ML071970172: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 15: Line 15:


=Text=
=Text=
{{#Wiki_filter:July 19, 2007LICENSEE:PPL Susquehanna, LLC (PPL)FACILITY:Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2)
{{#Wiki_filter:July 19, 2007 LICENSEE:               PPL Susquehanna, LLC (PPL)
FACILITY:               Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2)


==SUBJECT:==
==SUBJECT:==


==SUMMARY==
==SUMMARY==
OF JUNE 29, 2007, CATEGORY 1 WORKING-LEVELMEETING WITH PPL TO DISCUSS STEAM DRYER ANALYSIS, LICENSING, DESIGN APPROACH, AND POWER ASCENSION TEST
OF JUNE 29, 2007, CATEGORY 1 WORKING-LEVEL MEETING WITH PPL TO DISCUSS STEAM DRYER ANALYSIS, LICENSING, DESIGN APPROACH, AND POWER ASCENSION TEST PLANS On June 29, 2007, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of PPL and its vendor, General Electric-Hitachi, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss PPLs steam dryer finite element analysis, licensing, design approach, and power ascension test plans. Certain portions of the meeting were closed to the public as some of the presentation material and discussion were determined to be proprietary in nature.
PPL provided an overview of the SSES 1 and 2 replacement steam dryer licensing, design, instrumentation, and test plans for the proposed constant pressure power uprate (CPPU).
PPLs conclusion is summarized as follows:
(1)    the steam dryer licensing basis is conservative and meets the American Society of Mechanical Engineers (ASME) fatigue limit of 13,600 pounds per square inch; (2)    the fabricated replacement steam dryer will have reduced stress intensities and increased margins to the ASME fatigue limit; (3)    the revised finite element model provides results less than the ASME limit; (4)    the replacement steam dryer is designed and fabricated in accordance with Title 10 of the Code of Federal Regulations, Part 50, Appendix B using improved design and fabrication techniques; (5)    the Unit 1 steam dryer will be instrumented for 107% current licensed thermal power (CLTP), will demonstrate structural adequacy of the new steam dryer design, and will validate dryer analysis tools; (6)    the power ascension test program will be slow and deliberate, consists of an acceptance criteria based on the 13,600 fatigue limit, will confirm no acoustic resonances at 114%
CLTP, will allow validation of analysis and dryer design prior to full CPPU operation, and will confirm acceptability of the dryer up to full CPPU conditions.


PLANSOn June 29, 2007, a public meeting was held between the U.S. Nuclear RegulatoryCommission (NRC), and representatives of PPL and its vendor, General Electric-Hitachi, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss PPL's steam dryer finite element analysis, licensing, design approach, and power ascension test plans. Certain portions of the meeting were closed to the public as some of the presentation material and discussion were determined to be proprietary in nature.PPL provided an overview of the SSES 1 and 2 replacement steam dryer licensing, design,instrumentation, and test plans for the proposed constant pressure power uprate (CPPU).
PPL Susquehanna, LLC                           PPL also discussed its corrective actions related to a modeling input error in the finite element analysis, as well as its approach in responding to NRC staffs request for supplemental information (Agency Documents Access and Management System (ADAMS) Accession No.
PPL's conclusion is summarized as follows:(1) the steam dryer licensing basis is conservative and meets the American Society of      Mechanical Engineers (ASME) fatigue limit of 13,600 pounds per square inch; (2) the fabricated replacement steam dryer will have reduced stress intensities and increased margins to the ASME fatigue limit;(3) the revised finite element model provides results less than the ASME limit; (4) the replacement steam dryer is designed and fabricated in accordance with Title 10 of the Code of Federal Regulations, Part 50, Appendix B using improved design and fabrication techniques;(5) the Unit 1 steam dryer will be instrumented for 107% current licensed thermal power      (CLTP), will demonstrate structural adequacy of the new steam dryer design, and will validate dryer analysis tools;(6) the power ascension test program will be slow and deliberate, consists of an acceptancecriteria based on the 13,600 fatigue limit, will confirm no acoustic resonances at 114%
CLTP, will allow validation of analysis and dryer design prior to full CPPU operation, and will confirm acceptability of the dryer up to full CPPU conditions.
PPL Susquehanna, LLC- 2 -PPL also discussed its corrective actions related to a modeling input error in the finite elementanalysis, as well as its approach in responding to NRC staff's request for supplemental information (Agency Documents Access and Management System (ADAMS) Accession No.
ML071920490).
ML071920490).
 
