Letter Sequence Acceptance Review |
---|
TAC:MF2584, Control Room Habitability (Approved, Closed) TAC:MF2585, Control Room Habitability (Approved, Closed) TAC:MF2586, Control Room Habitability (Approved, Closed) TAC:MF2587, Control Room Habitability (Approved, Closed) TAC:MF2588, Control Room Habitability (Approved, Closed) |
|
MONTHYEARML0414902132004-05-26026 May 2004 Transmittal of Nine Mile Point Units 1 & 2 Application for Renewed Operating Licenses, Including Environmental Report Project stage: Request ML0430003332004-10-26026 October 2004 to Audit and Review Plan for Plant Aging Management Reviews and Programs for the Nine Mile Point Nuclear Station, Units 1 and 2. Project stage: Other ML0432105802004-11-15015 November 2004 Audit and Review Plan for Plant Aging Management Reviews and Programs for the Nine Mile Point Nuclear Station, Units 1 and 2 (TAC Nos MC3272 and MC3273.) Project stage: Other ML0504601382005-02-14014 February 2005 Summary of a Conference Call Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group Inc. Concerning the Review of the Nine Mile Point Nuclear Station, Units 1 and 2 Project stage: Approval ML0516500862005-06-0909 June 2005 Presentation Slides, Nine Mile Point, Units 1 and 2, LRA Status Update Project stage: Other ML0516704462005-06-16016 June 2005 Summary of Meeting Held on June 9, 2005, Between the U.S. Nuclear Regulatory Commission (NRC) Staff and the Constellation Energy Group, Inc. Representatives to Discuss the Status of Their Recovery Effort, Nine Mile Point Nuclear Station, Un Project stage: Meeting ML0529702752005-10-20020 October 2005 E-mail from Ngoc Le of NRC to David Dellario Regarding the Audit and Review Plan for Plant Aging Management Programs and Reviews for Nine Mile Point Nuclear Station, Units 1 and 2 Project stage: Acceptance Review ML0536300522005-12-13013 December 2005 License Renewal Application (LRA) - Editorial Changes to Letter NMP1L 2005 and NMP1L 2007 Project stage: Other ML0601301972006-01-11011 January 2006 Amended License Renewal Application - Responses to NRC Requests for Additional Information - Sections 3.4 and 4.7 Project stage: Response to RAI ML0602200092006-01-18018 January 2006 Summary of Meeting with the Constellation Energy Group Inc. to Discuss Results of the Staff Audit of the Aging Management Programs and Reviews for Nine Mile Point, Units 1 and 2 Project stage: Meeting ML0609504132006-03-23023 March 2006 SER Open Item 4.7B.1-1 and Closure of Amended License Renewal Application (Alra) Section A2.4, Commitment 39 - Biological Shield Wall Neutron Fluence Analysis Project stage: Other ML0608905792006-03-29029 March 2006 01/23/2006 Summary of a Telephone Conference Call Held Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group, Inc. Concerning the Review for the Nine Mile Point, Units 1 & 2, License Renewal Application Project stage: Other ML0609406222006-03-29029 March 2006 Email (3/29/06) from Peter Mazzaferro to Ngoc (Tommy) B. Le NMP2 Bioshield Fluence Calc Info Project stage: Other ML0610201662006-04-0303 April 2006 Safety Evaluation Report with Open Items Related to the License Renewal of Nine Mile Point, Dated March 2006 - NMPNS Comments (TAC Nos. MC3272 and MC3273) Project stage: Other ML0610201542006-04-0404 April 2006 Safety Evaluation Report (Ser), with Open Items Related to the License Renewal Dated March 2006 - SER Open Item 3.0.3.2.17-1 Project stage: Other ML0610901062006-04-19019 April 2006 Request for Additional Information, Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application (TAC Nos. MC3272 and MC3273) Project stage: RAI ML0612205952006-04-21021 April 2006 Amended License Renewal Application - NRC Request for Additional Information (RAI) 4.7.5. A-1 Project stage: Request ML0628304332006-10-31031 October 2006 Federal Register Notice for Nine Mile Point Nuclear, LLC Nine Mile Point Nuclear Station Units 1 