| number = ML19191A188
| number = ML19191A188
| issue date = 07/09/2019
| issue date = 07/09/2019
| title = 06/12/2019 - Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary
| title = Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary
| author name = Greives J
| author name = Greives J
| author affiliation = NRC/RGN-I/DRP/PB4
| author affiliation = NRC/RGN-I/DRP/PB4
Line 16: Line 16:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 July 9, 2019 MEETING  
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 July 9, 2019 MEETING  


==SUMMARY==
==SUMMARY==


LICENSEES: FirstEnergy Nuclear Operating Company, LLC Exelon Generation Company, LLC Susquehanna Nuclear, LLC  
LICENSEES:               FirstEnergy Nuclear Operating Company, LLC Exelon Generation Company, LLC Susquehanna Nuclear, LLC FACILITIES:             Beaver Valley Power Station (Beaver Valley), Units 1 and 2 Limerick Nuclear Generating Station (Limerick), Units 1 and 2 Peach Bottom Atomic Power Station (Peach Bottom), Units 2 and 3 Susquehanna Steam Electric Station (Susquehanna), Units 1 and 2 Three Mile Island Nuclear Station (Three Mile Island), Unit 1
 
FACILITIES: Beaver Valley Power Station (Beaver Valley), Units 1 and 2 Limerick Nuclear Generating Station (Limerick), Units 1 and 2 Peach Bottom Atomic Power Station (Peach Bottom), Units 2 and 3 Susquehanna Steam Electric Station (Susquehanna), Units 1 and 2 Three Mile Island Nuclear Station (Three Mile Island), Unit 1  


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF PUBLIC WEBINAR MEETING FOR BEAVER VALLEY, LIMERICK, PEACH BOTTOM, SUSQUEHANNA, AND THREE MILE ISLAND
OF PUBLIC WEBINAR MEETING FOR BEAVER VALLEY, LIMERICK, PEACH BOTTOM, SUSQUEHANNA, AND THREE MILE ISLAND On June 12, 2019, the U.S. Nuclear Regulatory Commission (NRC) held a two-part public webinar to discuss NRCs assessment of the safety performance at each operating facility located in Pennsylvania for 2018. During the first part of the webinar, the NRC staff presented the Agencys assessment of the safety performance at each facility for the period of January 1, 2018 through December 31, 2018, as described in the annual assessment letters for each site.
 
The second part of the webinar provided members of the public with an opportunity to submit questions verbally or in writing regarding topics discussed during the first part of the webinar and the NRCs role in ensuring safe plant operations. Members of the public, State officials, elected officials or their staff, and members of the media participated in the meeting. is a list of those who participated in the webinar. The following NRC staff provided presentations during the webinar: Jonathan Greives (Chief, Division of Reactor Projects),
On June 12, 2019, the U.S. Nuclear Regulatory Commission (NRC) held a two-part public webinar to discuss NRC's assessment of the safety performance at each operating facility located in Pennsylvania for 2018. During the first part of the webinar, the NRC staff presented the Agency's assessment of the safety performance at each facility for the period of January 1, 2018 through December 31, 2018, as described in the annual assessment letters for each site.
Matthew Young (Chief, Division of Reactor Projects), James Krafty (Senior Resident Inspector, Beaver Valley), Scott Rutenkroger (Senior Resident Inspector, Limerick), Justin Heinly (Senior Resident Inspector, Peach Bottom), Laura Micewski (Senior Resident Inspector, Susquehanna),
The second part of the webinar provided members of the public with an opportunity to submit questions verbally or in writing regarding topics discussed during the first part of the webinar and the NRC's role in ensuring safe plant operations. Members of the public, State officials, elected officials or their staff, and members of the media participated in the meeting. Enclosure 1 is a list of those who participated in the webinar. The following NRC staff provided presentations during the webinar: Jonathan Greives (Chief, Division of Reactor Projects),
and Zachary Hollcraft (Senior Resident Inspector, Three Mile Island).
Matthew Young (Chief, Division of Reactor Projects), James Krafty (Senior Resident Inspector, Beaver Valley), Scott Rutenkroger (Senior Resident Inspector, Limerick), Justin Heinly (Senior Resident Inspector, Peach Bottom), Laura Micewski (Senior Resident Inspector, Susquehanna), and Zachary Hollcraft (Senior Resident Inspector, Three Mile Island).  
Copies of the slides used by the NRC staff during the webinar can be accessed through the NRCs Agencywide Documents Access and Management System (ADAMS) using Accession Number ML19157A054. ADAMS is accessible from the NRC Web page at:
 
http://www.nrc.gov/reading-rm/adams.html. The NRC staff responded to questions that were submitted through the webinar process.
Copies of the slides used by the NRC staff during the webinar can be accessed through the NRC's Agencywide Documents Access and M anagement System (ADAMS) using Accession Number ML19157A054. ADAMS is accessible from the NRC Web page at: http://www.nrc.gov/reading-rm/adams.html. The NRC staff responded to questions that were submitted through the webinar process.  


