ML18127A027: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML18127A027
| number = ML18127A027
| issue date = 05/07/2018
| issue date = 05/07/2018
| title = 03/27/2018 - Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides
| title = Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides
| author name =  
| author name =  
| author affiliation = NRC/RGN-I
| author affiliation = NRC/RGN-I
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:Memo to File: Attached Annual Assessment Meeting on.
{{#Wiki_filter:Memo to File: May 7, 2018 Attached are NRC slides presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.
1Pilgrim Annual Assessment MeetingMarch 27, 2018Agenda*Introduction*Discussion of NRC Oversight Results
 
*Discussion of Confirmatory Action LetterFollow-Up Inspection Status*Entergy Response and Remarks
ML18127A027 Pilgrim Annual Assessment Meeting March 27, 2018 Agenda
*Break
* Introduction
*Public Q&A
* Discussion of NRC Oversight Results
*NRC Closing Remarks2 2Annual Performance Assessment*Pilgrim operated safely in 2017 *Pilgrim's performance for 2017 warrants continued placement in Column 4 *NRC noted some improvement in performance, but sustainability remains to be determined. 3Background*2015 -NRC placed Pilgrim in Column 4*2016 -NRC enhanced oversight and inspections began*2017 -NRC completed comprehensive team   inspections (95003)-NRC reviewed Pilgrim Recovery Plan
* Discussion of Confirmatory Action Letter Follow-Up Inspection Status
-Confirmatory Action Letter (CAL) issued4 3Enhanced Oversight Activities*Additional region-based resources to support enhanced baseline inspectionoIncreased problem identification and resolution samples on previously-identified performance issuesoMore in-depth inspectionsoAdditional inspection resources*Increased NRC management oversight5*15,000+ inspection hours o33 findings of very low safety significanceoPerformance Indicators -all Green*Significant Inspection and oversight in 2017: oSupplemental Inspection (95003)oRefueling Outage Inspection, oReview of Entergy's Recovery Plan oCAL development; 1stCAL inspection2017 Inspection Findings and Performance Indicators6 4Confirmatory Action Letter Follow-up Inspections*CALfollow-up inspections scheduled to independently verify effectiveness of corrective actions *NRC inspectors will-oreview CAL items and focus areas to determine if corrective actions are completed and effective in accordance with the CAL commitmentsoevaluate whether Pilgrim has demonstrated sustained performance improvement7Confirmatory Action Letter Follow-up Inspections*Five quarterly team inspectionso1stinspection completed in 4thquarter of 2017o2ndinspection is ongoingo3 additional inspections scheduled for 2018*Additional follow-up inspections will be scheduled, as warranted, until all CAL commitments are satisfied. 8 5Summary*Pilgrim operated safely in 2017*NRC has seen some performance improvement, but the plant needs to demonstrate sustained improved performance to be removed from Column 4*Pilgrim will continue to receive heightened NRC inspection and oversight in 20189Licensee Response and RemarksBrian SullivanSite Vice President, PilgrimEntergy Nuclear Operations, Inc.10 Memo to File: Attached Annual Assessment Meeting on.
* Entergy Response and Remarks
1Pilgrim Annual Assessment MeetingMarch 27, 2018Agenda*Introduction*Discussion of NRC Oversight Results
* Break
*Discussion of Confirmatory Action LetterFollow-Up Inspection Status*Entergy Response and Remarks
* Public Q&A
*Break
* NRC Closing Remarks 2
*Public Q&A
1
*NRC Closing Remarks2 2Annual Performance Assessment*Pilgrim operated safely in 2017 *Pilgrim's performance for 2017 warrants continued placement in Column 4 *NRC noted some improvement in performance, but sustainability remains to be determined. 3Background*2015 -NRC placed Pilgrim in Column 4*2016 -NRC enhanced oversight and inspections began*2017 -NRC completed comprehensive team   inspections (95003)-NRC reviewed Pilgrim Recovery Plan
 
