|
|
Line 60: |
Line 60: |
| MN No. 13-002 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 14, 2013 Licensee: NextEra Energy, Seabrook, LLC Facilities: Seabrook Station, Unit No. 1 (Seabrook) | | MN No. 13-002 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 14, 2013 Licensee: NextEra Energy, Seabrook, LLC Facilities: Seabrook Station, Unit No. 1 (Seabrook) |
| Docket Nos: 50-443 Date/ Time: March 27, 2013, from 5:30 p.m. to 7:30 p.m. | | Docket Nos: 50-443 Date/ Time: March 27, 2013, from 5:30 p.m. to 7:30 p.m. |
| Location: Best Western Plus The Inn at Hampton 815 Lafayette Road Hampton, New Hampshire, 03842 (603) 926-6771 Purpose: The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Seabrook for 2012, as described in the annual assessment letter dated March 4, 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations. | | Location: Best Western Plus The Inn at Hampton 815 Lafayette Road Hampton, New Hampshire, 03842 (603) 926-6771 |
| | |
| | ==Purpose:== |
| | The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Seabrook for 2012, as described in the annual assessment letter dated March 4, 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations. |
| NRC Attendees: G. Dentel, Chief, Division of Reactor Projects, Branch 3 M. Marshall, Chief, Aging Management of Structures, Electrical, and Systems Branch R. Conte, Senior Project Manager, Division of Reactor Safety W. Cook, Senior Reactor Analyst, Division of Reactor Safety P. McKenna, Acting Senior Resident Inspector, Seabrook W. Raymond, Operations Engineer, Inspections, Tests, Analyses and Acceptance Criteria Branch M. Jennerich, Resident Inspector, Seabrook Public Participation: This is a Category 3 Meeting. The NRC will host an open house to discuss NextEra's performance at Seabrook during calendar year 2012. | | NRC Attendees: G. Dentel, Chief, Division of Reactor Projects, Branch 3 M. Marshall, Chief, Aging Management of Structures, Electrical, and Systems Branch R. Conte, Senior Project Manager, Division of Reactor Safety W. Cook, Senior Reactor Analyst, Division of Reactor Safety P. McKenna, Acting Senior Resident Inspector, Seabrook W. Raymond, Operations Engineer, Inspections, Tests, Analyses and Acceptance Criteria Branch M. Jennerich, Resident Inspector, Seabrook Public Participation: This is a Category 3 Meeting. The NRC will host an open house to discuss NextEra's performance at Seabrook during calendar year 2012. |
| NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Seabrook. | | NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Seabrook. |
| Meeting Contact: Glenn T. Dentel, Chief, Projects Branch 3 (610) 337-5233 E-mail: Glenn.Dentelk.N RC.Gov | | Meeting |
| | |
| | ==Contact:== |
| | Glenn T. Dentel, Chief, Projects Branch 3 (610) 337-5233 E-mail: Glenn.Dentelk.N RC.Gov |
|
| |
|
| 2 The NRC's annual assessment letter regarding Seabrook's performance during 2012 can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML13063A194. ADAMS is accessible from the NRC website at: | | 2 The NRC's annual assessment letter regarding Seabrook's performance during 2012 can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML13063A194. ADAMS is accessible from the NRC website at: |
Line 81: |
Line 87: |
| ===Background=== | | ===Background=== |
| MN No. 13-005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 13, 2013 Licensee: Entergy Nuclear Operations, Inc. | | MN No. 13-005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 13, 2013 Licensee: Entergy Nuclear Operations, Inc. |
| Facility: Pilgrim Nuclear Power Station Docket No: 50-293 Date/Time: Tuesday, April 2, 2013 5:00 p.m. to 6:30 p.m Location: Plymouth Town Hall 11 Lincoln Street Plymouth, MA 02360 Purpose: The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Pilgrim for 2012, as described in the annual assessment letter dated March 5, 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations. | | Facility: Pilgrim Nuclear Power Station Docket No: 50-293 Date/Time: Tuesday, April 2, 2013 5:00 p.m. to 6:30 p.m Location: Plymouth Town Hall 11 Lincoln Street Plymouth, MA 02360 |
| | |
| | ==Purpose:== |
| | The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Pilgrim for 2012, as described in the annual assessment letter dated March 5, 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations. |
| NRC Attendees: R. Bellamy, Chief, Division of Reactor Projects, Branch 5 M. Schneider, Senior Resident Inspector T. Setzer, Senior Project Engineer B. Smith, Resident Inspector S. Campbell, Office Assistant Public Participation: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss Entergy's performance at Pilgrim Nuclear Power Station during calendar year 2012. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Pilgrim. | | NRC Attendees: R. Bellamy, Chief, Division of Reactor Projects, Branch 5 M. Schneider, Senior Resident Inspector T. Setzer, Senior Project Engineer B. Smith, Resident Inspector S. Campbell, Office Assistant Public Participation: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss Entergy's performance at Pilgrim Nuclear Power Station during calendar year 2012. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Pilgrim. |
| Meeting Contact: Ronald R. Bellamy Ph.D., Chief, Projects Branch 5 610-337-5200 E-mail: Ronald.Bellamy@nrc.gov The NRC's annual assessment letter regarding Pilgrim performance during 2012 can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML13060A340. ADAMS is accessible from the NRC website at: | | Meeting |
