| issue date = 03/23/2018
| issue date = 03/23/2018
| title = Ltr 03/23/18 LaSalle County Station, Units 1 and 2 - Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000373/2018002; 05000374/2018002 (DRS-V.Petrella)
| title = Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000373/2018002; 05000374/2018002 (DRS-V.Petrella)
| author name = Petrella V
| author name = Petrella V
| author affiliation = NRC/RGN-III
| author affiliation = NRC/RGN-III
Line 14: Line 14:
| page count = 9
| page count = 9
}}
}}
See also: [[followed by::IR 05000373/2018002]]
See also: [[see also::IR 05000373/2018002]]


=Text=
=Text=
{{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION III 2443 WARRENVILLE RD. SUITE 210 LISLE, ILLINOIS 60532-4352 March 23, 2018 Mr. Bryan C. Hanson Senior VP, Exelon Generation Company, LLC President and CNO, Exelon Nuclear 4300 Winfield Road Warrenville, IL 60555 SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002 Dear Mr. Hanson: On June 18, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion of the Triennial Heat Sink Performance Inspection at your LaSalle County Station, Units 1 and 2. This inspection will be performed in accordance with NRC Baseline Inspection Procedure 71111.07. In order to minimize the impact that the inspection has on the site and to ensure a productive inspection, we have enclosed a request for documents needed for the inspection. The documents have been divided into three groups. The first group lists information necessary for our initial inspection scoping activities. This information should be available to the lead inspector no later than April 23, 2018. By May 4, 2018, the inspector will communicate the initial selected set of approximately 2-3 risk-significant heat exchangers. The second group is needed to support our in-office preparation activities. This set of documents, including the calculations associated with the selected heat exchangers, should be available at the Regional Office no later than June 4, 2018. This information should be separated for each selected component, especially if provided electronically (e.g., folder with component name that includes calculations, condition reports, maintenance history, etc.). During the in-office preparation activities, the inspector may identify additional information needed to support the inspection. The last group includes the additional information above as well as plant specific reference material. This information should be available at the Regional Office no later than June 11, 2018. It is also requested that corrective action documents and/or questions developed during the inspection be provided to the inspector as the documents are generated during the inspection. All requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous Heat Sink Performance Inspection. If no activities were accomplished in that time period, then the request applies to the last applicable document in the previous time period. It is important that these documents be as complete as possible, in order to minimize the number of documents requested during the preparation week or during the onsite inspection.
{{#Wiki_filter:UNITED STATES
B. Hanson -2- The lead inspector for this inspection is Vance Petrella. We understand that our licensing contact for this inspection is Terry Lanc of your organization. If there are any questions about the inspection or the material requested in the enclosure, please contact the lead inspector at 630-829-9847 or via e-mail at Vance.Petrella@nrc.gov. This letter does not contain new or amended information collection requirements subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information collection requirements were approved by the Office of Management and Budget, Control Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to respond to, a request for information or an information collection requirement unless the requesting document displays a currently valid Office of Management and Budget Control Number.   This letter and its enclosure will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR Sincerely, /RA/   Vance Petrella, Reactor Engineer Engineering Branch 2 Division of Reactor Safety Docket Nos. 50373; 50374 License Nos. NPF11; NPF18 Enclosure: Document Request for Triennial Heat Sink  Performance Inspection cc: Distribution via LISTSERV
                              NUCLEAR REGULATORY COMMISSION
B. Hanson -3- Letter to Bryan C. Hanson from Vance Petrella dated March 23, 2018 SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002 DISTRIBUTION: Jeremy Bowen RidsNrrDorlLpl3 RidsNrrPMLaSalle RidsNrrDirsIrib Resource Steven West Darrell Roberts Richard Skokowski Allan Barker DRPIII DRSIII                           ADAMS Accession Number ML: 18082B381 OFFICE RIII RIII RIII RIII NAME VPetrella:cl   DATE 03/23/18   OFFICIAL RECORD COPY
                                                  REGION III
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION Enclosure Inspection Report: 05000373/2018002; 05000374/2018002 Inspection Dates: June 1822, 2018 Inspection Procedure: Lead Inspector: Vance Petrella 630-829-9847 Vance.Petrella@nrc.gov preferably on some portable electronic media (e.g., CD-ROM, DVD). The portable electronic media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of someone who has knowledge of light water reactor technology. I. Information Requested By April 23, 2018 1. List of the Generic Letter (GL) 89-cting Safety- heat exchangers in order of risk significance. 2. Copy of heat exchanger performance trending data tracked for each GL 89-13 heat exchanger. 3. List of Corrective Action Program documents (with a short description) associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling, aging, heat exchanger testing, and safety-related service water systems for the previous 3 years or since the last Corrective Action Program document list was sent to the NRC for the previous heat sink performance inspection. The list should include all corrective action program documents not on the last Corrective Action Program document list. 4. Copy of any self-assessment done on any of GL 89-13 heat exchangers, Ultimate Heat Sink (UHS), and safety-related service water systems since the last heat sink performance inspection. 5. Last two System Health Report(s) and maintenance rule system notebooks for all the GL 89-13 heat exchangers, UHS, and safety-related service water systems. 6. List of engineering-related operator workarounds (with a short description) associated with GL 89-13 heat exchangers. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. 7. List of permanent and temporary modifications (with a short description) associated with GL 89-13 heat exchangers, UHS, and safety-related service water systems. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.