There were no members of the public in attendance, and no public meeting feedback forms were received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a non-proprietary copy of the licensees slides presented at the meeting. A proprietary copy of the licensees presentation slides can be found in ADAMS (Accession No. ML071980285).
There were no members of the public in attendance, and no public meeting feedback forms were received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a non-proprietary copy of the licensee's slides presented at the meeting. A proprietary copy of the licensee's presentation slides can be found in ADAMS (Accession No. ML071980285). Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov./RA/Richard V. Guzman, Senior Project ManagerPlant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor RegulationDocket Nos. 50-387 and 50-388
Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov.
                                            /RA/
Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388


==Enclosures:==
==Enclosures:==
: 1. List of Attendees
: 1. List of Attendees
: 2. Licensee's Handouts/Slides (Non-Proprietary)cc w/encls: See next page
: 2. Licensees Handouts/Slides (Non-Proprietary) cc w/encls: See next page
 
ML071970172 OFFICE LPLI-1/PM                LPLI-1/LA            LPLI-1/BC NAME RGuzman                    SLittle              MKowal DATE      7/18/07              7/18/07              7/19/07
 
LIST OF ATTENDEES NUCLEAR REGULATORY COMMISSION (NRC)
NUCLEAR REACTOR REGULATION (NRR) CATEGORY 1 MEETING WITH PPL SUSQUEHANNA, LLC (PPL)
REPLACEMENT STEAM DRYER ANALYSIS, DESIGN, AND TESTING PLANS FOR THE PROPOSED EXTENDED POWER UPRATE APPLICATION SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 JUNE 27, 2007 NAME                            ORGANIZATION
: 1. Richard Guzman              NRC/NRR/Plant Licensing Branch I-1
: 2. Kamal Manoly                NRC/NRR/Mechanical and Civil Engineering Branch
: 3. John Wu                      NRC/NRR/Mechanical and Civil Engineering Branch
: 4. Chakrapani Basavaraju        NRC/NRR/Mechanical and Civil Engineering Branch
: 5. William Jessup              NRC/NRR/Mechanical and Civil Engineering Branch
: 6. Tom Scarbrough              NRC/NRR/Component Performance and Testing Branch
: 7. Tom Alexion                  NRC/NRR/Generic Communication and Power Uprate
: 8. Rick Pagodin                PPL
: 9. Micheal Crowthers            PPL
: 10. Michael Gorski              PPL
: 11. John Bartos                PPL
: 12. John Krais                  PPL
: 13. Kevin Browning              PPL
: 14. Craig Nichols              General Electric - Hitachi
: 15. Mike Bridges                General Electric - Hitachi
: 16. Jim Klapproth              General Electric - Hitachi
: 17. Larry King                  General Electric - Hitachi
: 18. Rico Betti                  General Electric - Hitachi
: 19. Dan Pappone                General Electric - Hitachi
: 20. Joseph Ferrante            Nuclear Management Company - Monticello
: 21. Shelly Kugler              Public Service Enterprise Group Nuclear - Hope Creek
: 22. Jamie Mallon                Public Service Enterprise Group Nuclear - Hope Creek
: 23. Gary Pavis                  Constellation Energy Group - Nine Mile Point
: 24. Steve Hambric              NRC Contractor
: 25. Vic Shah                    NRC Contractor
: 26. Samir Ziada                NRC Contractor Enclosure 1


