ML19242B871: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:e .
{{#Wiki_filter:e .
M
M r            ; .
      ,
i y
                  .    .
Duquesne Lidit                                                                  ..  . _
r            ; .
435 Seth Avenue Pif*SDv'QS. P4 August 7, 1979 Mr. Harold R. Denton Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attention:        A. Schwencer, Chief Operating Reactors Branch No. 1 Division of Operating Reactors Washington, DC 20555
i
        .
y Duquesne Lidit                                                                  ..  . _
435 Seth Avenue Pif*SDv'QS. P4
            "'"
August 7, 1979 Mr. Harold R. Denton Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attention:        A. Schwencer, Chief Operating Reactors Branch No. 1 Division of Operating Reactors Washington, DC 20555


==Reference:==
==Reference:==
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Request to Terminate the Commission's Fbrch 13, 1979 Order to Show Cause Centlemen:
Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Request to Terminate the Commission's Fbrch 13, 1979 Order to Show Cause Centlemen:
Enclosed are three (3) signed originals and thirty-seven (37) copies of Revision 4 to the Report on the Reanalysis of Safety Related Piping Systems for Beaver Valley No. 1 Unit. This revision consists of replacement pages to the original report submitted to you on June 19, 1979 and includes information on the results of the analysis on certain supports that had previously not been analyzed. We have determined that one additional modification is required.        This modification consists of the removal of one support to permit the remaining existing supports to better accomodate the design loads.
Enclosed are three (3) signed originals and thirty-seven (37) copies of Revision 4 to the Report on the Reanalysis of Safety Related Piping Systems for Beaver Valley No. 1 Unit. This revision consists of replacement pages to the original report submitted to you on June 19, 1979 and includes information on the results of the analysis on certain supports that had previously not been analyzed. We have determined that one additional modification is required.        This modification consists of the removal of one support to permit the remaining existing supports to better accomodate the design loads.
                                                                                        '
We have now completed all modification work identified in the amended report and hereby request that the Nuclear Regulatory Commission terminate the March 13, 1979 Order to Show Cause.
We have now completed all modification work identified in the amended report and hereby request that the Nuclear Regulatory Commission terminate the March 13, 1979 Order to Show Cause.
* Very truly yours, C. N. Dunn Vice President, Operations Enclosure
Very truly yours, C. N. Dunn Vice President, Operations Enclosure
                                                                                       \6 C)S.
                                                                                       \6 C)S.
7 00809 0 9/fo
7 00809 0 9/fo


-
      .
(CORPORATE SEAL)
(CORPORATE SEAL)
Attest:
Attest:
Line 46: Line 37:
CCUNTY OF ALLEGEENY            )
CCUNTY OF ALLEGEENY            )
On this 7        day of  8/s e h id                          ,  1979, before me ,      HENRY G STOECKER  , a Notary PubMc in and for said Ccmmon-wealth and County, personally appeared C. N. Dunn, who being duly cworn, deposed, and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.
On this 7        day of  8/s e h id                          ,  1979, before me ,      HENRY G STOECKER  , a Notary PubMc in and for said Ccmmon-wealth and County, personally appeared C. N. Dunn, who being duly cworn, deposed, and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.
_.
        .
mM NRY G. STCf CKER. Notary Me N'aburgh, A!!egheny County, Pa.
mM NRY G. STCf CKER. Notary Me N'aburgh, A!!egheny County, Pa.
My Commeon Empires feCrWry 20.1582 c,0o 9  \
My Commeon Empires feCrWry 20.1582 c,0o 9  \
s}}
s}}

Latest revision as of 01:41, 2 February 2020

Forwards Revision 4 to Rept on Reanalysis of Safety-Related Piping Sys.
ML19242B871
Person / Time
Site: Beaver Valley
Issue date: 08/07/1979
From: Dunn C
DUQUESNE LIGHT CO.
To: Schwencer A
Office of Nuclear Reactor Regulation
Shared Package
ML19242B872 List:
References
TAC-42636, NUDOCS 7908090480
Download: ML19242B871 (2)


Text

e .

M r  ; .

i y

Duquesne Lidit .. . _

435 Seth Avenue Pif*SDv'QS. P4 August 7, 1979 Mr. Harold R. Denton Director of Nuclear Reactor Regulation United States Nuclear Regulatory Commission Attention: A. Schwencer, Chief Operating Reactors Branch No. 1 Division of Operating Reactors Washington, DC 20555

Reference:

Beaver Valley Power Station, Unit No. 1 Docket No. 50-334 Request to Terminate the Commission's Fbrch 13, 1979 Order to Show Cause Centlemen:

Enclosed are three (3) signed originals and thirty-seven (37) copies of Revision 4 to the Report on the Reanalysis of Safety Related Piping Systems for Beaver Valley No. 1 Unit. This revision consists of replacement pages to the original report submitted to you on June 19, 1979 and includes information on the results of the analysis on certain supports that had previously not been analyzed. We have determined that one additional modification is required. This modification consists of the removal of one support to permit the remaining existing supports to better accomodate the design loads.

We have now completed all modification work identified in the amended report and hereby request that the Nuclear Regulatory Commission terminate the March 13, 1979 Order to Show Cause.

Very truly yours, C. N. Dunn Vice President, Operations Enclosure

\6 C)S.

7 00809 0 9/fo

(CORPORATE SEAL)

Attest:

) Y W H.W. Staas Secretary CCM10NWEALTH OF PENNSYLVANIA)

) SS:

CCUNTY OF ALLEGEENY )

On this 7 day of 8/s e h id , 1979, before me , HENRY G STOECKER , a Notary PubMc in and for said Ccmmon-wealth and County, personally appeared C. N. Dunn, who being duly cworn, deposed, and said that (1) he is Vice President of Duquesne Light, (2) he is duly authorized to execute and file the foregoing Submittal on behalf of said Company, and (3) the statements set forth in the Submittal are true and correct to the best of his knowledge, information and belief.

mM NRY G. STCf CKER. Notary Me N'aburgh, A!!egheny County, Pa.

My Commeon Empires feCrWry 20.1582 c,0o 9 \

s