MONTHYEARML24185A0912024-07-0101 July 2024 Acceptance of LAR to Revise TS Definition of Reactor Trip System (RTS) Response Time and Apply Response Time Testing to RTS Trip Functions with Time Delay Assumptions in the Accident Analyses ML24116A2532024-04-25025 April 2024 Final Request for Additional Information for LAR to Revise SR 3.8.1.2 Note 3 (EPID: L- 2023-LLA-0135) ML24045A1502024-02-15015 February 2024 Verbal Authorization for Alternative Relief Request-09 ML24045A0862024-02-12012 February 2024 Final RAI for Alternative RR-09 ML23348A3472023-12-12012 December 2023 NRR E-mail Capture - (External_Sender) NRC Notification to the State of Minnesota Regarding a Prairie Island Nuclear Generating Plant, Units 1 & 2, Amendment ML23335A1152023-12-0101 December 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Request for Additional Information LAR to Revise TS 3.7.8 Required Actions ML23312A0882023-11-0808 November 2023 Acceptance of Request to Revise Alternatives 1-RR-5-10 and 2-RR-5-10 ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23207A1962023-07-26026 July 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Requested Licensing Action Request to Revise Technical Specification 3.7.8 Required Actions ML23075A2802023-03-16016 March 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Acceptance of Relief Requests 1-RR-5-15 and 2-RR-5-15 to Use Subsequent ASME Code Edition and Addenda ML23065A0592023-02-27027 February 2023 NRR E-mail Capture - (External_Sender) Prairie Island Request for Pre-application Meeting for Proposed LAR to Change TS 3.7.8, Condition B Required Actions ML23018A2952023-01-18018 January 2023 Acceptance of Requested Licensing Action to Revise Technical Specification 5.6.6, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) (EPID L-2022-LLA-0184) (Email) ML22167A0452022-06-16016 June 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Request to Adopt TSTF-277 ML22166A4112022-06-15015 June 2022 NRR E-mail Capture - Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-08, PIV Leakage ML22160A6022022-06-0909 June 2022 NRR E-mail Capture - Draft Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, 24-Month Operating Cycle Amendment ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22045A4972022-02-14014 February 2022 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Unit 2 - Acceptance of Alternative Request Alternative Related PIV Leakage Monitoring ML21347A0082021-12-10010 December 2021 NRR E-mail Capture - Monticello and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested License Amendment Standard Emergency Plan and Consolidated Emergency Operations Facility ML21321A0452021-11-10010 November 2021 Request for Additional Information: Prairie Island 24-Month Cycle Amendment Request ML21302A1252021-10-29029 October 2021 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action RTS Power Range Amendment ML21305A0102021-10-29029 October 2021 NRR E-mail Capture - Request for Additional Information Prairie Island Cooling Water Amendment ML21252A0152021-09-0202 September 2021 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Change in the Maximum Surveillance Intervals from 24 Months to 30 Months ML21252A0122021-08-30030 August 2021 NRR E-mail Capture - Request for Additional Information Amendment Request to Adopt TSTF-471 and 517-T for Prairie Island ML21133A2502021-05-13013 May 2021 NRR E-mail Capture - Prairie Island - Acceptance Review of TSTF-471 and TSTF-571-T ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20253A2782020-09-0909 September 2020 E-Mail Submitting Proposed New License Condition ML20254A1162020-09-0909 September 2020 Draft License Transmittal E-Mail ML20223A0632020-08-10010 August 2020 Email Shpo Comment Letter: Proposed License Amendment for the Prairie Island Independent Spent Fuel Storage Installation ML20192A1442020-07-0707 July 2020 NRR E-mail Capture - Request for Additional Information Prairie Island License Amendment Request to Adopt TSTF-505 ML20163A4282020-06-10010 June 2020 Email from MPCA Comment Letter - Prairie Island ISFSI ML20154K7632020-06-0202 June 2020 NRR E-mail Capture - Revision 2 to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20135G8212020-05-14014 