ML071970172OFFICELPLI-1/PMLPLI-1/LALPLI-1/BCNAMERGuzmanSLittleMKowalDATE7/18/077/18/077/19/07 LIST OF ATTENDEESNUCLEAR REGULATORY COMMISSION (NRC)NUCLEAR REACTOR REGULATION (NRR) CATEGORY 1 MEETINGWITH PPL SUSQUEHANNA, LLC (PPL)REPLACEMENT STEAM DRYER ANALYSIS, DESIGN, AND TESTING PLANSFOR THE PROPOSED EXTENDED POWER UPRATE APPLICATIONSUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2JUNE 27, 2007NAME ORGANIZATION1. Richard GuzmanNRC/NRR/Plant Licensing Branch I-12. Kamal ManolyNRC/NRR/Mechanical and Civil Engineering Branch
MEETING SLIDES (Non-proprietary version)
: 3. John WuNRC/NRR/Mechanical and Civil Engineering Branch
Enclosure 2
: 4. Chakrapani BasavarajuNRC/NRR/Mechanical and Civil Engineering Branch
: 5. William JessupNRC/NRR/Mechanical and Civil Engineering Branch
: 6. Tom ScarbroughNRC/NRR/Component Performance and Testing Branch
: 7. Tom AlexionNRC/NRR/Generic Communication and Power Uprate
: 8. Rick PagodinPPL
: 9. Micheal CrowthersPPL
: 10. Michael GorskiPPL
: 11. John BartosPPL
: 12. John KraisPPL
: 13. Kevin BrowningPPL
: 14. Craig NicholsGeneral Electric - Hitachi
: 15. Mike BridgesGeneral Electric - Hitachi
: 16. Jim KlapprothGeneral Electric - Hitachi
: 17. Larry KingGeneral Electric - Hitachi
: 18. Rico BettiGeneral Electric - Hitachi
: 19. Dan PapponeGeneral Electric - Hitachi
: 20. Joseph FerranteNuclear Management Company - Monticello
: 21. Shelly KuglerPublic Service Enterprise Group Nuclear - Hope Creek
: 22. Jamie Mallon Public Service Enterprise Group Nuclear - Hope Creek
: 23. Gary PavisConstellation Energy Group - Nine Mile Point
: 24. Steve Hambric NRC Contractor
: 25. Vic ShahNRC Contractor
: 26. Samir ZiadaNRC ContractorEnclosure 1 MEETING SLIDES (Non-proprietary version)Enclosure 2 Susquehanna Steam Electric Station, Units 1 and 2 cc:
Britt T. McKinneySr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA  18603-0467Cornelius J. GannonVice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA  18603-0467Robert M. PaleyGeneral Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467Rocco R. SgarroManager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Supervisor -Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467Michael H. CrowthersSupervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Ronald E. SmithGeneral Manager - Site Preparedness and Services PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467Manager - Quality AssurancePPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467Luis A. RamosCommunity Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA  18603-0467Bryan A. Snapp, EsqAssoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA  18101-1179Supervisor - Document Control ServicesPPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179Richard W. OsborneAllegheny Electric Cooperative, Inc.
212 Locust Street P.O. Box 1266 Harrisburg, PA  17108-1266Director, Bureau of Radiation ProtectionPennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469Senior Resident InspectorU.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4Berwick, PA 18603-0035Regional Administrator, Region 1U.S. Nuclear Regulatory Commission


475 Allendale Road King of Prussia, PA 19406Board of SupervisorsSalem Township P.O. Box 405 Berwick, PA 18603-0035Dr. Judith JohnsrudNational Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803}}
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Britt T. McKinney                                Luis A. Ramos Sr. Vice President and                            Community Relations Manager, Chief Nuclear Officer                            Susquehanna PPL Susquehanna, LLC                              PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3                          634 Salem Blvd., SSO Berwick, PA 18603-0467                            Berwick, PA 18603-0467 Cornelius J. Gannon                              Bryan A. Snapp, Esq Vice President - Nuclear Operations              Assoc. General Counsel PPL Susquehanna, LLC                              PPL Services Corporation 769 Salem Blvd., NUCSB3                          Two North Ninth Street, GENTW3 Berwick, PA 18603-0467                            Allentown, PA 18101-1179 Robert M. Paley                                  Supervisor - Document Control Services General Manager - Plant Support                  PPL Susquehanna, LLC PPL Susquehanna, LLC                              Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSB2                          Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro                                  Allegheny Electric Cooperative, Inc.
Manager - Nuclear Regulatory Affairs              212 Locust Street PPL Susquehanna, LLC                              P.O. Box 1266 Two North Ninth Street, GENPL4                    Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Supervisor -                                      Pennsylvania Department of Nuclear Regulatory Affairs                        Environmental Protection PPL Susquehanna, LLC                              Rachel Carson State Office Building 769 Salem Blvd., NUCSA4                          P.O. Box 8469 Berwick, PA 18603-0467                            Harrisburg, PA 17105-8469 Michael H. Crowthers                              Senior Resident Inspector Supervising Engineer                              U.S. Nuclear Regulatory Commission Nuclear Regulatory Affairs                        P.O. Box 35, NUCSA4 PPL Susquehanna, LLC                              Berwick, PA 18603-0035 Two North Ninth Street, GENPL4 Allentown, PA 18101-1179                          Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission Ronald E. Smith                                  475 Allendale Road General Manager - Site Preparedness              King of Prussia, PA 19406 and Services PPL Susquehanna, LLC                              Board of Supervisors 769 Salem Blvd., NUCSA4                          Salem Township Berwick, PA 18603-0467                            P.O. Box 405 Berwick, PA 18603-0035 Manager - Quality Assurance PPL Susquehanna, LLC                              Dr. Judith Johnsrud 769 Salem Blvd., NUCSB2                          National Energy Committee Berwick, PA 18603-0467                            Sierra Club 443 Orlando Avenue State College, PA 16803}}

