July 19, 2007 LICENSEE:
FACILITY:
Susquehanna Steam Electric Station, Units 1 and 2 (SSES 1 and 2)
SUBJECT:
SUMMARY
OF JUNE 29, 2007, CATEGORY 1 WORKING-LEVEL MEETING WITH PPL TO DISCUSS STEAM DRYER ANALYSIS, LICENSING, DESIGN APPROACH, AND POWER ASCENSION TEST PLANS On June 29, 2007, a public meeting was held between the U.S. Nuclear Regulatory Commission (NRC), and representatives of PPL and its vendor, General Electric-Hitachi, at NRC Headquarters, One White Flint North, 11555 Rockville Pike, Rockville, Maryland. The purpose of the meeting was to discuss PPLs steam dryer finite element analysis, licensing, design approach, and power ascension test plans. Certain portions of the meeting were closed to the public as some of the presentation material and discussion were determined to be proprietary in nature.
PPL provided an overview of the SSES 1 and 2 replacement steam dryer licensing, design, instrumentation, and test plans for the proposed constant pressure power uprate (CPPU).
PPLs conclusion is summarized as follows:
(1) the steam dryer licensing basis is conservative and meets the American Society of Mechanical Engineers (ASME) fatigue limit of 13,600 pounds per square inch; (2) the fabricated replacement steam dryer will have reduced stress intensities and increased margins to the ASME fatigue limit; (3) the revised finite element model provides results less than the ASME limit; (4) the replacement steam dryer is designed and fabricated in accordance with Title 10 of the Code of Federal Regulations, Part 50, Appendix B using improved design and fabrication techniques; (5) the Unit 1 steam dryer will be instrumented for 107% current licensed thermal power (CLTP), will demonstrate structural adequacy of the new steam dryer design, and will validate dryer analysis tools; (6) the power ascension test program will be slow and deliberate, consists of an acceptance criteria based on the 13,600 fatigue limit, will confirm no acoustic resonances at 114%
CLTP, will allow validation of analysis and dryer design prior to full CPPU operation, and will confirm acceptability of the dryer up to full CPPU conditions.
PPL Susquehanna, LLC PPL also discussed its corrective actions related to a modeling input error in the finite element analysis, as well as its approach in responding to NRC staffs request for supplemental information (Agency Documents Access and Management System (ADAMS) Accession No. ML071920490).
There were no members of the public in attendance, and no public meeting feedback forms were received. Enclosure 1 is a list of meeting attendees and Enclosure 2 is a non-proprietary copy of the licensees slides presented at the meeting. A proprietary copy of the licensees presentation slides can be found in ADAMS (Accession No. ML071980285).
Please direct any inquiries to me at 301-415-1030, or rvg@nrc.gov.
/RA/
Richard V. Guzman, Senior Project Manager Plant Licensing Branch I-1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-387 and 50-388
Enclosures:
- 1. List of Attendees
- 2. Licensees Handouts/Slides (Non-Proprietary) cc w/encls: See next page
ML071970172 OFFICE LPLI-1/PM LPLI-1/LA LPLI-1/BC NAME RGuzman SLittle MKowal DATE 7/18/07 7/18/07 7/19/07
LIST OF ATTENDEES NUCLEAR REGULATORY COMMISSION (NRC)
NUCLEAR REACTOR REGULATION (NRR) CATEGORY 1 MEETING WITH PPL SUSQUEHANNA, LLC (PPL)
REPLACEMENT STEAM DRYER ANALYSIS, DESIGN, AND TESTING PLANS FOR THE PROPOSED EXTENDED POWER UPRATE APPLICATION SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1 AND 2 JUNE 27, 2007 NAME ORGANIZATION
- 1. Richard Guzman NRC/NRR/Plant Licensing Branch I-1
- 2. Kamal Manoly NRC/NRR/Mechanical and Civil Engineering Branch
- 3. John Wu NRC/NRR/Mechanical and Civil Engineering Branch
- 4. Chakrapani Basavaraju NRC/NRR/Mechanical and Civil Engineering Branch
- 5. William Jessup NRC/NRR/Mechanical and Civil Engineering Branch
- 6. Tom Scarbrough NRC/NRR/Component Performance and Testing Branch
- 7. Tom Alexion NRC/NRR/Generic Communication and Power Uprate
- 8. Rick Pagodin PPL
- 9. Micheal Crowthers PPL
- 10. Michael Gorski PPL
- 11. John Bartos PPL
- 12. John Krais PPL
- 13. Kevin Browning PPL
- 14. Craig Nichols General Electric - Hitachi
- 15. Mike Bridges General Electric - Hitachi
- 16. Jim Klapproth General Electric - Hitachi
- 17. Larry King General Electric - Hitachi
- 18. Rico Betti General Electric - Hitachi
- 19. Dan Pappone General Electric - Hitachi
- 20. Joseph Ferrante Nuclear Management Company - Monticello
- 21. Shelly Kugler Public Service Enterprise Group Nuclear - Hope Creek
- 22. Jamie Mallon Public Service Enterprise Group Nuclear - Hope Creek
- 23. Gary Pavis Constellation Energy Group - Nine Mile Point
- 24. Steve Hambric NRC Contractor
- 25. Vic Shah NRC Contractor
- 26. Samir Ziada NRC Contractor
MEETING SLIDES (Non-proprietary version)
Susquehanna Steam Electric Station, Units 1 and 2 cc:
Britt T. McKinney Sr. Vice President and Chief Nuclear Officer PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Cornelius J. Gannon Vice President - Nuclear Operations PPL Susquehanna, LLC 769 Salem Blvd., NUCSB3 Berwick, PA 18603-0467 Robert M. Paley General Manager - Plant Support PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Rocco R. Sgarro Manager - Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Supervisor -
Nuclear Regulatory Affairs PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Michael H. Crowthers Supervising Engineer Nuclear Regulatory Affairs PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Ronald E. Smith General Manager - Site Preparedness and Services PPL Susquehanna, LLC 769 Salem Blvd., NUCSA4 Berwick, PA 18603-0467 Manager - Quality Assurance PPL Susquehanna, LLC 769 Salem Blvd., NUCSB2 Berwick, PA 18603-0467 Luis A. Ramos Community Relations Manager, Susquehanna PPL Susquehanna, LLC 634 Salem Blvd., SSO Berwick, PA 18603-0467 Bryan A. Snapp, Esq Assoc. General Counsel PPL Services Corporation Two North Ninth Street, GENTW3 Allentown, PA 18101-1179 Supervisor - Document Control Services PPL Susquehanna, LLC Two North Ninth Street, GENPL4 Allentown, PA 18101-1179 Richard W. Osborne Allegheny Electric Cooperative, Inc.
212 Locust Street P.O. Box 1266 Harrisburg, PA 17108-1266 Director, Bureau of Radiation Protection Pennsylvania Department of Environmental Protection Rachel Carson State Office Building P.O. Box 8469 Harrisburg, PA 17105-8469 Senior Resident Inspector U.S. Nuclear Regulatory Commission P.O. Box 35, NUCSA4 Berwick, PA 18603-0035 Regional Administrator, Region 1 U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406 Board of Supervisors Salem Township P.O. Box 405 Berwick, PA 18603-0035 Dr. Judith Johnsrud National Energy Committee Sierra Club 443 Orlando Avenue State College, PA 16803