UNITED STATES NUCLEAR REGULATORY COMMISSION rch 4, 2013

SUBJECT:

ANNUAL ASSESSMENT LETTER FOR SEABROOK STATION, UNIT NO. 1 (REPORT 05000443/2012001)

Dear Mr. Walsh:

On February 12, 2013, the U.S. Nuclear Regulatory Commission (NRC) completed its end-of-cycle performance review of Seabrook Station, Unit No. 1 (Seabrook). The NRC reviewed the most recent quarterly performance indicators (PIs) in addition to inspection results and enforcement actions from January 1, 2012, through December 31, 2012. This letter informs you of the NRCs assessment of your facility during this period and its plans for future inspections at your facility.

The NRC determined the performance at Seabrook during the most recent quarter was within the Regulatory Response column of the NRC=s Reactor Oversight Process (ROP) Action Matrix because of one low (i.e., white) safety significance Emergency Preparedness cornerstone input described in Inspection Report (IR) 05000443/2012503, dated April 19, 2012 (ML12151A036)1.

This finding involved not identifying an exercise weakness during the post-exercise critique for an April 17, 2012, full-participation emergency exercise. The significance determination for this finding was finalized in our August 7, 2012, letter to you (ML12220A471). The 95001 supplemental inspection for the white finding was completed the week of January 21, 2013, and the results will be communicated to you via separate correspondence. The objectives of that supplemental inspection were to provide assurance that: (1) the root and contributing causes for the risk-significant issues were understood; (2) the extent of condition and extent of cause of the issues were identified and (3) the licensees corrective actions were sufficient to address the root and contributing causes, and prevent recurrence.

On September 5, 2012, the NRC Executive Director for Operations (EDO) approved a deviation from the ROP (ML12242A370) to conduct additional inspections, beyond those prescribed by the ROP Action Matrix, that were determined to be necessary to fully evaluate the concrete degradation that you identified as occurring in safety related concrete structures at Seabrook 1 Designation in parenthesis refers to an ADAMS accession number. Documents referenced in this letter are publicly available using the accession number in ADAMS. due to Alkali-Silica Reaction (ASR). The additional inspection samples as well as inspection and assessment resources will be used to: 1) inspect NextEras completed and planned actions associated with the eleven Confirmatory Action Letter (CAL) 1-2012-002 (ML121254172)

concerns; 2) evaluate the quality and applicability of results from the licensees proposed large-scale concrete specimen testing; 3) provide support for the development of staff technical guidance and 4) continue to support communications and outreach activities for stakeholders.

The memorandum anticipates that this deviation will remain in force until the NRC has concluded: 1) that all CAL commitments have been satisfactorily completed and 2) an acceptable basis has been established to assure that the continued operability of concrete structures will be maintained. The status of the CAL will be reviewed during semi-annual assessments in accordance with the ROP.

On December 3, 2012, the NRC issued inspection report IR 05000443/2012009 (ML12338A283) that reviewed the adequacy of your actions to address the impact of ASR on reinforced concrete structures. Based on the inspection results, five of the eleven CAL items were closed. The remaining six will be reviewed during the inspection currently in progress and scheduled to be completed in 2013. As such, based on the closure criteria defined in the September 5, 2012, NRC EDO memorandum, the deviation from the ROP will remain in force.

The enclosed inspection plan lists the inspections scheduled through June 30, 2014. Routine inspections performed by resident inspectors are not included in the inspection plan. The inspections listed during the last nine months of the inspection plan are tentative and may be revised at the mid-cycle performance review. In addition to the baseline inspection program, the NRC plans to complete two inspections in accordance with Inspection Procedure (IP) 92702, Follow-up of Corrective Actions for Violations and Deviations, in order to review the actions taken in response to: 1) the CAL dated May 15, 2012, (ML12125A172) which addressed the ASR degradation of certain Seabrook concrete structures and 2) a severity level IV non-cited violation related to a contract electrician entering a high radiation area without the proper health physics briefing. The NRC will also be conducting, Temporary Instruction (TI)-182, Review of the Implementation of the Industry Initiative to Control Degradation of underground Piping, and IP 60855.1, Operation of an ISFSI at Operating Plants, which will review operations during the 2013 ISFSI loading campaign. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes. This inspection plan does not include security related inspections, which will be sent via separate, non-publicly available correspondence.

In accordance with 10 CFR 2.390 of the NRC=s ARules of Practice,@ a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Please contact Glenn Dentel at 610-337-5233 with any questions you have regarding this letter.

