| {{#Wiki_filter:January 18, 2006LICENSEE:Constellation Energy Group, Inc.FACILITY:Nine Mile Point Nuclear Station, Units 1 and 2 | | {{#Wiki_filter:January 18, 2006 LICENSEE: Constellation Energy Group, Inc. |
| | FACILITY: Nine Mile Point Nuclear Station, Units 1 and 2 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF A MEETING HELD ON NOVEMBER 18, 2005, BETWEEN THEU.S. NUCLEAR REGULATORY COMMISSION STAFF AND THE CONSTELLATION ENERGY GROUP INC. REPRESENTATIVES TO DISCUSS RESULTS OF THE STAFF AUDIT OF THE AGING MANAGEMENT PROGRAMS AND REVIEWS FOR THE NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MC3272 AND MC3273)A public meeting was held on November 18, 2005, in the Town of Scriba, located in Oswego, New York, for the U.S. Nuclear Regulatory Commission staff (NRC or the staff) todiscuss the results of the staff's audit of the Aging Management Programs (AMPs) and Aging Management Reviews (AMRs) with representatives of Constellation Energy Group Inc., | | OF A MEETING HELD ON NOVEMBER 18, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND THE CONSTELLATION ENERGY GROUP INC. REPRESENTATIVES TO DISCUSS RESULTS OF THE STAFF AUDIT OF THE AGING MANAGEMENT PROGRAMS AND REVIEWS FOR THE NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MC3272 AND MC3273) |
| (CEG or the applicant). The audit was conducted as part of the review process of the license renewal application (LRA) for Nine Mile Point Nuclear Station (NMP), Units 1 and 2, submitted on May 27, 2004, as amended July 14, 2005. The purpose of the audit and review is to verify that the applicant's LRA is pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR 54), ?Requirements for Renewal of Operating Licenses for Nuclear Power Plants." Specifically, the audit and review verify that the applicant's aging management activities and programs will adequately manage the effects of aging on structures and components, so thattheir intended functions will be maintained consistent with the plant's Current Licensing Basis(CLB) for the period of extended operation. This is the regulatory requirement defined in 10CFR 54.21(a)(3).The NRC audit team reviewed LRA AMP and AMR line items which the applicant stated areconsistent with NRC's Generic Aging Lessons Learned (GALL) Report, or are based on NRC'sapproved precedents. The GALL Report is a listing of AMP and AMR line items that represents one method that the NRC staff has already found to be acceptable to meet 10 CFR 54.21(a)(3). By conducting the audit, the NRC also confirms that the applicant ismaking appropriate commitments to modify its Updated Final Safety Analysis Report (UFSAR) to meet the regulatory requirement defined in 10 CFR 54.21(d). The remaining LRA AMP and AMR line items, and the scoping and screening reviews are being reviewed by other NRC technical branches at the headquarters office located in Rockville, Maryl and.A list of meeting attendees is provided in Enclosure 1 and the meeting agenda is provided inEnclosure 2. Details of the audit activities conducted by the NRC review team for the review ofthe NMP's amended license renewal application (ALRA) submitted on July 15, 2005 are described in Enclosure 3, along with the staff audit activities conducted earlier during the staff review of the original NMP LRA submitted on May 27, 2004, for completeness. There were no comments received from members of the public during this meeting. The database for the staff audit of the NMP ALRA can be viewed through the AgencywideDocuments Access and Management System (ADAMS). The ADAMS Public Electronic Reading Room is accessible at http://www.nrc.gov/reading-rm/adams.html on the NRC's Website. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRC's PDR Reference staff at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr@nrc.gov | | A public meeting was held on November 18, 2005, in the Town of Scriba, located in Oswego, New York, for the U.S. Nuclear Regulatory Commission staff (NRC or the staff) to discuss the results of the staffs audit of the Aging Management Programs (AMPs) and Aging Management Reviews (AMRs) with representatives of Constellation Energy Group Inc., |
| ./RA/Ngoc (Tommy) B. Le, Senior Project ManagerLicense Renewal Branch B Division of License Renewal Office of Nuclear Reactor RegulationDocket Nos. 50-220 and 50-410
| | (CEG or the applicant). The audit was conducted as part of the review process of the license renewal application (LRA) for Nine Mile Point Nuclear Station (NMP), Units 1 and 2, submitted on May 27, 2004, as amended July 14, 2005. The purpose of the audit and review is to verify that the applicants LRA is pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR 54), ?Requirements for Renewal of Operating Licenses for Nuclear Power Plants. |
| | Specifically, the audit and review verify that the applicants aging management activities and programs will adequately manage the effects of aging on structures and components, so that their intended functions will be maintained consistent with the plants Current Licensing Basis (CLB) for the period of extended operation. This is the regulatory requirement defined in 10 CFR 54.21(a)(3). |
| | The NRC audit team reviewed LRA AMP and AMR line items which the applicant stated are consistent with NRCs Generic Aging Lessons Learned (GALL) Report, or are based on NRCs approved precedents. The GALL Report is a listing of AMP and AMR line items that represents one method that the NRC staff has already found to be acceptable to meet 10 CFR 54.21(a)(3). By conducting the audit, the NRC also confirms that the applicant is making appropriate commitments to modify its Updated Final Safety Analysis Report (UFSAR) to meet the regulatory requirement defined in 10 CFR 54.21(d). The remaining LRA AMP and AMR line items, and the scoping and screening reviews are being reviewed by other NRC technical branches at the headquarters office located in Rockville, Maryland. |
| | A list of meeting attendees is provided in Enclosure 1 and the meeting agenda is provided in . Details of the audit activities conducted by the NRC review team for the review of the NMPs amended license renewal application (ALRA) submitted on July 15, 2005 are described in Enclosure 3, along with the staff audit activities conducted earlier during the staff review of the original NMP LRA submitted on May 27, 2004, for completeness. There were no comments received from members of the public during this meeting. |
| | |
| | The database for the staff audit of the NMP ALRA can be viewed through the Agencywide Documents Access and Management System (ADAMS). The ADAMS Public Electronic Reading Room is accessible at http://www.nrc.gov/reading-rm/adams.html on the NRCs Web site. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRCs PDR Reference staff at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr@nrc.gov. |
| | /RA/ |
| | Ngoc (Tommy) B. Le, Senior Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-220 and 50-410 |
|
| |
|
| ==Enclosures:== | | ==Enclosures:== |
| As statedcc w/encls: See next page
| |
|
| |
|
| .: ML060220009Document Name: E:\Filenet\ML060220009.wpdOFFICEPM:DLR:RLRBLA:DLRBC:DRL:RLRB (A)NAME:NBLeMJenkinsLLund DATE:12/30/200501/10/200601/18/2006 Nine Mile Point Nuclear Station, Units 1 and 2 cc:
| | As stated cc w/encls: See next page |
| Regional Administrator, Region IU.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406Resident InspectorU.S. Nuclear Regulatory Commission
| |
|
| |
|
| P.O. Box 126 Lycoming, NY 13093 SupervisorTown of Scriba Route 8, Box 382 Oswego, NY 13126Mr. James R. EvansLIPA P.O. Box 129 Lycoming, NY 10393Charles Donaldson, EsquireAssistant Attorney General New York Department of Law 120 Broadway New York, NY 10271Mr. Paul D. EddyElectric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 C. Adrienne RhodesChairman and Executive Director State Consumer Protection Board 5 Empire State Plaza, Suite 2101 Albany, NY 12223-1556Kathryn M. Sutton, EsquireMorgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004Mark J. Wetterhahn, EsquireWinston & Strawn 1700 K Street, NW Washington, DC 20006Mr. Michael J. WallacePresident Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group, Inc.
| | .: ML060220009 Document Name: E:\Filenet\ML060220009.wpd OFFICE PM:DLR:RLRB LA:DLR BC:DRL:RLRB (A) |
| 750 East Pratt Street Baltimore, MD 21202Carey W. Fleming, EsquireSr. Counsel - Nuclear Generation Constellation Energy Group 750 East Pratt Street, 5 th FloorBaltimore, MD 21202Mr. Peter R. Smith, PresidentNew York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399Mr. James RossNuclear Energy Institute 1776 I St., NW, Suite 400 Washington, DC 20006-3708Mr. Mark FlahertyManager - Fleet Licensing R.E. Ginna Nuclear Power Plant 1503 Lake Rd.
