IR 05000498/2018403: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML18197A371
| number = ML18351A428
| issue date = 07/16/2018
| issue date = 12/17/2018
| title = NRC Security Inspection Report 05000498/2018403; 05000499/2018403
| title = Errata - South Texas Project Electric Generating Station, Units 1 and 2 - NRC Security Inspection Report 05000498/2018403; 05000499/2018403
| author name = Groom J
| author name = Holman D
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| author affiliation = NRC/RGN-IV/DRS/PSB-1
| addressee name = Powell G
| addressee name = Powell G
Line 12: Line 12:
| document report number = IR 2018403
| document report number = IR 2018403
| document type = Inspection Report, Letter
| document type = Inspection Report, Letter
| page count = 7
| page count = 10
}}
}}


Line 18: Line 18:


=Text=
=Text=
{{#Wiki_filter:July 16, 2018
{{#Wiki_filter:ber 17, 2018


==SUBJECT:==
==SUBJECT:==
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403
ERRATA - SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403


==Dear Mr. Powell:==
==Dear Mr. Powell:==
On, June 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your South Texas Project Electric Generating Station, Units 1 and 2, facility.
The NRC has confirmed an error in the NRC Inspection Report No. 05000498/2018403, 05000499/2018403, July 16, 2018 (Agencywide Document Access Management System (ADAMS) Accession No. ML18197A371). Specifically, the report omitted the scope and results of the performance indicator verification sample that was completed according to Inspection Procedure 71151 Performance Indicator Verification. The NRC has reissued the report in its entirety to correct this error.
 
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).


The NRC inspector discussed the results of this inspection with Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of your staff. The results of this inspection are documented in the enclosed report.
However, the enclosed, revised report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


The NRC inspectors did not identify any finding or violation of more than minor significance.
Sincerely,
/RA/
David A. Holman, Chief Plant Support Branch 1 ber 17, 2018


In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS)
==SUBJECT:==
. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403


If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response "Security-Related Information
==Dear Mr. Powell:==
- Withhold from Public Disclosure Under 10 CFR 2.390" (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).
On, June 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your South Texas Project Electric Generating Station, Units 1 and 2, facility. The NRC inspector discussed the results of this inspection with Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of your staff. The results of this inspection are documented in the enclosed report.


Sincerely,
The NRC inspector did not identify any finding or violation of more than minor significance.
/RA/ Jeremy R. Groom, Chief Plant Support Branch 1 Division Reactor Safety Docket No s. 50-4 98 , 50-4 99 License No s. NPF-76 and NPF-80 Enclosures:
Inspection Report 050004 98/201840 3 , 050004 99/201840 3 Enclosure U.S. NUCLEAR REGULATORY COMMISSION


==Inspection Report==
In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Docket Nos.:
050004 98, 050004 99 License No s.: NPF-76 , NPF-8 0 Report No.: 05000445/201840 5; 05000446/201840 5 Enterprise Identifier:
I-2018-403-0008 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: Wadsworth, Texas Dates: June 18 to J une 2 1 , 2018 Inspector:
A. Meyen, Physical Security Inspector Approved By:
Jeremy R. Groom Chief, Plant Support Branch 1 Division of Reactor Safety


2  
If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).


=EXECUTIVE SUMMARY=
Sincerely,
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensee's performance by conducting a Baseline Security Inspection at South Texas Project Electric Generating Station, Units 1 and 2
/RA/
David A. Holman, Chief Plant Support Branch 1 Division Reactor Safety Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80 Enclosure:
NRC Inspection Report 05000498/2018403, 05000499/2018403


, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRC's program for overseeing the safe operation of commercial nuclear power reactors.
U.S. NUCLEAR REGULATORY COMMISSION Region IV Docket Nos.: 05000498, 05000499 License Nos.: NPF-76, NPF-80 Report Nos.: 05000445/2018403; 05000446/2018403 Enterprise Identifier: I-2018-403-0008 Licensee:  STP Nuclear Operating Company Facility:  South Texas Project Electric Generating Station, Units 1 and 2 Location:  Wadsworth, Texas 77483 Dates:  June 18, 2018 to June 21, 2018 Inspector:  A. Meyen, Physical Security Inspector Approved By:  David A. Holman Chief, Plant Support Branch 1 Division of Reactor Safety Enclosure


Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.
=SUMMARY=
The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.