| | |
| | ==Contact:== |
| | Ronald R. Bellamy Ph.D., Chief, Projects Branch 5 610-337-5200 E-mail: Ronald.Bellamy@nrc.gov The NRC's annual assessment letter regarding Pilgrim performance during 2012 can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML13060A340. ADAMS is accessible from the NRC website at: |
| http://www.nrc.gov/reading-rm/adams.html. | | http://www.nrc.gov/reading-rm/adams.html. |
|
| |
|
|
---|
Category:Congressional Correspondence
MONTHYEARML21022A2212021-02-0505 February 2021 Letter to Senator Charles Schumer from Margaret Doane Response for NRC to Reconsider Its Decision to Not Allow for a Public Hearing in the Transfer of Indian Point'S License ML20192A2392020-07-29029 July 2020 Letter to the Honorable Jeanne Shaheen, Et Al., from Chairman Svinicki Regarding Concerns About Recent Incidents at Seabrook Station and Requests for a Public Information Session and Congressional Briefing ML20119A9872020-05-0505 May 2020 Letter to the Honorable Edward Markey, Et Al., from Chairman Svinicki Responds to Questions About the Seabrook Nuclear Plant Refueling Process During the Ongoing Coronavirus Outbreak ML20111A1402020-04-20020 April 2020 LTR-20-0159 Senator Edward Markey Et Al., Letter Questions About the Seabrook Nuclear Plant Refueling Process During the Ongoing Coronavirus Outbreak ML19262G4752019-10-0808 October 2019 10-08-19 - Ltr to the Honorable Edward J. Markey, Et Al., Responds to Concerns Related to the NRC Staff Recommendation Regarding a Request from Entergy for Exemptions from Emergency Preparedness and Planning Requirements for Pilgrim Nuclear ML19239A1452019-08-26026 August 2019 Letter to the Honorable Edward J. Markey from Rochelle C. Bavol, Acting Secretary of the Commission, Regarding the Pilgrim Nuclear Power Station License Transfer Request from Entergy and Holtec ML19233A2432019-08-21021 August 2019 LTR-19-0326 Sen Edward Markey, Sen Elizabeth Warren & REP William Keating, Letter Urges to Delay the Final Ruling on the Pilgrim Nuclear Power Station License Transfer Request from Entergy & Holtec Until After the Commission Has Ruled Upon ML19221B4792019-08-0808 August 2019 LTR-19-0310 Sen Edward J. Markey, Letter Urges the Chairman to Direct the NRC Staff to Delay Ruling on the Pilgrim Nuclear Power Station License Transfer Request from Entergy and Holtec (Docket No. 50-293 & 72-1004) ML18341A0162018-12-20020 December 2018 Letter to the Honorable William Keating Responds to His Letter Commenting on Recent NRC Inspection Reports Issued for the Pilgrim Nuclear Power Station ML18331A0402018-11-21021 November 2018 Acknowledgement Letter to Congressman William Keating on Pilgrim Inspection Report ML18228A6432018-08-28028 August 2018 Letter to Representative William Keating from Chairman Svinicki Responds to His Letter Regarding the Proposed Sale of Pilgrim Nuclear Power Station by Entergy Nuclear Operations Inc. to a Subsidiary of Holtec International ML18135A1022018-05-29029 May 2018 Letter to the Honorable Edward Markey from Chairman Svinicki Responds to His Letter Regarding Spent Fuel Storage at Pilgrim Nuclear Power Station and the Potential Impacts of Climate Change ML18127A0312018-05-0707 May 2018 Statement of Senator Edward J. Markey - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18127A0322018-05-0707 May 2018 Statement of Senator Elizabeth Warren - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18127A0302018-05-0707 May 2018 Statement of Congressman William R. Keating - NRC Annual Assessment Meeting for Pilgrim Nuclear Power Station - 03/27/2018 ML18066A0822018-03-19019 March 2018 Enclosure - Letter to Senator Elizabeth Warren, Et Al., from Chairman Svinicki Regarding Winter Storms and an Inspector for Pilgrim Nuclear Power Station ML16295A0892016-10-20020 October 2016 Letter to Senator Edward J. Markey Et Al., from Chairman Burns, Response to Letter Urging the Commission to Reject a Request from Entergy Nuclear Operations Inc. for an Extension of Time to Comply with NRC Order EA-13-109 ML16266A0652016-09-21021 September 2016 LTR-16-0469 Senator Edward J. Markey Et Al., Letter Request to Reject Entergy'S Efforts to Reduce Safety Requirements at Pilgrim ML16174A4032016-06-15015 June 2016 Letter to Senator Edward Markey from Eugene Dacus, OCA Provides Final Response to His Letter on Seabrook Station, Unit 1 Enclosing UFSAR Revisions 11, 12, 13, 14 and 15 ML16141B3062016-05-17017 May 2016 05-17-16, Letter to Senator Edward Markey from Eugene Dacus Provides Second Response for Documents Regarding the Seabrook Station Unit 1 (Rev. 16 of the UFSAR and NextEra Response Letter to the Staff on License Renewal for Seabrook) ML16111B3122016-04-19019 April 2016 04-19-16 Letter to Senator Markey Fm Eugene Dacus Responds to His Letter Requesting Documents Pertaining to the Seabrook Station (Revisions 12-16 for Seabrook'S Updated Final Safety Analysis Reports, Chapter 3) ML16054A7672016-02-23023 February 2016 02-23-16 Letter to Senator Edward Markey from Eugene Dacus Acknowledging His Letter to Chairman Burns Dated 02/17/16 Pertaining to the Seabrook Station ML16054A1172016-02-17017 February 2016 LTR-16-0080 - Senator Edward J. Markey, Letter Request for Documents Related to Safety Issues at Seabrook Station Nuclear Power Plant ML15309A1282015-11-30030 November 2015 Letter to Senator Edward J. Markey, Et Al., from Chairman