ML15121A651: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(3 intermediate revisions by the same user not shown)
Line 2: Line 2:
| number = ML15121A651
| number = ML15121A651
| issue date = 04/29/2015
| issue date = 04/29/2015
| title = Ltr 04/29/15 Prairie Island Nuclear Generating Plant, Units 1 and 2, Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) Inspection Report 05000282/2015007; 05000306/2015007 (Jen)
| title = Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) Inspection Report 05000282/2015007; 05000306/2015007 (Jen)
| author name = Lipa C A
| author name = Lipa C
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
| addressee name = Davison K
| addressee name = Davison K
Line 14: Line 14:
| page count = 8
| page count = 8
}}
}}
See also: [[followed by::IR 05000282/2015007]]
See also: [[see also::IR 05000282/2015007]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                              NUCLEAR REGULATORY COMMISSION
REGION III 2443 WARRENVILLE RD. SUIT
                                                REGION III
E 210 LISLE, IL 60532
                                      2443 WARRENVILLE RD. SUITE 210
-4352   April 29, 2015 Mr. Kevin Davison
                                            LISLE, IL 60532-4352
Site Vice President
                                              April 29, 2015
Prairie Island Nuclear Generating Plant
Mr. Kevin Davison
Northern States Power Company, Minnesota
Site Vice President
1717 Wakonade Drive East
Prairie Island Nuclear Generating Plant
Welch, MN 55089
Northern States Power Company, Minnesota
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT,
1717 Wakonade Drive East
UNITS 1 AND 2
Welch, MN 55089
, REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI) INSPECTION
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, REQUEST
REPORT 05000282/2015007; 05000306/2015007 Dear Mr. Davison: On August 3, 2015,
              FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT
the U. S. Nuclear Regulatory Commission (NRC) will begin a  
              DESIGN BASES INSPECTION (CDBI) INSPECTION REPORT 05000282/2015007;
triennial baseline Component Design Bases Inspection (CDBI) at
              05000306/2015007
Prairie Island Nuclear Generating Plant, Units 1 and 2.
Dear Mr. Davison:
  A team of six inspectors will perform this
On August 3, 2015, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial
3-week inspection. This inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.21.
baseline Component Design Bases Inspection (CDBI) at Prairie Island Nuclear Generating
The CDBI focuses on the design, maintenance, and operation of risk
Plant, Units 1 and 2. A team of six inspectors will perform this 3-week inspection. This
-significant components
inspection will be performed in accordance with NRC Baseline Inspection Procedure
associated with one or more accident scenario or systems. The components to be reviewed during this baseline inspection will be identified during the in-office preparation week that occurs prior to the first on
(IP) 71111.21.
-site inspection
The CDBI focuses on the design, maintenance, and operation of risk-significant components
week. In addition, operating experience issues, associated with the component samples, will also be selected for review. The inspection team may request scenarios to be performed on the simulator. This request would require support from you
associated with one or more accident scenario or systems. The components to be reviewed
r simulator staff to validate scenarios, simulator time, and a crew to perform the actions which would most likely occur during the second on
during this baseline inspection will be identified during the inoffice preparation week that occurs
-site week. The team will work closely with your staff early on during the inspection process to ensure this activity can be accomplished with minimal impact.
prior to the first on-site inspection week. In addition, operating experience issues, associated
The inspection will include  
with the component samples, will also be selected for review. The inspection team may request
3 weeks on-site. The inspection team will consist of six NRC inspectors, of which five will focus on engineering/maintenance
scenarios to be performed on the simulator. This request would require support from your
, and one on operations
simulator staff to validate scenarios, simulator time, and a crew to perform the actions which
The current inspection schedule is as follows:
would most likely occur during the second on-site week. The team will work closely with your
   On-site weeks:
staff early on during the inspection process to ensure this activity can be accomplished with
August 3-7, 2015;   August 17-21, 2015; and   August 31
minimal impact.
-September 4, 2015.
The inspection will include 3 weeks on-site. The inspection team will consist of six NRC
The team will be preparing for the inspection, mainly during the week of
inspectors, of which five will focus on engineering/maintenance, and one on operations.
July 27-31, 2015, as discussed in the attached enclosure.
The current inspection schedule is as follows:
 