May 2020 NRR E-mail Capture - Revision to the Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20112F4582020-04-21021 April 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Low Temperature Overpressure Protection ML20083F4202020-03-20020 March 2020 NRR E-mail Capture - Plan for the Audit of the Prairie Island Nuclear Generating Plant TSTF-505 License Amendment Request (Epdi: L-2019-LLA-0283) ML20077L4632020-03-17017 March 2020 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 -Acceptance of Requested Licensing Action Request to Adopt TSTF-529 ML20052C7582020-02-21021 February 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Westinghouse NSAL-09-05 and NSAL-09-05 ML20035F1552020-02-0404 February 2020 NRR E-mail Capture - Request for Additional Information Monticello and Prairie Island Alternative Requests to Adopt Code Cases N-786-3 and N-789-3 (Epids: L-2019-LLR-0078 and L-2019-LLR-0079) ML20022A1762020-01-22022 January 2020 NRR E-mail Capture - Prairie Units 1 and 2 - Acceptance of Requested Licensing Action Application to Revise Technical Specifications to Adopt TSTF-547, Clarification of Rod Position Requirements ML20021A1832020-01-21021 January 2020 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2 ML19316A0172019-11-0101 November 2019 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Integrated Leak Rate Test Extension Request ML19253B9642019-09-10010 September 2019 NRR E-mail Capture - Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Relief Request Adoption of Code Case N-786-3 ML19233A0032019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Prairie Island Relief Requests 1-RR-10 and 2-RR-10 ML19193A0142019-07-0909 July 2019 NRR E-mail Capture - Acceptance of Prairie Island Nuclear Generating Plant, Units 1 and 2 Relief Request Nos. 1-RR-5-10 and 2-RR-5-10 Related to Reactor Vessel Inspection Intervals) ML19057A1652019-02-26026 February 2019 NRR E-mail Capture - Request for Additional Information Prairie Island 50.69 Amendment Request ML19057A4212019-02-26026 February 2019 NRR E-mail Capture - Acceptance of Prairie Island Reactor Vessel Capsule Removal Schedule Request ML19008A3562019-01-0707 January 2019 NRR E-mail Capture - Prairie Island Nuclear Generating Plant - Audit Plan Related to the License Amendment Request to Implement 10 CFR 50.69 ML18351A0142018-12-14014 December 2018 NRR E-mail Capture - Prairie Island Nuclear Generating Plant, Units 1 and 2 - Acceptance of Requested Licensing Action Classification of Certain Fuel Handling Equipment ML18347A3282018-12-12012 December 2018 E-Mail from M. Krick/Sses SSES ISFSI (Conversation Held on December 12, 2018) ML18313A0832018-11-0707 November 2018 NRR E-mail Capture - Request for Additional Information Prairie Island NFPA-805 License Condition Modification Amendment Request ML18235A2982018-08-23023 August 2018 NRR E-mail Capture - Request for Additional Information Prairie Island TSTF-425 License Amendment Request 2024-07-01
[Table view] Category:Request for Additional Information (RAI)
MONTHYEARML24197A2012024-07-15015 July 2024 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2024004 ML24149A3712024-05-29029 May 2024 (Ping) - Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection ML24141A0452024-05-20020 May 2024 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML24116A2532024-04-25025 April 2024 Final Request for Additional Information for LAR to Revise SR 3.8.1.2 Note 3 (EPID: L- 2023-LLA-0135) ML24045A0862024-02-12012 February 2024 Final RAI for Alternative RR-09 ML23335A1152023-12-0101 December 2023 NRR E-mail Capture - Prairie Island Units 1 and 2 - Request for Additional Information LAR to Revise TS 3.7.8 Required Actions ML23248A3462023-09-0505 September 2023 NRR E-mail Capture - Request for Additional Information for Monticello Nuclear Generating Plant and Prairie Island Nuclear Generating Plant - Decommissioning Funding Status Reports ML23214A2032023-08-0202 August 2023 Request for Information for an NRC Quadrennial Comprehensive Engineering Team Inspection: Inspection Report 05000282/2024010; 05000306/2024010 ML23199A0922023-07-18018 July 2023 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000306/2023004 