IR 05000315/2013503: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
(7 intermediate revisions by the same user not shown) | |||
Line 3: | Line 3: | ||
| issue date = 07/08/2013 | | issue date = 07/08/2013 | ||
| title = IR 05000315-13-503; 05000316-13-503; 06/03/2013 - 06/07/2013; Donald C. Cook Nuclear Power Plant, Units 1 and 2; Baseline Emergency Preparedness Exercise Evaluation | | title = IR 05000315-13-503; 05000316-13-503; 06/03/2013 - 06/07/2013; Donald C. Cook Nuclear Power Plant, Units 1 and 2; Baseline Emergency Preparedness Exercise Evaluation | ||
| author name = Maynen J | | author name = Maynen J | ||
| author affiliation = NRC/RGN-III/DRS/PSB | | author affiliation = NRC/RGN-III/DRS/PSB | ||
| addressee name = Weber L | | addressee name = Weber L | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:UNITED STATES uly 8, 2013 | ||
==SUBJECT:== | |||
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000315/2013503; 05000316/2013503 | |||
==Dear Mr. Weber:== | |||
On June 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Donald C. Cook Nuclear Power Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on June 7, 2013, with Mr. J. Gebbie and other members of your staff. | |||
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license. | |||
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel. | |||
No findings were identified during this inspection. | |||
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS) | |||
component of NRC's Agencywide Documents Access and Management System (ADAMS), | |||
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | |||
Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | Sincerely, | ||
/RA/ | |||
Joseph Maynen, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74 | |||
===Enclosure:=== | ===Enclosure:=== | ||
Inspection Report 05000315/2013503; 05000316/2013503 | Inspection Report 05000315/2013503; 05000316/2013503 w/Attachment: Supplemental Information | ||
REGION III== | |||
Docket Nos: 50-315; 50-316 License Nos: DPR-58; DPR-74 Report No: 05000315/2013503; 05000316/2013503 Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Dates: June 3 - 7, 2013 Inspectors: R. Jickling, Senior Emergency Preparedness Inspector J. Beavers, Emergency Preparedness Inspector J. Ellegood, Senior Resident Inspector E. Schrader, Emergency Preparedness Specialist N. Valos, Senior Reactor Analyst Approved by: J. Maynen, Acting Chief Plant Support Branch Division of Reactor Safety Enclosure | |||
=SUMMARY OF FINDINGS= | |||
IR 05000315/2013503; 05000316/2013503; 06/03/2013 - 06/07/2013; Donald C. Cook Nuclear | |||
Power Plant, Units 1 and 2; Baseline Emergency Preparedness Exercise Evaluation - Hostile Action Event; Exercise Evaluation Scenario Review; Performance Indicator Verification. | |||
This report covers a one-week period of announced baseline inspection by three Region III inspectors, one resident inspector, and one emergency preparedness specialist. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006. | |||
= | ===NRC-Identified=== | ||
and Self-Revealed Findings | |||
===Cornerstone: Emergency Preparedness=== | |||
No findings were identified. | |||
=== | ===Licensee-Identified Violations=== | ||
No violations were identified. | No violations were identified. | ||
Line 68: | Line 68: | ||
==REACTOR SAFETY== | ==REACTOR SAFETY== | ||
===Cornerstone:=== | ===Cornerstone: Emergency Preparedness=== | ||
{{a|1EP7}} | {{a|1EP7}} | ||
==1EP7 Exercise Evaluation - Hostile Action Event== | ==1EP7 Exercise Evaluation - Hostile Action Event== | ||
Line 76: | Line 75: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Title 10, Code of Federal Regulations (CFR), Part 50, Appendix E, Section IV.F.2.j, requires in part, that nuclear power reactor licensees, in each eight calendar year | Title 10, Code of Federal Regulations (CFR), Part 50, Appendix E, Section IV.F.2.j, requires in part, that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their Emergency Response Organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a Hostile Action (HA) directed at the plant site. Donald C. Cook Nuclear Power Plant designed the June 4, 2013, exercise to satisfy this requirement, and the NRC inspected the Donald C. Cook Nuclear Power Plant HA event exercise to assess the licensees ability to effectively implement their Emergency Plan during an HA event and adequately protect public health and safety. | ||
exercise | The exercise evaluation consisted of the following reviews and assessments: | ||
The adequacy of the licensees performance in the biennial exercise conducted on June 4, 2013, regarding the implementation of the Risk-Significant Planning Standards (RSPSs) in 10 CFR 50.47 (b)(4), (5), (9), and (10), which address emergency classification, offsite notification, radiological assessment, and Protective Action Recommendations (PARs), respectively. | |||