*   On-site weeks:       August 3-7, 2015;
K. Davison
                          August 17-21, 2015; and
-2- Experience with previous baseline design inspections of similar depth and length has shown that this type of inspection is
                          August 31-September 4, 2015.
extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on
The team will be preparing for the inspection, mainly during the week of July 27-31, 2015, as
-site portions of
discussed in the attached enclosure.
the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into three groups:
 
   The first group lists information necessary for our initial inspection scoping activities. This information should be provided to the lead inspector no later than
K. Davison                                     -2-
June 23, 2015.  
Experience with previous baseline design inspections of similar depth and length has shown
By July 10, 2015, the lead inspector will communicate the initial selected set of approximately  
that this type of inspection is extremely resource intensive, both for the NRC inspectors and the
15 components.  
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive
  The second group of documents requested is
inspection for both parties, we have enclosed a request for information needed for the
those items needed to support our in
inspection.
-office preparation activities. This set of documents, including the calculations associated with the initial selected components, should be provided to the lead inspector
It is important that all of these documents are up to date and complete in order to minimize the
at the Regional Office no later than
number of additional documents requested during the preparation and/or the on-site portions of
July 22, 2015.
the inspection. Insofar as possible, this information should be provided electronically to the lead
  During the in
inspector. The information request has been divided into three groups:
-office preparation activities, the team may identify additional information needed to support the inspection.
*   The first group lists information necessary for our initial inspection scoping activities.
  The last group includes the additional information above as well as plant specific reference material. This information should be available to the team onsite on August 3, 2015.
    This information should be provided to the lead inspector no later than June 23, 2015. By
  It is also requested that corrective action documents and/or questions developed during the  
    July 10, 2015, the lead inspector will communicate the initial selected set of approximately
inspection be provided to the lead inspector as the documents are generated.
    15 components.
The lead inspector for this inspection is
*    The second group of documents requested is those items needed to support our in-office
James Neurauter.  
    preparation activities. This set of documents, including the calculations associated with the
We understand that our licensing contact for this inspection is
    initial selected components, should be provided to the lead inspector at the Regional Office
Benjamin Hammargren of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829
    no later than July 22, 2015. During the in-office preparation activities, the team may identify
-9828 or via e-mail at James.Neurauter@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
    additional information needed to support the inspection.
  Existing information collection
*    The last group includes the additional information above as well as plant specific reference
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget  
    material. This information should be available to the team onsite on August 3, 2015. It is
Control Number.  
    also requested that corrective action documents and/or questions developed during the
K. Davison
    inspection be provided to the lead inspector as the documents are generated.
    -3- In accordance with Title 10 of the Code of Federal Regulations
The lead inspector for this inspection is James Neurauter. We understand that our licensing
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy  
contact for this inspection is Benjamin Hammargren of your organization. If there are any
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS)  
questions about the inspection or the material requested in the enclosure, please contact the
component of the NRC's Agencywide
lead inspector at (630) 829-9828 or via e-mail at James.Neurauter@nrc.gov.
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
This letter does not contain new or amended information collection requirements subject to
-rm/adams.html
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
(the Public Electronic Reading Room).
collection requirements were approved by the Office of Management and Budget, Control
Sincerely,
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
  /RA Andrew Dunlop Acting for/
respond to, a request for information or an information collection requirement unless the
 
requesting document displays a currently valid Office of Management and Budget Control
Christine A. Lipa, Chief Engineering Branch 2
Number.
Division of Reactor Safety  
 
Docket Nos. 50-282; 50-306 License No
K. Davison                                     -3-
s. DPR-42; DPR-60 Enclosure:
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
  Information Request for Component Design Bases Inspection (CDBI)
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
cc w/encl: Distribution via LISTSERV  
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
                                              Sincerely,
                                              /RA Andrew Dunlop Acting for/
                                              Christine A. Lipa, Chief
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket Nos. 50-282; 50-306
License Nos. DPR-42; DPR-60
Enclosure:
  Information Request for Component Design Bases Inspection (CDBI)
cc w/encl: Distribution via LISTSERV
 
    INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
Inspection Report:              05000282/2015007; 05000306/2015007
Inspection Dates:                August 3-7, 2015;
                                August 17-21, 2015; and
                                August 31-September 4, 2015.
Inspection Procedure:            IP 71111.21 Component Design Bases Inspection
Lead Inspector:                  James Neurauter, Senior Reactor Engineer, DRS
                                (630) 829-9828
                                James.Neurauter@nrc.gov
I.    Information Requested Prior to the On-site Information Gathering/Inspection Week
      The following information is requested by June 23, 2015, or sooner, to facilitate
      inspection preparation. If you have any questions regarding this information, please call
      the team leader as soon as possible. Please provide the information electronically in
      pdf files, Excel, or other searchable formats, preferably on some portable electronic
      media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media should
      contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.
      Information in lists should contain enough information to be easily understood by
      someone who has knowledge of light water reactor technology.
      1.      Risk-ranking of top 250 components from your site specific probabilistic safety
                analysis (PSA) sorted by Risk-Achievement Worth (RAW). Include values for
                Birnbaum Importance, Risk-Reduction Worth (RRW), and Fussell-Veseley (FV)
                (as applicable).
      2.      Risk-ranking of top 100 containment-related components (i.e. Large Early
                Release Frequency [LERF]) from your site specific PSA sorted by RAW.
      3.      Provide a list of the top 200 cut-sets from your PSA.
      4.      Provide a list of the top 100 cut-sets for each initiator modeled in the PSA
                that contributes more than 5 percent to the baseline plant core damage
                frequency (CDF).
      5.      Copies of PSA system notebooks and latest PSA summary document.
      6.      List of time critical operator actions. Identify those actions that do not have job
                performance measures (JPMs).
      7.      Provide copies of the emergency operating procedures (EOPs).
      8.      If you have an External Events or Fire PSA Model, provide the information
                requested in Items 1 and 2 for external events and fire. Provide narrative
                description of each coded event (including fire, flood zone description).
                                                                                            Enclosure
 
    INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
      9.      Electronic copy of the site Individual Plant Examination of External
              Events (IPEEE), if available.
      10.    Any pre-existing evaluation or list of components and associated calculations
              with low-design margins, (i.e., pumps closest to the design limit for flow or
              pressure, diesel generator close to design required output, heat exchangers
              close to rated design heat removal etc.).
      11.    List of available design (setup) margins in both the open and closed direction
              (identify safety-related direction) for valves in the Motor-Operated Valve (MOV)
              and Air-Operated Valve (AOV) Programs. Identify the basis for how the margin
              was determined.
      12.    List of high-risk Maintenance Rule systems/components based on engineering
              or expert panel judgment (i.e., those systems/components not identified in the
              PSA).
      13.    Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)
              category for the last 3 years.
      14.    Site top ten issues list (if applicable).
      15.    A list of operating experience evaluations for the last 3 years.
      16.    Information of any common cause failure of components experienced in the last
              5 years at your facility.
      17.    List of Root Cause Evaluations associated with component failures or design
              issues initiated/completed in the last 5 years.
      18.    List of open operability evaluations.
      19.    List of components/systems considered operable but degraded/nonconforming.
      20.    Current management and engineering organizational chart.
      21.    Electronic copies of Updated Final Safety Analysis Report, Technical
              Specifications, Technical Specifications Bases, and Technical Requirements
              Manual.
      22.    Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
      23.    Electronic copy of Piping and Instrumentation Drawings (P&IDs) (if available).
II.    Information Requested (for the approximate 15 selected components) to be
      Available by July 22, 2015, (will be reviewed by the team in the Regional office
      during the week of July 27-31, 2015).
      This information should be separated for each selected component, especially if
      provided electronically (e.g., folder with component name that includes calculations,
      condition reports, maintenance history, etc.).
                                                  2
 