| | NAME: NBLe MJenkins LLund DATE: 12/30/2005 01/10/2006 01/18/2006 |
| Ontario, NY 14519Mr. M. Steven LeonardGeneral Supervisor - Nuclear Regulatory Matters, Nine Mile Point Nuclear Station, LLC
| |
|
| |
|
| P.O. Box 63 Lycoming, NY 13093 Nine Mile Point Nuclear Station, Units 1 and 2 cc:
| | Nine Mile Point Nuclear Station, Units 1 and 2 cc: |
| Mr. Peter MazzaferroSite Project Manager - License Renewal Nine Mile Point Nuclear Station, LLC | | Regional Administrator, Region I Mark J. Wetterhahn, Esquire U.S. Nuclear Regulatory Commission Winston & Strawn 475 Allendale Road 1700 K Street, NW King of Prussia, PA 19406 Washington, DC 20006 Resident Inspector Mr. Michael J. Wallace U.S. Nuclear Regulatory Commission President P.O. Box 126 Nine Mile Point Nuclear Station, LLC Lycoming, NY 13093 c/o Constellation Energy Group, Inc. |
| | 750 East Pratt Street Supervisor Baltimore, MD 21202 Town of Scriba Route 8, Box 382 Carey W. Fleming, Esquire Oswego, NY 13126 Sr. Counsel - Nuclear Generation Constellation Energy Group Mr. James R. Evans 750 East Pratt Street, 5th Floor LIPA Baltimore, MD 21202 P.O. Box 129 Lycoming, NY 10393 Mr. Peter R. Smith, President New York State Energy, Research, and Charles Donaldson, Esquire Development Authority Assistant Attorney General 17 Columbia Circle New York Department of Law Albany, NY 12203-6399 120 Broadway New York, NY 10271 Mr. James Ross Nuclear Energy Institute Mr. Paul D. Eddy 1776 I St., NW, Suite 400 Electric Division Washington, DC 20006-3708 NYS Department of Public Service Agency Building 3 Mr. Mark Flaherty Empire State Plaza Manager - Fleet Licensing Albany, NY 12223 R.E. Ginna Nuclear Power Plant 1503 Lake Rd. |
| | C. Adrienne Rhodes Ontario, NY 14519 Chairman and Executive Director State Consumer Protection Board Mr. M. Steven Leonard 5 Empire State Plaza, Suite 2101 General Supervisor - Nuclear Regulatory Albany, NY 12223-1556 Matters, Nine Mile Point Nuclear Station, LLC Kathryn M. Sutton, Esquire P.O. Box 63 Morgan, Lewis & Bockius LLP Lycoming, NY 13093 1111 Pennsylvania Avenue, NW Washington, DC 20004 |
|
| |
|
| P.O. Box 63 Lycoming, NY 13093 Mr. Mike HeffleySenior Vice President and Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 500 Annapolis, MD 21401 Mr. James A. SpinaVice President Nine Mile Point Nine Mile Point Nuclear Station, LLC | | Nine Mile Point Nuclear Station, Units 1 and 2 cc: |
| | Mr. Peter Mazzaferro Site Project Manager - License Renewal Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 Mr. Mike Heffley Senior Vice President and Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 500 Annapolis, MD 21401 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 |
|
| |
|
| P.O. Box 63 Lycoming, NY 13093 Note to Licensee: Constellation Energy Group From Ngoc (Tommy) Le dated January 18, 2006
| | Note to Licensee: Constellation Energy Group From Ngoc (Tommy) Le dated January 18, 2006 |
|
| |
|
| ==SUBJECT:== | | ==SUBJECT:== |
|
| |
|
| ==SUMMARY== | | ==SUMMARY== |
| OF A MEETING HELD ON NOVEMBER 18, 2005, BETWEEN THEU.S. NUCLEAR REGULATORY COMMISSION STAFF AND THE CONSTELLATION ENERGY GROUP INC. REPRESENTATIVES TO DISCUSS RESULTS OF THE STAFF AUDIT OF THE AGING MANAGEMENT PROGRAMS AND REVIEWS FOR THE NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MC3272 AND MC3273)DISTRIBUTION | | OF A MEETING HELD ON NOVEMBER 18, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND THE CONSTELLATION ENERGY GROUP INC. REPRESENTATIVES TO DISCUSS RESULTS OF THE STAFF AUDIT OF THE AGING MANAGEMENT PROGRAMS AND REVIEWS FOR THE NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MC3272 AND MC3273) |
| :SSmith (srs3)
| | DISTRIBUTION: |
| | SSmith (srs3) |
| RidsNrrDrip RidsNrrDe RidsNrrDss RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDci RidsNrrDnrl RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDeEqvb RidsNrrDeEemb RidsOgcMailCenter RidsNrrDssSbpb RidsResDetErab RidsAcrsAcnwMailCenter DLR R/F | | RidsNrrDrip RidsNrrDe RidsNrrDss RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDci RidsNrrDnrl RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDeEqvb RidsNrrDeEemb RidsOgcMailCenter RidsNrrDssSbpb RidsResDetErab RidsAcrsAcnwMailCenter DLR R/F |
| -------------MLemoncelliCHolden RLaufer TColburn BFuller, RI EKnutson, RI JTrapp, RI SBurnett BHayden RidsOpaMail RidsNrrDlrRlra ATTENDANCE LIST NRC MEETING WITH CONSTELLATION ENERGY GROUP, INC. NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2November 18, 2005ParticipantsAffilliationsNgoc LeKenneth Chang Jacob Zimmerman David Dellario Peter Mazaferro Michael Fa llinNicola Conicella Jim Hutton Jill Lyon William Holston Larry Martiniano Rick Plasse Terry J. HerrmannU.S. Nuclear Regulatory Commission (NRC)NRC NRC Constellation Energy Group, Inc. (CEG) | | ------------- |
| CEG CEG CEG CEG CEG CEG LIPA Entergy Entergy MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND CONSTELLATION ENERGY GROUP, INC. TO DISCUSS THE AUDIT OF THE AGING MANAGEMENT PROGRAMS AND REVIEWS FOR THE AMENDED LICENSE RENEWAL APPLICATIONFOR NINE MILE POINT, UNITS 1 AND 2 Town of ScribaConference Room42 Creamery RoadOswego, NY 1:30 p.m. - 2:30 p.m.Meeting AgendaWelcome/Introduction 5 minutes Staff discuss audit results of the Aging Management Programs and Reviews 45 minutesQuestions and Answers 10 minutes Meeting Adjourn NRC AUDIT ACTIVITIES FOR THE REVIEW OF AGING MANAGEMENT PROGRAMS AND AGING MANAGEMENT REVIEWSLICENSE RENEWAL APPLICATION (LRA) AND AMENDED LRA (ALRA)NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2DOCKET NOS. 50-210 AND 50-410The safety audits and reviews of NMP LRA AMPs and AMRs which the applicant stated to beconsistent with the GALL Report were performed in two stages, the LRA and the ALRA.First stage On May 26, 2004, NMP submitted the LRA for Units 1 and 2 (ADAMS Accession No. ML041470060)NRC quickly mobilized an audit team consisting of contractors and NRC staff,covering 5 engineering disciplines.For NMP, AMPs are common for Unit 1 and 2. AMRs are unit specific. Unit 1 is aboiling water reactor (BWR) Mark I and Unit 2 is a BWR Mark II. Component sizes and design requirements are all different. Therefore, is equivalent to two applications and two reviews.During the first site audit, at the request of the NRC, a question and answer list (daily list - audit data base) was developed to track questions and answers. Status at the end of the first stage*Aging Management Programs (AMPs)Team members asked 155 questionsA supplement, dated October 29, 2004, was issued covering 18 LRA revisionsand 5 commitmentsAll issues resolved (some with follow-up actions), no requests for additional information (RAIs)*Aging Management Reviews (AMRs)Team members asked 230 questions. The number of questions was excessivebecause one or more of the following:a.credited an AMP which is not capable of managing certain aging effects; b.the ?discussion" column said | | MLemoncelli CHolden RLaufer TColburn BFuller, RI EKnutson, RI JTrapp, RI SBurnett BHayden RidsOpaMail RidsNrrDlrRlra |
| ?not consistent with GALL" while in reality it isconsistent with GALL with exception; c.the ?discussion" column said | | |
