ML16210A043: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(One intermediate revision by the same user not shown)
Line 2: Line 2:
| number = ML16210A043
| number = ML16210A043
| issue date = 07/27/2016
| issue date = 07/27/2016
| title = Ltr 07/27/16 Davis-Besse Nuclear Power Station, Unit 1 - Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000346/2016009 (Akd)
| title = Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000346/2016009 (Akd)
| author name = Dahbur A
| author name = Dahbur A
| author affiliation = NRC/RGN-III/DRS
| author affiliation = NRC/RGN-III/DRS
Line 17: Line 17:


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III  
{{#Wiki_filter:UNITED STATES
2443 WARRENVILLE RD. SUITE  
                            NUCLEAR REGULATORY COMMISSION
210 LISLE, IL 60532-
                                              REGION III
4352 July 27, 2016 Mr. Brian D. Boles Site Vice President FirstEnergy Nuclear Operating Co. Davis-Besse Nuclear Power Station 5501 N. State Rte. 2, Mail Stop ADB3080 Oak Harbor, OH 434499760 SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - NOTIFICATION OF NRC TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR  
                                  2443 WARRENVILLE RD. SUITE 210
INFORMATION; INSPECTION REPORT 05000346/2016009 Dear Mr.  
                                        LISLE, IL 60532-4352
: On October 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire protection baseline inspection at your Davis-Besse Nuclear Power Station.
                                          July 27, 2016
Th is inspection will  
Mr. Brian D. Boles
be performed in accordance with Inspection Procedure 71111.05Tprotection inspection procedure.
Site Vice President
  Changes were made to the Inspection Procedure 71111.05T, which now requir
FirstEnergy Nuclear Operating Co.
es the fire protection inspection to review your actions to mitigate postulated events that could potentially cause loss of large areas of power reactor facilities due to explosions or fires. This requirement was implemented by the issuance of the Interim Compensatory Measures Order EA-
Davis-Besse Nuclear Power Station
02-026, Section B.5.b, and the subsequent requirements of Title  
5501 N. State Rte. 2, Mail Stop A-DB-3080
10 of the Code of Federal Regulations , Part 50.54(hh)(2), which are collectively referred to as B.5.b requirements.
Oak Harbor, OH 43449-9760
  During this inspection, the B.5.b requirements review will be performed during the first onsite week of  
SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - NOTIFICATION OF NRC
the inspection starting on November 2, 2016. The schedule for the onsite inspection activity is as follows: Information Gathering Visit: October 31 November 2, 2016;B.5.b Requirements: November 2 - 4, 2016; andFire Protection Inspection
            TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR
: November 14 18, and November 28 December 2, 2016.The purpose of the information gathering visit is: (1) to obtain information and documentation  
            INFORMATION; INSPECTION REPORT 05000346/2016009
needed to support the inspection; (2) to become familiar with the Davis-Besse Fire Protection Programs, fire protection features, post-fire safe shutdown capabilities, and plant layout; and (3) to arrange administrative details, such as office space, availability of knowledgeable office personnel and to ensure unescorted site access privileges. Experience has shown that the baseline fire protection inspections are extremely resource intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection impact on the site and to ensure a productive inspection for both organizations, we have enclosed a request for documents needed for the inspection. These documents have been divided into four groups.  
Dear Mr. Boles:
B. Boles -2- The first group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection. It is requested that this information be provided to the lead inspector via mail or electronically no later than October 7, 2016. The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit October 31, 2016. The third group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week November 14, 2016. The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory contact for this inspection is Ms. Vicki Wadsworth of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9810, or via e-mail at Alan.Dahbur@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   In accordance with Title 10 of the Code of Federal Regulations e NRC's "Rules of Practice," a copy of Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Alan Dahbur, Senior Reactor Inspector Engineering Branch 3 Division of Reactor Safety Docket No. 50346 and 72014 License No. NPF3 Enclosure:  Triennial Fire Protection Baseline     Inspection Document Request cc: Distribution via LISTSERV
On October 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST Enclosure Inspection Report: 05000346/2016009 Onsite Inspection Dates: October 31 November 2, 2016, Information Gathering Visit November 2 - 4, 2016, B.5.b Requirements November 14 -18, 2016, Fire Protection Inspection November 28 December 2, 2016, Fire Protection Inspection Inspection Procedures: IP 71111.05T IP Identification and Resolution of Problems Inspectors: Alan Dahbur Senior Reactor Inspector (Lead) (630) 829-9810 Alan.Dahbur@nrc.gov Atif Shaikh Ijaz Hafeez Senior Reactor Inspector Reactor Inspector (630) 829-9824 (630) 829-9843 Atif.Shaikh@nrc.gov Ijaz.Hafeez@nrc.gov I. Information Requested Prior To the Information Gathering Visit The following information is requested by October 7, 2016. If you have any questions regarding this request, please call the lead inspector as soon as possible. All information should be sent to Mr. Alan Dahbur (e-mail: Alan.Dahbur@nrc.gov). Electronic media is preferred. The preferrea compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease of use, if possible. Please provide three copies of each CD submitted (one for each inspector). 1. The most risk significant fire areas as determined by probabilistic risk analyses, if available. Otherwise, the reactor plant's Individual Plant Examination for External Events for fire and results of any post- Individual Plant Examination for External Events reviews for fire. 2. A copy of the current version of the Fire Protection Program, fire hazards analysis, safe shutdown analysis, updated safety analysis report, technical specifications, license (including the fire protection license condition), and technical requirements manual or equivalent for fire protection structures, systems, and components. 3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas for which Title 10, Code of Federal Regulations [CFR], Part 50, Appendix R, Section III G, requirements are satisfied under Section III.G.3), or where both safe shutdown trains can be affected.  
protection baseline inspection at your Davis-Besse Nuclear Power Station. This inspection will
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST 2 4. Plant operating procedures which would be used and describe shutdown for a postulated fire (for both areas requiring alternative shutdown and areas which do not require alternative shutdown). Only those procedures with actions specific to shutdown in the event of a fire need be included. In addition, please include those procedures which operators would use for initial response to a fire, such as annunciator or alarm response procedures, the procedure used for activating the fire brigade, and the procedure which directs operators to the applicable safe shutdown procedure. 5. Analysis performed in support of plant evaluation regarding multiple spurious operation (MSO), which includes the following: a. List of identified multiple spurious fire-induced circuit failure configurations. b. List of the generic and plant specific MSOs. c. Results of expert panel process and associated review/evaluation of the generic and plant specific MSOs and existing safe shutdown analysis. d. Evaluations and corrective actions taken for resolution of MSO issues. II. Information Requested During the Information Gathering Visit (October 31, 2016) The following information is requested to be provided to the inspection team during the onsite information gathering visit. Except for Item 8, it is requested that the following information be provided on three sets of CDs (searchable, if possible) with the B.5.b Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD. In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d. 1. One set of hard-copy documents for facility layout drawings which identify plant fire area delineation; areas protected by automatic fire suppression and detection; and locations of fire protection equipment. 2. Licensing Information: a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs) applicable to fire protection (specifically including those SERs referenced by the plant fire protection license condition) and all licensing correspondence referenced by the SERs; b. All licensing correspondence associated with the comparison to Standard Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes; c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and associated licensing correspondence; d. For pre-1979 plants, all licensing correspondence associated with those sections of 10 CFR Part 50, Appendix R, that are not applicable to the plant under 10 CFR Part 50.48(b)(1). Specifically, the licensing correspondence associated with those fire protection features proposed or implemented by the licensee that have been accepted by the NRC staff as satisfying the provisions of Appendix A to Branch Technical Position APCSB 9.5-1 reflected in the NRC fire protection
be performed in accordance with Inspection Procedure 71111.05T, the NRCs baseline fire
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST 3 SERs issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire protection features, which were accepted by the NRC staff in comprehensive fire protection SERs issued before Appendix A to Branch Technical Position APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and e. The final safety analysis report sections applicable to fire protection, FHA, and SSA in effect at the time of original licensing. 3. Fire Protection Program: a. A listing of changes made to the Fire Protection Program since the last triennial fire protection inspection; b. For pre-1979 plants, a listing of the protection methodologies identified under 10 CFR Part 50, Appendix R, Section III.G used to achieve compliance for selected fire zones/areas (to be determined during information gathering visit). That is, please specify whether 3-hour rated fire barriers; (Section III.G.2.a), 20 foot separation along with detection and suppression; (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression; (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used as a strategy for each selected fire zone/area; c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe shutdown evaluations); d. A list of applicable codes and standards related to the design of plant fire protection features. The list should include National Fire Protection Association code versions committed to (i.e., the National Fire Protection Association Codes of Record); and e. List of plant deviations from code commitments and associated evaluations. 4. Facility Information: a. Piping and instrumentation (flow) diagrams showing the components used to achieve and maintain hot standby and cold shutdown for fires outside the control room, those components used for those areas requiring alternative shutdown capability, and systems relied upon for B.5.b mitigation strategies. These can be of the type that are used for training; b. One-line schematic drawings of the electrical distribution system for 4160 Volts alternating current (Vac) down to 480Vac; c. One-line schematic drawings of the electrical distribution system for 250 Volts direct current and 125 Volts direct current systems as applicable; d. Logic diagrams showing the components used to achieve and maintain hot standby and cold shutdown; and e. Safe shutdown cable routing database (requested electronically, such as on compact disc, if available).
