ML19254C661: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
 
(Created page by program invented by StriderTol)
 
Line 32: Line 32:
: 5. The Fit: Patrick plant is conducting training in DOT and NRC regulations and the waste burial license requirements for site personnel involved in the transfer, packaging and transport of low-level radioactive material, a
: 5. The Fit: Patrick plant is conducting training in DOT and NRC regulations and the waste burial license requirements for site personnel involved in the transfer, packaging and transport of low-level radioactive material, a
                                                                                           .o7 l 1\ 1:, .
                                                                                           .o7 l 1\ 1:, .
                                                                                         . .. s
                                                                                         . .. s 7910170 0 7
            -
7910170 0 7


*. ~,
*. ~,
MR. BOYCE H. GRIER, DIRECTOR                                  September 12, 1979 BULLETIN 79-19                                                JAFP-79-479 Page            This training applies to operators of radioactive waste treatment facii ties, radiological and environmental services department super-
MR. BOYCE H. GRIER, DIRECTOR                                  September 12, 1979 BULLETIN 79-19                                                JAFP-79-479 Page            This training applies to operators of radioactive waste treatment facii ties, radiological and environmental services department super-visors .4nd senior technicians and other site supervisory personnel with administrative responsibilities for the shipment of low-level radioactive material. In addition, training instructions will be amended to require initial training for replacement personnel and retraining at two-year intervals for appropriate personnel in these topics. The training department maintains records of training dates, attendees and subject matter for all training activities.            Initial training and amendment of training instructions will be completed prior to December 31, 1979.
                  '
visors .4nd senior technicians and other site supervisory personnel with administrative responsibilities for the shipment of low-level radioactive material. In addition, training instructions will be amended to require initial training for replacement personnel and retraining at two-year intervals for appropriate personnel in these topics. The training department maintains records of training dates, attendees and subject matter for all training activities.            Initial training and amendment of training instructions will be completed prior to December 31, 1979.
: 6. The Fit: Patrick plant will conduct initial training for tne radioactive waste treatment facility operators (hereafter referred to as operators) to assure that waste is processed into acceptable chemical and physical form for transfer and shipment to a low-level radioactive waste treat-ment burial facility. Training instructions sill be amended to require initial training for replacement operators and retraining at two-year intervals for operators.      Initial training and amendment of' training instructions will be completed prior to December 31, 1979.
: 6. The Fit: Patrick plant will conduct initial training for tne radioactive waste treatment facility operators (hereafter referred to as operators) to assure that waste is processed into acceptable chemical and physical form for transfer and shipment to a low-level radioactive waste treat-ment burial facility. Training instructions sill be amended to require initial training for replacement operators and retraining at two-year intervals for operators.      Initial training and amendment of' training instructions will be completed prior to December 31, 1979.
After low-level radioactive waste is transferred to the radioactive waste facility, operators have little control over the volume of such waste. In order to reduce the volume of low-level radioactive waste to the minimum practicable amount, the training curriculum for indoc-trination of contractor and replacement personnel has historically emphasized the need for reducing the volume of material brought into contaminated areas. This philosophy originates at the management level and is communicated through supervisors and foremen who direct the work in contaminated areas.
After low-level radioactive waste is transferred to the radioactive waste facility, operators have little control over the volume of such waste. In order to reduce the volume of low-level radioactive waste to the minimum practicable amount, the training curriculum for indoc-trination of contractor and replacement personnel has historically emphasized the need for reducing the volume of material brought into contaminated areas. This philosophy originates at the management level and is communicated through supervisors and foremen who direct the work in contaminated areas.
Line 48: Line 44:
                                                   -          s  N JDL: BSM:sw
                                                   -          s  N JDL: BSM:sw
                                 /
                                 /
                                        -    -
bki &                '''
bki &                '''
ew! A U'!'s
ew! A U'!'s n
                                                                              <
John D. Leonard, Jr.
n John D. Leonard, Jr.
CC:  Distribution                      Resident Manager      ll5'        19/
CC:  Distribution                      Resident Manager      ll5'        19/
                                                                            -
                                                                                   -~t
                                                                                   -~t


    '
'..  . MR. BOYCE H. GRIER, DIRECTOR                              Septcmber 12, 1979 BULLETIN 79-19                                            JAFP-79-4'9 Page        DISTRIBUTION:
'..  . MR. BOYCE H. GRIER, DIRECTOR                              Septcmber 12, 1979 BULLETIN 79-19                                            JAFP-79-4'9 Page        DISTRIBUTION:
NRC Office of Inspection and Enforcement Division of Fuel Facility and Matericis Safety Inspection G. T. Berry, PASNY, NYO G. A. Wilverding, PASNY, NYO P. W. Lycn, PASNY, NYO M. C. Cosgrove, PASNY, JAF R. J. Pasternak, PASNY, JAF R. Burns D. Tall B. Mays Document Control Center JAFP-79-479 j 1I 1.
NRC Office of Inspection and Enforcement Division of Fuel Facility and Matericis Safety Inspection G. T. Berry, PASNY, NYO G. A. Wilverding, PASNY, NYO P. W. Lycn, PASNY, NYO M. C. Cosgrove, PASNY, JAF R. J. Pasternak, PASNY, JAF R. Burns D. Tall B. Mays Document Control Center JAFP-79-479 j 1I 1.
                                            .
(
(
                                                ' . '
30r
30r
                                                       ._ . . J
                                                       ._ . . J
                                                                         .}}
                                                                         .}}

Latest revision as of 00:20, 2 February 2020

Responds to IE Bulletin 79-19.Mgt-approved Detailed Instructions & Operating Procedures Re Transfer,Packaging & Transport of Low Level Radwaste Are Provided to Personnel Involved.Liquid Radwaste Is Generated
ML19254C661
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 09/12/1979
From: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
JAFP-79-479, NUDOCS 7910170076
Download: ML19254C661 (3)


Text

  • F, .

