Summary of a Conference Call Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group Inc. Concerning the Review of the Nine Mile Point Nuclear Station, Units 1 and 2
ML050460138
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 02/14/2005
From: Le N
NRC/NRR/DRIP/RLEP
To:
Constellation Energy Group
Le N. B., NRR/DRIP/RLEP, 415-1458
References
TAC MC3272, TAC MC3273
Download: ML050460138 (8)


Text

February 14, 2005 LICENSEE:

Constellation Energy Group, Inc.

FACILITY:

Nine Mile Point Nuclear Station, Units 1 and 2

SUBJECT:

SUMMARY

OF A CONFERENCE CALL HELD ON JANUARY 28, 2005, BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND THE CONSTELLATION ENERGY GROUP INC. CONCERNING THE REVIEW FOR THE NINE MILE POINT NUCLEAR STATION, UNITS 1 AND 2, LICENSE RENEWAL APPLICATION (TAC NOS. MC3272 AND MC3273)

The U.S. Nuclear Regulatory Commission staff and representatives of Constellation Energy Group Inc. (CEG or the applicant) held a conference call on January 28, 2005, to discuss questions pertaining to the Nine Mile Point Nuclear Station, Units 1 and 2 (NMP) license renewal application (LRA).

The conference call was useful in further clarifying the intent of the staffs followup questions to the applicant supplement dated November 19, 2004 (ADAMS ML043360053) and supplement dated December 6, 2004 (ADAMS ML043490370). On the basis of the discussion, the applicant was able to better understand the staffs questions. No staff decisions were made during the meeting, and the applicant agreed to provide information for clarification in their final responses. provides a list of the meeting participants. Enclosure 2 contains a listing of the staffs followup questions and the applicants corresponding proposed responses which were used as discussion material during the telephone conference.

/RA/

N. B. (Tommy) Le, Senior Project Manager License Renewal Section A License Renewal and Environmental Impacts Program Division of Regulatory Improvement Programs Office of Nuclear Reactor Regulation Docket Nos.: 50-220 and 50-410

Enclosures:

As stated cc w/encls.: See next page

ML050460138 Document Name: E:\\Filenet\\ML050460138.wpd OFFICE PM:RLEP SC:RLEP NAME NLe SLee DATE 02/14 /2005 02/ 14 /2005

DISTRIBUTION: Note to Constellation Energy Group, Inc. Re: Nine Mile Point Nuclear Station, Units 1 and 2, Dated: February 14, 2005 Adams Accession No.: ML050460138 HARD COPY RLEP RF N. Le (PM)

E-MAIL:

RidsNrrDrip RidsNrrDe G. Bagchi K. Manoly W. Bateman J. Calvo R. Jenkins P. Shemanski S. Miranda K. Hsu RidsNrrDssa RidsNrrDipm D. Thatcher R. Pettis G. Galletti C. Li M. Itzkowitz (RidsOgcMailCenter)

T. Smith M. Lemoncelli M. Mayfield A. Murphy S. Smith (srs3)

S. Duraiswamy Y. L. (Renee) Li RLEP Staff C. Holden R. Laufer P. Tam B. Fuller, RI E. Knutson, RI J. Trapp, RI T. Mensah OPA LIST OF PARTICIPANTS FOR THE CONFERENCE CALL HELD ON BETWEEN THE U.S. NUCLEAR REGULATORY COMMISSION AND CONSTELLATION ENERGY GROUP, INC.

JANUARY 27, 2005 Participants Affiliation Tommy Le U.S. Nuclear Regulatory Commission (NRC)

Sam Miranda NRC Kaiwah (Robert) Hsu NRC Peter Mazzaforro Constellation Energy Group (CNG)

Mike Fallins CNG George Wrobel CNG Dennis Vandeputte CNG George Inch CNG David Dellarion CNG REVIEW OF LICENSE RENEWAL APPLICATION (LRA) FOR NINE MILE POINT UNITS 1 AND 2 (NMP 1 AND NMP 2)

January 28, 2005 The staff has previously sent the following followup questions (e.g., Followup Items) to the applicant. The applicants provided the staff with their draft responses for use as discussion material. The staff held a telephone conference with the applicant on January 27, 2005, to discussion the staffs Followup Items questions. The relevant staffs Followup Items questions, the applicants responses to the staffs original RAIs are provided below:

NINE MILE POINT NUCLEAR STATION UNITS 1 AND 2

1.

Followup Item 3.1.1.A-08 of Table 3.1 2.

Followup Item 3.1.1.A-27 of Table 3.1

Reference:

Applicants Supplemental letter, NMP1L 1888, dated November 19, 2004 (ADAMS ML043360053) and Supplemental letter, NMP1L 1892, dated December 6, 2004 (ADAMS ML050060182)

1.