The | The overall adequacy of the licensees emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities, and Emergency Plan commitments. The facilities assessed were the Control Room Simulator (CRS), Alternate Emergency Response Facility, Incident Command Post (ICP), and the Emergency Operations Facility (EOF). | ||
A review of other performance areas, such as the licensee EROs recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra - and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Emergency Plan and its implementing procedures. | |||
The adequacy of the | Past performance issues from NRC Inspection Reports (IRs) to determine the effectiveness of corrective actions, as demonstrated during this exercise, to ensure compliance with 10 CFR 50.47(b)(14). | ||
The adequacy of the licensees post-exercise critiques, to evaluate Donald C. Cook Nuclear Power Plants self-assessment of its ERO performance during the June 4, 2013, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g. | |||
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis. | |||
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.07-06. | This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.07-06. | ||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. {{a|1EP8}} | ||
{{a|1EP8}} | |||
==1EP8 Exercise Evaluation - Scenario Review== | ==1EP8 Exercise Evaluation - Scenario Review== | ||
{{IP sample|IP=IP 71114.08}} | {{IP sample|IP=IP 71114.08}} | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, | Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the Emergency Plan, as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle. | ||
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis. | |||
This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08-06. | |||
====b. Findings==== | ====b. Findings==== | ||
Line 104: | Line 109: | ||
==OTHER ACTIVITIES== | ==OTHER ACTIVITIES== | ||
===Cornerstone:=== | ===Cornerstone: Emergency Preparedness=== | ||
{{a|4OA1}} | {{a|4OA1}} | ||
==4OA1 Performance Indicator Verification== | ==4OA1 Performance Indicator Verification== | ||
Line 112: | Line 116: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors sampled licensee submittals for the Drill and Exercise Performance (DEP) Indicator, for the period from the first quarter 2012 through first quarter 2013. To determine the accuracy of the Performance Indicator (PI) data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, | The inspectors sampled licensee submittals for the Drill and Exercise Performance (DEP) Indicator, for the period from the first quarter 2012 through first quarter 2013. To determine the accuracy of the Performance Indicator (PI) data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated CRS training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report. | ||
This inspection constituted one DEP sample as defined in IP 71151-05. | This inspection constituted one DEP sample as defined in IP 71151-05. | ||
Line 122: | Line 126: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors sampled licensee submittals for the ERO Drill Participation PI, for the period from the first quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, | The inspectors sampled licensee submittals for the ERO Drill Participation PI, for the period from the first quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, participation during the 2012 and 2013 drills, and revisions of the roster of personnel assigned to key ERO positions. Documents reviewed are listed in the Attachment to this report. | ||
This inspection constituted one ERO Drill Participation sample as defined in IP 71151-05. | This inspection constituted one ERO Drill Participation sample as defined in IP 71151-05. | ||
Line 132: | Line 136: | ||
====a. Inspection Scope==== | ====a. Inspection Scope==== | ||
The inspectors sampled licensee submittals for the Alert and Notification System (ANS) PI for the period from the first quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, | The inspectors sampled licensee submittals for the Alert and Notification System (ANS) | ||
PI for the period from the first quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI Guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests. | |||
Documents reviewed are listed in the Attachment to this report. | |||
This inspection constituted one ANS sample as defined in IP 71151-05. | |||
====b. Findings==== | ====b. Findings==== | ||
No findings were identified. | No findings were identified. | ||
{{a|4OA6}} | {{a|4OA6}} | ||