Revision as of 04:35, 23 November 2019

06/29/2007 Summary of Category 1 Working-Level Meeting with PPL to Discuss Steam Dryer Analysis, Licensing, Design Approach, and Power Ascension Test Plans
ML071970172
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 07/19/2007
From: Richard Guzman
NRC/NRR/ADRO/DORL/LPLI-1
To:
Guzman R, NRR/DORL, 415-1030
References
Download: ML071970172 (7)


Text

July 19, 2007 LICENSEE: PPL Susquehanna, LLC (PPL)

FACILITY: Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2)

SUBJECT:

SUMMARY

OF JUNE 29, 2007, CATEGORY 1 WORKING-LEVEL MEETING WITH PPL TO DISCUSS STEAM DRYER ANALYSIS, LICENSING, DESIGN APPROACH, AND POWER ASCENSION TEST PLANS On June 29, 2007, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of PPL and its vendor, General Electric-Hitachi, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss PPLs steam dryer finite element analysis, licensing, design approach, and power ascension test plans. Certain portions of the meeting were closed to the public as some of the presentation material and discussion were determined to be proprietary in nature.

PPL provided an overview of the SSES 1 and 2 replacement steam dryer licensing, design, instrumentation, and test plans for the proposed constant pressure power uprate (CPPU).

PPLs conclusion is summarized as follows:

(1) the steam dryer licensing basis is conservative and meets the American Society of Mechanical Engineers (ASME) fatigue limit of 13,600 pounds per square inch; (2) the fabricated replacement steam dryer will have reduced stress intensities and increased margins to the ASME fatigue limit; (3) the revised finite element model provides results less than the ASME limit; (4) the replacement steam dryer is designed and fabricated in accordance with Title 10 of the Code of Federal Regulations, Part 50, Appendix B using improved design and fabrication techniques; (5) the Unit 1 steam dryer will be instrumented for 107% current licensed thermal power (CLTP), will demonstrate structural adequacy of the new steam dryer design, and will validate dryer analysis tools; (6) the power ascension test program will be slow and deliberate, consists of an acceptance criteria based on the 13,600 fatigue limit, will confirm no acoustic resonances at 114%

CLTP, will allow validation of analysis and dryer design prior to full CPPU operation, and will confirm acceptability of the dryer up to full CPPU conditions.

PPL Susquehanna, LLC PPL also discussed its corrective actions related to a modeling input error in the finite element analysis, as well as its approach in responding to NRC staffs request for supplemental information (Agency Documents Access and Management System (ADAMS) Accession No.

ML071920490).

There were no members of the public in attendance, and no public meeting feedback forms were received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a non-proprietary copy of the licensees slides presented at the meeting. A proprietary copy of the licensees presentation slides can be found in ADAMS (Accession No. ML071980285).

Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov.

