Letter Sequence Response to RAI |
|---|
TAC:MC3272, Control Room Habitability (Approved, Closed) TAC:MC3273, Control Room Habitability (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance
- Supplement, Supplement, Supplement, Supplement
Results
- Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval, Approval
Other: ML042450123, ML043000333, ML043150211, ML043210580, ML050120217, ML050420328, ML050680270, ML050690308, ML051440459, ML051650086, ML052000147, ML052000163, ML052000175, ML052500572, ML052940236, ML052970007, ML053120311, ML053320201, ML053430012, ML053460458, ML053470313, ML053630052, ML060180205, ML060890579, ML060940577, ML060940622, ML060950413, ML061020154, ML061020166, ML061080367, ML061090064, ML062830307, ML062830317, ML082530250, ML091830049, ML091980454, ML110680289, ML110680291, ML13294A039, ML14063A184, ML14078A594, ML14106A053, ML14148A114
|
MONTHYEARML0414700602004-05-26026 May 2004 Independent Survey of Power-Reactor Licensees Project stage: Request ML0414902132004-05-26026 May 2004 Transmittal of Nine Mile Point Units 1 & 2 Application for Renewed Operating Licenses, Including Environmental Report Project stage: Request ML0419802972004-06-15015 June 2004 License Renewal Application (E-Mail) - Enclosure 4. Gurdziel E-mail, Dated 06/15/2004, Comments to Nine Mile Point License Extension Meeting Project stage: Meeting ML0418404122004-07-0202 July 2004 Summary of Meeting Between the U.S. Nuclear Regulatory Commission (NRC) Staff and Constellation Energy, Inc Representatives to Discuss the Nine Mile Point Power Station, Units 1 & 2 License Renewal Application Project stage: Meeting ML0424501232004-09-0202 September 2004 License Renewal Application Work Split Tables Project stage: Other ML0430003332004-10-26026 October 2004 To Audit and Review Plan for Plant Aging Management Reviews and Programs for the Nine Mile Point Nuclear Station, Units 1 and 2 Project stage: Other 05000220/LER-2004-004, Regarding Manual Reactor Scram Due to Failure of 13 Feedwater Flow Control Valve Positioner2004-10-29029 October 2004 Regarding Manual Reactor Scram Due to Failure of 13 Feedwater Flow Control Valve Positioner Project stage: Request ML0432002282004-11-0101 November 2004 Draft Safety Evaluation Report Related to the License Renewal of the Arkansas Nuclear One, Unit 2 Project stage: Draft Approval ML0431502112004-11-0909 November 2004 Audit Trip Report Regarding the Constellation Energy Group Application for License Renewal for the Nine Mile Nuclear Station, Units 1 and 2, Dated May 27, 2004 Project stage: Other ML0432105802004-11-15015 November 2004 Audit and Review Plan for Plant Aging Management Reviews and Programs for the Nine Mile Point Nuclear Station, Units 1 and 2 (TAC Nos MC3272 and MC3273.) Project stage: Other ML0432706342004-11-17017 November 2004 Summary of a Meeting Held on October 28, 2004, Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group, Inc. Concerning the Review for the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Meeting ML0432806832004-11-22022 November 2004 Requests for Additional Information for Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0434200492004-12-0303 December 2004 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0434504402004-12-0707 December 2004 Status of Staff Review of the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0435703682004-12-21021 December 2004 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0500403152004-12-21021 December 2004 License Renewal Application - Responses to NRC Requests for Additional Information Regarding Sections 2.3.2, 2.3.4, and B2. 1.32 Project stage: Response to RAI ML0436500032004-12-22022 December 2004 Request for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application, Project stage: RAI ML0500403322004-12-22022 December 2004 License Renewal Application - Responses to NRC Request for Additional Information Regarding Scoping and Screening Methodology Project stage: Response to RAI ML0500601822004-12-22022 December 2004 License Renewal Application - Responses to NRC Requests for Additional Information Regarding Sections 2.2, 2.3.3, and 2.3.4 Project stage: Response to RAI ML0436500062004-12-27027 December 2004 Request for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application, Project stage: RAI ML0501202172005-01-0303 January 2005 License Renewal Application - Response to NRC Letter Dated December 7, 2004 Regarding Status of NRC Staff Review Project stage: Other ML0501102352005-01-0303 January 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding the Reactor Recirculation Systems Project stage: Response to RAI ML0500604212005-01-0505 January 2005 Revision of Schedule for the Conduct of Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0501902962005-01-0707 January 2005 License Renewal Application - Response to NRC Request for Additional Information Regarding the Nine Mile Point Unit 1 Containment System Project stage: Response to RAI ML0501902922005-01-10010 January 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding Structures Project stage: Response to RAI ML0501902952005-01-10010 January 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding Aging Management of Electrical and Instrumentation and Control Systems Project stage: Response to RAI ML0502404242005-01-13013 January 2005 Request for Additional Information - Nine Mile Point Nuclear Station, Units 1 and 2, Fire Protection Open Items Project stage: RAI ML0501302832005-01-13013 January 2005 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0502103762005-01-13013 January 2005 Request for Additional Information on Open Items for Balance of Plant Section Project