| ?aging effects not applicable," the GALL Reportrequires further evaluation;d.many AMPs NMP has implemented were not considered in the AMR; e.preparer(s) confused among the various AMPs implemented under One In-Service Inspection Plan;f.changes of personnel and loss of continuity; g.all questions were discussed several times. Some questions st ill requirefollow-up. Data Base for the staff's questions and the applicant's responses is now on the dockets (ADAMS Accession nos. ML050660380 and ML050660384) and;h.the applicant provided three supplements to capture their responses to the NRC audit team's questions as well as their responses to the headquartersstaff's requests for additional information (RAIs) dated December 6, 2004 (ADAMS Accession no. ML043490370); February 4, 2005 (ADAMS Accession no. ML050450485); and February 11, 2005 (ADAMS Accession No. ML050560199)The staff reviewed the supplements and found, subsequently, that the supplementsdid not provide sufficient responses to some questions that were previously asked, both as the staff's audit questions and the staff's requests for additional information (RAIs). Constellation requested a 90-day grace period to amend the LRA and to address the identified open items.Second stageConstellation submitted the amended LRA (ALRA) on July 15, 2005 (ADAMS Accession Nos. ML052000175 and ML052000186)The ALRA is essentially a new and improved document compared to the originalLRA. NMP also provided the staff with a road map by color highlights to identify the changes for ease of the staff reviews and audit.The basis for the ALRA is still the GALL, Revision 0. However, it considered theJanuary 2005 draft GALL as past precedent.The basis documents were improved. Many new sections were added to severalAMPs.Existing AMPs were updated and new AMPs were added to make it consistent withthe January 2005 GALL AMPs.The original audit team was reassembled and conducted 2 audits on AMPs andAMRs, simultaneously. The audits were performed during the week of September 19, 2005 and October 24, 2005. The first audit resolved 173 questions with 159 items closed, and 14 items acceptedwith 6 items requiring further evaluation.The second audit focused on closing out the 6 remaining open questions. This goalwas accomplished.The team also reviewed the changes in AMPs from the January 2005 GALL report tothe September 2005 GALL report and the differences were reconciled with 3 items added to the audit database.The audit database, contained 148 items, and all questions were adequatelyanswered in the database. The database for the staff's questions and the applicant's responses is now on the dockets (ADAMS Accession No. ML053460458).}} | | ATTENDANCE LIST NRC MEETING WITH CONSTELLATION ENERGY GROUP, INC. |
| | NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 November 18, 2005 Participants Affilliations Ngoc Le U.S. Nuclear Regulatory Commission (NRC) |
| | Kenneth Chang NRC Jacob Zimmerman NRC David Dellario Constellation Energy Group, Inc. (CEG) |
| | Peter Mazaferro CEG Michael Fallin CEG Nicola Conicella CEG Jim Hutton CEG Jill Lyon CEG William Holston CEG Larry Martiniano LIPA Rick Plasse Entergy Terry J. Herrmann Entergy Enclosure 1 |
| | |
| | MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND CONSTELLATION ENERGY GROUP, INC. TO DISCUSS THE AUDIT OF THE AGING MANAGEMENT PROGRAMS AND REVIEWS FOR THE AMENDED LICENSE RENEWAL APPLICATION FOR NINE MILE POINT, UNITS 1 AND 2 Town of Scriba Conference Room 42 Creamery Road Oswego, NY 1:30 p.m. - 2:30 p.m. |
| | Meeting Agenda Welcome/Introduction 5 minutes Staff discuss audit results of the Aging Management Programs and Reviews 45 minutes Questions and Answers 10 minutes Meeting Adjourn Enclosure 2 |
| | |
| | NRC AUDIT ACTIVITIES FOR THE REVIEW OF AGING MANAGEMENT PROGRAMS AND AGING MANAGEMENT REVIEWS LICENSE RENEWAL APPLICATION (LRA) AND AMENDED LRA (ALRA) |
| | NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-210 AND 50-410 The safety audits and reviews of NMP LRA AMPs and AMRs which the applicant stated to be consistent with the GALL Report were performed in two stages, the LRA and the ALRA. |
| | First stage C On May 26, 2004, NMP submitted the LRA for Units 1 and 2 (ADAMS Accession No. ML041470060) |
| | C NRC quickly mobilized an audit team consisting of contractors and NRC staff, covering 5 engineering disciplines. |
| | C For NMP, AMPs are common for Unit 1 and 2. AMRs are unit specific. Unit 1 is a boiling water reactor (BWR) Mark I and Unit 2 is a BWR Mark II. Component sizes and design requirements are all different. Therefore, is equivalent to two applications and two reviews. |
| | C During the first site audit, at the request of the NRC, a question and answer list (daily list - audit data base) was developed to track questions and answers. |
| | Status at the end of the first stage |
| | * Aging Management Programs (AMPs) |
| | < Team members asked 155 questions |
| | < A supplement, dated October 29, 2004, was issued covering 18 LRA revisions and 5 commitments |
| | < All issues resolved (some with follow-up actions), no requests for additional information (RAIs) |
| | * Aging Management Reviews (AMRs) |
| | < Team members asked 230 questions. The number of questions was excessive because one or more of the following: |
| | : a. credited an AMP which is not capable of managing certain aging effects; |
| | : b. the ?discussion column said ?not consistent with GALL while in reality it is consistent with GALL with exception; Enclosure 3 |
| | : c. the ?discussion column said ?aging effects not applicable, the GALL Report requires further evaluation; |
| | : d. many AMPs NMP has implemented were not considered in the AMR; |
| | : e. preparer(s) confused among the various AMPs implemented under One In-Service Inspection Plan; |
| | : f. changes of personnel and loss of continuity; |
| | : g. all questions were discussed several times. Some questions still require follow-up. Data Base for the staffs questions and the applicants responses is now on the dockets (ADAMS Accession nos. ML050660380 and ML050660384) and; |
| | : h. the applicant provided three supplements to capture their responses to the NRC audit teams questions as well as their responses to the headquarters staffs requests for additional information (RAIs) dated December 6, 2004 (ADAMS Accession no. ML043490370); February 4, 2005 (ADAMS Accession no. ML050450485); and February 11, 2005 (ADAMS Accession No. ML050560199) |
| | C The staff reviewed the supplements and found, subsequently, that the supplements did not provide sufficient responses to some questions that were previously asked, both as the staffs audit questions and the staffs requests for additional information (RAIs). Constellation requested a 90-day grace period to amend the LRA and to address the identified open items. |
| | Second stage C Constellation submitted the amended LRA (ALRA) on July 15, 2005 (ADAMS Accession Nos. ML052000175 and ML052000186) |
| | C The ALRA is essentially a new and improved document compared to the original LRA. NMP also provided the staff with a road map by color highlights to identify the changes for ease of the staff reviews and audit. |
| | C The basis for the ALRA is still the GALL, Revision 0. However, it considered the January 2005 draft GALL as past precedent. |
| | C The basis documents were improved. Many new sections were added to several AMPs. |
| | C Existing AMPs were updated and new AMPs were added to make it consistent with the January 2005 GALL AMPs. |
| | C The original audit team was reassembled and conducted 2 audits on AMPs and AMRs, simultaneously. The audits were performed during the week of September 19, 2005 and October 24, 2005. |
| | |
| | C The first audit resolved 173 questions with 159 items closed, and 14 items accepted with 6 items requiring further evaluation. |
| | C The second audit focused on closing out the 6 remaining open questions. This goal was accomplished. |
| | C The team also reviewed the changes in AMPs from the January 2005 GALL report to the September 2005 GALL report and the differences were reconciled with 3 items added to the audit database. |
| | C The audit database, contained 148 items, and all questions were adequately answered in the database. The database for the staffs questions and the applicants responses is now on the dockets (ADAMS Accession No. ML053460458). |
| | }} |
Letter Sequence Meeting |
---|
|
Results
Other: ML043000333, ML043210580, ML051650086, ML053630052, ML060180205, ML060890579, ML060940577, ML060940622, ML060950413, ML061020154, ML061020166, ML061090064, ML062830307, ML062830317, ML082530250, ML091830049, ML091980454, ML110680289, ML110680291
|