Burns Responds to His Letter Seeking Assurance That Decommissioning of Pilgrim Nuclear Power Station Will Be in Compliance with NRC Regulations (Response) ML15299A1142015-10-21021 October 2015 10-21-15 Ack Ltr to Honorable Edward J Markey - Pilgrim ML15289A1452015-10-15015 October 2015 LTR-15-0519 Senator Edward J. Markey, Letter Request to Ensure That the Remaining Period During Which the Pilgrim Nuclear Power Station Operates Receives the Utmost Attention to Safety and Security ML14163A4332014-08-0101 August 2014 Letter to Senator Edward J. Markey from Chairman Macfarlane Information About NRC-Sanctioned Job Shadow Program with China ML14141A6242014-05-20020 May 2014 LTR-14-0288 - Senator Edward J. Markey Ltr. Information About NRC-Sanctioned Job Shadow Program with China ML14043A1382014-02-14014 February 2014 G20140055/LTR-13-0957 - Sen. Edward Markey, Et Al., Ltr Requests the NRC Make No Decision on the 6/1/10, Request for the Seabrook Nuclear Power Plant for a 20 Year Operating License Until the Concrete Degradation Is Well Tested and Remedied ML14037A1262014-02-14014 February 2014 G20140030/LTR-14-0009- Senator Jeanne Shaheen Email Seabrook - Piping/Plumbing (Response) ML14014A2252014-01-14014 January 2014 LTR-13-0957, Response Letter to Senator Edward Markey Et Al., on His Request for NRC to Not Make a Decision for the Seabrook Plants for a 20 Year OL Until the Concrete Degradation Is Well Tested and Remedied ML13354B9522013-12-18018 December 2013 G20140055/LTR-13-0957 - Senator Edward Markey, Et Al., Ltr Requests the NRC Make No Decision on the June 1, 2010, Request for the Seabrook Nuclear Power Plant for a 20 Year Operating License Until the Concrete Degradation Is Well Tested and ML13079A2822013-03-26026 March 2013 G20130209/LTR-13-0224 Ltr. to Rep. E. Markey, Et Al. - Responds to Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Seabrook ML13079A0202013-03-18018 March 2013 G20130209/LTR-13-0224 - Ltr. Representatives Edward J. Markey, John F. Tierney and Bill Keating Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Sea ML13007A4062013-01-0202 January 2013 Comment (136) of Thomas J. Calter, State Representative on Environmental Impacts of Temporary Storage of Spent Fuel After Cessation of Reactor Operation ML12215A0212012-07-31031 July 2012 G20120556/LTR-12-0385/EDATS: SECY-2012-0393 - Rep. Edward J. Markey and Rep. Bill Keating Ltr. Emergency Response Capability at the Pilgrim Nuclear Generating Station During Labor Dispute ML12163A5022012-07-23023 July 2012 G20120371/LTR-12-0238/EDATS: OEDO-2012-0270 - Letter to Rep. Edward J. Markey from Chairman Allison M. Macfarlane Re Request That the Nuclear Regulatory Commission Deny Staff'S Request to Re-License the Pilgrim Nuclear Power Plant ML12191A3352012-07-23023 July 2012 G20120430/LTR-12-0277/EDATS: SECY-2012-0310 - Letter to Reps. Edward Markey and William Keating from Chairman Allison M. Macfarlane Concerns About Current Emergency Response Capabilities at Pilgrim Nuclear Generating Station ML12152A3892012-07-23023 July 2012 LTR-12-0187 - Ltr to Congressmen Edward Markey and William Keating from Chairman Macfarlane Responds to Letter Regarding the twenty-year Extension of Pilgrim Nuclear Power Station'S Operating License ML12172A3032012-06-0808 June 2012 G20120430/LTR-12-0277/EDATS: SECY-2012-0310 - Ltr. Reps. Edward Markey and William R. Keating Concerns the Current Emergency Response Capability at the Pilgrim Nuclear Generating Station ML12153A0262012-05-24024 May 2012 G20120371/LTR-12-0238/EDATS: SECY-2012-0270 - Ltr. Rep. Edward J. Markey Re Request That the Nuclear Regulatory Commission Deny Staff'S Request to Re-License the Pilgrim Nuclear Power Plant ML12145A6922012-05-0404 May 2012 LTR-12-0187 - Incoming from Rep Markey and Rep Keating to Chairman Jaczko Urging the Commission Not to Move Forward with Its Decision on Whether to Issue the twenty-year License Extension for Pilgrim Nuclear Power Station ML12114A0172012-04-13013 April 2012 G20120265/LTR-12-0150/EDATS: SECY-2012-0195 - Ltr. Reps. Edward J. Markey and John F. Tierney to Chairman Jaczko Seabrook Nuclear Power Plant - Degradation of Concrete ML12090A5882012-03-27027 March 2012 G20120213/LTR-12-0123/EDATS: SECY-2012-0147 - Senator Kelly A. Ayotte Ltr. Seabrook Nuclear Station ML12104A1132012-03-23023 March 2012 G20120234/LTR-12-0140/EDATS: SECY-2012-0178 - E-mail Senator John F. Kerry Safety Issues at Seabrook Nuclear Power Plant ML12079A2162012-03-21021 March 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 - Ltr to Rep. Edward J. Markey Fm R. W. Borchardt Re Pilgrim Nuclear Power Station ML12072A3032012-03-0808 March 2012 Letter from the Secretary to the Honorable Edward J. Markey in Response to His February 27, 2012 Letter ML12079A2182012-02-27027 February 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 - Responses to Information Requests from Representative Edward J. Markey ML12061A2152012-02-27027 February 2012 G20120135/LTR-12-0080/EDATS: SECY-2012-0096 Urges NRC Not to Relicense the Pilgrim Nuclear Power Station Until All Legal Requirements Stipulated by the Endangered Species Act Have Been Met CY-92-223, G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 19712011-07-14014 July 2011 G20110523/LTR-11-0411/EDATS: SECY-2011-0411 - Ltr. from Rep. E.J. Markey to Chairman Jaczko NRC Safety Requirements for Reactors Granted Construction Permits Prior to 1971 2021-02-05
[Table view] Category:Letter