List of Findings and Violations No Findings Additional Tracking Items No Additional Items 3  Report Details
List of Findings and Violations No Findings Additional Tracking Items No Additional Items


=INSPECTION SCOPES=
=INSPECTION SCOPES=
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, "Security Inspection Program for Commercial Nuclear Power Reactors.The inspectors reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.
 
Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.


==SAFEGUARDS==
==SAFEGUARDS==
IP 71130.0 2 - Access Control (1 Sample)  The inspector evaluated the security program. The following elements were evaluated:
 
Tier I: all 19 requirements Tier II: all 7 requirements Tier III: all 1 requirement
==71130.02 - Access Control==
{{IP sample|IP=IP 71130.02|count=1}}
 
The inspector evaluated the security program. The following elements were evaluated:
Tier I: all 19 requirements Tier II: all 7 requirements Tier III: all 1 requirement
 
===71151 - Performance Indicator Verification ===
{{IP sample|IP=IP 71151|count=1}}
The inspector verified licensee performance indicators submittals listed below for the period from October 2017 through June 2018 Protected Area Security Equipment Performance Index.
: (1) Protected Area Security Equipment Performance Index


==INSPECTION RESULTS==
==INSPECTION RESULTS==
Line 69: Line 79:


==EXIT MEETINGS AND DEBRIEFS==
==EXIT MEETINGS AND DEBRIEFS==
The inspector verified no proprietary information was retained or documented in this report.
On June 21, 2018, the inspector presented the Baseline Security Inspection results to Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report.


On June 2 1, 2018, the inspectors presented the Baseline Security Inspection results to Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report. The inspector confirmed that proprietary information was controlled to protect from public disclosure
=DOCUMENTS REVIEWED=
.
4


=DOCUMENTS REVIEWED=
71130.02 - Access Control
Procedure Type            Designation          Description or Title                Revision
71130.02 Procedure        OPGP03-ZS-0001 Vehicle, Material and Personnel          50
Access Control
OPGP03-ZS-0005 Control of Keys, Locks, Cores,            22
Keycards and Passwords
OPGO-ZA-0001 Plant Access Authorization                  34
Program
Security      1005              Security Incidents                    8
Instructions  1006              Security Performance Indicator        10
Calculation
2101              Access Control                        29
2402              Alarm Station Operator                26
3701              Security Equipment Operability        37
Test
3702              Explosive Detector Operability        4
Test
3001              Security Force Communications        10
Misc.              Designated Vehicle List 5-30-18      N/A
Security      SEL                Security Event Logs Dates,            N/A
Logs                            10-03-17 to 5-31-18
Logs              Security Daily Logs(CAS)              N/A
Dates, 6/1/18 - 6/20/18
Self-Assessment Access Control Self-Assessment          N/A
Audits                          5-10-18
Audit 17-02        Physical Security Quality Audit      N/A
Report
Condition Reports
17-21674          17-21675          17-21680            17-21728            17-21742
17-21678          17-21714          17-21717            17-21720            17-21740
17-21741          17-15288          17-02145            17-17882            17-22663
17-21346          18-542            18-818              18-233              18-1620
 
ML18351A428
Cover Letter            ADAMS:          Non-Publicly Available      Non-Sensitive Keyword:
SUNSI Review By: ADM  Yes  No        Publicly Available          Sensitive
OFFICE        PSI:PSB1      C:PSB1        C:RPB          C:PSB1
NAME          AMeyen        DHolman        NTaylor        DHolman
SIGNATURE      /RA/          /RA/          /RA/            /RA/
DATE          12/13/18      12/13/18      12/13/18        12/17/18


