ML15121A651: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML15121A651
| number = ML15121A651
| issue date = 04/29/2015
| issue date = 04/29/2015
| title = Ltr 04/29/15 Prairie Island Nuclear Generating Plant, Units 1 and 2, Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) Inspection Report 05000282/2015007; 05000306/2015007 (Jen)
| title = Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) Inspection Report 05000282/2015007; 05000306/2015007 (Jen)
| author name = Lipa C
| author name = Lipa C
| author affiliation = NRC/RGN-III/DRS/EB2
| author affiliation = NRC/RGN-III/DRS/EB2
Line 18: Line 18:
=Text=
=Text=
{{#Wiki_filter:UNITED STATES
{{#Wiki_filter:UNITED STATES
NUCLEAR REGULATORY COMMISSION
                              NUCLEAR REGULATORY COMMISSION
REGION III 2443 WARRENVILLE RD. SUIT
                                                REGION III
E 210 LISLE, IL 60532
                                      2443 WARRENVILLE RD. SUITE 210
-4352   April 29, 2015 Mr. Kevin Davison
                                            LISLE, IL 60532-4352
Site Vice President
                                              April 29, 2015
Prairie Island Nuclear Generating Plant
Mr. Kevin Davison
Northern States Power Company, Minnesota
Site Vice President
1717 Wakonade Drive East
Prairie Island Nuclear Generating Plant
Welch, MN 55089
Northern States Power Company, Minnesota
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2
1717 Wakonade Drive East
, REQUEST FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT DESIGN BASES INSPECTION (CDBI) INSPECTION
Welch, MN 55089
REPORT 0500 0 282/20 1 5007; 05000 306/20 1 5007 Dear M r. Davison: On August 3, 2015, the U. S. Nuclear Regulatory Commission (NRC) will begin a  
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, REQUEST
triennial baseline Component Design Bases Inspection (CDBI) at
              FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT
Prairie Island Nuclear Generating Plant, Units 1 and 2.
              DESIGN BASES INSPECTION (CDBI) INSPECTION REPORT 05000282/2015007;
  A team of six inspectors will perform this
              05000306/2015007
3-week inspection. This inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.21. The CDBI focuses on the design, maintenance, and operation of risk
Dear Mr. Davison:
-significant components
On August 3, 2015, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial
associated with one or more accident scenari o or systems. The components to be reviewed during this baseline inspection will be identified during the in-office preparation week that occurs prior to the first on
baseline Component Design Bases Inspection (CDBI) at Prairie Island Nuclear Generating
-site inspection
Plant, Units 1 and 2. A team of six inspectors will perform this 3-week inspection. This
week. In addition, operating experience issues, associated with the component samples, will also be selected for review. The inspection team may request scenarios to be performed on the simulator. This request would require support from you
inspection will be performed in accordance with NRC Baseline Inspection Procedure
r simulator staff to validate scenarios, simulator time, and a crew to perform the actions which would most likely occur during the second on
(IP) 71111.21.
-site week. The team will work closely with your staff early on during the inspection process to ensure this activity can be accomplished with minimal impact.
The CDBI focuses on the design, maintenance, and operation of risk-significant components
The inspection will include  
associated with one or more accident scenario or systems. The components to be reviewed
3 weeks on-site. The inspection team will consist of six NRC inspectors, of which five will focus on engineering/maintenance
during this baseline inspection will be identified during the inoffice preparation week that occurs
, and one on operations. The current inspection schedule is as follows:
prior to the first on-site inspection week. In addition, operating experience issues, associated
   On-site weeks:
with the component samples, will also be selected for review. The inspection team may request
August 3-7, 2015;   August 1 7-21, 2015; and   August 31-September 4, 2015.
scenarios to be performed on the simulator. This request would require support from your
The team will be preparing for the inspection, mainly during the week of
simulator staff to validate scenarios, simulator time, and a crew to perform the actions which
July 27-31, 2015, as discussed in the attached enclosure.
would most likely occur during the second on-site week. The team will work closely with your
 
staff early on during the inspection process to ensure this activity can be accomplished with
K. Davison
minimal impact.
-2- Experience with previous baseline design inspections of similar depth and length has shown that th is type of inspection is
The inspection will include 3 weeks on-site. The inspection team will consist of six NRC
extremely resource intensive, both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both parties, we have enclosed a request for information needed for the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the on
inspectors, of which five will focus on engineering/maintenance, and one on operations.
-site portions of
The current inspection schedule is as follows:
the inspection. Insofar as possible, this information should be provided electronically to the lead inspector. The information request has been divided into three groups:
*   On-site weeks:       August 3-7, 2015;
   The first group lists information necessary for our initial inspection scoping activities. This information should be provided to the lead inspector no later than
                          August 17-21, 2015; and
June 23, 2015.  
                          August 31-September 4, 2015.
By July 10, 2015, the lead inspector will communicate the initial selected set of approximately  
The team will be preparing for the inspection, mainly during the week of July 27-31, 2015, as
15 components.  
discussed in the attached enclosure.
  The second group of documents requested is
 