-Confirmatory Action Letter (CAL) issued4 3Enhanced Oversight Activities*Additional region-based resources to support enhanced baseline inspectionoIncreased problem identification and resolution samples on previously-identified performance issuesoMore in-depth inspectionsoAdditional inspection resources*Increased NRC management oversight5*15,000+ inspection hours o33 findings of very low safety significanceoPerformance Indicators -all Green*Significant Inspection and oversight in 2017: oSupplemental Inspection (95003)oRefueling Outage Inspection, oReview of Entergy's Recovery Plan oCAL development; 1stCAL inspection2017 Inspection Findings and Performance Indicators6 4Confirmatory Action Letter Follow-up Inspections*CALfollow-up inspections scheduled to independently verify effectiveness of corrective actions *NRC inspectors will-oreview CAL items and focus areas to determine if corrective actions are completed and effective in accordance with the CAL commitmentsoevaluate whether Pilgrim has demonstrated sustained performance improvement7Confirmatory Action Letter Follow-up Inspections*Five quarterly team inspectionso1stinspection completed in 4thquarter of 2017o2ndinspection is ongoingo3 additional inspections scheduled for 2018*Additional follow-up inspections will be scheduled, as warranted, until all CAL commitments are satisfied. 8 5Summary*Pilgrim operated safely in 2017*NRC has seen some performance improvement, but the plant needs to demonstrate sustained improved performance to be removed from Column 4*Pilgrim will continue to receive heightened NRC inspection and oversight in 20189Licensee Response and RemarksBrian SullivanSite Vice President, PilgrimEntergy Nuclear Operations, Inc.10}}
Annual Performance Assessment
* Pilgrim operated safely in 2017
* Pilgrims performance for 2017 warrants continued placement in Column 4
* NRC noted some improvement in performance, but sustainability remains to be determined.
3
 
===Background===
* 2015 - NRC placed Pilgrim in Column 4
* 2016 - NRC enhanced oversight and inspections began
* 2017 - NRC completed comprehensive team inspections (95003)
        - NRC reviewed Pilgrim Recovery Plan
        - Confirmatory Action Letter (CAL) issued 4
2
 
Enhanced Oversight Activities
* Additional region-based resources to support enhanced baseline inspection o Increased problem identification and resolution samples on previously-identified performance issues o More in-depth inspections o Additional inspection resources
* Increased NRC management oversight 5
2017 Inspection Findings and Performance Indicators
* 15,000+ inspection hours o 33 findings of very low safety significance o Performance Indicators - all Green
* Significant Inspection and oversight in 2017:
o Supplemental Inspection (95003) o Refueling Outage Inspection, o Review of Entergys Recovery Plan o CAL development; 1st CAL inspection 6
3
 
Confirmatory Action Letter Follow-up Inspections
* CAL follow-up inspections scheduled to independently verify effectiveness of corrective actions
* NRC inspectors will o review CAL items and focus areas to determine if corrective actions are completed and effective in accordance with the CAL commitments o evaluate whether Pilgrim has demonstrated sustained performance improvement 7
Confirmatory Action Letter Follow-up Inspections
* Five quarterly team inspections o 1st inspection completed in 4th quarter of 2017 o 2nd inspection is ongoing o 3 additional inspections scheduled for 2018
* Additional follow-up inspections will be scheduled, as warranted, until all CAL commitments are satisfied.
8 4
 
Summary
* Pilgrim operated safely in 2017
* NRC has seen some performance improvement, but the plant needs to demonstrate sustained improved performance to be removed from Column 4
* Pilgrim will continue to receive heightened NRC inspection and oversight in 2018 9
Licensee Response and Remarks Brian Sullivan Site Vice President, Pilgrim Entergy Nuclear Operations, Inc.
10 5
 
Memo to File: May 7, 2018 Attached are NRC slides presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.
 