MONTHYEARIR 05000443/20240032024-10-30030 October 2024 Integrated Inspection Report 05000443/2024003 L-2024-176, Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums2024-10-30030 October 2024 Annual 10 CFR 140.21 Licensee Guarantees of Payment of Deferred Premiums ML24303A0352024-10-29029 October 2024 Operator Licensing Examination Approval IR 05000443/20244022024-10-17017 October 2024 Material Control and Accounting Program Inspection Report 05000443/2024402 (Cover Letter Only) L-2024-159, Core Operating Limits Report for Reload Cycle 242024-10-15015 October 2024 Core Operating Limits Report for Reload Cycle 24 L-2024-169, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes2024-10-15015 October 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site- Specific Annexes ML24254A2552024-09-25025 September 2024 Alternative Request No. 4A-01 for the Fourth 10-Year Inservice Inspection Interval L-2024-158, Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-25025 September 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes ML24239A5382024-09-20020 September 2024 Issuance of Amendment No. 175 One-Time Allowable Outage Time Extension to the Technical Specification 3.8.1.1, A.C. Sources – Operating, Limiting Condition for Operation ML24240A1692024-09-18018 September 2024 Cy 2023 Summary of Decommissioning Trust Fund Status L-2024-136, Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-09-16016 September 2024 Supplement to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes IR 05000443/20240052024-08-29029 August 2024 Updated Inspection Plan for Seabrook Station (Report 05000443/2024005) ML24232A1142024-08-21021 August 2024 Correction to Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves IR 05000293/20240022024-08-21021 August 2024 NRC Inspection Report No. 05000293/2024002 L-2024-141, Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit2024-08-15015 August 2024 Third Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Be L-2024-137, Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent .2024-08-12012 August 2024 Second Supplement to NextEra Energy Seabrook, LLC, Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent . IR 05000443/20240022024-08-0606 August 2024 Integrated Inspection Report 05000443/2024002 and Independent Spent Fuel Storage Installation Inspection Report 07200063/2024001 ML24163A0012024-08-0505 August 2024 LTR-24-0119-1-1 Response to Nh Letter Regarding Review of NextEras Emergency Preparedness Amendment Review L-2024-127, Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent2024-08-0505 August 2024 Supplement to Letter L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent PNP 2024-030, Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 02024-08-0202 August 2024 Update Report for Holtec Decommissioning International Fleet Decommissioning Quality Assurance Program Rev. 3 and Palisades Transitioning Quality Assurance Plan, Rev 0 L-2024-125, Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes2024-07-24024 July 2024 Notice of Intent to Provide Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-108, Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite.2024-07-16016 July 2024 Response to Request for Additional Information (RAI) Regarding One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite. ML24193A2432024-07-12012 July 2024 – Interim Audit Summary Report in Support of Review of License Amendment Requests Regarding Fleet Emergency Plan L-2024-114, Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal2024-07-10010 July 2024 Quality Assurance Topical Report (FPL-1 Revision 31 Annual Submittal L-2024-102, Official Service List Update2024-06-19019 June 2024 Official Service List Update L-2024-098, Preparation and Scheduling of Operator Licensing Examinations2024-06-12012 June 2024 Preparation and Scheduling of Operator Licensing Examinations ML24149A2862024-06-12012 June 2024 NextEra Fleet - Proposed Alternative Frr 23-01 to Use ASME Code Case N-752-1, Risk-Informed Categorization and Treatment for Repair/Replacement Activities in Class 2 and 3 Systems Section X1, Division 1 (EPID L-2023-LLR-0009) - Letter ML24151A6482024-06-0303 June 2024 Changes in Reactor Decommissioning Branch Project Management Assignments for Some Decommissioning Facilities L-2024-084, Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld2024-05-30030 May 2024 Relief Request 4A-01, Rev 1 - Revision to Relief Request for Examination of Control Rod Drive Mechanism (Rod) Housing H-4 Canopy Seal Weld IR 05000443/20240102024-05-29029 May 2024 Biennial Problem Identification and Resolution Inspection Report 05000443/2024010 ML24129A1042024-05-26026 May 2024 Preapplication Readiness Assessment Plan for the Holtec Decommissioning International License Termination Plan IR 05000443/20240112024-05-24024 May 2024 Age-Related Degradation Inspection Report 05000443/2024011 ML24136A2382024-05-14014 May 2024 Annual Radiological Environmental Operating Report for 2023 ML24135A3212024-05-14014 May 2024 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2023 IR 05000443/20240012024-05-13013 May 2024 Integrated Inspection Report 05000443/2024001 L-2024-061, NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distribut2024-05-10010 May 2024 NextEra Energy Seabrook, LLC, License Amendment Request - One Time Extension to Technical Specification 3.8.1.1.a, Allowed Outage Time with One Independent Circuit Between the Offsite