those items needed to support our in
K. Davison                                     -2-
-office preparation activities. This set of documents, including the calculations associated with the initial selected components, should be provided to the lead inspector
Experience with previous baseline design inspections of similar depth and length has shown
at the Regional Office no later than
that this type of inspection is extremely resource intensive, both for the NRC inspectors and the
July 22, 2015.
licensee staff. In order to minimize the inspection impact on the site and to ensure a productive
  During the in
inspection for both parties, we have enclosed a request for information needed for the
-office preparation activities, the team may identify additional information needed to support the inspection.
inspection.
  The last group includes the additional information above as well as plant specific reference material. This information should be available to the team onsite on August 3, 2015.
It is important that all of these documents are up to date and complete in order to minimize the
  It is also requested that corrective action documents and/or questions developed during the  
number of additional documents requested during the preparation and/or the on-site portions of
inspection be provided to the lead inspector as the documents are generated.
the inspection. Insofar as possible, this information should be provided electronically to the lead
The lead inspector for this inspection is
inspector. The information request has been divided into three groups:
James Neurauter.  
*   The first group lists information necessary for our initial inspection scoping activities.
We understand that our licensing contact for this inspection is
    This information should be provided to the lead inspector no later than June 23, 2015. By
Benjamin Hammargren of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at (630) 829
    July 10, 2015, the lead inspector will communicate the initial selected set of approximately
-9828 or via e-mail a t James.Neurauter@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.).
    15 components.
  Existing information collection
*    The second group of documents requested is those items needed to support our in-office
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget  
    preparation activities. This set of documents, including the calculations associated with the
Control Number.  
    initial selected components, should be provided to the lead inspector at the Regional Office
K. Davison
    no later than July 22, 2015. During the in-office preparation activities, the team may identify
    -3- In accordance with Title 10 of the Code of Federal Regulations
    additional information needed to support the inspection.
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy  
*    The last group includes the additional information above as well as plant specific reference
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS)  
    material. This information should be available to the team onsite on August 3, 2015. It is
component of the NRC's Agencywide
    also requested that corrective action documents and/or questions developed during the
Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
    inspection be provided to the lead inspector as the documents are generated.
-rm/adams.html
The lead inspector for this inspection is James Neurauter. We understand that our licensing
(the Public Electronic Reading Room).
contact for this inspection is Benjamin Hammargren of your organization. If there are any
Sincerely, /RA Andrew Dunlop Acting for/
questions about the inspection or the material requested in the enclosure, please contact the
 
lead inspector at (630) 829-9828 or via e-mail at James.Neurauter@nrc.gov.
Christine A. Lipa , Chie f Engineering Branch 2
This letter does not contain new or amended information collection requirements subject to
Division of Reactor Safety  
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
Docket No s. 50-282; 50-306 License No
collection requirements were approved by the Office of Management and Budget, Control
s. D PR-42; D P R-60 Enclosure:
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
  Information Request for Component Design Bases Inspection (CDBI)
respond to, a request for information or an information collection requirement unless the
cc w/encl: Distribution via LISTSERV  
requesting document displays a currently valid Office of Management and Budget Control
Number.
 
K. Davison                                     -3-
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
(the Public Electronic Reading Room).
                                              Sincerely,
                                              /RA Andrew Dunlop Acting for/
                                              Christine A. Lipa, Chief
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket Nos. 50-282; 50-306
License Nos. DPR-42; DPR-60
Enclosure:
  Information Request for Component Design Bases Inspection (CDBI)
cc w/encl: Distribution via LISTSERV
 
    INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
Inspection Report:              05000282/2015007; 05000306/2015007
Inspection Dates:                August 3-7, 2015;
                                August 17-21, 2015; and
                                August 31-September 4, 2015.
Inspection Procedure:            IP 71111.21 Component Design Bases Inspection
Lead Inspector:                  James Neurauter, Senior Reactor Engineer, DRS
                                (630) 829-9828
                                James.Neurauter@nrc.gov
I.    Information Requested Prior to the On-site Information Gathering/Inspection Week
      The following information is requested by June 23, 2015, or sooner, to facilitate
      inspection preparation. If you have any questions regarding this information, please call
      the team leader as soon as possible. Please provide the information electronically in
      pdf files, Excel, or other searchable formats, preferably on some portable electronic
      media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media should
      contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.
      Information in lists should contain enough information to be easily understood by
      someone who has knowledge of light water reactor technology.
      1.      Risk-ranking of top 250 components from your site specific probabilistic safety
                analysis (PSA) sorted by Risk-Achievement Worth (RAW). Include values for
                Birnbaum Importance, Risk-Reduction Worth (RRW), and Fussell-Veseley (FV)
                (as applicable).
      2.      Risk-ranking of top 100 containment-related components (i.e. Large Early
                Release Frequency [LERF]) from your site specific PSA sorted by RAW.
      3.      Provide a list of the top 200 cut-sets from your PSA.
      4.      Provide a list of the top 100 cut-sets for each initiator modeled in the PSA
                that contributes more than 5 percent to the baseline plant core damage
                frequency (CDF).
      5.      Copies of PSA system notebooks and latest PSA summary document.
      6.      List of time critical operator actions. Identify those actions that do not have job
                performance measures (JPMs).
      7.      Provide copies of the emergency operating procedures (EOPs).
      8.      If you have an External Events or Fire PSA Model, provide the information
                requested in Items 1 and 2 for external events and fire. Provide narrative
                description of each coded event (including fire, flood zone description).
                                                                                            Enclosure
 
    INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
      9.      Electronic copy of the site Individual Plant Examination of External
              Events (IPEEE), if available.
      10.    Any pre-existing evaluation or list of components and associated calculations
              with low-design margins, (i.e., pumps closest to the design limit for flow or
              pressure, diesel generator close to design required output, heat exchangers
              close to rated design heat removal etc.).
      11.    List of available design (setup) margins in both the open and closed direction
              (identify safety-related direction) for valves in the Motor-Operated Valve (MOV)
              and Air-Operated Valve (AOV) Programs. Identify the basis for how the margin
              was determined.
      12.    List of high-risk Maintenance Rule systems/components based on engineering
              or expert panel judgment (i.e., those systems/components not identified in the
              PSA).
      13.    Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)
              category for the last 3 years.
      14.    Site top ten issues list (if applicable).
      15.    A list of operating experience evaluations for the last 3 years.
      16.    Information of any common cause failure of components experienced in the last
              5 years at your facility.
      17.    List of Root Cause Evaluations associated with component failures or design
              issues initiated/completed in the last 5 years.
      18.    List of open operability evaluations.
      19.    List of components/systems considered operable but degraded/nonconforming.
      20.    Current management and engineering organizational chart.
      21.    Electronic copies of Updated Final Safety Analysis Report, Technical
              Specifications, Technical Specifications Bases, and Technical Requirements
              Manual.
      22.    Major one line electrical drawings (ac and dc) and key diagrams (paper copies).
      23.    Electronic copy of Piping and Instrumentation Drawings (P&IDs) (if available).
II.    Information Requested (for the approximate 15 selected components) to be
      Available by July 22, 2015, (will be reviewed by the team in the Regional office
      during the week of July 27-31, 2015).
      This information should be separated for each selected component, especially if
      provided electronically (e.g., folder with component name that includes calculations,
      condition reports, maintenance history, etc.).
                                                  2
 