                                      2443 WARRENVILLE RD. SUITE 210
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION 2 8. Electronic copies of the current Final Safety Analysis Report, Technical Specifications, Technical Specifications Basis, and Technical Report Manual. 9. List of enhancements and/or commitments made during license renewal for GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling water systems (as applicable). II. Information Requested By June 4, 2018 1. Copies of the GL 89-13 responses. 2. Copies of procedures developed to implement the recommendations of GL 89-13 (e.g., the GL 89-13 Heat Exchanger Program description). 3. Copies of the selected corrective action program documents. 4. For the specific heat exchangers selected: a. Copies of the Updated Final Safety Analysis Report (UFSAR) sections applicable for each heat exchanger. b. Copy of system description and design basis document for the heat exchangers (as applicable). c. Provide the calculations or evaluations that: i. establish the limiting design basis heat load required to be removed by each of these heat exchangers; ii. demonstrate the heat exchangers capacity to remove the limiting heat load; iii. correlate surveillance testing and/or inspection results from these heat exchangers with design basis heat removal capability (e.g., basis for surveillance test and/or inspection acceptance criteria); iv. evaluate the potential for water hammer in each heat exchanger or associated piping; and v. evaluate excessive tube vibration in each heat exchanger. d. Copy of any operability determinations or other documentation of degradation associated with the heat exchangers or the systems that support the operation for the selected heat exchangers. e. Copy of the construction code, design specification, heat exchanger data sheets, and vendor documents including component drawings applicable for the heat exchangers. f. Copies of normal, abnormal, and emergency operating procedures associated with the selected heat exchangers.
                                        LISLE, ILLINOIS 60532-4352
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION 3 g. Copies of the Aging Management Programs (AMP) and the implementing procedures that manage aging of the selected heat exchangers (as applicable). 5. For the UHS and the safety-related service water system (or equivalent): a. Copies of the applicable UFSAR sections. b. Copy of system description and design basis document (as applicable). c. Copy of any operability determinations or other documentation of degradation associated with the UHS and the safety-related service water system. d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that states the maximum cooling water system inlet temperature limit that still allows full licensed power operation of the nuclear reactor.   e. Copy of system description and design basis document (as applicable). f. Copy of the construction code and design specification. g. Copies of normal, abnormal, and emergency operating procedures associated with the UHS and safety-related service water systems including procedures for loss of these systems. h. Copies of corrective action documents associated with waterhammer or hydraulic transients in the service water system since the last Heat Sink Inspection. i. If available, provide an electronic copy of piping and instrumentation diagrams for the service water system, including the intake structure. j. Provide a list of calculations (with a short description), which currently apply to UHS and safety-related service water system. k. Provide a list of instruments (with a short description) associated with automatic or alarm functions for the safety-related service water system and/or UHS. l. Provide a list of any design change (with a short description) performed on the UHS or safety-related service water system since the last heat sink performance inspection. m. Copies of the AMPs and the implementing procedures that manage aging of the UHS (including the intake structure) and the safety-related service and closed cooling water systems (as applicable). 6. A schedule of all inspections, cleanings, maintenance, or testing of any safety-related plant heat exchanger to be performed during the onsite portion of the inspection.
                                            March 23, 2018
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION 4 III. Information Requested By June 11, 2018 1. For the specific heat exchangers selected. a. Copies of the two most recent completed tests and evaluation data confirming thermal performance for those heat exchangers which are performance tested.   b. Documentation and procedures that identify the types, accuracy, and location of any special instrumentation used for the two most recently completed thermal performance tests for the heat exchangers (e.g., high accuracy ultrasonic flow instruments or temperature instruments). Include calibration records for the instruments used during these tests.   c. Information regarding any alarms which monitor on-line performance.   d. Copy of the document describing the inspection results of each heat exchanger. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.   e. The cleaning and inspection maintenance schedule for each heat exchanger for the next 5 years.     f. Copy of the operating procedure that ensures that the maximum cooling water system inlet temperature limit is not exceeded.   g. The documents that describe the controls that prevent heat exchanger degradation due to excessive flow induced vibration during operation.   h. Copy of the periodic flow testing at or near maximum design flow. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.   i. Copy of the document which identifies the current number of tubes in service for each heat exchanger and the supporting calculation which establishes the maximum number of tubes which can be plugged in each heat exchanger.   j. Copy of the document establishing the repair criteria (plugging limit) for degraded tubes which are identified in each heat exchanger.   k. Copies of the documents that verify the structural integrity of the heat exchanger (e.g. eddy current summary sheets, ultrasonic testing results, and visual inspection results).     l. Copies of those documents that describe the methods taken to control water chemistry in the heat exchangers, including those credited by any AMPs (as applicable).  