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
  Enclosure
  1. List of condition reports (corrective action documents) associated with each of
Inspection Report:
      the selected components for the last 6 years.
  05000282/2015007; 05000306/2015007 Inspection Dates:
  2.  The maintenance history (corrective, preventive, and elective) associated with
  August 3-7, 2015;    August 17
      each of the selected components for the last 10 years. Identify frequency of
-21, 2015; and     August 31
      preventive maintenance activities.
-September 4, 2015
  3. Copies of calculations associated with each of the selected components (if not
. Inspection Procedure:
      previously provided), excluding data files. Please review the calculations and
IP 71111.21 "Component Design Bases Inspection"
      also provide copies of important referenced material (such as drawings,
  Lead Inspector:
      engineering requests, and vendor letters). Pipe stress calculations are excluded
  James Neurauter
      from this request
, Senior Reactor Engineer, DRS
  4System Health Reports, System Descriptions, Design Basis Documents, and/or
  (630) 829
      Training Lesson Plans associated with each of the selected components.
-9828    James.Neurauter@nrc.gov
  5A list of modifications, including equivalency evaluations and setpoint changes,
I. Information Requested Prior to the On
      associated with each of the selected components. This list should include a
-site Information Gathering/Inspection Week
      descriptive paragraph on the purpose of the modification. Please ensure this list
  The following
      only includes design completed (not canceled) modifications.
information is requested by June 23, 2015, or sooner, to facilitate inspection preparation.  If you have any questions regarding this information, please call the team leader as soon as possiblePlease provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, flash drive, etc.).  The portable electronic media
  6. Copies of operability evaluations (open/closed for last 3 years) associated with
should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge
      each of the selected components and plans for restoring operability, if applicable.
of light water reactor technology.
  7.  Copies of selected operator work-around evaluations associated with each of the
  1. Risk-ranking of t
      selected components and plans for resolution, if applicable.
op 250 components from your site specific probabilistic safety
  8. Copies of any open temporary modifications associated with each of the selected
analysis (PSA) sorted by Risk
      components, if applicable.
-Achievement Worth (RAW).  Include values for Birnbaum Importance, Risk
  9. Trend data on the selected electrical/mechanical components performance for
-Reduction Worth (RRW), and Fussell
      last 3 years (For example, pumps performance including in-service testing, other
-Veseley (FV)
      vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate
(as applicable).
      results, etc.).
2. Risk-ranking of top 100 containment-related components (i.e. Large Early Release Frequency
  10. Provide copies of the normal and abnormal operating procedures associated with
[LERF]) from your site specific PSA sorted by
      the selected components and selected scenarios.
  RAW. 3. Provide a list of the top 200 cut
  11. A copy of any internal/external self-assessments and associated corrective
-sets from your PSA.
      action documents generated in preparation for the inspection.
4. Provide a list of the top 100 cut-sets for each initiator modeled in the P
  12. Copy of latest completed tests and surveillances for each component, for
SA that contributes more than 5
      example:
percent to the baseline plant core damage frequency (CDF).
          *    Pumps: comprehensive test, quarterly test, flow balance, etc.
5. Copies of PSA "system notebooks" and latest PSA summary document.
          *    Valves: stroke time testing, diagnostic testing, leak testing, interlocks,
6. List of time critical operator actions.  Identify those actions that do not have job
                etc.
performance measures (JPMs). 7. Provide copies of the emergency operating procedures
          *    Heat Exchangers/room coolers: thermal performance, clean/inspect, fan
(EOPs). 8. If you have an External Events or Fire PSA Model, provide the information requested in Items 1 and 2 for external events and fire.  Provide narrative description of each coded event (including fire, flood zone description)
                flows, etc.
.  
      Acceptance criteria basis calculations should also be included.
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
                                          3
2 9. Electronic copy of the site Individual Plant Examination of External Events (IPEEE), if available.
 