stage: RAI ML0502501882005-01-14014 January 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding the Time-Limited Aging Analysis for Main Steam Isolation Valve Corrosion Allowance and the Closed-Cycle Cooling Water System Project stage: Response to RAI ML0503304632005-01-20020 January 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding Aging Management of Bolting Project stage: Response to RAI ML0503903702005-01-26026 January 2005 . License Renewal Application - Responses to NRC Requests for Additional Information Regarding Aging Management of Auxiliary Systems Project stage: Response to RAI ML0504602332005-01-31031 January 2005 . License Renewal Application - Responses to NRC Requests for Additional Information Regarding Sections 2.2, 2.3.3, and 2.3.4, and Scoping and Screening Methodology Project stage: Response to RAI ML0504504852005-02-0404 February 2005 License Renewal Application - Submittal of Supplemental Information Resulting from the NRC Audit of Aging Management Reviews Project stage: Supplement ML0504104282005-02-10010 February 2005 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0505601992005-02-11011 February 2005 License Renewal Application - Submittal of Supplemental Information for Review of the License Renewal Application Project stage: Supplement ML0504203872005-02-11011 February 2005 Summary of a Conference Call Held with Constellation Energy Group Inc. Concerning the Review of the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Project stage: Approval ML0504203282005-02-11011 February 2005 Summary of a Conference Call Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group, Inc. Concerning the Review for the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Other ML0506100592005-02-14014 February 2005 License Renewal Application - Responses to NRC Requests for Additional Information Regarding the Reactor Vessel and Reactor Vessel Internal Components Project stage: Response to RAI ML0504601382005-02-14014 February 2005 Summary of a Conference Call Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group Inc. Concerning the Review of the Nine Mile Point Nuclear Station, Units 1 and 2 Project stage: Approval ML0505401962005-02-22022 February 2005 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0505402632005-02-23023 February 2005 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0506802702005-03-0303 March 2005 Recovery of Nine Mile Point License Renewal Application Quality Project stage: Other ML0506205912005-03-0303 March 2005 Requests for Additional Information for the Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: RAI ML0506601472005-03-0707 March 2005 Extension of Staff Review Schedule for Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0506903082005-03-10010 March 2005 Summary of a Conference Call Held on February 28, 2005, Between the U.S. Nuclear Regulatory Commission and the Constellation Energy Group Inc. Concerning the Review for the Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal App Project stage: Other ML0507001342005-03-11011 March 2005 Revision of Schedule for the Conduct of Review of Nine Mile Point Nuclear Station, Units 1 and 2, License Renewal Application Project stage: Approval ML0510905402005-04-19019 April 2005 Summary of Meeting Held on March 30, 2005, Between the NRC Staff and the Constellation Energy Group, Inc. Representatives to Discuss the Status of Their Recovery Effort for Nine Mile Point, Units 1 and 2, License Renewal Application Project stage: Meeting ML0514404592005-05-13013 May 2005 Recovery of Nine Point License Renewal Application Quality Project stage: Other ML0516500862005-06-0909 June 2005 Presentation Slides, Nine Mile Point, Units 1 and 2, LRA Status Update Project stage: Other 2005-01-14
[Table View] |
Text
-
Constellation Energy Nine Mile Point Nuclear Station RO. Box 63 Lycoming, New York 13093 January 7, 2005 NMP1L 1910 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Nine Mile Point Units 1 and 2 Docket Nos. 50-220 and 50-410 Facility Operating License Nos. DPR-63 and NPF-69 License Renewal Application - Response to NRC Request for Additional Information Regarding the Nine Mile Point Unit 1 Containment System (TAC Nos. MC3272 and MC3273)
Gentlemen:
By letter dated May 26, 2004, Nine Mile Point Nuclear Station, LLC (NMPNS) submitted an application to renew the operating licenses for Nine Mile Point Units 1 and 2.
In a letter dated December 8, 2004, the NRC requested additional information regarding the Nine Mile Point Unit 1 Containment System that is described in Sections 2.3.3.A.5 and 3.3.2.A.4 of the License Renewal Application. The NMPNS response to this request for additional information is provided in Attachment 1. This letter contains no new regulatory commitments.
If you have any questions about this submittal, please contact Peter Mazzaferro, NMPNS LicenseRenewal Project Manager, at 315) 4349i109._
Very truly yours, mes A. Spina Vice President Nine Mile Point JAS/DEV/jm.
X e
, I S I
I F.,IFE0
Page 2 NMP1L 1910 STATE OF NEW YORK TO WIT:
COUNTY OF OSWEGO I, James A. Spina, being duly sworn, state that I am Vice President Nine Mile Point, and that I am duly authorized to execute and file this supplemental information on behalf of Nine Mile Point Nuclear Station, LLC. To the best of my knowledge and belief, the statements contained in this submittal are true and correct. To the extent that these statements are not based on my personal knowledge, they are based upon information provided by other Nine Mile Point
-employees-and/or consultants. Such information has been reviewed in accordance with company practice and I believe it to be reliable.