/RA/

Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388

Enclosures:

1. List of Attendees
2. Licensees Handouts/Slides (Non-Proprietary) cc w/encls: See next page

ML071970172 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME RGuzman SLittle MKowal DATE 7/18/07 7/18/07 7/19/07

LIST OF ATTENDEES NUCLEAR REGULATORY COMMISSION (NRC)

NUCLEAR REACTOR REGULATION (NRR) CATEGORY 1 MEETING WITH PPL SUSQUEHANNA, LLC (PPL)

REPLACEMENT STEAM DRYER ANALYSIS, DESIGN, AND TESTING PLANS FOR THE PROPOSED EXTENDED POWER UPRATE APPLICATION SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 JUNE 27, 2007 NAME ORGANIZATION

1. Richard Guzman NRC/NRR/Plant Licensing Branch I-1
2. Kamal Manoly NRC/NRR/Mechanical and Civil Engineering Branch
3. John Wu NRC/NRR/Mechanical and Civil Engineering Branch
4. Chakrapani Basavaraju NRC/NRR/Mechanical and Civil Engineering Branch
5. William Jessup NRC/NRR/Mechanical and Civil Engineering Branch
6. Tom Scarbrough NRC/NRR/Component Performance and Testing Branch
7. Tom Alexion NRC/NRR/Generic Communication and Power Uprate
8. Rick Pagodin PPL
9. Micheal Crowthers PPL
10. Michael Gorski PPL
11. John Bartos PPL
12. John Krais PPL
13. Kevin Browning PPL
14. Craig Nichols General Electric - Hitachi
15. Mike Bridges General Electric - Hitachi
16. Jim Klapproth General Electric - Hitachi
17. Larry King General Electric - Hitachi
18. Rico Betti General Electric - Hitachi
19. Dan Pappone General Electric - Hitachi
20. Joseph Ferrante Nuclear Management Company - Monticello
21. Shelly Kugler Public Service Enterprise Group Nuclear - Hope Creek
22. Jamie Mallon Public Service Enterprise Group Nuclear - Hope Creek
23. Gary Pavis Constellation Energy Group - Nine Mile Point
24. Steve Hambric NRC Contractor
25. Vic Shah NRC Contractor
26. Samir Ziada NRC Contractor Enclosure 1

MEETING SLIDES (Non-proprietary version)

Enclosure 2

Susquehanna Steam Electric Station, Units 1 and 2 cc:

Britt T. McKinney Luis A. Ramos Sr. Vice President and Community Relations Manager, Chief Nuclear Officer Susquehanna PPL Susquehanna, LLC PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 634 Salem Blvd., SSO Berwick, PA 18603-0467 Berwick, PA 18603-0467 Cornelius J. Gannon Bryan A. Snapp, Esq Vice President - Nuclear Operations Assoc. General Counsel PPL Susquehanna, LLC PPL Services Corporation 769 Salem Blvd., NUCSB3 Two North Ninth Street, GENTW3 Berwick, PA 18603-0467 Allentown, PA 18101-1179 Robert M. Paley Supervisor - Document Control Services General Manager - Plant Support PPL Susquehanna, LLC PPL Susquehanna, LLC Two North Ninth Street, GENPL4 769 Salem Blvd., NUCSB2 Allentown, PA 18101-1179 Berwick, PA 18603-0467 Richard W. Osborne Rocco R. Sgarro Allegheny Electric Cooperative, Inc.

Manager - Nuclear Regulatory Affairs 212 Locust Street PPL Susquehanna, LLC P.O. Box 1266 Two North Ninth Street, GENPL4 Harrisburg, PA 17108-1266 Allentown, PA 18101-1179 Director, Bureau of Radiation Protection Supervisor - Pennsylvania Department of Nuclear Regulatory Affairs Environmental Protection PPL Susquehanna, LLC Rachel Carson State Office Building 769 Salem Blvd., NUCSA4 P.O. Box 8469 Berwick, PA 18603-0467 Harrisburg, PA 17105-8469 Michael H. Crowthers Senior Resident Inspector Supervising Engineer U.S. Nuclear Regulatory Commission Nuclear Regulatory Affairs P.O. Box 35, NUCSA4 PPL Susquehanna, LLC Berwick, PA 18603-0035 Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission Ronald E. Smith 475 Allendale Road General Manager - Site Preparedness King of Prussia, PA 19406 and Services PPL Susquehanna, LLC Board of Supervisors 769 Salem Blvd., NUCSA4 Salem Township Berwick, PA 18603-0467 P.O. Box 405 Berwick, PA 18603-0035 Manager - Quality Assurance PPL Susquehanna, LLC Dr. Judith Johnsrud 769 Salem Blvd., NUCSB2 National Energy Committee Berwick, PA 18603-0467 Sierra Club 443 Orlando Avenue State College, PA 16803