Mr. Bryan C. Hanson
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION 5 m. Copies of any credited AMP monitoring/inspection results for the selected heat exchangers (as applicable). The requested documents are to be for any completed monitoring/inspection in the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. 2. For the UHS:   a. Copies of the inspection procedures for the verification of the structural integrity of underwater UHS and the associated results. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.   b. Copies of the maintenance and/or inspection procedures for underwater UHS sediment intrusion and the associated results including underwater diving inspections and/or sediment removal activities. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.   c. Copies of calculations and surveillances that determine the UHS reservoir capacity and heat transfer capability.   d. Copies of surveillance procedures and testing results performed on the instrumentation relied upon to determine UHS reservoir capability. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.  3. For the review associated with the system walkdown of the service water intake structure: a. Copies of corrective maintenance for the last 6 years associated with service water strainers, traveling screens and trash racks.   b. Copies of the last two inspections and/or surveillances associated with service water strainers, traveling screens and trash racks.   c. List of preventive maintenance, including frequency, associated with service water strainers, traveling screens and trash racks.   d. Copies of abnormal procedures for the traveling screens and service water strainers. e. Copies of the last two inspections and/or surveillances documenting that component mounts have not excessively degraded (i.e., due to corrosion). For example, inspections for the mounts for the, Service water pumps, service water strainers, traveling screens and trash racks.   f. Copies of the documents associated with the monitoring, trending, and remediation of silt accumulation at the service water pump bay.  
Senior VP, Exelon Generation Company, LLC
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION 6 g. Copies of surveillance procedures and testing results performed on the service water pump bay water level instruments. The requested documents are to be for the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection.   h. Copies of procedures associated with operating during adverse weather conditions (e.g. icing, high temperatures, or low level).   i. Copy of the evaluation for the potential effects of low flow/level on underwater weir walls intended to limit silt or sand intake, if applicable.   j. Copies of any credited AMP monitoring/inspection results for the safety-related service and closed cooling water systems, and the UHS (as applicable). The requested documents are to be for any completed monitoring/inspection in the time period from the onsite inspection period back to the documents that were provided in response to the previous heat sink performance inspection. If the information requested above will not be available, please contact Vance Petrella as soon as possible at 630-829-9847 or e-mail Vance.Petrella@nrc.gov.
President and CNO, Exelon Nuclear
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC
              TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR
              INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002
Dear Mr. Hanson:
On June 18, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion
of the Triennial Heat Sink Performance Inspection at your LaSalle County Station, Units 1 and
2. This inspection will be performed in accordance with NRC Baseline Inspection Procedure
71111.07.
In order to minimize the impact that the inspection has on the site and to ensure a productive
inspection, we have enclosed a request for documents needed for the inspection. The
documents have been divided into three groups.
    The first group lists information necessary for our initial inspection scoping activities.
    This information should be available to the lead inspector no later than April 23, 2018.
    By May 4, 2018, the inspector will communicate the initial selected set of approximately
    2-3 risk-significant heat exchangers.
    The second group is needed to support our in-office preparation activities. This set of
    documents, including the calculations associated with the selected heat exchangers, should
    be available at the Regional Office no later than June 4, 2018. This information should be
    separated for each selected component, especially if provided electronically (e.g., folder with
    component name that includes calculations, condition reports, maintenance history, etc.).
    During the in-office preparation activities, the inspector may identify additional information
    needed to support the inspection.
    The last group includes the additional information above as well as plant specific
    reference material. This information should be available at the Regional Office no later than
    June 11, 2018. It is also requested that corrective action documents and/or questions
    developed during the inspection be provided to the inspector as the documents are
    generated during the inspection.
All requested documents are to be for the time period from the onsite inspection period back
to the documents that were provided in response to the previous Heat Sink Performance
Inspection. If no activities were accomplished in that time period, then the request applies to the
last applicable document in the previous time period. It is important that these documents be as
complete as possible, in order to minimize the number of documents requested during the
preparation week or during the onsite inspection.
 
