{{#Wiki_filter:March 2, 2006 Jack Keenan, Chief Nuclear Officer Pacific Gas and Electric Company
{{#Wiki_filter:rch 2, 2006


Mail Code B32
==SUBJECT:==
 
ANNUAL ASSESSMENT LETTER - DIABLO CANYON POWER PLANT (NRC INSPECTION REPORT 05000275/2006001 AND 05000323/2006001)
P.O. Box 770000
 
San Francisco, California 94177-0001SUBJECT:ANNUAL ASSESSMENT LETTER - DIABLO CANYON POWER PLANT (NRC INSPECTION REPORT 05000275/2006001 AND 05000323/2006001)


==Dear Mr. Keenan:==
==Dear Mr. Keenan:==
On February 7, 2006, the NRC staff completed its performance review of Diablo Canyon Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most
On February 7, 2006, the NRC staff completed its performance review of Diablo Canyon Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2005.
 
recent quarter and inspection results for the period from January 1 through December 31, 2005.


The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.
The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.


This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as "Official Use Only - Security-Related
This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.
 
Information" will include the physical protection review and resultant inspection plan.
 
Overall, Diablo Canyon Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most
 
recent quarter was within the Licensee Response column of the NRC's Action Matrix, based on
 
all inspection findings being classified as having very low safety significance (Green) and all PIs
 
indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we
 
plan to conduct reactor oversight process baseline inspections at your facility.
 
While plant performance for the most recent quarter is within the Licensee Response column of the Action Matrix, there was a safety significant PI that affected the second and third quarters of
 
the assessment cycle, which resulted in plant performance being in the Regulatory Response
 
column for those two quarters. As discussed in our Assessment Followup Letter dated
 
November 4, 2005, the second quarter 2005 Emergency Preparedness Drill/Exercise
 
Performance PI documentation incorrectly in cluded 3 of the 33 emergency drills as having been successfully completed. This PI assesses the percentage of all drill, exercise, and actual
 
opportunities that were performed timely and accurately during the previous eight quarters.
 
When the Emergency Preparedness Drill/Exercise Performance PI data for the second quarter
 
of 2005 was re-evaluated, the PI crossed the Green-to-White threshold. This error also carried
 
over into the third quarter and when the Emergency Preparedness Drill/Exercise Performance
 
PI data was re-evaluated, the PI again crossed the Green-to-White threshold. Pacific Gas and
 
Electric Company has submitted corrected second and third quarter Emergency Preparedness Pacific Gas and Electric Company- 2 -
Drill/Exercise Performance PIs. Both quarters subsequently indicated the Emergency Preparedness Drill/Exercise Performance PI was White. Pacific Gas and Electric Company
 
provided additional training and conducted numerous drills which were evaluated as successful.
 
The resulting data for the fourth quarter of 2005 indicated that the Emergency Preparedness
 
Drill/Exercise Performance PI was Green. As noted in the following paragraph, a supplemental
 
inspection of the root cause, extent of cause and condition, and corrective actions will be
 
conducted.
 
The enclosed inspection plan details the inspection, except those related to physical protection, scheduled through September 30, 2007. Routine resident inspections are not listed due to their
 
ongoing and continuous nature. In addition to the baseline inspections, the NRC will also be
 
conducting inspections related to Temporary Instruction 2515/160, "Pressurizer Penetration


Nozzles and Steam Space Piping Connections in U.S. Pressurized Water Reactors," for Unit 2;
Overall, Diablo Canyon Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility.


Inspection Procedure 60853, "On Site Fabrication of Components and Construction of an
While plant performance for the most recent quarter is within the Licensee Response column of the Action Matrix, there was a safety significant PI that affected the second and third quarters of the assessment cycle, which resulted in plant performance being in the Regulatory Response column for those two quarters. As discussed in our Assessment Followup Letter dated November 4, 2005, the second quarter 2005 Emergency Preparedness Drill/Exercise Performance PI documentation incorrectly included 3 of the 33 emergency drills as having been successfully completed. This PI assesses the percentage of all drill, exercise, and actual opportunities that were performed timely and accurately during the previous eight quarters.


ISFSI [Independent Spent Fuel Storage Installation]"; and a supplemental inspection utilizing
When the Emergency Preparedness Drill/Exercise Performance PI data for the second quarter of 2005 was re-evaluated, the PI crossed the Green-to-White threshold. This error also carried over into the third quarter and when the Emergency Preparedness Drill/Exercise Performance PI data was re-evaluated, the PI again crossed the Green-to-White threshold. Pacific Gas and Electric Company has submitted corrected second and third quarter Emergency Preparedness


Inspection Procedure 95001, "Inspection for One or Two White inputs in a Strategic
Pacific Gas and Electric Company  -2-Drill/Exercise Performance PIs. Both quarters subsequently indicated the Emergency Preparedness Drill/Exercise Performance PI was White. Pacific Gas and Electric Company provided additional training and conducted numerous drills which were evaluated as successful.