and 2, Notice of Issuance of Renewed Facility Operating License Nos. DPR-63 and NPF-69 for an Additional 20-Year Period Project stage: Approval ML0628303072006-10-31031 October 2006 LLC Docket No. 50-220 Nine Mile Point Nuclear Station, Unit 1 Renewed Facility Operating License Renewed License No. DPR-63 Project stage: Other ML0628303172006-10-31031 October 2006 LLC Docket No. 50-410 Nine Mile Point Nuclear Station, Unit 2 Renewed Facility Operating License Renewed License No. NPF-69 Project stage: Other ML0628302732006-10-31031 October 2006 Issuance of Renewed Facility Operating License Nos. DPR-63 and NPF-69 for the Nine Mile Point Nuclear Station, Units 1 and 2 Project stage: Approval ML0825302502008-08-29029 August 2008 Request to Utilize an Alternative to the Requirements of 10 CFR 50.55a(g) for the Repair and Inservice Inspection of Control Rod Drive Stub Tubes for the License Renewal Period of Extended Operation Project stage: Other ML1106802912011-03-0404 March 2011 Request to Utilize an Alternative to the Requirements of 10CFR50.55a(g) for Repair of Control Rod Drive Housing Penetrations for the Remainder of License Renewal Period of Extended Operation Project stage: Other ML1235500402012-12-17017 December 2012 ISFSI Decommissioning Funding Plan Project stage: Request ML13098A0842013-03-27027 March 2013 Decommissioning Funding Status Report Project stage: Request ML13141A4082013-05-0909 May 2013 Submittal of Corporate Restructuring Project stage: Request ML13232A1562013-08-0606 August 2013 ISFSI, Nine Mile Point, Units 1, 2 and ISFSI and R.E. Ginna, and ISFSI, Application for Order Approving Transfer of Operating Authority and Conforming License Amendments. Part 1 of 2 Project stage: Request ML13232A1572013-08-0606 August 2013 ISFSI, Nine Mile Point, Units 1, 2 and ISFSI and R.E. Ginna, and ISFSI, Application for Order Approving Transfer of Operating Authority and Conforming License Amendments. Part 2 of 2 Project stage: Request ML13228A1862013-08-14014 August 2013 Supplement to Application for Order Approving Transfer of Operating Authority and Conforming License Amendments Project stage: Supplement ML13256A3642013-09-17017 September 2013 Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant - Acceptance of Requested Licensing Action Regarding Direct License Transfer (TAC MF2584 - MF2588) Project stage: Acceptance Review ML13269A3122013-10-0202 October 2013 Request for Withholding Information from Public Disclosure for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, and R.E. Ginna Nuclear Power Plant (TAC Nos. MF2584, MF2585, MF2586, M Project stage: Withholding Request Acceptance ML13294A0392013-11-0707 November 2013 Notice of Consideration of Approval of Transfer of Renewed Facility Operating Licenses and Conforming Amendments,.. Project stage: Other ML13337A3902013-12-0505 December 2013 Request for Additional Information Regarding Order Approving Direct Transfer of Renewed Facility Operating License and Conforming Amendments Project stage: RAI ML13360A2002013-12-17017 December 2013 Response to Nrc'S Request for Additional Information Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments Project stage: Request ML13294A0702013-12-18018 December 2013 Consideration of Approval of Transfer of Renewed Facility Operating Licenses, Materials Licenses, and Conforming Amendments Containing SUNSI Project stage: Request ML14057A8492014-01-0909 January 2014 NRR E-mail Capture - January 09, 2014 - Report of the Nuclear Advisory Committee (MF2584-88) Project stage: Request ML14050A3712014-02-0505 February 2014 Supplemental Response to Nrc'S Requests for Additional Information Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments Project stage: Supplement ML14057A7132014-02-14014 February 2014 NRR E-mail Capture - Constellation License Transfer Tq RAI Responses (MF2584-88) Project stage: Request