10. Any pre-existing evaluation or list of components and associated calculations with low-design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to
    INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
design required output, heat exchangers close to rated design heat removal etc.). 11. List of available design (setup) margins in both the
        13.   A copy of engineering/operations related audits completed in the last 2 years.
open and closed direction (identify safety
III.   Additional Information to be Provided on August 3, 2015, On-Site (for final
-related direction) for valves
        selected components)
in the Motor-Operated Valve
        1.     During the in-office preparation activities, the team will be making final selections
(MOV) and Air-Operated Valve
              and may identify additional information needed to support the inspection. The
(AOV) Programs. Identify the basis for how the margin was determined.
              lead inspector will provide a list of the additional information needed during the
12. List of high
              week of July 27-31, 2015.
-risk Maintenance Rule systems/components based on engineering
        2.     Schedule of any testing/maintenance activities to be conducted on the selected
or expert panel judgment
              components during the three onsite inspection weeks.
(i.e., those systems/components not identified in the  
IV.     Information Requested to be Provided Throughout the Inspection
PSA). 13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) category for the last
        1.    Copies of any corrective action documents generated as a result of the teams
3 years. 14. Site top ten issues list (if applicable)
              questions or queries during this inspection.
. 15. A list of operating experience evaluations for the last
        2.     Copies of the list of questions submitted by the team members and the
3 years. 16. Information of any common cause failure of components experienced in the last 5 years at your facility
              status/resolution of the information requested (provide daily during the inspection
. 17. List of Root Cause Evaluations associated with component failures or design
              to each team member).
issues initiated/completed in the last
        3.     One complete set of P&IDs (paper copies).
5 years. 18. List of open operability evaluations.
        4.     Reference materials. (make available if needed during all on-site weeks):
19. List of components/systems considered operable but degraded/nonconforming.
              *  Individual Plant Examination/Probabilistic Risk Assessment (IPE/PRA)
20. Current management and engineering organizational chart
                  Report;
. 21. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual. 22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
              *  Procurement documents for components selected (verify retrievable);
23. Electronic copy of Piping and Instrumentation Drawing
              *  Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
s (P&IDs) (if available).
              *  Vendor manuals.
II. Information Requested (for the approximate 15 selected components) to be
If you have questions regarding the information requested, please contact the lead inspector.
Available by
                                                  4
July 22, 2015
 
, (will be reviewed by the team in the Regional office during the week of
K. Davison                                                                -3-
July 27-31, 2015).   This information
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
.).
of this letter, its enclosure, and your response (if any) will be available electronically for public
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
3 1. List of condition reports (corrective action documents) associated with each of the selected components for the last
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
6 years. 2. The maintenance history
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(corrective, preventive, and elective)
(the Public Electronic Reading Room).
associated with each of the selected components for the last
                                                                          Sincerely,
10 years.  Identify frequency of preventive maintenance activities.
                                                                          /RA Andrew Dunlop Acting for/
3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files.  Please review the calculations and also provide copies of important referenced material (such as drawings, engineering requests, and vendor letters)
                                                                          Christine A. Lipa, Chief
.  Pipe stress calculations
                                                                          Engineering Branch 2
are excluded from this request
                                                                          Division of Reactor Safety
4. System Health Reports, System Descriptions, Design Basis Documents, and/or Training Lesson Plans associated with each of the selected components.
Docket Nos. 50-282; 50-306
5. A list of modifications, including equivalency evaluations and setpoint changes,
License Nos. DPR-42; DPR-60
associated with each of the selected components
Enclosure:
.  This list should include a descriptive paragraph on the purpose of the modification.  Please ensure this list only includes design completed (not canceled) modifications.
  Information Request for Component Design Bases Inspection (CDBI)
6. Copies of operability evaluations (open/closed for last 3 years) associated with each of the selected components and plans for restoring operability, if applicable
cc w/encl: Distribution via LISTSERV
. 7. Copies of selected operator work
DISTRIBUTION w/encl:
-around evaluations associated with each of the selected components and plans for resolution, if applicable.
Kimyata MorganButler
  8. Copies of any open temporary modifications associated with each of the selected components, if applicable.
RidsNrrPMPrairieIsland Resource
9. Trend data on the selected electrical/mechanical components' performance for last 3 years (For example, pumps' performance including in
RidsNrrDorlLpl3-1 Resource
-service testing, other vibration monitoring, oil sample results, etc., for valves:
RidsNrrDirsIrib Resource
stroke time and leak rate results, etc.
Cynthia Pederson
). 10. Provide copies of the normal and abnormal operating procedures associated with the selected components
Darrell Roberts
and selected scenarios
Richard Skokowski
. 11. A copy of any internal/external self
Allan Barker
-assessments and associated corrective action documents generated in preparation for the inspection
Carole Ariano
. 12. Copy of latest completed tests and surveillances for each component
Linda Linn
, for example:  Pumps:  comprehensive test, quarterly test, flow balance, etc.
DRPIII
  Valves:  stroke time testing, diagnostic testing, leak testing, interlocks, etc.  Heat Exchangers/room coolers
DRSIII
:  thermal performance, clean/inspect, fan flows, etc.
Jim Clay
Acceptance criteria basis calculations should also be included.
Carmen Olteanu
 