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
  Enclosure Inspection Report:
  1. List of condition reports (corrective action documents) associated with each of
  05000 282/20 1 5007; 05000 306/20 1 5007 Inspection Dates:
      the selected components for the last 6 years.
  August 3-7, 2015;    August 17-21, 2015; and     August 31-September 4, 2015
  2.  The maintenance history (corrective, preventive, and elective) associated with
. Inspection Procedure:
      each of the selected components for the last 10 years. Identify frequency of
IP 71111.21 "Component Design Bases Inspection"
      preventive maintenance activities.
  Lead Inspector:
  3. Copies of calculations associated with each of the selected components (if not
  James Neurauter
      previously provided), excluding data files. Please review the calculations and
, Senior Reactor Engineer, DRS
      also provide copies of important referenced material (such as drawings,
  (630) 829-9828    James.Neurauter@nrc.gov
      engineering requests, and vendor letters). Pipe stress calculations are excluded
I. Information Requested Prior to the On
      from this request
-site Information Gathering/Inspection Week
  4System Health Reports, System Descriptions, Design Basis Documents, and/or
The following information is requested by June 23, 2015 , or sooner, to facilitate inspection preparation. If you have any questions regarding this information, please call the team leader as soon as possiblePlease provide the information electronically in "pdf" files, Excel, or other searchable formats, preferably on some portable electronic media (e.g., CDROM, DVD, flash drive, etc.)The portable electronic media
      Training Lesson Plans associated with each of the selected components.
should contain descriptive names, and be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood by someone who has knowledge of light water reactor technology.
  5A list of modifications, including equivalency evaluations and setpoint changes,
1. Risk-ranking of t
      associated with each of the selected components. This list should include a
op 2 50 components from your site specific probabilistic safety
      descriptive paragraph on the purpose of the modification. Please ensure this list
analysis (PSA) sorted by Risk
      only includes design completed (not canceled) modifications.
-Achievement Worth (RAW)Include values for Birnbaum Importance, Risk
  6Copies of operability evaluations (open/closed for last 3 years) associated with
-Reduction Worth (RRW), and Fussell
      each of the selected components and plans for restoring operability, if applicable.
-Veseley (FV)
  7. Copies of selected operator work-around evaluations associated with each of the
(as applicable).
      selected components and plans for resolution, if applicable.
  2. Risk-ranking of top 100 containment-related components (i.e. Large Early Release Frequency
  8. Copies of any open temporary modifications associated with each of the selected
[LERF]) from your site specific PSA sorted by
      components, if applicable.
  RAW. 3. Provide a list of the top 200 cut
  9. Trend data on the selected electrical/mechanical components performance for
-sets from your PSA.
      last 3 years (For example, pumps performance including in-service testing, other
  4. Provide a list of the top 100 cut-sets for each initiator modeled in the P
      vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate
S A that contributes more than 5
      results, etc.).
percent to the baseline plant core damage frequency (CDF).
  10. Provide copies of the normal and abnormal operating procedures associated with
5. Copies of PSA "system notebooks" and latest PSA summary document.
      the selected components and selected scenarios.
6. List of time critical operator actions. Identify those actions that do not have job
  11. A copy of any internal/external self-assessments and associated corrective
performance measures (JPMs). 7. Provide copies of the emergency operating procedures
      action documents generated in preparation for the inspection.
(EOPs). 8. If you have an External Events or Fire PSA Model, provide the information requested in Items 1 and 2 for external events and fire.  Provide narrative description of each coded event (including fire, flood zone description)
  12. Copy of latest completed tests and surveillances for each component, for
.  
      example:
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
          *    Pumps: comprehensive test, quarterly test, flow balance, etc.
2 9. Electronic copy of the site Individual Plant Examination of External Events (IPEEE), if available.
          *    Valves: stroke time testing, diagnostic testing, leak testing, interlocks,
10. Any pre-existing evaluation or list of components and associated calculations with low-design margins, (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to
                etc.
design required output, heat exchangers close to rated design heat removal etc.). 11. List of available design (setup) margins in both the  
          *    Heat Exchangers/room coolers: thermal performance, clean/inspect, fan
open and closed direction (identify safety
                flows, etc.
-related direction) for valves
      Acceptance criteria basis calculations should also be included.
in the Motor-Operated Valve
                                          3
(MOV) and Air-Operated Valve
 
(AOV) Programs.  Identify the basis for how the margin was determined.
    INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
12. List of high
        13.   A copy of engineering/operations related audits completed in the last 2 years.
-risk Maintenance Rule systems/components based on engineering
III.   Additional Information to be Provided on August 3, 2015, On-Site (for final
or expert panel judgment
        selected components)
(i.e., those systems/components not identified in the  
        1.     During the in-office preparation activities, the team will be making final selections
P S A). 13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1) category for the last
              and may identify additional information needed to support the inspection. The
3 years. 14. Site top ten issues list (if applicable)
              lead inspector will provide a list of the additional information needed during the
. 15. A list of operating experience evaluations for the last
              week of July 27-31, 2015.
3 years. 16. Information of any common cause failure of components experienced in the last 5 years at your facility
        2.     Schedule of any testing/maintenance activities to be conducted on the selected
. 17. List of Root Cause Evaluations associated with component failures or design
              components during the three onsite inspection weeks.
issues initiated/completed in the last
IV.     Information Requested to be Provided Throughout the Inspection
5 years. 18. List of open operability evaluations.
        1.     Copies of any corrective action documents generated as a result of the teams
19. List of components/systems considered operable but degraded/nonconforming.
              questions or queries during this inspection.
20. Current management and engineering organizational chart
        2.     Copies of the list of questions submitted by the team members and the
. 21. Electronic copies of Updated Final Safety Analysis Report, Technical Specifications, Technical Specifications Bases, and Technical Requirements Manual. 22. Major o ne line electrical drawings (ac and dc) and key diagrams (paper copies).
              status/resolution of the information requested (provide daily during the inspection
23. Electronic copy of Piping and Instrumentation Drawing
              to each team member).
s (P&IDs) (if available).
        3.     One complete set of P&IDs (paper copies).
II. Information Requested (for the approximate 15 selected components) to be
        4.     Reference materials. (make available if needed during all on-site weeks):
Available by
              *  Individual Plant Examination/Probabilistic Risk Assessment (IPE/PRA)
July 22, 2015 , (will be reviewed by the team in the Regional office during the week of
                  Report;
July 27-31, 2015).   This information
              *  Procurement documents for components selected (verify retrievable);
should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc
              *  Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
.). 
              *  Vendor manuals.
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
If you have questions regarding the information requested, please contact the lead inspector.
3 1. List of condition reports (corrective action documents) associated with each of the selected components for the last
                                                  4
6 years. 2. The maintenance history
 