2 The meeting notice was issued on May 15, 2019, was posted on the NRC's public webpage, and can be found in ADAMS using Accession Number ML19136A096. Additional information relevant to the NRC's annual assessment process and the safety performance of each site can be found on the NRC's website at: https://www.nrc.gov/reactors/operating/oversight.html.               /RA Matthew Young for/
2 The meeting notice was issued on May 15, 2019, was posted on the NRCs public webpage, and can be found in ADAMS using Accession Number ML19136A096. Additional information relevant to the NRC's annual assessment process and the safety performance of each site can be found on the NRC's website at: https://www.nrc.gov/reactors/operating/oversight.html.
Jonathan Greives, Chief Projects Branch 4 Division of Reactor Projects  
                                              /RA Matthew Young for/
Jonathan Greives, Chief Projects Branch 4 Division of Reactor Projects


==Enclosures:==
==Enclosures:==
: 1. NRC Annual Assessment Meeting Presentation (ML19157A054) 2. Webinar Attendee List (ML19183A353)  
: 1. NRC Annual Assessment Meeting Presentation (ML19157A054)
: 2. Webinar Attendee List (ML19183A353)


ML19191A188 SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME DBeacon/JDeBoer for JDeBoer MYoung JGreives/MYoung for DATE 7/9/19 7/9/19 7/9/19 7/9/19}}
ML19191A188 Non-Sensitive                             Publicly Available SUNSI Review Sensitive                                  Non-Publicly Available OFFICE           RI/DRP                 RI/DRP                 RI/DRP               RI/DRP NAME             DBeacon/JDeBoer for   JDeBoer                 MYoung               JGreives/MYoung for DATE             7/9/19                 7/9/19                 7/9/19               7/9/19}}

Latest revision as of 01:05, 30 November 2019

Joint Annual Assessment Meeting (Webinar) for Pennsylvania Power Plants - Meeting Summary
ML19191A188
Person / Time
Site: Beaver Valley, Peach Bottom, Three Mile Island, Susquehanna, Limerick  Constellation icon.png
Issue date: 07/09/2019
From: Jon Greives
Reactor Projects Region 1 Branch 4
To:
Greives J
References
MN 19-006
Download: ML19191A188 (3)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 2100 RENAISSANCE BOULEVARD, SUITE 100 KING OF PRUSSIA, PENNSYLVANIA 19406-2713 July 9, 2019 MEETING

SUMMARY

LICENSEES: FirstEnergy Nuclear Operating Company, LLC Exelon Generation Company, LLC Susquehanna Nuclear, LLC FACILITIES: Beaver Valley Power Station (Beaver Valley), Units 1 and 2 Limerick Nuclear Generating Station (Limerick), Units 1 and 2 Peach Bottom Atomic Power Station (Peach Bottom), Units 2 and 3 Susquehanna Steam Electric Station (Susquehanna), Units 1 and 2 Three Mile Island Nuclear Station (Three Mile Island), Unit 1

SUBJECT:

SUMMARY

OF PUBLIC WEBINAR MEETING FOR BEAVER VALLEY, LIMERICK, PEACH BOTTOM, SUSQUEHANNA, AND THREE MILE ISLAND On June 12, 2019, the U.S. Nuclear Regulatory Commission (NRC) held a two-part public webinar to discuss NRCs assessment of the safety performance at each operating facility located in Pennsylvania for 2018. During the first part of the webinar, the NRC staff presented the Agencys assessment of the safety performance at each facility for the period of January 1, 2018 through December 31, 2018, as described in the annual assessment letters for each site.

The second part of the webinar provided members of the public with an opportunity to submit questions verbally or in writing regarding topics discussed during the first part of the webinar and the NRCs role in ensuring safe plant operations. Members of the public, State officials, elected officials or their staff, and members of the media participated in the meeting. is a list of those who participated in the webinar. The following NRC staff provided presentations during the webinar: Jonathan Greives (Chief, Division of Reactor Projects),

Matthew Young (Chief, Division of Reactor Projects), James Krafty (Senior Resident Inspector, Beaver Valley), Scott Rutenkroger (Senior Resident Inspector, Limerick), Justin Heinly (Senior Resident Inspector, Peach Bottom), Laura Micewski (Senior Resident Inspector, Susquehanna),

and Zachary Hollcraft (Senior Resident Inspector, Three Mile Island).

Copies of the slides used by the NRC staff during the webinar can be accessed through the NRCs Agencywide Documents Access and Management System (ADAMS) using Accession Number ML19157A054. ADAMS is accessible from the NRC Web page at:

http://www.nrc.gov/reading-rm/adams.html. The NRC staff responded to questions that were submitted through the webinar process.

2 The meeting notice was issued on May 15, 2019, was posted on the NRCs public webpage, and can be found in ADAMS using Accession Number ML19136A096. Additional information relevant to the NRC's annual assessment process and the safety performance of each site can be found on the NRC's website at: https://www.nrc.gov/reactors/operating/oversight.html.

/RA Matthew Young for/

Jonathan Greives, Chief Projects Branch 4 Division of Reactor Projects

Enclosures:

1. NRC Annual Assessment Meeting Presentation (ML19157A054)
2. Webinar Attendee List (ML19183A353)

ML19191A188 Non-Sensitive Publicly Available SUNSI Review Sensitive Non-Publicly Available OFFICE RI/DRP RI/DRP RI/DRP RI/DRP NAME DBeacon/JDeBoer for JDeBoer MYoung JGreives/MYoung for DATE 7/9/19 7/9/19 7/9/19 7/9/19