Transmission Network and the Onsite Class 1E Distributio ML24046A0512024-05-0707 May 2024 Issuance of Amendment No. 174 to Update the Period of Applicability (Poa) for the Pressure-Temperature Limits (PTL) and Low Temperature Overpressure Protection (LTOP) Curves IR 05000293/20240012024-05-0707 May 2024 NRC Inspection Report No. 05000293/2024001 ML24127A0632024-05-0606 May 2024 Supplemental Information to License Amendment Request to Adopt Common Emergency Plan with Site-Specific Annexes L-2024-078, 2023 Annual Radioactive Effluent Release Report2024-05-0101 May 2024 2023 Annual Radioactive Effluent Release Report L-2024-077, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 2023 Annual Radiological Environmental Operating Report L-24-009, HDI Annual Occupational Radiation Exposure Data Reports - 20232024-04-29029 April 2024 HDI Annual Occupational Radiation Exposure Data Reports - 2023 L-24-010, Request for Preapplication Readiness Assessment of the Draft License Termination Plan2024-04-22022 April 2024 Request for Preapplication Readiness Assessment of the Draft License Termination Plan IR 05000443/20245012024-04-22022 April 2024 Emergency Preparedness Biennial Exercise Inspection Report 05000443/2024501 05000443/LER-2024-001, Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources2024-04-19019 April 2024 Condition Prohibited by Technical Specifications - Transformer Bushing Failure - Offsite AC Sources SBK-L-24030, 2023 Annual Environmental Operating Report2024-04-12012 April 2024 2023 Annual Environmental Operating Report L-24-007, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI)2024-03-29029 March 2024 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations – Holtec Decommissioning International, LLC (HDI) L-2024-011, and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2024-03-13013 March 2024 and Point Beach, Units 1 and 2 - 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications ML24067A2622024-03-0808 March 2024 Issuance of Amendment No. 173 Revise Technical Specification 3/4.8.1 to Allow Replacement of Reserve Auxiliary Transformer (Emergency Circumstances) L-2024-038, to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source2024-03-0808 March 2024 to Seabrook Emergency License Amendment Request - One Time Extension to Technical Specifications (TS) 3/4.8.1 Action a.3 Allowed Outage Time for an Inoperable Offsite Source 2024-09-25
[Table view] Category:Meeting Notice
MONTHYEARML24113A1282024-04-30030 April 2024 5/29/2024 - Notice of Public Meeting - Annual Assessment Meeting for Seabrook Station PMNS20240522, Public Pre-submittal Meeting with the Nuclear Regulatory Commission Staff and NextEra Energy Seabrook LLC (NextEra) Regarding Proposed License Amendment Request (LAR) for a Single Reserve Auxiliary Transformer (RAT)2024-04-17017 April 2024 Public Pre-submittal Meeting with the Nuclear Regulatory Commission Staff and NextEra Energy Seabrook LLC (NextEra) Regarding Proposed License Amendment Request (LAR) for a Single Reserve Auxiliary Transformer (RAT) PMNS20240542, Public Pre-submittal Meeting with the Nuclear Regulatory Commission Staff and NextEra Energy Seabrook LLC (NextEra) Regarding a Proposed License Amendment Request (LAR) Related to Seabrooks Planned Fall 2024 Outage2024-04-17017 April 2024 Public Pre-submittal Meeting with the Nuclear Regulatory Commission Staff and NextEra Energy Seabrook LLC (NextEra) Regarding a Proposed License Amendment Request (LAR) Related to Seabrooks Planned Fall 2024 Outage PMNS20240303, Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan2024-03-0606 March 2024 Notice of Meeting with NextEra Energy/Florida Power & Light Regarding License Amendment Request to Create a Fleet Emergency Plan ML23152A1252023-06-0101 June 2023 6/27/2023, Notice of Public Meeting, Annual Assessment Meeting for Seabrook Station PMNS20230163, Notice of Meeting with NextEra Energy Seabrook, LLC2023-02-22022 February 2023 Notice of Meeting with NextEra Energy Seabrook, LLC PMNS20221209, Meeting with the U.S. Nuclear Regulatory Commission Petition Review Board and C-10 Research & Education Foundation Regarding a 2.206 Petition Submitted on October 4, 20222022-11-29029 November 2022 Meeting with the U.S. Nuclear Regulatory Commission Petition Review Board and C-10 Research & Education Foundation Regarding a 2.206 Petition Submitted on October 4, 2022 PMNS20220534, Notice of Meeting with NextEra Energy Seabrook, LLC2022-05-17017 May 2022 Notice of Meeting with NextEra Energy Seabrook, LLC PMNS20220468, Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company2022-05-0404 May 2022 Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company ML22116A0652022-04-26026 April 2022 Notice of Public Meeting - Annual Assessment Meeting for Seabrook Station PMNS20220108, Notice of Meeting with NextEra Energy Seabrook, LLC2022-02-0909 February 2022 Notice of Meeting with NextEra Energy Seabrook, LLC PMNS20220063, Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company2022-02-0101 February 2022 Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company ML21132A0162021-05-12012 May 2021 June 9, 2021, Notice of Public Meeting for Seabrook Station Unit 1 PMNS20210441, Notice of Meeting with NextEra Energy Seabrook, LLC2021-04-15015 April 2021 Notice of Meeting with NextEra Energy Seabrook, LLC PMNS20201308, Meeting with NextEra Energy/Florida Power & Light Company to Discuss Generic Safety