ML18127A027 Pilgrim Annual Assessment Meeting March 27, 2018 Agenda
* Introduction
* Discussion of NRC Oversight Results
* Discussion of Confirmatory Action Letter Follow-Up Inspection Status
* Entergy Response and Remarks
* Break
* Public Q&A
* NRC Closing Remarks 2
1
 
Annual Performance Assessment
* Pilgrim operated safely in 2017
* Pilgrims performance for 2017 warrants continued placement in Column 4
* NRC noted some improvement in performance, but sustainability remains to be determined.
3
 
===Background===
* 2015 - NRC placed Pilgrim in Column 4
* 2016 - NRC enhanced oversight and inspections began
* 2017 - NRC completed comprehensive team inspections (95003)
        - NRC reviewed Pilgrim Recovery Plan
        - Confirmatory Action Letter (CAL) issued 4
2
 
Enhanced Oversight Activities
* Additional region-based resources to support enhanced baseline inspection o Increased problem identification and resolution samples on previously-identified performance issues o More in-depth inspections o Additional inspection resources
* Increased NRC management oversight 5
2017 Inspection Findings and Performance Indicators
* 15,000+ inspection hours o 33 findings of very low safety significance o Performance Indicators - all Green
* Significant Inspection and oversight in 2017:
o Supplemental Inspection (95003) o Refueling Outage Inspection, o Review of Entergys Recovery Plan o CAL development; 1st CAL inspection 6
3
 
Confirmatory Action Letter Follow-up Inspections
* CAL follow-up inspections scheduled to independently verify effectiveness of corrective actions
* NRC inspectors will o review CAL items and focus areas to determine if corrective actions are completed and effective in accordance with the CAL commitments o evaluate whether Pilgrim has demonstrated sustained performance improvement 7
Confirmatory Action Letter Follow-up Inspections
* Five quarterly team inspections o 1st inspection completed in 4th quarter of 2017 o 2nd inspection is ongoing o 3 additional inspections scheduled for 2018
* Additional follow-up inspections will be scheduled, as warranted, until all CAL commitments are satisfied.
8 4
 
Summary
* Pilgrim operated safely in 2017
* NRC has seen some performance improvement, but the plant needs to demonstrate sustained improved performance to be removed from Column 4
* Pilgrim will continue to receive heightened NRC inspection and oversight in 2018 9
Licensee Response and Remarks Brian Sullivan Site Vice President, Pilgrim Entergy Nuclear Operations, Inc.
10 5}}

Latest revision as of 15:17, 30 November 2019

Annual Assessment Meeting for Pilgrim Nuclear Power Station - NRC Presentation Slides
ML18127A027
Person / Time
Site: Pilgrim
Issue date: 05/07/2018
From:
NRC Region 1
To:
Dimitriadis A
References
Download: ML18127A027 (6)


Text

Memo to File: May 7, 2018 Attached are NRC slides presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.

ML18127A027 Pilgrim Annual Assessment Meeting March 27, 2018 Agenda

  • Introduction
  • Discussion of NRC Oversight Results
  • Discussion of Confirmatory Action Letter Follow-Up Inspection Status
  • Entergy Response and Remarks
  • Break
  • Public Q&A
  • NRC Closing Remarks 2

1

Annual Performance Assessment

  • Pilgrim operated safely in 2017
  • Pilgrims performance for 2017 warrants continued placement in Column 4
  • NRC noted some improvement in performance, but sustainability remains to be determined.

3

Background

  • 2015 - NRC placed Pilgrim in Column 4
  • 2016 - NRC enhanced oversight and inspections began
  • 2017 - NRC completed comprehensive team inspections (95003)

- NRC reviewed Pilgrim Recovery Plan

- Confirmatory Action Letter (CAL) issued 4

2

Enhanced Oversight Activities

  • Additional region-based resources to support enhanced baseline inspection o Increased problem identification and resolution samples on previously-identified performance issues o More in-depth inspections o Additional inspection resources
  • Increased NRC management oversight 5