ML23096A3082023-04-0707 April 2023 Notification of Inspection an NRC Biennial Licensed Operator Requalification Program Inspection and Request for Information ML23055B0562023-02-27027 February 2023 Request for Information for NRC Commercial Grade Dedication Inspection Inspection Report 05000282/2023010 and 05000306/2023010 ML23053A1432023-02-22022 February 2023 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Prairie Island Nuclear Generating Plant ML22166A4112022-06-15015 June 2022 NRR E-mail Capture - Request for Additional Information Prairie Island Nuclear Generating Plant, Unit 2, Alternative RR-08, PIV Leakage ML22160A6022022-06-0909 June 2022 NRR E-mail Capture - Draft Request for Additional Information Prairie Island Nuclear Generating Plant, Units 1 and 2, 24-Month Operating Cycle Amendment IR 05000282/20224022022-05-25025 May 2022 Information Request for the Cyber-Security Baseline Inspection, Notification to Perform Inspection 05000282/2022402 05000306/2022402 ML22131A2652022-05-11011 May 2022 NRR E-mail Capture - Request for Additional Information Xcel Energy Amendment Request to Create a Common Eplan and EOF for Monticello and Prairie Island ML22130A5792022-05-11011 May 2022 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML21321A0452021-11-10010 November 2021 Request for Additional Information: Prairie Island 24-Month Cycle Amendment Request ML21305A0102021-10-29029 October 2021 NRR E-mail Capture - Request for Additional Information Prairie Island Cooling Water Amendment ML21252A0122021-08-30030 August 2021 NRR E-mail Capture - Request for Additional Information Amendment Request to Adopt TSTF-471 and 517-T for Prairie Island ML21147A5232021-06-0303 June 2021 Prarie Island Nuclear Generating Plant, Units 1 and 2 - Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML21131A0752021-05-10010 May 2021 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2021004; 05000306/2021004 ML21099A0972021-04-0909 April 2021 Information Request to Support Upcoming Temporary Instruction 2515/194 Inspection; Inspection Report 05000282/2021012 and 05000306/2021012 ML21062A0532021-03-0202 March 2021 Information Request to Support Upcomng Problem Identification and Resolution (Pi&R) Inspection at the Prairie Island Nuclear Generating Plant ML21033A6112021-02-0101 February 2021 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team); Inspection Report 05000282/2021010 and 05000306/2021010 ML20343A1292020-12-0808 December 2020 NRR E-mail Capture - Request for Additional Information ML20192A1442020-07-0707 July 2020 NRR E-mail Capture - Request for Additional Information Prairie Island License Amendment Request to Adopt TSTF-505 ML20189A1782020-07-0606 July 2020 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2020004; 05000306/2020004 ML20133K0692020-05-14014 May 2020 Information Request to Support the NRC Annual Baseline Emergency Action Level and Emergency Plan Changes Inspection ML20077K6242020-04-13013 April 2020 License Amendment Request - Request for Additional Information ML20052F4102020-02-21021 February 2020 Notification of Nrc Design Bases Assurance Inspection (Programs) (05000282/202010; 05000306/202010) and Initial Request for Information ML20035F1552020-02-0404 February 2020 NRR E-mail Capture - Request for Additional Information Monticello and Prairie Island Alternative Requests to Adopt Code Cases N-786-3 and N-789-3 (Epids: L-2019-LLR-0078 and L-2019-LLR-0079) ML19233A0032019-08-14014 August 2019 NRR E-mail Capture - Request for Additional Information Prairie Island Relief Requests 1-RR-10 and 2-RR-10 ML19057A1652019-02-26026 February 2019 NRR E-mail Capture - Request for Additional Information Prairie Island 50.69 Amendment Request ML18313A0832018-11-0707 November 2018 NRR E-mail Capture - Request for Additional Information Prairie Island NFPA-805 License Condition Modification Amendment Request ML18264A1912018-09-19019 September 2018 NRC Information Request (9/19/2018); Part B Items (Onsite) IP 71111.08 - E-Mailed 09/19/18 (DRS-M.Holmberg) ML18235A2982018-08-23023 August 2018 NRR E-mail Capture - Request for Additional Information Prairie Island TSTF-425 License Amendment Request