ADAMS Accession Number ML15121A651
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
    Publicly Available                          Non-Publicly Available                    Sensitive                Non-Sensitive
4 13. A copy of engineering/operations related audits completed in the last 2 years.
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
III. Additional Information to be
OFFICE              RIII                                RIII                            RIII                              RIII
Provided on August 3, 2015
NAME                JNeurauter:cl                        ADunlop for CLipa
, On-Site (for final selected components)
  DATE                04/29/15                            04/29/15
1. During the in
                                                            OFFICIAL RECORD COPY
-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection.  The lead inspector will provide a list of the additional information needed during the week of July 27-31, 2015.
  2. Schedule of any testing/maintenance activities to be conducted on the selected components during the three onsite inspection weeks.
  IV. Information Requested to be Provided Throughout the Inspection
1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection
. 2. Copies of the list of questions submitted by the team members and the
status/resolution of the information requested (provide daily during the inspection to each team member). 3. One complete set of P&IDs (paper copies)
. 4. Reference materials
. (make available if needed during all on
-site weeks):
  Individual Plant Examination
/Probabilistic Risk Assessment
(IPE/PRA) Report;  Procurement documents for components selected (verify retrievable);
  Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
  Vendor manuals.
If you have questions regarding the information requested, please contact the lead inspector.
    K. Davison
    -3- In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,
  /RA Andrew Dunlop Acting for
Christine A. Lipa, Chief Engineering Branch 2
Division of Reactor Safety
Docket Nos. 50-282; 50-306 License No
s. DPR-42; DPR-60 Enclosure:
  Information Request for Component Design Bases Inspection (CDBI)
cc w/encl:  Distribution via LISTSERV DISTRIBUTION
w/encl: Kimyata MorganButler
RidsNrrPMPrairieIsland Resource
RidsNrrDorlLpl3-1 Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts
Richard Skokowski
Allan Barker
Carole Ariano
Linda Linn
DRPIII DRSIII Jim Clay Carmen Olteanu
  ADAMS Accession Number ML15121A651
  Publicly Available
  Non-Publicly Available
  Sensitive
  Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII  RIII  RIII  RIII  NAME JNeurauter:cl
ADunlop for CLipa  DATE 04/29/15 04/29/15  OFFICIAL RECORD COP
Y
}}
}}

Latest revision as of 01:22, 17 November 2019

Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) Inspection Report 05000282/2015007; 05000306/2015007 (Jen)
ML15121A651
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 04/29/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Davison K
Northern States Power Co
References
IR 2015007
Download: ML15121A651 (8)


See also: IR 05000282/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

April 29, 2015

Mr. Kevin Davison

Site Vice President

Prairie Island Nuclear Generating Plant

Northern States Power Company, Minnesota

1717 Wakonade Drive East

Welch, MN 55089

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, REQUEST

FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT

DESIGN BASES INSPECTION (CDBI) INSPECTION REPORT 05000282/2015007;

05000306/2015007

Dear Mr. Davison:

On August 3, 2015, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial

baseline Component Design Bases Inspection (CDBI) at Prairie Island Nuclear Generating

Plant, Units 1 and 2. A team of six inspectors will perform this 3-week inspection. This

inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.21.