Procedure
ML18351A428
Type              Designation                Description or Title                            Revision
Entire Report:           ADAMS:         Non-Publicly Available     Non-Sensitive Keyword:
71130.0 2 Procedure      Security Instructions
SUNSI Review By: ADM  Yes No         Publicly Available         Sensitive    NRC-002
Security Logs    Audit s OPGP03-ZS-0001 Vehicle, Material and Personnel Access Control
OFFICE         PSI:PSB1     C:PSB1         C:PBB          C:PSB1       1
OPGP03-ZS-0005 Control of Keys, Locks, Cores, Keycards and Passwords
NAME           AMeyen       DHolman        NTaylor         DHolman
OPGO-ZA-0001 Plant Access Authorization Program 34 1005 Security Incidents
SIGNATURE       /RA/         /RA/           /RA/           /RA/
1006 Security Performance Indicator Calculation
DATE           12/12/18     12/14/18       12/15/18       12/17/18
2101 Access Control
2402 Alarm Station Operator
3701 Security Equipment Operability Test 37 3702 Explosive Detector Operability Test 4 3001 Security Force Communications
Misc. Designated Vehicle List 5
-30-18 N/A SEL Security Event Logs
Dates, 10-03-17 to 5-31-18 N/A Logs Security Daily Logs(CAS)
Dates, 6/1/18
- 6/20/18 N/A Self-Assessment
Access Control Self
-Assessment
5-10-18 N/A Audit 17-02 Physical Security Quality Audit Report N/A Condition Reports
17-21674 17-21675 17-21680 17-21728 17-21742 17-21678 17-21714 17-21717 17-21720 17-21740 17-21741 17-15288 17-02145 17-17882 17-22663 17-21346 18-542 18-818 18-233 18-1620       
: [[contact::G. Powell 3  SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION]], UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403
- DATED  JULY 16, 2018
DISTRIBUTION
: KKennedy, RA
SMorris, DRA
AVegel, DRP
MShaffer, DRS
RLantz, DRP
JClark, DRS
DCylkowski, RC
NTaylor, DRP
DProulx, DRP
JMelfi, DRP
ECombs, DRP
FSanchez, DRP
JChoate, DRP
LReyna, DRP JBowen, RIV/OEDO
VDricks, ORA
JWeil, OCA
LRenger, NRR
AMoreno, RIV/CAO
BMaier, RSLO
GGeorge, IPAT
EUribe, IPAT
R4Enforcement
ADAMS ACCESSION
NUMBER:ML18197A371
Entire Report:
ADAMS:   Non-Publicly Available
Non-Sensitive Keyword:   SUNSI Review
By: ADM  Yes     No Publicly Available
Sensitive ______  OFFICE PSI:PSB1 PSI:PSB1 C:PSB1 C:RPB C:PSB1 NAME AMeyen RLanfear JGroom NTaylor JGroom  SIGNATURE /RA/ /RA/ /RA/ /RA DProulx Acting For/
/RA/  DATE 6/26/18 6/26/18 7/05/18 07/16/18 07/16/18  OFFICIAL RECORD COPY
}}
}}

Latest revision as of 11:22, 15 November 2019

Errata - South Texas Project Electric Generating Station, Units 1 and 2 - NRC Security Inspection Report 05000498/2018403; 05000499/2018403
ML18351A428
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 12/17/2018
From: David Holman
Plant Support Branch-1
To: Gerry Powell
South Texas
References
IR 2018403
Download: ML18351A428 (10)


Text

ber 17, 2018

SUBJECT:

ERRATA - SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403

Dear Mr. Powell:

The NRC has confirmed an error in the NRC Inspection Report No. 05000498/2018403, 05000499/2018403, July 16, 2018 (Agencywide Document Access Management System (ADAMS) Accession No. ML18197A371). Specifically, the report omitted the scope and results of the performance indicator verification sample that was completed according to Inspection Procedure 71151 Performance Indicator Verification. The NRC has reissued the report in its entirety to correct this error.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of ADAMS. ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

However, the enclosed, revised report contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

David A. Holman, Chief Plant Support Branch 1 ber 17, 2018

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION, UNITS 1 AND 2, NRC SECURITY INSPECTION REPORT 05000498/2018403; 05000499/2018403

Dear Mr. Powell:

On, June 21, 2018, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your South Texas Project Electric Generating Station, Units 1 and 2, facility. The NRC inspector discussed the results of this inspection with Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of your staff. The results of this inspection are documented in the enclosed report.

The NRC inspector did not identify any finding or violation of more than minor significance.

In accordance with Title 10 of the Code of Federal Regulations (CFR) 2.390, Public Inspections, Exemptions, Requests for Withholding, of the NRC's "Agency Rules of Practice and Procedure," a copy of this letter will be available electronically for public inspection in the NRCs Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).