Performance Area," for the Emergency Preparedness Drill/Exercise Performance PI. The
The resulting data for the fourth quarter of 2005 indicated that the Emergency Preparedness Drill/Exercise Performance PI was Green. As noted in the following paragraph, a supplemental inspection of the root cause, extent of cause and condition, and corrective actions will be conducted.


inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel
The enclosed inspection plan details the inspection, except those related to physical protection, scheduled through September 30, 2007. Routine resident inspections are not listed due to their ongoing and continuous nature. In addition to the baseline inspections, the NRC will also be conducting inspections related to Temporary Instruction 2515/160, Pressurizer Penetration Nozzles and Steam Space Piping Connections in U.S. Pressurized Water Reactors, for Unit 2; Inspection Procedure 60853, On Site Fabrication of Components and Construction of an ISFSI [Independent Spent Fuel Storage Installation]; and a supplemental inspection utilizing Inspection Procedure 95001, Inspection for One or Two White inputs in a Strategic Performance Area, for the Emergency Preparedness Drill/Exercise Performance PI. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.


availability issues well in advance of inspector arrival onsite. Routine resident inspections are
In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


not listed due to their ongoing and continuous nature. The inspections in the last 9 months of
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. William B. Jones at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.
 
the inspection plan are tentative and may be revised at the midcycle review.
 
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public
 
Document Room or from the Publicly Ava ilable Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
 
If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. William B. Jones at 817-860-8141
 
with any questions you may have regarding this letter or the inspection plan.


Sincerely,
Sincerely,
/RA/Arthur T. Howell III, Director Division of Reactor Projects Dockets: 50-275 50-323
/RA/
 
Arthur T. Howell III, Director Division of Reactor Projects Dockets: 50-275 50-323 Licenses: DPR-80 DPR-82 Enclosure:
Licenses: DPR-80
Diablo Canyon Inspection/Activity Plan
 
DPR-82 Enclosure:
Diablo Canyon Inspection/Activity Plan Pacific Gas and Electric Company- 3 -
cc w/enclosure:
David H. Oatley, Vice President
 
and General Manager
 
Diablo Canyon Power Plant
 
P.O. Box 56
 
Avila Beach, CA 93424 Donna Jacobs Vice President, Nuclear Services
 
Diablo Canyon Power Plant
 
P.O. Box 56
 
Avila Beach, CA 93424 James R. Becker, Vice President Diablo Canyon Operations and
 
Station Director, Pacific Gas and
 
Electric Company
 
Diablo Canyon Power Plant
 
P.O. Box 3
 
Avila Beach, CA 93424 Sierra Club San Lucia Chapter ATTN: Andrew Christie
 
P.O. Box 15755
 
San Luis Obispo, CA 93406 Nancy Culver San Luis Obispo Mothers for Peace
 
P.O. Box 164
 
Pismo Beach, CA 93448 Chairman San Luis Obispo County Board of
 
Supervisors
 
Room 370 County Government Center
 
San Luis Obispo, CA 93408 Truman Burns\Robert Kinosian California Public Utilities Commission
 
505 Van Ness Ave., Rm. 4102
 
San Francisco, CA 94102-3298 Diablo Canyon Independent Safety Committee Robert R. Wellington, Esq.
 
Legal Counsel
 
857 Cass Street, Suite D
 
Monterey, CA 93940 Ed Bailey, Chief Radiologic Health Branch
 
State Department of Health Services
 
P.O. Box 997414 (MS 7610)
 
Sacramento, CA 95899-7414 Richard F. Locke, Esq.
 
Pacific Gas and Electric Company
 
P.O. Box 7442
 
San Francisco, CA 94120 City Editor The Tribune
 
3825 South Higuera Street
 
P.O. Box 112
 
San Luis Obispo, CA 93406-0112 James D. Boyd, Commissioner California Energy Commission
 
1516 Ninth Street (MS 34)
 
Sacramento, CA 95814 Jennifer Tang Field Representative
 
United States Senator Barbara Boxer
 
1700 Montgomery Street, Suite 240
 
San Francisco, CA 94111 Federal Emergency Management Agency Region IX Karen Armes, Regional Director
 
1111 Broadway
 
Suite 1200
 
Oakland, CA 94607 The Honorable Tony Ferrara Mayor, City of Arroyo Grande
 
P.O. Box 550
 
Arroyo Grande, CA 93421 The Honorable Larry Versaw Pacific Gas and Electric Company- 4 -
Mayor, City of Grover Beach 154 S. 8th Street
 
Grover Beach, CA 93483 The Honorable Janice Peters Mayor, City of Morro Bay
 
595 Harbor Street
 
Morro Bay, CA 93442 The Honorable Dave Romero Mayor, City of San Luis Obispo
 
990 Palm Street
 
San Luis Obispo, CA 93401 The Honorable Mary Ann Reiss Mayor, City of Pismo Beach
 
760 Mattie Road
 
Pismo Beach, CA 93449 David Edge, County Administrative Officer San Luis Obispo County Board of
 