B. Hanson                                     -2-
The lead inspector for this inspection is Vance Petrella. We understand that our licensing
contact for this inspection is Terry Lanc of your organization. If there are any questions about
the inspection or the material requested in the enclosure, please contact the lead inspector at
630-829-9847 or via e-mail at Vance.Petrella@nrc.gov.
This letter does not contain new or amended information collection requirements subject
to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information
collection requirements were approved by the Office of Management and Budget, Control
Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to
respond to, a request for information or an information collection requirement unless the
requesting document displays a currently valid Office of Management and Budget Control
Number.
This letter and its enclosure will be made available for public inspection and copying at
http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in
accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.
                                              Sincerely,
                                              /RA/
                                              Vance Petrella, Reactor Engineer
                                              Engineering Branch 2
                                              Division of Reactor Safety
Docket Nos. 50-373; 50-374
License Nos. NPF-11; NPF-18
Enclosure:
Document Request for Triennial Heat Sink
   Performance Inspection
cc: Distribution via LISTSERV
 
B. Hanson                                 -3-
Letter to Bryan C. Hanson from Vance Petrella dated March 23, 2018
SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC
            TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR
            INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002
DISTRIBUTION:
Jeremy Bowen
RidsNrrDorlLpl3
RidsNrrPMLaSalle
RidsNrrDirsIrib Resource
Steven West
Darrell Roberts
Richard Skokowski
Allan Barker
DRPIII
DRSIII
ADAMS Accession Number ML: 18082B381
  OFFICE RIII                   RIII               RIII           RIII
  NAME       VPetrella:cl
  DATE       03/23/18
                                OFFICIAL RECORD COPY
 
    DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
Inspection Report:             05000373/2018002; 05000374/2018002
Inspection Dates:               June 18-22, 2018
Inspection Procedure:           IP 71111.07, Heat Sink Performance
Lead Inspector:                 Vance Petrella
                                630-829-9847
                                Vance.Petrella@nrc.gov
Please provide the information electronically in pdf files, Excel, or other searchable formats,
preferably on some portable electronic media (e.g., CD-ROM, DVD). The portable electronic
media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of
use. Information in lists should contain enough information to be easily understood by
someone who has knowledge of light water reactor technology.
I.     Information Requested By April 23, 2018
        1.     List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting
              Safety-Related Equipment, heat exchangers in order of risk significance.
        2.     Copy of heat exchanger performance trending data tracked for each GL 89-13
              heat exchanger.
        3.     List of Corrective Action Program documents (with a short description)
              associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,
              aging, heat exchanger testing, and safety-related service water systems for the
              previous 3 years or since the last Corrective Action Program document list was
              sent to the NRC for the previous heat sink performance inspection. The list
              should include all corrective action program documents not on the last Corrective
              Action Program document list.
        4.     Copy of any self-assessment done on any of GL 89-13 heat exchangers,
              Ultimate Heat Sink (UHS), and safety-related service water systems since the
              last heat sink performance inspection.
        5.     Last two System Health Report(s) and maintenance rule system notebooks for all
              the GL 89-13 heat exchangers, UHS, and safety-related service water systems.
        6.     List of engineering-related operator workarounds (with a short description)
              associated with GL 89-13 heat exchangers. The requested documents are to be
              for the time period from the onsite inspection period back to the documents that
              were provided in response to the previous heat sink performance inspection.
        7.     List of permanent and temporary modifications (with a short description)
              associated with GL 89-13 heat exchangers, UHS, and safety-related service
              water systems. The requested documents are to be for the time period from the
              onsite inspection period back to the documents that were provided in response to
              the previous heat sink performance inspection.
                                                                                          Enclosure
 
    DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
      8.   Electronic copies of the current Final Safety Analysis Report, Technical
            Specifications, Technical Specifications Basis, and Technical Report Manual.
      9.   List of enhancements and/or commitments made during license renewal for
            GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling
            water systems (as applicable).
II.   Information Requested By June 4, 2018
      1.   Copies of the GL 89-13 responses.
      2.   Copies of procedures developed to implement the recommendations of GL 89-13
            (e.g., the GL 89-13 Heat Exchanger Program description).
      3.   Copies of the selected corrective action program documents.
      4.   For the specific heat exchangers selected:
            a. Copies of the Updated Final Safety Analysis Report (UFSAR) sections
                applicable for each heat exchanger.
            b. Copy of system description and design basis document for the heat
                exchangers (as applicable).
            c. Provide the calculations or evaluations that:
                  i. establish the limiting design basis heat load required to be removed by
                    each of these heat exchangers;
                ii. demonstrate the heat exchangers capacity to remove the limiting heat
                    load;
                iii. correlate surveillance testing and/or inspection results from these heat
                    exchangers with design basis heat removal capability (e.g., basis for
                    surveillance test and/or inspection acceptance criteria);
                iv. evaluate the potential for water hammer in each heat exchanger or
                    associated piping; and
                v. evaluate excessive tube vibration in each heat exchanger.
            d. Copy of any operability determinations or other documentation of degradation
                associated with the heat exchangers or the systems that support the
                operation for the selected heat exchangers.
            e. Copy of the construction code, design specification, heat exchanger data
                sheets, and vendor documents including component drawings applicable for
                the heat exchangers.
            f.   Copies of normal, abnormal, and emergency operating procedures
                associated with the selected heat exchangers.
                                                2
 
