ML071010040: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML071010040
| number = ML071010040
| issue date = 04/10/2007
| issue date = 04/10/2007
| title = 03/29/2007 Summary of Annual Assessment Meeting with FPL Energy Seabrook, LLC
| title = Summary of Annual Assessment Meeting with FPL Energy Seabrook, LLC
| author name = Krohn P G
| author name = Krohn P
| author affiliation = NRC/RGN-I/DRP/PB6
| author affiliation = NRC/RGN-I/DRP/PB6
| addressee name =  
| addressee name =  
Line 9: Line 9:
| docket = 05000443
| docket = 05000443
| license number = NPF-086
| license number = NPF-086
| contact person = Krohn P G, RI/DRP/PB6/610-337-5120
| contact person = Krohn P, RI/DRP/PB6/610-337-5120
| document type = Meeting Summary
| document type = Meeting Summary
| page count = 2
| page count = 2
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:April 10, 2007MEETING
{{#Wiki_filter:April 10, 2007 MEETING


==SUMMARY==
==SUMMARY==
LICENSEE:FPL ENERGY SEABROOK, LLCFACILITY:SEABROOK STATION
 
LICENSEE:       FPL ENERGY SEABROOK, LLC FACILITY:       SEABROOK STATION


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF MARCH 29, 2007 ANNUAL ASSESSMENT MEETING WITHFPL ENERGY SEABROOKOn March 29, 2007, at 6:30 p.m., an Annual Assessment Meeting was conducted at the Inn ofHampton, Hampton, NH, between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC (Seabrook). The NRC requested the meeting with Seabrook management to discuss the NRC's assessment of the safety performance of the Seabrook nuclear power plant for calendar year 2006.The NRC presented and discussed its assessment of the safety performance of SeabrookUnit 1 for the period between January 1 through December 31, 2006. The NRC presentation included a discussion of the Reactor Oversight Process, general background on the plant, 2006performance assessment results, and an overview of calendar year 2007 planned inspections.
OF MARCH 29, 2007 ANNUAL ASSESSMENT MEETING WITH FPL ENERGY SEABROOK On March 29, 2007, at 6:30 p.m., an Annual Assessment Meeting was conducted at the Inn of Hampton, Hampton, NH, between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC (Seabrook). The NRC requested the meeting with Seabrook management to discuss the NRCs assessment of the safety performance of the Seabrook nuclear power plant for calendar year 2006.
As part of this annual assessment meeting, Seabrook presented an overview of their initiatives in the areas of human performance and engineering. The public observed this meeting and was offered the opportunity to communicate with theNRC regarding Seabrook's performance and the role of the agency in ensuring safe plant operations. At the end of the meeting between the NRC and Seabrook, the NRC answered questions from the public which included the status of dissimilar metal pressurizer weld inspections, security issues that occurred during 2005, use and distribution of potassium iodide tablets, and some additional detail on selected 2006 NRC findings. The meeting notice with attaches meeting agenda can be located in ADAMS Accession No. ML070720415. The slides can be found at ADAMS Accession No. ML071000208. Sincerely,/RA Barry Norris for/Paul Krohn, ChiefProjects Branch 6 Division of Reactor Projects 2Distribution
The NRC presented and discussed its assessment of the safety performance of Seabrook Unit 1 for the period between January 1 through December 31, 2006. The NRC presentation included a discussion of the Reactor Oversight Process, general background on the plant, 2006 performance assessment results, and an overview of calendar year 2007 planned inspections.
:P. Krohn, DRP B. Norris, DRP G. Dentel, DRP S. Shaffer, DRP S. Nelson, DRP E. Huang. DRP E. Miller, DRP A. Burritt, DRP V. Nevses, NRRSUNSI Review Complete:__PGK_____ DOCUMENT NAME: G:\DRP\BRANCH 6\Meeting Notice and Summary\ROP5 SeabrookMeeting Summary.wpdAfter declaring this document "An Official Agency Record" it will be released to the Public.To receive a copy of this document, indicate in the box:
As part of this annual assessment meeting, Seabrook presented an overview of their initiatives in the areas of human performance and engineering.
" C" = Copy without attachment/enclosure   " E" = Copy withattachment/enclosure   " N" = No copyOFFICERI/DRP     RI/DRP       NAMEA. Burritt/
The public observed this meeting and was offered the opportunity to communicate with the NRC regarding Seabrooks performance and the role of the agency in ensuring safe plant operations. At the end of the meeting between the NRC and Seabrook, the NRC answered questions from the public which included the status of dissimilar metal pressurizer weld inspections, security issues that occurred during 2005, use and distribution of potassium iodide tablets, and some additional detail on selected 2006 NRC findings. The meeting notice with attaches meeting agenda can be located in ADAMS Accession No. ML070720415. The slides can be found at ADAMS Accession No. ML071000208.
AB P. Krohn/BN forDATE04/10/0704/10/07 OFFICIAL RECORD COPY}}
Sincerely,
                                                    /RA Barry Norris for/
Paul Krohn, Chief Projects Branch 6 Division of Reactor Projects
 