Supervisors
 
1055 Monterey Street, Suite D430
 
San Luis Obispo, CA 93408 Harry Ovitt, Supervisor District One San Luis Obispo County Board of
 
Supervisors
 
1055 Monterey Street, Suite D430
 
San Luis Obispo, CA 93408 Shirley Bianchi, Supervisor District Two San Luis Obispo County Board of
 
Supervisors
 
County Government Center, Room 370
 
San Luis Obispo, CA 93408 Jerry Lenthall, Supervisor District Three San Luis Obispo County Board of
 
Supervisors
 
1055 Monterey Street, Suite D430
 
San Luis Obispo, CA 93408 Khatchik Achadjian, Supervisor District Four San Luis Obispo County Board of
 
Supervisors
 
1055 Monterey Street, Suite D430


San Luis Obispo, CA 93408 James Patterson, Supervisor District Five San Luis Obispo County Board of
Pacific Gas and Electric Company -3-cc w/enclosure:
David H. Oatley, Vice President Diablo Canyon Independent Safety Committee and General Manager  Robert R. Wellington, Esq.


Supervisors
Diablo Canyon Power Plant  Legal Counsel P.O. Box 56  857 Cass Street, Suite D Avila Beach, CA 93424  Monterey, CA 93940 Donna Jacobs  Ed Bailey, Chief Vice President, Nuclear Services Radiologic Health Branch Diablo Canyon Power Plant  State Department of Health Services P.O. Box 56  P.O. Box 997414 (MS 7610)
Avila Beach, CA 93424  Sacramento, CA 95899-7414 James R. Becker, Vice President Richard F. Locke, Esq.


1055 Monterey Street, Suite D430
Diablo Canyon Operations and Pacific Gas and Electric Company Station Director, Pacific Gas and P.O. Box 7442 Electric Company  San Francisco, CA 94120 Diablo Canyon Power Plant P.O. Box 3  City Editor Avila Beach, CA 93424  The Tribune 3825 South Higuera Street Sierra Club San Lucia Chapter P.O. Box 112 ATTN: Andrew Christie  San Luis Obispo, CA 93406-0112 P.O. Box 15755 San Luis Obispo, CA 93406  James D. Boyd, Commissioner California Energy Commission Nancy Culver  1516 Ninth Street (MS 34)
San Luis Obispo Mothers for Peace Sacramento, CA 95814 P.O. Box 164 Pismo Beach, CA 93448  Jennifer Tang Field Representative Chairman  United States Senator Barbara Boxer San Luis Obispo County Board of 1700 Montgomery Street, Suite 240 Supervisors  San Francisco, CA 94111 Room 370 County Government Center  Federal Emergency Management Agency San Luis Obispo, CA 93408  Region IX Karen Armes, Regional Director Truman Burns\Robert Kinosian 1111 Broadway California Public Utilities Commission Suite 1200 505 Van Ness Ave., Rm. 4102 Oakland, CA 94607 San Francisco, CA 94102-3298 The Honorable Tony Ferrara Mayor, City of Arroyo Grande P.O. Box 550 Arroyo Grande, CA 93421 The Honorable Larry Versaw


San Luis Obispo, CA 93408 Institute of Nuclear Power Operations (INPO)
Pacific Gas and Electric Company -4-Mayor, City of Grover Beach  James Patterson, Supervisor District Five 154 S. 8th Street  San Luis Obispo County Board of Grover Beach, CA 93483  Supervisors 1055 Monterey Street, Suite D430 The Honorable Janice Peters  San Luis Obispo, CA 93408 Mayor, City of Morro Bay 595 Harbor Street  Institute of Nuclear Power Operations (INPO)
Records Center
Morro Bay, CA 93442  Records Center 700 Galleria Parkway SE, Suite 100 The Honorable Dave Romero  Atlanta, GA 30339 Mayor, City of San Luis Obispo 990 Palm Street San Luis Obispo, CA 93401 The Honorable Mary Ann Reiss Mayor, City of Pismo Beach 760 Mattie Road Pismo Beach, CA 93449 David Edge, County Administrative Officer San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Harry Ovitt, Supervisor District One San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Shirley Bianchi, Supervisor District Two San Luis Obispo County Board of Supervisors County Government Center, Room 370 San Luis Obispo, CA 93408 Jerry Lenthall, Supervisor District Three San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Khatchik Achadjian, Supervisor District Four San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408