Sincerely,

/RA/

Darrell J. Roberts, Director Division of Reactor Projects Docket Nos. 50-443 License Nos. NPF-86 Enclosure: Seabrook Inspection/Activity Plan cc w/encl: Distribution via ListServ

ML13063A194 SUNSI Review Non-Sensitive Publicly Available Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP NAME RMontgomery/RM GDentel/ GTD DRoberts/ DJR DATE 03/01 /13 03/01 /13 03/01/13

Page 1 of 2 Seabrook 01/29/2013 15:15:05 Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 95001 - SUPPLEMENTAL INSP-2012 EP WHITE FINDING 3 1 01/22/2013 01/31/2013 IP 95001 Supplemental Inspection for One or Two White Inputs in a Strategic Performance Area ASR - REPORT NO. 2 CAL FOLLOWUP 8 1 01/22/2013 01/25/2013 IP 92702 Followup On Corrective Actions For Violations And Deviations 1 02/25/2013 03/01/2013 IP 92702 Followup On Corrective Actions For Violations And Deviations 1 03/25/2013 03/29/2013 IP 92702 Followup On Corrective Actions For Violations And Deviations 1 04/22/2013 04/26/2013 IP 92702 Followup On Corrective Actions For Violations And Deviations EXM 7/16 - SEABROOK INITIAL EXAM 5 1 06/10/2013 06/14/2013 U01870 FY13-SEABROOK INITIAL OPERATOR LICENSING EXAM 1 07/15/2013 07/20/2013 U01870 FY13-SEABROOK INITIAL OPERATOR LICENSING EXAM 71124 - OCC RADIATION SAFETY 1 1 03/11/2013 03/15/2013 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/11/2013 03/15/2013 IP 71124.02 Occupational ALARA Planning and Controls 1 03/11/2013 03/15/2013 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 7111121 - CDBI 6 1 03/25/2013 03/29/2013 IP 7111121 Component Design Bases Inspection 1 04/08/2013 04/12/2013 IP 7111121 Component Design Bases Inspection 1 04/22/2013 04/26/2013 IP 7111121 Component Design Bases Inspection 71124 - RADIO EFFLUENTS 1 1 05/20/2013 05/23/2013 IP 71124.06 Radioactive Gaseous and Liquid Effluent Treatment 60855 - ISFSI LOADING INSPECTION 2 1 06/01/2013 09/30/2013 IP 60855 Operation Of An ISFSI 1 06/01/2013 09/30/2013 IP 60855.1 Operation of an Independent Spent Fuel Storage Installation at Operating Plants EP PROGR - EP PROGRAM INSPECTION 1 1 07/08/2013 07/12/2013 IP 7111402 Alert and Notification System Testing 1 07/08/2013 07/12/2013 IP 7111403 Emergency Preparedness Organization Staffing and Augmentation System 1 07/08/2013 07/12/2013 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 71124 - REMP 1 1 07/22/2013 07/26/2013 IP 71124.07 Radiological Environmental Monitoring Program 7111111B - SEABROOK REQUAL INSP WITH P/F RESULTS 2 1 12/02/2013 12/06/2013 IP 7111111B Licensed Operator Requalification Program 71151 - HP PI VERIFICATION 1 1 12/02/2013 12/02/2013 IP 71151 Performance Indicator Verification This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Seabrook 01/29/2013 15:15:05 Inspection / Activity Plan Report 22 01/01/2013 - 06/30/2014 Unit Planned Dates No. of Staff Number Start End Inspection Activity Title on Site 71124 - RAD HAZARD & ALARA 1 1 03/03/2014 03/07/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 03/03/2014 03/07/2014 IP 71124.02 Occupational ALARA Planning and Controls TI 182 - DEGRAD UNDERGROUND PIPING - PHASE 2 1 1 03/17/2014 03/21/2014 IP 2515/182 Review of the Implementation of the Industry Initiative to Control Degradation of Underground Piping 7111108P - INSERVICE INSPECTION 1 1 04/14/2014 04/25/2014 IP 7111108P Inservice Inspection Activities - PWR 71124 - HP INSPECTION IP 71124.01, 02, 03 & 04 1 1 04/21/2014 04/25/2014 IP 71124.01 Radiological Hazard Assessment and Exposure Controls 1 04/21/2014 04/25/2014 IP 71124.02 Occupational ALARA Planning and Controls 1 04/21/2014 04/25/2014 IP 71124.03 In-Plant Airborne Radioactivity Control and Mitigation 1 04/21/2014 04/25/2014 IP 71124.04 Occupational Dose Assessment TRI FI - TRIENNIAL FIRE PROTECTION 4 1 06/23/2014 06/27/2014 IP 7111105T Fire Protection [Triennial]

This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.