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
      g. Copies of the Aging Management Programs (AMP) and the implementing
          procedures that manage aging of the selected heat exchangers (as
          applicable).
  5. For the UHS and the safety-related service water system (or equivalent):
      a. Copies of the applicable UFSAR sections.
      b. Copy of system description and design basis document (as applicable).
      c. Copy of any operability determinations or other documentation of degradation
          associated with the UHS and the safety-related service water system.
      d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that
          states the maximum cooling water system inlet temperature limit that still
          allows full licensed power operation of the nuclear reactor.
      e. Copy of system description and design basis document (as applicable).
      f. Copy of the construction code and design specification.
      g. Copies of normal, abnormal, and emergency operating procedures
          associated with the UHS and safety-related service water systems including
          procedures for loss of these systems.
      h. Copies of corrective action documents associated with waterhammer or
          hydraulic transients in the service water system since the last Heat Sink
          Inspection.
      i. If available, provide an electronic copy of piping and instrumentation
          diagrams for the service water system, including the intake structure.
      j. Provide a list of calculations (with a short description), which currently apply
          to UHS and safety-related service water system.
      k. Provide a list of instruments (with a short description) associated with
          automatic or alarm functions for the safety-related service water system
          and/or UHS.
      l. Provide a list of any design change (with a short description) performed on
          the UHS or safety-related service water system since the last heat sink
          performance inspection.
      m. Copies of the AMPs and the implementing procedures that manage aging of
          the UHS (including the intake structure) and the safety-related service and
          closed cooling water systems (as applicable).
  6. A schedule of all inspections, cleanings, maintenance, or testing of any
      safety-related plant heat exchanger to be performed during the onsite portion
      of the inspection.
                                          3
 
    DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
III.   Information Requested By June 11, 2018
      1.   For the specific heat exchangers selected.
            a. Copies of the two most recent completed tests and evaluation data
                confirming thermal performance for those heat exchangers which are
                performance tested.
            b. Documentation and procedures that identify the types, accuracy, and location
                of any special instrumentation used for the two most recently completed
                thermal performance tests for the heat exchangers (e.g., high accuracy
                ultrasonic flow instruments or temperature instruments). Include calibration
                records for the instruments used during these tests.
            c. Information regarding any alarms which monitor on-line performance.
            d. Copy of the document describing the inspection results of each heat
                exchanger. The requested documents are to be for the time period from the
                onsite inspection period back to the documents that were provided in
                response to the previous heat sink performance inspection.
            e. The cleaning and inspection maintenance schedule for each heat exchanger
                for the next 5 years.
            f. Copy of the operating procedure that ensures that the maximum cooling
                water system inlet temperature limit is not exceeded.
            g. The documents that describe the controls that prevent heat exchanger
                degradation due to excessive flow induced vibration during operation.
            h. Copy of the periodic flow testing at or near maximum design flow. The
                requested documents are to be for the time period from the onsite inspection
                period back to the documents that were provided in response to the previous
                heat sink performance inspection.
            i. Copy of the document which identifies the current number of tubes in service
                for each heat exchanger and the supporting calculation which establishes the
                maximum number of tubes which can be plugged in each heat exchanger.
            j. Copy of the document establishing the repair criteria (plugging limit) for
                degraded tubes which are identified in each heat exchanger.
            k. Copies of the documents that verify the structural integrity of the heat
                exchanger (e.g. eddy current summary sheets, ultrasonic testing results, and
                visual inspection results).
            l. Copies of those documents that describe the methods taken to control water
                chemistry in the heat exchangers, including those credited by any AMPs (as
                applicable).
                                              4
 
DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
      m. Copies of any credited AMP monitoring/inspection results for the selected
          heat exchangers (as applicable). The requested documents are to be for any
          completed monitoring/inspection in the time period from the onsite inspection
          period back to the documents that were provided in response to the previous
          heat sink performance inspection.
  2. For the UHS:
      a. Copies of the inspection procedures for the verification of the structural
          integrity of underwater UHS and the associated results. The requested
          documents are to be for the time period from the onsite inspection period
          back to the documents that were provided in response to the previous heat
          sink performance inspection.
      b. Copies of the maintenance and/or inspection procedures for underwater UHS
          sediment intrusion and the associated results including underwater diving
          inspections and/or sediment removal activities. The requested documents
          are to be for the time period from the onsite inspection period back to the
          documents that were provided in response to the previous heat sink
          performance inspection.
      c. Copies of calculations and surveillances that determine the UHS reservoir
          capacity and heat transfer capability.
      d. Copies of surveillance procedures and testing results performed on the
          instrumentation relied upon to determine UHS reservoir capability. The
          requested documents are to be for the time period from the onsite inspection
          period back to the documents that were provided in response to the previous
          heat sink performance inspection.
   3. For the review associated with the system walkdown of the service water intake
      structure:
      a. Copies of corrective maintenance for the last 6 years associated with service
          water strainers, traveling screens and trash racks.
      b. Copies of the last two inspections and/or surveillances associated with
          service water strainers, traveling screens and trash racks.
      c. List of preventive maintenance, including frequency, associated with service
          water strainers, traveling screens and trash racks.
      d. Copies of abnormal procedures for the traveling screens and service water
          strainers.
      e. Copies of the last two inspections and/or surveillances documenting that
          component mounts have not excessively degraded (i.e., due to corrosion).
          For example, inspections for the mounts for the, Service water pumps,
          service water strainers, traveling screens and trash racks.
      f. Copies of the documents associated with the monitoring, trending, and
          remediation of silt accumulation at the service water pump bay.
                                        5
 
    DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION
                g. Copies of surveillance procedures and testing results performed on the
                    service water pump bay water level instruments. The requested documents
                    are to be for the time period from the onsite inspection period back to the
                    documents that were provided in response to the previous heat sink
                    performance inspection.
                h. Copies of procedures associated with operating during adverse weather
                    conditions (e.g. icing, high temperatures, or low level).
                i. Copy of the evaluation for the potential effects of low flow/level on underwater
                    weir walls intended to limit silt or sand intake, if applicable.
                j. Copies of any credited AMP monitoring/inspection results for the
                    safety-related service and closed cooling water systems, and the UHS (as
                    applicable). The requested documents are to be for any completed
                    monitoring/inspection in the time period from the onsite inspection period
                    back to the documents that were provided in response to the previous heat
                    sink performance inspection.
If the information requested above will not be available, please contact Vance Petrella as soon
as possible at 630-829-9847 or e-mail Vance.Petrella@nrc.gov.
                                                    6
}}
}}

Latest revision as of 21:13, 15 November 2019

Notification of an NRC Triennial Heat Sink Performance Inspection and Request for Information; Inspection Report 05000373/2018002; 05000374/2018002 (DRS-V.Petrella)
ML18082B381
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 03/23/2018
From: Vance Petrella
NRC/RGN-III
To: Bryan Hanson
Exelon Generation Co, Exelon Nuclear
References
IR 2018002
Download: ML18082B381 (9)


See also: IR 05000373/2018002

Text

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION III

2443 WARRENVILLE RD. SUITE 210

LISLE, ILLINOIS 60532-4352

March 23, 2018

Mr. Bryan C. Hanson

Senior VP, Exelon Generation Company, LLC

President and CNO, Exelon Nuclear

4300 Winfield Road

Warrenville, IL 60555

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002

Dear Mr. Hanson:

On June 18, 2018, the U.S. Nuclear Regulatory Commission (NRC) will begin the onsite portion

of the Triennial Heat Sink Performance Inspection at your LaSalle County Station, Units 1 and

2. This inspection will be performed in accordance with NRC Baseline Inspection Procedure 71111.07.

In order to minimize the impact that the inspection has on the site and to ensure a productive

inspection, we have enclosed a request for documents needed for the inspection. The

documents have been divided into three groups.

The first group lists information necessary for our initial inspection scoping activities.

This information should be available to the lead inspector no later than April 23, 2018.

By May 4, 2018, the inspector will communicate the initial selected set of approximately

2-3 risk-significant heat exchangers.

The second group is needed to support our in-office preparation activities. This set of

documents, including the calculations associated with the selected heat exchangers, should

be available at the Regional Office no later than June 4, 2018. This information should be

separated for each selected component, especially if provided electronically (e.g., folder with

component name that includes calculations, condition reports, maintenance history, etc.).

During the in-office preparation activities, the inspector may identify additional information

needed to support the inspection.

The last group includes the additional information above as well as plant specific

reference material. This information should be available at the Regional Office no later than

June 11, 2018. It is also requested that corrective action documents and/or questions

developed during the inspection be provided to the inspector as the documents are

generated during the inspection.

All requested documents are to be for the time period from the onsite inspection period back

to the documents that were provided in response to the previous Heat Sink Performance

Inspection. If no activities were accomplished in that time period, then the request applies to the

last applicable document in the previous time period. It is important that these documents be as

complete as possible, in order to minimize the number of documents requested during the

preparation week or during the onsite inspection.

B. Hanson -2-

The lead inspector for this inspection is Vance Petrella. We understand that our licensing

contact for this inspection is Terry Lanc of your organization. If there are any questions about

the inspection or the material requested in the enclosure, please contact the lead inspector at

630-829-9847 or via e-mail at Vance.Petrella@nrc.gov.

This letter does not contain new or amended information collection requirements subject

to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). Existing information

collection requirements were approved by the Office of Management and Budget, Control

Number 3150-0011. The NRC may not conduct or sponsor, and a person is not required to

respond to, a request for information or an information collection requirement unless the

requesting document displays a currently valid Office of Management and Budget Control

Number.

This letter and its enclosure will be made available for public inspection and copying at

http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in

accordance with 10 CFR 2.390, Public Inspections, Exemptions, Requests for Withholding.

Sincerely,

/RA/

Vance Petrella, Reactor Engineer

Engineering Branch 2

Division of Reactor Safety

Docket Nos. 50-373; 50-374

License Nos. NPF-11; NPF-18

Enclosure:

Document Request for Triennial Heat Sink

Performance Inspection

cc: Distribution via LISTSERV

B. Hanson -3-

Letter to Bryan C. Hanson from Vance Petrella dated March 23, 2018

SUBJECT: LASALLE COUNTY STATION, UNITS 1 AND 2NOTIFICATION OF AN NRC

TRIENNIAL HEAT SINK PERFORMANCE INSPECTION AND REQUEST FOR

INFORMATION; INSPECTION REPORT 05000373/2018002; 05000374/2018002

DISTRIBUTION:

Jeremy Bowen

RidsNrrDorlLpl3

RidsNrrPMLaSalle

RidsNrrDirsIrib Resource

Steven West

Darrell Roberts

Richard Skokowski

Allan Barker

DRPIII

DRSIII

ADAMS Accession Number ML: 18082B381

OFFICE RIII RIII RIII RIII

NAME VPetrella:cl

DATE 03/23/18

OFFICIAL RECORD COPY

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

Inspection Report: 05000373/2018002; 05000374/2018002

Inspection Dates: June 18-22, 2018

Inspection Procedure: IP 71111.07, Heat Sink Performance

Lead Inspector: Vance Petrella

630-829-9847

Vance.Petrella@nrc.gov

Please provide the information electronically in pdf files, Excel, or other searchable formats,

preferably on some portable electronic media (e.g., CD-ROM, DVD). The portable electronic

media should contain descriptive names, and be indexed and hyperlinked to facilitate ease of

use. Information in lists should contain enough information to be easily understood by

someone who has knowledge of light water reactor technology.

I. Information Requested By April 23, 2018

1. List of the Generic Letter (GL) 89-13, Service Water System Problems Affecting

Safety-Related Equipment, heat exchangers in order of risk significance.

2. Copy of heat exchanger performance trending data tracked for each GL 89-13

heat exchanger.

3. List of Corrective Action Program documents (with a short description)

associated with GL 89-13 heat exchangers, heat sinks, silting, corrosion, fouling,

aging, heat exchanger testing, and safety-related service water systems for the

previous 3 years or since the last Corrective Action Program document list was

sent to the NRC for the previous heat sink performance inspection. The list

should include all corrective action program documents not on the last Corrective

Action Program document list.

4. Copy of any self-assessment done on any of GL 89-13 heat exchangers,

Ultimate Heat Sink (UHS), and safety-related service water systems since the

last heat sink performance inspection.

5. Last two System Health Report(s) and maintenance rule system notebooks for all

the GL 89-13 heat exchangers, UHS, and safety-related service water systems.

6. List of engineering-related operator workarounds (with a short description)

associated with GL 89-13 heat exchangers. The requested documents are to be

for the time period from the onsite inspection period back to the documents that

were provided in response to the previous heat sink performance inspection.

7. List of permanent and temporary modifications (with a short description)

associated with GL 89-13 heat exchangers, UHS, and safety-related service

water systems. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in response to

the previous heat sink performance inspection.

Enclosure

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

8. Electronic copies of the current Final Safety Analysis Report, Technical

Specifications, Technical Specifications Basis, and Technical Report Manual.

9. List of enhancements and/or commitments made during license renewal for

GL 89-13 heat exchangers, UHS, and safety-related service and closed cooling

water systems (as applicable).

II. Information Requested By June 4, 2018

1. Copies of the GL 89-13 responses.

2. Copies of procedures developed to implement the recommendations of GL 89-13

(e.g., the GL 89-13 Heat Exchanger Program description).

3. Copies of the selected corrective action program documents.

4. For the specific heat exchangers selected:

a. Copies of the Updated Final Safety Analysis Report (UFSAR) sections

applicable for each heat exchanger.

b. Copy of system description and design basis document for the heat

exchangers (as applicable).

c. Provide the calculations or evaluations that:

i. establish the limiting design basis heat load required to be removed by

each of these heat exchangers;

ii. demonstrate the heat exchangers capacity to remove the limiting heat

load;

iii. correlate surveillance testing and/or inspection results from these heat

exchangers with design basis heat removal capability (e.g., basis for

surveillance test and/or inspection acceptance criteria);

iv. evaluate the potential for water hammer in each heat exchanger or

associated piping; and

v. evaluate excessive tube vibration in each heat exchanger.

d. Copy of any operability determinations or other documentation of degradation

associated with the heat exchangers or the systems that support the

operation for the selected heat exchangers.

e. Copy of the construction code, design specification, heat exchanger data

sheets, and vendor documents including component drawings applicable for

the heat exchangers.

f. Copies of normal, abnormal, and emergency operating procedures

associated with the selected heat exchangers.

2

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

g. Copies of the Aging Management Programs (AMP) and the implementing

procedures that manage aging of the selected heat exchangers (as

applicable).

5. For the UHS and the safety-related service water system (or equivalent):

a. Copies of the applicable UFSAR sections.

b. Copy of system description and design basis document (as applicable).

c. Copy of any operability determinations or other documentation of degradation

associated with the UHS and the safety-related service water system.

d. Copy of the document (e.g., UFSAR or Technical Requirements Manual) that

states the maximum cooling water system inlet temperature limit that still

allows full licensed power operation of the nuclear reactor.

e. Copy of system description and design basis document (as applicable).

f. Copy of the construction code and design specification.

g. Copies of normal, abnormal, and emergency operating procedures

associated with the UHS and safety-related service water systems including

procedures for loss of these systems.

h. Copies of corrective action documents associated with waterhammer or

hydraulic transients in the service water system since the last Heat Sink

Inspection.

i. If available, provide an electronic copy of piping and instrumentation

diagrams for the service water system, including the intake structure.

j. Provide a list of calculations (with a short description), which currently apply

to UHS and safety-related service water system.

k. Provide a list of instruments (with a short description) associated with

automatic or alarm functions for the safety-related service water system

and/or UHS.

l. Provide a list of any design change (with a short description) performed on

the UHS or safety-related service water system since the last heat sink

performance inspection.

m. Copies of the AMPs and the implementing procedures that manage aging of

the UHS (including the intake structure) and the safety-related service and

closed cooling water systems (as applicable).