==4OA6 Management Meetings== | ==4OA6 Management Meetings== | ||
===.1 Exit Meeting Summary On June 7, 2013, the inspectors presented the biennial exercise inspection results to Mr. J. Gebbie and other members of the licensee staff. | ===.1 Exit Meeting Summary=== | ||
The licensee acknowledged the issues presented. | |||
On June 7, 2013, the inspectors presented the biennial exercise inspection results to Mr. J. Gebbie and other members of the licensee staff. The licensee acknowledged the issues presented. | |||
The inspectors confirmed that none of the potential report input discussed was considered proprietary. | The inspectors confirmed that none of the potential report input discussed was considered proprietary. | ||
===.2 Public and Media Briefing On June 7, 2013, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefing hosted by the DHS and FEMA Region V Field Office staff at the Berrien County Building in Benton Harbor, Michigan. ATTACHMENT: | ===.2 Public and Media Briefing=== | ||
On June 7, 2013, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefing hosted by the DHS and FEMA Region V Field Office staff at the Berrien County Building in Benton Harbor, Michigan. | |||
ATTACHMENT: | |||
=SUPPLEMENTAL INFORMATION= | =SUPPLEMENTAL INFORMATION= | ||
==KEY POINTS OF CONTACT== | ==KEY POINTS OF CONTACT== | ||
Licensee | |||
: [[contact::J. Gebbie]], Site Vice President | Licensee | ||
: [[contact::J. Calhoun]], Emergency Preparedness Coordinator | : [[contact::J. Gebbie]], Site Vice President | ||
: [[contact::M. Carlson]], Vice President of Site Support Services | : [[contact::J. Calhoun]], Emergency Preparedness Coordinator | ||
: [[contact::D. Cantrell]], Operations Director | : [[contact::M. Carlson]], Vice President of Site Support Services | ||
: [[contact::B. Chambers]], Emergency Preparedness Manger | : [[contact::D. Cantrell]], Operations Director | ||
: [[contact::K. Henderson]], Regulatory Affairs | : [[contact::B. Chambers]], Emergency Preparedness Manger | ||
: [[contact::C. Hutchinson]], Nuclear Security Director | : [[contact::K. Henderson]], Regulatory Affairs | ||
: [[contact::S. Lies]], Engineering Vice President | : [[contact::C. Hutchinson]], Nuclear Security Director | ||
: [[contact::J. Nimtz]], Emergency Preparedness Coordinator | : [[contact::S. Lies]], Engineering Vice President | ||
: [[contact::S. Parton]], Plant Manager | : [[contact::J. Nimtz]], Emergency Preparedness Coordinator | ||
: [[contact::J. Ross]], Plant Engineer Director | : [[contact::S. Parton]], Plant Manager | ||
: [[contact::M. Scarpello]], Regulatory Assurance Manager | : [[contact::J. Ross]], Plant Engineer Director | ||
: [[contact::R. Sieber]], Training Manger | : [[contact::M. Scarpello]], Regulatory Assurance Manager | ||
: [[contact::A. Thompson]], Emergency Preparedness Coordinator | : [[contact::R. Sieber]], Training Manger | ||
: [[contact::C. Wohlgamuth]], Regulatory Affairs | : [[contact::A. Thompson]], Emergency Preparedness Coordinator | ||
: [[contact::C. Wohlgamuth]], Regulatory Affairs | |||
: [[contact::T. Woods]], Plant Support Director | : [[contact::T. Woods]], Plant Support Director | ||
Nuclear Regulatory Commission | Nuclear Regulatory Commission | ||
: [[contact::J. Ellegood]], Senior Resident Inspector | : [[contact::J. Ellegood]], Senior Resident Inspector | ||
: [[contact::P. LaFlamme]], Resident Inspector | : [[contact::P. LaFlamme]], Resident Inspector | ||
==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ==LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED== | ||
===Opened, Closed, and Discussed=== | ===Opened, Closed, and Discussed=== | ||
None | None Attachment | ||
==LIST OF DOCUMENTS REVIEWED== | ==LIST OF DOCUMENTS REVIEWED== | ||
}} | }} |
Latest revision as of 16:13, 20 December 2019
ML13191A150 | |
Person / Time | |
---|---|
Site: | Cook ![]() |
Issue date: | 07/08/2013 |
From: | Maynen J Plant Support Branch II |
To: | Weber L Indiana Michigan Power Co |
Caroline Tilton | |
References | |
IR-13-503 | |
Download: ML13191A150 (12) | |
Text
UNITED STATES uly 8, 2013
SUBJECT:
DONALD C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2 BASELINE EMERGENCY PREPAREDNESS BIENNIAL EXERCISE INSPECTION REPORT 05000315/2013503; 05000316/2013503
Dear Mr. Weber:
On June 7, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at your Donald C. Cook Nuclear Power Plant, Units 1 and 2. The enclosed report documents the results of this inspection, which were discussed on June 7, 2013, with Mr. J. Gebbie and other members of your staff.
The inspection examined activities conducted under your license as they relate to safety and compliance with the Commissions rules and regulations and with the conditions of your license.