ML18169A4202018-06-25025 June 2018 Supplemental Information Needed for Acceptance of Requested Licensing Action Amendment to Modify Renewed Facility Operating License Paragraph 2.C(4)(c) ML18025C0152018-01-24024 January 2018 Request for Information for an NRC Triennial Baseline Design Bases Assurance Inspection (Team): Inspection Report 05000282/2018011; 05000306/2018011 (DRS-A.Dunlop) ML17277B3332017-10-0404 October 2017 NRR E-mail Capture - Request for Additional Information Prairie Island Special Heavy Lifting Devices LAR ML17249A9232017-09-0606 September 2017 Notification of NRC Baseline Inspection and Request for Information; Inspection Report 05000282/2017004; 05000306/2017004 (Exf) ML17235A9982017-08-23023 August 2017 NRR E-mail Capture - Request for Additional Information Prairie Island EAL Scheme Change ML17221A3892017-08-0909 August 2017 NRR E-mail Capture - Request for Additional Information for Prairie Island Nuclear Generating Plant License Amendment Request Dated February 23, 2017 Emergency Response Organization ML17219A0762017-08-0707 August 2017 NRR E-mail Capture - Request for Additional Information for Prairie Island Nuclear Generating Plant License Amendment Request Dated February 23, 2017 Emergency Response Organization ML17038A5132017-02-0707 February 2017 NRR E-mail Capture - Prairie Island NFPA 805 LAR, PRA RAI 21.01 ML17018A4272017-01-18018 January 2017 NRR E-mail Capture - Request for Additional Information: Prairie Island License Amendment Request to Revise Technical Specification 3.8.7 to Remove Non-Conservative Required Action ML16326A3532016-11-18018 November 2016 NRR E-mail Capture - Draft Request for Information Related to Prairie Island NFPA-805 License Amendment ML16265A1652016-09-20020 September 2016 Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000282/2016004; 05000306/2016004 (Gfo) ML16189A2052016-07-0707 July 2016 Notification of NRC Inspection and Request for Information ML16113A1612016-04-21021 April 2016 Information Request to Support Upcoming Problem Identification and Resolution (Pi&R) Inspection at Prairie Island Nuclear Generating Plant, Units 1 and 2 2024-07-15
[Table view] |
Text
NRR-PMDAPEm Resource From: Kuntz, Robert Sent: Wednesday, August 09, 2017 3:43 PM To: 'Fields, John S.'
Cc: 'Gohdes, Peter D.'
Subject:
Request for Additional Information for Prairie Island Nuclear Generating Plant License Amendment Request dated February 23, 2017 RE: Emergency Response Organization Mr. Fields, On July 17, 2017 I forwarded a draft request for additional information (RAI). On Thursday August 3, 2017 a call to clarify the draft RAI was conducted. Following the clarification call, the final RAI was forward in an e-mail dated August 7, 2017 (and copied below). In addition to the items in the final RAI, the draft RAI contained the following request:
PINGP RAI-9 LAR Enclosure 1, Attachment 1, Table 1, should list all the on-shift and augmented ERO functions and positions that are considered minimum staff consistent with the staffing figures provided in the Emergency Plan. However, Table 1 is not consistent with the information provided for the minimum staff positions listed on the staffing figures for the OSC, TSC, and EOF.
- a. Revise Table 1 and/or facility staffing figures to depict all minimum staffing positions, both on-shift and augmented for the OSC, TSC, and EOF.
- b. Describe whether PINGP has conducted, or plans to conduct drills, tabletops, etc. to validate whether the minimum staffing positions identified in Table 1 can adequately assume and perform the facilitys Emergency Plan functions in relief of the on-shift staff prior to full augmentation as described in the emergency plan or implementing procedures.
During the clarification call and subsequent review by the Nuclear Regulatory Commission staff, it was determined that the requested information was provided in the license amendment request and is not required to be provided. This e-mail is to clarify that the requested information in PINGP RAI-9 from the draft RAI is not required.
Robert Kuntz Senior Project Manager NRC/NRR/DORL/LPL-3 (301) 415-3733 From: Kuntz, Robert Sent: Monday, August 07, 2017 6:54 AM To: Fields, John S.