2 Distribution:
P. Krohn, DRP B. Norris, DRP G. Dentel, DRP S. Shaffer, DRP S. Nelson, DRP E. Huang. DRP E. Miller, DRP A. Burritt, DRP V. Nevses, NRR SUNSI Review Complete:                 __PGK_____
DOCUMENT NAME: G:\DRP\BRANCH 6\Meeting Notice and Summary\ROP5 Seabrook Meeting Summary.wpd After declaring this document An Official Agency Record it will be released to the Public.
To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP                               RI/DRP NAME          A. Burritt/AB                 P. Krohn/BN for DATE          04/10/07                      04/10/07 OFFICIAL RECORD COPY}}

Latest revision as of 13:54, 7 December 2019

Summary of Annual Assessment Meeting with FPL Energy Seabrook, LLC
ML071010040
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 04/10/2007
From: Paul Krohn
NRC/RGN-I/DRP/PB6
To:
Krohn P, RI/DRP/PB6/610-337-5120
References
Download: ML071010040 (2)


Text

April 10, 2007 MEETING

SUMMARY

LICENSEE: FPL ENERGY SEABROOK, LLC FACILITY: SEABROOK STATION

SUBJECT:

SUMMARY

OF MARCH 29, 2007 ANNUAL ASSESSMENT MEETING WITH FPL ENERGY SEABROOK On March 29, 2007, at 6:30 p.m., an Annual Assessment Meeting was conducted at the Inn of Hampton, Hampton, NH, between the Nuclear Regulatory Commission (NRC) and FPL Energy Seabrook, LLC (Seabrook). The NRC requested the meeting with Seabrook management to discuss the NRCs assessment of the safety performance of the Seabrook nuclear power plant for calendar year 2006.

The NRC presented and discussed its assessment of the safety performance of Seabrook Unit 1 for the period between January 1 through December 31, 2006. The NRC presentation included a discussion of the Reactor Oversight Process, general background on the plant, 2006 performance assessment results, and an overview of calendar year 2007 planned inspections.

As part of this annual assessment meeting, Seabrook presented an overview of their initiatives in the areas of human performance and engineering.

The public observed this meeting and was offered the opportunity to communicate with the NRC regarding Seabrooks performance and the role of the agency in ensuring safe plant operations. At the end of the meeting between the NRC and Seabrook, the NRC answered questions from the public which included the status of dissimilar metal pressurizer weld inspections, security issues that occurred during 2005, use and distribution of potassium iodide tablets, and some additional detail on selected 2006 NRC findings. The meeting notice with attaches meeting agenda can be located in ADAMS Accession No. ML070720415. The slides can be found at ADAMS Accession No. ML071000208.

Sincerely,

/RA Barry Norris for/

Paul Krohn, Chief Projects Branch 6 Division of Reactor Projects

2 Distribution:

P. Krohn, DRP B. Norris, DRP G. Dentel, DRP S. Shaffer, DRP S. Nelson, DRP E. Huang. DRP E. Miller, DRP A. Burritt, DRP V. Nevses, NRR SUNSI Review Complete: __PGK_____

DOCUMENT NAME: G:\DRP\BRANCH 6\Meeting Notice and Summary\ROP5 Seabrook Meeting Summary.wpd After declaring this document An Official Agency Record it will be released to the Public.

To receive a copy of this document, indicate in the box: "C" = Copy without attachment/enclosure "E" = Copy with attachment/enclosure "N" = No copy OFFICE RI/DRP RI/DRP NAME A. Burritt/AB P. Krohn/BN for DATE 04/10/07 04/10/07 OFFICIAL RECORD COPY