protection inspection procedure.
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST 4 5. Operations Response for Fire Protection: a. Pre-fire plans for selected fire zones/areas (to be determined during information gathering visit); b. Plant operating procedures which specify the initial operations response to a fire alarm or annunciator; and c. Procedure for calling out the fire brigade and requesting offsite assistance. 6. Corrective Actions: a. Listing of open and closed fire protection condition reports (i.e., problem identification forms and their resolution reports) since the date of the last triennial fire protection inspection; and b. List of current fire impairments, including duration. 7. General Information: a. A listing of abbreviations and/or designators for plant systems; b. Organization charts of site personnel down to the level of fire protection staff personnel; and c. A phone list for onsite licensee personnel. 8. B.5.b Mitigating Strategies: a. A list of all modifications to regulatory commitments made to meet the requirements of Section B.5.b of the ICM Order, EA-02-026, dated February 25, 2002, the subsequently imposed license conditions, and 10 CFR 50.54(hh)(2); b. Copies of procedures/guidelines that were revised or generated to implement the mitigation strategies. These could be extensive damage mitigation guidelines, severe accident management guidelines, emergency operating procedures, abnormal operating procedures, etc.; c. A matrix that shows the correlation between the mitigation strategies identified in Nuclear Energy Institute 06-12 and the site-specific procedures or guidelines that are used to implement each strategy; d. A listing of engineering evaluations/calculations that were used to verify engineering bases for the mitigation strategies; e. Copies of procedures used to inventory equipment (hoses, fittings, pumps, etc.) required to be used to implement the mitigation strategies; f. A list of B.5.b mitigating strategies, if any, which have implementing details that differ from that documented in the submittals and the safety evaluation report;
Changes were made to the Inspection Procedure 71111.05T, which now requires the fire
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST 5 g. Copies of Memoranda of Understanding (e.g., with local fire departments) required to implement any mitigating strategies; and h. A list of changes made to B.5.b mitigating strategies and associated procedures since the previous NRC inspection of B.5.b mitigating strategies. 9. Onsite Discussions: In addition, during the information gathering visit, it is requested that licensee staff be available for the following: a. Informal discussion on plant procedures operators would use in the event of fire or explosion (including B.5.b mitigation strategies) and under what conditions would the plant be shutdown using alternative shutdown methodology; b. Ithe plant-wide cable routing database, as applicable; and c. A tour of alternative shutdown and risk significant fire areas. d. A discussion of scheduling of fire drills which may occur during the inspection so that the inspectors may be able to observe a fire drill, if possible. III. Information Requested to be Available on first Day of the Second Onsite Inspection Week (November 14, 2016) The following information is requested to be provided on the first day of inspection. It is requested that this information be provided on three sets of CDs (searchable, if possible). 1. Program Procedures: a. Procedures for: i. Administrative controls (such as allowed out of service times and compensatory measures) for fire protection systems and components ii. Control of transient combustibles iii. Control of hot work b. List of maintenance and surveillance testing procedures for alternative shutdown capability and fire barriers, detectors, pumps, and suppression systems; and c. List of maintenance procedures which routinely verify fuse breaker coordination in accordance with the post-fire safe shutdown coordination analysis.
protection inspection to review your actions to mitigate postulated events that could potentially
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST 6 2. Design and Equipment Information: a. Coordination calculations and/or justifications that verify fuse/breaker coordination for selected fire zones/areas (to be determined during information gathering visit) that are fed off of the same electrical buses as components in the protected safe shutdown train; b. Copies of significant fire protection and post-fire safe shutdown related design change package descriptions (including their associated 10 CFR 50.59 evaluations) and Generic Letter 86-10 (or adverse to safe shutdown) evaluations; c. Gaseous suppression system pre-operational testing, if applicable, for selected fire zones/areas (to be determined during information gathering visit); d. Hydraulic calculations and supporting test data which demonstrate operability for water suppression systems, if applicable, for selected fire zones/areas (to be determined during information gathering visit); e. Alternating current coordination calculations for 4160Vac down to 480Vac electrical systems; and f. List of all fire protection or Appendix R calculations. 3. Assessment and Corrective Actions: a. The three most recent fire protection Quality Assurance audits and/or fire protection self-assessments. 4. Any updates to information previously provided. IV. Information Requested to Be Provided Throughout the Inspection 1. Copies of any corrective action documents generated as a result of the inspection 2. Copies of the list of questions submitted by the inspection team members and the status/resolution of the information requested (provided daily during the inspection to each inspection team member).  
cause loss of large areas of power reactor facilities due to explosions or fires. This requirement
  B. Boles -2- The first group lists information necessary to aid the inspection team in choosing specific focus areas for the inspection. It is requested that this information be provided to the lead inspector via mail or electronically no later than October 7, 2016. The second group also lists information and areas for discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the inspection and to ensure that the inspection team is adequately prepared for the inspection. It is requested this information be available during the information gathering visit October 31, 2016. The third group of requested documents consists of those items that the team will review, or need access to, during the inspection. Please have this information available by the first day of the second onsite inspection week November 14, 2016. The fourth group lists the information necessary to aid the inspection team in tracking issues identified as a result of the inspection. It is requested that this information be provided to the lead inspector as the information is generated during the inspection. It is important that all of these documents are up to date and complete in order to minimize the number of additional documents requested during the preparation and/or the onsite portions of the inspection. The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory contact for this inspection is Ms. Vicki Wadsworth of your organization. If there are any questions about the inspection or the material requested, please contact the lead inspector at 630-829-9810, or via e-mail at Alan.Dahbur@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   In accordance with Title 10 of the Code of Federal Regulations this letter and its t Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). Sincerely, /RA/ Alan Dahbur, Senior Reactor Inspector Engineering Branch 3 Division of Reactor Safety Docket No. 50346 and 72014 License No. NPF3 Enclosure:  Triennial Fire Protection Baseline     Inspection Document Request cc: Distribution via LISTSERV DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3-2 Resource RidsNrrPMDavisBesse Resource RidsNrrDirsIrib Resource Cynthia Pederson Darrell Roberts Richard Skokowski Allan Barker Carole Ariano Linda Linn DRPIII DRSIII ADAMS Accession Number ML16210A043 Publicly Available Non-Publicly Available Sensitive Non-Sensitive To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy OFFICE RIII RIII RIII RIII NAME ADahbur:cl    DATE 07/27/16   OFFICIAL RECORD COPY
was implemented by the issuance of the Interim Compensatory Measures Order EA-02-026,
Section B.5.b, and the subsequent requirements of Title 10 of the Code of Federal Regulations,
Part 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this
inspection, the B.5.b requirements review will be performed during the first onsite week of
the inspection starting on November 2, 2016.
The schedule for the onsite inspection activity is as follows:
      Information Gathering Visit: October 31 - November 2, 2016;
      B.5.b Requirements: November 2 - 4, 2016; and
      Fire Protection Inspection: November 14 - 18, and November 28 - December 2, 2016.
The purpose of the information gathering visit is: (1) to obtain information and documentation
needed to support the inspection; (2) to become familiar with the Davis-Besse Stations Fire
Protection Programs, fire protection features, post-fire safe shutdown capabilities, and plant
layout; and (3) to arrange administrative details, such as office space, availability of
knowledgeable office personnel and to ensure unescorted site access privileges.
Experience has shown that the baseline fire protection inspections are extremely resource
intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection
impact on the site and to ensure a productive inspection for both organizations, we have
enclosed a request for documents needed for the inspection. These documents have been
divided into four groups.
 