ML14071A4782014-02-21021 February 2014 Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments Project stage: Request ML14105A4722014-03-24024 March 2014 Order Approving Direct Transfer of Renewed Operating Licenses, Independent Spent Fuel Storage Installation License, and Conforming Amendments (TAC Nos. MF2584, MF2585, and L24780) Project stage: Other ML14063A1252014-03-24024 March 2014 Order Approving Direct Transfer of Licenses and Conforming Amendment, Independent Spent Fuel Storage Installation License, (Tacs. MF2584 and MF2585) Project stage: Other ML14078A6432014-03-24024 March 2014 MF2584-85 Calvert Cliffs Conforming Amendments Project stage: Other ML14078A6492014-03-24024 March 2014 Draft License Pgs Project stage: Draft Other ML14078A6072014-03-25025 March 2014 Draft License Pages Project stage: Draft Other ML14106A1192014-03-25025 March 2014 R. E. Ginna Nuclear Power Plant - Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment Project stage: Other ML14063A2112014-03-25025 March 2014 Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment Project stage: Other ML14078A5782014-03-25025 March 2014 Conforming Amendment Page Project stage: Other ML14078A5842014-03-25025 March 2014 Draft License Pgs Project stage: Draft Other NRC-2013-0252, R.E. Ginna Nuclear Power Plant - Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment2014-03-25025 March 2014 R.E. Ginna Nuclear Power Plant - Order Approving Direct Transfer of Renewed Operating License and Conforming License Amendment Project stage: Other ML14063A1842014-03-25025 March 2014 Order Approving Direct Transfer of Renewed Operating Licenses and Conforming License Amendments Project stage: Other 2008-08-29
[Table View] |
|
---|
Category:Letter
MONTHYEARIR 05000244/20230042024-02-0505 February 2024 LLC - Integrated Inspection Report 05000244/2023004 IR 05000317/20230042024-02-0101 February 2024 Integrated Inspection Report 05000317/2023004 and 05000318/2023004 NMP1L3570, Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation2024-02-0101 February 2024 Supplemental Information Letter - Revision to the Technical Specifications Design Features Sections to Remove the Nine Mile 3 Nuclear Project, LLC, Designation IR 05000220/20230042024-02-0101 February 2024 Integrated Inspection Report 05000220/2023004 and 05000410/2023004 ML24029A0102024-01-29029 January 2024 Request for Information and Notification of Conduct of IP 71111.21.N.04, Age-Related Degradation, Reference Inspection Report 05000317/2024010 and 05000318/2024010 ML24026A0112024-01-26026 January 2024 R. E. Ginna Nuclear Power Plant, Relief Request Associated with Inservice Testing of B Auxiliary Feedwater Pump NMP1L3569, CFR 50.46 Annual Report2024-01-26026 January 2024 CFR 50.46 Annual Report ML24003A8872024-01-19019 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0033 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) 05000318/LER-2023-004, Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-16016 January 2024 Submittal of LER 2023-004-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Submittal of Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer ML24011A0732024-01-11011 January 2024 Proposed Alternative to the Requirements for Repair/Replacement of Saltwater (SW) System Buried Piping 05000318/LER-2023-002, Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer2024-01-0808 January 2024 Forward LER 2023-002-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Automatic Reactor Trip from Reactor Protection System Actuation Due to Loss of Unit Service Transformer 05000318/LER-2023-003, Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip2024-01-0808 January 2024 Forward LER 2023-003-00 for Calvert Cliffs Nuclear Power Plant, Unit 2, Manual Actuation of Auxiliary Feedwater System Due to 22 Steam Generator Feedwater Pump Trip ML24004A2122024-01-0808 January 2024 Senior Reactor and Reactor