February 10, 2005 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

SUBJECT:

REQUESTS FOR ADDITIONAL INFORMATION FOR THE REVIEW OF NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MC3272 AND MC3273)

Dear Mr. Spina:

By letter dated May 26, 2004, Constellation Energy Group Inc., submitted an application pursuant to Title 10 of the Code of Federal Regulations Part 54 (10 CFR Part 54), to renew the operating licenses for the Nine Mile Point Nuclear Station (NMP), Units 1 and 2, for review by the U.S. Nuclear Regulatory Commission (NRC). The NRC staff is reviewing the information contained in the license renewal application (LRA) and has identified, in the enclosure, areas where additional information is needed to complete the review.

Based on discussions with Mr. Peter Mazzaferro of your staff, a mutually agreeable date for your response is within 30 days from the date of this letter. If you have any questions regarding this letter or if circumstances result in your need to revise the response date, please contact me at 301-415-1458 or by e-mail at nbl@nrc.gov.

Sincerely,

/RA/

N. B. (Tommy) Le, Senior Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-220 and 50-410

Enclosure:

As stated cc w/encl: See next page

ML050410428 Document Name: E:\\Filenet\\ML050410428.wpd OFFICE RLEP:PM RLEP:SC-A NAME N. Le S. Lee DATE 02/10 /05 02/10 /05

DISTRIBUTION: Ltr. To J. Spina, Re: Nine Mile Nuclear Station, Units 1 and 2 Dated: February XX, 2005 Adams Accession No.: ML050410428 HARD COPY RLEP RF N. Le (PM)

E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski PY Chen RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis C. Li D. Nguyen M. Itzkowitz (RidsOgcMailCenter)

T. Smith M. Lemoncelli M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff C. Holden R. Laufer P. Tam B. Fuller, RI E. Knutson, RI J. Trapp, RI T. Mensah OPA

NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 (NMP1 and NMP2)

LICENSE RENEWAL APPLICATION (LRA)

REQUEST FOR ADDITIONAL INFORMATION (RAI)

RELATED TO:

ELECTRICAL & INSTRUMENTATION AND CONTROL SYSTEMS SECTION 2.5 RAI 2.5-1 LRA Section 2.5, Table 2.5.C.4-1 does not include the transmission connections in the AMR.

Please provide information to clarify why transmission connections are not included with transmission conductors as per requirements of 10 CFR.54.21(a)1, and (a)2.

RAI 2.5-2 In the LRA, the applicant does not identify uninsulated ground conductors as within the scope of license renewal and require an AMR. Please provide information to explain why the uninsulated ground conductors are not in scope of license renewal as per requirements of 10 CFR.54.21(a)1, and (a)2.

RAI 2.5-3 Interim Staff Guidance (ISG)-2, NRC Staff Position on License Renewal Rule (10 CFR 54.4)

As It Relates to theStation Blackout Rule (10CFR 50.63), states, in part, that The offsite power systems consist of a transmission system (grid) component that provides a source of power and a plant system component that connects the power source to a plants onsite electrical distribution systems which power safety equipment. For the purpose of the license renewal rule, the staff has determined that the plant system portion of the offsite power system that is used to connect the plant to the offsite power source should be included within the scope of the rule.

A.

Please provide a detail description of the NMP recovery path and discuss how the recovery path is consistent with scoping and screen results described in Section 2.5 of the LRA. Also, please provide a one line diagram with redline showing the recovery path of Station Blackout (SBO).

B.

Please identify the location of each commodity group component in the recovery path circuits. Do the SBO recovery path circuits include the control circuit wiring that is associated with the power circuits shown on the drawings? If not, please explain why? Are there any underground (both outside and inside) power circuits used in the SBO recovery paths?

If so, were they identified as requiring an AMR? If not, please explain why?

ATTACHMENT

Nine Mile Point Nuclear Station, Units 1 and 2 cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James R. Evans LIPA P.O. Box 129 Lycoming, NY 10393 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy Electric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 C. Adrienne Rhodes Chairman and Executive Director State Consumer Protection Board 5 Empire State Plaza, Suite 2101 Albany, NY 12223-1556 Kathryn M. Sutton, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Mr. Michael J. Wallace President Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group, Inc.

750 East Pratt Street Baltimore, MD 21202 Mr. James M. Petro, Jr., Esquire Counsel Constellation Energy Group 750 East Pratt Street, 5th Floor Baltimore, MD 21202 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Fred Emerson Nuclear Energy Institute 1776 I St., NW, Suite 400 Washington, DC 20006-3708 Mr. Mark Flaherty Manager - Fleet Licensing R.E. Ginna Nuclear Power Plant 1503 Lake Rd.

Ontario, NY 14519 Mr. M. Steven Leonard General Supervisor - Nuclear Regulatory Matters Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

Nine Mile Point Nuclear Station, Units 1 and 2 cc:

Mr. Peter Mazzaferro Site Project Manager - License Renewal Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 Mr. Mike Heffley Senior Vice President and Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 500 Annapolis, MD 21401