Summary of Meeting Held on June 9, 2005, Between the U.S. Nuclear Regulatory Commission (NRC) Staff and the Constellation Energy Group, Inc. Representatives to Discuss the Status of Their Recovery Effort, Nine Mile Point Nuclear Station, Un
ML051670446
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 06/16/2005
From: Le N
NRC/NRR/DRIP/RLEP
To:
Constellation Energy Group
Le N. B., NRR/DRIP/RLEP, 415-1458
Shared Package
ML051660508 List:
References
TAC MC3272, TAC MC3273
Download: ML051670446 (8)


Text

June 16, 2005 LICENSEE:

Constellation Energy Group, Inc.

FACILITY:

Nine Mile Point Nuclear Station, Units 1 and 2

SUBJECT:

SUMMARY

OF MEETING HELD ON JUNE 9, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION (NRC) STAFF AND THE CONSTELLATION ENERGY GROUP INC. REPRESENTATIVES TO DISCUSS THE STATUS OF THEIR RECOVERY EFFORT FOR THE NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MC3272 AND MC3273)

A public meeting was held on June 9, 2005, in Rockville, Maryland for representatives of Constellation Energy Group Inc., (CEG or the applicant) to discuss the status of the applicants recovery effort for the Nine Mile Point Nuclear Station, Units 1 and 2, (NMP1 and NMP2) license renewal application (LRA). The applicant described CEGs road map in updating their LRA to address staff requests for additional information (RAIs). In addressing the RAIs, the applicant identified 14 additional systems in the scope of license renewal. CEG plans to submit an updated NMP LRA by July 15, 2005. The applicant has requested a 90-day grace period to perform a quality recovery effort for the NMP1 and NMP2 LRA by their letter dated March 3, 2005 (ADAMS Accession No. ML050680270). The NRC staff acknowledged CEGs request by letter dated March 7, 2005 (ADAMS Accession No. ML050660147).

The list of attendees is provided in Enclosure 1, and the meeting agenda is provided in. A meeting handout can be viewed through the Agency wide Documents Access and Management Systems (ADAMS) using Accession No. ML051660508. The ADAMS Public Electronic Reading Room is accessible at http://www.nrc.gov/reading-rm/adams.html on the NRC Web site. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRCs PDR Reference staff at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr@nrc.gov.

/RA/

Ngoc (Tommy) B. Le, Senior Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-220 and 50-410

Enclosures:

As stated cc w/encls: See next page

ML050680270). The NRC staff acknowledged CEGs request by letter dated March 7, 2005 (ADAMS Accession No. ML050660147).

The list of attendees is provided in Enclosure 1, and the meeting agenda is provided in. A meeting handout can be viewed through the Agency wide Documents Access and Management Systems (ADAMS) using Accession No. ML051660508. The ADAMS Public Electronic Reading Room is accessible at http://www.nrc.gov/reading-rm/adams.html on the NRC Web site. Persons who do not have access to ADAMS, or who encounter problems in accessing the documents located in ADAMS, should contact the NRCs PDR Reference staff at 1-800-397-4209, or 301-415-4737, or by e-mail at pdr@nrc.gov.

/RA/

Ngoc (Tommy) B. Le, Senior Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-220 and 50-410

Enclosures:

As stated cc w/encls: See next page Adams Accession Nos.: ML051670446 PKG#: ML051660508 (including slides)

DOCUMENT NAME:E:\\Filenet\\ML051670446.wpd OFFICE PM:RLEP LA:RLEP SC:RLEP NAME:

NBLe MJenkins SLee DATE:

6/15/05 6/15/05 6/16 /05

Nine Mile Point Nuclear Station, Units 1 and 2 cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James R. Evans LIPA P.O. Box 129 Lycoming, NY 10393 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy Electric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 C. Adrienne Rhodes Chairman and Executive Director State Consumer Protection Board 5 Empire State Plaza, Suite 2101 Albany, NY 12223-1556 Kathryn M. Sutton, Esquire Morgan, Lewis & Bockius LLP 1111 Pennsylvania Avenue, NW Washington, DC 20004 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Mr. Michael J. Wallace President Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group, Inc.

750 East Pratt Street Baltimore, MD 21202 Carey W. Fleming, Esquire Sr. Counsel - Nuclear Generation Constellation Energy Group 750 East Pratt Street, 5th Floor Baltimore, MD 21202 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. James Ross Nuclear Energy Institute 1776 I St., NW, Suite 400 Washington, DC 20006-3708 Mr. Mark Flaherty Manager - Fleet Licensing R.E. Ginna Nuclear Power Plant 1503 Lake Rd.

Ontario, NY 14519 Mr. M. Steven Leonard General Supervisor - Nuclear Regulatory Matters, Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

Nine Mile Point Nuclear Station, Units 1 and 2 cc:

Mr. Peter Mazzaferro Site Project Manager - License Renewal Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 Mr. Mike Heffley Senior Vice President and Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 500 Annapolis, MD 21401 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093

DISTRIBUTION: Meeting Summary to Licensee: Constellation Energy Group (NMP 1 and NMP 2), Re: Summary of mtg held on 6/09/05 Dated: June 16, 2005 Adams Accession No.: ML051670446 HARD COPY RLEP RF N. Le (PM)

E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski J. Fair RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li K. Winsberg (RidsOgcMailCenter)

M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff S. Lee M. Lemoncelli C. Holden R. Laufer P. Tam B. Fuller, RI E. Knutson, RI J. Trapp, RI T. Mensah S. Burnett B. Hayden OPA ATTENDANCE LIST NRC MEETING WITH CONSTELLATION ENERGY GROUP, INC.

NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 JUNE 9, 2005 Name Organization Ngoc Le Kenneth Chang Samson Lee P. T. Kuo Kimberley Corp Steve Hoffman U.S. Nuclear Regulatory Commission (NRC)

NRC NRC NRC NRC NRC Peter Wen NRC Kaihwa Hsu NRC Donnie Ashley NRC Duc Nguyen NRC Prakash Patnaik NRC Meena Khanna NRC David Jeng NRC John Fair NRC Angelo Stubbs NRC Mauri Lemoncelli NRC Cliff Marks Information Systems Laboratories Mike Kennedy ISL Greg Halnon First Energy Nuclear Operating Company Steve Dort FENOC Dave Kunsekmiller FENOC Kazunobu Sakamoto Japanese Nuclear Energy Safety Organization Mark Flaherty Constellation Energy Group, Inc. (CEG)

David Dellario CEG Peter Mazaferro CEG Michael Fallin CEG NRC MEETING WITH CONSTELLATION ENERGY GROUP, INC.

CONCERNING THE LICENSE RENEWAL APPLICATION FOR NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2 ROCKVILLE, MARYLAND ROOM O-12B4 AGENDA June 9, 2005 I.

Introduction/Opening remarks 5 minutes II.

Presentation by Constellation Energy Group, Inc. (CEG) 50 minutes Regarding CEGs recovery plan for NMP 1 and 2 license renewal application Acknowledging comments from the staff III.

Public Comments 5 minutes IV.

Adjourn