(corrective, preventive, and elective)
K. Davison                                                                -3-
associated with each of the selected components for the last
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
10 years. Identify frequency of preventive maintenance activities.
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
3. Copies of calculations associated with each of the selected components (if not previously provided), excluding data files.  Please review the calculations and also provide copies of important referenced material (such as drawings, engineering requests, and vendor letters). Pipe stress calculations
of this letter, its enclosure, and your response (if any) will be available electronically for public
are excluded from this request
inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)
4. System Health Reports, System Descriptions, Design Basis Documents, and/or Training Lesson Plans associated with each of the selected components.
component of the NRC's Agencywide Documents Access and Management System (ADAMS).
5. A list of modifications, including equivalency evaluations and setpoint changes, associated with each of the selected components
ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html
.  This list should include a descriptive paragraph on the purpose of the modification.  Please ensure this list only includes design completed (not canceled) modifications.
(the Public Electronic Reading Room).
6. Copies of operability evaluations (open/closed for last 3 years) associated with each of the selected components and plans for restoring operability, if applicable
                                                                          Sincerely,
. 7. Copies of selected operator work
                                                                          /RA Andrew Dunlop Acting for/
-around evaluations associated with each of the selected components and plans for resolution, if applicable.
                                                                          Christine A. Lipa, Chief
  8. Copies of any open temporary modifications associated with each of the selected components, if applicable.
                                                                          Engineering Branch 2
  9. Trend data on the selected electrical/mechanical components' performance for last 3 years (For example, pumps' performance including in
                                                                          Division of Reactor Safety
-service testing, other vibration monitoring, oil sample results, etc., for valves:
Docket Nos. 50-282; 50-306
stroke time and leak rate results, etc.
License Nos. DPR-42; DPR-60
). 10. Provide copies of the normal and abnormal operating procedures associated with the selected components
Enclosure:
and selected scenarios
  Information Request for Component Design Bases Inspection (CDBI)
. 11. A copy of any internal/external self
cc w/encl: Distribution via LISTSERV
-assessments and associated corrective action documents generated in preparation for the inspection
DISTRIBUTION w/encl:
. 12. Copy of latest completed tests and surveillances for each component
Kimyata MorganButler
, for example:  Pumps:  comprehensive test, quarterly test, flow balance, etc.
RidsNrrPMPrairieIsland Resource
  Valves:  stroke time testing, diagnostic testing, leak testing, interlocks, etc.  Heat Exchangers/room coolers
RidsNrrDorlLpl3-1 Resource
:  thermal performance, clean/inspect, fan flows, etc.
RidsNrrDirsIrib Resource
Acceptance criteria basis calculations should also be included.
Cynthia Pederson
 