Subject:
Request for Additional Information for Prairie Island Nuclear Generating Plant License Amendment Request dated February 23, 2017 RE: Emergency Response Organization Mr. Fields:
1
By application dated February 23, 2017 (Agencywide Documents Access and Management System (ADAMS)
Accession Number ML17055C359), Northern States Power Company, a Minnesota corporation (NSPM) submitted a license amendment request (LAR) pursuant to Title 10 of the Code of Federal Regulations (10 CFR) 50.90. The amendment submits changes to the Prairie Island Nuclear Generating Plant (PINGP)
Emergency Plan for review and prior approval in accordance with 10 CFR 50.54(q). The proposed changes would revise the PINGP Emergency Plan to increase the staff augmentation times for certain emergency response organization (ERO) positions from 30 and 60 minutes to 60 and 90 minutes, respectively.
The Nuclear Regulatory Commission (NRC) staff has determined that additional information is required to complete its review. The following is the NRC staffs request for additional information (RAI). The NRC staff expects a response to this RAI within 30 days of this message.
Robert Kuntz Senior Project Manager (Monticello and Prairie Island)
NRC/NRR/DORL/LPL3 (301)415-3733 REQUEST FOR ADDITIONAL INFORMATION LICENSE AMENDMENT REQUEST EMERGENCY PLAN CHANGE PRAIRIE ISLAND NUCLEAR GENERATING PLANT UNIT 1 AND UNIT 2 DOCKET NOS. 50-282 AND 50-306 (CAC NOS. MF9345 AND MF9346)
PINGP RAI-1 LAR Enclosure 1, Section 3.1.2.2, Current on-shift dose assessment, states, in part (on page 12 of 43):
RASCAL software was updated in 2014 to include the Unified RASCAL Interface (URI). The URI application is available on ERF [emergency response facility] dose assessment computers.
Clarify which ERFs have dose assessment computers, consistent with ERO responsibilities for performing dose assessment described in the PINGP Emergency Plan.
PINGP RAI-2 LAR Enclosure 1, Section 3.2.2, Emergency Direction and Control, states (on page 18 of 43):
This change is acceptable in that it identifies minimum staffing positions in the TSC and OSC which enable transfer of the command and control functions (Classification, Notification, Protective Actions and Emergency Exposure Authorization) in advance of the 60-minute activation requirement. Additionally, identification of minimum staffing positions in the EOF allows for the transfer of the Notification and Protective Action functions to the EOF in advance of the 90-minute activation requirement.
LAR Enclosure 1, Attachment 1, Section 5.3.1, Direction and Coordination, states, in part (on page 21 of 162):
Upon activation of the EOF, responsibility for offsite functions of notification and protective action recommendations transfer from the TSC to the EOF Emergency Manager (EM).
[Emphasis added]
However, the table provided in Section 5.3.1 only illustrates responsibility for classification being transferred from the Control Room (On-Shift/Emergency Director) to the TSC Emergency Director.
2
In addition, LAR Enclosure 1, Attachment 1, Section 5.4.1, EOF Direction and Control, states, in part (on page 41 of 162):
The Emergency Manager relieves the Emergency Director of the following responsibilities:
B. Authorization of emergency classification changes. The Emergency Director retains the primary responsibility for re-classifications and makes recommendations to the Emergency Manager who has the responsibility to review and authorize the new classification.
[Emphasis added]
Clarify inconsistencies in regards to which ERO position has the responsibility for performing emergency classifications for the duration of an event, based on the activation of the TSC and EOF.
PINGP RAI-3 LAR Enclosure 1, Section 3.2.5, Plant Stem Engineering, Repair and Corrective Actions Function (Technical Support Major Task c), states, in part (on page 26 of 43):
A review of procedural actions for this position demonstrated that failed fuel determinations as well as establishing recovery/reentry priorities would not be required during the first 60 minutes of the event. Initial reactor core stabilization activities are performed by the Operations crew under the direction of the STA [Shift Technical Advisor].
Provide further justification for the extension in augmentation timing for the Core Thermal Engineer position.
Specifically, clarify whether the STA has the necessary expertise with core/thermal hydraulics, and possesses the ability to offer adequate functional oversight to assess core conditions, in addition to providing direction to the Operations personnel who are performing initial reactor core stabilization activities. This justification should include a description of any procedure and information technology advances since the implementation of NUREG-0654, such as improvements that allow using a symptom-based emergency operating procedure network, and computerized or automated systems for the acquisition and display of parameters used to evaluate core conditions.
