Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 July 21, 2021 10 CFR 50.55a ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 2 Renewed Facility Operating License No. DPR-52 NRC Docket No. 50-260

Subject:

American Society of Mechanical Engineers,Section XI, Fifth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owners Activity Report for Browns Ferry Nuclear Plant, Unit 2, Cycle 21 Operation The Tennessee Valley Authority is submitting the Browns Ferry Nuclear Plant (BFN), American Society of Mechanical Engineers (ASME),Section XI, Owners Activity Report for BFN, Unit 2, Cycle 21 Operation. The report is contained in the enclosure to this letter and is in accordance with the requirements of ASME Code Case N-532-5, Repair/Replacement Documentation Requirements and Inservice Summary Report Preparation and Submission,Section XI, Division 1.

The report is an overview of the inservice examination results that were performed on components within the ASME Section XI boundary, up to and including the BFN, Unit 2, Cycle 21 refueling outage, during the second inspection period of the Fifth 10 Year Inspection Interval. The applicable provisions of the ASME Code Case N-532-5 require that this report be submitted within 90 calendar days of the completion of each refueling outage. The BFN, Unit 2, Cycle 21 refueling outage ended on April 22, 2021. Accordingly, this submittal is due by July 21, 2021.

U.S. Nuclear Regulatory Commission Page 2 July 21, 2021 There are no new regulatory commitments contained in this letter. Should you have any questions concerning this submittal, please contact J. L. Paul, Site Licensing Manager, at (256) 729-2636.

Respectfully, Matthew Rasmussen Site Vice President

Enclosure:

American Society of Mechanical Engineers,Section XI, Fourth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inspection, and Repair and Replacement Programs, Owners Activity Report for Browns Ferry Nuclear Plant, Unit 2, Cycle 21 Operation cc (Enclosure): NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant NRC Project Manager - Browns Ferry Nuclear Plant p

y

Enclosure Tennessee Valley Authority Browns Ferry Nuclear Plant Unit 2 American Society of Mechanical Engineers,Section XI, Fifth 10 Year Inspection Interval, Inservice Inspection, System Pressure Test, Containment Inservice Inspection, and Repair and Replacement Programs, Owners Activity Report for Browns Ferry Nuclear Plant, Unit 2, Cycle 21 Operation See Enclosed