23233A0432023-08-18018 August 2023 Enforcement Action EA-22-122 Inspection Readiness Notification ML23219A1542023-08-17017 August 2023 Request to Use Later Edition of ASME Code for Operation and Maintenance and Alternative Requests BFN-IST-01 Through 05 for the Fifth 10-Year Interval Inservice Testing Program ML23228A1642023-08-16016 August 2023 Site Emergency Plan Implementing Procedure Revision ML23228A0202023-08-15015 August 2023 (BFN) Unit 1 - Special Report 259/2023-001 for Inoperable Post Accident Monitoring (PAM) Instrumentation IR 05000259/20230022023-08-10010 August 2023 Integrated Inspection Report 05000259/2023002, 05000260/2023002, 05000296/2023002 and 07200052/2023001 ML23192A4472023-07-31031 July 2023 Staff Assessment of Updated Seismic Hazards at TVA Sites Following the NRC Process for the Ongoing Assessment of Natural Hazards Information CNL-23-055, Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills2023-07-25025 July 2023 Tennessee Valley Authority - Emergency Preparedness Department Procedure Revision. Includes EPDP-3, Revision 3, Emergency Plan Exercises and Preparedness Drills ML23171A8862023-07-24024 July 2023 Issuance of Amend. Nos. 331, 354, and 314; 365 and 359 Regarding Adoption of TSTF-541-A, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML23201A2182023-07-20020 July 2023 Registration of Use of Cask to Store Spent Fuel (MPC-298 and -299) ML23159A2552023-07-20020 July 2023 Proposed Alternative to the Requirements of the ASME Code Regarding Volumetric Inspection of Standby Liquid Control Nozzles ML23199A3072023-07-18018 July 2023 Site Emergency Plan Implementing Procedure Revision CNL-23-053, Tennessee Valley Authority - Radiological Emergency Plan Revisions2023-07-18018 July 2023 Tennessee Valley Authority - Radiological Emergency Plan Revisions IR 05000259/20233012023-07-18018 July 2023 NRC Operator License Examination Report Nos. 05000259/2023301, 05000260/2023301, and 05000296/2023301 2024-02-01
[Table view] |
Text
Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 February 20, 2019 10 CFR 50.55 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 1 Renewed Facility Operating License No. DPR-33 NRG Docket No. 50-259
Subject:
American Society of Mechanical EngineersSection XI, lnservice Inspection, System Pressure Test, Containment lnservice Inspection, and Repair and Replacement Programs - Owner's Activity Report for Browns Ferry Nuclear Plant, Unit 1, Cycle 12 Operation The Tennessee Valley Authority is submitting the Browns Ferry Nuclear Plant (BFN), American Society of Mechanical Engineers (ASME),Section XI, Owner's Activity Report for BFN, Unit 1, Cycle 12 Operation. The report is contained in the enclosure to this letter and is in accordance with the requirements of ASME Code Case N-532-5, Repair/Replacement Documentation Requirements and lnservice Summary Report Preparation and Submission,Section XI , Division 1.
The report is an overview of the inservice examination results that were performed on components within the ASME Section XI boundary, up to and including the BFN, Unit 1, Cycle 12 refueling outage, during the first inspection period of the Third 1O Year Inspection Interval. The applicable provisions of the ASME Code Case N-532-5 require that this report be submitted within 90 calendar days of the completion of each refueling outage. The BFN, Unit 1, Cycle 12 refueling outage ended on November 22, 2018. Accordingly, this submittal is due by February 20, 2019.
U.S. Nuclear Regulatory Commission Page 2 February 20, 2019 There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact M. W. Oliver, Acting Nuclear Site Licensing Manager, at (256) 729-7874.