If you choose to provide a response to this report that contains Security-Related Information, please mark your entire response Security-Related Information - Withhold from Public Disclosure Under 10 CFR 2.390 (d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely,

/RA/

David A. Holman, Chief Plant Support Branch 1 Division Reactor Safety Docket Nos.: 50-498, 50-499 License Nos.: NPF-76 and NPF-80 Enclosure:

NRC Inspection Report 05000498/2018403, 05000499/2018403

U.S. NUCLEAR REGULATORY COMMISSION Region IV Docket Nos.: 05000498, 05000499 License Nos.: NPF-76, NPF-80 Report Nos.: 05000445/2018403; 05000446/2018403 Enterprise Identifier: I-2018-403-0008 Licensee: STP Nuclear Operating Company Facility: South Texas Project Electric Generating Station, Units 1 and 2 Location: Wadsworth, Texas 77483 Dates: June 18, 2018 to June 21, 2018 Inspector: A. Meyen, Physical Security Inspector Approved By: David A. Holman Chief, Plant Support Branch 1 Division of Reactor Safety Enclosure

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) continued monitoring the licensees performance by conducting a Baseline Security Inspection at South Texas Project Electric Generating Station, Units 1 and 2, in accordance with the Reactor Oversight Process. The Reactor Oversight Process is the NRCs program for overseeing the safe operation of commercial nuclear power reactors. Refer to https://www.nrc.gov/reactors/operating/oversight.html for more information. NRC and self-revealed findings, violations, and additional items are summarized in the table below.

List of Findings and Violations No Findings Additional Tracking Items No Additional Items

INSPECTION SCOPES

Inspections were conducted using the appropriate portions of the inspection procedures (IPs) in effect at the beginning of the inspection unless otherwise noted. Samples were declared complete when the IP requirements most appropriate to the inspection activity were met consistent with Inspection Manual Chapter (IMC) 2201, Security Inspection Program for Commercial Nuclear Power Reactors. The inspector reviewed selected procedures and records, observed activities, and interviewed personnel to assess licensee performance and compliance with Commission rules and regulations, license conditions, site procedures, and standards.

SAFEGUARDS

71130.02 - Access Control

The inspector evaluated the security program. The following elements were evaluated:

Tier I: all 19 requirements Tier II: all 7 requirements Tier III: all 1 requirement

71151 - Performance Indicator Verification

The inspector verified licensee performance indicators submittals listed below for the period from October 2017 through June 2018 Protected Area Security Equipment Performance Index.

(1) Protected Area Security Equipment Performance Index

INSPECTION RESULTS

No findings were identified.

EXIT MEETINGS AND DEBRIEFS

On June 21, 2018, the inspector presented the Baseline Security Inspection results to Mr. R. Aguilera, Manager, Plant Protection and Emergency Planning, and other members of the licensee staff. The inspector verified no proprietary information was retained or documented in this report.

DOCUMENTS REVIEWED

71130.02 - Access Control

Procedure Type Designation Description or Title Revision

71130.02 Procedure OPGP03-ZS-0001 Vehicle, Material and Personnel 50

Access Control

OPGP03-ZS-0005 Control of Keys, Locks, Cores, 22

Keycards and Passwords

OPGO-ZA-0001 Plant Access Authorization 34

Program

Security 1005 Security Incidents 8

Instructions 1006 Security Performance Indicator 10

Calculation

2101 Access Control 29

2402 Alarm Station Operator 26

3701 Security Equipment Operability 37

Test

3702 Explosive Detector Operability 4

Test

3001 Security Force Communications 10

Misc. Designated Vehicle List 5-30-18 N/A

Security SEL Security Event Logs Dates, N/A

Logs 10-03-17 to 5-31-18

Logs Security Daily Logs(CAS) N/A

Dates, 6/1/18 - 6/20/18

Self-Assessment Access Control Self-Assessment N/A

Audits 5-10-18

Audit 17-02 Physical Security Quality Audit N/A

Report

Condition Reports

17-21674 17-21675 17-21680 17-21728 17-21742

17-21678 17-21714 17-21717 17-21720 17-21740

17-21741 17-15288 17-02145 17-17882 17-22663

17-21346 18-542 18-818 18-233 18-1620

ML18351A428

Cover Letter ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: ADM Yes No Publicly Available Sensitive

OFFICE PSI:PSB1 C:PSB1 C:RPB C:PSB1

NAME AMeyen DHolman NTaylor DHolman

SIGNATURE /RA/ /RA/ /RA/ /RA/

DATE 12/13/18 12/13/18 12/13/18 12/17/18

ML18351A428

Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review By: ADM Yes No Publicly Available Sensitive NRC-002

OFFICE PSI:PSB1 C:PSB1 C:PBB C:PSB1 1

NAME AMeyen DHolman NTaylor DHolman

SIGNATURE /RA/ /RA/ /RA/ /RA/

DATE 12/12/18 12/14/18 12/15/18 12/17/18