The CDBI focuses on the design, maintenance, and operation of risk-significant components

associated with one or more accident scenario or systems. The components to be reviewed

during this baseline inspection will be identified during the inoffice preparation week that occurs

prior to the first on-site inspection week. In addition, operating experience issues, associated

with the component samples, will also be selected for review. The inspection team may request

scenarios to be performed on the simulator. This request would require support from your

simulator staff to validate scenarios, simulator time, and a crew to perform the actions which

would most likely occur during the second on-site week. The team will work closely with your

staff early on during the inspection process to ensure this activity can be accomplished with

minimal impact.

The inspection will include 3 weeks on-site. The inspection team will consist of six NRC

inspectors, of which five will focus on engineering/maintenance, and one on operations.

The current inspection schedule is as follows:

  • On-site weeks: August 3-7, 2015;

August 17-21, 2015; and

August 31-September 4, 2015.

The team will be preparing for the inspection, mainly during the week of July 27-31, 2015, as

discussed in the attached enclosure.

K. Davison -2-

Experience with previous baseline design inspections of similar depth and length has shown

that this type of inspection is extremely resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than June 23, 2015. By

July 10, 2015, the lead inspector will communicate the initial selected set of approximately

15 components.

  • The second group of documents requested is those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with the

initial selected components, should be provided to the lead inspector at the Regional Office

no later than July 22, 2015. During the in-office preparation activities, the team may identify

additional information needed to support the inspection.

  • The last group includes the additional information above as well as plant specific reference

material. This information should be available to the team onsite on August 3, 2015. It is

also requested that corrective action documents and/or questions developed during the

inspection be provided to the lead inspector as the documents are generated.

The lead inspector for this inspection is James Neurauter. We understand that our licensing

contact for this inspection is Benjamin Hammargren of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at (630) 829-9828 or via e-mail at James.Neurauter@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

K. Davison -3-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA Andrew Dunlop Acting for/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-282; 50-306

License Nos. DPR-42; DPR-60

Enclosure:

Information Request for Component Design Bases Inspection (CDBI)

cc w/encl: Distribution via LISTSERV

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)

Inspection Report: 05000282/2015007; 05000306/2015007

Inspection Dates: August 3-7, 2015;

August 17-21, 2015; and

August 31-September 4, 2015.

Inspection Procedure: IP 71111.21 Component Design Bases Inspection

Lead Inspector: James Neurauter, Senior Reactor Engineer, DRS

(630) 829-9828

James.Neurauter@nrc.gov

I. Information Requested Prior to the On-site Information Gathering/Inspection Week

The following information is requested by June 23, 2015, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the team leader as soon as possible. Please provide the information electronically in

pdf files, Excel, or other searchable formats, preferably on some portable electronic

media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media should

contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by

someone who has knowledge of light water reactor technology.

1. Risk-ranking of top 250 components from your site specific probabilistic safety

analysis (PSA) sorted by Risk-Achievement Worth (RAW). Include values for

Birnbaum Importance, Risk-Reduction Worth (RRW), and Fussell-Veseley (FV)

(as applicable).

2. Risk-ranking of top 100 containment-related components (i.e. Large Early

Release Frequency [LERF]) from your site specific PSA sorted by RAW.

3. Provide a list of the top 200 cut-sets from your PSA.

4. Provide a list of the top 100 cut-sets for each initiator modeled in the PSA

that contributes more than 5 percent to the baseline plant core damage

frequency (CDF).

5. Copies of PSA system notebooks and latest PSA summary document.

6. List of time critical operator actions. Identify those actions that do not have job

performance measures (JPMs).

7. Provide copies of the emergency operating procedures (EOPs).

8. If you have an External Events or Fire PSA Model, provide the information

requested in Items 1 and 2 for external events and fire. Provide narrative

description of each coded event (including fire, flood zone description).

Enclosure

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)

9. Electronic copy of the site Individual Plant Examination of External

Events (IPEEE), if available.

10. Any pre-existing evaluation or list of components and associated calculations

with low-design margins, (i.e., pumps closest to the design limit for flow or

pressure, diesel generator close to design required output, heat exchangers

close to rated design heat removal etc.).

11. List of available design (setup) margins in both the open and closed direction

(identify safety-related direction) for valves in the Motor-Operated Valve (MOV)

and Air-Operated Valve (AOV) Programs. Identify the basis for how the margin

was determined.