B. Boles                                         -2-
The first group lists information necessary to aid the inspection team in choosing specific focus
areas for the inspection. It is requested that this information be provided to the lead inspector
via mail or electronically no later than October 7, 2016. The second group also lists information
and areas for discussion necessary to aid the inspection team in choosing specific fire
protection focus areas for the inspection and to ensure that the inspection team is adequately
prepared for the inspection. It is requested this information be available during the information
gathering visit October 31, 2016. The third group of requested documents consists of those
items that the team will review, or need access to, during the inspection. Please have this
information available by the first day of the second onsite inspection week November 14, 2016.
The fourth group lists the information necessary to aid the inspection team in tracking issues
identified as a result of the inspection. It is requested that this information be provided to the
lead inspector as the information is generated during the inspection. It is important that all of
these documents are up to date and complete in order to minimize the number of additional
documents requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory
contact for this inspection is Ms. Vicki Wadsworth of your organization. If there are any
questions about the inspection or the material requested, please contact the lead inspector
at 630-829-9810, or via e-mail at Alan.Dahbur@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number
3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,
a request for information or an information collection requirement unless the requesting
document displays a currently valid Office of Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public
Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy
of this letter and its enclosure will be available electronically for public inspection in the NRCs
Public Document Room or from the Publicly Available Records (PARS) component of the NRC's
Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible
from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic
Reading Room).
                                                Sincerely,
                                                /RA/
                                                Alan Dahbur, Senior Reactor Inspector
                                                Engineering Branch 3
                                                Division of Reactor Safety
Docket No. 50-346 and 72-014
License No. NPF-3
Enclosure:
   Triennial Fire Protection Baseline
  Inspection Document Request
cc: Distribution via LISTSERV
 
    TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
Inspection Report:             05000346/2016009
Onsite Inspection Dates:       October 31 - November 2, 2016, Information Gathering Visit
                                November 2 - 4, 2016, B.5.b Requirements
                                November 14 -18, 2016, Fire Protection Inspection
                                November 28 - December 2, 2016, Fire Protection Inspection
Inspection Procedures:         IP 71111.05T, Fire Protection (Triennial)
                                IP 71152, Identification and Resolution of Problems
Inspectors:                     Alan Dahbur
                                Senior Reactor Inspector (Lead)
                                (630) 829-9810
                                Alan.Dahbur@nrc.gov
                                Atif Shaikh                           Ijaz Hafeez
                                Senior Reactor Inspector               Reactor Inspector
                                (630) 829-9824                         (630) 829-9843
                                Atif.Shaikh@nrc.gov                   Ijaz.Hafeez@nrc.gov
I.     Information Requested Prior To the Information Gathering Visit
      The following information is requested by October 7, 2016. If you have any questions
      regarding this request, please call the lead inspector as soon as possible. All
      information should be sent to Mr. Alan Dahbur (e-mail: Alan.Dahbur@nrc.gov).
      Electronic media is preferred. The preferred file format is a searchable pdf file on
      a compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease
      of use, if possible. Please provide three copies of each CD submitted (one for each
      inspector).
      1. The most risk significant fire areas as determined by probabilistic risk analyses, if
          available. Otherwise, the reactor plant's Individual Plant Examination for External
          Events for fire and results of any post- Individual Plant Examination for External
          Events reviews for fire.
      2. A copy of the current version of the Fire Protection Program, fire hazards analysis,
          safe shutdown analysis, updated safety analysis report, technical specifications,
          license (including the fire protection license condition), and technical requirements
          manual or equivalent for fire protection structures, systems, and components.
      3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas
          for which Title 10, Code of Federal Regulations [CFR], Part 50, Appendix R,
          Section III G, requirements are satisfied under Section III.G.3), or where both
          safe shutdown trains can be affected.
                                                                                          Enclosure
 
    TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
    4. Plant operating procedures which would be used and describe shutdown for a
        postulated fire (for both areas requiring alternative shutdown and areas which do
        not require alternative shutdown). Only those procedures with actions specific to
        shutdown in the event of a fire need be included. In addition, please include
        those procedures which operators would use for initial response to a fire, such as
        annunciator or alarm response procedures, the procedure used for activating the fire
        brigade, and the procedure which directs operators to the applicable safe shutdown
        procedure.
    5. Analysis performed in support of plant evaluation regarding multiple spurious
        operation (MSO), which includes the following:
        a. List of identified multiple spurious fire-induced circuit failure configurations.
        b. List of the generic and plant specific MSOs.
        c. Results of expert panel process and associated review/evaluation of the generic
            and plant specific MSOs and existing safe shutdown analysis.
        d. Evaluations and corrective actions taken for resolution of MSO issues.
II. Information Requested During the Information Gathering Visit (October 31, 2016)
    The following information is requested to be provided to the inspection team during the
    onsite information gathering visit. Except for Item 8, it is requested that the following
    information be provided on three sets of CDs (searchable, if possible) with the B.5.b
    Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD.
    In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.
    1. One set of hard-copy documents for facility layout drawings which identify plant fire
        area delineation; areas protected by automatic fire suppression and detection; and
        locations of fire protection equipment.
    2. Licensing Information:
        a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)
            applicable to fire protection (specifically including those SERs referenced by
            the plant fire protection license condition) and all licensing correspondence
            referenced by the SERs;
        b. All licensing correspondence associated with the comparison to Standard
            Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;
        c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and
            associated licensing correspondence;
        d. For pre-1979 plants, all licensing correspondence associated with those sections
            of 10 CFR Part 50, Appendix R, that are not applicable to the plant under
            10 CFR Part 50.48(b)(1). Specifically, the licensing correspondence associated
            with those fire protection features proposed or implemented by the licensee that
            have been accepted by the NRC staff as satisfying the provisions of Appendix A
            to Branch Technical Position APCSB 9.5-1 reflected in the NRC fire protection
                                                2
 
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
        SERs issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire
        protection features, which were accepted by the NRC staff in comprehensive
        fire protection SERs issued before Appendix A to Branch Technical Position
        APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and
    e. The final safety analysis report sections applicable to fire protection, FHA, and
        SSA in effect at the time of original licensing.
3. Fire Protection Program:
        a. A listing of changes made to the Fire Protection Program since the last
            triennial fire protection inspection;
        b. For pre-1979 plants, a listing of the protection methodologies identified
            under 10 CFR Part 50, Appendix R, Section III.G used to achieve
            compliance for selected fire zones/areas (to be determined during information
            gathering visit). That is, please specify whether 3-hour rated fire barriers;
            (Section III.G.2.a), 20 foot separation along with detection and suppression;
            (Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;
            (Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used
            as a strategy for each selected fire zone/area;
        c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe
            shutdown evaluations);
        d. A list of applicable codes and standards related to the design of plant
            fire protection features. The list should include National Fire Protection
            Association code versions committed to (i.e., the National Fire Protection
            Association Codes of Record); and
        e. List of plant deviations from code commitments and associated evaluations.
4. Facility Information:
        a. Piping and instrumentation (flow) diagrams showing the components used to
            achieve and maintain hot standby and cold shutdown for fires outside the
            control room, those components used for those areas requiring alternative
            shutdown capability, and systems relied upon for B.5.b mitigation strategies.
            These can be of the type that are used for training;
        b. One-line schematic drawings of the electrical distribution system for
            4160 Volts alternating current (Vac) down to 480Vac;
        c. One-line schematic drawings of the electrical distribution system for 250 Volts
            direct current and 125 Volts direct current systems as applicable;
        d. Logic diagrams showing the components used to achieve and maintain hot
            standby and cold shutdown; and
        e. Safe shutdown cable routing database (requested electronically, such as on
            compact disc, if available).
                                            3
 
TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
5. Operations Response for Fire Protection:
      a. Pre-fire plans for selected fire zones/areas (to be determined during
          information gathering visit);
      b. Plant operating procedures which specify the initial operations response to
          a fire alarm or annunciator; and
      c. Procedure for calling out the fire brigade and requesting offsite assistance.
6. Corrective Actions:
      a. Listing of open and closed fire protection condition reports (i.e., problem
          identification forms and their resolution reports) since the date of the last
          triennial fire protection inspection; and
      b. List of current fire impairments, including duration.
7. General Information:
      a. A listing of abbreviations and/or designators for plant systems;
      b. Organization charts of site personnel down to the level of fire protection staff
          personnel; and
      c. A phone list for onsite licensee personnel.
8. B.5.b Mitigating Strategies:
      a. A list of all modifications to regulatory commitments made to meet
          the requirements of Section B.5.b of the ICM Order, EA-02-026, dated
          February 25, 2002, the subsequently imposed license conditions, and
          10 CFR 50.54(hh)(2);
      b. Copies of procedures/guidelines that were revised or generated to implement
          the mitigation strategies. These could be extensive damage mitigation
          guidelines, severe accident management guidelines, emergency operating
          procedures, abnormal operating procedures, etc.;
      c. A matrix that shows the correlation between the mitigation strategies
          identified in Nuclear Energy Institute 06-12 and the site-specific procedures
          or guidelines that are used to implement each strategy;
      d. A listing of engineering evaluations/calculations that were used to verify
          engineering bases for the mitigation strategies;
      e. Copies of procedures used to inventory equipment (hoses, fittings, pumps,
          etc.) required to be used to implement the mitigation strategies;
      f. A list of B.5.b mitigating strategies, if any, which have implementing details
          that differ from that documented in the submittals and the safety evaluation
          report;
                                          4
 
    TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
              g. Copies of Memoranda of Understanding (e.g., with local fire departments)
                  required to implement any mitigating strategies; and
              h. A list of changes made to B.5.b mitigating strategies and associated
                  procedures since the previous NRC inspection of B.5.b mitigating strategies.
      9. Onsite Discussions:
          In addition, during the information gathering visit, it is requested that licensee staff be
          available for the following:
              a. Informal discussion on plant procedures operators would use in the event
                  of fire or explosion (including B.5.b mitigation strategies) and under what
                  conditions would the plant be shutdown using alternative shutdown
                  methodology;
              b. Informal discussion on the plants safe shutdown cable routing database and
                  the plant-wide cable routing database, as applicable; and
              c. A tour of alternative shutdown and risk significant fire areas.
              d. A discussion of scheduling of fire drills which may occur during the inspection
                  so that the inspectors may be able to observe a fire drill, if possible.
III. Information Requested to be Available on first Day of the Second Onsite
      Inspection Week (November 14, 2016)
      The following information is requested to be provided on the first day of inspection.
      It is requested that this information be provided on three sets of CDs (searchable, if
      possible).
      1. Program Procedures:
              a. Procedures for:
                      i. Administrative controls (such as allowed out of service times and
                          compensatory measures) for fire protection systems and components
                      ii. Control of transient combustibles
                    iii. Control of hot work
              b. List of maintenance and surveillance testing procedures for alternative
                  shutdown capability and fire barriers, detectors, pumps, and suppression
                  systems; and
              c. List of maintenance procedures which routinely verify fuse breaker
                  coordination in accordance with the post-fire safe shutdown coordination
                  analysis.
                                                  5
 
      TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST
        2. Design and Equipment Information:
                a. Coordination calculations and/or justifications that verify fuse/breaker
                    coordination for selected fire zones/areas (to be determined during
                    information gathering visit) that are fed off of the same electrical buses as
                    components in the protected safe shutdown train;
                b. Copies of significant fire protection and post-fire safe shutdown
                    related design change package descriptions (including their associated
                    10 CFR 50.59 evaluations) and Generic Letter 86-10 (or adverse to safe
                    shutdown) evaluations;
                c. Gaseous suppression system pre-operational testing, if applicable, for
                    selected fire zones/areas (to be determined during information gathering
                    visit);
                d. Hydraulic calculations and supporting test data which demonstrate operability
                    for water suppression systems, if applicable, for selected fire zones/areas
                    (to be determined during information gathering visit);
                e. Alternating current coordination calculations for 4160Vac down to 480Vac
                    electrical systems; and
                f. List of all fire protection or Appendix R calculations.
        3. Assessment and Corrective Actions:
                a. The three most recent fire protection Quality Assurance audits and/or fire
                    protection self-assessments.
        4. Any updates to information previously provided.
IV.     Information Requested to Be Provided Throughout the Inspection
        1. Copies of any corrective action documents generated as a result of the inspection
            teams questions or queries during this inspection.
        2. Copies of the list of questions submitted by the inspection team members and the
            status/resolution of the information requested (provided daily during the inspection
            to each inspection team member).
If you have questions regarding the information requested, please contact the lead inspector.
                                                    6
 
B. Boles                                                                  -2-
The first group lists information necessary to aid the inspection team in choosing specific focus areas for
the inspection. It is requested that this information be provided to the lead inspector via mail or
electronically no later than October 7, 2016. The second group also lists information and areas for
discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the
inspection and to ensure that the inspection team is adequately prepared for the inspection. It is
requested this information be available during the information gathering visit October 31, 2016. The third
group of requested documents consists of those items that the team will review, or need access to, during
the inspection. Please have this information available by the first day of the second onsite inspection
week November 14, 2016. The fourth group lists the information necessary to aid the inspection team in
tracking issues identified as a result of the inspection. It is requested that this information be provided to
the lead inspector as the information is generated during the inspection. It is important that all of these
documents are up to date and complete in order to minimize the number of additional documents
requested during the preparation and/or the onsite portions of the inspection.
The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory contact for
this inspection is Ms. Vicki Wadsworth of your organization. If there are any questions about the
inspection or the material requested, please contact the lead inspector at 630-829-9810, or via e-mail at
Alan.Dahbur@nrc.gov.
This letter does not contain new or amended information collection requirements subject to
the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection
requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The
NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or
an information collection requirement unless the requesting document displays a currently valid Office of
Management and Budget Control Number.
In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,
Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its
enclosure will be available electronically for public inspection in the NRCs Public Document Room or
from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access
and Management System (ADAMS). ADAMS is accessible from the NRC Web site at
http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
                                                                          Sincerely,
                                                                          /RA/
                                                                          Alan Dahbur, Senior Reactor Inspector
                                                                          Engineering Branch 3
                                                                          Division of Reactor Safety
Docket No. 50-346 and 72-014
License No. NPF-3
Enclosure:
   Triennial Fire Protection Baseline
    Inspection Document Request
cc: Distribution via LISTSERV
DISTRIBUTION:
Jeremy Bowen                                         RidsNrrDirsIrib Resource                  Richard Skokowski              Linda Linn
RidsNrrDorlLpl3-2 Resource                           Cynthia Pederson                          Allan Barker                    DRPIII
RidsNrrPMDavisBesse Resource                         Darrell Roberts                           Carole Ariano                   DRSIII
ADAMS Accession Number ML16210A043
    Publicly Available                       Non-Publicly Available                       Sensitive               Non-Sensitive
To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy
  OFFICE             RIII                               RIII                           RIII                               RIII
  NAME               ADahbur:cl
   DATE               07/27/16
                                                              OFFICIAL RECORD COPY
}}
}}