700 Galleria Parkway SE, Suite 100
Pacific Gas and Electric Company -5-Electronic distribution by RIV:
Regional Administrator (BSM1)
DRP Director (ATH)
DRS Director (DDC)
DRS Deputy Director (RJC1)
Senior Resident Inspector (TWJ)
Branch Chief, DRP/B (WBJ)
Senior Project Engineer, DRP/E (RAK1)
Team Leader, DRP/TSS (RLN1)
RITS Coordinator (KEG)
V. Dricks, PAO (VLD)
W. Maier, RSLO (WAM)
C. Gordon (CJG)
DRS Branch Chiefs (JAC, ATG, LJS, MPS1)
T. Bergman, Chief, TRPS, OEDO (TAB)
S. Richards, Deputy Director, DIRS, NRR (SAR)
C. Holden, Deputy Director, DORL, NRR (CFH)
C. Haney, Director, DORL, NRR (CXH)
D. Terao, Chief, LPLG, DORL, NRR (DXT)
A. Wang, NRR Project Manager for DC (ABW)
RidsNrrDirsIpab SUNSI Review Completed: _wbj__ ADAMS: : Yes G No Initials: _wbj___
: Publicly Available G Non-Publicly Available G Sensitive : Non-Sensitive S:\DRP\DRPDIR\EOC 05\Assessment Letters\DC.wpd C:DRP/B  D:DRS D:DRP WBJones;df DDChamberlain ATHowell III
/RA/  RJCaniano for /RA/
2/22/06  2/23/06 2/27/06 OFFICIAL RECORD COPY  T=Telephone E=E-mail F=Fax


Atlanta, GA 30339 Pacific Gas and Electric Company- 5 -
Page 1 of 2      Diablo Canyon 03/01/2006 08:31:22     Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit        No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type 95001 - OB SUPPLEMENTAL       1 1, 2 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 04/03/2006 04/07/2006 Supplemental Program EB1-08P - ISI U2       1 2 IP 7111108P Inservice Inspection Activities - PWR    04/24/2006 05/05/2006 Baseline Inspections TI - 160 - PRESSURIZER PENETRATION AND STEAM SPACE     2 2 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 04/17/2006 05/23/2006 Safety Issues RP-ORS - OCCUPATIONAL RADIATION SAFETY     1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas   04/24/2006 04/28/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls     04/24/2006 04/28/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification     04/24/2006 04/28/2006 Baseline Inspections EB2-52B - DC PIR INSPECTION       4 1, 2 IP 71152B  Identification and Resolution of Problems    06/05/2006 06/09/2006 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems     06/19/2006 06/23/2006 Baseline Inspections EB2-12B - MAINTENANCE RULE BIENNIAL     1 1, 2 IP 7111112B Maintenance Effectiveness      07/10/2006 07/14/2006 Baseline Inspections RP-ORS - OCCUPATIONAL RADIATION SAFETY     1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas   07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls     07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification     07/31/2006 08/04/2006 Baseline Inspections EB1-21 - CDB       8 1, 2 IP 7111121 Component Design Bases Inspection    09/11/2006 09/15/2006 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection     09/25/2006 10/06/2006 Baseline Inspections EP1 - EMERG PREPARDNESS EXERCISE     3 1, 2 IP 7111401 Exercise Evaluation     10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes   10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification     10/23/2006 10/27/2006 Baseline Inspections EB2-07B - HX PERFORMANCE       1 1, 2 IP 7111107B Heat Sink Performance      11/13/2006 11/17/2006 Baseline Inspections RP TEAM - RP SAFETY TEAM       5 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment   12/04/2006 12/08/2006 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 12/04/2006 12/08/2006 Baseline Inspections EXAM - INITIAL EXAM       5 1 X02326 DIABLO CANYON UNIT 1 INITAL EXAM (3/5/07)     02/12/2007 02/16/2007 Not Applicable 2 X02327 DIABLO CANYON UNIT 2 INITIAL EXAM (3/5/07)     02/12/2007 02/16/2007 Not Applicable 1 X02326 DIABLO CANYON UNIT 1 INITAL EXAM (3/5/07)     03/05/2007 03/09/2007 Not Applicable This report does not include INPO and OUTAGE activities.
Electronic distribution by RIV:
Regional Administrator (BSM1)DRP Director (ATH)DRS Director (DDC)DRS Deputy Director (RJC1)Senior Resident Inspector (TWJ)Branch Chief, DRP/B (WBJ)Senior Project Engineer, DRP/E (RAK1)Team Leader, DRP/TSS (RLN1)RITS Coordinator (KEG)V. Dricks, PAO (VLD)W. Maier, RSLO (WAM)C. Gordon (CJG)DRS Branch Chiefs (JAC, ATG, LJS, MPS1)
T. Bergman, Chief, TRPS, OEDO (TAB)S. Richards, Deputy Director, DIRS, NRR (SAR)C. Holden, Deputy Director, DORL, NRR (CFH)C. Haney, Director, DORL, NRR (CXH)D. Terao, Chief, LPLG, DORL, NRR (DXT)A. Wang, NRR Project Manager for DC (ABW)RidsNrrDirsIpabSUNSI Review Completed: _wbj__ADAMS: Yes G No Initials: _wbj___ Publicly Available G Non-Publicly Available G Sensitive Non-Sensitive S:\DRP\DRPDIR\EOC 05\Assessment Letters\DC.wpdC:DRP/BD:DRSD:DRP WBJones;dfDDChamberlainATHowell III /RA/ RJCaniano for /RA/2/22/062/23/062/27/06OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax Diablo Canyon Inspection / Activity Plan 03/01/2006-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 1 of 2 03/01/2006 08:31:22 Report 22 1 95001-OB SUPPLEMENTAL Supplemental Program 04/03/2006 04/07/2006 1, 2 95001 IP Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 1 EB1-08P-ISI U2 Baseline Inspections 04/24/2006 05/05/2006 2 7111108P IP Inservice Inspection Activities - PWR 2 TI - 160-PRESSURIZER PENETRATION AND STEAM SPACE Safety Issues 04/17/2006 05/23/2006 2 2515/160 IP Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01]
1 RP-ORS-OCCUPATIONAL RADIATION SAFETY Baseline Inspections 04/24/2006 04/28/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 04/24/2006 04/28/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 04/24/2006 04/28/2006 1, 2 71151 IP Performance Indicator Verification 4 EB2-52B-DC PIR INSPECTION Baseline Inspections 06/05/2006 06/09/2006 1, 2 71152B IP Identification and Resolution of Problems Baseline Inspections 06/19/2006 06/23/2006 1, 2 71152B IP Identification and Resolution of Problems 1 EB2-12B-MAINTENANCE RULE BIENNIAL Baseline Inspections 07/10/2006 07/14/2006 1, 2 7111112B IP Maintenance Effectiveness 1 RP-ORS-OCCUPATIONAL RADIATION SAFETY Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112101 IP Access Control to Radiologically Significant Areas Baseline Inspections 07/31/2006 08/04/2006 1, 2 7112102 IP ALARA Planning and Controls Baseline Inspections 07/31/2006 08/04/2006 1, 2 71151 IP Performance Indicator Verification 8 EB1-21-CDB Baseline Inspections 09/11/2006 09/15/2006 1, 2 7111121 IP Component Design Bases Inspection Baseline Inspections 09/25/2006 10/06/2006 1, 2 7111121 IP Component Design Bases Inspection 3 EP1-EMERG PREPARDNESS EXERCISE Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111401 IP Exercise Evaluation Baseline Inspections 10/23/2006 10/27/2006 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 10/23/2006 10/27/2006 1, 2 71151 IP Performance Indicator Verification 1 EB2-07B-HX PERFORMANCE Baseline Inspections 11/13/2006 11/17/2006 1, 2 7111107B IP Heat Sink Performance 5 RP TEAM-RP SAFETY TEAM Baseline Inspections 12/04/2006 12/08/2006 1, 2 7112103 IP Radiation Monitoring Instrumentation and Protective Equipment Baseline Inspections 12/04/2006 12/08/2006 1, 2 7112203 IP Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 5 EXAM-INITIAL EXAM Not Applicable 02/12/2007 02/16/2007 1 X02326 DIABLO CANYON UNIT 1 INITAL EXAM (3/5/07)
Not Applicable 02/12/2007 02/16/2007 2 X02327 DIABLO CANYON UNIT 2 INITIAL EXAM (3/5/07)
Not Applicable 03/05/2007 03/09/2007 1 X02326 DIABLO CANYON UNIT 1 INITAL EXAM (3/5/07)
This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.