The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel.
No findings were identified during this inspection.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure, and your response (if any) will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records System (PARS)
component of NRC's Agencywide Documents Access and Management System (ADAMS),
accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Sincerely,
/RA/
Joseph Maynen, Acting Chief Plant Support Branch Division of Reactor Safety Docket Nos. 50-315; 50-316 License Nos. DPR-58; DPR-74
Enclosure:
Inspection Report 05000315/2013503; 05000316/2013503 w/Attachment: Supplemental Information
REGION III==
Docket Nos: 50-315; 50-316 License Nos: DPR-58; DPR-74 Report No: 05000315/2013503; 05000316/2013503 Licensee: Indiana Michigan Power Company Facility: Donald C. Cook Nuclear Power Plant, Units 1 and 2 Location: Bridgman, MI Dates: June 3 - 7, 2013 Inspectors: R. Jickling, Senior Emergency Preparedness Inspector J. Beavers, Emergency Preparedness Inspector J. Ellegood, Senior Resident Inspector E. Schrader, Emergency Preparedness Specialist N. Valos, Senior Reactor Analyst Approved by: J. Maynen, Acting Chief Plant Support Branch Division of Reactor Safety Enclosure
SUMMARY OF FINDINGS
IR 05000315/2013503; 05000316/2013503; 06/03/2013 - 06/07/2013; Donald C. Cook Nuclear
Power Plant, Units 1 and 2; Baseline Emergency Preparedness Exercise Evaluation - Hostile Action Event; Exercise Evaluation Scenario Review; Performance Indicator Verification.
This report covers a one-week period of announced baseline inspection by three Region III inspectors, one resident inspector, and one emergency preparedness specialist. The NRCs program for overseeing the safe operation of commercial nuclear power reactors is described in NUREG-1649, Reactor Oversight Process, Revision 4, dated December 2006.
NRC-Identified
and Self-Revealed Findings
Cornerstone: Emergency Preparedness
No findings were identified.
Licensee-Identified Violations
No violations were identified.
REPORT DETAILS
REACTOR SAFETY
Cornerstone: Emergency Preparedness
1EP7 Exercise Evaluation - Hostile Action Event
.1 Exercise Evaluation
a. Inspection Scope
Title 10, Code of Federal Regulations (CFR), Part 50, Appendix E,Section IV.F.2.j, requires in part, that nuclear power reactor licensees, in each eight calendar year exercise cycle, provide the opportunity for their Emergency Response Organization (ERO) to demonstrate proficiency in the key skills necessary to respond to a Hostile Action (HA) directed at the plant site. Donald C. Cook Nuclear Power Plant designed the June 4, 2013, exercise to satisfy this requirement, and the NRC inspected the Donald C. Cook Nuclear Power Plant HA event exercise to assess the licensees ability to effectively implement their Emergency Plan during an HA event and adequately protect public health and safety.
The exercise evaluation consisted of the following reviews and assessments:
The adequacy of the licensees performance in the biennial exercise conducted on June 4, 2013, regarding the implementation of the Risk-Significant Planning Standards (RSPSs) in 10 CFR 50.47 (b)(4), (5), (9), and (10), which address emergency classification, offsite notification, radiological assessment, and Protective Action Recommendations (PARs), respectively.
The overall adequacy of the licensees emergency response facilities with regard to NUREG-0696, Functional Criteria for Emergency Response Facilities, and Emergency Plan commitments. The facilities assessed were the Control Room Simulator (CRS), Alternate Emergency Response Facility, Incident Command Post (ICP), and the Emergency Operations Facility (EOF).
A review of other performance areas, such as the licensee EROs recognition of abnormal plant conditions; command and control, including interactions with site security staff; intra - and inter-facility communications; prioritization of mitigating activities; utilization of repair and field monitoring teams; interface with offsite agencies, including local law enforcement agencies; staffing and procedure adequacy; and the overall implementation of the Emergency Plan and its implementing procedures.
Past performance issues from NRC Inspection Reports (IRs) to determine the effectiveness of corrective actions, as demonstrated during this exercise, to ensure compliance with 10 CFR 50.47(b)(14).
The adequacy of the licensees post-exercise critiques, to evaluate Donald C. Cook Nuclear Power Plants self-assessment of its ERO performance during the June 4, 2013, exercise and to ensure compliance with 10 CFR Part 50, Appendix E, Section IV.F.2.g.