MONTHYEARML0414902132004-05-26026 May 2004 Transmittal of Nine Mile Point Units 1 & 2 Application for Renewed Operating Licenses, Including Environmental Report Project stage: Request ML0430003332004-10-26026 October 2004 to Audit and Review Plan for Plant Aging Management Reviews and Programs for the Nine Mile Point Nuclear Station, Units 1 and 2. Project stage: Other ML0432105802004-11-15015 November 2004 Audit and Review Plan for Plant Aging Management Reviews and Programs for the Nine Mile Point Nuclear Station, Units 1 and 2 (TAC Nos MC3272 and MC3273.) Project stage: Other ML0504601382005-02-14014 February 2005 Summary of a Conference Call Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group Inc. Concerning the Review of the Nine Mile Point Nuclear Station, Units 1 and 2 Project stage: Approval ML0516500862005-06-0909 June 2005 Presentation Slides, Nine Mile Point, Units 1 and 2, LRA Status Update Project stage: Other ML0516704462005-06-16016 June 2005 Summary of Meeting Held on June 9, 2005, Between the U.S. Nuclear Regulatory Commission (NRC) Staff and the Constellation Energy Group, Inc. Representatives to Discuss the Status of Their Recovery Effort, Nine Mile Point Nuclear Station, Un Project stage: Meeting ML0529702752005-10-20020 October 2005 E-mail from Ngoc Le of NRC to David Dellario Regarding the Audit and Review Plan for Plant Aging Management Programs and Reviews for Nine Mile Point Nuclear Station, Units 1 and 2 Project stage: Acceptance Review ML0536300522005-12-13013 December 2005 License Renewal Application (LRA) - Editorial Changes to Letter NMP1L 2005 and NMP1L 2007 Project stage: Other ML0601301972006-01-11011 January 2006 Amended License Renewal Application - Responses to NRC Requests for Additional Information - Sections 3.4 and 4.7 Project stage: Response to RAI ML0601802052006-01-18018 January 2006 1/18/06 - Audit and Review Report for the Nine Mile Point Nuclear Station, Units 1 and 2, Amended License Renewal Application (TAC Nos. MC3272 and MC3273 Project stage: Other ML0602200092006-01-18018 January 2006 Summary of Meeting with the Constellation Energy Group Inc. to Discuss Results of the Staff Audit of the Aging Management Programs and Reviews for Nine Mile Point, Units 1 and 2 Project stage: Meeting ML0605807562006-03-0303 March 2006 Transmittal Letter - Safety Evaluation Report for the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0605807582006-03-0303 March 2006 Safety Evaluation Report for the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0609504132006-03-23023 March 2006 SER Open Item 4.7B.1-1 and Closure of Amended License Renewal Application (Alra) Section A2.4, Commitment 39 - Biological Shield Wall Neutron Fluence Analysis Project stage: Other ML0608905792006-03-29029 March 2006 01/23/2006 Summary of a Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group, Inc. Concerning the Review for the Nine Mile Point, Units 1 & 2, License Renewal Application Project stage: Other ML0609406222006-03-29029 March 2006 Email (3/29/06) from Peter Mazzaferro to Ngoc (Tommy) B. Le NMP2 Bioshield Fluence Calc Info Project stage: Other ML0610201662006-04-0303 April 2006 Safety Evaluation Report with Open Items Related to the License Renewal of Nine Mile Point, Dated March 2006 - NMPNS Comments (TAC Nos. MC3272 and MC3273) Project stage: Other ML0610201542006-04-0404 April 2006 Safety Evaluation Report (Ser), with Open Items Related to the License Renewal Dated March 2006 - SER Open Item 3.0.3.2.17-1 Project stage: Other ML0609405772006-04-0404 April 2006 Note to File - Docketing of Additional Information Pertaining to License Renewal Application of the Nine Mile Point Nuclear Station, Units 1 and 2 (TAC Nos. MC3272 and MC3273) Project stage: Other ML0610900642006-04-18018 April 2006 Note to File - Docketing of Additional Information Pertaining to License Renewal Application of the Nine Mile Point Nuclear Station, Units 1 and 2 (TAC No'S. MC3272 and MC3273) Project stage: Other ML0610901062006-04-19019 April 2006 Request for Additional Information, Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application (TAC Nos. MC3272 and MC3273) Project stage: RAI ML0612205952006-04-21021 April 2006 Amended License Renewal Application - NRC Request for Additional Information (RAI) 4.7.5. A-1 Project stage: Request ML0611802422006-06-0101 June 2006 Ltr to Timothy O' Connor - Final Safety Evaluation Report Related to the License Renewal of the Nine Mile Point Nuclear Station, Units 1 and 2 (TAC Nos. MC3272 and MC3273) Project stage: Approval ML0614603132006-06-0101 June 2006 Safety Evaluation Report Related to the License Renewal of the Nine Mile Point Nuclear Station, Units 1 and 2 (TAC Nos. MC3272 and MC3273) Project stage: Approval ML0619800502006-07-13013 July 2006 03/27/2006 Summary of Meeting Between U.S. Nuclear Regulatory Commission Staff & Constellation Energy Group Inc. Representatives to Discuss Status of Open Item 3.0.3.2.17-1 for Nine Mile Point Nuclear Station, Units 1 & 2, License Renewal A Project stage: Meeting ML0628302732006-10-31031 October 2006 Issuance of Renewed Facility Operating License Nos. DPR-63 and NPF-69 for the Nine Mile Point Nuclear Station, Units 1 and 2 Project stage: Approval ML0628303172006-10-31031 October 2006 LLC Docket No. 50-410 Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License Renewed License No. NPF-69 Project stage: Other ML0628304332006-10-31031 October 2006 Federal Register Notice for Nine Mile Point Nuclear, LLC Nine Mile Point Nuclear Station Units 1 and 2, Notice of Issuance of Renewed Facility Operating License Nos. DPR-63 and NPF-69 for an Additional 20-Year Period Project stage: Approval ML0628303072006-10-31031 October 2006 LLC Docket No. 50-220 Nine Mile Point Nuclear Station, Unit 1 Renewed Facility Operating License Renewed License No. DPR-63 Project stage: Other ML0825302502008-08-29029 August 2008 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair and Inservice Inspection of Control Rod Drive Stub Tubes for the License Renewal Period of Extended Operation Project stage: Other ML0907101082009-03-17017 March 2009 Request for Additional Information, Alternative for the Repair and Inservice Inspection of Control Rod Drive Stub Tubes for the License Renewal Period of Extended Operation Project stage: RAI ML0914104472009-05-14014 May 2009 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair and Inservice Inspection of Control Rod Drive Stub Tubes for the License Renewal Period of Extended Operation - Response to NRC Request for Additional Project stage: Request ML0918300492009-06-25025 June 2009 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair & Inservice Inspection of Control Rod Drive Stub Tubes for the License Renewal Period of Extended Operation - Response. Project stage: Other ML0919804542009-08-0303 August 2009 Request to Utilize Alternative of Applying ASME Code Case 730 for Repair and ISI of Control Rod Drive Bottom Head Penetrations for the License Renewal Period of Extended Operation Project stage: Other ML1106802892011-03-0404 March 2011 Areva Calculation No. 32-9138066-000, NMP-1 CRD Housing Idtb Weld Anomaly Analysis. (Non-Proprietary) Project stage: Other ML1106802912011-03-0404 March 2011 Request to Utilize an Alternative to the Requirements of 10CFR50.55a(g) for Repair of Control Rod Drive Housing Penetrations for the Remainder of License Renewal Period of Extended Operation Project stage: Other ML13256A3642013-09-17017 September 2013 Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant - Acceptance of Requested Licensing Action Regarding Direct License Transfer (TAC MF2584 - MF2588) Project stage: Acceptance Review ML13269A3122013-10-0202 October 2013 Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant (TAC Nos. MF2584, MF2585, MF2586, M Project stage: Withholding Request Acceptance ML13294A0392013-11-0707 November 2013 Notice of Consideration of Approval of Transfer of Renewed Facility Operating Licenses and Conforming Amendments,.. Project stage: Other ML13337A3902013-12-0505 December 2013 Request for Additional Information Regarding Order Approving Direct Transfer of Renewed Facility Operating License and Conforming Amendments Project stage: RAI ML13294A0702013-12-18018 December 2013 Consideration of Approval of Transfer of Renewed Facility Operating Licenses, Materials Licenses, and Conforming Amendments Containing SUNSI Project stage: Request ML14050A3712014-02-0505 February 2014 Supplemental Response to Nrc'S Requests for Additional Information Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments Project stage: Supplement ML14063A1842014-03-25025 March 2014 Order Approving Direct Transfer of Renewed Operating Licenses and Conforming License Amendments Project stage: Other ML14106A0532014-03-25025 March 2014 Order Approving Direct Transfer of Renewed Operating Licenses and Conforming License Amendments Project stage: Acceptance Review ML14078A5942014-03-25025 March 2014 Enclosure 2 - Conforming Amendments to Nine Mile Point License Project stage: Other ML14078A6072014-03-25025 March 2014 Draft License Pages Project stage: Draft Other ML14091A3232014-04-0101 April 2014 Issuance of Amendments to Conform the Renewed Facility Operating Licenses and Materials License to Reflect the Direct Transfer of Operating Authority Project stage: Approval ML14105A1362014-05-0808 May 2014 Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant Project stage: Withholding Request Acceptance ML14148A1142014-07-16016 July 2014 Correction Letter - Correction to the Title Page of the Renewed Facility Operating License No. NPF-69 and Change in the Title Page of the Current License No. NPF-69 Project stage: Other 2006-04-04