Operator Initial License Examinations ML24005A0222024-01-0505 January 2024 Revised Steam Generator Tube Inspection Reports ML23354A0012024-01-0404 January 2024 Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0059 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23304A0642024-01-0202 January 2024 Issuance of Amendment No. 349 to Modify the Long-Term Coupon Surveillance Program IR 05000244/20230102023-12-19019 December 2023 LLC - Age-Related Degradation Inspection Report 05000244/2023010 ML23348A0992023-12-15015 December 2023 R. E. Ginna Nuclear Power Plant Exemption from Select Requirements of 10 CFR Part 73 (EPID L-2023-LLE-0029 (Security Notifications, Reports, and Recordkeeping and Suspicious Activity Reporting)) ML23278A1292023-12-14014 December 2023 Units 1 & 2; Limerick, Units 1 & 2; Nine Mile Point, Units 1 & 2; and Peach Bottom, Units 2 & 3 -Revision to Approved Alternatives to Use Boiling Water Reactor Vessel and Internals Project Guidelines IR 05000410/20243012023-12-14014 December 2023 Initial Operator Licensing Examination Report 05000410/2024301 NMP1L3566, Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station2023-12-14014 December 2023 Radiological Emergency Plan Document Revision. Includes EP-AA-1013, Revision 10, Radiological Emergency Plan Annex for Nine Mile Point Station ML23305A1402023-12-13013 December 2023 Units 1 & 2; Nine Mile Point, Unit 2; Peach Bottom, Units 2 & 3; and Quad Cities, Units 1 and 2 - Issuance of Amendments to Adopt Traveler TSTF-580 ML23347A0092023-12-13013 December 2023 Annual Commitment Change Notification ML23346A0142023-12-12012 December 2023 LLC - Senior Reactor and Reactor Operator Initial License Examinations ML23341A1252023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements ML23291A4642023-12-0707 December 2023 Issuance of Amendment No. 251 Regarding the Adoption of Title 10 the Code of Federal Regulations Section 50.69, Risk-Informed Categorization and Treatment of SSC for Nuclear Power Plants NMP1L3564, Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements2023-12-0707 December 2023 Supplemental Response to Part 73 Exemption Request - Withdrawal of Request for Exemption from 10 CFR 73, Subpart B, Preemption Authority Requirements RS-23-125, Request for Exemption from 10 CFR 2.109(b)2023-12-0707 December 2023 Request for Exemption from 10 CFR 2.109(b) ML23289A0122023-12-0606 December 2023 Issuance of Amendment No. 250 Regarding the Revision to Technical Specifications to Adopt TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b NMP1L3563, Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208)2023-12-0404 December 2023 Submittal of Relief Request I5R-12, Revision 0, Concerning the Installation of a Full Structural Weld Overlay on Reactor Pressure Vessel Recirculation Inlet Nozzle N2E Safe End-to-Nozzle Dissimilar Metal Weld (32-WD-208) IR 05000220/20234022023-11-28028 November 2023 Security Baseline Inspection Report 05000220/2023402 and 05000410/2023402 ML23331A2992023-11-27027 November 2023 Submittal of Condition Prohibited by Technical Specifications Due to Failure to Sample Diesel Generator Fuel Oil Storage Tank NMP1L3557, Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation2023-11-22022 November 2023 Request for Exemption from Enhanced Weapons, Firearms Background Checks, and Security Event Notifications Implementation IR 05000317/20230102023-11-20020 November 2023 Biennial Problem Identification and Resolution Inspection Report 05000317/2023010 and 05000318/2023010 ML23321A1392023-11-17017 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information and Request for Additional Information ML23318A4722023-11-14014 November 2023 Supplement to License Amendment Request to Adopt TSTF-59-A ML23317A1032023-11-10010 November 2023 Supplemental Information Letter for Part 73 Exemption Request - Responses to Request for Confirmatory Information ML23317A1192023-11-10010 November 2023 Constellation Energy Generation, LLC - 2023 Annual Report - Guarantees of Payment of Deferred Premiums ML23310A0442023-11-0707 November 2023 Project Manager Assignment IR 05000317/20230402023-11-0202 November 2023 95001 Supplemental Inspection Report 05000317/2023040 and Follow-Up Assessment Letter IR 05000317/20230032023-11-0101 November 2023 Integrated Inspection Report 05000317/2023003 and 05000318/2023003 IR 05000220/20234202023-11-0101 November 2023 Security Baseline Inspection Report 05000220/2023420 and 05000410/2023420 ML23305A0052023-11-0101 November 2023 Operator Licensing Examination Approval IR 05000317/20230902023-10-26026 October 2023 Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; Inspection Report 05000317/2023090 IR 05000244/20230032023-10-25025 October 2023 LLC - Integrated Inspection Report 05000244/2023003 IR 05000220/20230032023-10-25025 October 2023 Integrated Inspection Report 05000220/2023003 and 05000410/2023003 ML23292A0282023-10-19019 October 2023 LLC - Notification of Conduct of a Fire Protection Team Inspection IR 05000220/20235012023-10-17017 October 2023 Emergency Preparedness Biennial Exercise Inspection Report 05000220/2023501 and 05000410/2023501 IR 05000220/20230112023-10-16016 October 2023 Comprehensive Engineering Team Inspection Report 05000220/2023011 and 05000410/2023011 2024-02-05
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 20555-0001 September 17, 2013 Mary G. Korsnick Acting Chief Executive Officer and Chief Nuclear Officer Constellation Energy Nuclear Group, LLC 100 Constellation Way, Suite 200C Baltimore, MD 21202
SUBJECT:
CALVERT CLIFFS NUCLEAR POWER PLANT, UNIT NOS. 1 AND 2, NINE MILE POINT NUCLEAR STATION, UNIT NOS. 1 AND 2, AND R. E. GINNA NUCLEAR POWER PLANT - ACCEPTANCE OF REQUESTED LICENSING ACTION REGARDING DIRECT LICENSE TRANSFER (TAC NOS. MF2584, MF2585, MF2586, MF2587, AND MF2588)
Dear Ms. Korsnick:
By letter dated August 6, 2013 (Agencywide Documents Access and Management System (ADAMS) Accession Nos. ML13232A156 and ML13232A157), as supplemented by letter dated August 14, 2013 (ADAMS Accession No. ML13228A186), Constellation Energy Nuclear Group, LLC, the licensee, submitted a license amendment request (LAR) for Calvert Cliffs Nuclear Power Plant, Unit Nos. 1 and 2, Calvert Cliffs Independent Spent Fuel Storage Installation (ISFSI), Nine Mile Point Nuclear Station, Unit Nos. 1 and 2, Nine Mile Point Nuclear Station ISFSI, R. E. Ginna Nuclear Power Plant, and R. E. Ginna ISFSI. The proposed LAR would directly transfer operating authority of the aforementioned licenses to Exelon Generation Company, LLC. The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff's acceptance review. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.33 of 10 CFR addresses the content of general information required.
The licensee requested a shorten review period to support their implementation date. The NRC staff will make an effort to support the licensee's schedule.
M. Korsnick -2 If you have any questions, please contact me at {301} 415-1016.
Sincerely, d~~ .
/' ~adiyah S. Morgan, Project Manager Plant Licensing Branch 1-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-317, 50-318, 50-220, 50-410, 50-244, 72-8, 72-1036,72-67 cc: Mr. George H. Gel/rich, Vice President Calvert Cliffs Nuclear Power Plant, Inc.
Calvert Cliffs Nuclear Power Plant 1650 Calvert Cliffs Parkway Lusby, MD 20657-4702 Christopher Costanzo Nine Mile Point Nuclear Station, LLC P. O. Box 63 Lycoming, New York 13093 Mr. Joseph E. Pacher Vice President R.E. Ginna Nuclear Power Plant R.E. Ginna Nuclear Power Plant, LLC 1503 Lake Road Ontario, NY 14519 Additional Distribution via Listserv
ML13256A364 *via e-mail OFFICE NRRlDORLlLPLI-1/PM NRRlDORLlLPLI-1/LA*
NRRlDORLlLPLI-1/BC (A) i NAME NMorgan KGoldstein RBeali DATE 09/17/13 09/13/13 09/17/13