Issue-191/Generic Letter 2004-02 Closeout Letters2020-11-0505 November 2020 Meeting with NextEra Energy/Florida Power & Light Company to Discuss Generic Safety Issue-191/Generic Letter 2004-02 Closeout Letters ML20132A1892020-05-11011 May 2020 June 3, 2020: Notice of Public Meeting for Seabrook Station Unit 1 ML19098A6402019-04-0808 April 2019 April 24, 2019 Notice of Public Meeting to Present the NRCs Assessment of Safety Performance at the Seabrook Station, Unit 1, for 2018 ML19070A0962019-03-11011 March 2019 Notice of Category 3 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML18361A5452018-12-27027 December 2018 Notice of Public Webinar Meeting for Pilgrim Nuclear Power Station to Discuss the Decommissioning Process for Nuclear Power Reactors ML18131A0832018-05-0101 May 2018 Email to R. Jones, City of Newburyport Regarding Upcoming Public Meeting Regarding Seabrook Nuclear Station ML18109A0152018-04-19019 April 2018 Notice of Public Annual Assessment Meeting for Seabrook Station, Unit 1 ML18073A1402018-03-14014 March 2018 Notice of Category 1 Public Meeting - Annual Assessment Meeting for Pilgrim Nuclear Power Station ML17179A0822017-06-28028 June 2017 Open Regulatory Conference July 13, 2017 ML17125A0422017-05-26026 May 2017 Notice of Category 3 Public Annual Assessment Meeting for Seabrook Station, Unit 1 ML17069A0942017-03-10010 March 2017 3/21/2017 - Notice of Category 1 Public Meeting - Annual Assessment and 95003 Inspection Exit Meeting for Pilgrim Nuclear Power Station ML17020A0032017-01-19019 January 2017 1/31/2017 - Notice of Category 3 Public Meeting - Preliminary Findings and Status of 95003 Inspection at Pilgrim Nuclear Power Station ML16153A0652016-06-0101 June 2016 Notice of Public Meeting with the Public on Seabrook, Unit 1 to Discuss Nrc'S Assessment of Safety Performance ML16090A2332016-03-30030 March 2016 4/13/2016 - Notice of Category 1 Public Meeting - Annual Assessment of Safety Performance at the Pilgrim Nuclear Power Station for 2015 IR 05000293/20150072015-06-22022 June 2015 Notice of Category 1 Public Meeting - Regulatory Conference to Discuss Preliminary White Finding and Associated Apparent Violation for Pilgrim Nuclear Power Station (IR 05000293/2015007) ML15155A6852015-06-0404 June 2015 Public Meeting Notice for Annual Assessment Meeting on June 18, 2015 ML15062A0872015-03-0404 March 2015 3/18/2015 - Notice of Category 1 Public Meeting - Pilgrim 2014 Annual Assessment Meeting ML14156A2552014-06-0505 June 2014 Notice of Public Meeting with Seabrook, Unit 1 to Discuss the Nrc'S Assessment of Safety Performance for 2013 ML14098A3162014-04-0808 April 2014 5/1/2014 - Notice of Category 1 Public Meeting to Discuss Entergy Performance at Pilgrim Nuclear Power Station During Cy 2013 ML13336A8092013-12-0202 December 2013 Webinar to Discuss Independent Spent Fuel Storage Installation (ISFSI) Basics and Planned Use at the Pilgrim Nuclear Power Station ML13330A5842013-11-26026 November 2013 Public Meeting Notice for (ASR) Seabrook Station ML13254A0042013-09-10010 September 2013 10/9/2013 - Notice of Public Meeting with NextEra Regarding Concrete Degradation Caused by Alkali-Silica Reaction at Seabrook Station ML13108A3282013-04-22022 April 2013 Notice of Forthcoming Meeting with Petitioners Requesting Action Against Entergy Nuclear Operations, Inc., Regarding Operations at FitzPatrick, Pilgrim, and Vermont Yankee Nuclear Power Stations (TAC Nos. MF1092, MF1093, and MF1094) ML13099A2152013-04-18018 April 2013 Forthcoming Meeting with Nextera Energy Seabrook, LLC (Nextera) Regarding a Pre-Submittal for a Fixed Incore Detector License Amendment Request ML13086A5902013-03-27027 March 2013 Revised: April 2, 2013 Notice of Public Meeting with Entergy Nuclear Operations, Inc. to Discuss Pilgrim'S Performance During FY12 ML13079A0202013-03-18018 March 2013 G20130209/LTR-13-0224 - Ltr. Representatives Edward J. Markey, John F. Tierney and Bill Keating Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Sea ML13073A1862013-03-14014 March 2013 3/27/2013 - Notice of Public Meeting Regarding Seabrook Station, Unit No. 1 ML13072A6782013-03-13013 March 2013 Notice of Public Meeting, April 2, 2013 ML13038A6242013-02-0808 February 2013 02/21/2013 Forthcoming Meeting with Nextera Energy Seabrook, LLC (Nextera) Regarding License Renewal for the Seabrook Station ML12324A2182012-11-19019 November 2012 Notice of Public Meeting with NRC and NextEra Energy, Seabrook, LLC, to Discuss the Safety Implications and Status of Its Review of Commitment Actions Related to the Alkali-Silica Reaction (ASR) Conditions ML12222A0392012-08-0909 August 2012 8/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol ML12158A2612012-06-0606 June 2012 Federal Register Notice Regarding the ACRS Plant License Renewal (Seabrook) Subcommittee Meeting, July 10, 2012 ML12174A0582012-06-0404 June 2012 Concrete Degradation - Region I Engineering Branch No. 1 (Eb 1); Seabrook Concrete Degradation & Implications to Part 50 & 54, September 8, 2011, 3:00 Pm to 4:00 Pm ML12111A1992012-04-20020 April 2012 Updated: 4/26/2012 - Seabrook Notice of Public Meeting No. 12-013 with NextEra Energy Seabrook, LLC ML12101A1982012-04-10010 April 2012 4/26/2012 - Seabrook Notice of Public Meeting No. 12-013 with NextEra Energy Seabrook, LLC 2024-04-30
[Table view] |
Text
ETS SU.S.NRC Ticket No: G20130209 P ,w, Nudg a 11,pdlt,F s,,a ProtectingPeople,antdthle Fniirowment 2188 SF.