Y&

POWER AUTHORITY OF THE STATE OF NEW YORK JAMES A. FtrzPATRICK N UCLE A R POWER PLANr

  1. "" leo A n, y,n n September 12, 1979 Lycomin New Yo 13093 JAFP-79-479 -

315 342 3840 Mr. Boyce H. Grier, Director United States Nuclear Regulatory Commission Region 1 631 Park Avenue King of Prussia, Pennsylvania 19406

SUBJECT:

NRC I 6 E BULLETIN 79-19 PACKAGING OF LOW-LEVEL RADIOACTIVE WASTE FOR TRANSPORT AND BURIAL De2r Mr. Grier:

The Fit: Patrick plant staff has completed its review of the subject bulletin and the results of that review are presented below in the same order as indicated in the bulletin.

1. A current set of Nuclear Regulatory Commission Regulations, concerning the transfer, packaging and transport of low-level radioactive waste are maintained. A set of Department of Transportation (DOT) regulations are maintained and kept current on an annual basis. The Fit: Patrick plant will, within six months, obtain a complete set of the DOT regu-lations and will maintain these copies as current as practicable.
2. A current set of requirements (licenses) placed on the waste burial fims by the agreement states of South Carolina and Washington are maintained by the Fit: Patrick facility.
3. The plant has designated in writing the personnel in the organization who are responsible for the safe transfer, packaging, and transport of low-level radioactive materials.
4. Management approved detailed instructions and operating procedures relating to the transfer, packaging and transport of low-level radioactive materials are currently provided to those personnel involved.
5. The Fit: Patrick plant is conducting training in DOT and NRC regulations and the waste burial license requirements for site personnel involved in the transfer, packaging and transport of low-level radioactive material, a

.o7 l 1\ 1:, .

. .. s 7910170 0 7

  • . ~,

MR. BOYCE H. GRIER, DIRECTOR September 12, 1979 BULLETIN 79-19 JAFP-79-479 Page This training applies to operators of radioactive waste treatment facii ties, radiological and environmental services department super-visors .4nd senior technicians and other site supervisory personnel with administrative responsibilities for the shipment of low-level radioactive material. In addition, training instructions will be amended to require initial training for replacement personnel and retraining at two-year intervals for appropriate personnel in these topics. The training department maintains records of training dates, attendees and subject matter for all training activities. Initial training and amendment of training instructions will be completed prior to December 31, 1979.

6. The Fit: Patrick plant will conduct initial training for tne radioactive waste treatment facility operators (hereafter referred to as operators) to assure that waste is processed into acceptable chemical and physical form for transfer and shipment to a low-level radioactive waste treat-ment burial facility. Training instructions sill be amended to require initial training for replacement operators and retraining at two-year intervals for operators. Initial training and amendment of' training instructions will be completed prior to December 31, 1979.

After low-level radioactive waste is transferred to the radioactive waste facility, operators have little control over the volume of such waste. In order to reduce the volume of low-level radioactive waste to the minimum practicable amount, the training curriculum for indoc-trination of contractor and replacement personnel has historically emphasized the need for reducing the volume of material brought into contaminated areas. This philosophy originates at the management level and is communicated through supervisors and foremen who direct the work in contaminated areas.

7. A management controlled audit function of transfer, packaging- and transport activities is currently performed as required by 10 cFR 71 by the quality assurance department.
8. A management controlled audit was accomplished by the quality assurance department during the months of March and May of 1979. Future audits of the transfer, packaging and transport of low-level radioactive waste will be scheduled as required to fulfill remaining requirements of this bulletin w lch may not have been addressed in the original audits. -

With respect to the three questions set forth at the end of the bulletin, answers to the first two questions are contained in the Fit: Patrick Effluent and Waste Disposal Semi-Annual Report. In answer to question three, the Fit: Patrick plant does generate liquid low-level radioactive waste. This waste is reduced in volume by plant operators utilizing permanently installed liquid waste evaporators and is later solidified using urea formaldehyde.

Very truly yours,

- s N JDL: BSM:sw

/

bki &

ew! A U'!'s n

John D. Leonard, Jr.

CC: Distribution Resident Manager ll5' 19/

-~t

'.. . MR. BOYCE H. GRIER, DIRECTOR Septcmber 12, 1979 BULLETIN 79-19 JAFP-79-4'9 Page DISTRIBUTION:

NRC Office of Inspection and Enforcement Division of Fuel Facility and Matericis Safety Inspection G. T. Berry, PASNY, NYO G. A. Wilverding, PASNY, NYO P. W. Lycn, PASNY, NYO M. C. Cosgrove, PASNY, JAF R. J. Pasternak, PASNY, JAF R. Burns D. Tall B. Mays Document Control Center JAFP-79-479 j 1I 1.

(

30r

._ . . J

.