Latest revision as of 17:12, 16 November 2019

Notification of NRC Triennial Fire Protection Baseline Inspection Request for Information; Inspection Report 05000346/2016009 (Akd)
ML16210A043
Person / Time
Site: Davis Besse  Cleveland Electric icon.png
Issue date: 07/27/2016
From: Alan Dahbur
Division of Reactor Safety III
To: Boles B
FirstEnergy Nuclear Operating Co
References
IR 2016009
Download: ML16210A043 (9)


See also: IR 05000346/2016009

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, IL 60532-4352

July 27, 2016

Mr. Brian D. Boles

Site Vice President

FirstEnergy Nuclear Operating Co.

Davis-Besse Nuclear Power Station

5501 N. State Rte. 2, Mail Stop A-DB-3080

Oak Harbor, OH 43449-9760

SUBJECT: DAVIS-BESSE NUCLEAR POWER STATION, UNIT 1 - NOTIFICATION OF NRC

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION REQUEST FOR

INFORMATION; INSPECTION REPORT 05000346/2016009

Dear Mr. Boles:

On October 31, 2016, the U.S. Nuclear Regulatory Commission (NRC) will begin a triennial fire

protection baseline inspection at your Davis-Besse Nuclear Power Station. This inspection will

be performed in accordance with Inspection Procedure 71111.05T, the NRCs baseline fire

protection inspection procedure.

Changes were made to the Inspection Procedure 71111.05T, which now requires the fire

protection inspection to review your actions to mitigate postulated events that could potentially

cause loss of large areas of power reactor facilities due to explosions or fires. This requirement

was implemented by the issuance of the Interim Compensatory Measures Order EA-02-026,

Section B.5.b, and the subsequent requirements of Title 10 of the Code of Federal Regulations,

Part 50.54(hh)(2), which are collectively referred to as B.5.b requirements. During this

inspection, the B.5.b requirements review will be performed during the first onsite week of

the inspection starting on November 2, 2016.

The schedule for the onsite inspection activity is as follows:

Information Gathering Visit: October 31 - November 2, 2016;

B.5.b Requirements: November 2 - 4, 2016; and

Fire Protection Inspection: November 14 - 18, and November 28 - December 2, 2016.

The purpose of the information gathering visit is: (1) to obtain information and documentation

needed to support the inspection; (2) to become familiar with the Davis-Besse Stations Fire

Protection Programs, fire protection features, post-fire safe shutdown capabilities, and plant

layout; and (3) to arrange administrative details, such as office space, availability of

knowledgeable office personnel and to ensure unescorted site access privileges.

Experience has shown that the baseline fire protection inspections are extremely resource

intensive both for the NRC inspectors and the licensee staff. In order to minimize the inspection

impact on the site and to ensure a productive inspection for both organizations, we have

enclosed a request for documents needed for the inspection. These documents have been

divided into four groups.

B. Boles -2-

The first group lists information necessary to aid the inspection team in choosing specific focus

areas for the inspection. It is requested that this information be provided to the lead inspector

via mail or electronically no later than October 7, 2016. The second group also lists information

and areas for discussion necessary to aid the inspection team in choosing specific fire

protection focus areas for the inspection and to ensure that the inspection team is adequately

prepared for the inspection. It is requested this information be available during the information

gathering visit October 31, 2016. The third group of requested documents consists of those

items that the team will review, or need access to, during the inspection. Please have this

information available by the first day of the second onsite inspection week November 14, 2016.

The fourth group lists the information necessary to aid the inspection team in tracking issues

identified as a result of the inspection. It is requested that this information be provided to the

lead inspector as the information is generated during the inspection. It is important that all of

these documents are up to date and complete in order to minimize the number of additional

documents requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory

contact for this inspection is Ms. Vicki Wadsworth of your organization. If there are any

questions about the inspection or the material requested, please contact the lead inspector

at 630-829-9810, or via e-mail at Alan.Dahbur@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number

3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to,

a request for information or an information collection requirement unless the requesting

document displays a currently valid Office of Management and Budget Control Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public

Inspections, Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy

of this letter and its enclosure will be available electronically for public inspection in the NRCs

Public Document Room or from the Publicly Available Records (PARS) component of the NRC's

Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible

from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic

Reading Room).

Sincerely,

/RA/

Alan Dahbur, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket No. 50-346 and 72-014

License No. NPF-3

Enclosure:

Triennial Fire Protection Baseline

Inspection Document Request

cc: Distribution via LISTSERV

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

Inspection Report: 05000346/2016009

Onsite Inspection Dates: October 31 - November 2, 2016, Information Gathering Visit

November 2 - 4, 2016, B.5.b Requirements

November 14 -18, 2016, Fire Protection Inspection

November 28 - December 2, 2016, Fire Protection Inspection

Inspection Procedures: IP 71111.05T, Fire Protection (Triennial)

IP 71152, Identification and Resolution of Problems

Inspectors: Alan Dahbur

Senior Reactor Inspector (Lead)

(630) 829-9810

Alan.Dahbur@nrc.gov

Atif Shaikh Ijaz Hafeez

Senior Reactor Inspector Reactor Inspector

(630) 829-9824 (630) 829-9843

Atif.Shaikh@nrc.gov Ijaz.Hafeez@nrc.gov

I. Information Requested Prior To the Information Gathering Visit

The following information is requested by October 7, 2016. If you have any questions

regarding this request, please call the lead inspector as soon as possible. All

information should be sent to Mr. Alan Dahbur (e-mail: Alan.Dahbur@nrc.gov).

Electronic media is preferred. The preferred file format is a searchable pdf file on

a compact disk (CD). The CD should be indexed and hyper-linked to facilitate ease

of use, if possible. Please provide three copies of each CD submitted (one for each

inspector).