Diablo Canyon Inspection / Activity Plan 03/01/2006-09/30/2007 Inspection Type Inspection Activity Planned Dates Start End No. of Staff on Site Title Unit Number Page 2 of 2 03/01/2006 08:31:22 Report 22 5 EXAM-INITIAL EXAM Not Applicable 03/05/2007 03/09/2007 2 X02327 DIABLO CANYON UNIT 2 INITIAL EXAM (3/5/07)
Page 2 of 2      Diablo Canyon 03/01/2006 08:31:22    Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit      No. of Staff Planned Dates Inspection Number Inspection Activity    Title  on Site Start End Type EXAM - INITIAL EXAM     5 2 X02327 DIABLO CANYON UNIT 2 INITIAL EXAM (3/5/07)   03/05/2007 03/09/2007 Not Applicable REQUAL - BIENNIAL REQUALIFICATION    2 1, 2 IP 7111111B Licensed Operator Requalification Program   06/04/2007 06/08/2007 Baseline Inspections EP2 - EP PROGRAM      1 1, 2 IP 7111402 Alert and Notification System Testing   07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing   07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes   07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification   07/16/2007 07/20/2007 Baseline Inspections EB02/17 - 50.59 & PERMANENT PLANT MODS     3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments   09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications   09/10/2007 09/14/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.
2 REQUAL-BIENNIAL REQUALIFICATION Baseline Inspections 06/04/2007 06/08/2007 1, 2 7111111B IP Licensed Operator Requalification Program 1 EP2-EP PROGRAM Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111402 IP Alert and Notification System Testing Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111403 IP Emergency Response Organization Augmentation Testing Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111404 IP Emergency Action Level and Emergency Plan Changes Baseline Inspections 07/16/2007 07/20/2007 1, 2 7111405 IP Correction of Emergency Preparedness Weaknesses and Deficiencies Baseline Inspections 07/16/2007 07/20/2007 1, 2 71151 IP Performance Indicator Verification 3 EB02/17-50.59 & PERMANENT PLANT MODS Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111102 IP Evaluation of Changes, Tests, or Experiments Baseline Inspections 09/10/2007 09/14/2007 1, 2 7111117B IP Permanent Plant Modifications This report does not include INPO and OUTAGE activities.