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
This exercise evaluation inspection constituted one sample as defined in Inspection Procedure (IP) 71114.07-06.
b. Findings
No findings were identified.
1EP8 Exercise Evaluation - Scenario Review
a. Inspection Scope
Prior to the inspection activity, the inspectors conducted an in-office review of the exercise objectives and scenario submitted to the NRC using IP 71114.08, Exercise Evaluation - Scenario Review, to determine if the exercise would test major elements of the Emergency Plan, as required by 10 CFR 50.47(b)(14). This inspection activity represents one sample on a biennial cycle.
The inspectors reviewed various documents, which are listed in the Attachment to this report. This inspection activity satisfied one inspection sample for the exercise evaluation on a biennial basis.
This review of the exercise objectives and scenario constituted one sample as defined in IP 71114.08-06.
b. Findings
No findings were identified.
OTHER ACTIVITIES
Cornerstone: Emergency Preparedness
4OA1 Performance Indicator Verification
.1 Drill/Exercise Performance
a. Inspection Scope
The inspectors sampled licensee submittals for the Drill and Exercise Performance (DEP) Indicator, for the period from the first quarter 2012 through first quarter 2013. To determine the accuracy of the Performance Indicator (PI) data reported during those periods, PI definitions and guidance contained in the Nuclear Energy Institute (NEI) Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, assessments of PI opportunities during pre-designated CRS training sessions, and performance during other drills. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one DEP sample as defined in IP 71151-05.
b. Findings
No findings were identified.
.2 Emergency Response Organization Drill Participation
a. Inspection Scope
The inspectors sampled licensee submittals for the ERO Drill Participation PI, for the period from the first quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and NEI guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI, participation during the 2012 and 2013 drills, and revisions of the roster of personnel assigned to key ERO positions. Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ERO Drill Participation sample as defined in IP 71151-05.
b. Findings
No findings were identified.
.3 Alert and Notification System
a. Inspection Scope
The inspectors sampled licensee submittals for the Alert and Notification System (ANS)
PI for the period from the first quarter 2012 through the first quarter 2013. To determine the accuracy of the PI data reported during those periods, PI definitions and guidance contained in the NEI Document 99-02, Regulatory Assessment Performance Indicator Guideline, Revision 6, were used. The inspectors reviewed the licensees records associated with the PI to verify that the licensee accurately reported the indicator in accordance with relevant procedures and the NEI Guidance. Specifically, the inspectors reviewed licensee records and processes including procedural guidance on assessing opportunities for the PI and results of periodic scheduled ANS operability tests.
Documents reviewed are listed in the Attachment to this report.
This inspection constituted one ANS sample as defined in IP 71151-05.
b. Findings
No findings were identified.
4OA6 Management Meetings
.1 Exit Meeting Summary
On June 7, 2013, the inspectors presented the biennial exercise inspection results to Mr. J. Gebbie and other members of the licensee staff. The licensee acknowledged the issues presented.
The inspectors confirmed that none of the potential report input discussed was considered proprietary.
.2 Public and Media Briefing
On June 7, 2013, the inspector summarized the NRC's preliminary exercise inspection conclusions at a public and media briefing hosted by the DHS and FEMA Region V Field Office staff at the Berrien County Building in Benton Harbor, Michigan.
ATTACHMENT:
SUPPLEMENTAL INFORMATION
KEY POINTS OF CONTACT
Licensee
- J. Gebbie, Site Vice President
- J. Calhoun, Emergency Preparedness Coordinator
- M. Carlson, Vice President of Site Support Services
- D. Cantrell, Operations Director
- B. Chambers, Emergency Preparedness Manger
- K. Henderson, Regulatory Affairs
- C. Hutchinson, Nuclear Security Director
- S. Lies, Engineering Vice President
- J. Nimtz, Emergency Preparedness Coordinator
- S. Parton, Plant Manager
- J. Ross, Plant Engineer Director
- M. Scarpello, Regulatory Assurance Manager
- R. Sieber, Training Manger
- A. Thompson, Emergency Preparedness Coordinator
- C. Wohlgamuth, Regulatory Affairs
- T. Woods, Plant Support Director
Nuclear Regulatory Commission
- J. Ellegood, Senior Resident Inspector
- P. LaFlamme, Resident Inspector
LIST OF ITEMS OPENED, CLOSED, AND DISCUSSED
Opened, Closed, and Discussed
None Attachment