Followup Item 3.1.1.A-08 of Table 3.1 Item 3.1.1.A-08 page 3.1-23 of NMPs Supplement letter dated December 6,2004, stated that the vessel flange leak detection (VFLD) lines for NMP1 are not within scope of license renewal.

However, LRA Table 2.3.1.A.1-1 listed flange leak detection lines in scope. of NMPs Supplement letter dated November 19, 2004,November 19, 2004, stated that the classification of the NMP1 reactor vessel VFLD line will be re-evaluated, and an AMP be identified as appropriate by May 31,2005.

In AMR Audit item 226, NMP stated that the component is tested by the ISI pressure test since it is essentially a small-bore pipe. At NMP1, it will be part of the One-time inspection program too, since the component is subject to SCC.

Staffs Comment: Please verify if NMP1 VFLD line is in scope or not. Also the scheduled date of May 31, 2005, for providing this information to the staff is VERY untimely to support the staff review.

Proposed Draft Response from the Applicant: The NMP1 VFLD line is not in scope for license renewal since it is non-safety related (NSR) and does not contain a liquid such that it meets the criteria for inclusion under (a)(2). This line is NSR since it does not meet any of the criteria of RG 1.26 for being safety related (i.e. part of reactor coolant pressure boundary (RCPB), needed to safely shutdown the reactor, or prevent radiological releases). The line is not considered part of the RCPB since the boundary ends at the reactor vessel flange. The VFLD line also does not contain any liquid during plant operation. Therefore, there is no liquid to leak onto SR equipment should a failure be postulated. Based on the above, the NMP1 VFLD line is not considered in-scope for license renewal. NMP recognizes that LRA Table 2.3.1.A.1-1 is in error and should have been corrected in our 11/19/04 letter. The LRA will be revised to remove the VFLD line from this table in a new letter.

2.

Followup Item 3.1.1.A-27 of Table 3.1 Item 3.1.1.A-27 page 3.1-26 of NMPs Supplement letter dated December 6, 2004, states that NMP1 credited ASME Section XI ISI program to manage aging effects. In its 12/6/04 supplement, the applicant states that for Nozzles component type (under Item 3.1.1.A-27, on page 3.1-42), NMP1 credited BWR Control Rod Drive Return Line (CRDRL) Nozzle Program as the aging management program (AMP) to manage its cracking aging effect.

Staffs Comment: Please clarify the above discrepancy in AMP for CRDRL Proposed Draft Response from the Applicant: The CRD Return Line is inspected under the applicants ISI plan which includes each of the attributes of the BWR CRD Return Line Program.

The applicant stated that the last sentence of the Discussion column for item 3.1.1.A-27 was an attempt to clarify why the line item in the Table 2 credits the BWR CRD Return Line Program and that NMP does not have a program titled as such in Appendix A or B. NMP will clarify it further or provide different wording.

Nine Mile Point Nuclear Station, Units 1 and 2 cc:

Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 126 Lycoming, NY 13093 Supervisor Town of Scriba Route 8, Box 382 Oswego, NY 13126 Mr. James R. Evans LIPA P.O. Box 129 Lycoming, NY 10393 Charles Donaldson, Esquire Assistant Attorney General New York Department of Law 120 Broadway New York, NY 10271 Mr. Paul D. Eddy Electric Division NYS Department of Public Service Agency Building 3 Empire State Plaza Albany, NY 12223 C. Adrienne Rhodes Chairman and Executive Director State Consumer Protection Board 5 Empire State Plaza, Suite 2101 Albany, NY 12223-1556 Kathryn M. Sutton, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Mark J. Wetterhahn, Esquire Winston & Strawn 1400 L Street, NW Washington, DC 20005-3502 Mr. Michael J. Wallace President Nine Mile Point Nuclear Station, LLC c/o Constellation Energy Group, Inc.

750 East Pratt Street Baltimore, MD 21202 Mr. James M. Petro, Jr., Esquire Counsel Constellation Energy Group 750 East Pratt Street, 5th Floor Baltimore, MD 21202 Mr. Peter R. Smith, President New York State Energy, Research, and Development Authority 17 Columbia Circle Albany, NY 12203-6399 Mr. Fred Emerson Nuclear Energy Institute 1776 I St., NW, Suite 400 Washington, DC 20006-3708 Mr. Mark Flaherty Manager - Fleet Licensing R.E. Ginna Nuclear Power Plant 1503 Lake Rd.

Ontario, NY 14519 Mr. M. Steven Leonard General Supervisor - Nuclear Regulatory Matters Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 Nine Mile Point Nuclear Station, Units 1 and 2 cc:

Mr. Peter Mazzaferro Site Project Manager - License Renewal Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093 Mr. Mike Heffley Senior Vice President and Chief Nuclear Officer Constellation Generation Group 1997 Annapolis Exchange Parkway Suite 500 Annapolis, MD 21401 Mr. James A. Spina Vice President Nine Mile Point Nine Mile Point Nuclear Station, LLC P.O. Box 63 Lycoming, NY 13093