Darrell Roberts
INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)
Richard Skokowski
4 13. A copy of engineering/operations related audits completed in the last 2 years.
Allan Barker
III. Additional Information to be
Carole Ariano
Provided on August 3, 2015
Linda Linn
, On-Site (for final selected components)
DRPIII
1. During the in
DRSIII
-office preparation activities, the team will be making final selections and may identify additional information needed to support the inspection.  The lead inspector will provide a list of the additional information needed during the week of July 27-31, 2015.  2. Schedule of any testing/maintenance activities to be conducted on the selected components during the three onsite inspection weeks.
Jim Clay
  IV. Information Requested to be Provided Throughout the Inspection
Carmen Olteanu
1. Copies of any corrective action documents generated as a result of the team's questions or queries during this inspection
ADAMS Accession Number ML15121A651
. 2. Copies of the list of questions submitted by the team members and the
    Publicly Available                          Non-Publicly Available                    Sensitive                Non-Sensitive
status/resolution of the information requested (provide daily during the inspection to each team member). 3. One complete set of P&IDs (paper copies)
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
. 4. Reference materials. (make available if needed during all on
  OFFICE              RIII                                RIII                            RIII                              RIII
-site weeks):
  NAME                JNeurauter:cl                        ADunlop for CLipa
  Individual Plant Examination
DATE                04/29/15                            04/29/15
/Probabilistic Risk Assessment
                                                            OFFICIAL RECORD COPY
(IPE/PRA) Report;  Procurement documents for components selected (verify retrievable);
  Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
  Vendor manuals.
If you have questions regarding the information requested, please contact the lead inspector.
    K. Davison
    -3- In accordance with Title 10 of the Code of Federal Regulations
(10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy
of this letter, its enclosure, and your response (if any) will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS)
component of the NRC's Agencywide
Documents Access and Management System (ADAMS).  ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading
-rm/adams.html
(the Public Electronic Reading Room).
Sincerely,  /RA Andrew Dunlop Acting for
Christine A. Lipa, Chie f Engineering Branch 2
Division of Reactor Safety
Docket No s. 50-282; 50-306 License No
s. DPR-42; DPR-60 Enclosure:
  Information Request for Component Design Bases Inspection (CDBI)
cc w/encl:  Distribution via LISTSERV DISTRIBUTION
w/encl: Kimyata MorganButler
RidsNrrPMPrairieIsland Resource
RidsNrrDorlLpl3-1 Resource
RidsNrrDirsIrib Resource
Cynthia Pederson
Darrell Roberts
Richard Skokowski
Allan Barker
Carole Ariano
Linda Linn
DRPIII DRSIII Jim Clay Carmen Olteanu
  ADAMS Accession Number ML15121A651
  Publicly Available
  Non-Publicly Available
  Sensitive  Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
OFFICE RIII  RIII  RIII  RIII  NAME JNeurauter:cl
ADunlop for CLipa  DATE 04/29/15 04/29/15  OFFICIAL RECORD COP
Y
}}
}}

Latest revision as of 00:22, 17 November 2019

Request for Information for an NRC Triennial Baseline Component Design Bases Inspection (CDBI) Inspection Report 05000282/2015007; 05000306/2015007 (Jen)
ML15121A651
Person / Time
Site: Prairie Island  Xcel Energy icon.png
Issue date: 04/29/2015
From: Christine Lipa
NRC/RGN-III/DRS/EB2
To: Davison K
Northern States Power Co
References
IR 2015007
Download: ML15121A651 (8)


See also: IR 05000282/2015007

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

April 29, 2015

Mr. Kevin Davison

Site Vice President

Prairie Island Nuclear Generating Plant

Northern States Power Company, Minnesota

1717 Wakonade Drive East

Welch, MN 55089

SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2, REQUEST

FOR INFORMATION FOR AN NRC TRIENNIAL BASELINE COMPONENT

DESIGN BASES INSPECTION (CDBI) INSPECTION REPORT 05000282/2015007;

05000306/2015007

Dear Mr. Davison:

On August 3, 2015, the U. S. Nuclear Regulatory Commission (NRC) will begin a triennial

baseline Component Design Bases Inspection (CDBI) at Prairie Island Nuclear Generating

Plant, Units 1 and 2. A team of six inspectors will perform this 3-week inspection. This

inspection will be performed in accordance with NRC Baseline Inspection Procedure (IP) 71111.21.

The CDBI focuses on the design, maintenance, and operation of risk-significant components

associated with one or more accident scenario or systems. The components to be reviewed

during this baseline inspection will be identified during the inoffice preparation week that occurs

prior to the first on-site inspection week. In addition, operating experience issues, associated

with the component samples, will also be selected for review. The inspection team may request

scenarios to be performed on the simulator. This request would require support from your

simulator staff to validate scenarios, simulator time, and a crew to perform the actions which

would most likely occur during the second on-site week. The team will work closely with your

staff early on during the inspection process to ensure this activity can be accomplished with

minimal impact.

The inspection will include 3 weeks on-site. The inspection team will consist of six NRC

inspectors, of which five will focus on engineering/maintenance, and one on operations.

The current inspection schedule is as follows:

  • On-site weeks: August 3-7, 2015;

August 17-21, 2015; and

August 31-September 4, 2015.

The team will be preparing for the inspection, mainly during the week of July 27-31, 2015, as

discussed in the attached enclosure.

K. Davison -2-

Experience with previous baseline design inspections of similar depth and length has shown

that this type of inspection is extremely resource intensive, both for the NRC inspectors and the

licensee staff. In order to minimize the inspection impact on the site and to ensure a productive

inspection for both parties, we have enclosed a request for information needed for the

inspection.

It is important that all of these documents are up to date and complete in order to minimize the

number of additional documents requested during the preparation and/or the on-site portions of

the inspection. Insofar as possible, this information should be provided electronically to the lead

inspector. The information request has been divided into three groups:

  • The first group lists information necessary for our initial inspection scoping activities.