[Table View] |
|
---|
Category:Meeting Agenda
MONTHYEARPMNS20241276, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations2024-11-0606 November 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Alternative for Reactor Pressure Vessel Stud Examinations PMNS20240456, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-322024-04-10010 April 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Alternative to Implement Code Case OMN-32 PMNS20240360, Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks2024-03-14014 March 2024 Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Hooded Masks PMNS20240007, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-9322024-01-0303 January 2024 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Potential Requests to Use Code Case N-932 PMNS20231227, Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-5912023-11-13013 November 2023 Pre-Application Meeting with Constellation Energy Generation, LLC, (Constellation) Regarding Adoption of TSTF-591 PMNS20231019, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Potential Emergency Plan Revisions2023-09-21021 September 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Potential Emergency Plan Revisions PMNS20230129, Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels2023-02-22022 February 2023 Pre-Application Meeting with Constellation Energy Generation, LLC (Constellation) Regarding Revision of the Emergency Action Levels ML22301A0132022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments ML22305A5922022-11-0303 November 2022 Pre-Submittal Meeting Presentation Slides - Risk Informed Completion Time (TSTF-505) and Risk Informed Categorization and Treatmentof SSCs (10 CFR 50.69) Proposed License Amendments-Updated ML22305A5952022-11-0101 November 2022 Pre-Application Teleconference Meeting with Constellation Energy Generation, LLC to Discuss Planned License Amendment Requests for Nine Mile Point Nuclear Station, Unit No. 1 ML21314A4472021-11-10010 November 2021 Slides for Presubmittial Meeting for Proposed Alternative to Adopt ASME Code Case N-921 to Extend the Inservice Inspection Interval PMNS20211231, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals2021-10-0505 October 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding Extending Inservice Inspection Intervals PMNS20210947, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards2021-07-13013 July 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a, Codes and Standards PMNS20210759, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2021-06-0404 June 2021 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20210550, Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2021-04-28028 April 2021 Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201418, Public Meeting with Exelon Generation Company, LLC to Discuss License Amendment Request to Adopt TSTF-582, RPV (Reactor Pressure Vessel) WIC (Water Inventory Control) Enhancements, at Nine Mile Point Nuclear Station, Unit 12020-12-21021 December 2020 Public Meeting with Exelon Generation Company, LLC to Discuss License Amendment Request to Adopt TSTF-582, RPV (Reactor Pressure Vessel) WIC (Water Inventory Control) Enhancements, at Nine Mile Point Nuclear Station, Unit 1 PMNS20201359, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards2020-12-14014 December 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Exemption from Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a, Codes and Standards PMNS20201291, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards2020-10-30030 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations Section 50.55a Codes and Standards PMNS20201224, Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards2020-10-20020 October 2020 Pre-Application Meeting with Exelon Generation Company, LLC (Exelon) Regarding a Proposed Alternative to Certain Requirements in Title 10 of the Code of Federal Regulations (10 CFR) Section 50.55a Codes and Standards ML20178A4282020-06-30030 June 2020 NEI Questions for June 30, 2020 Public Meeting ML19308A0512019-11-0404 November 2019 Pre-Application Meeting with Exelon Generation Company, LLC ML19151A6602019-05-31031 May 2019 BWR Fleet Mssv/Srv Testing Frequency Relief Request NRC Pre-Application Meeting June 4, 2019 ML17265A7672017-09-25025 September 2017 Notice of Forthcoming Closed Teleconference with Exelon Generation Company, LLC to Discuss Planned License Amendment Request to Remove Boraflex Credit for Nine Mile Point Nuclear Station, Unit 1 ML15169B1392015-06-18018 June 2015 Agenda - ACRS Power Uprates Subcommittee Meeting, June 22, 2015 ML13282A6282013-10-0909 October 2013 11/1/2013 - Notice of Public Meeting - Nine Mile Point Regulatory Conference, to Discuss Preliminary Greater than Green Finding and Apparent Violation ML13199A3282013-07-17017 July 2013 8/5/13 - Notice of Public Meeting - Constellation Energy Nuclear Group, LLC (Calvert Cliffs, Ginna, and Nine Mile Point) ML13077A0472013-03-18018 March 2013 3/29/2013 - Notice of Category 1 Meeting with Nine Mile Point Nuclear Station, Llc. to Discuss Maximum Extended Load Line Limit Analysis Plus (Mellla+) License Amendment Request (LAR) Submittal and the Use of GESTR-M Vs. Prime Codes ML13036A0062013-02-0606 February 2013 Notice of Forthcoming Meeting with Nine Mile Point Nuclear Station, LLC to Discuss the Maximum Extended Load Line Limit Analysis Plus (Mellla+) Implementation for Nine Mile Point (NMP) Unit 2 ML12249A0522012-09-0505 September 2012 Notice of Public Meeting with NRC and Constellation Energy Nuclear Group, Inc., Llc., to Discuss Constellation fleet-wide Performance (Calvert Cliffs, R.E. Ginna and Nine Mile Point) ML12107A5052012-04-16016 April 2012 Forthcoming Category 1 Public Meeting with Constellation Energy Nuclear Group, LLC to Discuss Preliminary Enforcement ML1207200542012-03-12012 March 2012 Notice of Forthcoming Pre-Application Meeting with Licensee for Nine Mile Point, Unit No. 1 to Discuss Proposed NFPA-805 License Amendment Request ML11250A1712011-09-14014 September 2011 Notice of Forthcoming Meeting with Petitioner Requesting Action Under 10 CFR 2.206 Regarding Immediate Suspension of the Operating Licenses of General Electric (GE) Mark 1 Boiling Water Reactors (Bwrs) ML1113605612011-05-16016 May 2011 NRC Meeting Slides, Nine Mile Point & Fitzpatrick 2011 Annual Assessment Meeting ML11126A0962011-05-12012 May 2011 Notice of Meeting with Petitioner Requesting Action Under 10CFR2.206 Regarding Immediate Suspension of Operating Licenses of General Electric Mark 1 Boiling Water Reactors ML1110501002011-04-18018 April 2011 and James A. FitzPatrick Nuclear Power Plant Notice of Public Meeting on May 4, 2011 ML1100300212010-12-29029 December 2010 Ltr to E. Erb Re Participation in Commission Meeting on Implementation of Part 26 on 02/08/11 ML1028600022010-10-19019 October 2010 Summary of Closed Meeting with Nine Mile Point Nuclear Station, LLC, to Discuss Proposed Extended Power Uprate (EPU) Steam Dryer Review and Analyses for