Subscribed and sworn before me, a Notary Public in and f the State of New York and County of Oswego, this 74' day of 2005.
WITNESS my Hand and Notarial Seal:
My Commission Expires:
SANDRA A. OSWALD Commiso xie V/4.kLAW4 Notary Public 1/ /7 105
/ Dat6 Attachmrent en______
- 1. Response to NRC Request for Additional Information (RAI) Regarding the Nine Mile Point Unit 1 Containment System Described in Sections 2.3.3.A.5 and 3.3.2.A.4 of the License Renewal Application cc:
Mr. S. J. Collins, NRC Regional Administrator, Region I Mr. G. K. Hunegs, NRC Senior Resident Inspector Mr. P. S. Tam, Senior Project Manager, NRR Mr. N. B. Le, License Renewal Project Manager, NRR Mr. J. P. Spath, NYSERDA
ATTACHMENT 1 Nine Mile Point Nuclear Station Response to NRC Request for Additional Information (RAI)
Regarding the Nine Mile Point Unit 1 Containment System Described in Sections 2.3.3.A.5 and 3.3.2.A.4 of the License Renewal Application
-This attachment-provides the Nine MilePoint NuclearStation_ LLC (NMPNS) response to the request for additional information contained in the NRC letter dated December 8, 2004, regarding the Nine Mile Point Unit 1 (NMPI) Containment System, The NRC RAI is repeated, followed by the NMPNS response.
RAI 2.3.3.A.5 LRA Tables 2.3.3.A.5-1 and 3.3.2.A-4, and Section 2.3.3.A.5for Containment System, do not include piping/fittings and drywell air cooler unitsfor NAMP; however, these items are shown as within the scope of license renewal on LRA drawings and are subject to all aging management review (AMR). Please clarify the discrepancy. If these components are in scope, please provide information on the associated aging management review and programs in the format of LRA Tables 2.3.3.A.5-1 and 3.3.2.A-4. If these components are not in scope, please provide justificationfor their exclusion.
Response
The piping and fittings and drywell air cooler units in the NMP1 Containment System are component types that are within the scope of license renewal and subject to aging management review AMRJ.ithepiping andjtjings component type is included in the Svstem Descrition portion of LRA Section 2.3.3.A.5 but was inadvertently omitted from Tables 2.3.3.A.5-1 and 3.3.2.A-4. LRA table revisions to incorporate the requested information regarding the intended function, AMR, and aging management programs (AMPs) are provided below.
With respect to the drywell air cooler units, the requested information is included in the current LRA tables. The drywell air cooler units are part of the Primary Containment Area Cooling System that is described in LRA Section 2.3.3.A.5. The system consists of ducting and drywell air coolers. The ducting and drywell air coolers are addressed under the component types "Ducting" and "Heat Exchangers," respectively. The information regarding the intended functions, AMR, and AMPs for these component types is included in the current LRA Tables 2.3.3.A.5-1 and 3.3.2.A-4.
Page 1 of 3
LRA Revisions LRA Table 2.3.3.A.5-1 (page 2.3-70) is revised to add the "Piping and Fittings" component type, as follows (revisions highlighted by shading):
Table 2.3.3.A.5-1 NMPI Containment Systems Component Type Intended Functions m Rping and i~ ngs EPre ssre BouVnda-r~y In LRA Table 3.3.2.A-4, information is added for the "Piping and Fittings" component type, as shown on the followming page.
Page 2 of 3
V.~
I Table 3.3.2.A-4 Auxiliary Systems I
NMPI Containment Svstems - Summarv of Aging Management Evaluation Envionmet Agng EfectNUREG-Component Intended Materal Reuirin Aging Management 1801 Table I Noe l
~Tpnn ntcdonlMateirial lEnvironment Requiring anp gNotesm; Type Function MaaeetProgram Volume 2 Item Maaeet-J Item Piping and PB Carbon oe Low Air Loss of Material 10 CFR 50 VII.F3.4-a 3.3.1.A-05 C, 10 Fittings Alloy Steel (Yiei Apoendix J Proaram Strength,,100 Preventive VIl.F3.4-a 3.3.1.A-05 C, 10 Ksi)
Maintenanc re Proaram t
Systems Wall'down Vll.1.--b 3.3.1.A-05 A, 3 Program I
Air,-Moisture or Loss of Material Preventive VII.F3.4-a 3.3.1.A-05 C,-10 Wettihg!_
Maintenance temperature Programi 21 400F Dried Air or None None None Gas Demineralized Loss of Material Preventive Untreated Mainfenance.¶ Water, Low Proqrami Flow I,__ _
Wrought Dried Air or None None None Austeniti~___
Ga's Stainless Sfel
-e Copper Alloys Dried Air or None None None (Zinc d5%)
Gas' I
Page 3 of 3 (I