b Assigned Office: OEDO OEDO Due Date: 03/19/2013 Other Assignees: SECY Due Date: 03/19/2013 Date Response Requested by Originator: 03/27/2013 Other Parties:
Subject:
Request for the Nuclear Regulatory Commission to Alter Plans to Hold Open House Style Meetings to Review the 2012 Performance of Pilgrim and Seabrook
Description:
CC Routing: NRR, OCA, OGC, Regioni ADAMS Accession Numbers - Incoming: Response / Package:
- he Infrmaio Cross Reference No
- LTR-13-0224 SRM\Other: No Action Type: Letter OEDO Concurrence: No Signature Level: Chairman Macfarlane OCM Concurrence: No Special Instructions: OCA Concurrence: No Please prepare response in accordance with OEDO Notice 2009-0441-02 (ML093290179). NRR and Region I to provide input to Roger Rihm, OEDO, if required. Roger Rihm will coordinate response with OGC and OCA. Note: Response should be provided before the Seabrook Meeting scheduled for March 27, 2013 (see background).
Originator Name: Representative Edward J. Markey/Rep. John F. Date of Incoming: 03/18/2013 Originator Org: Congress Document Received by OEDO Date: 03/18/2013 Addressee: Chairman Macfarlane Incoming Task: Letter OEDO POC: Roger Rihm
'-0)
OFFICE OF THE SECRETARY CORRESPONDENCE CONTROL TICKET Date Printed:Mar 18, 2013 14:11 PAPER NUMBER: LTR- 13-0224 LOGGING DATE: 03/18/2013 ACTION OFFICE:
ED AUTHOR: REP Edward Markey, et al.
AFFILIATION: CONG ADDRESSEE: CHRM Allison Macfarlane
SUBJECT:
Urges the NRC to alter its plans to hold open house style meetings to review the 2012 performance of both the Pilgrim Nuclear Generating Station and the Seabrook Nuclear Power Plant ACTION: Signature of Chairman DISTRIBUTION: RF, OCA to Ack.
LETTER DATE: 03/1 8/2013 ACKNOWLEDGED No SPECIAL HANDLING: Commission Correspondence NOTES: Response should be provided before the Seabrook meeting scheduled for March 27, 2013. See background.
FILE LOCATION: ADAMS DATE DUE: 03/19/2013 DATE SIGNED:
Received OEDO:
3/18/2013, 4:00PM EDO -- G20130209
( ongriess nf thc U niteb 19.ates.
March 18, 2013 The Honorable Allison Macfarlane Chairman Nuclear Regulatory Commission 11555 Rockville Pike Rockville, MD 20852
Dear Chairman Macfarlane:
We write to urge the Nuclear Regulatory Commission (NRC) to alter its plans to hold "open house" style meetings to review the 2012 performance of both the Pilgrim Nuclear Generating Station' and the Seabrook Nuclear Power Plant 2 , because they enable only small group or one-on-one question and answer sessions rather than a more transparent "public meeting" in which all attendees can hear the responses to all questions that are asked. We additionally request that appropriate NRC technical subject matter experts be present and available at this meeting to answer questions the public may have, and that the NRC presentations provide plant-specific operating, enforcement and safety information and statistics, utilizing plant engineers to supplement headquarters staff to respond to questions as appropriate.
Last year, Reps. Markey and Tierney requested 3 that a public meeting be held regarding Seabrook in response to a similar NRC plan to move to the more restrictive "open house" format.
Then, like now, residents of Massachusetts and New Hampshire contacted our offices to express their strong opposition to this apparent effort to restrict the historically more open nature of NRC meetings. The Commission ultimately decided to hold this safety-related public meeting at Seabrook. However, the "open house" format has been used for the past two years at the Pilgrim Nuclear Generating Station. According to one attendee, this format is "the equivalent of a cocktail party where folks chat to each NRC official. It is simply a PR event. Perhaps if they served cocktails it may not be a total waste of time!"
We have also learned that even the formats of recent public meetings left much to be desired. For example, we have been informed 4 that last year at Seabrook "no engineers from Seabrook were expected to address the plant's operating experience as a responsible engineer or plant executive. We did not know who was there from the plant in the room. The NRC tightly controlled the proceedings with little reporting as they focused the majority of their time on a slide presentation of safety assurances post Fukushima and not focused on the plant's regulatory compliance or operating experience.... The slide presentation was a canned presentation and not plant specific."
' http://pbadupws.nrc.gov/docs/ML1307/MLI3072A678.pdf 2 http://pbadupws.nrc.gov/docs/ML 1307/ML13073A186.pdf 3 http://markey.house.gov/press-reease/markey-tiemey-call-local-public-meeting-seabrook-nuclear-power-plant-discuss-safety 4 Email from an attendee at last year's Seabrook public meeting to Rep. Markey's office.