Nine Mile Point, Unit No. 2 ML1025719262010-09-15015 September 2010 Revised Notice of Closed Meeting with Nine Mile Point Nuclear Station, LLC, to Discuss the Review of Steam Dryer Analysis for the NMP2 Extended Power Uprate License Amendment Request ML1023709572010-08-31031 August 2010 Notice of Closed Meeting with Nine Mile Point Nuclear Station, LLC, to Discuss the Review of Steam Dryer Analysis for the NMP2 Extended Power Uprate License Amendment Request ML1011603792010-04-27027 April 2010 Summary of Closed Meeting with Nine Mile Point Nuclear Station, LLC to Discuss Proposed Extended Power Uprate (EPU) Steam Dryer Review and Analyses for Nine Mile Point, Unit No. 2 ML1006301062010-03-10010 March 2010 Notice of Forthcoming Closed Meeting with Nine Mile Point Nuclear Station, LLC to Discuss the Review of Steam Dryer Analysis for the NMP2 Extended Power Uprate License Amendment Request ML0932706122009-11-25025 November 2009 Summary of Closed Meeting Held with Constellation Energy Nuclear Group, LLC to Discuss Joint Venture with Edf Development, Inc ML0923210872009-09-0101 September 2009 Notice of Public Meeting with Constellation Energy to Discuss Plans for Construction and Operation of Independent Spent Fuel Storage Installations at Three Constellation Sites ML0825202662008-09-0909 September 2008 Notice of Meeting with Nine Mile Point Nuclear Station to Discuss Extended Power Uprate for Nine Mile Point, Unit No. 2 ML0823407942008-08-27027 August 2008 Notice of Meeting with Nine Mile Point Nuclear Station to Discuss Proposed Extended Power Uprate Related to Steam Dryer Analysis for Unit No. 2 ML0807300302008-03-18018 March 2008 Notice of Meeting with Constellation Energy, Llc., to Discuss the Nrc'S Assessment of the Safety Performance Nine Point Nuclear Station for 2007 ML0717902472007-07-10010 July 2007 08/14-16/2007 Notice of Public Meeting to Communicate with Members of the Mid-atlantic Nuclear Training Group (Mantg) on Issues Related to Operator Licensing Requirements and Guidance and to Identify Open Questions for Further Review ML0710100982007-04-10010 April 2007 Meeting Notice and Agenda for Annual Assessment Meeting with Constellation Management to Discuss Nrc'S Assessment of the Safety Performance of Nine Mile Point Units 1 and 2 for Calendar Year 2006 ML0631700342006-11-16016 November 2006 Forthcoming Meeting with Constellation Energy Group, Nine Mile Point, Unit 1 (NMP1), Pre-Application Review Meeting Related to Forthcoming Alternative Source Term License Amendment Request ML0624100142006-08-31031 August 2006 Notice of Forthcoming Pre-Applicaftion Review Meeting with Constellation Generation Group/Nine Mile Point Nuclear Station, LLC Et. Al., Regarding N;Ine Mile Point Nuclear Station, Unit No.2 (NMP2) Extended Power Uprate 2024-04-10
[Table view] Category:Meeting Summary
MONTHYEARML24155A1992024-06-0303 June 2024 Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - NRC Meeting Summary ML24128A2512024-05-14014 May 2024 Summary of April 11, 2024, Public Meeting with Constellation Energy Generation, LLC Regarding Proposed Alternative to Implement American Society of Mechanical Engineers Operation and Maintenance Code Case OMN-32 ML24113A2872024-04-25025 April 2024 Summary of Public Meeting with Constellation Energy Generation, LLC Regarding Hooded Masks ML24032A0862024-02-0202 February 2024 Summary of Meeting with Constellation Energy Generation, LLC, on Planned Requests to Use Code Case N-932 ML23320A2472023-11-17017 November 2023 Constellation - Summary of November 14, 2023, Public Pre-Application Meeting with Constellation Energy Generation, LLC on Adoption of TSTF-591 ML23271A2682023-10-0505 October 2023 September 25, 2023, Summary of with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans ML23263B1062023-09-22022 September 2023 R. E. Ginna Nuclear Power Plant - Constellation - Pre-Application Amse 9/18/2023 Meeting Summary ML23179A0012023-06-28028 June 2023 6/7/2023 - Annual Assessment Meeting for Pa/Md/Ny/Nj Nuclear Power Plants - Meeting Summary ML23055A0352023-03-24024 March 2023 Summary of February 23, 2023, with Constellation Energy Generation, LLC on Proposed Changes to Emergency Plans to Revise Emergency Action Levels ML22346A0002022-12-14014 December 2022 Summary of November 3, 2022, Meeting with Constellation to Discuss Planned License Amendment Requests to Adopt TSTF-505 and 10 CFR 50.69 ML22187A1462022-07-0606 July 2022 Joint Annual Assessment Meeting for Pa/Md/Nj/Ny Nuclear Power Plants - Meeting Summary ML21333A1532021-11-30030 November 2021 Summary of November 16, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Extend the Inservice Inspection Interval ML21237A0412021-08-30030 August 2021 Summary of the July 27, 2021, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use Case OMN-28, ML21176A0822021-07-0606 July 2021 June 15, 2021, Summary of Meeting with Exelon Generation Company, LLC Vessel Nozzle Repair Related to a Planned Request for an Alternative Related to Reactor Pressure ML21139A1852021-06-22022 June 2021 Summary of Meeting with Exelon Generation Company, LLC Regarding Its Requested Alternative to Eliminate Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting ML21033A6252021-02-16016 February 2021 Summary of January 5, 2021, Meeting with Exelon Generation Company, LLC Regarding License Amendment Request to Adopt Reactor Pressure Vessel Water Inventory Control Enhancements at Nine Mile Point Nuclear Station, Unit 1 ML21011A2822021-01-21021 January 2021 Summary of January 6, 2021, Presubmittal Meeting Between the NRC and Exelon Generation Company, LLC Regarding Licensing Activities to Support the Planned Early Closures of Byron, Unit Nos. 1 and 2 and Dresden, Units 2 and 3 ML20351A2832020-12-18018 December 2020 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Exemption to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20342A3522020-12-10010 December 2020 Summary of November 13, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alterantive to Certain Documentation Requirements for the Replacement of Pressure Retaining Bolting (EPID-L-2020-LRM-0102) ML20323A0332020-12-0101 December 2020 Summary of November 4, 2020, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Reduce the Frequency of Updates to Its Inservice Testing and Inspection Programs ML20230A0222020-08-20020 August 2020 Summary of August 6, 2020, Meeting with Exelon Generation Company, LLC Planned Submittal of a License Amendment Request and Alternative Request on Excess Check Valve Testing ML20205L3712020-07-23023 July 2020 and R.E. Ginna Nuclear Power Plant Summary of Meeting ML20181A0002020-06-29029 June 2020 Summary of 6/24/20 Meeting with Exelon Generation Company, LLC Regarding Planned Request for Alternative to Supplemental Valve Position Indication Testing Requirements for Braidwood, Calvert Cliffs, Clinton, Limerick, Nine Mile, Peach Botto ML20160A0432020-06-11011 June 2020 Summary of April 9, 2020, Meeting with Exelon Generation Company, LLC Regarding License Amendment Request to Change Allowable Main Steam Isolation Valve Leak Rates at Nine Mile Point Nuclear Station, Unit 2 ML20157A1822020-06-0808 June 2020 Summary of May 8, 2020, Meeting with Exelon Generation Company, LLC, Regarding Proposed Emergency License Amendment Request Involving Control Room Air Treatment System ML19326C3582019-12-0303 December 2019 Summary of November 20, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Revise the Quality Assurance Program ML19326A3152019-12-0303 December 2019 Summary of November 18, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request for an Alternative to Supplemental Valve Position Indication Testing Requirements ML19302D3152019-10-28028 October 2019 Annual Assessment Meeting for James A. Fitzpatrick Nuclear Power Plant and Nine Mile Point Nuclear Generating Station - Meeting Summary ML19183A2382019-07-19019 July 2019 Summary of Meeting with Exelon Generation Company, LLC, Planned Concurrent Submittal of Risk-Informed Completion Time and Risk-Informed Categorization ML19162A0272019-06-21021 June 2019 Summary of June 4, 2019, Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Extend