2017 Inspection Findings and Performance Indicators

  • 15,000+ inspection hours o 33 findings of very low safety significance o Performance Indicators - all Green
  • Significant Inspection and oversight in 2017:

o Supplemental Inspection (95003) o Refueling Outage Inspection, o Review of Entergys Recovery Plan o CAL development; 1st CAL inspection 6

3

Confirmatory Action Letter Follow-up Inspections

  • CAL follow-up inspections scheduled to independently verify effectiveness of corrective actions
  • NRC inspectors will o review CAL items and focus areas to determine if corrective actions are completed and effective in accordance with the CAL commitments o evaluate whether Pilgrim has demonstrated sustained performance improvement 7

Confirmatory Action Letter Follow-up Inspections

  • Five quarterly team inspections o 1st inspection completed in 4th quarter of 2017 o 2nd inspection is ongoing o 3 additional inspections scheduled for 2018
  • Additional follow-up inspections will be scheduled, as warranted, until all CAL commitments are satisfied.

8 4

Summary

  • Pilgrim operated safely in 2017
  • NRC has seen some performance improvement, but the plant needs to demonstrate sustained improved performance to be removed from Column 4
  • Pilgrim will continue to receive heightened NRC inspection and oversight in 2018 9

Licensee Response and Remarks Brian Sullivan Site Vice President, Pilgrim Entergy Nuclear Operations, Inc.

10 5

Memo to File: May 7, 2018 Attached are NRC slides presented at the Annual Assessment Meeting for Pilgrim Nuclear Power Station on March 27, 2018.

ML18127A027 Pilgrim Annual Assessment Meeting March 27, 2018 Agenda

  • Introduction
  • Discussion of NRC Oversight Results
  • Discussion of Confirmatory Action Letter Follow-Up Inspection Status
  • Entergy Response and Remarks
  • Break
  • Public Q&A
  • NRC Closing Remarks 2

1

Annual Performance Assessment

  • Pilgrim operated safely in 2017
  • Pilgrims performance for 2017 warrants continued placement in Column 4
  • NRC noted some improvement in performance, but sustainability remains to be determined.

3

Background

  • 2015 - NRC placed Pilgrim in Column 4
  • 2016 - NRC enhanced oversight and inspections began
  • 2017 - NRC completed comprehensive team inspections (95003)

- NRC reviewed Pilgrim Recovery Plan

- Confirmatory Action Letter (CAL) issued 4

2

Enhanced Oversight Activities

  • Additional region-based resources to support enhanced baseline inspection o Increased problem identification and resolution samples on previously-identified performance issues o More in-depth inspections o Additional inspection resources
  • Increased NRC management oversight 5

2017 Inspection Findings and Performance Indicators

  • 15,000+ inspection hours o 33 findings of very low safety significance o Performance Indicators - all Green
  • Significant Inspection and oversight in 2017:

o Supplemental Inspection (95003) o Refueling Outage Inspection, o Review of Entergys Recovery Plan o CAL development; 1st CAL inspection 6

3

Confirmatory Action Letter Follow-up Inspections

  • CAL follow-up inspections scheduled to independently verify effectiveness of corrective actions
  • NRC inspectors will o review CAL items and focus areas to determine if corrective actions are completed and effective in accordance with the CAL commitments o evaluate whether Pilgrim has demonstrated sustained performance improvement 7

Confirmatory Action Letter Follow-up Inspections

  • Five quarterly team inspections o 1st inspection completed in 4th quarter of 2017 o 2nd inspection is ongoing o 3 additional inspections scheduled for 2018
  • Additional follow-up inspections will be scheduled, as warranted, until all CAL commitments are satisfied.

8 4

Summary

  • Pilgrim operated safely in 2017
  • NRC has seen some performance improvement, but the plant needs to demonstrate sustained improved performance to be removed from Column 4
  • Pilgrim will continue to receive heightened NRC inspection and oversight in 2018 9

Licensee Response and Remarks Brian Sullivan Site Vice President, Pilgrim Entergy Nuclear Operations, Inc.