6. A schedule of all inspections, cleanings, maintenance, or testing of any

safety-related plant heat exchanger to be performed during the onsite portion

of the inspection.

3

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

III. Information Requested By June 11, 2018

1. For the specific heat exchangers selected.

a. Copies of the two most recent completed tests and evaluation data

confirming thermal performance for those heat exchangers which are

performance tested.

b. Documentation and procedures that identify the types, accuracy, and location

of any special instrumentation used for the two most recently completed

thermal performance tests for the heat exchangers (e.g., high accuracy

ultrasonic flow instruments or temperature instruments). Include calibration

records for the instruments used during these tests.

c. Information regarding any alarms which monitor on-line performance.

d. Copy of the document describing the inspection results of each heat

exchanger. The requested documents are to be for the time period from the

onsite inspection period back to the documents that were provided in

response to the previous heat sink performance inspection.

e. The cleaning and inspection maintenance schedule for each heat exchanger

for the next 5 years.

f. Copy of the operating procedure that ensures that the maximum cooling

water system inlet temperature limit is not exceeded.

g. The documents that describe the controls that prevent heat exchanger

degradation due to excessive flow induced vibration during operation.

h. Copy of the periodic flow testing at or near maximum design flow. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

i. Copy of the document which identifies the current number of tubes in service

for each heat exchanger and the supporting calculation which establishes the

maximum number of tubes which can be plugged in each heat exchanger.

j. Copy of the document establishing the repair criteria (plugging limit) for

degraded tubes which are identified in each heat exchanger.

k. Copies of the documents that verify the structural integrity of the heat

exchanger (e.g. eddy current summary sheets, ultrasonic testing results, and

visual inspection results).

l. Copies of those documents that describe the methods taken to control water

chemistry in the heat exchangers, including those credited by any AMPs (as

applicable).

4

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

m. Copies of any credited AMP monitoring/inspection results for the selected

heat exchangers (as applicable). The requested documents are to be for any

completed monitoring/inspection in the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

2. For the UHS:

a. Copies of the inspection procedures for the verification of the structural

integrity of underwater UHS and the associated results. The requested

documents are to be for the time period from the onsite inspection period

back to the documents that were provided in response to the previous heat

sink performance inspection.

b. Copies of the maintenance and/or inspection procedures for underwater UHS

sediment intrusion and the associated results including underwater diving

inspections and/or sediment removal activities. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

c. Copies of calculations and surveillances that determine the UHS reservoir

capacity and heat transfer capability.

d. Copies of surveillance procedures and testing results performed on the

instrumentation relied upon to determine UHS reservoir capability. The

requested documents are to be for the time period from the onsite inspection

period back to the documents that were provided in response to the previous

heat sink performance inspection.

3. For the review associated with the system walkdown of the service water intake

structure:

a. Copies of corrective maintenance for the last 6 years associated with service

water strainers, traveling screens and trash racks.

b. Copies of the last two inspections and/or surveillances associated with

service water strainers, traveling screens and trash racks.

c. List of preventive maintenance, including frequency, associated with service

water strainers, traveling screens and trash racks.

d. Copies of abnormal procedures for the traveling screens and service water

strainers.

e. Copies of the last two inspections and/or surveillances documenting that

component mounts have not excessively degraded (i.e., due to corrosion).

For example, inspections for the mounts for the, Service water pumps,

service water strainers, traveling screens and trash racks.

f. Copies of the documents associated with the monitoring, trending, and

remediation of silt accumulation at the service water pump bay.

5

DOCUMENT REQUEST FOR TRIENNIAL HEAT SINK PERFORMANCE INSPECTION

g. Copies of surveillance procedures and testing results performed on the

service water pump bay water level instruments. The requested documents

are to be for the time period from the onsite inspection period back to the

documents that were provided in response to the previous heat sink

performance inspection.

h. Copies of procedures associated with operating during adverse weather

conditions (e.g. icing, high temperatures, or low level).

i. Copy of the evaluation for the potential effects of low flow/level on underwater

weir walls intended to limit silt or sand intake, if applicable.

j. Copies of any credited AMP monitoring/inspection results for the

safety-related service and closed cooling water systems, and the UHS (as

applicable). The requested documents are to be for any completed

monitoring/inspection in the time period from the onsite inspection period

back to the documents that were provided in response to the previous heat

sink performance inspection.

If the information requested above will not be available, please contact Vance Petrella as soon

as possible at 630-829-9847 or e-mail Vance.Petrella@nrc.gov.

6