1. The most risk significant fire areas as determined by probabilistic risk analyses, if

available. Otherwise, the reactor plant's Individual Plant Examination for External

Events for fire and results of any post- Individual Plant Examination for External

Events reviews for fire.

2. A copy of the current version of the Fire Protection Program, fire hazards analysis,

safe shutdown analysis, updated safety analysis report, technical specifications,

license (including the fire protection license condition), and technical requirements

manual or equivalent for fire protection structures, systems, and components.

3. A list of fire areas requiring alternative shutdown capability, (i.e., those areas

for which Title 10, Code of Federal Regulations [CFR], Part 50, Appendix R,

Section III G, requirements are satisfied under Section III.G.3), or where both

safe shutdown trains can be affected.

Enclosure

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

4. Plant operating procedures which would be used and describe shutdown for a

postulated fire (for both areas requiring alternative shutdown and areas which do

not require alternative shutdown). Only those procedures with actions specific to

shutdown in the event of a fire need be included. In addition, please include

those procedures which operators would use for initial response to a fire, such as

annunciator or alarm response procedures, the procedure used for activating the fire

brigade, and the procedure which directs operators to the applicable safe shutdown

procedure.

5. Analysis performed in support of plant evaluation regarding multiple spurious

operation (MSO), which includes the following:

a. List of identified multiple spurious fire-induced circuit failure configurations.

b. List of the generic and plant specific MSOs.

c. Results of expert panel process and associated review/evaluation of the generic

and plant specific MSOs and existing safe shutdown analysis.

d. Evaluations and corrective actions taken for resolution of MSO issues.

II. Information Requested During the Information Gathering Visit (October 31, 2016)

The following information is requested to be provided to the inspection team during the

onsite information gathering visit. Except for Item 8, it is requested that the following

information be provided on three sets of CDs (searchable, if possible) with the B.5.b

Mitigating Strategies information (Items 8.a through 8.h) provided on one separate CD.

In addition, one set of hard copy drawings are requested for Items 4.a. through 4.d.

1. One set of hard-copy documents for facility layout drawings which identify plant fire

area delineation; areas protected by automatic fire suppression and detection; and

locations of fire protection equipment.

2. Licensing Information:

a. All Nuclear Regulatory Commission (NRC) Safety Evaluation Reports (SERs)

applicable to fire protection (specifically including those SERs referenced by

the plant fire protection license condition) and all licensing correspondence

referenced by the SERs;

b. All licensing correspondence associated with the comparison to Standard

Review Plan (NUREG-0800), Section 9.5.1 or equivalent for licensing purposes;

c. Exemptions from 10 CFR 50.48 and 10 CFR Part 50, Appendix R, and

associated licensing correspondence;

d. For pre-1979 plants, all licensing correspondence associated with those sections

of 10 CFR Part 50, Appendix R, that are not applicable to the plant under

10 CFR Part 50.48(b)(1). Specifically, the licensing correspondence associated

with those fire protection features proposed or implemented by the licensee that

have been accepted by the NRC staff as satisfying the provisions of Appendix A

to Branch Technical Position APCSB 9.5-1 reflected in the NRC fire protection

2

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

SERs issued before February 19, 1981, (10 CFR 50.48(b)(1)(i)); or those fire

protection features, which were accepted by the NRC staff in comprehensive

fire protection SERs issued before Appendix A to Branch Technical Position

APCSB 9.5-1 was published in August 1976 (10 CFR 50.48(b)(1)(ii)); and

e. The final safety analysis report sections applicable to fire protection, FHA, and

SSA in effect at the time of original licensing.

3. Fire Protection Program:

a. A listing of changes made to the Fire Protection Program since the last

triennial fire protection inspection;

b. For pre-1979 plants, a listing of the protection methodologies identified

under 10 CFR Part 50, Appendix R, Section III.G used to achieve

compliance for selected fire zones/areas (to be determined during information

gathering visit). That is, please specify whether 3-hour rated fire barriers;

(Section III.G.2.a), 20 foot separation along with detection and suppression;

(Section III.G.2.b), 1-hour rated fire barriers with detection and suppression;

(Section III.G.2.c), or alternative shutdown capability; (Section III.G.3) is used

as a strategy for each selected fire zone/area;

c. A list of Generic Letter 86-10 evaluations (i.e., a list of adverse to safe

shutdown evaluations);

d. A list of applicable codes and standards related to the design of plant

fire protection features. The list should include National Fire Protection

Association code versions committed to (i.e., the National Fire Protection

Association Codes of Record); and

e. List of plant deviations from code commitments and associated evaluations.

4. Facility Information:

a. Piping and instrumentation (flow) diagrams showing the components used to

achieve and maintain hot standby and cold shutdown for fires outside the

control room, those components used for those areas requiring alternative

shutdown capability, and systems relied upon for B.5.b mitigation strategies.

These can be of the type that are used for training;

b. One-line schematic drawings of the electrical distribution system for

4160 Volts alternating current (Vac) down to 480Vac;

c. One-line schematic drawings of the electrical distribution system for 250 Volts

direct current and 125 Volts direct current systems as applicable;

d. Logic diagrams showing the components used to achieve and maintain hot

standby and cold shutdown; and

e. Safe shutdown cable routing database (requested electronically, such as on

compact disc, if available).

3

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

5. Operations Response for Fire Protection:

a. Pre-fire plans for selected fire zones/areas (to be determined during

information gathering visit);

b. Plant operating procedures which specify the initial operations response to

a fire alarm or annunciator; and

c. Procedure for calling out the fire brigade and requesting offsite assistance.

6. Corrective Actions:

a. Listing of open and closed fire protection condition reports (i.e., problem

identification forms and their resolution reports) since the date of the last

triennial fire protection inspection; and

b. List of current fire impairments, including duration.

7. General Information:

a. A listing of abbreviations and/or designators for plant systems;

b. Organization charts of site personnel down to the level of fire protection staff

personnel; and

c. A phone list for onsite licensee personnel.