This report shows only on-site and announced inspection procedures.
This report shows only on-site and announced inspection procedures.
}}
}}

Latest revision as of 22:39, 23 November 2019

Annual Assessment Letter - Diablo Canyon Power Plant (NRC Inspection Report 05000275-06-001 & 05000323-06-001)
ML060610280
Person / Time
Site: Diablo Canyon  Pacific Gas & Electric icon.png
Issue date: 03/02/2006
From: Howell A
NRC/RGN-IV/DRP
To: Keenan J
Pacific Gas & Electric Co
References
IR-06-001
Download: ML060610280 (7)


Text

rch 2, 2006

SUBJECT:

ANNUAL ASSESSMENT LETTER - DIABLO CANYON POWER PLANT (NRC INSPECTION REPORT 05000275/2006001 AND 05000323/2006001)

Dear Mr. Keenan:

On February 7, 2006, the NRC staff completed its performance review of Diablo Canyon Power Plant, Units 1 and 2. Our technical staff reviewed performance indicators (PIs) for the most recent quarter and inspection results for the period from January 1 through December 31, 2005.

The purpose of this letter is to inform you of our assessment of your safety performance during this period and our plans for future inspections at your facility.

This performance review and enclosed inspection plan do not include physical protection information. A separate letter designated and marked as Official Use Only - Security-Related Information will include the physical protection review and resultant inspection plan.

Overall, Diablo Canyon Power Plant, Units 1 and 2, operated in a manner that preserved public health and safety and fully met all cornerstone objectives. Plant performance for the most recent quarter was within the Licensee Response column of the NRCs Action Matrix, based on all inspection findings being classified as having very low safety significance (Green) and all PIs indicating performance at a level requiring no additional NRC oversight (Green). Therefore, we plan to conduct reactor oversight process baseline inspections at your facility.

While plant performance for the most recent quarter is within the Licensee Response column of the Action Matrix, there was a safety significant PI that affected the second and third quarters of the assessment cycle, which resulted in plant performance being in the Regulatory Response column for those two quarters. As discussed in our Assessment Followup Letter dated November 4, 2005, the second quarter 2005 Emergency Preparedness Drill/Exercise Performance PI documentation incorrectly included 3 of the 33 emergency drills as having been successfully completed. This PI assesses the percentage of all drill, exercise, and actual opportunities that were performed timely and accurately during the previous eight quarters.

When the Emergency Preparedness Drill/Exercise Performance PI data for the second quarter of 2005 was re-evaluated, the PI crossed the Green-to-White threshold. This error also carried over into the third quarter and when the Emergency Preparedness Drill/Exercise Performance PI data was re-evaluated, the PI again crossed the Green-to-White threshold. Pacific Gas and Electric Company has submitted corrected second and third quarter Emergency Preparedness

Pacific Gas and Electric Company -2-Drill/Exercise Performance PIs. Both quarters subsequently indicated the Emergency Preparedness Drill/Exercise Performance PI was White. Pacific Gas and Electric Company provided additional training and conducted numerous drills which were evaluated as successful.

The resulting data for the fourth quarter of 2005 indicated that the Emergency Preparedness Drill/Exercise Performance PI was Green. As noted in the following paragraph, a supplemental inspection of the root cause, extent of cause and condition, and corrective actions will be conducted.

The enclosed inspection plan details the inspection, except those related to physical protection, scheduled through September 30, 2007. Routine resident inspections are not listed due to their ongoing and continuous nature. In addition to the baseline inspections, the NRC will also be conducting inspections related to Temporary Instruction 2515/160, Pressurizer Penetration Nozzles and Steam Space Piping Connections in U.S. Pressurized Water Reactors, for Unit 2; Inspection Procedure 60853, On Site Fabrication of Components and Construction of an ISFSI [Independent Spent Fuel Storage Installation]; and a supplemental inspection utilizing Inspection Procedure 95001, Inspection for One or Two White inputs in a Strategic Performance Area, for the Emergency Preparedness Drill/Exercise Performance PI. The inspection plan is provided to allow for the resolution of any scheduling conflicts and personnel availability issues well in advance of inspector arrival onsite. Routine resident inspections are not listed due to their ongoing and continuous nature. The inspections in the last 9 months of the inspection plan are tentative and may be revised at the midcycle review.

In accordance with 10 CFR 2.390 of the NRCs Rules of Practice, a copy of this letter and its enclosure will be made available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If circumstances arise which cause us to change this inspection plan, we will contact you to discuss the change as soon as possible. Please contact Mr. William B. Jones at 817-860-8141 with any questions you may have regarding this letter or the inspection plan.