This information should be provided to the lead inspector no later than June 23, 2015. By

July 10, 2015, the lead inspector will communicate the initial selected set of approximately

15 components.

  • The second group of documents requested is those items needed to support our in-office

preparation activities. This set of documents, including the calculations associated with the

initial selected components, should be provided to the lead inspector at the Regional Office

no later than July 22, 2015. During the in-office preparation activities, the team may identify

additional information needed to support the inspection.

  • The last group includes the additional information above as well as plant specific reference

material. This information should be available to the team onsite on August 3, 2015. It is

also requested that corrective action documents and/or questions developed during the

inspection be provided to the lead inspector as the documents are generated.

The lead inspector for this inspection is James Neurauter. We understand that our licensing

contact for this inspection is Benjamin Hammargren of your organization. If there are any

questions about the inspection or the material requested in the enclosure, please contact the

lead inspector at (630) 829-9828 or via e-mail at James.Neurauter@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

K. Davison -3-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA Andrew Dunlop Acting for/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-282; 50-306

License Nos. DPR-42; DPR-60

Enclosure:

Information Request for Component Design Bases Inspection (CDBI)

cc w/encl: Distribution via LISTSERV

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)

Inspection Report: 05000282/2015007; 05000306/2015007

Inspection Dates: August 3-7, 2015;

August 17-21, 2015; and

August 31-September 4, 2015.

Inspection Procedure: IP 71111.21 Component Design Bases Inspection

Lead Inspector: James Neurauter, Senior Reactor Engineer, DRS

(630) 829-9828

James.Neurauter@nrc.gov

I. Information Requested Prior to the On-site Information Gathering/Inspection Week

The following information is requested by June 23, 2015, or sooner, to facilitate

inspection preparation. If you have any questions regarding this information, please call

the team leader as soon as possible. Please provide the information electronically in

pdf files, Excel, or other searchable formats, preferably on some portable electronic

media (e.g., CDROM, DVD, flash drive, etc.). The portable electronic media should

contain descriptive names, and be indexed and hyperlinked to facilitate ease of use.

Information in lists should contain enough information to be easily understood by

someone who has knowledge of light water reactor technology.

1. Risk-ranking of top 250 components from your site specific probabilistic safety

analysis (PSA) sorted by Risk-Achievement Worth (RAW). Include values for

Birnbaum Importance, Risk-Reduction Worth (RRW), and Fussell-Veseley (FV)

(as applicable).

2. Risk-ranking of top 100 containment-related components (i.e. Large Early

Release Frequency [LERF]) from your site specific PSA sorted by RAW.

3. Provide a list of the top 200 cut-sets from your PSA.

4. Provide a list of the top 100 cut-sets for each initiator modeled in the PSA

that contributes more than 5 percent to the baseline plant core damage

frequency (CDF).

5. Copies of PSA system notebooks and latest PSA summary document.

6. List of time critical operator actions. Identify those actions that do not have job

performance measures (JPMs).

7. Provide copies of the emergency operating procedures (EOPs).

8. If you have an External Events or Fire PSA Model, provide the information

requested in Items 1 and 2 for external events and fire. Provide narrative

description of each coded event (including fire, flood zone description).

Enclosure

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)

9. Electronic copy of the site Individual Plant Examination of External

Events (IPEEE), if available.

10. Any pre-existing evaluation or list of components and associated calculations

with low-design margins, (i.e., pumps closest to the design limit for flow or

pressure, diesel generator close to design required output, heat exchangers

close to rated design heat removal etc.).

11. List of available design (setup) margins in both the open and closed direction

(identify safety-related direction) for valves in the Motor-Operated Valve (MOV)

and Air-Operated Valve (AOV) Programs. Identify the basis for how the margin

was determined.

12. List of high-risk Maintenance Rule systems/components based on engineering

or expert panel judgment (i.e., those systems/components not identified in the

PSA).

13. Structures, systems, and components (SSCs) in the Maintenance Rule (a)(1)

category for the last 3 years.

14. Site top ten issues list (if applicable).

15. A list of operating experience evaluations for the last 3 years.

16. Information of any common cause failure of components experienced in the last

5 years at your facility.

17. List of Root Cause Evaluations associated with component failures or design

issues initiated/completed in the last 5 years.

18. List of open operability evaluations.

19. List of components/systems considered operable but degraded/nonconforming.

20. Current management and engineering organizational chart.

21. Electronic copies of Updated Final Safety Analysis Report, Technical

Specifications, Technical Specifications Bases, and Technical Requirements

Manual.