the Test Interval for Safety Relief Valves ML20108F0902019-04-20020 April 2019 April 15, 2020, Meeting Summary with Exelon Generation Company, LLC Regarding Planned Request to Defer Submittal of Owner'S Activity Report (Braidwood 2,Byron 2,Calvert Cliffs 1, LaSalle 1, Limerick 1, Nine Mile Point 2, Quad 2, R. E. Ginna ML19036A8832019-02-0707 February 2019 Summary of Meeting with Exelon Generation Company, LLC Regarding a Planned Request to Use ASME Code Case N-879 ML18354B1712019-01-0202 January 2019 Summary of December 19, 2018, Meeting with Exelon Generation Company, LLC Regarding the Use of Boiling Water Reactor Vessel and Internals Project Guidelines ML18347B4932019-01-0202 January 2019 Summary of Pre-Application Meeting with Exelon Generation Co., LLC (Exelon) Forthcoming License Amendment Requests to Revise Technical Specification Requirements for Main Steam Isolation Valve Leak Rate Tests ML18325A1712018-11-28028 November 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned Fleet License Amendment Request to Revise Technical Specifications for High Radiation Areas ML18297A1722018-10-26026 October 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Planned License Amendment Request to Adopt TSTF-427 ML18283B7992018-10-15015 October 2018 Summary of Telephone Conference with Exelon Generation Company, LLC, Request to Revise Nine Mile Point Nuclear Station, Unit 1, Technical Specifications with New Requirements on Reactor Pressure Vessel Water Inventory Control ML18262A3662018-09-18018 September 2018 August 21, 2018, James A. Fitzpatrick Nuclear Power Plant (Fitzpatrick) and Nine Mile Point Nuclear Generating Station (Nine Mile Point) Summary of Public Meeting ML18222A2852018-09-0404 September 2018 Summary of Telephone Conf. with Exelon Generation Company, LLC Regarding a Request to Revise Nine Mile Point Nuclear Station, Unit 1 Technical Specifications with New Requirements on Reactor Pressure Vessel Water Inventory Control ML18163A2682018-06-19019 June 2018 Summary of June 5, 2018, Teleconference with Exelon Generation Company, LLC to Discuss Emergency Plan Changes at James A. Fitzpatrick Nuclear Power Plant and Nine Mile Point Nuclear Station ML18120A1772018-05-0101 May 2018 Summary of Meeting with Exelon Generation Company, LLC Regarding Draft Guidance for Emergency Response Organization Staffing ML18065A8362018-03-0707 March 2018 Summary of February 27, 2018, Meeting with Exelon Generation Company, LLC Planned Fleet License Amendment Request to Relocate Staff Qualification Requirements from TSs to the Quality Assurance Topical Report ML18058A5232018-03-0101 March 2018 Summary of February 26, 2018, Meeting with Exelon Generation Company, LLC Regarding Proposed Alternative to the Main Steam Isolation Valve Testing Requirements ML18010A1262018-01-19019 January 2018 Summary of Teleconference with Exelon Generation Company, LLC on Planned Submittal of License Amendment Request Concerning Reactor Pressure Vessel Water Inventory Control ML17328A4422017-12-0505 December 2017 Summary of Teleconference with Exelon Generation Company, LLC on Planned Submittal of License Amendment Request to Remove Boraflex Credit and Use of Cell Blockers ML17297A6292017-10-26026 October 2017 Summary of Meeting with Exelon Generation Company, LLC, on Planned Submittal of License Amendment Request to Remove Boraflex Credit and Use of Cell Blockers ML17184A0092017-07-10010 July 2017 Summary of June 29, 2017, Meeting with Exelon Generation Company, LLC, on Proposed Changes to Emergency Plans to Revise Emergency Action Levels (CAC Nos. MF9779-MF9801) ML17144A2852017-06-0202 June 2017 Summary Teleconference with Exelon Generation Company, LLC, on Planned Submittals of License Amendment Requests to Change Emergency Action Levels Associated with Lake Ontario Water Level ML17143A1902017-05-23023 May 2017 Public Meeting Handouts and Sign in Sheet ML17143A3582017-05-23023 May 2017 Summary of Public Meeting for James A. Fitzpatrick and Nine Mile Point 2024-06-03
[Table view] |
Text
January 18, 2006 LICENSEE: Constellation Energy Group, Inc.
FACILITY: Nine Mile Point Nuclear Station, Units 1 and 2
SUBJECT:
SUMMARY
OF A MEETING HELD ON NOVEMBER 18, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND THE CONSTELLATION ENERGY GROUP INC. REPRESENTATIVES TO DISCUSS RESULTS OF THE STAFF AUDIT OF THE AGING MANAGEMENT PROGRAMS AND REVIEWS FOR THE NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MC3272 AND MC3273)
A public meeting was held on November 18, 2005, in the Town of Scriba, located in Oswego, New York, for the U.S. Nuclear Regulatory Commission staff (NRC or the staff) to discuss the results of the staffs audit of the Aging Management Programs (AMPs) and Aging Management Reviews (AMRs) with representatives of Constellation Energy Group Inc.,
(CEG or the applicant). The audit was conducted as part of the review process of the license renewal application (LRA) for Nine Mile Point Nuclear Station (NMP), Units 1 and 2, submitted on May 27, 2004, as amended July 14, 2005. The purpose of the audit and review is to verify that the applicants LRA is pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR 54), ?Requirements for Renewal of Operating Licenses for Nuclear Power Plants.
Specifically, the audit and review verify that the applicants aging management activities and programs will adequately manage the effects of aging on structures and components, so that their intended functions will be maintained consistent with the plants Current Licensing Basis (CLB) for the period of extended operation. This is the regulatory requirement defined in 10 CFR 54.21(a)(3).
The NRC audit team reviewed LRA AMP and AMR line items which the applicant stated are consistent with NRCs Generic Aging Lessons Learned (GALL) Report, or are based on NRCs approved precedents. The GALL Report is a listing of AMP and AMR line items that represents one method that the NRC staff has already found to be acceptable to meet 10 CFR 54.21(a)(3). By conducting the audit, the NRC also confirms that the applicant is making appropriate commitments to modify its Updated Final Safety Analysis Report (UFSAR) to meet the regulatory requirement defined in 10 CFR 54.21(d). The remaining LRA AMP and AMR line items, and the scoping and screening reviews are being reviewed by other NRC technical branches at the headquarters office located in Rockville, Maryland.
A list of meeting attendees is provided in Enclosure 1 and the meeting agenda is provided in . Details of the audit activities conducted by the NRC review team for the review of the NMPs amended license renewal application (ALRA) submitted on July 15, 2005 are described in Enclosure 3, along with the staff audit activities conducted earlier during the staff review of the original NMP LRA submitted on May 27, 2004, for completeness. There were no comments received from members of the public during this meeting.
The database for the staff audit of the NMP ALRA can be viewed through the Agencywide Documents Access and Management System (ADAMS). The ADAMS Public Electronic Reading Room is accessible at http://www.nrc.gov/reading-rm/adams.html on the NRCs Web site. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRCs PDR Reference staff at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr@nrc.gov.
/RA/
Ngoc (Tommy) B. Le, Senior Project Manager License Renewal Branch B Division of License Renewal Office of Nuclear Reactor Regulation Docket Nos. 50-220 and 50-410
Enclosures:
As stated cc w/encls: See next page
.: ML060220009 Document Name: E:\Filenet\ML060220009.wpd OFFICE PM:DLR:RLRB LA:DLR BC:DRL:RLRB (A)
NAME: NBLe MJenkins LLund DATE: 12/30/2005 01/10/2006 01/18/2006
Nine Mile Point Nuclear Station, Units 1 and 2 cc:
Regional Administrator, Region I Mark J. Wetterhahn, Esquire U.S. Nuclear Regulatory Commission Winston & Strawn 475 Allendale Road 1700 K Street, NW King of Prussia, PA 19406 Washington, DC 20006 Resident Inspector Mr. Michael J. Wallace U.S. Nuclear Regulatory Commission President P.O. Box 126 Nine Mile Point Nuclear Station, LLC Lycoming, NY 13093 c/o Constellation Energy Group, Inc.
750 East Pratt Street Supervisor Baltimore, MD 21202 Town of Scriba Route 8, Box 382 Carey W. Fleming, Esquire Oswego, NY 13126 Sr. Counsel - Nuclear Generation Constellation Energy Group Mr. James R. Evans 750 East Pratt Street, 5th Floor LIPA Baltimore, MD 21202 P.O. Box 129 Lycoming, NY 10393 Mr. Peter R. Smith, President New York State Energy, Research, and Charles Donaldson, Esquire Development Authority Assistant Attorney General 17 Columbia Circle New York Department of Law Albany, NY 12203-6399 120 Broadway New York, NY 10271 Mr. James Ross Nuclear Energy Institute Mr. Paul D. Eddy 1776 I St., NW, Suite 400 Electric Division Washington, DC 20006-3708 NYS Department of Public Service Agency Building 3 Mr. Mark Flaherty Empire State Plaza Manager - Fleet Licensing Albany, NY 12223 R.E. Ginna Nuclear Power Plant 1503 Lake Rd.
C. Adrienne Rhodes Ontario, NY 14519 Chairman and Executive Director State Consumer Protection Board Mr. M. Steven Leonard 5 Empire State Plaza, Suite 2101 General Supervisor - Nuclear Regulatory Albany, NY 12223-1556 Matters, Nine Mile Point Nuclear Station, LLC Kathryn M. Sutton, Esquire P.O. Box 63 Morgan, Lewis & Bockius LLP Lycoming, NY 13093 1111 Pennsylvania Avenue, NW Washington, DC 20004
Nine Mile Point Nuclear Station, Units 1 and 2 cc:
Mr. Peter Mazzaferro Site Project Manager - License Renewal Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 Mr. Mike Heffley Senior Vice President and Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 500 Annapolis, MD 21401 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093
Note to Licensee: Constellation Energy Group From Ngoc (Tommy) Le dated January 18, 2006
SUBJECT:
SUMMARY
OF A MEETING HELD ON NOVEMBER 18, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND THE CONSTELLATION ENERGY GROUP INC. REPRESENTATIVES TO DISCUSS RESULTS OF THE STAFF AUDIT OF THE AGING MANAGEMENT PROGRAMS AND REVIEWS FOR THE NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MC3272 AND MC3273)
DISTRIBUTION:
SSmith (srs3)
RidsNrrDrip RidsNrrDe RidsNrrDss RidsNrrDlrRlra RidsNrrDlrRlrb RidsNrrDci RidsNrrDnrl RidsNrrDeEeeb RidsNrrDeEqva RidsNrrDeEqvb RidsNrrDeEemb RidsOgcMailCenter RidsNrrDssSbpb RidsResDetErab RidsAcrsAcnwMailCenter DLR R/F
MLemoncelli CHolden RLaufer TColburn BFuller, RI EKnutson, RI JTrapp, RI SBurnett BHayden RidsOpaMail RidsNrrDlrRlra
ATTENDANCE LIST NRC MEETING WITH CONSTELLATION ENERGY GROUP, INC.
NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 November 18, 2005 Participants Affilliations Ngoc Le U.S. Nuclear Regulatory Commission (NRC)
Kenneth Chang NRC Jacob Zimmerman NRC David Dellario Constellation Energy Group, Inc. (CEG)
Peter Mazaferro CEG Michael Fallin CEG Nicola Conicella CEG Jim Hutton CEG Jill Lyon CEG William Holston CEG Larry Martiniano LIPA Rick Plasse Entergy Terry J. Herrmann Entergy Enclosure 1
MEETING BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION STAFF AND CONSTELLATION ENERGY GROUP, INC. TO DISCUSS THE AUDIT OF THE AGING MANAGEMENT PROGRAMS AND REVIEWS FOR THE AMENDED LICENSE RENEWAL APPLICATION FOR NINE MILE POINT, UNITS 1 AND 2 Town of Scriba Conference Room 42 Creamery Road Oswego, NY 1:30 p.m. - 2:30 p.m.
Meeting Agenda Welcome/Introduction 5 minutes Staff discuss audit results of the Aging Management Programs and Reviews 45 minutes Questions and Answers 10 minutes Meeting Adjourn Enclosure 2
NRC AUDIT ACTIVITIES FOR THE REVIEW OF AGING MANAGEMENT PROGRAMS AND AGING MANAGEMENT REVIEWS LICENSE RENEWAL APPLICATION (LRA) AND AMENDED LRA (ALRA)
NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 DOCKET NOS. 50-210 AND 50-410 The safety audits and reviews of NMP LRA AMPs and AMRs which the applicant stated to be consistent with the GALL Report were performed in two stages, the LRA and the ALRA.
First stage C On May 26, 2004, NMP submitted the LRA for Units 1 and 2 (ADAMS Accession No. ML041470060)
C NRC quickly mobilized an audit team consisting of contractors and NRC staff, covering 5 engineering disciplines.
C For NMP, AMPs are common for Unit 1 and 2. AMRs are unit specific. Unit 1 is a boiling water reactor (BWR) Mark I and Unit 2 is a BWR Mark II. Component sizes and design requirements are all different. Therefore, is equivalent to two applications and two reviews.
C During the first site audit, at the request of the NRC, a question and answer list (daily list - audit data base) was developed to track questions and answers.
Status at the end of the first stage
< Team members asked 155 questions
< A supplement, dated October 29, 2004, was issued covering 18 LRA revisions and 5 commitments
< All issues resolved (some with follow-up actions), no requests for additional information (RAIs)
< Team members asked 230 questions. The number of questions was excessive because one or more of the following:
- a. credited an AMP which is not capable of managing certain aging effects;
- b. the ?discussion column said ?not consistent with GALL while in reality it is consistent with GALL with exception; Enclosure 3
- c. the ?discussion column said ?aging effects not applicable, the GALL Report requires further evaluation;
- d. many AMPs NMP has implemented were not considered in the AMR;
- e. preparer(s) confused among the various AMPs implemented under One In-Service Inspection Plan;
- f. changes of personnel and loss of continuity;
- g. all questions were discussed several times. Some questions still require follow-up. Data Base for the staffs questions and the applicants responses is now on the dockets (ADAMS Accession nos. ML050660380 and ML050660384) and;
- h. the applicant provided three supplements to capture their responses to the NRC audit teams questions as well as their responses to the headquarters staffs requests for additional information (RAIs) dated December 6, 2004 (ADAMS Accession no. ML043490370); February 4, 2005 (ADAMS Accession no. ML050450485); and February 11, 2005 (ADAMS Accession No. ML050560199)
C The staff reviewed the supplements and found, subsequently, that the supplements did not provide sufficient responses to some questions that were previously asked, both as the staffs audit questions and the staffs requests for additional information (RAIs). Constellation requested a 90-day grace period to amend the LRA and to address the identified open items.
Second stage C Constellation submitted the amended LRA (ALRA) on July 15, 2005 (ADAMS Accession Nos. ML052000175 and ML052000186)
C The ALRA is essentially a new and improved document compared to the original LRA. NMP also provided the staff with a road map by color highlights to identify the changes for ease of the staff reviews and audit.
C The basis for the ALRA is still the GALL, Revision 0. However, it considered the January 2005 draft GALL as past precedent.
C The basis documents were improved. Many new sections were added to several AMPs.
C Existing AMPs were updated and new AMPs were added to make it consistent with the January 2005 GALL AMPs.
C The original audit team was reassembled and conducted 2 audits on AMPs and AMRs, simultaneously. The audits were performed during the week of September 19, 2005 and October 24, 2005.
C The first audit resolved 173 questions with 159 items closed, and 14 items accepted with 6 items requiring further evaluation.
C The second audit focused on closing out the 6 remaining open questions. This goal was accomplished.
C The team also reviewed the changes in AMPs from the January 2005 GALL report to the September 2005 GALL report and the differences were reconciled with 3 items added to the audit database.
C The audit database, contained 148 items, and all questions were adequately answered in the database. The database for the staffs questions and the applicants responses is now on the dockets (ADAMS Accession No. ML053460458).