R~~
D. L. Hughes Site Vice President
Enclosure:
American Society of Mechanical Engineers,Section XI , Third 10 Year Inspection Interval, lnservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owner's Activity Report for Browns Ferry Nuclear Plant, Unit 1, Cycle 12 Operation cc (Enclosure): NRG Regional Administrator - Region II NRG Senior Resident Inspector - Browns Ferry Nuclear Plant NRG Project Manager - Browns Ferry Nuclear Plant
Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 1 American Society of Mechanical Engineers,Section XI, Third 10 Year Inspection Interval, lnservice Inspection, System Pressure Test, Containment lnservice Inspection, and Repair and Replacement Programs, Owner's Activity Report for Browns Ferry Nuclear Plant, Unit 1, Cycle 12 Operation See Enclosed
FORM OAR-1 OWNER'S ACTIVITY REPORT Report N u m b e r ~ B ~ F ~ N ~ U ~ 1 ~ R ~ 1 ~ 2 ~ - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Plant Browns Ferry Nuclear Plant P.O. Box 2000 Decatur AL 35609 Unit No . - - ~ ~ - - Commercial service date August 1 1974 Refueling Outage no. ---~U~1~R~1~2~----
(if applicable)
Current Inspection Interval Third Ten Year Inspection Interval (1st, 2nd , 3rd, other)
Current Inspection Period ~F~ir=st~P~e~r~io~d~--------------,---,----,-,--------------------
(1st, 2nd , 3rd) 2007 Edition, 2008 Addenda (ISi)
Edition and Addenda of Section XI applicable to the inspection plans ~2=0~13~E~d~it~io~n__,,{~C~IS~IJ._)- - - - - - - - - - - - - - - - - ~
0-TPP-ENG-376, Revision 0000, 09/06/2018 0-Tl-364, Revision 0022, 09/19/2018 Date and Revision of inspection plan 0-Sl-4.6.G Revision 0003 09/14/2018 Edition and Addenda of Section XI applicable to repairs/replacement activities, if different than the inspection plans _,_N.,,./A'-'----
Code Cases used for inspection and evaluation: N-508-4 N-532-5 N-613-2 N-648-1 N-702 N-716-1 and N-751 (if applicable , including cases modified by Case N-532 and later revisions)
CERTIFICATE OF CONFORMANCE I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI ; and (c) the repair/replacement activities and evaluations supporting the completion of --~U~1~R~1~2~---
conform to the requirements of Section XI. (refueling outage number)
Signed ; * /J4----
es;t> ~ r s Oesignee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by The Hartford Steam Boiler Inspection and Insurance Company of Hartford Connecticut have inspected the items described in this Owne r's Activity Report and state that, to the best of my knowledge and belief, the Owner has performed all activities represented by this report in accordance with the requirements of Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied , concerning the repair/replacement activities and evaluation described in this report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any pers~Aju roperty age or a loss of any kind arising from or connected with this Inspection .
Date _ _ 2--</,_,_(-=--+--
1/~ f '5____
FORM OAR-1 OWNER'S ACTIVITY REPORT TABLES Report Number BFNU1R12 PI ant Browns Ferry Unit No. 1 Commercial service date 08/01/1974 Refueling outage no. - 12- - -
Current inspection interval 3rd Current inspection period -1st TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRE EVALUATIONS FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description Variable spring as-found (Acceptance by Evaluation)
F-A, Item F1 .20C setting found out of range . The condition was evaluated in accordance Acceptance range is 2078 with IWF-3122.3. Since the spring support was lbs, +/- 54 (2024 lbs to determined to still be able to perform its design 2132 lbs). As-found function , corrective measures were performed setting 2350 lbs. [NOi to restore the support to its orig ina l design U1R12-001) condition per IWF-3122.3 (b). WO 11 9973691 reset the load setting of the spring to the design range specifications. Therefore, no add itional or preservice exams are applicable. The spring support was then reinspected to ve rify th e settings.
E-A, Item E1 .11 Gouge in Drywell liner. EVALUATED ACCEPTABLE
[NOi U1 R12-002] (No Corrective Measures Requ ired .)
An indication cons isting of mechanical damage 1/32" in depth , 3/8" in width , and 7/16" in length was identified on the steel conta inment vessel (Drywell) liner. The remaining wall th ickness was 0.73" in the area of mechanica l damage.
The wall thickness was below the acceptance criteria without Civil Design Eng ineeri ng evaluation of 0.75". Civil Engineering determined that the remaining th ickness of 0.73" is greater than the allowed 10% reduction of wall thickness (0.675"), thus it is acceptable for continued operation . Per IWE-3122.3 (b) the area will be reexamined in accordance with IWE-2420.
FORM OAR-1 OWNER'S ACTIVITY REPORT TABLES Report Number BFNU1R12 PI ant Browns Ferry Unit No. 1 Commercial service date 08/01/1974 Refueling outage no. - -
Current inspection interval 3rd Current inspection period -1st TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Description of Date Repair/Replacement Item Description Class Work I Completed Plan Number I
NONE NONE
FORM OAR-1 OWNER'S ACTIVITY REPORT TABLES Report Number BFNU1R12 PI ant Browns Ferry Unit No. 1 Commercial service date 08/01/1974 Refueling outage no. -12 ----
Current inspection interval 3rd
Current inspection period 1st Summary of IWE Indications for U1R12 The summary table below is provided in accordance with the requirements of 10 CFR 50.55a(b )(2)(ix)(A) .
Examination Component Indication Acceptability/Corrective Action Inaccessible Additional Category and Identifier Description Area Samples Item Number (Location and Evaluation)
E-A, Item E1 .30 Moisture Seal Areas of EVALUATED ACCEPTABLE None None Barrier Separation . None of the areas penetrated the full MSB-1-1 [NOi U1R12- depth of the seal , seal adhesion was 003] good in all locations, and there was no seal failure . The affected portions of the seal identified for repair were excavated and drywell liner below the seal was VT-1 examined . No evidence of moisture intrusion or damage to the liner indicative of moisture intrusion was observed demonstrating no seal failure occurred . The MSB was then re-poured in these areas and re-examined .