Sincerely,

/RA/

Arthur T. Howell III, Director Division of Reactor Projects Dockets: 50-275 50-323 Licenses: DPR-80 DPR-82 Enclosure:

Diablo Canyon Inspection/Activity Plan

Pacific Gas and Electric Company -3-cc w/enclosure:

David H. Oatley, Vice President Diablo Canyon Independent Safety Committee and General Manager Robert R. Wellington, Esq.

Diablo Canyon Power Plant Legal Counsel P.O. Box 56 857 Cass Street, Suite D Avila Beach, CA 93424 Monterey, CA 93940 Donna Jacobs Ed Bailey, Chief Vice President, Nuclear Services Radiologic Health Branch Diablo Canyon Power Plant State Department of Health Services P.O. Box 56 P.O. Box 997414 (MS 7610)

Avila Beach, CA 93424 Sacramento, CA 95899-7414 James R. Becker, Vice President Richard F. Locke, Esq.

Diablo Canyon Operations and Pacific Gas and Electric Company Station Director, Pacific Gas and P.O. Box 7442 Electric Company San Francisco, CA 94120 Diablo Canyon Power Plant P.O. Box 3 City Editor Avila Beach, CA 93424 The Tribune 3825 South Higuera Street Sierra Club San Lucia Chapter P.O. Box 112 ATTN: Andrew Christie San Luis Obispo, CA 93406-0112 P.O. Box 15755 San Luis Obispo, CA 93406 James D. Boyd, Commissioner California Energy Commission Nancy Culver 1516 Ninth Street (MS 34)

San Luis Obispo Mothers for Peace Sacramento, CA 95814 P.O. Box 164 Pismo Beach, CA 93448 Jennifer Tang Field Representative Chairman United States Senator Barbara Boxer San Luis Obispo County Board of 1700 Montgomery Street, Suite 240 Supervisors San Francisco, CA 94111 Room 370 County Government Center Federal Emergency Management Agency San Luis Obispo, CA 93408 Region IX Karen Armes, Regional Director Truman Burns\Robert Kinosian 1111 Broadway California Public Utilities Commission Suite 1200 505 Van Ness Ave., Rm. 4102 Oakland, CA 94607 San Francisco, CA 94102-3298 The Honorable Tony Ferrara Mayor, City of Arroyo Grande P.O. Box 550 Arroyo Grande, CA 93421 The Honorable Larry Versaw

Pacific Gas and Electric Company -4-Mayor, City of Grover Beach James Patterson, Supervisor District Five 154 S. 8th Street San Luis Obispo County Board of Grover Beach, CA 93483 Supervisors 1055 Monterey Street, Suite D430 The Honorable Janice Peters San Luis Obispo, CA 93408 Mayor, City of Morro Bay 595 Harbor Street Institute of Nuclear Power Operations (INPO)

Morro Bay, CA 93442 Records Center 700 Galleria Parkway SE, Suite 100 The Honorable Dave Romero Atlanta, GA 30339 Mayor, City of San Luis Obispo 990 Palm Street San Luis Obispo, CA 93401 The Honorable Mary Ann Reiss Mayor, City of Pismo Beach 760 Mattie Road Pismo Beach, CA 93449 David Edge, County Administrative Officer San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Harry Ovitt, Supervisor District One San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Shirley Bianchi, Supervisor District Two San Luis Obispo County Board of Supervisors County Government Center, Room 370 San Luis Obispo, CA 93408 Jerry Lenthall, Supervisor District Three San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408 Khatchik Achadjian, Supervisor District Four San Luis Obispo County Board of Supervisors 1055 Monterey Street, Suite D430 San Luis Obispo, CA 93408

Pacific Gas and Electric Company -5-Electronic distribution by RIV:

Regional Administrator (BSM1)

DRP Director (ATH)

DRS Director (DDC)

DRS Deputy Director (RJC1)

Senior Resident Inspector (TWJ)

Branch Chief, DRP/B (WBJ)

Senior Project Engineer, DRP/E (RAK1)

Team Leader, DRP/TSS (RLN1)

RITS Coordinator (KEG)

V. Dricks, PAO (VLD)

W. Maier, RSLO (WAM)

C. Gordon (CJG)

DRS Branch Chiefs (JAC, ATG, LJS, MPS1)

T. Bergman, Chief, TRPS, OEDO (TAB)

S. Richards, Deputy Director, DIRS, NRR (SAR)

C. Holden, Deputy Director, DORL, NRR (CFH)

C. Haney, Director, DORL, NRR (CXH)

D. Terao, Chief, LPLG, DORL, NRR (DXT)

A. Wang, NRR Project Manager for DC (ABW)

RidsNrrDirsIpab SUNSI Review Completed: _wbj__ ADAMS: : Yes G No Initials: _wbj___

Publicly Available G Non-Publicly Available G Sensitive : Non-Sensitive S:\DRP\DRPDIR\EOC 05\Assessment Letters\DC.wpd C:DRP/B D:DRS D:DRP WBJones;df DDChamberlain ATHowell III