12. List of high-risk Maintenance Rule systems/components based on engineering

or expert panel judgment (i.e., those systems/components not identified in the

PSA).

13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)

category for the last 3 years.

14. Site top ten issues list (if applicable).

15. A list of operating experience evaluations for the last 3 years.

16. Information of any common cause failure of components experienced in the last

5 years at your facility.

17. List of Root Cause Evaluations associated with component failures or design

issues initiated/completed in the last 5 years.

18. List of open operability evaluations.

19. List of components/systems considered operable but degraded/nonconforming.

20. Current management and engineering organizational chart.

21. Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies).

23. Electronic copy of Piping and Instrumentation Drawings (P&IDs) (if available).

II. Information Requested (for the approximate 15 selected components) to be

Available by July 22, 2015, (will be reviewed by the team in the Regional office

during the week of July 27-31, 2015).

This information should be separated for each selected component, especially if

provided electronically (e.g., folder with component name that includes calculations,

condition reports, maintenance history, etc.).

2

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)

1. List of condition reports (corrective action documents) associated with each of

the selected components for the last 6 years.

2. The maintenance history (corrective, preventive, and elective) associated with

each of the selected components for the last 10 years. Identify frequency of

preventive maintenance activities.

3. Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and

also provide copies of important referenced material (such as drawings,

engineering requests, and vendor letters). Pipe stress calculations are excluded

from this request

4. System Health Reports, System Descriptions, Design Basis Documents, and/or

Training Lesson Plans associated with each of the selected components.

5. A list of modifications, including equivalency evaluations and setpoint changes,

associated with each of the selected components. This list should include a

descriptive paragraph on the purpose of the modification. Please ensure this list

only includes design completed (not canceled) modifications.

6. Copies of operability evaluations (open/closed for last 3 years) associated with

each of the selected components and plans for restoring operability, if applicable.

7. Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

8. Copies of any open temporary modifications associated with each of the selected

components, if applicable.

9. Trend data on the selected electrical/mechanical components performance for

last 3 years (For example, pumps performance including in-service testing, other

vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate

results, etc.).

10. Provide copies of the normal and abnormal operating procedures associated with

the selected components and selected scenarios.

11. A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

12. Copy of latest completed tests and surveillances for each component, for

example:

  • Pumps: comprehensive test, quarterly test, flow balance, etc.
  • Valves: stroke time testing, diagnostic testing, leak testing, interlocks,

etc.

  • Heat Exchangers/room coolers: thermal performance, clean/inspect, fan

flows, etc.

Acceptance criteria basis calculations should also be included.

3

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)

13. A copy of engineering/operations related audits completed in the last 2 years.

III. Additional Information to be Provided on August 3, 2015, On-Site (for final

selected components)

1. During the in-office preparation activities, the team will be making final selections

and may identify additional information needed to support the inspection. The

lead inspector will provide a list of the additional information needed during the

week of July 27-31, 2015.

2. Schedule of any testing/maintenance activities to be conducted on the selected

components during the three onsite inspection weeks.

IV. Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

3. One complete set of P&IDs (paper copies).

4. Reference materials. (make available if needed during all on-site weeks):

  • Individual Plant Examination/Probabilistic Risk Assessment (IPE/PRA)

Report;

  • Procurement documents for components selected (verify retrievable);
  • Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
  • Vendor manuals.

If you have questions regarding the information requested, please contact the lead inspector.

4

K. Davison -3-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA Andrew Dunlop Acting for/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-282; 50-306

License Nos. DPR-42; DPR-60

Enclosure:

Information Request for Component Design Bases Inspection (CDBI)

cc w/encl: Distribution via LISTSERV

DISTRIBUTION w/encl:

Kimyata MorganButler

RidsNrrPMPrairieIsland Resource

RidsNrrDorlLpl3-1 Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Jim Clay

Carmen Olteanu

ADAMS Accession Number ML15121A651

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME JNeurauter:cl ADunlop for CLipa

DATE 04/29/15 04/29/15

OFFICIAL RECORD COPY