8. B.5.b Mitigating Strategies:

a. A list of all modifications to regulatory commitments made to meet

the requirements of Section B.5.b of the ICM Order, EA-02-026, dated

February 25, 2002, the subsequently imposed license conditions, and

10 CFR 50.54(hh)(2);

b. Copies of procedures/guidelines that were revised or generated to implement

the mitigation strategies. These could be extensive damage mitigation

guidelines, severe accident management guidelines, emergency operating

procedures, abnormal operating procedures, etc.;

c. A matrix that shows the correlation between the mitigation strategies

identified in Nuclear Energy Institute 06-12 and the site-specific procedures

or guidelines that are used to implement each strategy;

d. A listing of engineering evaluations/calculations that were used to verify

engineering bases for the mitigation strategies;

e. Copies of procedures used to inventory equipment (hoses, fittings, pumps,

etc.) required to be used to implement the mitigation strategies;

f. A list of B.5.b mitigating strategies, if any, which have implementing details

that differ from that documented in the submittals and the safety evaluation

report;

4

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

g. Copies of Memoranda of Understanding (e.g., with local fire departments)

required to implement any mitigating strategies; and

h. A list of changes made to B.5.b mitigating strategies and associated

procedures since the previous NRC inspection of B.5.b mitigating strategies.

9. Onsite Discussions:

In addition, during the information gathering visit, it is requested that licensee staff be

available for the following:

a. Informal discussion on plant procedures operators would use in the event

of fire or explosion (including B.5.b mitigation strategies) and under what

conditions would the plant be shutdown using alternative shutdown

methodology;

b. Informal discussion on the plants safe shutdown cable routing database and

the plant-wide cable routing database, as applicable; and

c. A tour of alternative shutdown and risk significant fire areas.

d. A discussion of scheduling of fire drills which may occur during the inspection

so that the inspectors may be able to observe a fire drill, if possible.

III. Information Requested to be Available on first Day of the Second Onsite

Inspection Week (November 14, 2016)

The following information is requested to be provided on the first day of inspection.

It is requested that this information be provided on three sets of CDs (searchable, if

possible).

1. Program Procedures:

a. Procedures for:

i. Administrative controls (such as allowed out of service times and

compensatory measures) for fire protection systems and components

ii. Control of transient combustibles

iii. Control of hot work

b. List of maintenance and surveillance testing procedures for alternative

shutdown capability and fire barriers, detectors, pumps, and suppression

systems; and

c. List of maintenance procedures which routinely verify fuse breaker

coordination in accordance with the post-fire safe shutdown coordination

analysis.

5

TRIENNIAL FIRE PROTECTION BASELINE INSPECTION DOCUMENT REQUEST

2. Design and Equipment Information:

a. Coordination calculations and/or justifications that verify fuse/breaker

coordination for selected fire zones/areas (to be determined during

information gathering visit) that are fed off of the same electrical buses as

components in the protected safe shutdown train;

b. Copies of significant fire protection and post-fire safe shutdown

related design change package descriptions (including their associated

10 CFR 50.59 evaluations) and Generic Letter 86-10 (or adverse to safe

shutdown) evaluations;

c. Gaseous suppression system pre-operational testing, if applicable, for

selected fire zones/areas (to be determined during information gathering

visit);

d. Hydraulic calculations and supporting test data which demonstrate operability

for water suppression systems, if applicable, for selected fire zones/areas

(to be determined during information gathering visit);

e. Alternating current coordination calculations for 4160Vac down to 480Vac

electrical systems; and

f. List of all fire protection or Appendix R calculations.

3. Assessment and Corrective Actions:

a. The three most recent fire protection Quality Assurance audits and/or fire

protection self-assessments.

4. Any updates to information previously provided.

IV. Information Requested to Be Provided Throughout the Inspection

1. Copies of any corrective action documents generated as a result of the inspection

teams questions or queries during this inspection.

2. Copies of the list of questions submitted by the inspection team members and the

status/resolution of the information requested (provided daily during the inspection

to each inspection team member).

If you have questions regarding the information requested, please contact the lead inspector.

6

B. Boles -2-

The first group lists information necessary to aid the inspection team in choosing specific focus areas for

the inspection. It is requested that this information be provided to the lead inspector via mail or

electronically no later than October 7, 2016. The second group also lists information and areas for

discussion necessary to aid the inspection team in choosing specific fire protection focus areas for the

inspection and to ensure that the inspection team is adequately prepared for the inspection. It is

requested this information be available during the information gathering visit October 31, 2016. The third

group of requested documents consists of those items that the team will review, or need access to, during

the inspection. Please have this information available by the first day of the second onsite inspection

week November 14, 2016. The fourth group lists the information necessary to aid the inspection team in

tracking issues identified as a result of the inspection. It is requested that this information be provided to

the lead inspector as the information is generated during the inspection. It is important that all of these

documents are up to date and complete in order to minimize the number of additional documents

requested during the preparation and/or the onsite portions of the inspection.

The lead inspector for this inspection is Mr. Alan Dahbur. We understand that our regulatory contact for

this inspection is Ms. Vicki Wadsworth of your organization. If there are any questions about the

inspection or the material requested, please contact the lead inspector at 630-829-9810, or via e-mail at

Alan.Dahbur@nrc.gov.

This letter does not contain new or amended information collection requirements subject to

the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection

requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The

NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or

an information collection requirement unless the requesting document displays a currently valid Office of

Management and Budget Control Number.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, Public Inspections,

Exemptions, Requests for Withholding, of the NRC's "Rules of Practice," a copy of this letter and its

enclosure will be available electronically for public inspection in the NRCs Public Document Room or

from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access

and Management System (ADAMS). ADAMS is accessible from the NRC Web site at

http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

Sincerely,

/RA/

Alan Dahbur, Senior Reactor Inspector

Engineering Branch 3

Division of Reactor Safety

Docket No. 50-346 and 72-014

License No. NPF-3

Enclosure:

Triennial Fire Protection Baseline

Inspection Document Request

cc: Distribution via LISTSERV

DISTRIBUTION:

Jeremy Bowen RidsNrrDirsIrib Resource Richard Skokowski Linda Linn

RidsNrrDorlLpl3-2 Resource Cynthia Pederson Allan Barker DRPIII

RidsNrrPMDavisBesse Resource Darrell Roberts Carole Ariano DRSIII

ADAMS Accession Number ML16210A043

Publicly Available Non-Publicly Available Sensitive Non-Sensitive

To receive a copy of this document, indicate in the concurrence box "C" = Copy without attach/encl "E" = Copy with attach/encl "N" = No copy

OFFICE RIII RIII RIII RIII

NAME ADahbur:cl

DATE 07/27/16

OFFICIAL RECORD COPY