PINGP RAI-4 LAR Enclosure 1, Section 3.2.5 (Repair and Corrective Actions Major Task c, 2nd paragraph) states, in part (on page 27 of 43):
Historically, the repair functions associated with an event have been completed by Auxiliary Operations (AOs) personnel on-shift who are qualified to respond to plant events and perform actions to stabilize the plant.
Please describe the training and qualifications provided to the AOs that would allow them to perform repair and corrective actions and justify the extension in augmentation times for the maintenance technicians. This justification should include a review that there will not be any conflict between the added collateral duties and other assigned emergency response functions.
PINGP RAI-5 LAR Enclosure 1, Section 3.2.5 (Repair and Corrective Actions Major Task c, 4th paragraph) states, in part (on page 27 of 43):
The proposed change to the E-Plan would eliminate the 60-minute RWO [RadWaste Operator]
responder. A review of PINGP procedures indicated operation of, or support for the maintenance of, Radwaste equipment was not necessary for implementation of the PINGP 3
AOPs [Abnormal Operating Procedures], EOPs [Emergency Operating Procedures] and SAMGs [Severe Accident Management Guidelines].
Clarify whether the review of PINGP procedures included a review of procedures used to implement and perform required emergency plan functions/duties.
PINGP RAI-6 LAR Enclosure 1, Section 3.2.6.c, Protective Actions (In-Plant) Function, states, in part (on page 28 of 43):
The proposed E-Plan would extend the response time for the Protective Actions 30-minute responder to 60-minutes and the two (2) 60 minute responders to 90 minutes.
However, Table 1, Guidance for Augmentation of Plant Emergency Organization, in Enclosure 1, Attachment 2, provides that the two 60 minute responders are reduced to one 90 minute responder.
Clarify if the number of responders is being reduced, and if so, provide justification for the reduction.
PINGP RAI-7 LAR Enclosure 1, Section 3.2.6, Access Control/Dosimetry states, in part (on page 28 of 43):
Radiation work permits (RWPs) establish the necessary preset warnings/alarms associated with the use of electronic dosimetry. Dedicated emergency electronic dosimetry is provided for use during a declared emergency, which automatically provides the electronic dosimetry with emergency dose and dose rate alarms.
Provide further description about the tools and processes used for the task of access control, including a description of portal/contamination monitors, self-alarming dosimeters, and automated access control system for the radiologically controlled area (RCA) that maintain active radiation work permits, which are readily available if an emergency is declared (e.g., the system verifies qualifications, dose margins, and access requirements).
PINGP RAI-8 LAR Enclosure 1, Section 3.2.6, Protective Actions (In-Plant) Function Summary states, in part (on page 29 of 43):
The proposed change maintains the existing on-shift RP [Radiation Protection] Specialist for the HP
[Health Physics] Coverage task. The proposed change extends the 30-minute and 60-minute response time for the personnel to 60 minutes and 90 minutes respectively. NSPM has implemented improvements in technology in the areas of dosimetry and access control at the PINGP which reduced the need for RP Specialist actions in each of these areas during the early stages of event response.
Provide further justification for the extensions in time for the RP Coverage task, including a description of the availability of installed area, process, airborne and effluent radiation monitors, automated systems and information technology solutions, and enhanced work processes that would be available under accident conditions.
4
Hearing Identifier: NRR_PMDA Email Number: 3650 Mail Envelope Properties (50921b78e6ed4711af9020dff805d6e6)
Subject:
Request for Additional Information for Prairie Island Nuclear Generating Plant License Amendment Request dated February 23, 2017 RE: Emergency Response Organization Sent Date: 8/9/2017 3:42:41 PM Received Date: 8/9/2017 3:42:42 PM From: Kuntz, Robert Created By: Robert.Kuntz@nrc.gov Recipients:
"'Gohdes, Peter D.'" <Peter.Gohdes@xenuclear.com>
Tracking Status: None
"'Fields, John S.'" <John.Fields@xenuclear.com>
Tracking Status: None Post Office: HQPWMSMRS05.nrc.gov Files Size Date & Time MESSAGE 10761 8/9/2017 3:42:42 PM Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date:
Recipients Received: