Text

Tennessee Valley Authority, Post Office Box 2000, Decatur, Alabama 35609-2000 February 1, 2021 10 CFR 50.4 ATTN: Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C. 20555-0001 Browns Ferry Nuclear Plant, Unit 1 Renewed Facility Operating License No. DPR-33 NRC Docket No. 50-259

Subject:

Unit 1 Replacement Steam Dryer Visual Inspection Results (U1R13)

Enclosed is a summary of the results of the visual inspections of the Unit 1 Replacement Steam Dryer that were performed during the recent refueling outage (U1R13). The inspections are required to be performed in accordance with Operating License Condition 2.C(18)(g) during the first two scheduled refueling outages after reaching full Extended Power Uprate conditions. This first report for Unit 1 is being submitted pursuant to Operating License Condition 2.C(18)(h) which requires that the results of the inspection be submitted in a report within 90 days following startup.

There are no new regulatory commitments in this letter. Should you have any questions concerning this submittal, please contact J. L. Paul, Site Licensing Manager, at (256) 729-2636.

Respectfully, M tth Matthew R Rasmussen Site Vice President

U.S. Nuclear Regulatory Commission Page 2 February 1, 2021

Enclosure:

Browns Ferry Unit 1 Replacement Steam Dryer (RSD) Inspection Results from the First Refueling Outage (U1R13) Following Installation of RSD and Implementation of Extended Power Uprate cc (w/ Enclosure):

NRC Regional Administrator - Region II NRC Senior Resident Inspector - Browns Ferry Nuclear Plant

Enclosure Browns Ferry Unit 1 Replacement Steam Dryer (RSD) Inspection Results from the First Refueling Outage (U1R13) Following Installation of RSD and Implementation of Extended Power Uprate See Attached

Browns Ferry Unit 1 Replacement Steam Dryer (RSD) Inspection Results from the First Refueling Outage (U1R13) Following Installation of RSD and Implementation of Extended Power Uprate



Purpose This report provides the results of visual inspections of the Replacement Steam Dryer (RSD) as required by the Browns Ferry Unit 1 Renewed Facility Operating License No. DPR-33, License Condition 2.C(18)(h). This license condition requires that the results of the visual inspections of the RSD be submitted to the NRC within 90 days following startup from each of the first two respective refueling outages.

Summary The Unit 1 RSD was inspected from October 7 through 19, 2020, during the Fall 2020 refueling outage (Unit 1 Refueling Outage 13: U1R13). This was the first refueling outage following installation of the RSD in October 2018 during Unit 1 Refueling Outage 12 (U1R12) and operation at Extended Power Uprate (EPU) conditions since January 31, 2019. The inspections were performed in accordance with GE Hitachi Nuclear Energy Report No. 003N5663, Revision 2 (Tennessee Valley Authority (TVA) Browns Ferry Nuclear Station (BFNS):

Recommendations for Future Inspections - Replacement Steam Dryer). The RSD design and the materials and fabrication processes utilized are expected to result in significantly improved resistance to stress corrosion cracking. Therefore, the inspection recommendations in the GEH report focus primarily on the locations that may be susceptible to fatigue from flow-induced vibration. The locations identified are those indicated to have relatively significant cyclic loading during the dryers operation, as determined by detailed stress analyses.

Tables 1 (Frequency of Recommended Locations Based on Analysis) and 2 (Description of Recommended Inspections Locations) of the GEH Report list locations that are considered the most susceptible for fatigue cracking based on BWR dryer experience and stress analysis. All accessible weld and weld heat-affected zone (HAZ) base metal surfaces of the RSD were visually inspected during U1R13, with a total scope of 664 points. The summary results of the inspections can be found in the table starting on the next page.

The following explanations apply to the table:

NRI: No Relevant Indication RI: Relevant Indication The parentheses after each Inspection Location refer to the number of points inspected for each.

1

Browns Ferry Unit 1 Replacement Steam Dryer (RSD) Inspection Results from the First Refueling Outage (U1R13) Following Installation of RSD and Implementation of Extended Power Uprate



Inspection Location Method Inspection Condition Disposition

Result Report(ifRI)

STEAM DRYER ID Divider Plate Welds & HAZs (32) VT-1-89 NRI Trough Side Plate to Base Plate Weld & VT-1-89 NRI HAZs (6)

Hood Vertical / Horizontal Welds & VT-1-89 NRI HAZs (12)

Trough Spacer Pin Weld & HAZs (6) VT-1-89 NRI Skirt to Support Beam Weld & HAZs (8) VT-1-89 NRI Guide Channel to Tee Weld & HAZs (4) VT-1-89 NRI Skirt to Tee Weld & HAZs (12) VT-1-89 NRI Drain Pipe to Trough Base Plate Weld & VT-1-89 NRI HAZs (12)

Drain Pipe to Elbow Weld & HAZs (21) VT-1-89 NRI Drain Elbow to Pipe Weld & HAZs (11) VT-1-89 NRI Drain Elbow to Skirt Weld & HAZs (12) VT-1-89 NRI Collar to Skirt Weld & HAZs (12) VT-1-89 NRI Perforated Plate to Trough Side Plate VT-1-89 NRI Weld & HAZs (22)

Cover Plate to Hood Weld & HAZs (2) VT-1-89 NRI Trough Base Plate to Hood Weld & VT-1-89 NRI HAZs (4)

Hood Support Stiffener Assembly, VT-1-89 NRI Stiffener to Hood Support Tee Weld &

HAZs, 360 degree weld (16)

Hood Support Stiffener Assembly, VT-1-89 NRI Stiffener to Trough Weld & HAZs, 360 degree weld (16)

Guide Channel to Lower Support Ring VT-1-89 NRI Welds & HAZs (2)

Skirt to Lower Support Ring Weld & VT-1-89 NRI HAZs (6)

Splice Bar Attachment Weld and HAZs VT-1-89 NRI (8)

Trans Brace to Upper Support Ring VT-1-89 NRI Weld & HAZs (2)

Trans Brace Coupler Weld & HAZs (1) VT-1-89 NRI Trans Brace Plate Welds & HAZs (8) VT-1-89 NRI Trans Brace Support Welds & HAZs VT-1-89 NRI (12)

Base Plate to Upper Support Ring Weld VT-1-89 NRI

& HAZs (8)

Cover Plate to Upper Support Ring Weld VT-1-89 NRI

& HAZs (2)

Splice Bar to Upper Support Ring and VT-1-89 NRI Trough Welds & HAZs (2)

Upper Support Ring Splice Bar - Taper VT-1-89 NRI Pin & Bolting - Welds & HAZs (2)

USR Segment Weld & HAZs (4) VT-1-89 NRI 2

Browns Ferry Unit 1 Replacement Steam Dryer (RSD) Inspection Results from the First Refueling Outage (U1R13) Following Installation of RSD and Implementation of Extended Power Uprate



Inspection Location Method Inspection Condition Disposition

Result Report(ifRI)

Skirt to Upper Support Ring Weld & VT-1-89 NRI HAZs (8)

   

STEAM DRYER OD 000 Degree Pad Welds & HAZs (1) VT-1-89 NRI Steam Dryer Outer Banks Access Panel VT-1-89 NRI Welds & HAZs 000 Side (6)

Steam Dryer Outer Banks Access Panel VT-1-89 NRI Welds & HAZs 180 Side (6)

Both Sides of the Bank to Divider Plate VT-1-89 NRI Weld & HAZs (16)

Both Sides of the Bank to Exhaust VT-1-89 NRI Plenum Plate Vertical Weld & HAZs (20)

Hood to Cover Plate Horizontal Weld & VT-1-89 NRI HAZs (2)

Hood to Top Cap Horizontal Weld & VT-1-89 NRI HAZs (6)

Perforated Plate to Bank Top Cap Weld VT-1-89 NRI

& HAZs (6)

Perforated Plate to Trough Side Plate VT-1-89 NRI Weld & HAZs (6)

Trough Side Plate to Base Plate Weld VT-1-89 NRI

& HAZs (6)

Both Sides of the Hood Support to VT-1-89 NRI Trough Weld & HAZs (16)

Perforated Plate to End Plate Weld & VT-1-89 NRI HAZs (13)

Perforated Plate to Perforated Plate VT-1-89 NRI Weld & HAZs (15)

Trough Spacer Pin Weld & HAZs (6) VT-1-89 NRI Bank Tie Rod Bolting Welds & HAZs for VT-1-89 NRI all 6 locations on the 000 Deg Side (6)

Bank Tie Rod Bolting Welds & HAZs for VT-1-89 NRI all 6 locations on the 180 Deg Side (6)

Hood to Trough Base Plate Horizontal VT-1-89 NRI Weld & HAZs (4)

Both Sides of the Divider Plate to Inner VT-1-89 NRI Plate Welds & HAZs (6)

Drain Channel to Upper Support Ring VT-1-89 NRI Horizontal Weld & HAZs (4)

Drain Channel to Support Beam Weld & VT-1-89 NRI HAZs (8)

Drain Channel to Support Ring Tab VT-1-89 NRI Welds & HAZs (20)

Guide Channel to Drain Channel Tee VT-1-89 NRI Vertical Weld & HAZs (4)

Drain Channel to Drain Channel Tee VT-1-89 NRI Vertical Weld & HAZs (8) 3

Browns Ferry Unit 1 Replacement Steam Dryer (RSD) Inspection Results from the First Refueling Outage (U1R13) Following Installation of RSD and Implementation of Extended Power Uprate



Inspection Location Method Inspection Condition Disposition

Result Report(ifRI)

Skirt to Drain Channel Tee Vertical Weld VT-1-89 NRI

& HAZs (4)

Doubler Plate to Upper Support Ring & VT-1-89 NRI HAZs (8)

General Overview of the Side Surfaces VT-3 NRI (4)

General Overview of the Top Surfaces VT-3 NRI (1)

Hood to Inlet End Plate Vertical Weld & VT-1-89 NRI HAZs (18)

Both Hood to Hood Tee Vertical Welds VT-1-89 NRI

& HAZs (22)

Both Sides of the Hold Down Assembly VT-1-89 NRI to Exhaust Plenum Plate Vertical Weld

& HAZs (4)

Hold Down Assembly to Trough Base VT-1-89 NRI Plate Horizontal Weld & HAZs (2)

Lifting Assembly - Support Ring Anchor VT-1-89 NRI Weld & HAZs (4)

Lifting Assembly - Bolting and Tack VT-1-89 RI 1644436 Repaired Weld & HAZs (4)

Lifting Assembly - Lower Bracket and VT-1-89 NRI Welds Plus HAZs (4)

Lifting Assembly - Middle Bracket and VT-1-89 NRI Welds Plus HAZs (4)

Lifting Assembly - Rod to Anchor Weld VT-1-89 NRI

& HAZs (4)

Lifting Assembly - Upper Bracket and VT-1-89 NRI Welds Plus HAZs (4)

Latch Box General Condition for VT-3 NRI Evidence of Handling Damage (2)

Lower Guide Channel General Condition VT-3 NRI for Evidence of Handling Damage (2)

Lower Guide Vertical Welds & HAZs (8) VT-1-89 NRI Lower Support Ring to Guide Channel VT-1-89 NRI Horizontal Weld & HAZs (2)

Lower Support Ring to Skirt Horizontal VT-1-89 NRI Weld & HAZs (6)

Lower Support Ring Splice Bar General VT-3 NRI Condition for Evidence of Handling Damage (2)

Splice Bar Attachment Weld & HAZs (8) VT-1-89 NRI Seismic Lug and Associated Bolting, VT-1-89 NRI also Welds & HAZs (2)

Seismic Lug General Condition for VT-3 RI 1645359 Accepted as-is Evidence of Handling Damage (2)

Bank Tie Bar Welds & HAZs (34) VT-1-89 NRI Trough Base Plate Center Horizontal VT-1-89 NRI Weld & HAZs (1) 4

Browns Ferry Unit 1 Replacement Steam Dryer (RSD) Inspection Results from the First Refueling Outage (U1R13) Following Installation of RSD and Implementation of Extended Power Uprate



Inspection Location Method Inspection Condition Disposition

Result Report(ifRI)

Top Flange to C-Channel to Hood VT-1-89 NRI Cover Weld & HAZs (2)

Upper Support Ring Horizontal Weld & VT-1-89 NRI HAZs (26)

Upper Support Ring Tapered Pin Seal VT-1-89 NRI Weld & HAZs (8)

Upper Support Ring to Splice Bar VT-1-89 NRI Vertical Weld & HAZs (4)

Upper Support Ring to Guide Channel VT-1-89 NRI Horizontal Weld & HAZs (2)

Upper Support Ring to Skirt Horizontal VT-1-89 NRI Weld & HAZs (2)

Inspection Results Two relevant indications were noted during inspections performed during U1R13. They are described as follows:

(1) BFN1-SD OD LA 040 Eye - Bolting _ Tack Welds: The Steam Dryer Lifting Assembly Bolt at 40° was observed to have sheared at the shaft and the nut was no longer present. A support/refute worksheet was prepared to determine the most probable cause of the relevant indication. It was determined that the most probable cause is that the bolt sustained an impact prior to Fuel Cycle 13 (U1C13). The impact is postulated to have initiated a crack in the bolt that subsequently propagated until the bolt ultimately failed at some point during U1C13.

(2) BFN1-SD OD Seismic Lug General 005 and BFN1-SD OD Seismic Lug General 185: Wear was observed at the contact point of the Steam Dryer Support Lug for the Steam Dryer Seismic Block at 5°, and wear was observed on the contact surface and the leading edge of the Steam Dryer Seismic Block at 185°. These indications appear to be the result of mechanical damage incurred by removal and reinstallation of the RSD.

Disposition of Indications Condition Reports (CRs) were initiated to disposition both relevant indications. Each disposition is as follows:

(1) BFN1-SD OD LA 040 Eye - Bolting _ Tack Welds: The sole function of the Steam Dryer Lifting Assembly Bolt at 40° is to prevent rotation of the lifting lug. Therefore, a repair was decided upon to tack weld the remaining bolt assembly as this would prevent rotation of the lifting lug and restore functionality.

(2) BFN1-SD OD Seismic Lug General 005 and BFN1-SD OD Seismic Lug General 185: The main purpose of the Steam Dryer Seismic Blocks is to transfer the lateral load from the RSD to 5

Browns Ferry Unit 1 Replacement Steam Dryer (RSD) Inspection Results from the First Refueling Outage (U1R13) Following Installation of RSD and Implementation of Extended Power Uprate



the RPV support brackets. The indications that were observed on the Steam Dryer Seismic Blocks at 5 degrees and 185 degrees appeared to be the result of mechanical damage incurred by the removal and reinstallation of the RSD, and are not expected in any way to interfere with the ability of the seismic blocks to perform their required function to transfer the lateral load from the RSD to the RPV support brackets. Therefore, an Engineering Evaluation was prepared which concluded that these indications have no bearing on the structural integrity of the seismic blocks and are acceptable as-is with no repair required.

Conclusion A completed baseline inspection of the Browns Ferry Unit 1 Replacement Steam Dryer (RSD) was performed during the Fall 2020 Refueling Outage 13. This baseline inspection included successful visual inspection of all inspection locations required by the Facility Operating License Condition 2.C(18)(h) for inspection of the RSD. All observations were acceptable for the locations inspected. There were two relevant indications that were adequately dispositioned.

The subsequent inspection scope of the RSD will be performed during Unit 1 Refueling Outage 14 (U1R14) in Fall 2022, and the results will be provided at that time consistent with the Browns Ferry Operating License.