22. Major one line electrical drawings (ac and dc) and key diagrams (paper copies).

23. Electronic copy of Piping and Instrumentation Drawings (P&IDs) (if available).

II. Information Requested (for the approximate 15 selected components) to be

Available by July 22, 2015, (will be reviewed by the team in the Regional office

during the week of July 27-31, 2015).

This information should be separated for each selected component, especially if

provided electronically (e.g., folder with component name that includes calculations,

condition reports, maintenance history, etc.).

2

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)

1. List of condition reports (corrective action documents) associated with each of

the selected components for the last 6 years.

2. The maintenance history (corrective, preventive, and elective) associated with

each of the selected components for the last 10 years. Identify frequency of

preventive maintenance activities.

3. Copies of calculations associated with each of the selected components (if not

previously provided), excluding data files. Please review the calculations and

also provide copies of important referenced material (such as drawings,

engineering requests, and vendor letters). Pipe stress calculations are excluded

from this request

4. System Health Reports, System Descriptions, Design Basis Documents, and/or

Training Lesson Plans associated with each of the selected components.

5. A list of modifications, including equivalency evaluations and setpoint changes,

associated with each of the selected components. This list should include a

descriptive paragraph on the purpose of the modification. Please ensure this list

only includes design completed (not canceled) modifications.

6. Copies of operability evaluations (open/closed for last 3 years) associated with

each of the selected components and plans for restoring operability, if applicable.

7. Copies of selected operator work-around evaluations associated with each of the

selected components and plans for resolution, if applicable.

8. Copies of any open temporary modifications associated with each of the selected

components, if applicable.

9. Trend data on the selected electrical/mechanical components performance for

last 3 years (For example, pumps performance including in-service testing, other

vibration monitoring, oil sample results, etc., for valves: stroke time and leak rate

results, etc.).

10. Provide copies of the normal and abnormal operating procedures associated with

the selected components and selected scenarios.

11. A copy of any internal/external self-assessments and associated corrective

action documents generated in preparation for the inspection.

12. Copy of latest completed tests and surveillances for each component, for

example:

  • Pumps: comprehensive test, quarterly test, flow balance, etc.
  • Valves: stroke time testing, diagnostic testing, leak testing, interlocks,

etc.

  • Heat Exchangers/room coolers: thermal performance, clean/inspect, fan

flows, etc.

Acceptance criteria basis calculations should also be included.

3

INFORMATION REQUEST FOR COMPONENT DESIGN BASES INSPECTION (CDBI)

13. A copy of engineering/operations related audits completed in the last 2 years.

III. Additional Information to be Provided on August 3, 2015, On-Site (for final

selected components)

1. During the in-office preparation activities, the team will be making final selections

and may identify additional information needed to support the inspection. The

lead inspector will provide a list of the additional information needed during the

week of July 27-31, 2015.

2. Schedule of any testing/maintenance activities to be conducted on the selected

components during the three onsite inspection weeks.

IV. Information Requested to be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the teams

questions or queries during this inspection.

2. Copies of the list of questions submitted by the team members and the

status/resolution of the information requested (provide daily during the inspection

to each team member).

3. One complete set of P&IDs (paper copies).

4. Reference materials. (make available if needed during all on-site weeks):

  • Individual Plant Examination/Probabilistic Risk Assessment (IPE/PRA)

Report;

  • Procurement documents for components selected (verify retrievable);
  • Plant procedures (normal, abnormal, emergency, surveillance, etc.); and
  • Vendor manuals.

If you have questions regarding the information requested, please contact the lead inspector.

4

K. Davison -3-

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter, its enclosure, and your response (if any) will be available electronically for public

inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS)

component of the NRC's Agencywide Documents Access and Management System (ADAMS).

ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html

(the Public Electronic Reading Room).

Sincerely,

/RA Andrew Dunlop Acting for/

Christine A. Lipa, Chief

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-282; 50-306

License Nos. DPR-42; DPR-60

Enclosure:

Information Request for Component Design Bases Inspection (CDBI)

cc w/encl: Distribution via LISTSERV

DISTRIBUTION w/encl:

Kimyata MorganButler

RidsNrrPMPrairieIsland Resource

RidsNrrDorlLpl3-1 Resource

RidsNrrDirsIrib Resource

Cynthia Pederson

Darrell Roberts

Richard Skokowski

Allan Barker

Carole Ariano

Linda Linn

DRPIII

DRSIII

Jim Clay

Carmen Olteanu

ADAMS Accession Number ML15121A651

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME JNeurauter:cl ADunlop for CLipa

DATE 04/29/15 04/29/15

OFFICIAL RECORD COPY