/RA/ RJCaniano for /RA/

2/22/06 2/23/06 2/27/06 OFFICIAL RECORD COPY T=Telephone E=E-mail F=Fax

Page 1 of 2 Diablo Canyon 03/01/2006 08:31:22 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type 95001 - OB SUPPLEMENTAL 1 1, 2 IP 95001 Supplemental Inspection For One Or Two White Inputs In A Strategic Performance Area 04/03/2006 04/07/2006 Supplemental Program EB1-08P - ISI U2 1 2 IP 7111108P Inservice Inspection Activities - PWR 04/24/2006 05/05/2006 Baseline Inspections TI - 160 - PRESSURIZER PENETRATION AND STEAM SPACE 2 2 IP 2515/160 Pzr Pene Nozzles & Stm Space Piping Connections in U.S. PWRs [NRC Bulletin 2004-01] 04/17/2006 05/23/2006 Safety Issues RP-ORS - OCCUPATIONAL RADIATION SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 04/24/2006 04/28/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 04/24/2006 04/28/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 04/24/2006 04/28/2006 Baseline Inspections EB2-52B - DC PIR INSPECTION 4 1, 2 IP 71152B Identification and Resolution of Problems 06/05/2006 06/09/2006 Baseline Inspections 1, 2 IP 71152B Identification and Resolution of Problems 06/19/2006 06/23/2006 Baseline Inspections EB2-12B - MAINTENANCE RULE BIENNIAL 1 1, 2 IP 7111112B Maintenance Effectiveness 07/10/2006 07/14/2006 Baseline Inspections RP-ORS - OCCUPATIONAL RADIATION SAFETY 1 1, 2 IP 7112101 Access Control to Radiologically Significant Areas 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 7112102 ALARA Planning and Controls 07/31/2006 08/04/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/31/2006 08/04/2006 Baseline Inspections EB1-21 - CDB 8 1, 2 IP 7111121 Component Design Bases Inspection 09/11/2006 09/15/2006 Baseline Inspections 1, 2 IP 7111121 Component Design Bases Inspection 09/25/2006 10/06/2006 Baseline Inspections EP1 - EMERG PREPARDNESS EXERCISE 3 1, 2 IP 7111401 Exercise Evaluation 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 10/23/2006 10/27/2006 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 10/23/2006 10/27/2006 Baseline Inspections EB2-07B - HX PERFORMANCE 1 1, 2 IP 7111107B Heat Sink Performance 11/13/2006 11/17/2006 Baseline Inspections RP TEAM - RP SAFETY TEAM 5 1, 2 IP 7112103 Radiation Monitoring Instrumentation and Protective Equipment 12/04/2006 12/08/2006 Baseline Inspections 1, 2 IP 7112203 Radiological Environmental Monitoring Program (REMP) And Radioactive Material Control Program 12/04/2006 12/08/2006 Baseline Inspections EXAM - INITIAL EXAM 5 1 X02326 DIABLO CANYON UNIT 1 INITAL EXAM (3/5/07) 02/12/2007 02/16/2007 Not Applicable 2 X02327 DIABLO CANYON UNIT 2 INITIAL EXAM (3/5/07) 02/12/2007 02/16/2007 Not Applicable 1 X02326 DIABLO CANYON UNIT 1 INITAL EXAM (3/5/07) 03/05/2007 03/09/2007 Not Applicable This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.

Page 2 of 2 Diablo Canyon 03/01/2006 08:31:22 Inspection / Activity Plan Report 22 03/01/2006 - 09/30/2007 Unit No. of Staff Planned Dates Inspection Number Inspection Activity Title on Site Start End Type EXAM - INITIAL EXAM 5 2 X02327 DIABLO CANYON UNIT 2 INITIAL EXAM (3/5/07) 03/05/2007 03/09/2007 Not Applicable REQUAL - BIENNIAL REQUALIFICATION 2 1, 2 IP 7111111B Licensed Operator Requalification Program 06/04/2007 06/08/2007 Baseline Inspections EP2 - EP PROGRAM 1 1, 2 IP 7111402 Alert and Notification System Testing 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111403 Emergency Response Organization Augmentation Testing 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111404 Emergency Action Level and Emergency Plan Changes 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 7111405 Correction of Emergency Preparedness Weaknesses and Deficiencies 07/16/2007 07/20/2007 Baseline Inspections 1, 2 IP 71151 Performance Indicator Verification 07/16/2007 07/20/2007 Baseline Inspections EB02/17 - 50.59 & PERMANENT PLANT MODS 3 1, 2 IP 7111102 Evaluation of Changes, Tests, or Experiments 09/10/2007 09/14/2007 Baseline Inspections 1, 2 IP 7111117B Permanent Plant Modifications 09/10/2007 09/14/2007 Baseline Inspections This report does not include INPO and OUTAGE activities.

This report shows only on-site and announced inspection procedures.