PRINTED ON RECYCLED PAPER
We believe that NRC's failure to conduct a public meeting to assess the 2012 performance of both Seabrook and Pilgrim would further undermine the public trust in the Commission's ability and willingness to assure the safety of these reactors. We urge you to alter the format of the "open house" meetings currently planned, and make every effort to ensure that the sort of reactor-specific information and knowledgeable personnel are included and available.
We look forward to your prompt response to this request.
Sincerely, Edward J, Markey / eyj John F. Tierney ) Bill Keating
Background
MN No.13-002 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 14, 2013 Licensee: NextEra Energy, Seabrook, LLC Facilities: Seabrook Station, Unit No. 1 (Seabrook)
Docket Nos: 50-443 Date/ Time: March 27, 2013, from 5:30 p.m. to 7:30 p.m.
Location: Best Western Plus The Inn at Hampton 815 Lafayette Road Hampton, New Hampshire, 03842 (603) 926-6771
Purpose:
The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Seabrook for 2012, as described in the annual assessment letter dated March 4, 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.
NRC Attendees: G. Dentel, Chief, Division of Reactor Projects, Branch 3 M. Marshall, Chief, Aging Management of Structures, Electrical, and Systems Branch R. Conte, Senior Project Manager, Division of Reactor Safety W. Cook, Senior Reactor Analyst, Division of Reactor Safety P. McKenna, Acting Senior Resident Inspector, Seabrook W. Raymond, Operations Engineer, Inspections, Tests, Analyses and Acceptance Criteria Branch M. Jennerich, Resident Inspector, Seabrook Public Participation: This is a Category 3 Meeting. The NRC will host an open house to discuss NextEra's performance at Seabrook during calendar year 2012.
NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Seabrook.
Meeting
Contact:
Glenn T. Dentel, Chief, Projects Branch 3 (610) 337-5233 E-mail: Glenn.Dentelk.N RC.Gov
2 The NRC's annual assessment letter regarding Seabrook's performance during 2012 can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML13063A194. ADAMS is accessible from the NRC website at:
http://www.nrc.qov/readinq-rm/adams.html.
Additional information relative to the NRC's annual assessment process and the safety performance of Seabrook can be found on the NRC's website at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.qov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by other NRC personnel at this meeting should be made known by March 25, 2013 via telephone to the NRC meeting contact.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
Please confirm the meeting schedule on the NRC website under public meetings.
IRA/
Approved by:
Glenn T. Dentel, Chief Projects Branch 3 Division of Reactor Projects cc: Distribution via ListServ
Background
MN No.13-005 U.S. NUCLEAR REGULATORY COMMISSION REGION I NOTICE OF PUBLIC MEETING March 13, 2013 Licensee: Entergy Nuclear Operations, Inc.
Facility: Pilgrim Nuclear Power Station Docket No: 50-293 Date/Time: Tuesday, April 2, 2013 5:00 p.m. to 6:30 p.m Location: Plymouth Town Hall 11 Lincoln Street Plymouth, MA 02360
Purpose:
The U. S. Nuclear Regulatory Commission (NRC) will meet with the public to discuss the NRC's assessment of safety performance at Pilgrim for 2012, as described in the annual assessment letter dated March 5, 2013. The NRC will respond to questions on specific performance issues at the plant and our role in ensuring safe plant operations.
NRC Attendees: R. Bellamy, Chief, Division of Reactor Projects, Branch 5 M. Schneider, Senior Resident Inspector T. Setzer, Senior Project Engineer B. Smith, Resident Inspector S. Campbell, Office Assistant Public Participation: This is a Category 3 Meeting. The NRC staff will hold an open house to discuss Entergy's performance at Pilgrim Nuclear Power Station during calendar year 2012. NRC staff will be available, in an informational setting, to answer questions from members of the public and discuss issues or concerns related to Pilgrim.
Meeting
Contact:
Ronald R. Bellamy Ph.D., Chief, Projects Branch 5 610-337-5200 E-mail: Ronald.Bellamy@nrc.gov The NRC's annual assessment letter regarding Pilgrim performance during 2012 can be found in the NRC's Agencywide Documents Access and Management System (ADAMS) with Accession Number ML13060A340. ADAMS is accessible from the NRC website at:
http://www.nrc.gov/reading-rm/adams.html.
2 Additional information relative to the NRC's annual assessment process and the safety performance of Pilgrim Nuclear Power Station can be found on the NRC's website at:
http://www.nrc.gov/NRR/OVERSIGHT/ASSESS/index.html.
The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC website, http://www.nrc.gov/reading-rm/doc-collections/commission/policy/67fr36920.html, and contains information regarding visitors and security.
The NRC provides reasonable accommodation to individuals with disabilities where appropriate.
If you need a reasonable accommodation to participate in this meeting, or need the meeting notice or other information from the meeting in another format (e.g., Braille, large print), please notify the NRC's meeting contact. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. Persons requiring assistance to attend the meeting shall make their requests known to the NRC meeting contact no later than two business days prior to the meeting.
Attendance by other NRC personnel at this meeting should be made known by March 26, 2013, via telephone to the NRC meeting contact.
Meetings are sometimes canceled or rescheduled as a result of unforeseen circumstances.
Please confirm the meeting schedule on the NRC website under public meetings.
IRA Steven Shaffer Acting for!
Approved by:
Ronald R. Bellamy Ph.D., Chief Projects Branch 5 Division of Reactor Projects cc: Distribution via ListServ